createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710364897885
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2420000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate14-03-2024 04:42:59
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee2320000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710364897917
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9761
titlePKG-754 A) Improvements to road Madhugiri-Hindupura SH-158 from Ch 0.00 KM to 5.50 KM (in Selected reaches) in Madhugiri Taluk of Tumkur District. B) Improvements to road Midigeshi - Chandandur MDR from Ch 0.00 KM to 5.50 KM (in Selected reaches) in Madhugiri Taluk of Tumkur District.
descriptionPKG-754 A) Improvements to road Madhugiri-Hindupura SH-158 from Ch 0.00 KM to 5.50 KM (in Selected reaches) in Madhugiri Taluk of Tumkur District. B) Improvements to road Midigeshi - Chandandur MDR from Ch 0.00 KM to 5.50 KM (in Selected reaches) in Madhugiri Taluk of Tumkur District.
categoryWORKS
categoryTextWorks
ecv242036811.80
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-754/MDG/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103648980000NoneNoneRoads754 A) Improvements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Roads(Reconstruction)102728475.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056639103610None16.29Providing and fixing of typical SHDP board will be a composite unit consisting of three plates of Aluminium Composite Materials ACM materialspecifications as per Clause 1701.3.7. The top most platewillbe in rectangular shape of 600mm x 600 mm size riveted overwelded M.S. angle iron frame of 25 mm x 25mm x 5 mm sizeon back on edges. The middle plate will be 1200 mm x 150mm size riveted over welded M.S. angle iron frame of 25mmx 25mmx 5 mm size on back on edges. The main lower mostplate will be 1500 mm x 600 mm size riveted over weldedM.S. angle iron frame of 25 mm x 25 mm x 5 mmsize.Weldingof all the sheets over angle iron frame will be done neatly tohave plain surface on one side. The angle iron frames of thelower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm 12 SWG sheet tubes posts placed at1125 mm apart centre to centre. The top of the middle platewill be flushed with the top of 75 mm dia medium steel tubeposts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower most platewill be 1200 mm from normal ground level and the bottomof middle plate will be 100 mm above the top level of thelower most plate. The rectangular shaped plate mounted overangle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWGhaving a spacing of 100 mm between the rectangular shapedplate and middle plate and this square section will be weldedto the bottom point of the rectangular shaped plate.ii The lettering and borders etc. of middle and bottomplate SHDP logo on top plate shall be as per clause 1701.4.6essages/Borders. All the sections of frame and posts will bepainted with primer and two coats of Epoxy paint. The steeltube below ground level will be painted with three coats ofEpoxy paint. The design painting and lettering shall be doneas per approved drawing. iii For warranty and durability the clause 1701.5 and formaintenance the clause 1911 shall be applicable. iv A reference number along with the month and yearof installation should be placed on the back of a sign ina contrasting colour or by stamping in characters notexceeding 50 mm in height.485777/2019/DirTech 7Retro Reflective Trafic Sign As per IRC 67 Clause1701.3.8.1 Class A Type 1 Rates inclusive of 18 percent GST Schedule of Rates PWD 2023-24 vol- 3 Item No: 16.29 Page No: 149 ---- item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056640103610None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) aRates inclusive of 18 percent GST Schedule ---- item rates are inclusive of 18 percent GSTSqm463.74463.7480.64FalseNoneNoneFalseNoneFalse37395.99360
3056641103610None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum112.1112.115928.75FalseNoneNoneFalseNoneFalse1785612.8750
3056642103610None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7.Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum140.42140.4213416.12FalseNoneNoneFalseNoneFalse1883891.57040
3056643103610None3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum581.74581.747046.43FalseNoneNoneFalseNoneFalse4099190.18820
3056644103610None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum2783.622783.628680.61FalseNoneNoneFalseNoneFalse24163519.60820
3056645103610None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum3019.623019.6210021.4FalseNoneNoneFalseNoneFalse30260819.8680
3056646103610None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm48.3848.3839011.0FalseNoneNoneFalseNoneFalse1887352.180
3056647103610None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm16.5216.5239340.0FalseNoneNoneFalseNoneFalse649896.80
3056648103610None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum11149.8211149.821967.0FalseNoneNoneFalseNoneFalse21931695.940
3056649103610None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects PWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum12925.7212925.721180.2FalseNoneNoneFalseNoneFalse15254934.7440
3056650103610Noneitem code 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.5)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm7.087.0829810.0FalseNoneNoneFalseNoneFalse211054.80
3056651103610None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.1.3)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0214.0FalseNoneNoneFalseNoneFalse98938.280
3056652103610None8.42.3Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 150 mm size(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.42.3)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTRmtr546.34546.34700.0FalseNoneNoneFalseNoneFalse382438.00
3056653103610None4.19Construction of Median and Island with Soil Taken from Roadway Cutting Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 408(PWD SR Rates 2023-2024, Volume-3, Page No. 27,Item. No. 4.19)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum433.06433.0649.0FalseNoneNoneFalseNoneFalse21219.940
3056654103610None13.14Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR Rates 2023-2024, Volume-3, Page No. 123,Item. No. 13.14)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm99.1299.12245.0FalseNoneNoneFalseNoneFalse24284.40
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (ROAD FURNITURES)2602297.54
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056655103611None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm10631.810631.87.96FalseNoneNoneFalseNoneFalse84629.1280
3056656103611None8.6 iiProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo5602.645602.6425.0FalseNoneNoneFalseNoneFalse140066.00
3056657103611None8.6 VIIProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. . (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 VII)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GSTNo5131.825131.8210.0FalseNoneNoneFalseNoneFalse51318.20
3056658103611None8.6 xvProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv) Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo7817.57817.520.0FalseNoneNoneFalseNoneFalse156350.00
3056659103611None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) ---- item rates are inclusive of 18 percent GSTSqm221.84221.84105.0FalseNoneNoneFalseNoneFalse23293.20
3056660103611None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm625.4625.41349.31FalseNoneNoneFalseNoneFalse843858.4740
3056661103611None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos430.7430.7922.0FalseNoneNoneFalseNoneFalse397105.40
3056662103611None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos993.56993.5627.0FalseNoneNoneFalseNoneFalse26826.120
3056663103611None8.25( i)Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTRmtr4295.24295.2200.0FalseNoneNoneFalseNoneFalse859040.00
3056664103611None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTNos3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3056665103611None8.16Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16)(i) 5th kilometre stone (precast) ---- item rates are inclusive of 18 percent GSTNo5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERTS) 1.5X1.5-1V (Ch. 1.450 & 4.055 Km)2828051.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056666103612None2.11 (a)Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11(A))Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum212.4212.442.66FalseNoneNoneFalseNoneFalse9060.9840
3056667103612None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum120.36120.36135.82FalseNoneNoneFalseNoneFalse16347.29520
3056668103612None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0221.19FalseNoneNoneFalseNoneFalse149750.15380
3056669103612None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.987.99FalseNoneNoneFalseNoneFalse744931.51020
3056670103612None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 15 Item No 2.4.3 ---- item rates are inclusive of 18 percent GSTCum8971.788971.7846.25FalseNoneNoneFalseNoneFalse414944.8250
3056671103612None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum9689.699689.6914.0FalseNoneNoneFalseNoneFalse135655.660
3056672103612None12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum1378.241378.2440.56FalseNoneNoneFalseNoneFalse55901.41440
3056673103612None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.4.Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum3158.863158.8610.8FalseNoneNoneFalseNoneFalse34115.6880
3056674103612None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum7461.147461.149.3FalseNoneNoneFalseNoneFalse69388.6020
3056675103612None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum2256.162256.167.8FalseNoneNoneFalseNoneFalse17598.0480
3056676103612None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8036.988036.9815.12FalseNoneNoneFalseNoneFalse121519.13760
3056677103612None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum13965.313965.324.0FalseNoneNoneFalseNoneFalse335167.20
3056678103612None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16485.7816485.783.6FalseNoneNoneFalseNoneFalse59348.8080
3056679103612None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2118.12118.148.0FalseNoneNoneFalseNoneFalse101668.80
3056680103612None8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm128.62128.6215.5FalseNoneNoneFalseNoneFalse1993.610
3056681103612None4.1A(V)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 PWD SR 2023-24, Vol-3 Page No 23 Item No 4.1A(V) ---- item rates are inclusive of 18 percent GSTCum2934.662934.669.6FalseNoneNoneFalseNoneFalse28172.7360
3056682103612NoneItem No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8720.728720.7261.06FalseNoneNoneFalseNoneFalse532487.16320
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (WATER SUPPLY LINE)693469.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056683103613None1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum120.36120.36264.6FalseNoneNoneFalseNoneFalse31847.2560
3056684103613None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm450.76450.76490.0FalseNoneNoneFalseNoneFalse220872.40
3056685103613None8.29Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum188.8188.8260.73FalseNoneNoneFalseNoneFalse49225.8240
3056686103613None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2610.162610.16150.0FalseNoneNoneFalseNoneFalse391524.00
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056687103614None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed41.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056688103614None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3087.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056689103614None10.3Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Qty Executed 463.05)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056690103614None10.2maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Qty Executed 1543.50)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056691103614None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =247.50)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056692103614None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete 40mm using Vg-30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge all as per clause 3004.2.Schedule of Rates PWD 2023-24 vol- 3 Item No 10.5 Page No 91 rates inclusive of 18 percentage GST Qty=0.0 (have to rectify irrespective of qty) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Road Maintenance Activities to be carried out for the Second Year.0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056693103615None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =61.740)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056694103615None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4116.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056695103615None10.3Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Qty Executed 463.0)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056696103615None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Qty Excecuted 1543.50) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056697103615None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =248)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056698103615None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete 40mm using Vg-30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge all as per clause 3004.2.Schedule of Rates PWD 2023-24 vol- 3 Item No 10.5 Page No 91 rates inclusive of 18 percentage GST Qty=0.00 (have to rectify irrespective of qty) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE)440470.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056699103616None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) aRates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST100 Sqm519.39519.3959.16FalseNoneNoneFalseNoneFalse30727.11240
3056700103616None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTRmtr7.937.934336.0FalseNoneNoneFalseNoneFalse34384.480
3056701103616None10.3Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm51.5451.54487.8FalseNoneNoneFalseNoneFalse25141.2120
3056702103616None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm128.19128.191626.0FalseNoneNoneFalseNoneFalse208436.940
3056703103616None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm563.0563.0162.6FalseNoneNoneFalseNoneFalse91543.80
3056704103616None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum125.55125.55180.0FalseNoneNoneFalseNoneFalse22599.00
3056705103616None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTKm2622.052622.055.42FalseNoneNoneFalseNoneFalse14211.5110
3056706103616None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTKm272.25272.2527.0FalseNoneNoneFalseNoneFalse7350.750
3056707103616None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm144.05144.0542.0FalseNoneNoneFalseNoneFalse6050.10
3056708103616None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4.Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTcm1.191.1921.6FalseNoneNoneFalseNoneFalse25.7040
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the 4th Year (PAID MAINTENANCE)427566.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056709103617None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST100 Sqm537.94537.9459.16FalseNoneNoneFalseNoneFalse31824.53040
3056710103617None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GSTRmtr8.218.214336.0FalseNoneNoneFalseNoneFalse35598.560
3056711103617None10.3Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) ---- item rates are inclusive of 18 percent GSTSqm53.3853.38487.8FalseNoneNoneFalseNoneFalse26038.7640
3056712103617None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) ---- item rates are inclusive of 18 percent GSTSqm132.77132.771626.0FalseNoneNoneFalseNoneFalse215884.020
3056713103617None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- item rates are inclusive of 18 percent GSTSqm583.11583.11162.6FalseNoneNoneFalseNoneFalse94813.6860
3056714103617None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GSTCum130.04130.04180.0FalseNoneNoneFalseNoneFalse23407.20
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur DistPKG 755 in Madhugiri Tq of Tumkur Dist Estimates for Maintenance - Activities to be carried out for the 5th Year (PAID MAINTENANCE)464050.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056715103618None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST100 Sqm477.89477.8959.16FalseNoneNoneFalseNoneFalse28271.97240
3056716103618None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GSTRmtr7.297.294336.0FalseNoneNoneFalseNoneFalse31609.440
3056717103618None10.3Maintenance of earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor MORTH Specification No. 3003 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) ---- item rates are inclusive of 18 percent GSTSqm47.4247.42487.8FalseNoneNoneFalseNoneFalse23131.4760
3056718103618None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. MORTH Specification No.3003(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) ---- item rates are inclusive of 18 percent GSTSqm117.95117.951626.0FalseNoneNoneFalseNoneFalse191786.70
3056719103618None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- item rates are inclusive of 18 percent GSTSqm518.01518.01325.2FalseNoneNoneFalseNoneFalse168456.8520
3056720103618None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GSTCum115.52115.52180.0FalseNoneNoneFalseNoneFalse20793.60
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur DistPKG 755 in Madhugiri Tq of Tumkur Dist Estimate for Renewal after Maintenance Period at 6th Year21214852.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056721103619None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTKm2902.992902.995.42FalseNoneNoneFalseNoneFalse15734.20580
3056722103619None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTKm301.42301.425.42FalseNoneNoneFalseNoneFalse1633.69640
3056723103619None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm159.49159.4942.0FalseNoneNoneFalseNoneFalse6698.580
3056724103619None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4.Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTcm1.321.3213500.0FalseNoneNoneFalseNoneFalse17820.00
3056725103619None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.PWD SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm17.5617.5639340.0FalseNoneNoneFalseNoneFalse690810.40
3056726103619None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. PWD SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16027.8916027.891180.2FalseNoneNoneFalseNoneFalse18916115.7780
3056727103619None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 67, Item No. 8.15 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm775.5775.51349.31FalseNoneNoneFalseNoneFalse1046389.9050
3056728103619None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 72, Item No. 8.43 Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm534.07534.07973.0FalseNoneNoneFalseNoneFalse519650.110
17103648980000NoneNoneRoads754 B) Improvements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Road Work)59475803.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056729103620None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 PWD SR2023-24,V-3,PageNo.149Item No.16.29 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056730103620None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm463.74463.7440.38FalseNoneNoneFalseNoneFalse18725.82120
3056731103620None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm7.087.0814662.5FalseNoneNoneFalseNoneFalse103810.50
3056732103620None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum112.1112.113410.25FalseNoneNoneFalseNoneFalse1503289.0250
3056733103620None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum140.42140.428205.03FalseNoneNoneFalseNoneFalse1152150.31260
3056734103620None4.4Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum581.74581.745085.37FalseNoneNoneFalseNoneFalse2958363.14380
3056735103620None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum2783.622783.624940.43FalseNoneNoneFalseNoneFalse13752279.75660
3056736103620None4.17Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(PWD SR Rates 2023-2024, Volume-3, Page No. 26,Item. No. 4.17) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum3019.623019.625436.37FalseNoneNoneFalseNoneFalse16415771.57940
3056737103620None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm48.3848.3820982.5FalseNoneNoneFalseNoneFalse1015133.350
3056738103620None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm16.5216.5220982.5FalseNoneNoneFalseNoneFalse346630.90
3056739103620None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum11149.8211149.821258.95FalseNoneNoneFalseNoneFalse14037065.8890
3056740103620None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects PWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum12925.7212925.72629.47FalseNoneNoneFalseNoneFalse8136352.96840
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (ROAD FURNITURES)2584518.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056741103621None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm10631.810631.811.48FalseNoneNoneFalseNoneFalse122053.0640
3056742103621None8.6 iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 ii) 90 cm equilateral triangle (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNo5602.645602.6424.0FalseNoneNoneFalseNoneFalse134463.360
3056743103621None8.6 (viii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 viii) 60 cm circular (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 viii) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNo5131.825131.8215.0FalseNoneNoneFalseNoneFalse76977.30
3056744103621None8.6 (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 xv) 90 cm high octagon (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 xv) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNo7817.57817.524.0FalseNoneNoneFalseNoneFalse187620.00
3056745103621None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm221.84221.8441.25FalseNoneNoneFalseNoneFalse9150.90
3056746103621None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm625.4625.4782.0FalseNoneNoneFalseNoneFalse489062.80
3056747103621None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNos430.7430.7528.0FalseNoneNoneFalseNoneFalse227409.60
3056748103621None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNos993.56993.5620.0FalseNoneNoneFalseNoneFalse19871.20
3056749103621None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNos3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3056750103621None8.16 (i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (i)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTNos5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3056751103621None8.25( i)Metal Beam Crash Barrier (i)Type A, W Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS1367 and IS1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTRmtr4295.24295.2300.0FalseNoneNoneFalseNoneFalse1288560.00
3056752103621None8.17Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings ---- item rates are inclusive of 18 percent GSTEach2384.782384.784.0FalseNoneNoneFalseNoneFalse9539.120
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERT) 1.5X1.5-1V (Ch. Km 0.212, 0.458, 0.574, 0.842, 0.960, 1.080, 1.958, 2.120, 2.302, 2.900 & 3.078)17938745.54
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056753103622None2.11(II(A)Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical meansPWD SR 2023-24, Vol-3 Page No 11 Item No 2.11(II(A)) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum212.4212.459.53FalseNoneNoneFalseNoneFalse12644.1720
3056754103622None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum120.36120.36747.05FalseNoneNoneFalseNoneFalse89914.9380
3056755103622None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.02116.51FalseNoneNoneFalseNoneFalse823378.50020
3056756103622None2.11(h)Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9843.97FalseNoneNoneFalseNoneFalse4099454.13060
3056757103622None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8971.788971.78590.2FalseNoneNoneFalseNoneFalse5295144.5560
3056758103622None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum9689.699689.6977.0FalseNoneNoneFalseNoneFalse746106.130
3056759103622None12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum1378.241378.24223.08FalseNoneNoneFalseNoneFalse307457.77920
3056760103622None12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24, Vol-3 Page No 117 Item No 12.4 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum3158.863158.86118.8FalseNoneNoneFalseNoneFalse375272.5680
3056761103622None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7461.147461.1451.14FalseNoneNoneFalseNoneFalse381562.69960
3056762103622None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum2256.162256.1642.9FalseNoneNoneFalseNoneFalse96789.2640
3056763103622None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8. Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8036.988036.9883.16FalseNoneNoneFalseNoneFalse668355.25680
3056764103622None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum13965.313965.3132.0FalseNoneNoneFalseNoneFalse1843419.60
3056765103622None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2. Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum16485.7816485.7819.8FalseNoneNoneFalseNoneFalse326418.4440
3056766103622None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTm2118.12118.1264.0FalseNoneNoneFalseNoneFalse559178.40
3056767103622None8.1Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. PWD SR 2023-24, Vol-3 Page No 123 Item No 13.14 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm128.62128.6285.25FalseNoneNoneFalseNoneFalse10964.8550
3056768103622None2.17 (ix) BDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leadii) By Mechanical Means B. Above 600 mm to 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) B) ---- item rates are inclusive of 18 percent GSTm1293.281293.2825.0FalseNoneNoneFalseNoneFalse32332.00
3056769103622Nonetem No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8720.728720.72260.34FalseNoneNoneFalseNoneFalse2270352.24480
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (BOX CULVERTY 2x2x1V)2507701.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056770103623None2.11 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SR Rates 2023-24 Item no 2.11 Page No 11 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum212.4212.432.4FalseNoneNoneFalseNoneFalse6881.760
3056771103623None2.17 (ix) C)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means C. Above 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) C) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTMtr1621.321621.3215.0FalseNoneNoneFalseNoneFalse24319.80
3056772103623None1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m (PWD SR Rates 2023-2024, Volume-3, Page No. 8,Item. No. 1.14.1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum120.36120.36100.63FalseNoneNoneFalseNoneFalse12111.82680
3056773103623None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-3, Page No. 15,Item. No. 2.1.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0217.09FalseNoneNoneFalseNoneFalse120775.37180
3056774103623None2.11 (h)Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (PWD SR Rates 2023-2024, Volume-1, Page No. 18 ,Item. No. 2.11(h) Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.987.3FalseNoneNoneFalseNoneFalse680600.7540
3056775103623None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-1, Page No. 16,Item. No. 2.4.3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8971.788971.7885.49FalseNoneNoneFalseNoneFalse766997.47220
3056776103623None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR Rates 2023-2024, Volume-1, Page No. 16,Item. No. 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum9689.699689.6916.62FalseNoneNoneFalseNoneFalse161042.64780
3056777103623None12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3A Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum1378.241378.2426.61FalseNoneNoneFalseNoneFalse36674.96640
3056778103623None12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24 Item No 12.4 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum3158.863158.865.4FalseNoneNoneFalseNoneFalse17057.8440
3056779103623None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7461.147461.146.38FalseNoneNoneFalseNoneFalse47602.07320
3056780103623None14.4AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum2256.162256.165.56FalseNoneNoneFalseNoneFalse12544.24960
3056781103623None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24 Item No 13.8 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8036.988036.987.56FalseNoneNoneFalseNoneFalse60759.56880
3056782103623None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24 Item No 13.9 Page No 122 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum13965.313965.312.0FalseNoneNoneFalseNoneFalse167583.60
3056783103623None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24 Item No 13.2 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum16485.7816485.784.28FalseNoneNoneFalseNoneFalse70559.13840
3056784103623None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24 Item No 13.16 Page No 124 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTMtr2118.12118.124.0FalseNoneNoneFalseNoneFalse50834.40
3056785103623None8.1Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. PWD SR 2023-24 Item No 8.1 Page No 66 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTSqm128.62128.6217.37FalseNoneNoneFalseNoneFalse2234.12940
3056786103623NoneItem No 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. PWD SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum8720.728720.7230.86FalseNoneNoneFalseNoneFalse269121.41920
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Retaining Wall)7494866.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056787103624None1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m PWD SR 2023-24 Item no 1.14.1 Page No 8 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum120.36120.361094.4FalseNoneNoneFalseNoneFalse131721.9840
3056788103624None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item no 2.1.3 Page No 15 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0282.65FalseNoneNoneFalseNoneFalse584089.2030
3056789103624None2.11 (h)Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures PWD SR 2023-24 Item no 2.11 h Page No 18 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9828.24FalseNoneNoneFalseNoneFalse2632899.35520
3056790103624None12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3A Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum1378.241378.24410.4FalseNoneNoneFalseNoneFalse565629.6960
3056791103624None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum7834.27834.2453.15FalseNoneNoneFalseNoneFalse3550067.730
3056792103624None14.4AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- item rates are inclusive of 18 percent GSTCum2256.162256.1613.5FalseNoneNoneFalseNoneFalse30458.160
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (1st Year Maintenance)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056793103625None2.5 ii a)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (ii) By Mechanical Means using Dozer a In area of light jungle (PWD SR Rates 2023-2024, Volume-3, Page No. 9,Item. No. 2.5 ii a) Rates are inclusive of 18% GST LBD qty=31.28 ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056794103625None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.19) Rates are inclusive of 18% GST LBD Qty=2346 ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056795103625None10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) Rates are inclusive of 18% GST LBD QTY=351.90 ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056796103625None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) Rates are inclusive of 18% GST LBD QTY=1173.00 ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056797103625None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) (have to Rectify irrespective of qty)Rates are inclusive of 18% GST LBD QTY=0.00 ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056798103625None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.12) Rates are inclusive of 18% GST LBD QTY=216 ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (2nd Year Maintenance)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056799103626Noneitem code 2.5 II aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a LBD QTY 46.920 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056800103626Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 LBD QTY 3128 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056801103626Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 LBD QTY 351.90 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056802103626Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 LBD QTY 1173 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056803103626Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 (have to Rectify irrespective of qty) LBD QTY 0.00 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056804103626Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 LBD QTY 216 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (3rd Year Maintenance)404857.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056805103627Noneitem code 2.5 II aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm519.39519.3937.92FalseNoneNoneFalseNoneFalse19695.26880
3056806103627Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTRmtr7.937.931564.0FalseNoneNoneFalseNoneFalse12402.520
3056807103627Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm51.5451.54351.9FalseNoneNoneFalseNoneFalse18136.9260
3056808103627Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm128.19128.191173.0FalseNoneNoneFalseNoneFalse150366.870
3056809103627Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm563.0563.0107.52FalseNoneNoneFalseNoneFalse60533.760
3056810103627Noneitem code 16.22Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.22 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTKm2622.052622.057.0FalseNoneNoneFalseNoneFalse18354.350
3056811103627Noneitem code 16.24 iMaintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SR Rates 2023 2024 Volume 3 Page No. 148 Item. No. 16.24i Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTKm272.25272.2520.0FalseNoneNoneFalseNoneFalse5445.00
3056812103627Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum125.55125.55810.0FalseNoneNoneFalseNoneFalse101695.50
3056813103627Noneitem code 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR Rates 2023-2024 Volume-3 Page No. 66 Item. No. 8.10 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm144.05144.05126.0FalseNoneNoneFalseNoneFalse18150.30
3056814103627Noneitem code 8.4Printing New letter and Figures of any Shade 8.3 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman PWD SR Rates 2023.2024 Volume 3 Page No. 63 Item. No. 8.4 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTcm1.191.1964.8FalseNoneNoneFalseNoneFalse77.1120
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (4th Year Maintenance)388631.58
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056815103628Noneitem code 2.5 ii aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm537.94537.9437.92FalseNoneNoneFalseNoneFalse20398.68480
3056816103628Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTRmtr8.218.213128.0FalseNoneNoneFalseNoneFalse25680.880
3056817103628Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm53.3853.38351.9FalseNoneNoneFalseNoneFalse18784.4220
3056818103628Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm132.77132.771173.0FalseNoneNoneFalseNoneFalse155739.210
3056819103628Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm583.11583.11107.52FalseNoneNoneFalseNoneFalse62695.98720
3056820103628Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum130.04130.04810.0FalseNoneNoneFalseNoneFalse105332.40
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (5th Year Maintenance)628028.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056821103629Noneitem code 2.5 ii aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm556.49556.4937.92FalseNoneNoneFalseNoneFalse21102.10080
3056822103629Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTRmtr8.58.53128.0FalseNoneNoneFalseNoneFalse26588.00
3056823103629Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm55.2255.22351.9FalseNoneNoneFalseNoneFalse19431.9180
3056824103629Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm137.35137.352346.0FalseNoneNoneFalseNoneFalse322223.10
3056825103629Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm603.22603.22215.05FalseNoneNoneFalseNoneFalse129722.4610
3056826103629Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum134.52134.52810.0FalseNoneNoneFalseNoneFalse108961.20
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (6th Year Maintenance)11716608.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056827103630None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.22) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTKm2902.992902.993.91FalseNoneNoneFalseNoneFalse11350.69090
3056828103630None16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (PWD SR Rates 2023-2024, Volume-3, Page No. 148,Item. No. 16.24i) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTKm301.42301.423.91FalseNoneNoneFalseNoneFalse1178.55220
3056829103630None8.10Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm159.49159.49190.8FalseNoneNoneFalseNoneFalse30430.6920
3056830103630None8.4Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.321.3213500.0FalseNoneNoneFalseNoneFalse17820.00
3056831103630None5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.3i) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm17.5617.5621477.5FalseNoneNoneFalseNoneFalse377144.90
3056832103630None5.16 CProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 37,Item. No. 5.16 C) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum16027.8916027.89645.15FalseNoneNoneFalseNoneFalse10340393.23350
3056833103630None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm775.5775.5911.03FalseNoneNoneFalseNoneFalse706503.7650
3056834103630None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTNos534.07534.07434.0FalseNoneNoneFalseNoneFalse231786.380
17103648980000NoneNoneRoadsImprovements to Road Midigeshi - Chandandur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (Water Supply)342675.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056835103631NoneItem. No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum309.16309.16135.0FalseNoneNoneFalseNoneFalse41736.60
3056836103631None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTm450.76450.76250.0FalseNoneNoneFalseNoneFalse112690.00
3056837103631None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24, Vol-1 Page No 7 Item No 1.10 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum188.8188.8133.02FalseNoneNoneFalseNoneFalse25114.1760
3056838103631None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29 Rates are Inclusive of 18 Percent GST ---- item rates are inclusive of 18 percent GSTm2610.162610.1662.5FalseNoneNoneFalseNoneFalse163135.00
17103648980000NoneNoneRoadsImprovements to Road Madhugiri- Hindupura SH-158 from Ch 0.00 km to Ch 5.50 Km (in Selected reaches) in Madugiri Taluk of Tumkur Dist (RCC DRAIN)5063807.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056839103632None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m)(UNI SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum120.36120.36704.0FalseNoneNoneFalseNoneFalse84733.440
3056840103632None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0270.4FalseNoneNoneFalseNoneFalse497518.2080
3056841103632None2.11 hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(UNI SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9811.52FalseNoneNoneFalseNoneFalse1074043.92960
3056842103632None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7461.147461.1486.4FalseNoneNoneFalseNoneFalse644642.4960
3056843103632None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8953.378953.3786.4FalseNoneNoneFalseNoneFalse773571.1680
3056844103632None2.10 (iv) BDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar(PWD SR Rates 2023-2024, Volume-3, Page No. 10,Item. No. 2.10(iv)B) ---- item rates are inclusive of 18 percent GSTCum719.8719.8345.6FalseNoneNoneFalseNoneFalse248762.880
3056845103632NoneItem. No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum10072.5410072.54172.8FalseNoneNoneFalseNoneFalse1740534.9120
17103648980000NoneNoneRoadsPKG 754 Improvements to Road Madhugiri Chandanadur MDR from Ch 0.00 km to Ch 5.50 km (in Selected reaches) in Madugiri Taluk of Tumkur Dist(Electrical Works)617019.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056846103633None1.011kV pin insulators with GI pins ---- item rates are inclusive of 18 percent GSTSet241.9241.990.0FalseNoneNoneFalseNoneFalse21771.00
3056847103633None1.1Guy sets ---- item rates are inclusive of 18 percent GSTSet2465.022465.0215.0FalseNoneNoneFalseNoneFalse36975.30
3056848103633None1.3Rabbit conductor with 1.5 % sag ---- item rates are inclusive of 18 percent GSTKm74219.6474219.640.5FalseNoneNoneFalseNoneFalse37109.820
3056849103633None1.4Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. ---- item rates are inclusive of 18 percent GSTSet2907.522907.526.0FalseNoneNoneFalseNoneFalse17445.120
3056850103633None1.5Releasing and Reerrection of Poles ---- item rates are inclusive of 18 percent GSTNos3907.813907.81100.0FalseNoneNoneFalseNoneFalse390781.00
3056851103633None1.6Releasing and reerrection of SP TC set ---- item rates are inclusive of 18 percent GSTNos11671.8511671.851.0FalseNoneNoneFalseNoneFalse11671.850
3056852103633None1.7Releasing and reerrection of DP TC set ---- item rates are inclusive of 18 percent GSTNos15658.1315658.131.0FalseNoneNoneFalseNoneFalse15658.130
3056853103633None1.8Releasing & rifixing of LT Protection kit ---- item rates are inclusive of 18 percent GSTNos800.39800.391.0FalseNoneNoneFalseNoneFalse800.390
3056854103633None1.9Releasing & rifixing of 11 KV DOLO Cutout ---- item rates are inclusive of 18 percent GSTNos533.6533.61.0FalseNoneNoneFalseNoneFalse533.60
3056855103633None1.10Releasing and Rifixing of H cross arm ---- item rates are inclusive of 18 percent GSTNos578.44578.4475.0FalseNoneNoneFalseNoneFalse43383.00
3056856103633None1.11Releasing and Rifixing of 4 Pin cross arm ---- item rates are inclusive of 18 percent GSTNo.578.44578.4432.0FalseNoneNoneFalseNoneFalse18510.080
3056857103633None1.12Releasing and Restringing of Rabbit conductor ---- item rates are inclusive of 18 percent GSTNo9779.69779.61.65FalseNoneNoneFalseNoneFalse16136.340
3056858103633None1.13Releasing and reerrection of 25KVA TC ---- item rates are inclusive of 18 percent GSTNo2676.952676.951.0FalseNoneNoneFalseNoneFalse2676.950
3056859103633None1.15Releasing and reerrection of 100KVA TC ---- item rates are inclusive of 18 percent GSTNo3567.023567.021.0FalseNoneNoneFalseNoneFalse3567.020
17103648980000NoneNoneRoadsCH.0. TO 5.5 Madugiri-Hindupur (Electrical estimate)1045490.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056860103634None1.09 Mtr PSCC Pole with working load of 200Kg ---- item rates are inclusive of 18 percent GSTNos7301.847301.8422.0FalseNoneNoneFalseNoneFalse160640.480
3056861103634None1.111KV Horizantal cross arm with clamps HT Single Top ---- item rates are inclusive of 18 percent GSTSet807.12807.1218.0FalseNoneNoneFalseNoneFalse14528.160
3056862103634None1.211 kV, 45 kN Polymeric Insulator ---- item rates are inclusive of 18 percent GSTNos228.92228.9236.0FalseNoneNoneFalseNoneFalse8241.120
3056863103634None1.311kV pin insulators with GI pins ---- item rates are inclusive of 18 percent GSTSet250.16250.1672.0FalseNoneNoneFalseNoneFalse18011.520
3056864103634None1.44 Pin cross arms with clamps, ---- item rates are inclusive of 18 percent GSTSet700.92700.9220.0FalseNoneNoneFalseNoneFalse14018.40
3056865103634None1.51.1 K V Pin Insulators, with G I Pins ---- item rates are inclusive of 18 percent GSTNos67.2667.2688.0FalseNoneNoneFalseNoneFalse5918.880
3056866103634None1.68 kv Strain Insulators. ---- item rates are inclusive of 18 percent GSTNos22.4222.4264.0FalseNoneNoneFalseNoneFalse1434.880
3056867103634None1.7Special 3Pin Cross Arms ---- item rates are inclusive of 18 percent GSTSet2256.162256.1618.0FalseNoneNoneFalseNoneFalse40610.880
3056868103634None1.8Releasing Reerraction of 9 mtr long PSCC pole ---- item rates are inclusive of 18 percent GSTNo4116.314116.3133.0FalseNoneNoneFalseNoneFalse135838.230
3056869103634None1.925/63/100 Kva Dtc stracture ---- item rates are inclusive of 18 percent GSTSet48973.5448973.545.0FalseNoneNoneFalseNoneFalse244867.70
3056870103634None1.10Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. ---- item rates are inclusive of 18 percent GSTSet3261.523261.5215.0FalseNoneNoneFalseNoneFalse48922.80
3056871103634None1.11Guy Wire 7/10 swg FOR neutral earthing ---- item rates are inclusive of 18 percent GSTKg91.1391.1350.0FalseNoneNoneFalseNoneFalse4556.50
3056872103634None1.12R & R LT Protection kit ---- item rates are inclusive of 18 percent GSTNos800.39800.395.0FalseNoneNoneFalseNoneFalse4001.950
3056873103634None1.13HG Fuse, 11 kV Solid Core Type ---- item rates are inclusive of 18 percent GSTSet1541.081541.0815.0FalseNoneNoneFalseNoneFalse23116.20
3056874103634None1.14Horizontal cross arms with clamps, HTST supports, bolts-nuts and washers, ---- item rates are inclusive of 18 percent GSTSet376.66376.6633.0FalseNoneNoneFalseNoneFalse12429.780
3056875103634None1.15Releasing and refixing of Special 3Pin Cross Arms ---- item rates are inclusive of 18 percent GSTSet1230.861230.863.0FalseNoneNoneFalseNoneFalse3692.580
3056876103634None1.16Guy Set Complete ---- item rates are inclusive of 18 percent GSTSet1879.741879.7414.0FalseNoneNoneFalseNoneFalse26316.360
3056877103634None1.17ACSR Rabbit Conductor ---- item rates are inclusive of 18 percent GSTKm56144.456144.41.25FalseNoneNoneFalseNoneFalse70180.50
3056878103634None1.18Relising & Restringing of ACSR wire ---- item rates are inclusive of 18 percent GSTKm10122.6310122.6320.2FalseNoneNoneFalseNoneFalse204477.1260
3056879103634None1.19Loading and Un loading Charges of PSC pole ---- item rates are inclusive of 18 percent GSTNos167.56167.5622.0FalseNoneNoneFalseNoneFalse3686.320
17103648980000NoneNoneRoadsCH.0.00 TO 1.0Madugiri -Hindupura(Electrical estimate)428823.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056880103635None1.09 mtr PSCC Pole 200kg WL for stud pole ---- item rates are inclusive of 18 percent GSTNos7010.387010.3810.0FalseNoneNoneFalseNoneFalse70103.80
3056881103635None1.111kv Polymeric Pin Insulators ---- item rates are inclusive of 18 percent GSTNos241.9241.921.0FalseNoneNoneFalseNoneFalse5079.90
3056882103635None1.245KN Disc Inslator for Rabbit Conductor ---- item rates are inclusive of 18 percent GSTNos219.48219.4836.0FalseNoneNoneFalseNoneFalse7901.280
3056883103635None1.311KV Horizantal cross arm with clamps ---- item rates are inclusive of 18 percent GSTSet1314.521314.528.0FalseNoneNoneFalseNoneFalse10516.160
3056884103635None1.4Special 3 Pin X Arms ---- item rates are inclusive of 18 percent GSTSet1959.981959.986.0FalseNoneNoneFalseNoneFalse11759.880
3056885103635None1.54 Pin Cross Arms ---- item rates are inclusive of 18 percent GSTSet837.8837.812.0FalseNoneNoneFalseNoneFalse10053.60
3056886103635None1.51.1 kv pin insulators ---- item rates are inclusive of 18 percent GSTNo77.8877.8848.0FalseNoneNoneFalseNoneFalse3738.240
3056887103635None1.6No. 8 KV Strain Insulator ---- item rates are inclusive of 18 percent GSTNo31.8631.8630.0FalseNoneNoneFalseNoneFalse955.80
3056888103635None1.6Guy sets ---- item rates are inclusive of 18 percent GSTSet2080.342080.348.0FalseNoneNoneFalseNoneFalse16642.720
3056889103635None1.7Guy concreting with Boulders, Mud and Sand ---- item rates are inclusive of 18 percent GSTSet295.0295.08.0FalseNoneNoneFalseNoneFalse2360.00
3056890103635None1.8Rabbit conductor with 1.5 % sag ---- item rates are inclusive of 18 percent GSTKm74219.6474219.641.2FalseNoneNoneFalseNoneFalse89063.5680
3056891103635None1.9Loading and unloading charges for poles ---- item rates are inclusive of 18 percent GSTNo167.56167.5610.0FalseNoneNoneFalseNoneFalse1675.60
3056892103635None1.10Relising & Reeriction of PSC Poles ---- item rates are inclusive of 18 percent GSTNo3907.813907.8126.0FalseNoneNoneFalseNoneFalse101603.060
3056893103635None1.11Releasing and refixing 4 Pin Cross Arms ---- item rates are inclusive of 18 percent GSTSet360.96360.9632.0FalseNoneNoneFalseNoneFalse11550.720
3056894103635None1.12Releasing and refixing H Cross Arms ---- item rates are inclusive of 18 percent GSTSet612.07612.0718.0FalseNoneNoneFalseNoneFalse11017.260
3056895103635None1.13Releasing and restringing of Rabbit conductor ---- item rates are inclusive of 18 percent GSTKm9779.69779.66.3FalseNoneNoneFalseNoneFalse61611.480
3056896103635None1.14Releasing and refixing of service mains ---- item rates are inclusive of 18 percent GSTNo74.2274.2250.0FalseNoneNoneFalseNoneFalse3711.00
3056897103635None1.15Releasing and refixing of Tube lights ---- item rates are inclusive of 18 percent GSTNo338.54338.5428.0FalseNoneNoneFalseNoneFalse9479.120
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103648990000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103648990000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103648990001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103649480000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103649540000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103649720000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103649830000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103649920000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17103650000000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103650070000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103650140000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17103650270000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103650370000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103650450000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103650530000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103650780000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103651410000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103651480000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103651640000NoneNoneELIGIBILITYOriginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103651880000NoneNoneELIGIBILITYAll Item rates are inclusive of 18% GST. Hence GST will not be paid separately.None
17103651940000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
17103656450000NoneNoneELIGIBILITYPotholes shall be rectified irrespective of quantities during DLP and Maintenance period.None
17103656510000NoneNoneELIGIBILITYAll the items includes all leads and lifts, loading and unloading, transportation charges, cost of all materials, labour, HOM of machineries as per standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work.None
17103665570000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty-first day of March of succeeding year (both days inclusive).None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1210.19 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bill copies shall not be accepted, Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: Earth Work for Embankment/ Subgrade/ Shoulders :53933.48 Cum, Granular Sub-Base (GSB)/ Wet Mix Macadam (WMM) :23270.73 Cum, Bituminous Base and Surface Course (DBM, BM, BC & SDBC): 5488.78 Cum, Pavement Quality Concrete (PQC) M30/M40: 0.00 Cum, PCC/DLC M10 & M15: 342.14 Cum, Reinforced Cement Concrete (RCC) M20 & higher grades: 1794.46 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity:1 No, Mechanical Paver Finisher :1 No, Static Road Roller :1 No, Vibratory Road Roller :1 No, Tippers :4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneMachineries could be on Lease/Hire, Wet Mix Plant / Pug mill: 1 No, Truck mounted Bitumen Sprayer: 1 No, Motor Grader:1 No, Vibratory Road Roller (6T to 10T):2 no, Tandem Roller:1 No, Excavator 0.90 Cum Bucket Capacity: 2 No, Tipper Trucks: 6 No, Self Loading Concrete Mixer 2 M3 Capacity:3 No, Water Tanker:3 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire/Lease agreement with original invoice of the original owner and specifying period of lease/hire
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity : (AxNx1.5 - B) Where, A : Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N : Number of years prescribed for completion of the works for which tenders are invited. B : Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4840.74 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.726.11 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAs given in KW-4OthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration certificateTrueTechnical Bid
Annual Turnover Certificate along with UDINTrueTechnical Bid
Work done Certificate Issued by not below Rank of Executive EngineerTrueTechnical Bid
Bid Capacity Calculation as per KW 4 DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalised Bank as per KW-4TrueTechnical Bid
EPF registrationFalseTechnical Bid
Details of committed worksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710371315000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer, PIU SHDP, Bengaluru
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone