tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710364898000 | 0 | None | None | Roads | 754 A) Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Roads(Reconstruction) | 102728475.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056639 | 103610 | None | 16.29 | Providing and fixing of typical SHDP board will be a composite unit consisting of three plates of Aluminium Composite Materials ACM materialspecifications as per Clause 1701.3.7. The top most platewillbe in rectangular shape of 600mm x 600 mm size riveted overwelded M.S. angle iron frame of 25 mm x 25mm x 5 mm sizeon back on edges. The middle plate will be 1200 mm x 150mm size riveted over welded M.S. angle iron frame of 25mmx 25mmx 5 mm size on back on edges. The main lower mostplate will be 1500 mm x 600 mm size riveted over weldedM.S. angle iron frame of 25 mm x 25 mm x 5 mmsize.Weldingof all the sheets over angle iron frame will be done neatly tohave plain surface on one side. The angle iron frames of thelower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm 12 SWG sheet tubes posts placed at1125 mm apart centre to centre. The top of the middle platewill be flushed with the top of 75 mm dia medium steel tubeposts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower most platewill be 1200 mm from normal ground level and the bottomof middle plate will be 100 mm above the top level of thelower most plate. The rectangular shaped plate mounted overangle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWGhaving a spacing of 100 mm between the rectangular shapedplate and middle plate and this square section will be weldedto the bottom point of the rectangular shaped plate.ii The lettering and borders etc. of middle and bottomplate SHDP logo on top plate shall be as per clause 1701.4.6essages/Borders. All the sections of frame and posts will bepainted with primer and two coats of Epoxy paint. The steeltube below ground level will be painted with three coats ofEpoxy paint. The design painting and lettering shall be doneas per approved drawing. iii For warranty and durability the clause 1701.5 and formaintenance the clause 1911 shall be applicable. iv A reference number along with the month and yearof installation should be placed on the back of a sign ina contrasting colour or by stamping in characters notexceeding 50 mm in height.485777/2019/DirTech 7Retro Reflective Trafic Sign As per IRC 67 Clause1701.3.8.1 Class A Type 1
Rates inclusive of 18 percent GST Schedule of Rates PWD 2023-24 vol- 3 Item No: 16.29 Page No: 149 ---- item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3056640 | 103610 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) aRates inclusive of 18 percent GST Schedule ---- item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 80.64 | False | None | None | False | None | False | 37395.9936 | 0 | 3056641 | 103610 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 15928.75 | False | None | None | False | None | False | 1785612.875 | 0 | 3056642 | 103610 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7.Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 13416.12 | False | None | None | False | None | False | 1883891.5704 | 0 | 3056643 | 103610 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 7046.43 | False | None | None | False | None | False | 4099190.1882 | 0 | 3056644 | 103610 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 8680.61 | False | None | None | False | None | False | 24163519.6082 | 0 | 3056645 | 103610 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 10021.4 | False | None | None | False | None | False | 30260819.868 | 0 | 3056646 | 103610 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 39011.0 | False | None | None | False | None | False | 1887352.18 | 0 | 3056647 | 103610 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 39340.0 | False | None | None | False | None | False | 649896.8 | 0 | 3056648 | 103610 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 1967.0 | False | None | None | False | None | False | 21931695.94 | 0 | 3056649 | 103610 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects PWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 1180.2 | False | None | None | False | None | False | 15254934.744 | 0 | 3056650 | 103610 | None | item code 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.5)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 29810.0 | False | None | None | False | None | False | 211054.8 | 0 | 3056651 | 103610 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.1.3)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 14.0 | False | None | None | False | None | False | 98938.28 | 0 | 3056652 | 103610 | None | 8.42.3 | Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 150 mm size(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.42.3)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Rmtr | 546.34 | 546.34 | 700.0 | False | None | None | False | None | False | 382438.0 | 0 | 3056653 | 103610 | None | 4.19 | Construction of Median and Island with Soil Taken from Roadway Cutting Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 408(PWD SR Rates 2023-2024, Volume-3, Page No. 27,Item. No. 4.19)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 433.06 | 433.06 | 49.0 | False | None | None | False | None | False | 21219.94 | 0 | 3056654 | 103610 | None | 13.14 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR Rates 2023-2024, Volume-3, Page No. 123,Item. No. 13.14)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 99.12 | 99.12 | 245.0 | False | None | None | False | None | False | 24284.4 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (ROAD FURNITURES) | 2602297.54 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056655 | 103611 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 7.96 | False | None | None | False | None | False | 84629.128 | 0 | 3056656 | 103611 | None | 8.6 ii | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 25.0 | False | None | None | False | None | False | 140066.0 | 0 | 3056657 | 103611 | None | 8.6 VII | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. . (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 VII)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 10.0 | False | None | None | False | None | False | 51318.2 | 0 | 3056658 | 103611 | None | 8.6 xv | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv) Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 20.0 | False | None | None | False | None | False | 156350.0 | 0 | 3056659 | 103611 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) ---- item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 105.0 | False | None | None | False | None | False | 23293.2 | 0 | 3056660 | 103611 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 1349.31 | False | None | None | False | None | False | 843858.474 | 0 | 3056661 | 103611 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 922.0 | False | None | None | False | None | False | 397105.4 | 0 | 3056662 | 103611 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 27.0 | False | None | None | False | None | False | 26826.12 | 0 | 3056663 | 103611 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 200.0 | False | None | None | False | None | False | 859040.0 | 0 | 3056664 | 103611 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 4.0 | False | None | None | False | None | False | 13815.44 | 0 | 3056665 | 103611 | None | 8.16 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16)(i) 5th kilometre stone (precast) ---- item rates are inclusive of 18 percent GST | No | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERTS) 1.5X1.5-1V (Ch. 1.450 & 4.055 Km) | 2828051.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056666 | 103612 | None | 2.11 (a) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11(A))Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 42.66 | False | None | None | False | None | False | 9060.984 | 0 | 3056667 | 103612 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 135.82 | False | None | None | False | None | False | 16347.2952 | 0 | 3056668 | 103612 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 21.19 | False | None | None | False | None | False | 149750.1538 | 0 | 3056669 | 103612 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 7.99 | False | None | None | False | None | False | 744931.5102 | 0 | 3056670 | 103612 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 15 Item No 2.4.3
---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 46.25 | False | None | None | False | None | False | 414944.825 | 0 | 3056671 | 103612 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 14.0 | False | None | None | False | None | False | 135655.66 | 0 | 3056672 | 103612 | None | 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 40.56 | False | None | None | False | None | False | 55901.4144 | 0 | 3056673 | 103612 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.4.Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 10.8 | False | None | None | False | None | False | 34115.688 | 0 | 3056674 | 103612 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 9.3 | False | None | None | False | None | False | 69388.602 | 0 | 3056675 | 103612 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 7.8 | False | None | None | False | None | False | 17598.048 | 0 | 3056676 | 103612 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 15.12 | False | None | None | False | None | False | 121519.1376 | 0 | 3056677 | 103612 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 24.0 | False | None | None | False | None | False | 335167.2 | 0 | 3056678 | 103612 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 3.6 | False | None | None | False | None | False | 59348.808 | 0 | 3056679 | 103612 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 48.0 | False | None | None | False | None | False | 101668.8 | 0 | 3056680 | 103612 | None | 8.10 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 15.5 | False | None | None | False | None | False | 1993.61 | 0 | 3056681 | 103612 | None | 4.1A(V) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 PWD SR 2023-24, Vol-3 Page No 23 Item No 4.1A(V) ---- item rates are inclusive of 18 percent GST | Cum | 2934.66 | 2934.66 | 9.6 | False | None | None | False | None | False | 28172.736 | 0 | 3056682 | 103612 | None | Item No 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8720.72 | 8720.72 | 61.06 | False | None | None | False | None | False | 532487.1632 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (WATER SUPPLY LINE) | 693469.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056683 | 103613 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 264.6 | False | None | None | False | None | False | 31847.256 | 0 | 3056684 | 103613 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 490.0 | False | None | None | False | None | False | 220872.4 | 0 | 3056685 | 103613 | None | 8.29 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 260.73 | False | None | None | False | None | False | 49225.824 | 0 | 3056686 | 103613 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 150.0 | False | None | None | False | None | False | 391524.0 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056687 | 103614 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed41.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056688 | 103614 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3087.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056689 | 103614 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Qty Executed 463.05)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056690 | 103614 | None | 10.2 | maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Qty Executed 1543.50)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056691 | 103614 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =247.50)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056692 | 103614 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete 40mm using Vg-30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge all as per clause 3004.2.Schedule of Rates PWD 2023-24 vol- 3 Item No 10.5 Page No 91 rates inclusive of 18 percentage GST Qty=0.0 (have to rectify irrespective of qty) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Road Maintenance Activities to be carried out for the Second Year. | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056693 | 103615 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =61.740)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056694 | 103615 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4116.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056695 | 103615 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Qty Executed 463.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056696 | 103615 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Qty Excecuted 1543.50) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056697 | 103615 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =248)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056698 | 103615 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete 40mm using Vg-30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge all as per clause 3004.2.Schedule of Rates PWD 2023-24 vol- 3 Item No 10.5 Page No 91 rates inclusive of 18 percentage GST Qty=0.00 (have to rectify irrespective of qty) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE) | 440470.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056699 | 103616 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) aRates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 59.16 | False | None | None | False | None | False | 30727.1124 | 0 | 3056700 | 103616 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 4336.0 | False | None | None | False | None | False | 34384.48 | 0 | 3056701 | 103616 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 487.8 | False | None | None | False | None | False | 25141.212 | 0 | 3056702 | 103616 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 1626.0 | False | None | None | False | None | False | 208436.94 | 0 | 3056703 | 103616 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 162.6 | False | None | None | False | None | False | 91543.8 | 0 | 3056704 | 103616 | None | 1.12 | Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 180.0 | False | None | None | False | None | False | 22599.0 | 0 | 3056705 | 103616 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 5.42 | False | None | None | False | None | False | 14211.511 | 0 | 3056706 | 103616 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 27.0 | False | None | None | False | None | False | 7350.75 | 0 | 3056707 | 103616 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 42.0 | False | None | None | False | None | False | 6050.1 | 0 | 3056708 | 103616 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4.Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 21.6 | False | None | None | False | None | False | 25.704 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the 4th Year (PAID MAINTENANCE) | 427566.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056709 | 103617 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST | 100 Sqm | 537.94 | 537.94 | 59.16 | False | None | None | False | None | False | 31824.5304 | 0 | 3056710 | 103617 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 4336.0 | False | None | None | False | None | False | 35598.56 | 0 | 3056711 | 103617 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) ---- item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 487.8 | False | None | None | False | None | False | 26038.764 | 0 | 3056712 | 103617 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) ---- item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 1626.0 | False | None | None | False | None | False | 215884.02 | 0 | 3056713 | 103617 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 162.6 | False | None | None | False | None | False | 94813.686 | 0 | 3056714 | 103617 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 180.0 | False | None | None | False | None | False | 23407.2 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur DistPKG 755 in Madhugiri Tq of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the 5th Year (PAID MAINTENANCE) | 464050.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056715 | 103618 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST | 100 Sqm | 477.89 | 477.89 | 59.16 | False | None | None | False | None | False | 28271.9724 | 0 | 3056716 | 103618 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GST | Rmtr | 7.29 | 7.29 | 4336.0 | False | None | None | False | None | False | 31609.44 | 0 | 3056717 | 103618 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) ---- item rates are inclusive of 18 percent GST | Sqm | 47.42 | 47.42 | 487.8 | False | None | None | False | None | False | 23131.476 | 0 | 3056718 | 103618 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) ---- item rates are inclusive of 18 percent GST | Sqm | 117.95 | 117.95 | 1626.0 | False | None | None | False | None | False | 191786.7 | 0 | 3056719 | 103618 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- item rates are inclusive of 18 percent GST | Sqm | 518.01 | 518.01 | 325.2 | False | None | None | False | None | False | 168456.852 | 0 | 3056720 | 103618 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GST | Cum | 115.52 | 115.52 | 180.0 | False | None | None | False | None | False | 20793.6 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur DistPKG 755 in Madhugiri Tq of Tumkur Dist Estimate for Renewal after Maintenance Period at 6th Year | 21214852.68 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056721 | 103619 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 5.42 | False | None | None | False | None | False | 15734.2058 | 0 | 3056722 | 103619 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 5.42 | False | None | None | False | None | False | 1633.6964 | 0 | 3056723 | 103619 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 42.0 | False | None | None | False | None | False | 6698.58 | 0 | 3056724 | 103619 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4.Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | cm | 1.32 | 1.32 | 13500.0 | False | None | None | False | None | False | 17820.0 | 0 | 3056725 | 103619 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.PWD SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 39340.0 | False | None | None | False | None | False | 690810.4 | 0 | 3056726 | 103619 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
PWD SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 1180.2 | False | None | None | False | None | False | 18916115.778 | 0 | 3056727 | 103619 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 67, Item No. 8.15 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 1349.31 | False | None | None | False | None | False | 1046389.905 | 0 | 3056728 | 103619 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 72, Item No. 8.43 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | m | 534.07 | 534.07 | 973.0 | False | None | None | False | None | False | 519650.11 | 0 |
| 1710364898000 | 0 | None | None | Roads | 754 B) Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Road Work) | 59475803.96 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056729 | 103620 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be
painted with primer and two coats of Epoxy paint. The steel
tube below ground level will be painted with three coats of
Epoxy paint. The design, painting and lettering shall be done
as per approved drawing.
(iii) For warranty and durability the clause 1701.5 and for
maintenance the clause 1911 shall be applicable.
(iv) A reference number along with the month and year
of installation should be placed on the back of a sign in
a contrasting colour or by stamping in characters not
exceeding 50 mm in height.485777/2019/Dir(Tech) 7 PWD SR2023-24,V-3,PageNo.149Item No.16.29 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3056730 | 103620 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 40.38 | False | None | None | False | None | False | 18725.8212 | 0 | 3056731 | 103620 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 14662.5 | False | None | None | False | None | False | 103810.5 | 0 | 3056732 | 103620 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 13410.25 | False | None | None | False | None | False | 1503289.025 | 0 | 3056733 | 103620 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 8205.03 | False | None | None | False | None | False | 1152150.3126 | 0 | 3056734 | 103620 | None | 4.4 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 5085.37 | False | None | None | False | None | False | 2958363.1438 | 0 | 3056735 | 103620 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 4940.43 | False | None | None | False | None | False | 13752279.7566 | 0 | 3056736 | 103620 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(PWD SR Rates 2023-2024, Volume-3, Page No. 26,Item. No. 4.17) Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 5436.37 | False | None | None | False | None | False | 16415771.5794 | 0 | 3056737 | 103620 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 20982.5 | False | None | None | False | None | False | 1015133.35 | 0 | 3056738 | 103620 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 20982.5 | False | None | None | False | None | False | 346630.9 | 0 | 3056739 | 103620 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 1258.95 | False | None | None | False | None | False | 14037065.889 | 0 | 3056740 | 103620 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects PWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 629.47 | False | None | None | False | None | False | 8136352.9684 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (ROAD FURNITURES) | 2584518.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056741 | 103621 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 11.48 | False | None | None | False | None | False | 122053.064 | 0 | 3056742 | 103621 | None | 8.6 ii | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 ii) 90 cm equilateral triangle (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 24.0 | False | None | None | False | None | False | 134463.36 | 0 | 3056743 | 103621 | None | 8.6 (viii) | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 viii) 60 cm circular (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 viii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 15.0 | False | None | None | False | None | False | 76977.3 | 0 | 3056744 | 103621 | None | 8.6 (xv) | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 xv) 90 cm high octagon (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 xv) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 24.0 | False | None | None | False | None | False | 187620.0 | 0 | 3056745 | 103621 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 41.25 | False | None | None | False | None | False | 9150.9 | 0 | 3056746 | 103621 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 782.0 | False | None | None | False | None | False | 489062.8 | 0 | 3056747 | 103621 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 528.0 | False | None | None | False | None | False | 227409.6 | 0 | 3056748 | 103621 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 20.0 | False | None | None | False | None | False | 19871.2 | 0 | 3056749 | 103621 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 4.0 | False | None | None | False | None | False | 13815.44 | 0 | 3056750 | 103621 | None | 8.16 (i) | Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including painting and printing etc.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (i)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3056751 | 103621 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type A, W Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS1367 and IS1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 300.0 | False | None | None | False | None | False | 1288560.0 | 0 | 3056752 | 103621 | None | 8.17 | Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings ---- item rates are inclusive of 18 percent GST | Each | 2384.78 | 2384.78 | 4.0 | False | None | None | False | None | False | 9539.12 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERT) 1.5X1.5-1V (Ch. Km 0.212, 0.458, 0.574, 0.842, 0.960, 1.080, 1.958, 2.120, 2.302, 2.900 & 3.078) | 17938745.54 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056753 | 103622 | None | 2.11(II(A) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical meansPWD SR 2023-24, Vol-3 Page No 11 Item No 2.11(II(A)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 59.53 | False | None | None | False | None | False | 12644.172 | 0 | 3056754 | 103622 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 747.05 | False | None | None | False | None | False | 89914.938 | 0 | 3056755 | 103622 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 116.51 | False | None | None | False | None | False | 823378.5002 | 0 | 3056756 | 103622 | None | 2.11(h) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 43.97 | False | None | None | False | None | False | 4099454.1306 | 0 | 3056757 | 103622 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 590.2 | False | None | None | False | None | False | 5295144.556 | 0 | 3056758 | 103622 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 77.0 | False | None | None | False | None | False | 746106.13 | 0 | 3056759 | 103622 | None | 12.3A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 223.08 | False | None | None | False | None | False | 307457.7792 | 0 | 3056760 | 103622 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24, Vol-3 Page No 117 Item No 12.4 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 118.8 | False | None | None | False | None | False | 375272.568 | 0 | 3056761 | 103622 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 51.14 | False | None | None | False | None | False | 381562.6996 | 0 | 3056762 | 103622 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.
PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 42.9 | False | None | None | False | None | False | 96789.264 | 0 | 3056763 | 103622 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8. Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 83.16 | False | None | None | False | None | False | 668355.2568 | 0 | 3056764 | 103622 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9 Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 132.0 | False | None | None | False | None | False | 1843419.6 | 0 | 3056765 | 103622 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2. Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 19.8 | False | None | None | False | None | False | 326418.444 | 0 | 3056766 | 103622 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.
PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16 Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 264.0 | False | None | None | False | None | False | 559178.4 | 0 | 3056767 | 103622 | None | 8.1 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.
PWD SR 2023-24, Vol-3 Page No 123 Item No 13.14 Rates are Inclusive of 18% GST
---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 85.25 | False | None | None | False | None | False | 10964.855 | 0 | 3056768 | 103622 | None | 2.17 (ix) B | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leadii) By Mechanical Means B. Above 600 mm to 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) B) ---- item rates are inclusive of 18 percent GST | m | 1293.28 | 1293.28 | 25.0 | False | None | None | False | None | False | 32332.0 | 0 | 3056769 | 103622 | None | tem No 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8720.72 | 8720.72 | 260.34 | False | None | None | False | None | False | 2270352.2448 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERTY 2x2x1V) | 2507701.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056770 | 103623 | None | 2.11 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SR Rates 2023-24 Item no 2.11 Page No 11 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 32.4 | False | None | None | False | None | False | 6881.76 | 0 | 3056771 | 103623 | None | 2.17 (ix) C) | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means C. Above 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) C) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Mtr | 1621.32 | 1621.32 | 15.0 | False | None | None | False | None | False | 24319.8 | 0 | 3056772 | 103623 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m (PWD SR Rates 2023-2024, Volume-3, Page No. 8,Item. No. 1.14.1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 100.63 | False | None | None | False | None | False | 12111.8268 | 0 | 3056773 | 103623 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-3, Page No. 15,Item. No. 2.1.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 17.09 | False | None | None | False | None | False | 120775.3718 | 0 | 3056774 | 103623 | None | 2.11 (h) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (PWD SR Rates 2023-2024, Volume-1, Page No. 18 ,Item. No. 2.11(h) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 7.3 | False | None | None | False | None | False | 680600.754 | 0 | 3056775 | 103623 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-1, Page No. 16,Item. No. 2.4.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 85.49 | False | None | None | False | None | False | 766997.4722 | 0 | 3056776 | 103623 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-1, Page No. 16,Item. No. 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 16.62 | False | None | None | False | None | False | 161042.6478 | 0 | 3056777 | 103623 | None | 12.3A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3A Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 26.61 | False | None | None | False | None | False | 36674.9664 | 0 | 3056778 | 103623 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24 Item No 12.4 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 5.4 | False | None | None | False | None | False | 17057.844 | 0 | 3056779 | 103623 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 6.38 | False | None | None | False | None | False | 47602.0732 | 0 | 3056780 | 103623 | None | 14.4A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 5.56 | False | None | None | False | None | False | 12544.2496 | 0 | 3056781 | 103623 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24 Item No 13.8 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 7.56 | False | None | None | False | None | False | 60759.5688 | 0 | 3056782 | 103623 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24 Item No 13.9 Page No 122 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 12.0 | False | None | None | False | None | False | 167583.6 | 0 | 3056783 | 103623 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24 Item No 13.2 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 4.28 | False | None | None | False | None | False | 70559.1384 | 0 | 3056784 | 103623 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24 Item No 13.16 Page No 124 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Mtr | 2118.1 | 2118.1 | 24.0 | False | None | None | False | None | False | 50834.4 | 0 | 3056785 | 103623 | None | 8.1 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. PWD SR 2023-24 Item No 8.1 Page No 66 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 17.37 | False | None | None | False | None | False | 2234.1294 | 0 | 3056786 | 103623 | None | Item No 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 8720.72 | 8720.72 | 30.86 | False | None | None | False | None | False | 269121.4192 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Retaining Wall) | 7494866.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056787 | 103624 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m PWD SR 2023-24 Item no 1.14.1 Page No 8 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 1094.4 | False | None | None | False | None | False | 131721.984 | 0 | 3056788 | 103624 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item no 2.1.3 Page No 15 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 82.65 | False | None | None | False | None | False | 584089.203 | 0 | 3056789 | 103624 | None | 2.11 (h) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures PWD SR 2023-24 Item no 2.11 h Page No 18 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 28.24 | False | None | None | False | None | False | 2632899.3552 | 0 | 3056790 | 103624 | None | 12.3A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3A Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 410.4 | False | None | None | False | None | False | 565629.696 | 0 | 3056791 | 103624 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 453.15 | False | None | None | False | None | False | 3550067.73 | 0 | 3056792 | 103624 | None | 14.4A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 13.5 | False | None | None | False | None | False | 30458.16 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (1st Year Maintenance) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056793 | 103625 | None | 2.5 ii a) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (ii) By Mechanical Means using Dozer a In area of light jungle (PWD SR Rates 2023-2024, Volume-3, Page No. 9,Item. No. 2.5 ii a) Rates are inclusive of 18% GST LBD qty=31.28 ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056794 | 103625 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.19) Rates are inclusive of 18% GST LBD Qty=2346 ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056795 | 103625 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) Rates are inclusive of 18% GST LBD QTY=351.90 ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056796 | 103625 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) Rates are inclusive of 18% GST LBD QTY=1173.00 ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056797 | 103625 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) (have to Rectify irrespective of qty)Rates are inclusive of 18% GST LBD QTY=0.00 ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056798 | 103625 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.12) Rates are inclusive of 18% GST LBD QTY=216 ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (2nd Year Maintenance) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056799 | 103626 | None | item code 2.5 II a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a LBD QTY 46.920 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056800 | 103626 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 LBD QTY 3128 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056801 | 103626 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 LBD QTY 351.90 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056802 | 103626 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 LBD QTY 1173 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056803 | 103626 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 (have to Rectify irrespective of qty) LBD QTY 0.00 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056804 | 103626 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 LBD QTY 216 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (3rd Year Maintenance) | 404857.61 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056805 | 103627 | None | item code 2.5 II a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 519.39 | 519.39 | 37.92 | False | None | None | False | None | False | 19695.2688 | 0 | 3056806 | 103627 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 1564.0 | False | None | None | False | None | False | 12402.52 | 0 | 3056807 | 103627 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 351.9 | False | None | None | False | None | False | 18136.926 | 0 | 3056808 | 103627 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 1173.0 | False | None | None | False | None | False | 150366.87 | 0 | 3056809 | 103627 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 107.52 | False | None | None | False | None | False | 60533.76 | 0 | 3056810 | 103627 | None | item code 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.22 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 7.0 | False | None | None | False | None | False | 18354.35 | 0 | 3056811 | 103627 | None | item code 16.24 i | Maintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SR Rates 2023 2024 Volume 3 Page No. 148 Item. No. 16.24i Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 20.0 | False | None | None | False | None | False | 5445.0 | 0 | 3056812 | 103627 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 810.0 | False | None | None | False | None | False | 101695.5 | 0 | 3056813 | 103627 | None | item code 8.10 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR Rates 2023-2024 Volume-3 Page No. 66 Item. No. 8.10 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 126.0 | False | None | None | False | None | False | 18150.3 | 0 | 3056814 | 103627 | None | item code 8.4 | Printing New letter and Figures of any Shade 8.3 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman PWD SR Rates 2023.2024 Volume 3 Page No. 63 Item. No. 8.4 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 64.8 | False | None | None | False | None | False | 77.112 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (4th Year Maintenance) | 388631.58 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056815 | 103628 | None | item code 2.5 ii a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 537.94 | 537.94 | 37.92 | False | None | None | False | None | False | 20398.6848 | 0 | 3056816 | 103628 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 3128.0 | False | None | None | False | None | False | 25680.88 | 0 | 3056817 | 103628 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 351.9 | False | None | None | False | None | False | 18784.422 | 0 | 3056818 | 103628 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 1173.0 | False | None | None | False | None | False | 155739.21 | 0 | 3056819 | 103628 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 107.52 | False | None | None | False | None | False | 62695.9872 | 0 | 3056820 | 103628 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 810.0 | False | None | None | False | None | False | 105332.4 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (5th Year Maintenance) | 628028.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056821 | 103629 | None | item code 2.5 ii a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 556.49 | 556.49 | 37.92 | False | None | None | False | None | False | 21102.1008 | 0 | 3056822 | 103629 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Rmtr | 8.5 | 8.5 | 3128.0 | False | None | None | False | None | False | 26588.0 | 0 | 3056823 | 103629 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 55.22 | 55.22 | 351.9 | False | None | None | False | None | False | 19431.918 | 0 | 3056824 | 103629 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 137.35 | 137.35 | 2346.0 | False | None | None | False | None | False | 322223.1 | 0 | 3056825 | 103629 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 603.22 | 603.22 | 215.05 | False | None | None | False | None | False | 129722.461 | 0 | 3056826 | 103629 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 134.52 | 134.52 | 810.0 | False | None | None | False | None | False | 108961.2 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (6th Year Maintenance) | 11716608.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056827 | 103630 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.22) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 3.91 | False | None | None | False | None | False | 11350.6909 | 0 | 3056828 | 103630 | None | 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (PWD SR Rates 2023-2024, Volume-3, Page No. 148,Item. No. 16.24i) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 3.91 | False | None | None | False | None | False | 1178.5522 | 0 | 3056829 | 103630 | None | 8.10 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 190.8 | False | None | None | False | None | False | 30430.692 | 0 | 3056830 | 103630 | None | 8.4 | Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.32 | 1.32 | 13500.0 | False | None | None | False | None | False | 17820.0 | 0 | 3056831 | 103630 | None | 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.3i) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 21477.5 | False | None | None | False | None | False | 377144.9 | 0 | 3056832 | 103630 | None | 5.16 C | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 37,Item. No. 5.16 C) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 645.15 | False | None | None | False | None | False | 10340393.2335 | 0 | 3056833 | 103630 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 911.03 | False | None | None | False | None | False | 706503.765 | 0 | 3056834 | 103630 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Nos | 534.07 | 534.07 | 434.0 | False | None | None | False | None | False | 231786.38 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Water Supply) | 342675.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056835 | 103631 | None | Item. No. 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 309.16 | 309.16 | 135.0 | False | None | None | False | None | False | 41736.6 | 0 | 3056836 | 103631 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 250.0 | False | None | None | False | None | False | 112690.0 | 0 | 3056837 | 103631 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24, Vol-1 Page No 7 Item No 1.10 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 133.02 | False | None | None | False | None | False | 25114.176 | 0 | 3056838 | 103631 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 62.5 | False | None | None | False | None | False | 163135.0 | 0 |
| 1710364898000 | 0 | None | None | Roads | Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (RCC DRAIN) | 5063807.04 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056839 | 103632 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m)(UNI SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 704.0 | False | None | None | False | None | False | 84733.44 | 0 | 3056840 | 103632 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 70.4 | False | None | None | False | None | False | 497518.208 | 0 | 3056841 | 103632 | None | 2.11 h | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(UNI SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 11.52 | False | None | None | False | None | False | 1074043.9296 | 0 | 3056842 | 103632 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 86.4 | False | None | None | False | None | False | 644642.496 | 0 | 3056843 | 103632 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 8953.37 | 8953.37 | 86.4 | False | None | None | False | None | False | 773571.168 | 0 | 3056844 | 103632 | None | 2.10 (iv) B | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar(PWD SR Rates 2023-2024, Volume-3, Page No. 10,Item. No. 2.10(iv)B) ---- item rates are inclusive of 18 percent GST | Cum | 719.8 | 719.8 | 345.6 | False | None | None | False | None | False | 248762.88 | 0 | 3056845 | 103632 | None | Item. No. 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 10072.54 | 10072.54 | 172.8 | False | None | None | False | None | False | 1740534.912 | 0 |
| 1710364898000 | 0 | None | None | Roads | PKG 754 Improvements to Road Madhugiri Chandanadur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist(Electrical Works) | 617019.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056846 | 103633 | None | 1.0 | 11kV pin insulators with GI pins ---- item rates are inclusive of 18 percent GST | Set | 241.9 | 241.9 | 90.0 | False | None | None | False | None | False | 21771.0 | 0 | 3056847 | 103633 | None | 1.1 | Guy sets ---- item rates are inclusive of 18 percent GST | Set | 2465.02 | 2465.02 | 15.0 | False | None | None | False | None | False | 36975.3 | 0 | 3056848 | 103633 | None | 1.3 | Rabbit conductor with 1.5 % sag ---- item rates are inclusive of 18 percent GST | Km | 74219.64 | 74219.64 | 0.5 | False | None | None | False | None | False | 37109.82 | 0 | 3056849 | 103633 | None | 1.4 | Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. ---- item rates are inclusive of 18 percent GST | Set | 2907.52 | 2907.52 | 6.0 | False | None | None | False | None | False | 17445.12 | 0 | 3056850 | 103633 | None | 1.5 | Releasing and Reerrection of Poles ---- item rates are inclusive of 18 percent GST | Nos | 3907.81 | 3907.81 | 100.0 | False | None | None | False | None | False | 390781.0 | 0 | 3056851 | 103633 | None | 1.6 | Releasing and reerrection of SP TC set ---- item rates are inclusive of 18 percent GST | Nos | 11671.85 | 11671.85 | 1.0 | False | None | None | False | None | False | 11671.85 | 0 | 3056852 | 103633 | None | 1.7 | Releasing and reerrection of DP TC set ---- item rates are inclusive of 18 percent GST | Nos | 15658.13 | 15658.13 | 1.0 | False | None | None | False | None | False | 15658.13 | 0 | 3056853 | 103633 | None | 1.8 | Releasing & rifixing of LT Protection kit ---- item rates are inclusive of 18 percent GST | Nos | 800.39 | 800.39 | 1.0 | False | None | None | False | None | False | 800.39 | 0 | 3056854 | 103633 | None | 1.9 | Releasing & rifixing of 11 KV DOLO Cutout ---- item rates are inclusive of 18 percent GST | Nos | 533.6 | 533.6 | 1.0 | False | None | None | False | None | False | 533.6 | 0 | 3056855 | 103633 | None | 1.10 | Releasing and Rifixing of H cross arm ---- item rates are inclusive of 18 percent GST | Nos | 578.44 | 578.44 | 75.0 | False | None | None | False | None | False | 43383.0 | 0 | 3056856 | 103633 | None | 1.11 | Releasing and Rifixing of 4 Pin cross arm ---- item rates are inclusive of 18 percent GST | No. | 578.44 | 578.44 | 32.0 | False | None | None | False | None | False | 18510.08 | 0 | 3056857 | 103633 | None | 1.12 | Releasing and Restringing of Rabbit conductor ---- item rates are inclusive of 18 percent GST | No | 9779.6 | 9779.6 | 1.65 | False | None | None | False | None | False | 16136.34 | 0 | 3056858 | 103633 | None | 1.13 | Releasing and reerrection of 25KVA TC ---- item rates are inclusive of 18 percent GST | No | 2676.95 | 2676.95 | 1.0 | False | None | None | False | None | False | 2676.95 | 0 | 3056859 | 103633 | None | 1.15 | Releasing and reerrection of 100KVA TC ---- item rates are inclusive of 18 percent GST | No | 3567.02 | 3567.02 | 1.0 | False | None | None | False | None | False | 3567.02 | 0 |
| 1710364898000 | 0 | None | None | Roads | CH.0. TO 5.5 Madugiri-Hindupur (Electrical estimate) | 1045490.37 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056860 | 103634 | None | 1.0 | 9 Mtr PSCC Pole with working load of 200Kg ---- item rates are inclusive of 18 percent GST | Nos | 7301.84 | 7301.84 | 22.0 | False | None | None | False | None | False | 160640.48 | 0 | 3056861 | 103634 | None | 1.1 | 11KV Horizantal cross arm with clamps HT Single Top ---- item rates are inclusive of 18 percent GST | Set | 807.12 | 807.12 | 18.0 | False | None | None | False | None | False | 14528.16 | 0 | 3056862 | 103634 | None | 1.2 | 11 kV, 45 kN Polymeric Insulator ---- item rates are inclusive of 18 percent GST | Nos | 228.92 | 228.92 | 36.0 | False | None | None | False | None | False | 8241.12 | 0 | 3056863 | 103634 | None | 1.3 | 11kV pin insulators with GI pins ---- item rates are inclusive of 18 percent GST | Set | 250.16 | 250.16 | 72.0 | False | None | None | False | None | False | 18011.52 | 0 | 3056864 | 103634 | None | 1.4 | 4 Pin cross arms with clamps, ---- item rates are inclusive of 18 percent GST | Set | 700.92 | 700.92 | 20.0 | False | None | None | False | None | False | 14018.4 | 0 | 3056865 | 103634 | None | 1.5 | 1.1 K V Pin Insulators, with G I Pins ---- item rates are inclusive of 18 percent GST | Nos | 67.26 | 67.26 | 88.0 | False | None | None | False | None | False | 5918.88 | 0 | 3056866 | 103634 | None | 1.6 | 8 kv Strain Insulators. ---- item rates are inclusive of 18 percent GST | Nos | 22.42 | 22.42 | 64.0 | False | None | None | False | None | False | 1434.88 | 0 | 3056867 | 103634 | None | 1.7 | Special 3Pin Cross Arms ---- item rates are inclusive of 18 percent GST | Set | 2256.16 | 2256.16 | 18.0 | False | None | None | False | None | False | 40610.88 | 0 | 3056868 | 103634 | None | 1.8 | Releasing Reerraction of 9 mtr long PSCC pole ---- item rates are inclusive of 18 percent GST | No | 4116.31 | 4116.31 | 33.0 | False | None | None | False | None | False | 135838.23 | 0 | 3056869 | 103634 | None | 1.9 | 25/63/100 Kva Dtc stracture ---- item rates are inclusive of 18 percent GST | Set | 48973.54 | 48973.54 | 5.0 | False | None | None | False | None | False | 244867.7 | 0 | 3056870 | 103634 | None | 1.10 | Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. ---- item rates are inclusive of 18 percent GST | Set | 3261.52 | 3261.52 | 15.0 | False | None | None | False | None | False | 48922.8 | 0 | 3056871 | 103634 | None | 1.11 | Guy Wire 7/10 swg FOR neutral earthing ---- item rates are inclusive of 18 percent GST | Kg | 91.13 | 91.13 | 50.0 | False | None | None | False | None | False | 4556.5 | 0 | 3056872 | 103634 | None | 1.12 | R & R LT Protection kit ---- item rates are inclusive of 18 percent GST | Nos | 800.39 | 800.39 | 5.0 | False | None | None | False | None | False | 4001.95 | 0 | 3056873 | 103634 | None | 1.13 | HG Fuse, 11 kV Solid Core Type ---- item rates are inclusive of 18 percent GST | Set | 1541.08 | 1541.08 | 15.0 | False | None | None | False | None | False | 23116.2 | 0 | 3056874 | 103634 | None | 1.14 | Horizontal cross arms with clamps, HTST supports, bolts-nuts and washers, ---- item rates are inclusive of 18 percent GST | Set | 376.66 | 376.66 | 33.0 | False | None | None | False | None | False | 12429.78 | 0 | 3056875 | 103634 | None | 1.15 | Releasing and refixing of Special 3Pin Cross Arms ---- item rates are inclusive of 18 percent GST | Set | 1230.86 | 1230.86 | 3.0 | False | None | None | False | None | False | 3692.58 | 0 | 3056876 | 103634 | None | 1.16 | Guy Set Complete ---- item rates are inclusive of 18 percent GST | Set | 1879.74 | 1879.74 | 14.0 | False | None | None | False | None | False | 26316.36 | 0 | 3056877 | 103634 | None | 1.17 | ACSR Rabbit Conductor ---- item rates are inclusive of 18 percent GST | Km | 56144.4 | 56144.4 | 1.25 | False | None | None | False | None | False | 70180.5 | 0 | 3056878 | 103634 | None | 1.18 | Relising & Restringing of ACSR wire ---- item rates are inclusive of 18 percent GST | Km | 10122.63 | 10122.63 | 20.2 | False | None | None | False | None | False | 204477.126 | 0 | 3056879 | 103634 | None | 1.19 | Loading and Un loading Charges of PSC pole ---- item rates are inclusive of 18 percent GST | Nos | 167.56 | 167.56 | 22.0 | False | None | None | False | None | False | 3686.32 | 0 |
| 1710364898000 | 0 | None | None | Roads | CH.0.00 TO 1.0Madugiri -Hindupura(Electrical estimate) | 428823.19 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056880 | 103635 | None | 1.0 | 9 mtr PSCC Pole 200kg WL for stud pole ---- item rates are inclusive of 18 percent GST | Nos | 7010.38 | 7010.38 | 10.0 | False | None | None | False | None | False | 70103.8 | 0 | 3056881 | 103635 | None | 1.1 | 11kv Polymeric Pin Insulators ---- item rates are inclusive of 18 percent GST | Nos | 241.9 | 241.9 | 21.0 | False | None | None | False | None | False | 5079.9 | 0 | 3056882 | 103635 | None | 1.2 | 45KN Disc Inslator for Rabbit Conductor ---- item rates are inclusive of 18 percent GST | Nos | 219.48 | 219.48 | 36.0 | False | None | None | False | None | False | 7901.28 | 0 | 3056883 | 103635 | None | 1.3 | 11KV Horizantal cross arm with clamps ---- item rates are inclusive of 18 percent GST | Set | 1314.52 | 1314.52 | 8.0 | False | None | None | False | None | False | 10516.16 | 0 | 3056884 | 103635 | None | 1.4 | Special 3 Pin X Arms ---- item rates are inclusive of 18 percent GST | Set | 1959.98 | 1959.98 | 6.0 | False | None | None | False | None | False | 11759.88 | 0 | 3056885 | 103635 | None | 1.5 | 4 Pin Cross Arms ---- item rates are inclusive of 18 percent GST | Set | 837.8 | 837.8 | 12.0 | False | None | None | False | None | False | 10053.6 | 0 | 3056886 | 103635 | None | 1.5 | 1.1 kv pin insulators ---- item rates are inclusive of 18 percent GST | No | 77.88 | 77.88 | 48.0 | False | None | None | False | None | False | 3738.24 | 0 | 3056887 | 103635 | None | 1.6 | No. 8 KV Strain Insulator ---- item rates are inclusive of 18 percent GST | No | 31.86 | 31.86 | 30.0 | False | None | None | False | None | False | 955.8 | 0 | 3056888 | 103635 | None | 1.6 | Guy sets ---- item rates are inclusive of 18 percent GST | Set | 2080.34 | 2080.34 | 8.0 | False | None | None | False | None | False | 16642.72 | 0 | 3056889 | 103635 | None | 1.7 | Guy concreting with Boulders, Mud and Sand ---- item rates are inclusive of 18 percent GST | Set | 295.0 | 295.0 | 8.0 | False | None | None | False | None | False | 2360.0 | 0 | 3056890 | 103635 | None | 1.8 | Rabbit conductor with 1.5 % sag ---- item rates are inclusive of 18 percent GST | Km | 74219.64 | 74219.64 | 1.2 | False | None | None | False | None | False | 89063.568 | 0 | 3056891 | 103635 | None | 1.9 | Loading and unloading charges for poles ---- item rates are inclusive of 18 percent GST | No | 167.56 | 167.56 | 10.0 | False | None | None | False | None | False | 1675.6 | 0 | 3056892 | 103635 | None | 1.10 | Relising & Reeriction of PSC Poles ---- item rates are inclusive of 18 percent GST | No | 3907.81 | 3907.81 | 26.0 | False | None | None | False | None | False | 101603.06 | 0 | 3056893 | 103635 | None | 1.11 | Releasing and refixing 4 Pin Cross Arms ---- item rates are inclusive of 18 percent GST | Set | 360.96 | 360.96 | 32.0 | False | None | None | False | None | False | 11550.72 | 0 | 3056894 | 103635 | None | 1.12 | Releasing and refixing H Cross Arms ---- item rates are inclusive of 18 percent GST | Set | 612.07 | 612.07 | 18.0 | False | None | None | False | None | False | 11017.26 | 0 | 3056895 | 103635 | None | 1.13 | Releasing and restringing of Rabbit conductor ---- item rates are inclusive of 18 percent GST | Km | 9779.6 | 9779.6 | 6.3 | False | None | None | False | None | False | 61611.48 | 0 | 3056896 | 103635 | None | 1.14 | Releasing and refixing of service mains ---- item rates are inclusive of 18 percent GST | No | 74.22 | 74.22 | 50.0 | False | None | None | False | None | False | 3711.0 | 0 | 3056897 | 103635 | None | 1.15 | Releasing and refixing of Tube lights ---- item rates are inclusive of 18 percent GST | No | 338.54 | 338.54 | 28.0 | False | None | None | False | None | False | 9479.12 | 0 |
|
|
---|