createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710420621371
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1934000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate14-03-2024 18:37:28
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1834000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710420621402
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9744
titleImprovements to road SH-34 connecting Aurad Sadashivagad Road from Ch 520.89 KM to 539.49 KM (in selected reaches) in Dharwad Taluk of Dharwad District.
descriptionImprovements to road SH-34 connecting Aurad Sadashivagad Road from Ch 520.89 KM to 539.49 KM (in selected reaches) in Dharwad Taluk of Dharwad District.
categoryWORKS
categoryTextWorks
ecv193404812.83
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PHASE-5/ST-1/DHAWAD/PKG-651/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17104206210000NoneNoneRoadsPKG 651- RECONSTRUCTION40704602.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3073926104949NoneVol - 3, Vide P.No 149, I. Code 16.29Providing and fixing of typical SHDP type informatory sign board with logo as per MORTH specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 class A Type-1) i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3073927104949NoneVol - 3, Vide P.No 9, I. Code 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm463.74463.7424.0FalseNoneNoneFalseNoneFalse11129.760
3073928104949NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Earthen Drain - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum112.1112.1607.5FalseNoneNoneFalseNoneFalse68100.750
3073929104949NoneVol - 1, Vide P.No 8, I. Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum112.1112.12700.0FalseNoneNoneFalseNoneFalse302670.00
3073930104949NoneVol - 3, Vide P.No 17, I. Code 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.087.0810000.0FalseNoneNoneFalseNoneFalse70800.00
3073931104949NoneVol - 3, Vide P.No 17, I. Code 3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum581.74581.743556.0FalseNoneNoneFalseNoneFalse2068667.440
3073932104949NoneVol - 3, Vide P.No 23, I. Code 4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2783.622783.624446.0FalseNoneNoneFalseNoneFalse12375974.520
3073933104949NoneVol - 3, Vide P.No 26, I. Code 4.17Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3019.623019.623625.0FalseNoneNoneFalseNoneFalse10946122.50
3073934104949NoneVolume - 3 Vide Page No. 31 Item Code. 5.2 B(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.INCLUDING 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm48.3848.3814000.0FalseNoneNoneFalseNoneFalse677320.00
3073935104949NoneVol - 3, Vide P.No 31, I. Code 5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm16.5216.5214000.0FalseNoneNoneFalseNoneFalse231280.00
3073936104949NoneVol - 3, Vide P.No 35, I. Code 5.12 (C ) Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.Rates are INCLUSIVE OF 18%GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11149.8211149.82700.0FalseNoneNoneFalseNoneFalse7804874.00
3073937104949NoneVol - 3, Vide P.No 38, I. Code 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12925.7212925.72420.0FalseNoneNoneFalseNoneFalse5428802.40
3073938104949NoneVol - 3, Vide P.No 63, I. Code 8.2aCast in Situ Cement Concrete M 20 Kerb with Channel Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 gradee foundation 150 mm thick, kerb channel 300 mm wide, 50 mm thick in PCC M20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 PCC M15 grade for kerb base- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm285.56285.562000.0FalseNoneNoneFalseNoneFalse571120.00
3073939104949NoneVol - 3, Vide P.No 66, I. Code 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces- Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm123.9123.9900.0FalseNoneNoneFalseNoneFalse111510.00
17104206210000NoneNoneRoadsPKG 651 - STRENGTHENING77630354.05
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3073940104950NoneUNI S.R. 2023-24, VOL3 Page No. 9 Item 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm463.74463.74176.16FalseNoneNoneFalseNoneFalse81692.43840
3073941104950NoneS.R. 2023-24, VolPage No.8 Item 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces,disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth)Earthen Drain Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum112.1112.14459.04FalseNoneNoneFalseNoneFalse499858.3840
3073942104950NoneS.R. 2023-24, Vol- 3 Page No.17 Item 3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum581.74581.741768.0FalseNoneNoneFalseNoneFalse1028516.320
3073943104950NoneS.R. 2023-24, Vol- 3 Page No. 26 Item4.17Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3019.623019.621500.0FalseNoneNoneFalseNoneFalse4529430.00
3073944104950NoneS.R. 2023-24, Vol - 3 Page No. 31 Item5.1A(i)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm48.3848.3810000.0FalseNoneNoneFalseNoneFalse483800.00
3073945104950NoneS.R. 2023-24, Vol - 3 Page No. 31 Item5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm16.5216.5210000.0FalseNoneNoneFalseNoneFalse165200.00
3073946104950NoneS.R. 2023-24, Vol - 3 Page No. 31 Item5.3Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm14.1614.1663400.0FalseNoneNoneFalseNoneFalse897744.00
3073947104950NoneS.R. 2023-24, Vol - 3 Page No. 35 Item5.12(c)Dense Graded Bituminous Macadam Grading - II for traffic smaller than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11149.8211149.823714.04FalseNoneNoneFalseNoneFalse41410877.47280
3073948104950None2023-24, Vol - 3 Page No. 38 Item5.16(c)Bituminous Concrete Grading II for traffic smaller than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12925.7212925.722202.0FalseNoneNoneFalseNoneFalse28462435.440
3073949104950NoneVolume - 3 Vide Page No. 17 Item Code. 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Rates including 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.087.0810000.0FalseNoneNoneFalseNoneFalse70800.00
17104206210000NoneNoneRoadsPKG 651 - ROAD FURNITURE4595499.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3073950104951NoneVol - 3, Vide P.No 67, I. Code 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm625.4625.43269.0FalseNoneNoneFalseNoneFalse2044432.60
3073951104951NoneVol - 3, Vide P.No 71, I. Code 8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm221.84221.84500.0FalseNoneNoneFalseNoneFalse110920.00
3073952104951NoneVol - 3, Vide P.No 65, I. Code 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm10631.810631.827.54FalseNoneNoneFalseNoneFalse292799.7720
3073953104951NoneVol - 3, Vide P.No 64, I. Code 8.5 ivRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4219.684219.6856.0FalseNoneNoneFalseNoneFalse236302.080
3073954104951NoneVol - 3, Vide P.No 64, I. Code 8.5 viiiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos5070.465070.4642.0FalseNoneNoneFalseNoneFalse212959.320
3073955104951NoneVol - 3, Vide P.No 74, I. Code 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos430.7430.71557.0FalseNoneNoneFalseNoneFalse670599.90
3073956104951NoneVol - 3, Vide P.No 80, I. Code 8.60.2 iiiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo61205.4261205.4212.0FalseNoneNoneFalseNoneFalse734465.040
3073957104951NoneVol - 3, Vide P.No 67, I. Code 8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5995.585995.582.0FalseNoneNoneFalseNoneFalse11991.160
3073958104951NoneVol - 3, Vide P.No 67, I. Code 8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo3453.863453.869.0FalseNoneNoneFalseNoneFalse31084.740
3073959104951NoneVol - 3, Vide P.No 67, I. Code 8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo993.56993.5636.0FalseNoneNoneFalseNoneFalse35768.160
3073960104951NoneVol - 1, Vide P.No 8, I. Code 1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.36153.0FalseNoneNoneFalseNoneFalse18415.080
3073961104951NoneVol - 3, Vide P.No 71, I. Code 8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2610.162610.1675.0FalseNoneNoneFalseNoneFalse195762.00
17104206210000NoneNoneRoadsPKG 651 - RCC DRAIN (1M X 1M)16755276.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3073962104952NoneS.R.2023-24,Vol-1, Vide P.No 8, I. Code 1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.364420.0FalseNoneNoneFalseNoneFalse531991.20
3073963104952NoneS.R.2023-24,Vol -1,Vide P.No 15, I. Code 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.02300.0FalseNoneNoneFalseNoneFalse2120106.00
3073964104952NoneS.R.2023-24, Vol-1,Vide P.No 18, I. Code 2.11 hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.9837.55FalseNoneNoneFalseNoneFalse3500898.3990
3073965104952NoneS.R.2023-24, Vol -1, Vide P.No 15, I. Code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7461.147461.14260.0FalseNoneNoneFalseNoneFalse1939896.40
3073966104952NoneS.R.2023-24,Vol -1, Vide P.No 15, I. Code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates - Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10072.5410072.54860.0FalseNoneNoneFalseNoneFalse8662384.40
17104206210000NoneNoneRoadsUTILITY SHIFTING - ELECTRICAL WORK4249991.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3073967104953NoneVOL 6 ITEM NO 4.4.7 PAGE NO 12Fabricating, supplying and erection of . ms long hot dip Galvanized Conical hot dip Pole with BSEN 10025 grade S355JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/s for .m Pole in single section and single joint welded as per IS 9595/IS10178AWS having dimensions bottom . mm , top . mmwith 3 mm thick, suitable base plate and 4Nos of.long J bolts along with template and the Pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc.,(excluding foundation) as per drawing appended.9 m - Top 75 mm and Bottom 165 mm dia, (PWD Electrical SR 2023-24, Pg No: 12/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach24190.024190.035.0FalseNoneNoneFalseNoneFalse846650.00
3073968104953NoneVOL 6 ITEM NO 4.6.5 PG NO 13Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., completeDouble Arm Bracket with 1500 mm Standard 40/50 mm dia (PWD Electrical SR 2023-24, Pg No: 13/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3894.03894.035.0FalseNoneNoneFalseNoneFalse136290.00
3073969104953NoneVOL 6 ITEM NO 11.8.5 PG NO 45Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach11870.811870.870.0FalseNoneNoneFalseNoneFalse830956.00
3073970104953NoneVOL 6 ITEM NO 13.50 PG NO 56Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires (PWD Electrical SR 2023-24, Pg No: 56/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach191.16191.1670.0FalseNoneNoneFalseNoneFalse13381.20
3073971104953NoneVOL 6 ITEM NO 5.13.1 PG NO 15Supply and fixing of 3pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947.25 A (PWD Electrical SR 2023-24, Pg No: 15/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1522.21522.22.0FalseNoneNoneFalseNoneFalse3044.40
3073972104953NoneVOL 6 ITEM NO 5.18.8 PG NO 17Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.40 A TPN (PWD Electrical SR 2023-24, Pg No: 17/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3591.923591.922.0FalseNoneNoneFalseNoneFalse7183.840
3073973104953NoneVOL 6 ITEM NO 5.22 PG NO 18Supplying, fixing and wiring 0 to 600V 96x96mm AC Voltmeter on existing panel/wood board. (PWD Electrical SR 2023-24, Pg No: 18/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach533.36533.362.0FalseNoneNoneFalseNoneFalse1066.720
3073974104953NoneVOL 6 ITEM NO 5.24 PG NO 18Supplying, fixing and wiring 0 to 30A Direct Reading AC analog type Ammeter (PWD Electrical SR 2023-24, Pg No: 18/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach548.7548.72.0FalseNoneNoneFalseNoneFalse1097.40
3073975104953NoneVOL 6 ITEM NO 5.27 PG NO 19Supplying, fixing and wiring rotary selector switch suitable for Ammeter (PWD Electrical SR 2023-24, Pg No: 19/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach236.0236.02.0FalseNoneNoneFalseNoneFalse472.00
3073976104953NoneVOL 6 ITEM NO 5.28 PG NO 19Supplying, fixing and wiring rotary selector switch suitable for Voltmeter (PWD Electrical SR 2023-24, Pg No: 19/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach188.8188.82.0FalseNoneNoneFalseNoneFalse377.60
3073977104953NoneVOL 6 ITEM NO 5.38 PG NO 19Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. (PWD Electrical SR 2023-24, Pg No: 19/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach607.7607.76.0FalseNoneNoneFalseNoneFalse3646.20
3073978104953NoneVOL 6 ITEM NO 5.41.2 PG NO 20Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and paintedwith 2 coats of red oxide and then two coats of approved paint. 50 x 50 x 6 mm (PWD Electrical SR 2023-24, Pg No: 20/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm466.1466.110.0FalseNoneNoneFalseNoneFalse4661.00
3073979104953NoneVOL 6 ITEM NO 5.42.1 PG NO 20Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paintand finally finished with approved colour etc., complete 14 SWG (PWD Electrical SR 2023-24, Pg No: 20/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSq CM0.590.5940000.0FalseNoneNoneFalseNoneFalse23600.00
3073980104953NoneVOL 6 ITEM NO 5.47 PG NO 21Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc.,.) 3-120sec setting (PWD Electrical SR 2023-24, Pg No: 21/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2731.72731.72.0FalseNoneNoneFalseNoneFalse5463.40
3073981104953NoneVOL 6 ITEM NO 32.05 PG NO 541.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm167373.56167373.561.1FalseNoneNoneFalseNoneFalse184110.9160
3073982104953NoneVOL 6 ITEM NO 32.08 PG NO 131.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip Rates are inclusive of GST 18% thickness and resistivity as per IS-3975 25 Sqmm, 4 Core, (13 GI Strips - 4 x 0.8 mm) (PWD Electrical SR 2023-24, Pg No: 13/81 ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm212215.92212215.920.06FalseNoneNoneFalseNoneFalse12732.95520
3073983104953NoneVOL 6 ITEM NO 12.56 PG NO 54Supplying, fixing, wiring, earth electrode for grounding conduits, I.C.cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia (PWD Electrical SR 2023-24, Pg No: 54/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo4141.84141.81.0FalseNoneNoneFalseNoneFalse4141.80
3073984104953NoneVOL 6 ITEM NO 12.58.2 PG NO 54GI/Copper strips for grounding connections, using necessary fixing materials as required. 25 x 3 mm GI strip (PWD Electrical SR 2023-24, Pg No: 54/105 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm96.7696.7610.0FalseNoneNoneFalseNoneFalse967.60
3073985104953NoneVOL 6 ITEM NO 66.04 PG NO 30HDPE/PLB Pipe 50/42 mm (PWD Electrical SR 2023-24, Pg No: 30/81 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm100316.52100316.520.05FalseNoneNoneFalseNoneFalse5015.8260
3073986104953NoneVOL 6 ITEM NO 66.05 PG NO 30HDPE/PLB Pipe 40/33 mm (PWD Electrical SR 2023-24, Pg No: 30/81 ) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm73556.4873556.480.95FalseNoneNoneFalseNoneFalse69878.6560
3073987104953NoneVOL 1 ITEM NO 1.4.1 PG NO 5Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (PWD Common SR 2023-24 Vol-I, Pg No:5) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum285.56285.56470.0FalseNoneNoneFalseNoneFalse134213.20
3073988104953NoneVOL 1 ITEM NO 2.1.2 PG NO 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD Common SR 2023-24 Vol-I, Pg No:15) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum6683.526683.522.0FalseNoneNoneFalseNoneFalse13367.040
3073989104953NoneVOL 1 ITEM NO 2.3.1 PG NO 16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD Common SR 2023-24 Vol-I, Pg No:16) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7461.147461.1414.0FalseNoneNoneFalseNoneFalse104455.960
3073990104953NoneVOL 1 ITEM NO 2.11.a PG NO 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings (PWD Common SR 2023-24 Vol-I, Pg No:18) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne105559.26105559.260.55FalseNoneNoneFalseNoneFalse58057.5930
3073991104953NoneVOL 6 ITEM NO Hescom Meter deposts Hescom Meter deposts Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKilo Watt5900.05900.010.0FalseNoneNoneFalseNoneFalse59000.00
3073992104953NoneVOL 1 ITEM NO 2.5.2 PG NO 6Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990 3C x 1.5 mm2 (PWD Common SR 2023-24 Vol-I, Pg No:6) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm84.9684.96650.0FalseNoneNoneFalseNoneFalse55224.00
3073993104953NoneVOL 6 ITEM NO 01 PG NO 01RCC Pole - 9 Mtr Long Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo10405.2410405.245.0FalseNoneNoneFalseNoneFalse52026.20
3073994104953NoneVOL 6 ITEM NO 02 PG NO 01PSCC Pole - 11 Mtr Long, 365 Kg WL for Intermediate Poles only as per REC Standards Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos11494.3811494.3835.0FalseNoneNoneFalseNoneFalse402303.30
3073995104953NoneVOL 6 ITEM NO 3 PG NO 23RCC Pole - 8 Mtr Long, 115 Kg WL for stud Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos7733.727733.725.0FalseNoneNoneFalseNoneFalse38668.60
3073996104953NoneVOL 6 ITEM NO 04 PG NO 232 Pin cross for Stud Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo502.68502.685.0FalseNoneNoneFalseNoneFalse2513.40
3073997104953NoneVOL 6 ITEM NO 05 PG NO 2511 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for RCC Poles - GI Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1083.241083.2440.0FalseNoneNoneFalseNoneFalse43329.60
3073998104953NoneVOL 6 ITEM NO 06 PG NO 26GOS 200 A single break Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo12453.7212453.722.0FalseNoneNoneFalseNoneFalse24907.440
3073999104953NoneVOL 6 ITEM NO 07 PG NO 26H-Frame Set for 11kV, 200Amps Single BreakGOS Mounting - MS Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5492.95492.92.0FalseNoneNoneFalseNoneFalse10985.80
3074000104953NoneVOL 6 ITEM NO 08 PG NO 26Double pole structure complete including 5KG ,8SWG Wire for structure Grounding for 9Mtr RCC POLES Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet31057.631057.62.0FalseNoneNoneFalseNoneFalse62115.20
3074001104953NoneVOL 6 ITEM NO 09 PG NO 2911kV, 5KN Composite/Polymeric Pin Insulator(20mm dia FP Rod) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo241.9241.988.0FalseNoneNoneFalseNoneFalse21287.20
3074002104953NoneVOL 6 ITEM NO 10 PG NO 29Silcon Rubber Composite Insulator/11kV 45kN Polymeric Insulator Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo219.48219.4888.0FalseNoneNoneFalseNoneFalse19314.240
3074003104953NoneVOL 6 ITEM NO 11 PG NO 29Guy set with No.15 strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07 Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet2080.342080.348.0FalseNoneNoneFalseNoneFalse16642.720
3074004104953NoneVOL 6 ITEM NO 12 PG NO 29Rabbit ACSR Conductor For HT Line Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm59702.159702.14.0FalseNoneNoneFalseNoneFalse238808.40
3074005104953NoneVOL 6 ITEM NO 13 PG NO 29Spiral Earth Electrode Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo391.76391.7624.0FalseNoneNoneFalseNoneFalse9402.240
3074006104953NoneVOL 6 ITEM NO 14 PG NO 29Concreting Materials for Guy sets without cement. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo295.0295.04.0FalseNoneNoneFalseNoneFalse1180.00
3074007104953NoneVOL 6 ITEM NO 15 PG NO 29Caution/Danger Board as per Drawing NO: BESCOM/GM/CP/40 DT: 24.10.07 Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo271.4271.43.0FalseNoneNoneFalseNoneFalse814.20
3074008104953NoneVOL 6 ITEM NO 16 PG NO 32Anti-Climbiang device (12mtrs/1Kg GI Barbed wire) Lumpsum Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo154.58154.583.0FalseNoneNoneFalseNoneFalse463.740
3074009104953NoneVOL 6 ITEM NO 17 PG NO 32LT. 2 Pin Cross arms, with pole clamps, bolts, nuts and washers for RCC poles Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet502.68502.6835.0FalseNoneNoneFalseNoneFalse17593.80
3074010104953NoneVOL 6 ITEM NO 18 PG NO 32LT. 4 Pin Cross arms, with pole clamps, bolts, nuts and washers for RCC poles Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet687.94687.9435.0FalseNoneNoneFalseNoneFalse24077.90
3074011104953NoneVOL 6 ITEM NO 19 PG NO 32Reasing & Refixing of Rabbit ACSR Conductor Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm5145.985145.986.0FalseNoneNoneFalseNoneFalse30875.880
3074012104953NoneVOL 6 ITEM NO 20 PG NO 32No. 8 Strain insulators Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo31.8631.868.0FalseNoneNoneFalseNoneFalse254.880
3074013104953NoneVOL 6 ITEM NO 21 PG NO 32Guy Sets Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet2042.582042.588.0FalseNoneNoneFalseNoneFalse16340.640
3074014104953NoneVOL 6 ITEM NO 22 PG NO 32Weasel ACSR Conductor Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm36673.2236673.223.0FalseNoneNoneFalseNoneFalse110019.660
3074015104953NoneVOL 6 ITEM NO 23 PG NO 32Releasing of 9 mtrs RCC pole Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2055.562055.5635.0FalseNoneNoneFalseNoneFalse71944.60
3074016104953NoneVOL 6 ITEM NO 24 PG NO 37Releasing of 9 mtrs PSC pole Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2055.562055.564.0FalseNoneNoneFalseNoneFalse8222.240
3074017104953NoneVOL 6 ITEM NO 25 PG NO 37Releasing of 8 mtrs RCC pole Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1681.51681.52.0FalseNoneNoneFalseNoneFalse3363.00
3074018104953NoneVOL 6 ITEM NO 26 PG NO 37Releasing of 4 Pin Cross arms Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet188.8188.840.0FalseNoneNoneFalseNoneFalse7552.00
3074019104953NoneVOL 6 ITEM NO 27 PG NO 37Releasing of 2 Pin Cross arms Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet188.8188.840.0FalseNoneNoneFalseNoneFalse7552.00
3074020104953NoneVOL 6 ITEM NO 01 PG NO 23Transformer Structure complete with cross arms braces, clamps, bolt&nuts and washers for 25/63 KVA using 2nos of 9Mtrs RCC poles Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet45473.6645473.664.0FalseNoneNoneFalseNoneFalse181894.640
3074021104953NoneVOL 6 ITEM NO 02 PG NO 2311kV, 5KN Composite/Polymeric Pin Insulator (20mm dia FP Rod) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet241.9241.924.0FalseNoneNoneFalseNoneFalse5805.60
3074022104953NoneVOL 6 ITEM NO 03 PG NO 23Silcon Rubber Composite Insulator/11kV 45kN Polymeric Insulator Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet219.48219.4824.0FalseNoneNoneFalseNoneFalse5267.520
3074023104953NoneVOL 6 ITEM NO 04 PG NO 27Guy set with No.15 strain insulator & Concreting materials as per Drwg No. BESCOM/GM/CP/7/Dt; 24.10.07 Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2080.342080.3412.0FalseNoneNoneFalseNoneFalse24964.080
3074024104953NoneVOL 6 ITEM NO 05 PG NO 27R&R Distribution Transformer,3-Phase, 11kV/433 V with oil 25kVA BEE -5Star rated Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1407.741407.743.0FalseNoneNoneFalseNoneFalse4223.220
3074025104953NoneVOL 6 ITEM NO 06 PG NO 27Earthing materials pipe type for grounding as per drawing NO: BESCOM/GM/CP/40 DT: 24.10.07 (Single Electrode with accessories) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet3160.043160.046.0FalseNoneNoneFalseNoneFalse18960.240
3074026104953NoneVOL 6 ITEM NO 07 PG NO 27Caution/Danger Board as per Drawing NO: BESCOM/GM/CP/40 DT: 24.10.07 Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo271.4271.42.0FalseNoneNoneFalseNoneFalse542.80
3074027104953NoneVOL 6 ITEM NO 08 PG NO 27Anti-Climbing device (12mtrs/1Kg GI Barbed wire) Lumpsum Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg154.58154.584.0FalseNoneNoneFalseNoneFalse618.320
3074028104953NoneVOL 6 ITEM NO 09 PG NO 33Concreting for Guy sets without cement. Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo295.0295.06.0FalseNoneNoneFalseNoneFalse1770.00
3074029104953NoneVOL 6 ITEM NO 10 PG NO 338 SWG GI Wire Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg88.5988.59100.0FalseNoneNoneFalseNoneFalse8859.00
3074030104953NoneVOL 6 ITEM NO 11 PG NO 357/10 SWG Guy Wire Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg91.1391.13200.0FalseNoneNoneFalseNoneFalse18226.00
3074031104953NoneVOL 6 ITEM NO 12 PG NO 3511KV lightning Arrester, Metal oxide, 9KV, 5KA Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet of 3 Nos5747.785747.782.0FalseNoneNoneFalseNoneFalse11495.560
3074032104953NoneVOL 6 ITEM NO 13 PG NO 35a)LT Protection kit for 25 KVA b) LT wiring kit for LT Protection kit Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2807.222807.222.0FalseNoneNoneFalseNoneFalse5614.440
3074033104953NoneVOL 6 ITEM NO 14 PG NO 35i. Al Lead Wire - 50 Sqmm Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1195.561195.5660.0FalseNoneNoneFalseNoneFalse71733.60
3074034104953NoneVOL 6 ITEM NO 15 PG NO 46ii. Copper Lugs - 50 Sqmm Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo68.4468.4420.0FalseNoneNoneFalseNoneFalse1368.80
3074035104953NoneVOL 6 ITEM NO 16 PG NO 46iii. PG Clamps - Rabbit to 50 Sqmm Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo120.36120.364.0FalseNoneNoneFalseNoneFalse481.440
3074036104953NoneVOL 6 ITEM NO 17 PG NO 46iv. Spacers for DTC Wiring Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo49.5649.564.0FalseNoneNoneFalseNoneFalse198.240
3074037104953NoneVOL 6 ITEM NO 18 PG NO 46v) Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo311.52311.524.0FalseNoneNoneFalseNoneFalse1246.080
3074038104953NoneVOL 6 ITEM NO 19 PG NO 50c) LT Metering box with CTs and necessary wiring for housing ETV Meter(Please see CDS - 39) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8492.468492.462.0FalseNoneNoneFalseNoneFalse16984.920
3074039104953NoneVOL 6 ITEM NO 20 PG NO 50e) LT Electronic Tri-Vector Meter 5A, with DLMS Class-0.5/1.0 accuracy Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo4573.684573.682.0FalseNoneNoneFalseNoneFalse9147.360
3074040104953NoneVOL 6 ITEM NO 21 PG NO 52HG Fuse, 11KV Solid Core Type (3Nos.) Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet of 3 Nos1541.081541.082.0FalseNoneNoneFalseNoneFalse3082.160
3074041104953NoneVOL 6 ITEM NO 22 PG NO 52GOS 200 A single break Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo12453.7212453.722.0FalseNoneNoneFalseNoneFalse24907.440
3074042104953NoneVOL 6 ITEM NO 23 PG NO 55H-Frame Set for 11kV, 200Amps Single BreakGOS Mounting - MS Rates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo5492.95492.92.0FalseNoneNoneFalseNoneFalse10985.80
17104206210000NoneNoneRoadsPKG 651 - 1ST YEAR MAINTENANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074043104954NoneUNI S.R. 2023-24, VL- 3 Vide Page No. 9 Item 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST. Quantity to be executed 66.720 per 100 sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074044104954NoneUNI S.R. 2023-24, VL -3 Vide Pg No. 147 code 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. Quantity to be executed 5004 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074045104954NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91 code10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Rates are inclusive of 18 % GST. Quantity to be executed 750.60 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074046104954NoneUNI S.R. 2023-24, Vl -3 Vide Page No. 91 code10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of 18 % GST. Quantity to be executed 1668 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074047104954NoneUNI S.R. 2023-24, Vl -3 Vide Page No. 91 code10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)" Rates are inclusive of 18 % GST. Quantity to be executed 0.00 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104206210000NoneNoneRoadsPKG 651 - 2ND YEAR MAINTENANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074048104955NoneUNI S.R. 2023-24, Vl -3 Vide Page No. 9 cide i 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Rates are inclusive of 18 % GST. Quantity to be executed 100.08 per 100 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074049104955NoneUNI S.R. 2023-24, Vl- 3 Vide Pg No. 147 code16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Rates are inclusive of 18 % GST. Quantity to be executed 6672 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074050104955NoneUNI S.R. 2023-24, Vl - 3 Vide Pge No. 91 icode10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Rates are inclusive of 18 % GST. Quantity to be executed 750.6 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074051104955NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91 code10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)" Rates are inclusive of 18 % GST. Quantity to be executed 2502 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3074052104955NoneUNI S.R. 2023-24, Volume - 3 Vide Page No. 91 ItemMaintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of 18 % GST. Quantity to be executed 0.0 Sqm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104206210000NoneNoneRoadsPKG 651 - 3RD YEAR MAINTANENCE744895.58
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074053104956NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 9 code 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm519.38519.38100.08FalseNoneNoneFalseNoneFalse51979.55040
3074054104956NoneUNI S.R. 2023-24, Vl - 3 Vide Pge No. 147code16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr7.937.936672.0FalseNoneNoneFalseNoneFalse52908.960
3074055104956NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm51.5451.54750.6FalseNoneNoneFalseNoneFalse38685.9240
3074056104956NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91 code10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm128.19128.192502.0FalseNoneNoneFalseNoneFalse320731.380
3074057104956NoneUNI S.R. 2023-24, Vl - 3 Vide Pge No. 147code16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2622.052622.058.3FalseNoneNoneFalseNoneFalse21763.0150
3074058104956NoneUNI S.R. 2023-24, Vl - 3 Vide Pg No. 148code10.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm272.25272.2547.0FalseNoneNoneFalseNoneFalse12795.750
3074059104956NoneUNI S.R. 2023-24, Vl - 3 Vide Pge No. 91 code 10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)" (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm563.0563.0437.0FalseNoneNoneFalseNoneFalse246031.00
17104206210000NoneNoneRoadsPKG 651 - 4TH YEAR MAINTENANCE735685.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074060104957NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. code 9 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(rate inclusive 18% gst ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm537.93537.93100.08FalseNoneNoneFalseNoneFalse53836.03440
3074061104957NoneUNI S.R. 2023-24, Vl - 3 Vide Pge No. 147code16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rate are inclusive of gst %) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.218.216672.0FalseNoneNoneFalseNoneFalse54777.120
3074062104957NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003(rate inclusive of gst 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm53.3853.38750.6FalseNoneNoneFalseNoneFalse40067.0280
3074063104957NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91 code10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rate are inclusive of gst 18 %) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm132.77132.772502.0FalseNoneNoneFalseNoneFalse332190.540
3074064104957NoneUNI S.R. 2023-24, Vl- 3 Vide Page No. 91 code10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) (rates are inclusive of gst 18 %) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm583.1583.1437.0FalseNoneNoneFalseNoneFalse254814.70
17104206210000NoneNoneRoadsPKG 651 - 5TH YEAR MAINANENCE1024641.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074065104958NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 9 code 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(rate are inclusive 18 % gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm556.48556.48100.08FalseNoneNoneFalseNoneFalse55692.51840
3074066104958NoneUNI S.R. 2023-24, V- 3 Vide Page No. 147 code16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates are inclusive 18 % gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.498.496672.0FalseNoneNoneFalseNoneFalse56645.280
3074067104958NoneUNI S.R. 2023-24, Vl- 3 Vide Page No. 91code 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rate areinclusive 18 % gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm55.2255.22750.6FalseNoneNoneFalseNoneFalse41448.1320
3074068104958NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91 code10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 rate are inclusive 18 % gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm137.35137.352502.0FalseNoneNoneFalseNoneFalse343649.70
3074069104958NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 91code10.5Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)" (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm603.21603.21874.0FalseNoneNoneFalseNoneFalse527205.540
17104206210000NoneNoneRoadsPKG 651 - 6TH YEAR MAINTENANCE/RENEWAL46963866.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3074070104959NoneUNI S.R. 2023-24, VL- 3 Vide Page No. 147 CODE16.2Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2902.982902.988.3FalseNoneNoneFalseNoneFalse24094.7340
3074071104959NoneUNI S.R. 2023-24, Vl -3 Vide Pge No.148 code16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rate are inclusive18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm301.41301.4147.0FalseNoneNoneFalseNoneFalse14166.270
3074072104959NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 31code 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (rates are inclusive 18 % gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.5517.5587400.0FalseNoneNoneFalseNoneFalse1533870.00
3074073104959NoneUNI S.R. 2023-24, Vl- 3 Vide Page No. 38 code5.16cBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16027.8916027.892622.0FalseNoneNoneFalseNoneFalse42025127.580
3074074104959NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 67 code8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm775.49775.493269.0FalseNoneNoneFalseNoneFalse2535076.810
3074075104959NoneUNI S.R. 2023-24, Vl - 3 Vide Page No. 74 code8.43Supplying & fixing of Solar Raised Pavement Markers made of polycarbonate molded body with circular shape, solar powered, LED self illumination in active mode, 360 degree illumination and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face in passive mode. The marker shall support a load of 20000 kg tested in ccordance to ASTM D 4280. The marker should be resistant to dust and water ingress according to IP 65 standards and should withstand tempertures in the range of 0 C to 70 C. Color of lighting could be provided in red or yellow amber) as per requirement and typicl frequency of blinking is 1 Hz. There should be current losses of less than 20 microamperes at 2.4 V in sleepcharging mode to enhance the life of the marker and a full charge should provide for a minimum autonomy of 50 hours. The height, width and length of the marker shall not be ess than 10 mm x 100 mm x 100 mm. Also, the surface diameter of the marker shall not be less than 100 mm respectively. The weight of the marker shall not exceed 0.5 kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive and complete as directed by the Engineer (rate are inclusive 18 %gst) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos534.06534.061557.0FalseNoneNoneFalseNoneFalse831531.420
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17104206230000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17104206230000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17104206230000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17104208480000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17104208540000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionNone
17104208610000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17104208670000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17104208740000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidderNone
17104208790000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17104208850000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17104208910000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement PortalNone
17104208960000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I RegistrationNone
17104209010000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17104209070000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tenderNone
17104209140000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the workNone
17104209200000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17104209250000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17104209310000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approvalNone
17104209370000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejectedNone
17104209420000NoneNoneELIGIBILITYOriginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid documentNone
17104209480000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence Bidder must quote the rates including GSTNone
17104209570000NoneNoneELIGIBILITYGST Shall Not be paid separatelyNone
17104209640000NoneNoneELIGIBILITYPotholes & other Maintenance items shall be rectified irrespective of the quantity during the period of DLP & MaintenanceNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.967.03Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Earth Work for Embankment-Subgrade-Shoulders 4259.20 Cum 2. GSB or WMM 7656.80Cum 3.BM/SDBC/DBM/BC 4043.39 Cum5. Reinforced Cement Concrete (RCC) M20 higher grades 896.00 cum) (80% of peak rate of construction)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No2.Mechanical Paver Finisher:1 No3. Static Road Roller: 1 No.4. Vibratory Road Roller: 1 No.5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- As Per KW4 Document
NoneNoneNoneNoneMachineries could be on Lease/Hire:1.Wet Mix Plant / Pug mill : 1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No6.Excavator 0.90 Cum Bucket Capacity:2 No7.Tipper Trucks:6 Nos8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos 9. Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- As Per KW4 Document
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDrawingsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Drawings
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3868.10 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.. 580.22 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneDetails of Committed WorksFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneCopies of Tax RegistrationFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneEPF registrationFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
NoneNoneNoneNoneAffidavitOthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710421410000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Project Officer, PIU-SHDP, Annex Building, K.R. Circle
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone