tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710415635000 | 0 | None | None | Water supply/sewage lines | Construction Of RCC Openwell | 2648977.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3072607 | 104829 | None | Code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces equired to complete the work.i) Lift 0.00 to 1.50 M with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Cum | 102.0 | 102.0 | 226.01 | False | None | None | False | None | False | 23053.02 | 0 | 3072608 | 104829 | None | Code02 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.ii) Lift 1.50 to 3.00 m ---- all clauses are mandatory | Cum | 363.0 | 363.0 | 214.74 | False | None | None | False | None | False | 77950.62 | 0 | 3072609 | 104829 | None | Code03 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.iii) Lift 3.00 m to 4.5 m ---- all clauses are mandatory | Cum | 463.0 | 463.0 | 203.75 | False | None | None | False | None | False | 94336.25 | 0 | 3072610 | 104829 | None | Code04 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.iv) Lift 4.50 m to 6.0 m ---- all clauses are mandatory | Cum | 486.15 | 486.15 | 194.56 | False | None | None | False | None | False | 94585.344 | 0 | 3072611 | 104829 | None | Code05 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.v) Lift 6.00 m to 7.50 m ---- all clauses are mandatory | Cum | 547.98 | 547.98 | 185.58 | False | None | None | False | None | False | 101694.1284 | 0 | 3072612 | 104829 | None | Code06 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.vi) Lift 7.5.00 m to 9.00 m ---- all clauses are mandatory | Cum | 573.51 | 573.51 | 117.83 | False | None | None | False | None | False | 67576.6833 | 0 | 3072613 | 104829 | None | Code07 | Earth work excavation for FOUNDATION by Mechanical means depthupto 1.50m, as per drawing and technical pecifications, includingsetting out, shoring, strutting, barricading, caution lights, including costof explosives, dressing of excavated surfaces, disposing off or levellingthe excavated stuff or sorting & stacking the selected stuff for reusein a radius of 50 m and lift upto 1.5 m including cost of labour, blastingmaterials, tools, usage of Machinery & all other ppurtenaces requiredto complete the work.Depth exceeding 3m, but not xceeding 4.5m.work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work i) Basic Rate= 540.00 (FOR 9.0 TO 10.5 MTR) ---- all clauses are mandatory | Mtr | 921.79 | 921.79 | 117.83 | False | None | None | False | None | False | 108614.5157 | 0 | 3072614 | 104829 | None | Code08 | Earth work excavation for FOUNDATION by Mechanical means depthupto 1.50m, as per drawing and technical pecifications, includingsetting out, shoring, strutting, barricading, caution lights, including costof explosives, dressing of excavated surfaces, disposing off or levellingthe excavated stuff or sorting & stacking the selected stuff for reusein a radius of 50 m and lift upto 1.5 m including cost of labour, blastingmaterials, tools, usage of Machinery & all other ppurtenaces requiredto complete the work.Depth exceeding 3m, but not xceeding 4.5m.work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ii) Basic Rate= 540.00 (FOR 10.5 TO 12.0 MTR) ---- all clauses are mandatory | Mtr | 965.0 | 965.0 | 117.83 | False | None | None | False | None | False | 113705.95 | 0 | 3072615 | 104829 | None | Code09 | Earth work excavation for FOUNDATION by Mechanical means depthupto 1.50m, as per drawing and technical pecifications, includingsetting out, shoring, strutting, barricading, caution lights, including costof explosives, dressing of excavated surfaces, disposing off or levellingthe excavated stuff or sorting & stacking the selected stuff for reusein a radius of 50 m and lift upto 1.5 m including cost of labour, blastingmaterials, tools, usage of Machinery & all other ppurtenaces requiredto complete the work.Depth exceeding 3m, but not xceeding 4.5m.work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work iii) Basic Rate= 540.00 (FOR 12.0 TO 13.5 MTR) ---- all clauses are mandatory | Mtr | 1010.37 | 1010.37 | 117.83 | False | None | None | False | None | False | 119051.8971 | 0 | 3072616 | 104829 | None | Code10 | Earth work excavation for FOUNDATION by Mechanical means depthupto 1.50m, as per drawing and technical pecifications, includingsetting out, shoring, strutting, barricading, caution lights, including costof explosives, dressing of excavated surfaces, disposing off or levellingthe excavated stuff or sorting & stacking the selected stuff for reusein a radius of 50 m and lift upto 1.5 m including cost of labour, blastingmaterials, tools, usage of Machinery & all other ppurtenaces requiredto complete the work.Depth exceeding 3m, but not xceeding 4.5m.work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work iv) Basic Rate= 540.00 (FOR 13.50 TO 15.00 MTR) ---- all clauses are mandatory | Mtr | 1058.01 | 1058.01 | 117.83 | False | None | None | False | None | False | 124665.3183 | 0 | 3072617 | 104829 | None | Code11 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The ranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm tickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates For Foundation. work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Cum | 6217.0 | 6217.0 | 8.44 | False | None | None | False | None | False | 52471.48 | 0 | 3072618 | 104829 | None | Code12 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The ranite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm tickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates For Foundation.work.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Cum | 6323.0 | 6323.0 | 97.09 | False | None | None | False | None | False | 613900.07 | 0 | 3072619 | 104829 | None | Code13 | Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work. ---- all clauses are mandatory | Kg | 79.01 | 79.01 | 9709.46 | False | None | None | False | None | False | 767144.4346 | 0 | 3072620 | 104829 | None | Code14 | Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete. with: MS angle of 65 x 65 x 10mm. Inside & Outside. with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work. ---- all clauses are mandatory | Mtr | 4377.0 | 4377.0 | 18.0 | False | None | None | False | None | False | 78786.0 | 0 | 3072621 | 104829 | None | Code15 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Excavation quantity, Construction quantity, Construction quantity, cc, raft,steining wall qty.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work. ---- all clauses are mandatory | Cum | 266.0 | 266.0 | 259.71 | False | None | None | False | None | False | 69082.86 | 0 | 3072622 | 104829 | None | Code16 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.ISMB 200X100 ---- all clauses are mandatory | Kg | 113.0 | 113.0 | 304.8 | False | None | None | False | None | False | 34442.4 | 0 | 3072623 | 104829 | None | Code17 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.ISMB 200X100. ---- all clauses are mandatory | Kg | 113.0 | 113.0 | 304.8 | False | None | None | False | None | False | 34442.4 | 0 | 3072624 | 104829 | None | Code18 | Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ISA 60X60X6 MM (21X 1.93 mtr).with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Kg | 106.0 | 106.0 | 156.33 | False | None | None | False | None | False | 16570.98 | 0 | 3072625 | 104829 | None | Code19 | Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.ISMC 75X40 (2 X 5.64 mtr, 2 X 9.75, 2 X 11.23 mtr,) with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Kg | 106.0 | 106.0 | 214.06 | False | None | None | False | None | False | 22690.36 | 0 | 3072626 | 104829 | None | Code20 | Providing and fixing Structural Steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Sqm | 280.0 | 280.0 | 98.53 | False | None | None | False | None | False | 27588.4 | 0 | 3072627 | 104829 | None | Code21 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as perdrawing and Technical Specifications.110mm Dia. ---- all clauses are mandatory | Mtr | 138.0 | 138.0 | 48.0 | False | None | None | False | None | False | 6624.0 | 0 |
| 1710415635000 | 0 | None | None | Water supply/sewage lines | Laying Of Rising Main | 232782.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3072628 | 104830 | None | Code01 | Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. -In all kinds of soils. Depth upto 1.50m.75mm dia.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Cum | 484.0 | 484.0 | 112.05 | False | None | None | False | None | False | 54232.2 | 0 | 3072629 | 104830 | None | Code02 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. 75mm dia.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work ---- all clauses are mandatory | Cum | 262.0 | 262.0 | 112.05 | False | None | None | False | None | False | 29357.1 | 0 | 3072630 | 104830 | None | Code03 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications.All kinds of soils.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.All kinds of soils ---- all clauses are mandatory | Cum | 160.0 | 160.0 | 112.05 | False | None | None | False | None | False | 17928.0 | 0 | 3072631 | 104830 | None | Code04 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note Upto 110mm dia Coil shall be used.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work. 75mm. ---- all clauses are mandatory | Mtr | 213.0 | 213.0 | 600.0 | False | None | None | False | None | False | 127800.0 | 0 | 3072632 | 104830 | None | Code05 | Supplying and installation for HDPE pipe Specials conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two “O” rings and a coupler of suitable size, including loading and unloading at both destination including jointing with all labour, all lead and lift.with all lead, lifts, loading & unloading charges including cost and conveyance of all materials, labour, equipments, HOM of machinary and other incidental charges required for successfull completion of work etc., complete as per specifications and as per the directions of the Engineer incharge of the work.90 MM ELECTRO FUSION COUPLER. ---- all clauses are mandatory | Nos | 231.0 | 231.0 | 15.0 | False | None | None | False | None | False | 3465.0 | 0 |
|
|
---|