tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710389502000 | 0 | None | None | Roads | CONSTRUCTION OF FLEXIBLE PAVEMENT | 138331150.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058024 | 103744 | None | 16.3 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 18658.82 | 18658.82 | 2.0 | False | None | None | False | None | False | 37317.64 | 0 | 3058025 | 103744 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 477.65 | 477.65 | 202.32 | False | None | None | False | None | False | 96638.148 | 0 | 3058026 | 103744 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.29 | 7.29 | 30311.0 | False | None | None | False | None | False | 220967.19 | 0 | 3058027 | 103744 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 115.46 | 115.46 | 9742.18 | False | None | None | False | None | False | 1124832.1028 | 0 | 3058028 | 103744 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 144.63 | 144.63 | 674.4 | False | None | None | False | None | False | 97538.472 | 0 | 3058029 | 103744 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 576.1 | 576.1 | 3503.71 | False | None | None | False | None | False | 2018487.331 | 0 | 3058030 | 103744 | None | 3.6 | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 599.19 | 599.19 | 23206.4 | False | None | None | False | None | False | 13905042.816 | 0 | 3058031 | 103744 | None | 4.2 (B) (5) | By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2. (B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2867.13 | 2867.13 | 9446.86 | False | None | None | False | None | False | 27085375.7118 | 0 | 3058032 | 103744 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3110.21 | 3110.21 | 12491.5 | False | None | None | False | None | False | 38851188.215 | 0 | 3058033 | 103744 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 49.83 | 49.83 | 48280.0 | False | None | None | False | None | False | 2405792.4 | 0 | 3058034 | 103744 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion
using emulsion pressure distributor at the rate of 0.25 kg/m2
on Granular surface" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 17.01 | 17.01 | 53680.0 | False | None | None | False | None | False | 913096.8 | 0 | 3058035 | 103744 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11484.31 | 11484.31 | 2624.0 | False | None | None | False | None | False | 30134829.44 | 0 | 3058036 | 103744 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13313.49 | 13313.49 | 1610.4 | False | None | None | False | None | False | 21440044.296 | 0 |
| 1710389502000 | 0 | None | None | Roads | Road Furnitures | 5614318.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058037 | 103745 | None | 8.16(i) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 6175.4 | 6175.4 | 1.0 | False | None | None | False | None | False | 6175.4 | 0 | 3058038 | 103745 | None | 8.16(ii) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 3557.5 | 3557.5 | 7.0 | False | None | None | False | None | False | 24902.5 | 0 | 3058039 | 103745 | None | 8.16(iii) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC
200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1023.4 | 1023.4 | 28.0 | False | None | None | False | None | False | 28655.2 | 0 | 3058040 | 103745 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 644.16 | 644.16 | 2449.0 | False | None | None | False | None | False | 1577547.84 | 0 | 3058041 | 103745 | None | 8.6(ii) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5770.7 | 5770.7 | 18.0 | False | None | None | False | None | False | 103872.6 | 0 | 3058042 | 103745 | None | 8.6(vi) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 7802.9 | 7802.9 | 13.0 | False | None | None | False | None | False | 101437.7 | 0 | 3058043 | 103745 | None | 8.6(ix) | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 mm x 75 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 8081.2 | 8081.2 | 16.0 | False | None | None | False | None | False | 129299.2 | 0 | 3058044 | 103745 | None | 8.6(xi) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 mm x 50 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5407.3 | 5407.3 | 15.0 | False | None | None | False | None | False | 81109.5 | 0 | 3058045 | 103745 | None | 8.6(xii) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5193.4 | 5193.4 | 25.0 | False | None | None | False | None | False | 129835.0 | 0 | 3058046 | 103745 | None | 8.6(xv) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 8052.03 | 8052.03 | 12.0 | False | None | None | False | None | False | 96624.36 | 0 | 3058047 | 103745 | None | 8.17 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2456.3 | 2456.3 | 256.0 | False | None | None | False | None | False | 628812.8 | 0 | 3058048 | 103745 | None | 8.31 | Rumble Strips
Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 228.5 | 228.5 | 190.0 | False | None | None | False | None | False | 43415.0 | 0 | 3058049 | 103745 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 443.62 | 443.62 | 1192.75 | False | None | None | False | None | False | 529127.755 | 0 | 3058050 | 103745 | None | 8.14 i | Painting Lines, Dashes, Arrows etc on Roads in Two Coats on Old Work
Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control
Over 10 cm in width ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 172.28 | 172.28 | 12.81 | False | None | None | False | None | False | 2206.9068 | 0 | 3058051 | 103745 | None | 1.12 | Crash Barrier Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 115.46 | 115.46 | 1.26 | False | None | None | False | None | False | 145.4796 | 0 | 3058052 | 103745 | None | 8.25 i | Metal Beam Crash Barrier
Providing and erecting a "W" metal beam crash barriersystem comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal
beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 4424.1 | 4424.1 | 270.0 | False | None | None | False | None | False | 1194507.0 | 0 | 3058053 | 103745 | None | 8.18 | Guard Stones / Boundary Pillers
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No. | 909.12 | 909.12 | 65.0 | False | None | None | False | None | False | 59092.8 | 0 | 3058054 | 103745 | None | 1.17.2 | Excavation for Pipe Line
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.
Depth exceeding 1.5 m, but not exceeding 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 320.86 | 320.86 | 535.5 | False | None | None | False | None | False | 171820.53 | 0 | 3058055 | 103745 | None | 8.29 i | Cable Duct Across the Road
Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground
level to prevent entry of water and dirt, all as per IRC: 98 -1997 and approved drawings.
Single row for one utility service ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 2688.5 | 2688.5 | 262.5 | False | None | None | False | None | False | 705731.25 | 0 |
| 1710389502000 | 0 | None | None | Roads | Construction of Box Culvert 3 Vent 2.00 X 2.00 | 3217095.89 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058056 | 103746 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 126.42 | False | None | None | False | None | False | 15672.2874 | 0 | 3058057 | 103746 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7556.14 | 7556.14 | 18.1 | False | None | None | False | None | False | 136766.134 | 0 | 3058058 | 103746 | None | 2.1.H | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 96029.96 | 96029.96 | 11.3 | False | None | None | False | None | False | 1085138.548 | 0 | 3058059 | 103746 | None | 2.5.2 | Concrete for Super Structure Works
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8316.98 | 8316.98 | 90.54 | False | None | None | False | None | False | 753019.3692 | 0 | 3058060 | 103746 | None | 2.5.2 | Concrete for Super Structure Works
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8316.98 | 8316.98 | 44.1 | False | None | None | False | None | False | 366778.818 | 0 | 3058061 | 103746 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification Items are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3253.62 | 3253.62 | 24.0 | False | None | None | False | None | False | 78086.88 | 0 | 3058062 | 103746 | None | 4.1V | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2867.12 | 2867.12 | 7.0 | False | None | None | False | None | False | 20069.84 | 0 | 3058063 | 103746 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Items are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8278.08 | 8278.08 | 10.6 | False | None | None | False | None | False | 87747.648 | 0 | 3058064 | 103746 | None | 13.90 | Approacch Slab - M30
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14384.25 | 14384.25 | 21.0 | False | None | None | False | None | False | 302069.25 | 0 | 3058065 | 103746 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Items are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16980.35 | 16980.35 | 5.04 | False | None | None | False | None | False | 85580.964 | 0 | 3058066 | 103746 | None | 13.14 | Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 102.09 | 102.09 | 36.78 | False | None | None | False | None | False | 3754.8702 | 0 | 3058067 | 103746 | None | 818 | Guard Stones / Boundary Pillers
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 909.11 | 909.11 | 40.0 | False | None | None | False | None | False | 36364.4 | 0 | 3058068 | 103746 | None | AAA | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1663.39 | 1663.39 | 130.9 | False | None | None | False | None | False | 217737.751 | 0 | 3058069 | 103746 | None | AAA | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1663.39 | 1663.39 | 3.78 | False | None | None | False | None | False | 6287.6142 | 0 | 3058070 | 103746 | None | 2.8 A | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
Lime /Cement Concrete
By Mechanical Means
Cement Concrete Grade M-15 & M-20 Items are inclusive of GST 18 percent"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 873.87 | 873.87 | 25.2 | False | None | None | False | None | False | 22021.524 | 0 |
| 1710389502000 | 0 | None | None | Roads | Construction of 2 vent Hume Pipe Culvert 1000mm Dia at Km Ch 1.298 | 542841.26 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058071 | 103747 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 80.82 | False | None | None | False | None | False | 10019.2554 | 0 | 3058072 | 103747 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7556.14 | 7556.14 | 5.17 | False | None | None | False | None | False | 39065.2438 | 0 | 3058073 | 103747 | None | 2.1h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96029.97 | 96029.97 | 0.31 | False | None | None | False | None | False | 29769.2907 | 0 | 3058074 | 103747 | None | 2.5.2 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(including formwork) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7684.97 | 7684.97 | 12.92 | False | None | None | False | None | False | 99289.8124 | 0 | 3058075 | 103747 | None | 9.1 (i) | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Double Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 23161.88 | 23161.88 | 15.0 | False | None | None | False | None | False | 347428.2 | 0 | 3058076 | 103747 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 323.3 | 323.3 | 28.86 | False | None | None | False | None | False | 9330.438 | 0 | 3058077 | 103747 | None | abc | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 614.0 | 614.0 | 12.93 | False | None | None | False | None | False | 7939.02 | 0 |
| 1710389502000 | 0 | None | None | Roads | Construction of 2 vent Hume Pipe Culvert 1200mm Dia at Km Ch 1.910, 4.490 | 1812589.52 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058078 | 103748 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 297.51 | False | None | None | False | None | False | 36882.3147 | 0 | 3058079 | 103748 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7556.1 | 7556.1 | 17.33 | False | None | None | False | None | False | 130947.213 | 0 | 3058080 | 103748 | None | 2.1h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96030.0 | 96030.0 | 1.0 | False | None | None | False | None | False | 96030.0 | 0 | 3058081 | 103748 | None | 2.4.2 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(including formwork) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8299.78 | 8299.78 | 40.1 | False | None | None | False | None | False | 332821.178 | 0 | 3058082 | 103748 | None | 9.1 (i) | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Double Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 26302.47 | 26302.47 | 45.0 | False | None | None | False | None | False | 1183611.15 | 0 | 3058083 | 103748 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 323.3 | 323.3 | 99.9 | False | None | None | False | None | False | 32297.67 | 0 |
| 1710389502000 | 0 | None | None | Roads | Construction of 1 vent Hume Pipe Culvert 1000mm Dia at Km Ch 6.127 | 289733.66 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058084 | 103749 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 46.71 | False | None | None | False | None | False | 5790.6387 | 0 | 3058085 | 103749 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7556.1 | 7556.1 | 2.91 | False | None | None | False | None | False | 21988.251 | 0 | 3058086 | 103749 | None | 2.1h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96029.97 | 96029.97 | 0.19 | False | None | None | False | None | False | 18245.6943 | 0 | 3058087 | 103749 | None | 2.4.2 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(including formwork) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7684.97 | 7684.97 | 7.98 | False | None | None | False | None | False | 61326.0606 | 0 | 3058088 | 103749 | None | 9.1 (i) | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Double Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 11520.78 | 11520.78 | 15.0 | False | None | None | False | None | False | 172811.7 | 0 | 3058089 | 103749 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 323.3 | 323.3 | 14.43 | False | None | None | False | None | False | 4665.219 | 0 | 3058090 | 103749 | None | 1.1a | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 614.8 | 614.8 | 7.98 | False | None | None | False | None | False | 4906.104 | 0 |
| 1710389502000 | 0 | None | None | Roads | Construction of Field Culvert | 3807124.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058091 | 103750 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 551.61 | False | None | None | False | None | False | 68383.0917 | 0 | 3058092 | 103750 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7556.1 | 7556.1 | 34.36 | False | None | None | False | None | False | 259627.596 | 0 | 3058093 | 103750 | None | 2.1h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96030.0 | 96030.0 | 3.78 | False | None | None | False | None | False | 362993.4 | 0 | 3058094 | 103750 | None | 2.4.2 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(including formwork) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7684.97 | 7684.97 | 159.58 | False | None | None | False | None | False | 1226367.5126 | 0 | 3058095 | 103750 | None | 9.1 (i) | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Double Row .
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
i. 1000 mm . ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 11521.0 | 11521.0 | 150.0 | False | None | None | False | None | False | 1728150.0 | 0 | 3058096 | 103750 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 323.3 | 323.3 | 180.38 | False | None | None | False | None | False | 58316.854 | 0 | 3058097 | 103750 | None | 1.1a | Form work as per Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 614.8 | 614.8 | 168.0 | False | None | None | False | None | False | 103286.4 | 0 |
| 1710389502000 | 0 | None | None | Roads | CD DRAINS WITHOUT DUCT | 4833379.74 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058098 | 103751 | None | 1.14.1 | Excavation Mechanical Means
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the
excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work
In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.37 | 126.37 | 1026.0 | False | None | None | False | None | False | 129655.62 | 0 | 3058099 | 103751 | None | 2.1.4 | Levelling Course - M10
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwor shall be paid separately)
Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7702.86 | 7702.86 | 92.0 | False | None | None | False | None | False | 708663.12 | 0 | 3058100 | 103751 | None | 2.1h | TMT for All Structures
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.6 | 97894.6 | 15.33 | False | None | None | False | None | False | 1500724.218 | 0 | 3058101 | 103751 | None | 2.5.2 | Concrete for Sub Structure Works
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10576.17 | 10576.17 | 196.0 | False | None | None | False | None | False | 2072929.32 | 0 | 3058102 | 103751 | None | 2.5.2 | Concrete for Super Structure Works
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11089.67 | 11089.67 | 38.0 | False | None | None | False | None | False | 421407.46 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 1st year | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058103 | 103752 | None | 1aa | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge.
ii)By Mechanical Means using Dozer, a)In area of light junglePWD
SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii) a) /
Page No. 9)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058104 | 103752 | None | 2aa | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058105 | 103752 | None | 3AA | Maintenance of Earth Shoulder (stripping excess soil) - Stripping
excess soil from the shoulder surface to a minimum depth of
150mm to achieve the approved level and compacting with plate
compactor including cost of materials, labour, HOM complete as per
specifications etc. inclusive of all lift and leads and all complete as
per the direction of Engineer-in-charge. MORTH Specification No.
3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058106 | 103752 | None | 4AA | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058107 | 103752 | None | 5AA | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) - RRemoval of all
failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.5 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058108 | 103752 | None | 6AA | Nala Training: Earth work in surface excavation by mechanical
means for lowering & leveling the ground for all works other than
foundation in all kinds of soils & upto depth not exceeding 300mm
as per drawing and technical specifications, including setting out,
shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated
surfaces, disposing off or levelling the excavated earth or sorting &
stacking the selected earth for reuse in a radius of 50 m and lift upto
1.5 m including cost of labour, tools, usage of machinery & other
appurtenances required to complete the work.In all kinds of soils
upto 300 mm depth, SR:2023-24 V 1 Page No.8. Item No.1.12"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 2nd year | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058109 | 103753 | None | 1aaa | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge.
ii)By Mechanical Means using Dozer, a)In area of light junglePWD
SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii) a) /
Page No. 9)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058110 | 103753 | None | 2AA | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 50 Kg | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058111 | 103753 | None | 3AA | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058112 | 103753 | None | 3AA | Nala Training: Earth work in surface excavation by mechanical
means for lowering & leveling the ground for all works other than
foundation in all kinds of soils & upto depth not exceeding 300mm
as per drawing and technical specifications, including setting out,
shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated
surfaces, disposing off or levelling the excavated earth or sorting &
stacking the selected earth for reuse in a radius of 50 m and lift upto
1.5 m including cost of labour, tools, usage of machinery & other
appurtenances required to complete the work.In all kinds of soils
upto 300 mm depth, SR:2023-24 V 1 Page No.8. Item No.1.12"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058113 | 103753 | None | 5AA | Maintenance of Earth Shoulder (stripping excess soil) - Stripping
excess soil from the shoulder surface to a minimum depth of
150mm to achieve the approved level and compacting with plate
compactor including cost of materials, labour, HOM complete as per
specifications etc. inclusive of all lift and leads and all complete as
per the direction of Engineer-in-charge. MORTH Specification No.
3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3058114 | 103753 | None | 6AA | Maintenance of Earth Shoulder (stripping excess soil) - Stripping
excess soil from the shoulder surface to a minimum depth of
150mm to achieve the approved level and compacting with plate
compactor including cost of materials, labour, HOM complete as per
specifications etc. inclusive of all lift and leads and all complete as
per the direction of Engineer-in-charge. MORTH Specification No.
3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 3rd year | 525925.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058115 | 103754 | None | 1AA | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge.
ii)By Mechanical Means using Dozer, a)In area of light junglePWD
SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii) a) /
Page No. 9)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 534.97 | 534.97 | 60.696 | False | None | None | False | None | False | 32470.53912 | 0 | 3058116 | 103754 | None | 2AA | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.16 | 8.16 | 5040.0 | False | None | None | False | None | False | 41126.4 | 0 | 3058117 | 103754 | None | 3AA | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 53.08 | 53.08 | 567.0 | False | None | None | False | None | False | 30096.36 | 0 | 3058118 | 103754 | None | 4AA | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 132.04 | 132.04 | 1890.0 | False | None | None | False | None | False | 249555.6 | 0 | 3058119 | 103754 | None | 5AA | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2700.71 | 2700.71 | 6.3 | False | None | None | False | None | False | 17014.473 | 0 | 3058120 | 103754 | None | 6AA | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 280.41 | 280.41 | 6.3 | False | None | None | False | None | False | 1766.583 | 0 | 3058121 | 103754 | None | 7AA | Nala Training: Earth work in surface excavation by mechanical
means for lowering & leveling the ground for all works other than
foundation in all kinds of soils & upto depth not exceeding 300mm
as per drawing and technical specifications, including setting out,
shoring, strutting, barricading, caution lights, removal of stumps
8
and other deleterious matter including dressing of excavated
surfaces, disposing off or levelling the excavated earth or sorting &
stacking the selected earth for reuse in a radius of 50 m and lift upto
1.5 m including cost of labour, tools, usage of machinery & other
appurtenances required to complete the work.In all kinds of soils"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 129.31 | 129.31 | 90.0 | False | None | None | False | None | False | 11637.9 | 0 | 3058122 | 103754 | None | 8AA | of Parapet walls of CD work.
KSRRB M800-6. Painting two coats on New Concrete Surface : Painting
two coats after filling the surface with synthetic enamel paint in all shades
on new plastered concrete surfaces complete as per specifications. etc.
inclusive of all lift and leads and all complete as per the direction of
Engineer-in-charge. MORTH Specification No. 803
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No."
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 148.37 | 148.37 | 60.0 | False | None | None | False | None | False | 8902.2 | 0 | 3058123 | 103754 | None | 8AA | Printing New Letter and Figures of any ShadePrinting new letter and
figures of any shade with synthetic enamel paint black or any other
approved colour to give an even shade-English and Roman etc. inclusive
of all lift and leads and all complete as per the direction of Engineer-incharge.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.4"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.22 | 1.22 | 4500.0 | False | None | None | False | None | False | 5490.0 | 0 | 3058124 | 103754 | None | 9AA | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) - RRemoval of all
failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.5 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 579.89 | 579.89 | 220.5 | False | None | None | False | None | False | 127865.745 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 4th year | 667033.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058125 | 103755 | None | 2.6 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge.
ii)By Mechanical Means using Dozer, a)In area of light junglePWD
SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii) a) /
Page No. 9)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 554.07 | 554.07 | 60.696 | False | None | None | False | None | False | 33629.83272 | 0 | 3058126 | 103755 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.45 | 8.45 | 5040.0 | False | None | None | False | None | False | 42588.0 | 0 | 3058127 | 103755 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.98 | 54.98 | 567.0 | False | None | None | False | None | False | 31173.66 | 0 | 3058128 | 103755 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 136.75 | 136.75 | 1890.0 | False | None | None | False | None | False | 258457.5 | 0 | 3058129 | 103755 | None | 10.4 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) - RRemoval of all
failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.5 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 600.6 | 600.6 | 220.5 | False | None | None | False | None | False | 132432.3 | 0 | 3058130 | 103755 | None | 1.14.1 | Nala Training
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. "
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 133.93 | 133.93 | 1260.0 | False | None | None | False | None | False | 168751.8 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 5th year | 1095751.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058131 | 103756 | None | 2.6 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to be
used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge.
ii)By Mechanical Means using Dozer, a)In area of light junglePWD
SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii) a) /
Page No. 9)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 573.18 | 573.18 | 60.696 | False | None | None | False | None | False | 34789.73328 | 0 | 3058132 | 103756 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.75 | 8.75 | 5040.0 | False | None | None | False | None | False | 44100.0 | 0 | 3058133 | 103756 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.88 | 56.88 | 567.0 | False | None | None | False | None | False | 32250.96 | 0 | 3058134 | 103756 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 141.47 | 141.47 | 3780.0 | False | None | None | False | None | False | 534756.6 | 0 | 3058135 | 103756 | None | 10.4 | concrete, 40mm (using VG-30 Grade Bitumen) - RRemoval of
all
failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-
10.5 /
Page No. 91)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 624.22 | 624.22 | 441.0 | False | None | None | False | None | False | 275281.02 | 0 | 3058136 | 103756 | None | 1.14.1 | Nala Training
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. "
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 138.55 | 138.55 | 1260.0 | False | None | None | False | None | False | 174573.0 | 0 |
| 1710389502000 | 0 | None | None | Roads | Maintainence 6th year | 30505127.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058137 | 103757 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2990.07 | 2990.07 | 6.3 | False | None | None | False | None | False | 18837.441 | 0 | 3058138 | 103757 | None | 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 310.46 | 310.46 | 6.3 | False | None | None | False | None | False | 1955.898 | 0 | 3058139 | 103757 | None | 16.26 | Painting of Parapet walls of CD work. Painting two coats on New
Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades
on new plastered concrete surfaces complete as per specifications. etc. inclusive of all lift and
leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No.
803PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 164.27 | 164.27 | 3200.0 | False | None | None | False | None | False | 525664.0 | 0 | 3058140 | 103757 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with
synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD
SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.4 Page No.63)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1.35 | 1.35 | 4500.0 | False | None | None | False | None | False | 6075.0 | 0 | 3058141 | 103757 | None | 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 18.08 | 18.08 | 53680.0 | False | None | None | False | None | False | 970534.4 | 0 | 3058142 | 103757 | None | 5.16B | Providing and laying Bituminous Concrete Grading II for traffic 20 MSA with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16374.59 | 16374.59 | 1610.4 | False | None | None | False | None | False | 26369639.736 | 0 | 3058143 | 103757 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 798.76 | 798.76 | 2449.0 | False | None | None | False | None | False | 1956163.24 | 0 | 3058144 | 103757 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate
and ABS moulded body and reflective panels with micro prismatic lens capable of providing total
internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in
accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH
Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed
50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the
slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical
shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is
to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go
inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation
and complete as directed by the engineer.The contractor shall submit a two year warranty for
satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the
Engineer. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-incharge.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.43 / Page No. 74)"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 550.09 | 550.09 | 1193.0 | False | None | None | False | None | False | 656257.37 | 0 |
| 1710389502000 | 0 | None | None | Roads | PIPE LINE | 934861.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058145 | 103758 | None | 1.AAA | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights bracing, using sight rails & boning rods at every 100 mm whevere necessary sdirected, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 123.97 | 123.97 | 432.0 | False | None | None | False | None | False | 53555.04 | 0 | 3058146 | 103758 | None | 123WER | Supplying, laying and jointing HDPE pipes of specified grade and
conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of
pipes and specials with ectrofusionwelding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth ailable from the excation, testing and commissioning. The rate is exclusive of
required specials and fittings wherever necessary like saddle Tee, stub
ends, flanged sets, bedns, reducers etc. complete (Contractor will make
his own arrangements for procuring water for testing) etc.
Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 :"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 347.6 | 347.6 | 400.0 | False | None | None | False | None | False | 139040.0 | 0 | 3058147 | 103758 | None | QW123 | 150 mmdia
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1645.65 | 1645.65 | 400.0 | False | None | None | False | None | False | 658260.0 | 0 | 3058148 | 103758 | None | QW123 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 194.46 | 194.46 | 432.0 | False | None | None | False | None | False | 84006.72 | 0 |
| 1710389502000 | 0 | None | None | Roads | Electrical Estimate | 2143720.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3058149 | 103759 | None | Uni sr 23-24 vol-6 pg no-3(81) i.no 1.01 | RCC Pole 9 Mtrs Long 145 kg WL ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 10405.24 | 10405.24 | 20.0 | False | None | None | False | None | False | 208104.8 | 0 | 3058150 | 103759 | None | Uni sr 23-24 vol-6 pg no-3(81) i.no 1.06 | PSCC Pole 9 Mtr Long 200 Kg WL ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 7010.37 | 7010.37 | 65.0 | False | None | None | False | None | False | 455674.05 | 0 | 3058151 | 103759 | None | Uni sr 23-24 vol-6 i.no 2.02 | RandR PSCC Pole 9 Mtr Long 200 Kg WL ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2055.56 | 2055.56 | 115.0 | False | None | None | False | None | False | 236389.4 | 0 | 3058152 | 103759 | None | Uni sr 23-24 vol-6 pg no- i.no | RandR 11KV DP Structure ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 12088.86 | 12088.86 | 13.0 | False | None | None | False | None | False | 157155.18 | 0 | 3058153 | 103759 | None | Uni sr 23-24 vol-6 i.no 3.01 | 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1079.7 | 1079.7 | 60.0 | False | None | None | False | None | False | 64782.0 | 0 | 3058154 | 103759 | None | Uni sr 23-24 vol-6 i no 3.01 | RandR 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for PSCC Pole 9 Mtr Long ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 609.8 | 609.8 | 115.0 | False | None | None | False | None | False | 70127.0 | 0 | 3058155 | 103759 | None | Uni sr 23-24 vol-6 i.no 6.05 | 11 kV 45 KN Polymeric Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 219.48 | 219.48 | 39.0 | False | None | None | False | None | False | 8559.72 | 0 | 3058156 | 103759 | None | Uni sr 23-24 vol-6 i.no 6.06 | Guy Set Complete with No. 15 Strain Insulator and ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2080.33 | 2080.33 | 31.0 | False | None | None | False | None | False | 64490.23 | 0 | 3058157 | 103759 | None | I No.9 | Guy concreting with Boulders Mud and Sand ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 295.0 | 295.0 | 31.0 | False | None | None | False | None | False | 9145.0 | 0 | 3058158 | 103759 | None | Uni sr 23-24 vol-6 i.no 1.8.2 | b Pole concreting 1 2 4 500x500x1650 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4052.12 | 4052.12 | 75.0 | False | None | None | False | None | False | 303909.0 | 0 | 3058159 | 103759 | None | Uni sr 23-24 vol-6 ) i.no 1.8.2 | c Coping 1 2 4 as per actuals ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 368.15 | 368.15 | 75.0 | False | None | None | False | None | False | 27611.25 | 0 | 3058160 | 103759 | None | Uni sr 23-24 vol-6 i.no 21.04 | 11KV Line Height Raisers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 3093.96 | 3093.96 | 25.0 | False | None | None | False | None | False | 77349.0 | 0 | 3058161 | 103759 | None | Uni sr 23-24 vol-6 pg i.no 21.04 | 11KV Pin insulators Polymeric ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 241.89 | 241.89 | 165.0 | False | None | None | False | None | False | 39911.85 | 0 | 3058162 | 103759 | None | I No.14 | Releasing and Re stringing of Rabbit conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 9777.36 | 9777.36 | 30.7 | False | None | None | False | None | False | 300164.952 | 0 | 3058163 | 103759 | None | Uni sr 23-24 vol-6 pg i.no 2.16 | Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 391.76 | 391.76 | 60.0 | False | None | None | False | None | False | 23505.6 | 0 | 3058164 | 103759 | None | Uni sr 23-24 vol-6 pg no-3(81) i.no 3.01 | RandR of SP Transformer Structure suitable for 25KVA Using 9 Mtr RCC Poles ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 21558.48 | 21558.48 | 2.0 | False | None | None | False | None | False | 43116.96 | 0 | 3058165 | 103759 | None | Uni sr 23-24 vol-6 pg no-i.no 21.04 | 11 KV 5KN Polymeric Pin Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 260.78 | 260.78 | 6.0 | False | None | None | False | None | False | 1564.68 | 0 | 3058166 | 103759 | None | I No.18 | 11KV Polymeric Disc insulators ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 238.35 | 238.35 | 6.0 | False | None | None | False | None | False | 1430.1 | 0 | 3058167 | 103759 | None | I No.19 | Releasing and Re erection of 25KVA Transformer ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2674.7 | 2674.7 | 2.0 | False | None | None | False | None | False | 5349.4 | 0 | 3058168 | 103759 | None | Uni sr 23-24 vol-6 pg i.no 6.06 | Guy Set Complete with No.15 strain insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2080.33 | 2080.33 | 4.0 | False | None | None | False | None | False | 8321.32 | 0 | 3058169 | 103759 | None | I No.21 | Earthing materials pipe type for grounding ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 3160.04 | 3160.04 | 6.0 | False | None | None | False | None | False | 18960.24 | 0 | 3058170 | 103759 | None | I No.22 | Guy concreting with Boulders Mud and Sand ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 295.0 | 295.0 | 4.0 | False | None | None | False | None | False | 1180.0 | 0 | 3058171 | 103759 | None | Uni sr 23-24 vol-6 pg no- i.no 6.18.3 | GI Wire 8 SWG ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kg | 88.5 | 88.5 | 10.0 | False | None | None | False | None | False | 885.0 | 0 | 3058172 | 103759 | None | Uni sr 23-24 vol-6 pg no- i.no | Guy wire 7or10 SWG ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kg | 91.13 | 91.13 | 20.0 | False | None | None | False | None | False | 1822.6 | 0 | 3058173 | 103759 | None | Uni sr 23-24 vol-6 pg no- i.no 17.01 | RandR LT Protection Kit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 3185.2 | 3185.2 | 2.0 | False | None | None | False | None | False | 6370.4 | 0 | 3058174 | 103759 | None | Uni sr 23-24 vol-6 i.no 15.17.1 | RandR of LT Wiring From DTC to LT Line ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2127.65 | 2127.65 | 2.0 | False | None | None | False | None | False | 4255.3 | 0 | 3058175 | 103759 | None | I No.27 | RandR11kV Solid Core Type HG Fuse Unit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1792.77 | 1792.77 | 2.0 | False | None | None | False | None | False | 3585.54 | 0 |
|
|
---|