tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Work (Reconstruction) | 38894515.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056279 | 103573 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the RECTANGLE shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 PWD SR2023-24,V-3,PageNo.149Item No.16.29 RATES ARE INCLUSIVE OF 18% GST ---- item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3056280 | 103573 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 112.56 | False | None | None | False | None | False | 52198.5744 | 0 | 3056281 | 103573 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 11880.0 | False | None | None | False | None | False | 84110.4 | 0 | 3056282 | 103573 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. 1.12(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.12) (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 5528.21 | False | None | None | False | None | False | 619712.341 | 0 | 3056283 | 103573 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 2011.02 | False | None | None | False | None | False | 282387.4284 | 0 | 3056284 | 103573 | None | 4.4 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 2823.94 | False | None | None | False | None | False | 1642798.8556 | 0 | 3056285 | 103573 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 3379.42 | False | None | None | False | None | False | 9407021.1004 | 0 | 3056286 | 103573 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 3852.9 | False | None | None | False | None | False | 11634293.898 | 0 | 3056287 | 103573 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 14983.5 | False | None | None | False | None | False | 724901.73 | 0 | 3056288 | 103573 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 14983.5 | False | None | None | False | None | False | 247527.42 | 0 | 3056289 | 103573 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 749.18 | False | None | None | False | None | False | 8353222.1476 | 0 | 3056290 | 103573 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 449.5 | False | None | None | False | None | False | 5810111.14 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(ROAD FURNITURES) | 1500453.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056291 | 103574 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 5.82 | False | None | None | False | None | False | 61877.076 | 0 | 3056292 | 103574 | None | 8.6 ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 7.0 | False | None | None | False | None | False | 39218.48 | 0 | 3056293 | 103574 | None | 8.6 viii | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 viii)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 6.0 | False | None | None | False | None | False | 30790.92 | 0 | 3056294 | 103574 | None | 8.6 xv | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 6.0 | False | None | None | False | None | False | 46905.0 | 0 | 3056295 | 103574 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) ---- item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 105.0 | False | None | None | False | None | False | 23293.2 | 0 | 3056296 | 103574 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 587.28 | False | None | None | False | None | False | 367284.912 | 0 | 3056297 | 103574 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(UNI SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 440.0 | False | None | None | False | None | False | 189508.0 | 0 | 3056298 | 103574 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 11.0 | False | None | None | False | None | False | 10929.16 | 0 | 3056299 | 103574 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 2.0 | False | None | None | False | None | False | 6907.72 | 0 | 3056300 | 103574 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type A, W : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25(i))Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 140.0 | False | None | None | False | None | False | 601328.0 | 0 | 3056301 | 103574 | None | 8.60.2 (iii) | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) gr ii and Bituminous Concrete (BC) gr ii for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IR C 67 -2022, ) Two lane with formation width of 9.00 m(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.60.2(III), Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 61205.42 | 61205.42 | 2.0 | False | None | None | False | None | False | 122410.84 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(BOX CULVERTS) | 5487924.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056302 | 103575 | None | 2.11 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 45.54 | False | None | None | False | None | False | 9672.696 | 0 | 3056303 | 103575 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 227.85 | False | None | None | False | None | False | 27424.026 | 0 | 3056304 | 103575 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 36.59 | False | None | None | False | None | False | 258582.2618 | 0 | 3056305 | 103575 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 15.19 | False | None | None | False | None | False | 1416208.9662 | 0 | 3056306 | 103575 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 157.73 | False | None | None | False | None | False | 1415118.8594 | 0 | 3056307 | 103575 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 26.25 | False | None | None | False | None | False | 254354.3625 | 0 | 3056308 | 103575 | None | 12.3 A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 79.83 | False | None | None | False | None | False | 110024.8992 | 0 | 3056309 | 103575 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 16.2 | False | None | None | False | None | False | 51173.532 | 0 | 3056310 | 103575 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 7836.2 | 7836.2 | 14.9 | False | None | None | False | None | False | 116759.38 | 0 | 3056311 | 103575 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 12.6 | False | None | None | False | None | False | 28427.616 | 0 | 3056312 | 103575 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 22.68 | False | None | None | False | None | False | 182278.7064 | 0 | 3056313 | 103575 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 36.0 | False | None | None | False | None | False | 502750.8 | 0 | 3056314 | 103575 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 6.75 | False | None | None | False | None | False | 111279.015 | 0 | 3056315 | 103575 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 72.0 | False | None | None | False | None | False | 152503.2 | 0 | 3056316 | 103575 | None | 8.10 | Painting Two Coats on New Concrete Surfaces.Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 28.5 | False | None | None | False | None | False | 3665.67 | 0 | 3056317 | 103575 | None | 4.2 (V) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(UNI SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 2934.66 | 2934.66 | 14.4 | False | None | None | False | None | False | 42259.104 | 0 | 3056318 | 103575 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 8074.6 | 8074.6 | 99.75 | False | None | None | False | None | False | 805441.35 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Pipe Culvert) | 2590093.68 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056319 | 103576 | None | 2.8 II(a) | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Rate is Inclusive of 18 percent GST(Volume-3 Page No 10 Item no 2.8 ii( a) PWD SR 2023-24) ---- item rates are inclusive of 18 percent GST | Cum | 848.42 | 848.42 | 12.9 | False | None | None | False | None | False | 10944.618 | 0 | 3056320 | 103576 | None | 1.19.2 | Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m,PWD SR 2023-24, Vol-1 Page No 10 Item No 1.19.2 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 657.26 | 657.26 | 188.89 | False | None | None | False | None | False | 124149.8414 | 0 | 3056321 | 103576 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Rates inclusive of 18 percentage
PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 17.34 | False | None | None | False | None | False | 122542.1268 | 0 | 3056322 | 103576 | None | 2.11(h | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates inclusive of 18 percentage
PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h)
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 2.15 | False | None | None | False | None | False | 200450.907 | 0 | 3056323 | 103576 | None | 2.1 IV(B) | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar, Volume-3 Page No 10 Item no 2.1 iv( b) PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 719.8 | 719.8 | 106.8 | False | None | None | False | None | False | 76874.64 | 0 | 3056324 | 103576 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates item no 2.4.2 Volume-1 page No 16 COMMON SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 8058.03 | 8058.03 | 155.67 | False | None | None | False | None | False | 1254393.5301 | 0 | 3056325 | 103576 | None | 17(B-7) | Providing fixing of dowel rod of 16 mm dia in the river bed for 400 mm depth @ 1000 mm c/c in single layer and grouting with underwater epoxy grout includes the cost of usage charges of all machineries, barge, boat, cost of all tools and all labour charges etc., complete. Volume-3 Page No 160 Item no 17(B-7) PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Nos | 4720.0 | 4720.0 | 30.0 | False | None | None | False | None | False | 141600.0 | 0 | 3056326 | 103576 | None | 1.23 | Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.Volume-1 Page No 11, Item no 1.23 PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 3164.76 | 3164.76 | 32.12 | False | None | None | False | None | False | 101652.0912 | 0 | 3056327 | 103576 | None | 9.1 II | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. ii. 1200 mm dia Volume-3 Page No 87 Item no 9.1 ii PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | m | 12705.06 | 12705.06 | 37.5 | False | None | None | False | None | False | 476439.75 | 0 | 3056328 | 103576 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Volume-1 Page No 7 Item no 1.10 PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 197.44 | False | None | None | False | None | False | 37276.672 | 0 | 3056329 | 103576 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.Rates inclusive of 18 percentage
PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 19.4 | False | None | None | False | None | False | 43769.504 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056330 | 103577 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST)
(Quantity to be executed=15.60) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056331 | 103577 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST)
(Quantity to be executed=1296.00) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056332 | 103577 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Rate is inclusive of 18% GST)
(Quantity to be executed =194.40) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056333 | 103577 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST)
(Quantity to be executed =648.00) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056334 | 103577 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (Rate is inclusive of 18% GST)
(QTY EXECUTED-0.0) (Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.1 | False | None | None | False | None | False | 0.001 | 0 | 3056335 | 103577 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =450)(Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Maintenance - Activities to be carried out for the Second Year.) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056336 | 103578 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Rate is inclusive of 18% GST)
(Quantity to be executed =23.40
) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056337 | 103578 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Rate is inclusive of 18% GST)
(Quantity to be executed =1728.00
) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056338 | 103578 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Rate is inclusive of 18% GST)
(Quantity to be executed =194.40
) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056339 | 103578 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST)
(Quantity to be executed =648
) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056340 | 103578 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST)
(Quantity to be executed =450) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056341 | 103578 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (Have to Rectify Irrespective of Quantity) (QTY EXECUTED -0.0) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.02 | False | None | None | False | None | False | 0.0002 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE) | 230526.35 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056342 | 103579 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 23.4 | False | None | None | False | None | False | 12153.726 | 0 | 3056343 | 103579 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 1728.0 | False | None | None | False | None | False | 13703.04 | 0 | 3056344 | 103579 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 194.4 | False | None | None | False | None | False | 10019.376 | 0 | 3056345 | 103579 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 648.0 | False | None | None | False | None | False | 83067.12 | 0 | 3056346 | 103579 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 75.6 | False | None | None | False | None | False | 42562.8 | 0 | 3056347 | 103579 | None | 8.10 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. (PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 125.55 | 125.55 | 450.0 | False | None | None | False | None | False | 56497.5 | 0 | 3056348 | 103579 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 2.14 | False | None | None | False | None | False | 5611.187 | 0 | 3056349 | 103579 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 2.14 | False | None | None | False | None | False | 582.615 | 0 | 3056350 | 103579 | None | 8.10 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10 ) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 43.75 | False | None | None | False | None | False | 6302.1875 | 0 | 3056351 | 103579 | None | 8.4 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic
enamel paint black or any other approved colour to give an
even shade English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rate inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.19 | 1.19 | 22.5 | False | None | None | False | None | False | 26.775 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Fourth Year) | 269870.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056352 | 103580 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST | 100 Sqm | 537.94 | 537.94 | 23.4 | False | None | None | False | None | False | 12587.796 | 0 | 3056353 | 103580 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 1728.0 | False | None | None | False | None | False | 14186.88 | 0 | 3056354 | 103580 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 194.4 | False | None | None | False | None | False | 10377.072 | 0 | 3056355 | 103580 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 648.0 | False | None | None | False | None | False | 86034.96 | 0 | 3056356 | 103580 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 151.2 | False | None | None | False | None | False | 88166.232 | 0 | 3056357 | 103580 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 450.0 | False | None | None | False | None | False | 58518.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Fifth Year (PAID MAINTENANCE)) | 324791.74 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056358 | 103581 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 556.49 | 556.49 | 23.4 | False | None | None | False | None | False | 13021.866 | 0 | 3056359 | 103581 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 8.5 | 8.5 | 1728.0 | False | None | None | False | None | False | 14688.0 | 0 | 3056360 | 103581 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 55.22 | 55.22 | 194.4 | False | None | None | False | None | False | 10734.768 | 0 | 3056361 | 103581 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 137.35 | 137.35 | 648.0 | False | None | None | False | None | False | 89002.8 | 0 | 3056362 | 103581 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 603.22 | 603.22 | 226.8 | False | None | None | False | None | False | 136810.296 | 0 | 3056363 | 103581 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 134.52 | 134.52 | 450.0 | False | None | None | False | None | False | 60534.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimate for Renewal after Maintenance Period at 6th Year) | 8139146.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056364 | 103582 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 2.16 | False | None | None | False | None | False | 6270.4584 | 0 | 3056365 | 103582 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 2.16 | False | None | None | False | None | False | 651.0672 | 0 | 3056366 | 103582 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 43.75 | False | None | None | False | None | False | 6977.6875 | 0 | 3056367 | 103582 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | cm | 1.32 | 1.32 | 7500.0 | False | None | None | False | None | False | 9900.0 | 0 | 3056368 | 103582 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 14983.5 | False | None | None | False | None | False | 263110.26 | 0 | 3056369 | 103582 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 449.5 | False | None | None | False | None | False | 7204536.555 | 0 | 3056370 | 103582 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 587.28 | False | None | None | False | None | False | 455435.64 | 0 | 3056371 | 103582 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | m | 534.07 | 534.07 | 360.0 | False | None | None | False | None | False | 192265.2 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(WATER SUPPLY LINE) | 307424.45 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056372 | 103583 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 309.16 | 309.16 | 113.4 | False | None | None | False | None | False | 35058.744 | 0 | 3056373 | 103583 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 210.0 | False | None | None | False | None | False | 94659.6 | 0 | 3056374 | 103583 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Rate is Inclusive of 18 percent GST
PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10
---- item rates are inclusive of 18 percent GST | m | 188.8 | 188.8 | 111.74 | False | None | None | False | None | False | 21096.512 | 0 | 3056375 | 103583 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 60.0 | False | None | None | False | None | False | 156609.6 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(ROAD WORK (Reconstruction)) | 46519667.69 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056376 | 103584 | None | 16.29 | Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in (Rectangular) shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate.(ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 messages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1(PWD SR Rates 2023-2024, Volume-3, Page No. 149,Item. No. 16.29 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3056377 | 103584 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 61.3 | False | None | None | False | None | False | 28427.262 | 0 | 3056378 | 103584 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 7508.0 | False | None | None | False | None | False | 53156.64 | 0 | 3056379 | 103584 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 1898.5 | False | None | None | False | None | False | 212821.85 | 0 | 3056380 | 103584 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situation PWD SR 2023-24, V-1,Page No. 7 Item No.1.8.Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 559.32 | 559.32 | 3840.0 | False | None | None | False | None | False | 2147788.8 | 0 | 3056381 | 103584 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6) Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 2534.6 | False | None | None | False | None | False | 1474478.204 | 0 | 3056382 | 103584 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 1962.5 | False | None | None | False | None | False | 5462854.25 | 0 | 3056383 | 103584 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 1725.0 | False | None | None | False | None | False | 5208844.5 | 0 | 3056384 | 103584 | None | 6.8.2 | Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) Vol-3 page No 51 Item No 6.8.2 (v)PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Sqm | 1369.98 | 1369.98 | 6100.0 | False | None | None | False | None | False | 8356878.0 | 0 | 3056385 | 103584 | None | 10.5 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5)Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Sqm | 502.68 | 502.68 | 84.0 | False | None | None | False | None | False | 42225.12 | 0 | 3056386 | 103584 | None | 5.23 (i) | Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)(PWD SR Rates 2023-2024, Volume-3, Page No. 40,Item. No. 5.23 (i)) Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Sqm | 55.46 | 55.46 | 210.0 | False | None | None | False | None | False | 11646.6 | 0 | 3056387 | 103584 | None | 5.4 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.4) Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 3150.0 | False | None | None | False | None | False | 52038.0 | 0 | 3056388 | 103584 | None | 5.12 (C ) | Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 35,Item. No. 5.12 (C ))Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 367.5 | False | None | None | False | None | False | 4097558.85 | 0 | 3056389 | 103584 | None | 5.16 C | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 38,Item. No. 5.16 C)Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 220.5 | False | None | None | False | None | False | 2850121.26 | 0 | 3056390 | 103584 | None | 6.1 | Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.Vol-3 page No 49 Item No 6.1 PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 5805.6 | 5805.6 | 840.0 | False | None | None | False | None | False | 4876704.0 | 0 | 3056391 | 103584 | None | 6.5 | Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid using Paver Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing.
Vol-3 page No 50 Item No 6.5 PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Cum | 9250.02 | 9250.02 | 1232.0 | False | None | None | False | None | False | 11396024.64 | 0 | 3056392 | 103584 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Vol-3 page No 31 Item No 5.3 (i) PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST
---- item rates are inclusive of 18 percent GST | Sqm | 14.16 | 14.16 | 4200.0 | False | None | None | False | None | False | 59472.0 | 0 | 3056393 | 103584 | None | 5.1a | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.Rates inclusive of 18 percent GST Vol-3 page No 31 Item No 5.1 A ((i) PWD SR 2023-24) ---- item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 3150.0 | False | None | None | False | None | False | 152397.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(ROAD FURNITURES) | 1035107.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056394 | 103585 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 2.56 | False | None | None | False | None | False | 27217.408 | 0 | 3056395 | 103585 | None | 8.6 ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 20.0 | False | None | None | False | None | False | 112052.8 | 0 | 3056396 | 103585 | None | 8.6 viii | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 VIIl)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 5.0 | False | None | None | False | None | False | 25659.1 | 0 | 3056397 | 103585 | None | 8.6 xv | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 20.0 | False | None | None | False | None | False | 156350.0 | 0 | 3056398 | 103585 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31)(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 105.0 | False | None | None | False | None | False | 23293.2 | 0 | 3056399 | 103585 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 431.05 | False | None | None | False | None | False | 269578.67 | 0 | 3056400 | 103585 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 309.0 | False | None | None | False | None | False | 133086.3 | 0 | 3056401 | 103585 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 9.0 | False | None | None | False | None | False | 8942.04 | 0 | 3056402 | 103585 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 60.0 | False | None | None | False | None | False | 257712.0 | 0 | 3056403 | 103585 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 2.0 | False | None | None | False | None | False | 6907.72 | 0 | 3056404 | 103585 | None | 8.17 | Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings
Vol-3 page No 67 Item No 8.17 PWD SR 2023-24 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Nos | 2384.78 | 2384.78 | 6.0 | False | None | None | False | None | False | 14308.68 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( BOX CULVERTS) | 1553235.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056405 | 103586 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 67.91 | False | None | None | False | None | False | 8173.6476 | 0 | 3056406 | 103586 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 10.59 | False | None | None | False | None | False | 74839.7418 | 0 | 3056407 | 103586 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 4.0 | False | None | None | False | None | False | 372931.92 | 0 | 3056408 | 103586 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 15 Item No 2.4.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 53.66 | False | None | None | False | None | False | 481425.7148 | 0 | 3056409 | 103586 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 7.0 | False | None | None | False | None | False | 67827.83 | 0 | 3056410 | 103586 | None | 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 32.32 | False | None | None | False | None | False | 44544.7168 | 0 | 3056411 | 103586 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 5.4 | False | None | None | False | None | False | 17057.844 | 0 | 3056412 | 103586 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 4.66 | False | None | None | False | None | False | 34768.9124 | 0 | 3056413 | 103586 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 3.9 | False | None | None | False | None | False | 8799.024 | 0 | 3056414 | 103586 | None | 4.1A(V) | Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Rate is Inclusive of 18 percent GST
PWD SR 2023-24, Vol-3 Page No 23 Item No 4.1A(V)
---- item rates are inclusive of 18 percent GST | Cum | 2934.66 | 2934.66 | 4.8 | False | None | None | False | None | False | 14086.368 | 0 | 3056415 | 103586 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 7.56 | False | None | None | False | None | False | 60759.5688 | 0 | 3056416 | 103586 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 12.0 | False | None | None | False | None | False | 167583.6 | 0 | 3056417 | 103586 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 1.8 | False | None | None | False | None | False | 29674.404 | 0 | 3056418 | 103586 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 24.0 | False | None | None | False | None | False | 50834.4 | 0 | 3056419 | 103586 | None | 13.14 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 123 Item No 13.14)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 99.12 | 99.12 | 7.75 | False | None | None | False | None | False | 768.18 | 0 | 3056420 | 103586 | None | 2.11(ii(a)) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever
necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(Rate inclusive of GST) ---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 21.33 | False | None | None | False | None | False | 4530.492 | 0 | 3056421 | 103586 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2. ---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 11.83 | False | None | None | False | None | False | 114629.0327 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056422 | 103587 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed=8.4) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056423 | 103587 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST)(Quantity to be executed=630.00) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056424 | 103587 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Rate is inclusive of 18% GST)(Quantity to be executed =94.50) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056425 | 103587 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST)(Quantity to be executed =315.00) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056426 | 103587 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST)(Quantity to be executed =90.00) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056427 | 103587 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (QTY EXECUTED-0.0)(Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(Road Maintenance Activities to be carried out for the Second Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056428 | 103588 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) (Rate is inclusive of 18% GST)a(Quantity to be executed =12.60) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056429 | 103588 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Rate is inclusive of 18% GST)(Quantity to be executed =840.00) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056430 | 103588 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Rate is inclusive of 18% GST)(Quantity to be executed =94.50) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056431 | 103588 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2).UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST)(Quantity to be executed =315.00) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056432 | 103588 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST)(Quantity to be executed =90.000) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056433 | 103588 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (QTY EXECUTED-0.0)(Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Third Year. (Payment Made) | 103268.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056434 | 103589 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 12.6 | False | None | None | False | None | False | 6544.314 | 0 | 3056435 | 103589 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 840.0 | False | None | None | False | None | False | 6661.2 | 0 | 3056436 | 103589 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 94.5 | False | None | None | False | None | False | 4870.53 | 0 | 3056437 | 103589 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 315.0 | False | None | None | False | None | False | 40379.85 | 0 | 3056438 | 103589 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 36.75 | False | None | None | False | None | False | 20690.25 | 0 | 3056439 | 103589 | None | 1.12 | Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 90.0 | False | None | None | False | None | False | 11299.5 | 0 | 3056440 | 103589 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 2.5 | False | None | None | False | None | False | 6555.125 | 0 | 3056441 | 103589 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 2.5 | False | None | None | False | None | False | 680.625 | 0 | 3056442 | 103589 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 14.0 | False | None | None | False | None | False | 2016.7 | 0 | 3056443 | 103589 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 3000.0 | False | None | None | False | None | False | 3570.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fourth Year. (Payment Made | 93674.29 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056444 | 103590 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 537.94 | 537.94 | 12.6 | False | None | None | False | None | False | 6778.044 | 0 | 3056445 | 103590 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 840.0 | False | None | None | False | None | False | 6896.4 | 0 | 3056446 | 103590 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 94.5 | False | None | None | False | None | False | 5044.41 | 0 | 3056447 | 103590 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 315.0 | False | None | None | False | None | False | 41822.55 | 0 | 3056448 | 103590 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 36.75 | False | None | None | False | None | False | 21429.2925 | 0 | 3056449 | 103590 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 90.0 | False | None | None | False | None | False | 11703.6 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fifth Year. (Payment Made) | 102260.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056450 | 103591 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 477.89 | 477.89 | 12.6 | False | None | None | False | None | False | 6021.414 | 0 | 3056451 | 103591 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 7.3 | 7.3 | 840.0 | False | None | None | False | None | False | 6132.0 | 0 | 3056452 | 103591 | None | 10.3 | Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 47.42 | 47.42 | 94.5 | False | None | None | False | None | False | 4481.19 | 0 | 3056453 | 103591 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 117.95 | 117.95 | 315.0 | False | None | None | False | None | False | 37154.25 | 0 | 3056454 | 103591 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 518.02 | 518.02 | 73.5 | False | None | None | False | None | False | 38074.47 | 0 | 3056455 | 103591 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 115.52 | 115.52 | 90.0 | False | None | None | False | None | False | 10396.8 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the sixth Year. (Payment Made) | 4179194.97 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056456 | 103592 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 5363.15 | 5363.15 | 1.85 | False | None | None | False | None | False | 9921.8275 | 0 | 3056457 | 103592 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 1.85 | False | None | None | False | None | False | 557.627 | 0 | 3056458 | 103592 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 14.0 | False | None | None | False | None | False | 2232.86 | 0 | 3056459 | 103592 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | cm | 1.32 | 1.32 | 3000.0 | False | None | None | False | None | False | 3960.0 | 0 | 3056460 | 103592 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 7350.0 | False | None | None | False | None | False | 129066.0 | 0 | 3056461 | 103592 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
PWD SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 220.5 | False | None | None | False | None | False | 3534149.745 | 0 | 3056462 | 103592 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 431.05 | False | None | None | False | None | False | 334279.275 | 0 | 3056463 | 103592 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 534.07 | 534.07 | 309.0 | False | None | None | False | None | False | 165027.63 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist(Water Supply Works) | 486794.84 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056464 | 103593 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 309.16 | 309.16 | 189.0 | False | None | None | False | None | False | 58431.24 | 0 | 3056465 | 103593 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications
PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 189.0 | False | None | None | False | None | False | 35683.2 | 0 | 3056466 | 103593 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 90.0 | False | None | None | False | None | False | 234914.4 | 0 | 3056467 | 103593 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia,PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 350.0 | False | None | None | False | None | False | 157766.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( ROAD WORK (Reconstruction) | 79223362.41 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056468 | 103594 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 PWD SR2023-24,V-3,PageNo.149Item No.16.29 Rate is inclusive of 18% Gst ---- item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3056469 | 103594 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a (Rate is inclusive of 18% Gst) ---- item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 166.7 | False | None | None | False | None | False | 77305.458 | 0 | 3056470 | 103594 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 (Rate is inclusive of 18% Gst) ---- item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 16290.0 | False | None | None | False | None | False | 115333.2 | 0 | 3056471 | 103594 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.)(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.12)Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 6512.18 | False | None | None | False | None | False | 730015.378 | 0 | 3056472 | 103594 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 5160.52 | False | None | None | False | None | False | 724640.2184 | 0 | 3056473 | 103594 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6)Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 5709.14 | False | None | None | False | None | False | 3321235.1036 | 0 | 3056474 | 103594 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 6816.94 | False | None | None | False | None | False | 18975770.5228 | 0 | 3056475 | 103594 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 7786.8 | False | None | None | False | None | False | 23513177.016 | 0 | 3056476 | 103594 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 30282.0 | False | None | None | False | None | False | 1465043.16 | 0 | 3056477 | 103594 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 30282.0 | False | None | None | False | None | False | 500258.64 | 0 | 3056478 | 103594 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 1514.1 | False | None | None | False | None | False | 16881942.462 | 0 | 3056479 | 103594 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsPWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 908.46 | False | None | None | False | None | False | 11742499.5912 | 0 | 3056480 | 103594 | None | 1.70 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.7)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 559.32 | 559.32 | 2038.03 | False | None | None | False | None | False | 1139910.9396 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.(ROAD FURNITURES) | 4070793.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056481 | 103595 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 11.08 | False | None | None | False | None | False | 117800.344 | 0 | 3056482 | 103595 | None | 8.6 ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 15.0 | False | None | None | False | None | False | 84039.6 | 0 | 3056483 | 103595 | None | 8.6 VIII | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 VII)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 15.0 | False | None | None | False | None | False | 76977.3 | 0 | 3056484 | 103595 | None | 8.6 xv | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 15.0 | False | None | None | False | None | False | 117262.5 | 0 | 3056485 | 103595 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 52.5 | False | None | None | False | None | False | 11646.6 | 0 | 3056486 | 103595 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 1062.55 | False | None | None | False | None | False | 664518.77 | 0 | 3056487 | 103595 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 782.0 | False | None | None | False | None | False | 336807.4 | 0 | 3056488 | 103595 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 22.0 | False | None | None | False | None | False | 21858.32 | 0 | 3056489 | 103595 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 610.0 | False | None | None | False | None | False | 2620072.0 | 0 | 3056490 | 103595 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 4.0 | False | None | None | False | None | False | 13815.44 | 0 | 3056491 | 103595 | None | 8.16(I) | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16) Rates inclusive of 18 percent GST KSRRB M800-2:Retro- Reflectorised Traffic Signs: Providing and fixing of retro - reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide clause 800.1.3, fixed over Aluminium sheeting, 1.5mm thick supported on a mild steel angleiron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing complete as per specifications. MORTH Specification No.801.(clause no.24.2.2 , 24.2.3 & 24.2.5 / page 191)
Vol-3 page No 67 Item No 8.16(i) PWD SR 2023-24 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Nos | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.(RCC DRAIN) | 2725794.17 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056492 | 103596 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m)(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 540.0 | False | None | None | False | None | False | 64994.4 | 0 | 3056493 | 103596 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 39.6 | False | None | None | False | None | False | 279853.992 | 0 | 3056494 | 103596 | None | 2.11 h | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(PWD SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 6.48 | False | None | None | False | None | False | 604149.7104 | 0 | 3056495 | 103596 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 48.6 | False | None | None | False | None | False | 362611.404 | 0 | 3056496 | 103596 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 10072.54 | 10072.54 | 97.2 | False | None | None | False | None | False | 979050.888 | 0 | 3056497 | 103596 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 8953.37 | 8953.37 | 48.6 | False | None | None | False | None | False | 435133.782 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( BOX CULVERTS) | 4327760.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056498 | 103597 | None | 2.11 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 10,Item. No. 2.11)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 44.22 | False | None | None | False | None | False | 9392.328 | 0 | 3056499 | 103597 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 203.75 | False | None | None | False | None | False | 24523.35 | 0 | 3056500 | 103597 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 31.77 | False | None | None | False | None | False | 224519.2254 | 0 | 3056501 | 103597 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 11.99 | False | None | None | False | None | False | 1117863.4302 | 0 | 3056502 | 103597 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 69.37 | False | None | None | False | None | False | 622372.3786 | 0 | 3056503 | 103597 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 21.0 | False | None | None | False | None | False | 203483.49 | 0 | 3056504 | 103597 | None | 12.3 A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 60.84 | False | None | None | False | None | False | 83852.1216 | 0 | 3056505 | 103597 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 16.2 | False | None | None | False | None | False | 51173.532 | 0 | 3056506 | 103597 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 4.66 | False | None | None | False | None | False | 34768.9124 | 0 | 3056507 | 103597 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 11.7 | False | None | None | False | None | False | 26397.072 | 0 | 3056508 | 103597 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 22.68 | False | None | None | False | None | False | 182278.7064 | 0 | 3056509 | 103597 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 36.0 | False | None | None | False | None | False | 502750.8 | 0 | 3056510 | 103597 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 5.4 | False | None | None | False | None | False | 89023.212 | 0 | 3056511 | 103597 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 72.0 | False | None | None | False | None | False | 152503.2 | 0 | 3056512 | 103597 | None | 8.10 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 23.25 | False | None | None | False | None | False | 2990.415 | 0 | 3056513 | 103597 | None | 2.17(IX(C) | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . Removal of all types of Hume pipes above 900 mm dia and stacking including earthwork and dismantling of masonry works PWD SR 2023-24, Vol-3 Page No 11 Item No 2.17(IX(A)) Rates inclusive of 18 percent GST
---- item rates are inclusive of 18 percent GST | m | 1621.32 | 1621.32 | 7.5 | False | None | None | False | None | False | 12159.9 | 0 | 3056514 | 103597 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 8720.72 | 8720.72 | 113.26 | False | None | None | False | None | False | 987708.7472 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056515 | 103598 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed=31.60
) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056516 | 103598 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed=2610.00) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056517 | 103598 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =391.50) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056518 | 103598 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =1305.00) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056519 | 103598 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rates inclusive of 18 percentage (QTY Executed is 0.0) (Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056520 | 103598 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =360.00
) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.Road Maintenance Activities to be carried out for the Second Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056521 | 103599 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =47.40) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056522 | 103599 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =3480.00) ---- item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056523 | 103599 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =391.50) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056524 | 103599 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =1305.0) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056525 | 103599 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rates inclusive of 18 percentage (Qty Executed is0.0)
(Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3056526 | 103599 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =360) ---- item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Third Year. (Payment Made) | 397105.23 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056527 | 103600 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 47.4 | False | None | None | False | None | False | 24619.086 | 0 | 3056528 | 103600 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 3480.0 | False | None | None | False | None | False | 27596.4 | 0 | 3056529 | 103600 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 391.5 | False | None | None | False | None | False | 20177.91 | 0 | 3056530 | 103600 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 1305.0 | False | None | None | False | None | False | 167287.95 | 0 | 3056531 | 103600 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 152.25 | False | None | None | False | None | False | 85716.75 | 0 | 3056532 | 103600 | None | 1.12 | Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 360.0 | False | None | None | False | None | False | 45198.0 | 0 | 3056533 | 103600 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 4.35 | False | None | None | False | None | False | 11405.9175 | 0 | 3056534 | 103600 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 22.0 | False | None | None | False | None | False | 5989.5 | 0 | 3056535 | 103600 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 63.0 | False | None | None | False | None | False | 9075.15 | 0 | 3056536 | 103600 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 32.4 | False | None | None | False | None | False | 38.556 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Fourth Year. (Payment Made) | 472603.68 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056537 | 103601 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 537.94 | 537.94 | 47.4 | False | None | None | False | None | False | 25498.356 | 0 | 3056538 | 103601 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 3480.0 | False | None | None | False | None | False | 28570.8 | 0 | 3056539 | 103601 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 391.5 | False | None | None | False | None | False | 20898.27 | 0 | 3056540 | 103601 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 1305.0 | False | None | None | False | None | False | 173264.85 | 0 | 3056541 | 103601 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 304.5 | False | None | None | False | None | False | 177556.995 | 0 | 3056542 | 103601 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 360.0 | False | None | None | False | None | False | 46814.4 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fifth Year. (Payment Made) | 580731.15 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056543 | 103602 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | 100 Sqm | 556.49 | 556.49 | 47.4 | False | None | None | False | None | False | 26377.626 | 0 | 3056544 | 103602 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Rmtr | 8.49 | 8.49 | 3480.0 | False | None | None | False | None | False | 29545.2 | 0 | 3056545 | 103602 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 55.22 | 55.22 | 391.5 | False | None | None | False | None | False | 21618.63 | 0 | 3056546 | 103602 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 137.35 | 137.35 | 1305.0 | False | None | None | False | None | False | 179241.75 | 0 | 3056547 | 103602 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 603.22 | 603.22 | 456.75 | False | None | None | False | None | False | 275520.735 | 0 | 3056548 | 103602 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 134.52 | 134.52 | 360.0 | False | None | None | False | None | False | 48427.2 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Sixth Year. (Payment Made) | 16345998.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056549 | 103603 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 4.35 | False | None | None | False | None | False | 12628.0065 | 0 | 3056550 | 103603 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 4.35 | False | None | None | False | None | False | 1311.177 | 0 | 3056551 | 103603 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 63.0 | False | None | None | False | None | False | 10047.87 | 0 | 3056552 | 103603 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | cm | 1.32 | 1.32 | 13500.0 | False | None | None | False | None | False | 17820.0 | 0 | 3056553 | 103603 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 30282.0 | False | None | None | False | None | False | 531751.92 | 0 | 3056554 | 103603 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 908.46 | False | None | None | False | None | False | 14560696.9494 | 0 | 3056555 | 103603 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 1062.55 | False | None | None | False | None | False | 824007.525 | 0 | 3056556 | 103603 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | m | 534.07 | 534.07 | 726.0 | False | None | None | False | None | False | 387734.82 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. (WATER SUPPLY LINE Shifting) | 600485.95 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056557 | 103604 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 309.16 | 309.16 | 216.0 | False | None | None | False | None | False | 66778.56 | 0 | 3056558 | 103604 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 400.0 | False | None | None | False | None | False | 180304.0 | 0 | 3056559 | 103604 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 212.84 | False | None | None | False | None | False | 40184.192 | 0 | 3056560 | 103604 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 120.0 | False | None | None | False | None | False | 313219.2 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. (Electrical Pole Shifting) | 325613.87 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056561 | 103605 | None | 1.0 | R&R of Rabbit ACSR wire (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 9777.36 | 9777.36 | 7.92 | False | None | None | False | None | False | 77436.6912 | 0 | 3056562 | 103605 | None | 2.0 | R&R of Horizontal X Arms (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Set | 609.82 | 609.82 | 99.0 | False | None | None | False | None | False | 60372.18 | 0 | 3056563 | 103605 | None | 3.0 | R&R of 9Mtr Poles (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 3905.56 | 3905.56 | 33.0 | False | None | None | False | None | False | 128883.48 | 0 | 3056564 | 103605 | None | 4.0 | R&R of DP Structure (9Mtr Poles)
(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Set | 12088.9 | 12088.9 | 3.0 | False | None | None | False | None | False | 36266.7 | 0 | 3056565 | 103605 | None | 5.0 | R&R of 45 kN Disc Insulator (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 68.44 | 68.44 | 12.0 | False | None | None | False | None | False | 821.28 | 0 | 3056566 | 103605 | None | 6.0 | Spl.Earth Electrode type Earthing (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 109.74 | 109.74 | 33.0 | False | None | None | False | None | False | 3621.42 | 0 | 3056567 | 103605 | None | 7.0 | Guy set with NO15 insulator & concreting (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 699.74 | 699.74 | 10.0 | False | None | None | False | None | False | 6997.4 | 0 | 3056568 | 103605 | None | 8.0 | R&R of 11 kV Pin Insulator (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 56.64 | 56.64 | 198.0 | False | None | None | False | None | False | 11214.72 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( BOX CULVERTS) | 1684305.62 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056569 | 103606 | None | 2.11 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 24.25 | False | None | None | False | None | False | 5150.7 | 0 | 3056570 | 103606 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 84.37 | False | None | None | False | None | False | 10154.7732 | 0 | 3056571 | 103606 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 13.85 | False | None | None | False | None | False | 97878.227 | 0 | 3056572 | 103606 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 5.86 | False | None | None | False | None | False | 546345.2628 | 0 | 3056573 | 103606 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 30.07 | False | None | None | False | None | False | 269781.4246 | 0 | 3056574 | 103606 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 12.25 | False | None | None | False | None | False | 118698.7025 | 0 | 3056575 | 103606 | None | 12.3 A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 20.28 | False | None | None | False | None | False | 27950.7072 | 0 | 3056576 | 103606 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 5.4 | False | None | None | False | None | False | 17057.844 | 0 | 3056577 | 103606 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 5.6 | False | None | None | False | None | False | 41782.384 | 0 | 3056578 | 103606 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 4.8 | False | None | None | False | None | False | 10829.568 | 0 | 3056579 | 103606 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 7.56 | False | None | None | False | None | False | 60759.5688 | 0 | 3056580 | 103606 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 12.0 | False | None | None | False | None | False | 167583.6 | 0 | 3056581 | 103606 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 3.15 | False | None | None | False | None | False | 51930.207 | 0 | 3056582 | 103606 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 24.0 | False | None | None | False | None | False | 50834.4 | 0 | 3056583 | 103606 | None | 8.10 | Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent
---- item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 13.0 | False | None | None | False | None | False | 1672.06 | 0 | 3056584 | 103606 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GST | Cum | 8720.72 | 8720.72 | 23.61 | False | None | None | False | None | False | 205896.1992 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( RCC DRAIN)) | 18185480.98 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056585 | 103607 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.(PWD SR Rates 2023-2024,olume-1, Page No. 8,Item. No. 1.14.1) ---- item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 2640.0 | False | None | None | False | None | False | 317750.4 | 0 | 3056586 | 103607 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.1.3) ---- item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 264.0 | False | None | None | False | None | False | 1865693.28 | 0 | 3056587 | 103607 | None | 2.11h | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(UNI SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) ---- item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 43.2 | False | None | None | False | None | False | 4027664.736 | 0 | 3056588 | 103607 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) ---- item rates are inclusive of 18 percent GST | Cum | 7859.49 | 7859.49 | 324.0 | False | None | None | False | None | False | 2546474.76 | 0 | 3056589 | 103607 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) top slab ---- item rates are inclusive of 18 percent GST | Cum | 8953.37 | 8953.37 | 324.0 | False | None | None | False | None | False | 2900891.88 | 0 | 3056590 | 103607 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) ---- item rates are inclusive of 18 percent GST | Cum | 10072.54 | 10072.54 | 648.0 | False | None | None | False | None | False | 6527005.92 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Electrical WORK) | 414260.65 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056591 | 103608 | None | 2.0 | PSC Poles 9 Mtr 300 kg WL ---- item rates are inclusive of 18 percent GST | No | 6886.0 | 6886.0 | 4.0 | False | None | None | False | None | False | 27544.0 | 0 | 3056592 | 103608 | None | 3.0 | PSC Poles 11 Mtr 365 kg WL ---- item rates are inclusive of 18 percent GST | No | 9476.0 | 9476.0 | 2.0 | False | None | None | False | None | False | 18952.0 | 0 | 3056593 | 103608 | None | 4.0 | Horizantal X-arm with HTS ---- item rates are inclusive of 18 percent GST | Set | 1118.0 | 1118.0 | 8.0 | False | None | None | False | None | False | 8944.0 | 0 | 3056594 | 103608 | None | 5.0 | 4 Pin X-arm ---- item rates are inclusive of 18 percent GST | Set | 602.0 | 602.0 | 6.0 | False | None | None | False | None | False | 3612.0 | 0 | 3056595 | 103608 | None | 7.0 | 11 KV Polymeric Pin Insulators ---- item rates are inclusive of 18 percent GST | Set | 212.0 | 212.0 | 15.0 | False | None | None | False | None | False | 3180.0 | 0 | 3056596 | 103608 | None | 8.0 | 1.1 KV Pin Insulators with GI Pin ---- item rates are inclusive of 18 percent GST | Set | 57.0 | 57.0 | 20.0 | False | None | None | False | None | False | 1140.0 | 0 | 3056597 | 103608 | None | 9.0 | 45 KN Disc Insulators ---- item rates are inclusive of 18 percent GST | No | 193.0 | 193.0 | 18.0 | False | None | None | False | None | False | 3474.0 | 0 | 3056598 | 103608 | None | 10.0 | 8 KV Strain Insulators ---- item rates are inclusive of 18 percent GST | No | 19.0 | 19.0 | 30.0 | False | None | None | False | None | False | 570.0 | 0 | 3056599 | 103608 | None | 11.0 | Guy Set (Complete) ---- item rates are inclusive of 18 percent GST | Set | 1572.0 | 1572.0 | 10.0 | False | None | None | False | None | False | 15720.0 | 0 | 3056600 | 103608 | None | 13.0 | Rabbit conductor with 1.5% Sag ---- item rates are inclusive of 18 percent GST | Km | 62898.0 | 62898.0 | 0.6 | False | None | None | False | None | False | 37738.8 | 0 | 3056601 | 103608 | None | 17.0 | PG Clamps Rabbit conductor ---- item rates are inclusive of 18 percent GST | No | 84.0 | 84.0 | 30.0 | False | None | None | False | None | False | 2520.0 | 0 | 3056602 | 103608 | None | 18.0 | Spiral Earth Electrode"s ---- item rates are inclusive of 18 percent GST | No | 291.0 | 291.0 | 4.0 | False | None | None | False | None | False | 1164.0 | 0 | 3056603 | 103608 | None | 19.0 | Loading & Unloading of 9mtr poles ---- item rates are inclusive of 18 percent GST | No | 142.0 | 142.0 | 4.0 | False | None | None | False | None | False | 568.0 | 0 | 3056604 | 103608 | None | 1.1 | 9mtrRCC DP Transformer structure ---- item rates are inclusive of 18 percent GST | No | 38537.0 | 38537.0 | 1.0 | False | None | None | False | None | False | 38537.0 | 0 | 3056605 | 103608 | None | 1.2 | 11 KV Pin Insulators with GI Pin ---- item rates are inclusive of 18 percent GST | Set | 149.0 | 149.0 | 3.0 | False | None | None | False | None | False | 447.0 | 0 | 3056606 | 103608 | None | 1.3 | 45 KN Disc Insulators ---- item rates are inclusive of 18 percent GST | No | 186.0 | 186.0 | 3.0 | False | None | None | False | None | False | 558.0 | 0 | 3056607 | 103608 | None | 1.4 | Guy set(complete) ---- item rates are inclusive of 18 percent GST | Set | 1572.0 | 1572.0 | 3.0 | False | None | None | False | None | False | 4716.0 | 0 | 3056608 | 103608 | None | 1.5 | Earthing materials pipe type for grounding ---- item rates are inclusive of 18 percent GST | No | 2678.0 | 2678.0 | 3.0 | False | None | None | False | None | False | 8034.0 | 0 | 3056609 | 103608 | None | 1.6 | Guy Wire 7/10SWG ---- item rates are inclusive of 18 percent GST | Kg | 79.0 | 79.0 | 10.0 | False | None | None | False | None | False | 790.0 | 0 | 3056610 | 103608 | None | 1.7 | G.I Wire 8SWG ---- item rates are inclusive of 18 percent GST | Kg | 77.0 | 77.0 | 5.0 | False | None | None | False | None | False | 385.0 | 0 | 3056611 | 103608 | None | 1.8 | 11KV Lightening Arrestor, ---- item rates are inclusive of 18 percent GST | Set | 1039.0 | 1039.0 | 1.0 | False | None | None | False | None | False | 1039.0 | 0 | 3056612 | 103608 | None | 1.90 | LT Protection Kit ---- item rates are inclusive of 18 percent GST | Kit | 2379.0 | 2379.0 | 1.0 | False | None | None | False | None | False | 2379.0 | 0 | 3056613 | 103608 | None | 1.10A | LT Wiring Kit 25/63 KVA TC"S(AL lead wire - 50 sq mtr) ---- item rates are inclusive of 18 percent GST | Mtr | 45.0 | 45.0 | 64.0 | False | None | None | False | None | False | 2880.0 | 0 | 3056614 | 103608 | None | 1.10B | Copper lugs -50 sq mm ---- item rates are inclusive of 18 percent GST | No | 30.0 | 30.0 | 58.0 | False | None | None | False | None | False | 1740.0 | 0 | 3056615 | 103608 | None | 1.10c | PG Clamps Rabbit -50 sq mm ---- item rates are inclusive of 18 percent GST | No | 93.0 | 93.0 | 4.0 | False | None | None | False | None | False | 372.0 | 0 | 3056616 | 103608 | None | 1.10D | Spacer's for DTC wiring ---- item rates are inclusive of 18 percent GST | No | 48.0 | 48.0 | 8.0 | False | None | None | False | None | False | 384.0 | 0 | 3056617 | 103608 | None | 1.10E | Fish plate with clamp's ,bolt's & nut's ---- item rates are inclusive of 18 percent GST | No | 185.0 | 185.0 | 2.0 | False | None | None | False | None | False | 370.0 | 0 | 3056618 | 103608 | None | 1.10F | LT Wiring Kit 25/63 KVA TC"S ---- item rates are inclusive of 18 percent GST | Job | 979.0 | 979.0 | 1.0 | False | None | None | False | None | False | 979.0 | 0 | 3056619 | 103608 | None | 1.11 | Caution/Danger Board as perDrawing No,BESCOM/GM/CP/40/Dt,24.10.07, ---- item rates are inclusive of 18 percent GST | No | 229.0 | 229.0 | 1.0 | False | None | None | False | None | False | 229.0 | 0 | 3056620 | 103608 | None | 1.12 | Transparent Alkithene tube19 mm Dia,2mm thick in Coil's of 30 mtr ---- item rates are inclusive of 18 percent GST | Coil | 517.0 | 517.0 | 68.4 | False | None | None | False | None | False | 35362.8 | 0 | 3056621 | 103608 | None | 1.13 | 11KV 200A Single Break GOS ---- item rates are inclusive of 18 percent GST | Set | 10552.0 | 10552.0 | 1.0 | False | None | None | False | None | False | 10552.0 | 0 | 3056622 | 103608 | None | 1.14 | HG Fuse Unit ---- item rates are inclusive of 18 percent GST | Set | 1306.0 | 1306.0 | 1.0 | False | None | None | False | None | False | 1306.0 | 0 | 3056623 | 103608 | None | 1.15 | Loading & un loading of 9 mtr pole's ---- item rates are inclusive of 18 percent GST | No | 142.0 | 142.0 | 2.0 | False | None | None | False | None | False | 284.0 | 0 | 3056624 | 103608 | None | 2.20 | Releasing& errection 9mtr Pole;s ---- item rates are inclusive of 18 percent GST | No | 1834.0 | 1834.0 | 68.4 | False | None | None | False | None | False | 125445.6 | 0 | 3056625 | 103608 | None | 2.4 | R & R of Rabbit Conductor ---- item rates are inclusive of 18 percent GST | Kms | 4361.0 | 4361.0 | 7.45 | False | None | None | False | None | False | 32489.45 | 0 | 3056626 | 103608 | None | 2.5 | Releasing & Refixingof H X-arm's ---- item rates are inclusive of 18 percent GST | Set | 272.0 | 272.0 | 38.0 | False | None | None | False | None | False | 10336.0 | 0 | 3056627 | 103608 | None | 2.6 | Releasing & Refixing of 4 pinX-arm's ---- item rates are inclusive of 18 percent GST | Set | 167.0 | 167.0 | 57.0 | False | None | None | False | None | False | 9519.0 | 0 |
| 1710362292000 | 0 | None | None | Roads | Improvements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District. (ELECTRICAL ESTIMATE) | 437841.23 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3056628 | 103609 | None | 1.0 | PSCC Pole-9 Mtr Long, 200 Kg WL (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Nos | 7010.38 | 7010.38 | 5.0 | False | None | None | False | None | False | 35051.9 | 0 | 3056629 | 103609 | None | 2.0 | 11KV Horizontal cross arm with clamp (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Set | 1151.68 | 1151.68 | 6.0 | False | None | None | False | None | False | 6910.08 | 0 | 3056630 | 103609 | None | 3.0 | 11 kV Insulator with GI pins\ (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Set | 241.9 | 241.9 | 90.0 | False | None | None | False | None | False | 21771.0 | 0 | 3056631 | 103609 | None | 4.0 | Guy set (Rate is inclusive of 18% GST)
---- item rates are inclusive of 18 percent GST | Set | 2465.02 | 2465.02 | 5.0 | False | None | None | False | None | False | 12325.1 | 0 | 3056632 | 103609 | None | 5.0 | Rabbit conductor with 1.5% sag (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Km | 74219.64 | 74219.64 | 0.5 | False | None | None | False | None | False | 37109.82 | 0 | 3056633 | 103609 | None | 6.0 | Earthing materials pipe type for grounding as per drawing no (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | Set | 2907.52 | 2907.52 | 3.0 | False | None | None | False | None | False | 8722.56 | 0 | 3056634 | 103609 | None | 7.0 | R&R of Poles (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 3905.56 | 3905.56 | 46.0 | False | None | None | False | None | False | 179655.76 | 0 | 3056635 | 103609 | None | 8.0 | R&R of SPTC set (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 11669.41 | 11669.41 | 1.0 | False | None | None | False | None | False | 11669.41 | 0 | 3056636 | 103609 | None | 9.0 | R&R of H cross Arms (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 576.19 | 576.19 | 110.0 | False | None | None | False | None | False | 63380.9 | 0 | 3056637 | 103609 | None | 10.0 | R&R of 25KVA TC (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 2580.54 | 2580.54 | 1.0 | False | None | None | False | None | False | 2580.54 | 0 | 3056638 | 103609 | None | 11.0 | R&R of Rabbit conductor (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST | No | 9777.36 | 9777.36 | 6.0 | False | None | None | False | None | False | 58664.16 | 0 |
|
|
---|