createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710328538418
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2780.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose22-03-2024 16:00:00
tenderQueryClose18-03-2024 12:00:00
technicalBidOpen25-03-2024 16:30:00
publishedDate14-03-2024 17:52:18
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate18-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710328538457
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9589
titleConstruction of Eight Class Rooms, Head master & Staff rooms, Library, Dining hall, Toilet, and drinking water RO plant and providing other facilities to Government Higher Primary School at Krishnanagara in Sandur taluk, Ballari district under 2515 KKRDB (Macro Projects) for the year 2023-24
descriptionConstruction of Eight Class Rooms, Head master & Staff rooms, Library, Dining hall, Toilet, and drinking water RO plant and providing other facilities to Government Higher Primary School at Krishnanagara in Sandur taluk, Ballari district under 2515 KKRDB (Macro Projects) for the year 2023-24
categoryWORKS
categoryTextWorks
ecv11091482.29
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount13205000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SANDUR/KKRDB/2023-24/KRISHNANAGARA
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103285380000NoneNoneBuildingsDISMANTLING84267.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3041853102782NoneCSR 2023-24 Vol-2, Pg No 187, Sl.no- 19.3Demolishing R.C.C. work manually/ by mechanical means including stack ing of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2547.32547.313.2FalseNoneNoneFalseNoneFalse33624.360
3041854102782NoneCSR 2023-24 Vol-2, Pg No 188, Sl.no- 19.10.1Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1051.051051.055.94FalseNoneNoneFalseNoneFalse6243.2370
3041855102782NoneCSR 2023-24 Vol-2, Pg No 8, Sl.no- 19.7.3Demolishing brick work manually/ by mechanical means including stack ing of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1080.451080.4537.54FalseNoneNoneFalseNoneFalse40560.0930
3041856102782NoneCSR 2023-24 Vol-2, Pg No 188, Sl.no- 19.12.1Dismantling doors, windows and clerestory windows (steel or wood) shut ter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos240.0240.016.0FalseNoneNoneFalseNoneFalse3840.00
17103285380000NoneNoneBuildingsGROUND FLOOR6489654.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3041857102783NoneCSR 2023-24 Vol-1, Pg No 8, Sl.no- 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.7540.16FalseNoneNoneFalseNoneFalse4005.960
3041858102783NoneCSR 2023-2024 Vol-2 Sl No. 4.1 P.No-5Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm123.9123.9267.75FalseNoneNoneFalseNoneFalse33174.2250
3041859102783NoneCSR 2023-2024 Vol-1 Sl No 1.14.1 P.No-8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1460.38FalseNoneNoneFalseNoneFalse49306.6980
3041860102783NoneCSR 2023-24 Vol-1 Item Code-1.23Provding and filling in plinth with granite /trap broken metal 100mm and down size & with aprroved sand including hand packing watering including cost of all materials and Labour with all lead and lift complete as per Specfcation ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.150.63FalseNoneNoneFalseNoneFalse142579.1430
3041861102783NoneCSR 2023-24 Volume-1 Item Code-2.1.3 P.no 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4562.48FalseNoneNoneFalseNoneFalse392902.3560
3041862102783NoneCSR 2023-24 Volume-2 sl.no-5.2Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6948.96948.93.1FalseNoneNoneFalseNoneFalse21541.590
3041863102783NoneCSR 2023-24 Volume-2 sl.no-5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6708.456708.457.33FalseNoneNoneFalseNoneFalse49172.93850
3041864102783NoneCSR 2023-2024 Vol-1 Sl No. 1.9 P.No-7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.3297.1FalseNoneNoneFalseNoneFalse82980.030
3041865102783NoneCSR 2023-24 Volume-I Sl.no-1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7224.08FalseNoneNoneFalseNoneFalse111524.6160
3041866102783NoneCSR 2023-24 Volume-I Sl.no-2.2.3Footing:-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6633.156633.1558.75FalseNoneNoneFalseNoneFalse389697.56250
3041867102783Nonefor Formwork, Centering Scaffolding 8 for footingsAdditionalities for Formwork, Centering & Scaffolding 8% for footings CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum532.22532.2258.76FalseNoneNoneFalseNoneFalse31273.24720
3041868102783NoneCSR 2023-24 Vol-I Sl.no 2.2.3Columns-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.87.01FalseNoneNoneFalseNoneFalse46636.1280
3041869102783NoneFormwork, Centering Scaffolding 70 per for ColumnAdditionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4656.964656.967.0FalseNoneNoneFalseNoneFalse32598.720
3041870102783NoneCSR 2023-24 Volume-I Sl.no-2.3.2Plinth Beam-Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregate ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6804.06804.035.03FalseNoneNoneFalseNoneFalse238344.120
3041871102783NoneFormwork, Centering Scaffolding 50 for Beam Additionalities for Formwork, Centering & Scaffolding 50% for Beam ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3402.03402.04.65FalseNoneNoneFalseNoneFalse15819.30
3041872102783NoneCentering & Scaffolding 10 for Retaining Wall Additionalities for Formwork, Centering & Scaffolding 10% for Retaining Wall CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum680.4680.430.38FalseNoneNoneFalseNoneFalse20670.5520
3041873102783NoneCSR 2023-24 Volume-I Sl.no-2.5.2Columns Above Plinth-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1510.29FalseNoneNoneFalseNoneFalse73935.19350
3041874102783NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5029.615029.6110.29FalseNoneNoneFalseNoneFalse51754.68690
3041875102783NoneCSR 2023-24 Vol-1 Sl.no-2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1559.35FalseNoneNoneFalseNoneFalse426438.65250
3041876102783NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4311.094311.0916.05FalseNoneNoneFalseNoneFalse69192.99450
3041877102783NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3592.573592.5743.31FalseNoneNoneFalseNoneFalse155594.20670
3041878102783NoneCSR 2023-24 Vol-1 Sl.no-2.5.1Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.51.64FalseNoneNoneFalseNoneFalse11416.860
3041879102783NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3132.683132.681.64FalseNoneNoneFalseNoneFalse5137.59520
3041880102783NoneCSR 2023-2024 Vol-1 Sl No. 2.1.4 P.No-15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6527.856527.852.13FalseNoneNoneFalseNoneFalse13904.32050
3041881102783NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3916.713916.712.13FalseNoneNoneFalseNoneFalse8342.59230
3041882102783NoneCSR 2023-24 Volume-I Sl.no-2.5.1Shelves-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.50.04FalseNoneNoneFalseNoneFalse278.460
3041883102783NoneCSR 2023-24 Addendum I P no 111Formwork, Centering & Scaffolding Charges for Roof (Straight & Arched) @ 50% CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3480.753480.750.04FalseNoneNoneFalseNoneFalse139.230
3041884102783NoneCSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18,Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs93929.8593929.8515.87FalseNoneNoneFalseNoneFalse1490666.71950
3041885102783NoneCSR 2023-24 Volume-2 Sl.no-6.12 P.no: 14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8367.458367.4564.64FalseNoneNoneFalseNoneFalse540871.9680
3041886102783NoneCSR 2023-24 Volume-2 Sl.no-6.12 P.no: 14Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1053.151053.159.76FalseNoneNoneFalseNoneFalse10278.7440
3041887102783NoneCSR 2023-24 Vol 2 Sl.no-12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum103755.75103755.750.3FalseNoneNoneFalseNoneFalse31126.7250
3041888102783NoneCSR 2023-24 Volume-2 Sl.no-12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1066.81066.85.0FalseNoneNoneFalseNoneFalse5334.00
3041889102783NoneCSR 2023-24 Volume-II Sl.no-12.57.5 p no 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4091.854091.8514.4FalseNoneNoneFalseNoneFalse58922.640
3041890102783NoneCSR 2023-24 Volume-II Sl.no-11.3 p no 77Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm8689.88689.89.9FalseNoneNoneFalseNoneFalse86029.020
3041891102783NoneCSR 2023-24 VOL 2 Sl.no-12.93.2Providing and fixing Factory made single extruded wood polymer composite (wpc) Soild dooe/window, clerestory windows & frames /chowkhat of frames size 65x125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm802.2802.25.85FalseNoneNoneFalseNoneFalse4692.870
3041892102783NoneCSR 2023-2024 Vol-2 Sl No.12.95Providing & fixing factory made 100% Carpenter friendly ready to use solid plain wood polymer composite (WPC) Flush shutter of 35mm thickness which is anti terminate and having high water absorption property.The cost includes cost of materials,Transportation labours and fixing charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4631.554631.551.58FalseNoneNoneFalseNoneFalse7317.8490
3041893102783NoneCSR 2023-24 Vol-2 Sl.no-12.86 p no 109Providing & fixing of 2 track x 2panel sliding windows made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P s shall not be made ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5659.55659.543.2FalseNoneNoneFalseNoneFalse244490.40
3041894102783NoneCSR 2023-24 Vol-2 Sl.no-12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6004.956004.950.81FalseNoneNoneFalseNoneFalse4864.00950
3041895102783NoneCSR 2023-2024 Vol-2 Sl No.11.34A P.No.86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs176.4176.4777.6FalseNoneNoneFalseNoneFalse137168.640
3041896102783NoneCSR 2023-24 Vol-2 Sl.no-8.1.2 p no 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm253.05253.05634.7FalseNoneNoneFalseNoneFalse160610.8350
3041897102783NoneCSR 2023-2024 Vol-2 Sl No.8.8 P.No.42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm389.55389.55333.95FalseNoneNoneFalseNoneFalse130090.22250
3041898102783NoneCSR 2023-24 Vol-2 Sl.no-8.2.2 p.no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm292.95292.957.42FalseNoneNoneFalseNoneFalse2173.6890
3041899102783NoneCSR 2023-24 Vol-2 Sl.no-8.51 p.no 50Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm105.0105.0878.12FalseNoneNoneFalseNoneFalse92202.60
3041900102783NoneBallari circle DSR Item No. 4.21 P.No-15KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6542.9FalseNoneNoneFalseNoneFalse1486.4850
3041901102783NoneCSR 2023-2024 Vol-2 Sl No.8.25 p no 45Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm143.85143.85878.11FalseNoneNoneFalseNoneFalse126316.12350
3041902102783NoneCSR 2023-2024 Vol-2 Sl No.8.28 p no 45Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar dropsb and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm93.4593.45299.07FalseNoneNoneFalseNoneFalse27948.09150
3041903102783NoneCSR 2023-2024 Vol-2 Sl No.8.29 P.No.45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm297.15297.1534.88FalseNoneNoneFalseNoneFalse10364.5920
3041904102783NoneCSR 2023-2024 (Vol-2) Sl No.8.34.1 P.No.47Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm55.6555.6534.56FalseNoneNoneFalseNoneFalse1923.2640
3041905102783NoneCSR 2023-2024 Vol-2 Sl No.8.33.2 P.No.46Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm144.9144.934.56FalseNoneNoneFalseNoneFalse5007.7440
3041906102783NoneCSR rate 2023-24 Vol-2 Sl.no 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm120.75120.7543.2FalseNoneNoneFalseNoneFalse5216.40
3041907102783NoneCSR 2023-2024 Vol-2 Sl No.9.24 P.No.63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2994.62994.688.68FalseNoneNoneFalseNoneFalse265561.1280
3041908102783NoneCSR 2023-2024 Vol-2 Sl No.10.2 P.No.69Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr344.4344.436.6FalseNoneNoneFalseNoneFalse12605.040
3041909102783NoneCSR 2023-2024 Vol-2 Sl No.9.23 P.No 64Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2589.32589.3189.09FalseNoneNoneFalseNoneFalse489610.7370
3041910102783NoneCSR 2023-2024 Vol-2 Sl No.9.11 P.No.60Providing and laying Ceramic glazed floor tiles of size 300x300 mm(thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm933.45933.454.5FalseNoneNoneFalseNoneFalse4200.5250
3041911102783NoneCSR 2023-2024 Vol-2 Sl No.9.38 P.No.65Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1461.61461.67.42FalseNoneNoneFalseNoneFalse10845.0720
3041912102783NoneCSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs144.9144.9129.6FalseNoneNoneFalseNoneFalse18779.040
3041913102783NoneCSR 2023-2024 Vol-2 Sl No 10.8 p no 70Providing and fixing granite stone slab with table rubbed, edges rounded and polished, of size 75x50 cm deep and 1.8 cm thick, fixed in urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6 mm nominal size) as per direction of Engineer-in- charge and finished smooth. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2928.452928.450.68FalseNoneNoneFalseNoneFalse1991.3460
3041914102783NoneCSR 2023-2024 Vol-2 Sl No 12.73.1 p no 107Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.220.0FalseNoneNoneFalseNoneFalse924.00
3041915102783NoneCSR 2023-2024 Vol-2 Sl No 12.74.1 p no 107Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.140.0FalseNoneNoneFalseNoneFalse4284.00
3041916102783NoneCSR 2023-2024 Vol-2 Sl No 12.72 p no 107Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.110.0FalseNoneNoneFalseNoneFalse861.00
3041917102783NoneCSR 2023-2024 Vol-2 Sl No 12.63 p no 105Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each136.5136.540.0FalseNoneNoneFalseNoneFalse5460.00
3041918102783None0220 Locking arrangements0220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.05.0FalseNoneNoneFalseNoneFalse3165.00
3041919102783NoneCSR 2023-2024 Vol-2 Sl No 7.18 p no 23Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2117.852117.850.34FalseNoneNoneFalseNoneFalse720.0690
3041920102783NoneCSR 2023-2024 Vol-2 Sl No 8.84 p no 55Providing wall black board in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc complete . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm498.75498.7514.4FalseNoneNoneFalseNoneFalse7182.00
17103285380000NoneNoneBuildingsFIRST FLOOR3784429.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3041921102784NoneCSR 2023-24 Volume-I Iteam Code-2.5.2Columns--Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.011.58FalseNoneNoneFalseNoneFalse84036.060
3041922102784NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5079.95079.911.58FalseNoneNoneFalseNoneFalse58825.2420
3041923102784NoneCSR 2023-24 Volume-I Iteam Code-2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.054.42FalseNoneNoneFalseNoneFalse394925.940
3041924102784NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4354.24354.216.55FalseNoneNoneFalseNoneFalse72062.010
3041925102784NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3628.53628.537.87FalseNoneNoneFalseNoneFalse137411.2950
3041926102784NoneCSR 2023-24 Volume-I Sl.no 2.5.1Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.117031.111.64FalseNoneNoneFalseNoneFalse11531.02040
3041927102784NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3164.03164.01.64FalseNoneNoneFalseNoneFalse5188.960
3041928102784NoneCSR 2023-2024 (Vol-1) Sl No. 2.1.4 P.No-15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6593.126593.122.05FalseNoneNoneFalseNoneFalse13515.8960
3041929102784NoneCSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne94869.1494869.147.46FalseNoneNoneFalseNoneFalse707723.78440
3041930102784NoneCSR 2023-2024 (Vol-2) Sl No. 6.8 P.No-14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8451.128451.1268.28FalseNoneNoneFalseNoneFalse577042.47360
3041931102784NoneCSR 2023-24 Volume-II Iteam Code-6.12Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1063.681063.6852.88FalseNoneNoneFalseNoneFalse56247.39840
3041932102784NoneCSR 2023-2024 (Vol-2) Sl No. 12.13.1 P.No-100Providing Salwood frames of doors, windows, clerestory windows,ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum104793.3104793.30.3FalseNoneNoneFalseNoneFalse31437.990
3041933102784NoneCSR 2023-24 VOL 2 Sl.no-12.93.2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1077.461077.465.0FalseNoneNoneFalseNoneFalse5387.30
3041934102784NoneCSR 2023-2024 Vol-2 Sl No.12.95Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.35 mm thick one side teak and one side commercial ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4132.774132.7714.4FalseNoneNoneFalseNoneFalse59511.8880
3041935102784NoneCSR 2023-2024 (Vol-2) Sl No. 12.51Providing and fixing Factory made single extruded wood polymer composite (wpc) Soild dooe/window, clerestory windows & frames /chowkhat of frames size 65x125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr802.2802.25.7FalseNoneNoneFalseNoneFalse4572.540
3041936102784NoneCSR 2023-24 Volume-II Sl.no-12.57.5 p no 105Providing & fixing factory made 100% Carpenter friendly ready to use solid plain wood polymer composite (WPC) Flush shutter of 35mm thickness which is anti terminate and having high water absorption property.The cost includes cost of materials,Transportation labours and fixing charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4631.554631.551.58FalseNoneNoneFalseNoneFalse7317.8490
3041937102784NoneCSR 2023-24 Vol-2 Sl.no-12.86 p no 109Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.80.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5716.095716.0932.4FalseNoneNoneFalseNoneFalse185201.3160
3041938102784NoneCSR 2023-24 Vol-2 Sl.no-12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6004.956004.950.94FalseNoneNoneFalseNoneFalse5644.6530
3041939102784NoneCSR 2023-2024 Vol-2 Sl No.11.34A P.No.85Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs178.16178.16583.2FalseNoneNoneFalseNoneFalse103902.9120
3041940102784NoneCSR 2023-24 Volume-2 Sl.no-8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm255.58255.58592.27FalseNoneNoneFalseNoneFalse151372.36660
3041941102784NoneCSR 2023-23 Volume-2 Sl.no -8.3.2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm353.14353.14356.61FalseNoneNoneFalseNoneFalse125933.25540
3041942102784NoneCSR 2023-24 Vol-2 Sl.no-8.2.2 p.no 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm295.88295.8814.51FalseNoneNoneFalseNoneFalse4293.21880
3041943102784NoneCSR 2023-2024 Vol-2 Sl No.8.51 P.No.41Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm106.05106.05834.7FalseNoneNoneFalseNoneFalse88519.9350
3041944102784NoneBallari circle DSR Item No. 4.21 P.No-15KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6539.6FalseNoneNoneFalseNoneFalse1372.140
3041945102784NoneCSR 2023-2024 Vol-2 Sl No.8.39 P.No.48Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm134.68134.68834.71FalseNoneNoneFalseNoneFalse112418.74280
3041946102784NoneCSR 2023-2024 Vol-2 Sl No.8.30 P.No.46Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm184.52184.52329.04FalseNoneNoneFalseNoneFalse60714.46080
3041947102784NoneCSR 2023-2024 Vol-2 Sl No.8.29 P.No.45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm300.12300.1227.57FalseNoneNoneFalseNoneFalse8274.30840
3041948102784NoneCSR 2023-2024 Vol-2 Sl No.8.34.1 P.No.47Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm56.256.234.56FalseNoneNoneFalseNoneFalse1942.2720
3041949102784NoneCSR2023-2024 (Vol-2) Sl No.8.33.2 P.No.46Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm146.34146.3434.56FalseNoneNoneFalseNoneFalse5057.51040
3041950102784NoneCSR 2023-24 Volume-2 Sl.no -8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm121.96121.9632.4FalseNoneNoneFalseNoneFalse3951.5040
3041951102784NoneCSR 2023-2024 PWD SR Vol-2 Sl No.10.2 P.No.69Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm347.84347.8431.6FalseNoneNoneFalseNoneFalse10991.7440
3041952102784NoneCSR 2023-2024 Vol-2 Sl No.9.23 P.No 64Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2615.192615.19235.23FalseNoneNoneFalseNoneFalse615171.14370
3041953102784NoneCSR 2023-2024 Vol-2 Sl No.9.11 P.No.60Providing and laying Ceramic glazed floor tiles of size 300x300 mm(thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm933.45933.454.5FalseNoneNoneFalseNoneFalse4200.5250
3041954102784NoneCSR 2023-2024 Vol-2 Sl No.9.38 P.No.65Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1461.61461.610.8FalseNoneNoneFalseNoneFalse15785.280
3041955102784NoneCSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs146.35146.3581.0FalseNoneNoneFalseNoneFalse11854.350
3041956102784NoneCSR 2023-2024 Vol-2 Sl No 12.73.1 p no 107Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.216.0FalseNoneNoneFalseNoneFalse739.20
3041957102784NoneCSR 2023-2024 Vol-2 Sl No 12.74.1 p no 107Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.132.0FalseNoneNoneFalseNoneFalse3427.20
3041958102784NoneCSR 2023-2024 Vol-2 Sl No 12.72 p no 107Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.18.0FalseNoneNoneFalseNoneFalse688.80
3041959102784NoneCSR 2023-2024 Vol-2 Sl No 12.63 p no 105Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos136.5136.532.0FalseNoneNoneFalseNoneFalse4368.00
3041960102784NoneCORRIGRNDUM 10220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.08.0FalseNoneNoneFalseNoneFalse5064.00
3041961102784NoneCSR 2023-2024 Vol-2 Sl No 8.84 p no 55Providing wall black boards in CM 1:3 with two coats of black paint including finishing etc., including cost of materials, labour, HOM complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm503.73503.7311.52FalseNoneNoneFalseNoneFalse5802.96960
3041962102784NoneCSR 2023-2024 Vol-2 Sl No.8.49 P.No.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.cm4.24.25000.0FalseNoneNoneFalseNoneFalse21000.00
17103285390000NoneNoneBuildingsWATER SUPPLY189005.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3041963102785NoneVol 1 -1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.127.0FalseNoneNoneFalseNoneFalse2891.70
3041964102785NoneVol 1- 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum168.0168.027.0FalseNoneNoneFalseNoneFalse4536.00
3041965102785NoneVol 2 - 13.2.2Providing and fixing brass bib cock of approved quality 20 mm nominal bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos362.25362.2520.0FalseNoneNoneFalseNoneFalse7245.00
3041966102785NoneBallari circle DSRProviding and fixing in position brass PUSH cock of approved quality 20mm nominal bore including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. (In Hand Wash) DR ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos168.0168.012.0FalseNoneNoneFalseNoneFalse2016.00
3041967102785NoneVol 2 -13.3.2Providing and fixing brass stop cock of approved quality : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos320.25320.256.0FalseNoneNoneFalseNoneFalse1921.50
3041968102785NoneVol 2 -13.4.3Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 40mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos737.1737.11.0FalseNoneNoneFalseNoneFalse737.10
3041969102785NoneVol 2 -13.4.450mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos897.75897.751.0FalseNoneNoneFalseNoneFalse897.750
3041970102785NoneVol 2- 13.5.2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 20mm Dia Nominal ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos329.7329.71.0FalseNoneNoneFalseNoneFalse329.70
3041971102785NoneVol 2- 13.5.325mm Dia Nominal ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos348.6348.61.0FalseNoneNoneFalseNoneFalse348.60
3041972102785NoneVol 2 -13.6.1.1Providing and fixing gun metal non- return valve of approved quality (screwed end) :25mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos651.0651.01.0FalseNoneNoneFalseNoneFalse651.00
3041973102785NoneVol 2- 13.6.2.132mm Dia Nominal Bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos849.45849.451.0FalseNoneNoneFalseNoneFalse849.450
3041974102785NoneVol 2-13.8.1.1Providing and fixing unplasticised PVC connection pipe with brass unions : 30 cm length 15 mm nominal bore ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos87.1587.151.0FalseNoneNoneFalseNoneFalse87.150
3041975102785NoneVol 2-13.32.2Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & the cost of cutting chases and making good the same including testing of joints complete as per direction of engineer in charge. Concealed work, including cutting chases and making good the walls etc20mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr397.95397.9530.0FalseNoneNoneFalseNoneFalse11938.50
3041976102785NoneVol 2-13.32.3Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipe and fittings with one step CPVC solvent cement & testing of joints complete as per direction of engineer in charge. Internal work- exposed on wall 25mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr333.9333.915.0FalseNoneNoneFalseNoneFalse5008.50
3041977102785NoneVol 2- 13.33.632mm OD Pipe ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr420.0420.010.0FalseNoneNoneFalseNoneFalse4200.00
3041978102785NoneVol 2-13.31.3Providing and fixing chorinated poly veny chloride (CPVC) pipes, having therminal stability for hot & cold water supply including all cPVC plain and brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of engineer in charge. External work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr757.05757.0540.0FalseNoneNoneFalseNoneFalse30282.00
3041979102785NoneBallari circle DSRProviding and fixing in position / brass / gun metal easy clean strainer of approved make with stainless steel strainer etc.., complete -PVC - Supreme / Prince / Mahesh ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3858.03858.03.0FalseNoneNoneFalseNoneFalse11574.00
3041980102785NoneBallari circle DSR 17 1Providing and fixing M.S. clamp of required dia to the top of casing/ housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr52.552.515.0FalseNoneNoneFalseNoneFalse787.50
3041981102785NoneVol 2-13.48Providing and fixing on wall face unplasticised rigid PVC rain water pipes conforming to IS: 13592 Type A, including jointimg with seal ring conforming to IS: 5382, leaving 10mm gap for termal expansion, (i) single socketed pipes 100mm diameter ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr305.55305.5530.0FalseNoneNoneFalseNoneFalse9166.50
3041982102785NoneVol 5-Sl.no-16 12Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing.150mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr610.05610.0540.0FalseNoneNoneFalseNoneFalse24402.00
3041983102785NoneVol 5-Sl.no-16 8Constructing brick masonry chamber of internal dimension 600x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5030.555030.554.0FalseNoneNoneFalseNoneFalse20122.20
3041984102785NoneVol 5-Sl.no-16 9Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5726.75726.72.0FalseNoneNoneFalseNoneFalse11453.40
3041985102785NoneBallari circle DSR 11.47 Pg no 75KSRB 12-7.1 : Making connection of drain or sewer line of size 100 to 230mm external dia with existing manhole including breaking into and making good the walls, floors with cement concrete M 15 with 20mm and downsize granite metal, cement plastered on both sides of mix 1:3, finished with a floating coat of neat cement, and making necessary channels for the drain, including cost of materials, labour charges, curing complete as per specifications. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos2828.72828.71.0FalseNoneNoneFalseNoneFalse2828.70
3041986102785NoneVol 2-14.25.1Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings :Flat back wash basin of size 630x450 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1035.31035.32.0FalseNoneNoneFalseNoneFalse2070.60
3041987102785NoneBallari circle DSRC.P brass piller tap elbow operated for sinks ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Unit650.0650.02.0FalseNoneNoneFalseNoneFalse1300.00
3041988102785NoneVol 2- 14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1068.91068.91.0FalseNoneNoneFalseNoneFalse1068.90
3041989102785NoneVol 2- 14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each520.8520.81.0FalseNoneNoneFalseNoneFalse520.80
3041990102785NoneBallari circle DSR12.113.1 90Providing and fixing CI Nahani trap of approved make conforming to ISI specifications and construction of Cistern in M-15 as per directions (Rate is inclusive of cost of materials and fixtures and conveyance of materials to work spot). - -do- 10cms x 7.5cms ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each262.5262.54.0FalseNoneNoneFalseNoneFalse1050.00
3041991102785NoneVol 2- 13.34Providing and placing on terrace(at all floor levels) polyethylene water storage tank, IS: 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9.459.45500.0FalseNoneNoneFalseNoneFalse4725.00
3041992102785NoneVol 2- 14.3.1Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lid ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Pan6275.856275.852.0FalseNoneNoneFalseNoneFalse12551.70
3041993102785NoneBallari circle item no 3Supplying and fixing of 2/1.5 H.P. Monolbock Pump of approved make with all accessories conforming to ISI specification including cost of all materials, labour, with all lead and lift etc. complete as per directions of the Engineer-in-cahrge of the work. ---- With all lead and lifts etc., complete as per specification and as per the directions of the Engineer-In-Charge of the work. XLV item no 3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos11443.9511443.951.0FalseNoneNoneFalseNoneFalse11443.950
17103285390000NoneNoneBuildingsELECTRIFICATION544125.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3041994102786None1.2.1Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr66.066.0500.0FalseNoneNoneFalseNoneFalse33000.00
3041995102786None1.2.225mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr78.078.0100.0FalseNoneNoneFalseNoneFalse7800.00
3041996102786None1.2.332mm dia 2.5mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr103.0103.020.0FalseNoneNoneFalseNoneFalse2060.00
3041997102786None1.2.440 mm dia 2.5 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr147.0147.010.0FalseNoneNoneFalseNoneFalse1470.00
3041998102786None1.4.1Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each106.0106.06.0FalseNoneNoneFalseNoneFalse636.00
3041999102786None1.4.2100x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each118.0118.04.0FalseNoneNoneFalseNoneFalse472.00
3042000102786None1.4.3135 x 75 x 65 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each139.0139.02.0FalseNoneNoneFalseNoneFalse278.00
3042001102786None1.4.4180X90X65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.08.0FalseNoneNoneFalseNoneFalse1288.00
3042002102786None1.4.5200x90x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each179.0179.02.0FalseNoneNoneFalseNoneFalse358.00
3042003102786None1.4.7200x200x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each348.0348.01.0FalseNoneNoneFalseNoneFalse348.00
3042004102786None1.5.1Supplying and fixing PVC/metal conduit Deep junction box 19/20mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each49.049.020.0FalseNoneNoneFalseNoneFalse980.00
3042005102786None1.5.225mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each56.056.010.0FalseNoneNoneFalseNoneFalse560.00
3042006102786None1.7.1Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete.upto 50mm Conduit in Brick Walls upto 50mm Conduit in Brick Walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr29.029.0150.0FalseNoneNoneFalseNoneFalse4350.00
3042007102786None2.2.1Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr117.0117.040.0FalseNoneNoneFalseNoneFalse4680.00
3042008102786None2.2.2Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group A Short piont up to 3 Mtr from tapping piont out let via switch. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point269.0269.090.0FalseNoneNoneFalseNoneFalse24210.00
3042009102786None2.2.3A medium point above 3m to 6 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point379.0379.030.0FalseNoneNoneFalseNoneFalse11370.00
3042010102786None2.3.2A Short piont up to 10 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point555.0555.010.0FalseNoneNoneFalseNoneFalse5550.00
3042011102786None2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr26.026.0400.0FalseNoneNoneFalseNoneFalse10400.00
3042012102786None2.3.42.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr42.042.0500.0FalseNoneNoneFalseNoneFalse21000.00
3042013102786None2.3.54 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr63.063.0200.0FalseNoneNoneFalseNoneFalse12600.00
3042014102786None2.3.66 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr92.092.030.0FalseNoneNoneFalseNoneFalse2760.00
3042015102786None3.5.210 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr167.0167.010.0FalseNoneNoneFalseNoneFalse1670.00
3042016102786None3.5.3Supplying and fixing superior quality switch mounting poly carbonate plate with necessary supporting back plate with required nos of machine tools, bolts, nuts etc., complete on the existing metal/PVC box.1 to 3 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.06.0FalseNoneNoneFalseNoneFalse966.00
3042017102786None3.5.44 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each175.0175.04.0FalseNoneNoneFalseNoneFalse700.00
3042018102786None3.5.56 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each234.0234.02.0FalseNoneNoneFalseNoneFalse468.00
3042019102786None3.5.68Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each284.0284.08.0FalseNoneNoneFalseNoneFalse2272.00
3042020102786None3.5.710-12 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each344.0344.02.0FalseNoneNoneFalseNoneFalse688.00
3042021102786None3.6.116 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each397.0397.01.0FalseNoneNoneFalseNoneFalse397.00
3042022102786None3.6.2Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6Amps one way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each102.0102.0150.0FalseNoneNoneFalseNoneFalse15300.00
3042023102786None3.6.46Amps two way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each166.0166.02.0FalseNoneNoneFalseNoneFalse332.00
3042024102786None3.6.7Stepped fan regulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each357.0357.040.0FalseNoneNoneFalseNoneFalse14280.00
3042025102786None3.6.916Amps one way switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each180.0180.020.0FalseNoneNoneFalseNoneFalse3600.00
3042026102786None3.6.1032Amps DP switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each326.0326.010.0FalseNoneNoneFalseNoneFalse3260.00
3042027102786None3.6.116/16Amps universal socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each236.0236.045.0FalseNoneNoneFalseNoneFalse10620.00
3042028102786None5.2.1TV/Telephone socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each156.0156.01.0FalseNoneNoneFalseNoneFalse156.00
3042029102786None5.18.1Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts,50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each646.0646.01.0FalseNoneNoneFalseNoneFalse646.00
3042030102786None5.18.3Supplying fully automatic star-delta starter unit push button type with suitable wires, 3 contactors, one adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/440 volts 3 phase and wired after fixing to the existing wooden board for motor. Upto 12.5HP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each7455.07455.01.0FalseNoneNoneFalseNoneFalse7455.00
3042031102786None5.19.9Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.6-32 Amps SP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each415.0415.01.0FalseNoneNoneFalseNoneFalse415.00
3042032102786None5.19.116-32 Amps DP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each739.0739.02.0FalseNoneNoneFalseNoneFalse1478.00
3042033102786NoneI-5.21Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure 12 Way SP & N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2329.02329.01.0FalseNoneNoneFalseNoneFalse2329.00
3042034102786None5.40.24 Way TP&N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4038.04038.02.0FalseNoneNoneFalseNoneFalse8076.00
3042035102786NoneP430ASupplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9255.09255.02.0FalseNoneNoneFalseNoneFalse18510.00
3042036102786NoneBESCOM III-32.07Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.250Amps 4x30x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3435.03435.01.0FalseNoneNoneFalseNoneFalse3435.00
3042037102786NoneBESCOM IV-32.07Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4390.04390.01.0FalseNoneNoneFalseNoneFalse4390.00
3042038102786NoneBESCOM-IV--29.01Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3750.03750.02.0FalseNoneNoneFalseNoneFalse7500.00
3042039102786NoneBESCOM-IV--29.07Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos139.54139.5430.0FalseNoneNoneFalseNoneFalse4186.20
3042040102786NoneBESCOM-III--35.01Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 3.5 core 25 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr23.6423.6430.0FalseNoneNoneFalseNoneFalse709.20
3042041102786None12.21Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required.25 sqmm to 75 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr889.0889.030.0FalseNoneNoneFalseNoneFalse26670.00
3042042102786None12.46Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc.,complete.(As per Civil SR KSRB I-2, P-7)In Soil (Ordinary) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr58.058.030.0FalseNoneNoneFalseNoneFalse1740.00
3042043102786None13.11Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr382.0382.08.0FalseNoneNoneFalseNoneFalse3056.00
3042044102786None13.13Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2969.02969.02.0FalseNoneNoneFalseNoneFalse5938.00
3042045102786None13.19Supplying of 1440rpm heavy duty exhaust fan with bracketblades suitable to operate on 230V 50Hz, AC Supply complete.48" Sweep (1200mm) Regular model ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2984.02984.040.0FalseNoneNoneFalseNoneFalse119360.00
3042046102786None5.34Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.LED light fighting 1 x420/22 w ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each690.0690.020.0FalseNoneNoneFalseNoneFalse13800.00
3042047102786None5.38supply of round/square recess/surface mounted rolling type LED Down light with W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each885.0885.030.0FalseNoneNoneFalseNoneFalse26550.00
3042048102786None12.46Supplying and fixing of 5'-80 Watts of T8 Fluorescent Tube with 54W power consumption with low 3mg Mercury content less phosphor coating. Operating voltage range from 180V to 265V, 50Hz AC power Supply ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each520.0520.030.0FalseNoneNoneFalseNoneFalse15600.00
3042049102786None13.11Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. 1 x 4' Tube light ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos340.0340.030.0FalseNoneNoneFalseNoneFalse10200.00
3042050102786None13.13Supplying & Fixing of 70-150 Watts lamp holder 2 Pin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each63.063.015.0FalseNoneNoneFalseNoneFalse945.00
3042051102786None13.19Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps.On wall / ceiling / Rafter / Girder ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos122.0122.080.0FalseNoneNoneFalseNoneFalse9760.00
3042052102786None5.34Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each315.0315.040.0FalseNoneNoneFalseNoneFalse12600.00
3042053102786None5.38Fixingoneexhaustfanaftermakingasuitablenotchinthewallandfinishingwithcementmortarandcolouringtomatchtheexistingwallorbrackets,withboltsandnutsanda5A,ceilingrosewithsufficientlengthof23/0.0076inchPVCinsulatedtwincorewireofapproved make with wire mesh and wooden frame. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each707.0707.02.0FalseNoneNoneFalseNoneFalse1414.00
3042054102786None13.19Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each490.0490.050.0FalseNoneNoneFalseNoneFalse24500.00
3042055102786None5.34Supplying, fixing and wiring 50/5 to 400/5Amps 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound., with all lead, lifts, loading, un-loading charges, including cost of all materials, cost oflabour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental andequipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each562.0562.02.0FalseNoneNoneFalseNoneFalse1124.00
3042056102786None5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440v A.C. 50 Hz 12/24v D.C.125 Amps 25kA. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each515.0515.03.0FalseNoneNoneFalseNoneFalse1545.00
3042057102786None5.33Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9315.09315.01.0FalseNoneNoneFalseNoneFalse9315.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103285400000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103285400000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103285400000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17103285810000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17103285880000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement Portal on or before the last date and time of bid submission.None
17103285950000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103286010000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103286080000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17103286140000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17103286200000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17103286280000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17103286360000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103286420000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17103286480000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17103286560000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17103286620000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17103286680000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building/Bridge during the defect liability period.None
17103286740000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17103286800000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24. And Value at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24) in the Technical Qualification Criteria mentioned in the next section.None
17103286850000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17103286920000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17103286980000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the kp-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17103287040000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17103287100000NoneNoneELIGIBILITYThe time stipulated for completion of work is 11 (Eleven) calendar months including rainy season.None
17103287180000NoneNoneELIGIBILITYThe Agency shall comply with ISO 14001 (Environmental Management System) requirement during execution of work.None
17103287240000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17103287300000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17103287370000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17103287440000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17103287490000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17103287580000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP-Procurement portalon or before the last date of bid submission.None
17103287670000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches.None
17103287730000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17103287790000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17103287850000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082009 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17103287940000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17103288020000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17103288110000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17103288170000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17103288250000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17103288350000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17103288460000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17103288560000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17103288660000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17103292550000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial implementation calendar format before last date of tender receipt in the kpp portal.None
17103292620000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17103292680000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply, Water supply, UGD from local bodies etc., before commencement of the workNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 2020-21, 2021-22 and 2022-23 - satisfactorily completed as prime contractor, at least one similar work such as - CONSTRUCTION OF BUILDING WORKS of value not less than Rs.56.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 2020-21, 2021-22 and 2022-23 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.222.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate along with UDIN)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment : 654.00 Cum, (b) SSM/BBM : 115.00 Cum, (c) PCC/RCC : 193.00 Cum, (d) Flooring : 433.00 Sqm, (e) Plastering : 1552.00 Sqm, (f) Steel : 18.70 t & (g) Wood : 0.50 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.31.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers Certificate - Information in Format-9
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Physical and financial implementation calendar formatTrueTechnical Bid
Annual Turnover Certificate with UDIN for the last five years duly attested by the Notary or Government Gazetted Officer and Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Similar Nature i.e CONSTRUCTION OF BUILDING WORKS Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Key qty statement i.e yearwise breakup detailsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710329812000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, PWD, Division, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone