noticeInvitingTenderDTO
createdTs1710362291896
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2416000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate14-03-2024 02:48:22
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee2316000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710362291926
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9760
titlePKG-753 A) Improvements to road connecting NH48 (Nelahal) to SH-158 Road SH 261 from Ch 22.60 KM to 30.00 KM (Srinivasapur to Jampenahalli Cross) (in selected reaches) in Koratagere Taluk of Tumkur District. B) Improvements to road Bagepally-Halaguru SH-94 from Ch 97.90 KM to 103.87 KM (in selected reaches) in Koratagere Taluk of Tumkur District. C) Imprnts to Madhugiri-Hindupura SH-158 from Ch 9.50KM to 11.50KM and Ch 13.50KM to 15.0KM (in selected reaches) in Madhugiri Taluk of Tumkur District
descriptionPKG-753 A) Improvements to road connecting NH48 (Nelahal) to SH-158 via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH 261 from Ch 22.60 KM to 30.00 KM (Srinivasapur to Jampenahalli Cross) (in selected reaches) in Koratagere Taluk of Tumkur District. B) Improvements to road Bagepally-Halaguru SH-94 from Ch 97.90 KM to 103.87 KM (in selected reaches) in Koratagere Taluk of Tumkur District. C) Improvements to road Madhugiri-Hindupura SH-158 from Ch 9.50 KM to 11.50 KM and Ch 13.50 KM to 15.00 KM (in selected reaches) in Madhugiri Taluk of Tumkur District.
categoryWORKS
categoryTextWorks
ecv241610088.75
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-753/KRTG/MDG/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Work (Reconstruction)38894515.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056279103573None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the RECTANGLE shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 PWD SR2023-24,V-3,PageNo.149Item No.16.29 RATES ARE INCLUSIVE OF 18% GST ---- item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056280103573None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm463.74463.74112.56FalseNoneNoneFalseNoneFalse52198.57440
3056281103573None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm7.087.0811880.0FalseNoneNoneFalseNoneFalse84110.40
3056282103573None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. 1.12(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.12) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum112.1112.15528.21FalseNoneNoneFalseNoneFalse619712.3410
3056283103573None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum140.42140.422011.02FalseNoneNoneFalseNoneFalse282387.42840
3056284103573None4.4Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum581.74581.742823.94FalseNoneNoneFalseNoneFalse1642798.85560
3056285103573None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum2783.622783.623379.42FalseNoneNoneFalseNoneFalse9407021.10040
3056286103573None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- item rates are inclusive of 18 percent GSTCum3019.623019.623852.9FalseNoneNoneFalseNoneFalse11634293.8980
3056287103573None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- item rates are inclusive of 18 percent GSTSqm48.3848.3814983.5FalseNoneNoneFalseNoneFalse724901.730
3056288103573None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- item rates are inclusive of 18 percent GSTSqm16.5216.5214983.5FalseNoneNoneFalseNoneFalse247527.420
3056289103573None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- item rates are inclusive of 18 percent GSTCum11149.8211149.82749.18FalseNoneNoneFalseNoneFalse8353222.14760
3056290103573None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- item rates are inclusive of 18 percent GSTCum12925.7212925.72449.5FalseNoneNoneFalseNoneFalse5810111.140
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(ROAD FURNITURES)1500453.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056291103574None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm10631.810631.85.82FalseNoneNoneFalseNoneFalse61877.0760
3056292103574None8.6 iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo5602.645602.647.0FalseNoneNoneFalseNoneFalse39218.480
3056293103574None8.6 viiiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 viii)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GSTNo5131.825131.826.0FalseNoneNoneFalseNoneFalse30790.920
3056294103574None8.6 xvRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo7817.57817.56.0FalseNoneNoneFalseNoneFalse46905.00
3056295103574None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) ---- item rates are inclusive of 18 percent GSTSqm221.84221.84105.0FalseNoneNoneFalseNoneFalse23293.20
3056296103574None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm625.4625.4587.28FalseNoneNoneFalseNoneFalse367284.9120
3056297103574None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(UNI SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos430.7430.7440.0FalseNoneNoneFalseNoneFalse189508.00
3056298103574None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos993.56993.5611.0FalseNoneNoneFalseNoneFalse10929.160
3056299103574None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTNos3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3056300103574None8.25( i)Metal Beam Crash Barrier (i)Type A, W : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25(i))Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTRmtr4295.24295.2140.0FalseNoneNoneFalseNoneFalse601328.00
3056301103574None8.60.2 (iii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) gr ii and Bituminous Concrete (BC) gr ii for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IR C 67 -2022, ) Two lane with formation width of 9.00 m(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.60.2(III), Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum61205.4261205.422.0FalseNoneNoneFalseNoneFalse122410.840
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(BOX CULVERTS)5487924.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056302103575None2.11 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum212.4212.445.54FalseNoneNoneFalseNoneFalse9672.6960
3056303103575None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum120.36120.36227.85FalseNoneNoneFalseNoneFalse27424.0260
3056304103575None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum7067.027067.0236.59FalseNoneNoneFalseNoneFalse258582.26180
3056305103575None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9815.19FalseNoneNoneFalseNoneFalse1416208.96620
3056306103575None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum8971.788971.78157.73FalseNoneNoneFalseNoneFalse1415118.85940
3056307103575None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum9689.699689.6926.25FalseNoneNoneFalseNoneFalse254354.36250
3056308103575None12.3 ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum1378.241378.2479.83FalseNoneNoneFalseNoneFalse110024.89920
3056309103575None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum3158.863158.8616.2FalseNoneNoneFalseNoneFalse51173.5320
3056310103575None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum7836.27836.214.9FalseNoneNoneFalseNoneFalse116759.380
3056311103575None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum2256.162256.1612.6FalseNoneNoneFalseNoneFalse28427.6160
3056312103575None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8036.988036.9822.68FalseNoneNoneFalseNoneFalse182278.70640
3056313103575None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum13965.313965.336.0FalseNoneNoneFalseNoneFalse502750.80
3056314103575None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16485.7816485.786.75FalseNoneNoneFalseNoneFalse111279.0150
3056315103575None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2118.12118.172.0FalseNoneNoneFalseNoneFalse152503.20
3056316103575None8.10Painting Two Coats on New Concrete Surfaces.Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm128.62128.6228.5FalseNoneNoneFalseNoneFalse3665.670
3056317103575None4.2 (V)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(UNI SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum2934.662934.6614.4FalseNoneNoneFalseNoneFalse42259.1040
3056318103575None2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8074.68074.699.75FalseNoneNoneFalseNoneFalse805441.350
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Pipe Culvert)2590093.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056319103576None2.8 II(a)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Rate is Inclusive of 18 percent GST(Volume-3 Page No 10 Item no 2.8 ii( a) PWD SR 2023-24) ---- item rates are inclusive of 18 percent GSTCum848.42848.4212.9FalseNoneNoneFalseNoneFalse10944.6180
3056320103576None1.19.2Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Depth exceeding 1.5 m, but not exceeding 3 m,PWD SR 2023-24, Vol-1 Page No 10 Item No 1.19.2 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum657.26657.26188.89FalseNoneNoneFalseNoneFalse124149.84140
3056321103576None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Rates inclusive of 18 percentage PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3 ---- item rates are inclusive of 18 percent GSTCum7067.027067.0217.34FalseNoneNoneFalseNoneFalse122542.12680
3056322103576None2.11(hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates inclusive of 18 percentage PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.982.15FalseNoneNoneFalseNoneFalse200450.9070
3056323103576None2.1 IV(B)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar, Volume-3 Page No 10 Item no 2.1 iv( b) PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum719.8719.8106.8FalseNoneNoneFalseNoneFalse76874.640
3056324103576None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates item no 2.4.2 Volume-1 page No 16 COMMON SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8058.038058.03155.67FalseNoneNoneFalseNoneFalse1254393.53010
3056325103576None17(B-7)Providing fixing of dowel rod of 16 mm dia in the river bed for 400 mm depth @ 1000 mm c/c in single layer and grouting with underwater epoxy grout includes the cost of usage charges of all machineries, barge, boat, cost of all tools and all labour charges etc., complete. Volume-3 Page No 160 Item no 17(B-7) PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTNos4720.04720.030.0FalseNoneNoneFalseNoneFalse141600.00
3056326103576None1.23Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.Volume-1 Page No 11, Item no 1.23 PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum3164.763164.7632.12FalseNoneNoneFalseNoneFalse101652.09120
3056327103576None9.1 IILaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. ii. 1200 mm dia Volume-3 Page No 87 Item no 9.1 ii PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTm12705.0612705.0637.5FalseNoneNoneFalseNoneFalse476439.750
3056328103576None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Volume-1 Page No 7 Item no 1.10 PWD SR 2023-24 Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum188.8188.8197.44FalseNoneNoneFalseNoneFalse37276.6720
3056329103576None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.Rates inclusive of 18 percentage PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A ---- item rates are inclusive of 18 percent GSTCum2256.162256.1619.4FalseNoneNoneFalseNoneFalse43769.5040
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056330103577None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) (Quantity to be executed=15.60) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056331103577None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) (Quantity to be executed=1296.00) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056332103577None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Rate is inclusive of 18% GST) (Quantity to be executed =194.40) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056333103577None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST) (Quantity to be executed =648.00) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056334103577None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (Rate is inclusive of 18% GST) (QTY EXECUTED-0.0) (Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.1FalseNoneNoneFalseNoneFalse0.0010
3056335103577None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =450)(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Road Maintenance - Activities to be carried out for the Second Year.)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056336103578None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Rate is inclusive of 18% GST) (Quantity to be executed =23.40 ) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056337103578None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Rate is inclusive of 18% GST) (Quantity to be executed =1728.00 ) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056338103578None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Rate is inclusive of 18% GST) (Quantity to be executed =194.40 ) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056339103578None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST) (Quantity to be executed =648 ) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056340103578None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST) (Quantity to be executed =450) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056341103578None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (Have to Rectify Irrespective of Quantity) (QTY EXECUTED -0.0) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.02FalseNoneNoneFalseNoneFalse0.00020
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE)230526.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056342103579None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm519.39519.3923.4FalseNoneNoneFalseNoneFalse12153.7260
3056343103579None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr7.937.931728.0FalseNoneNoneFalseNoneFalse13703.040
3056344103579None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm51.5451.54194.4FalseNoneNoneFalseNoneFalse10019.3760
3056345103579None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm128.19128.19648.0FalseNoneNoneFalseNoneFalse83067.120
3056346103579None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm563.0563.075.6FalseNoneNoneFalseNoneFalse42562.80
3056347103579None8.10Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. (PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm125.55125.55450.0FalseNoneNoneFalseNoneFalse56497.50
3056348103579None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm2622.052622.052.14FalseNoneNoneFalseNoneFalse5611.1870
3056349103579None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm272.25272.252.14FalseNoneNoneFalseNoneFalse582.6150
3056350103579None8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10 ) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTSqm144.05144.0543.75FalseNoneNoneFalseNoneFalse6302.18750
3056351103579None8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rate inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.191.1922.5FalseNoneNoneFalseNoneFalse26.7750
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Fourth Year)269870.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056352103580None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- item rates are inclusive of 18 percent GST100 Sqm537.94537.9423.4FalseNoneNoneFalseNoneFalse12587.7960
3056353103580None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- item rates are inclusive of 18 percent GSTRmtr8.218.211728.0FalseNoneNoneFalseNoneFalse14186.880
3056354103580None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- item rates are inclusive of 18 percent GSTSqm53.3853.38194.4FalseNoneNoneFalseNoneFalse10377.0720
3056355103580None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- item rates are inclusive of 18 percent GSTSqm132.77132.77648.0FalseNoneNoneFalseNoneFalse86034.960
3056356103580None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- item rates are inclusive of 18 percent GSTSqm583.11583.11151.2FalseNoneNoneFalseNoneFalse88166.2320
3056357103580None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- item rates are inclusive of 18 percent GSTCum130.04130.04450.0FalseNoneNoneFalseNoneFalse58518.00
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimates for Maintenance - Activities to be carried out for the Fifth Year (PAID MAINTENANCE))324791.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056358103581None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm556.49556.4923.4FalseNoneNoneFalseNoneFalse13021.8660
3056359103581None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr8.58.51728.0FalseNoneNoneFalseNoneFalse14688.00
3056360103581None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm55.2255.22194.4FalseNoneNoneFalseNoneFalse10734.7680
3056361103581None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm137.35137.35648.0FalseNoneNoneFalseNoneFalse89002.80
3056362103581None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm603.22603.22226.8FalseNoneNoneFalseNoneFalse136810.2960
3056363103581None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum134.52134.52450.0FalseNoneNoneFalseNoneFalse60534.00
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(Estimate for Renewal after Maintenance Period at 6th Year)8139146.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056364103582None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm2902.992902.992.16FalseNoneNoneFalseNoneFalse6270.45840
3056365103582None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm301.42301.422.16FalseNoneNoneFalseNoneFalse651.06720
3056366103582None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm159.49159.4943.75FalseNoneNoneFalseNoneFalse6977.68750
3056367103582None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTcm1.321.327500.0FalseNoneNoneFalseNoneFalse9900.00
3056368103582None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm17.5617.5614983.5FalseNoneNoneFalseNoneFalse263110.260
3056369103582None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum16027.8916027.89449.5FalseNoneNoneFalseNoneFalse7204536.5550
3056370103582None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm775.5775.5587.28FalseNoneNoneFalseNoneFalse455435.640
3056371103582None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTm534.07534.07360.0FalseNoneNoneFalseNoneFalse192265.20
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District.(WATER SUPPLY LINE)307424.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056372103583None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum309.16309.16113.4FalseNoneNoneFalseNoneFalse35058.7440
3056373103583None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm450.76450.76210.0FalseNoneNoneFalseNoneFalse94659.60
3056374103583None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10 ---- item rates are inclusive of 18 percent GSTm188.8188.8111.74FalseNoneNoneFalseNoneFalse21096.5120
3056375103583None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2610.162610.1660.0FalseNoneNoneFalseNoneFalse156609.60
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(ROAD WORK (Reconstruction))46519667.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056376103584None16.29Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in (Rectangular) shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate.(ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 messages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1(PWD SR Rates 2023-2024, Volume-3, Page No. 149,Item. No. 16.29 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056377103584None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm463.74463.7461.3FalseNoneNoneFalseNoneFalse28427.2620
3056378103584None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm7.087.087508.0FalseNoneNoneFalseNoneFalse53156.640
3056379103584None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1,Page No. 8 Item No.1.12 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum112.1112.11898.5FalseNoneNoneFalseNoneFalse212821.850
3056380103584None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situation PWD SR 2023-24, V-1,Page No. 7 Item No.1.8.Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum559.32559.323840.0FalseNoneNoneFalseNoneFalse2147788.80
3056381103584None3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6) Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum581.74581.742534.6FalseNoneNoneFalseNoneFalse1474478.2040
3056382103584None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum2783.622783.621962.5FalseNoneNoneFalseNoneFalse5462854.250
3056383103584None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum3019.623019.621725.0FalseNoneNoneFalseNoneFalse5208844.50
3056384103584None6.8.2 Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) Vol-3 page No 51 Item No 6.8.2 (v)PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm1369.981369.986100.0FalseNoneNoneFalseNoneFalse8356878.00
3056385103584None10.5Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5)Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm502.68502.6884.0FalseNoneNoneFalseNoneFalse42225.120
3056386103584None5.23 (i)Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)(PWD SR Rates 2023-2024, Volume-3, Page No. 40,Item. No. 5.23 (i)) Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm55.4655.46210.0FalseNoneNoneFalseNoneFalse11646.60
3056387103584None5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.4) Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm16.5216.523150.0FalseNoneNoneFalseNoneFalse52038.00
3056388103584None5.12 (C )Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 35,Item. No. 5.12 (C ))Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum11149.8211149.82367.5FalseNoneNoneFalseNoneFalse4097558.850
3056389103584None5.16 CProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 38,Item. No. 5.16 C)Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum12925.7212925.72220.5FalseNoneNoneFalseNoneFalse2850121.260
3056390103584None6.1Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.Vol-3 page No 49 Item No 6.1 PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum5805.65805.6840.0FalseNoneNoneFalseNoneFalse4876704.00
3056391103584None6.5Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid using Paver Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing. Vol-3 page No 50 Item No 6.5 PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTCum9250.029250.021232.0FalseNoneNoneFalseNoneFalse11396024.640
3056392103584None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Vol-3 page No 31 Item No 5.3 (i) PWD SR 2023-24 Rate is Inclusive Of 18 Percent GST ---- item rates are inclusive of 18 percent GSTSqm14.1614.164200.0FalseNoneNoneFalseNoneFalse59472.00
3056393103584None5.1aProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.Rates inclusive of 18 percent GST Vol-3 page No 31 Item No 5.1 A ((i) PWD SR 2023-24) ---- item rates are inclusive of 18 percent GSTSqm48.3848.383150.0FalseNoneNoneFalseNoneFalse152397.00
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(ROAD FURNITURES)1035107.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056394103585None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm10631.810631.82.56FalseNoneNoneFalseNoneFalse27217.4080
3056395103585None8.6 iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo5602.645602.6420.0FalseNoneNoneFalseNoneFalse112052.80
3056396103585None8.6 viiiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 VIIl)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GSTNo5131.825131.825.0FalseNoneNoneFalseNoneFalse25659.10
3056397103585None8.6 xvRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.6 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo7817.57817.520.0FalseNoneNoneFalseNoneFalse156350.00
3056398103585None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31)(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm221.84221.84105.0FalseNoneNoneFalseNoneFalse23293.20
3056399103585None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm625.4625.4431.05FalseNoneNoneFalseNoneFalse269578.670
3056400103585None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos430.7430.7309.0FalseNoneNoneFalseNoneFalse133086.30
3056401103585None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos993.56993.569.0FalseNoneNoneFalseNoneFalse8942.040
3056402103585None8.25( i)Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTRmtr4295.24295.260.0FalseNoneNoneFalseNoneFalse257712.00
3056403103585None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTNos3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3056404103585None8.17Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings Vol-3 page No 67 Item No 8.17 PWD SR 2023-24 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNos2384.782384.786.0FalseNoneNoneFalseNoneFalse14308.680
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( BOX CULVERTS)1553235.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056405103586None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m PWD SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum120.36120.3667.91FalseNoneNoneFalseNoneFalse8173.64760
3056406103586None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum7067.027067.0210.59FalseNoneNoneFalseNoneFalse74839.74180
3056407103586None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures PWD SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.984.0FalseNoneNoneFalseNoneFalse372931.920
3056408103586None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 15 Item No 2.4.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum8971.788971.7853.66FalseNoneNoneFalseNoneFalse481425.71480
3056409103586None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum9689.699689.697.0FalseNoneNoneFalseNoneFalse67827.830
3056410103586None12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum1378.241378.2432.32FalseNoneNoneFalseNoneFalse44544.71680
3056411103586None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum3158.863158.865.4FalseNoneNoneFalseNoneFalse17057.8440
3056412103586None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum7461.147461.144.66FalseNoneNoneFalseNoneFalse34768.91240
3056413103586None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum2256.162256.163.9FalseNoneNoneFalseNoneFalse8799.0240
3056414103586None4.1A(V)Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-3 Page No 23 Item No 4.1A(V) ---- item rates are inclusive of 18 percent GSTCum2934.662934.664.8FalseNoneNoneFalseNoneFalse14086.3680
3056415103586None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8036.988036.987.56FalseNoneNoneFalseNoneFalse60759.56880
3056416103586None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum13965.313965.312.0FalseNoneNoneFalseNoneFalse167583.60
3056417103586None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16485.7816485.781.8FalseNoneNoneFalseNoneFalse29674.4040
3056418103586None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2118.12118.124.0FalseNoneNoneFalseNoneFalse50834.40
3056419103586None13.14Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 123 Item No 13.14)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm99.1299.127.75FalseNoneNoneFalseNoneFalse768.180
3056420103586None2.11(ii(a))Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(Rate inclusive of GST) ---- item rates are inclusive of 18 percent GSTCum212.4212.421.33FalseNoneNoneFalseNoneFalse4530.4920
3056421103586None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2. ---- item rates are inclusive of 18 percent GSTCum9689.699689.6911.83FalseNoneNoneFalseNoneFalse114629.03270
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056422103587None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed=8.4) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056423103587None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST)(Quantity to be executed=630.00) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056424103587None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)(Rate is inclusive of 18% GST)(Quantity to be executed =94.50) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056425103587None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST)(Quantity to be executed =315.00) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056426103587None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST)(Quantity to be executed =90.00) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056427103587None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (QTY EXECUTED-0.0)(Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.(Road Maintenance Activities to be carried out for the Second Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056428103588None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) (Rate is inclusive of 18% GST)a(Quantity to be executed =12.60) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056429103588None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Rate is inclusive of 18% GST)(Quantity to be executed =840.00) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056430103588None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3)UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Rate is inclusive of 18% GST)(Quantity to be executed =94.50) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056431103588None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2).UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Rate is inclusive of 18% GST)(Quantity to be executed =315.00) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056432103588None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Rate is inclusive of 18% GST)(Quantity to be executed =90.000) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056433103588None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rate is Inclusive of 18 percent GST (QTY EXECUTED-0.0)(Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Third Year. (Payment Made)103268.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056434103589None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm519.39519.3912.6FalseNoneNoneFalseNoneFalse6544.3140
3056435103589None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr7.937.93840.0FalseNoneNoneFalseNoneFalse6661.20
3056436103589None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm51.5451.5494.5FalseNoneNoneFalseNoneFalse4870.530
3056437103589None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2)(Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm128.19128.19315.0FalseNoneNoneFalseNoneFalse40379.850
3056438103589None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm563.0563.036.75FalseNoneNoneFalseNoneFalse20690.250
3056439103589None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum125.55125.5590.0FalseNoneNoneFalseNoneFalse11299.50
3056440103589None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm2622.052622.052.5FalseNoneNoneFalseNoneFalse6555.1250
3056441103589None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm272.25272.252.5FalseNoneNoneFalseNoneFalse680.6250
3056442103589None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm144.05144.0514.0FalseNoneNoneFalseNoneFalse2016.70
3056443103589None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTcm1.191.193000.0FalseNoneNoneFalseNoneFalse3570.00
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fourth Year. (Payment Made93674.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056444103590None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm537.94537.9412.6FalseNoneNoneFalseNoneFalse6778.0440
3056445103590None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr8.218.21840.0FalseNoneNoneFalseNoneFalse6896.40
3056446103590None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm53.3853.3894.5FalseNoneNoneFalseNoneFalse5044.410
3056447103590None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm132.77132.77315.0FalseNoneNoneFalseNoneFalse41822.550
3056448103590None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm583.11583.1136.75FalseNoneNoneFalseNoneFalse21429.29250
3056449103590None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum130.04130.0490.0FalseNoneNoneFalseNoneFalse11703.60
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fifth Year. (Payment Made)102260.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056450103591None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm477.89477.8912.6FalseNoneNoneFalseNoneFalse6021.4140
3056451103591None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr7.37.3840.0FalseNoneNoneFalseNoneFalse6132.00
3056452103591None10.3Maintenance of earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm47.4247.4294.5FalseNoneNoneFalseNoneFalse4481.190
3056453103591None10.2Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm117.95117.95315.0FalseNoneNoneFalseNoneFalse37154.250
3056454103591None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 PWD SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm518.02518.0273.5FalseNoneNoneFalseNoneFalse38074.470
3056455103591None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth PWD SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum115.52115.5290.0FalseNoneNoneFalseNoneFalse10396.80
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the sixth Year. (Payment Made)4179194.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056456103592None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm5363.155363.151.85FalseNoneNoneFalseNoneFalse9921.82750
3056457103592None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint PWD SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm301.42301.421.85FalseNoneNoneFalseNoneFalse557.6270
3056458103592None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm159.49159.4914.0FalseNoneNoneFalseNoneFalse2232.860
3056459103592None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman PWD SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTcm1.321.323000.0FalseNoneNoneFalseNoneFalse3960.00
3056460103592None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm17.5617.567350.0FalseNoneNoneFalseNoneFalse129066.00
3056461103592None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. PWD SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum16027.8916027.89220.5FalseNoneNoneFalseNoneFalse3534149.7450
3056462103592None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm775.5775.5431.05FalseNoneNoneFalseNoneFalse334279.2750
3056463103592None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. PWD SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo534.07534.07309.0FalseNoneNoneFalseNoneFalse165027.630
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist(Water Supply Works)486794.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056464103593None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum309.16309.16189.0FalseNoneNoneFalseNoneFalse58431.240
3056465103593None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum188.8188.8189.0FalseNoneNoneFalseNoneFalse35683.20
3056466103593None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2610.162610.1690.0FalseNoneNoneFalseNoneFalse234914.40
3056467103593None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia,PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTm450.76450.76350.0FalseNoneNoneFalseNoneFalse157766.00
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( ROAD WORK (Reconstruction)79223362.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056468103594None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 PWD SR2023-24,V-3,PageNo.149Item No.16.29 Rate is inclusive of 18% Gst ---- item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056469103594None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle PWD SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a (Rate is inclusive of 18% Gst) ---- item rates are inclusive of 18 percent GSTSqm463.74463.74166.7FalseNoneNoneFalseNoneFalse77305.4580
3056470103594None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. PWD SR 2023-24, V-3,Page No. 17 Item No.3.5 (Rate is inclusive of 18% Gst) ---- item rates are inclusive of 18 percent GSTSqm7.087.0816290.0FalseNoneNoneFalseNoneFalse115333.20
3056471103594None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.)(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.12)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum112.1112.16512.18FalseNoneNoneFalseNoneFalse730015.3780
3056472103594None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) PWD SR 2023-24, V-1,Page No. 7 Item No.1.7. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum140.42140.425160.52FalseNoneNoneFalseNoneFalse724640.21840
3056473103594None3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(PWD SR Rates 2023-2024, Volume-3, Page No. 17,Item. No. 3.6)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum581.74581.745709.14FalseNoneNoneFalseNoneFalse3321235.10360
3056474103594None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(PWD SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum2783.622783.626816.94FalseNoneNoneFalseNoneFalse18975770.52280
3056475103594None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SR 2023-24, V-3,Page No. 26 Item No.4.17 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum3019.623019.627786.8FalseNoneNoneFalseNoneFalse23513177.0160
3056476103594None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means PWD SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm48.3848.3830282.0FalseNoneNoneFalseNoneFalse1465043.160
3056477103594None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface PWD SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm16.5216.5230282.0FalseNoneNoneFalseNoneFalse500258.640
3056478103594None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum11149.8211149.821514.1FalseNoneNoneFalseNoneFalse16881942.4620
3056479103594None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsPWD SR 2023-24, V-3,Page No. 38 Item No.5.16(c) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum12925.7212925.72908.46FalseNoneNoneFalseNoneFalse11742499.59120
3056480103594None1.70Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.7)Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum559.32559.322038.03FalseNoneNoneFalseNoneFalse1139910.93960
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.(ROAD FURNITURES)4070793.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056481103595None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(PWD SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm10631.810631.811.08FalseNoneNoneFalseNoneFalse117800.3440
3056482103595None8.6 iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 ii)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo5602.645602.6415.0FalseNoneNoneFalseNoneFalse84039.60
3056483103595None8.6 VIIIRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular- TYPE XI. (PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 VII)Rates are inclusive of GST 18 percent. ---- item rates are inclusive of 18 percent GSTNo5131.825131.8215.0FalseNoneNoneFalseNoneFalse76977.30
3056484103595None8.6 xvRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon.(PWD SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.5 xv)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNo7817.57817.515.0FalseNoneNoneFalseNoneFalse117262.50
3056485103595None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(PWD SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm221.84221.8452.5FalseNoneNoneFalseNoneFalse11646.60
3056486103595None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm625.4625.41062.55FalseNoneNoneFalseNoneFalse664518.770
3056487103595None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos430.7430.7782.0FalseNoneNoneFalseNoneFalse336807.40
3056488103595None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii))Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTNos993.56993.5622.0FalseNoneNoneFalseNoneFalse21858.320
3056489103595None8.25( i)Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.(PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTRmtr4295.24295.2610.0FalseNoneNoneFalseNoneFalse2620072.00
3056490103595None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTNos3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3056491103595None8.16(I)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16) Rates inclusive of 18 percent GST KSRRB M800-2:Retro- Reflectorised Traffic Signs: Providing and fixing of retro - reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide clause 800.1.3, fixed over Aluminium sheeting, 1.5mm thick supported on a mild steel angleiron post 75mmx75mmx6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmx45cmx60cm, 60cm below ground level as per approved drawing complete as per specifications. MORTH Specification No.801.(clause no.24.2.2 , 24.2.3 & 24.2.5 / page 191) Vol-3 page No 67 Item No 8.16(i) PWD SR 2023-24 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNos5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.(RCC DRAIN)2725794.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056492103596None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m)(PWD SR Rates 2023-2024, Volume-1, Page No. 8,Item. No. 1.14.1) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum120.36120.36540.0FalseNoneNoneFalseNoneFalse64994.40
3056493103596None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.1.3 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7067.027067.0239.6FalseNoneNoneFalseNoneFalse279853.9920
3056494103596None2.11 hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(PWD SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.986.48FalseNoneNoneFalseNoneFalse604149.71040
3056495103596None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum7461.147461.1448.6FalseNoneNoneFalseNoneFalse362611.4040
3056496103596None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum10072.5410072.5497.2FalseNoneNoneFalseNoneFalse979050.8880
3056497103596None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8953.378953.3748.6FalseNoneNoneFalseNoneFalse435133.7820
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( BOX CULVERTS)4327760.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056498103597None2.11 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 10,Item. No. 2.11)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum212.4212.444.22FalseNoneNoneFalseNoneFalse9392.3280
3056499103597None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum120.36120.36203.75FalseNoneNoneFalseNoneFalse24523.350
3056500103597None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum7067.027067.0231.77FalseNoneNoneFalseNoneFalse224519.22540
3056501103597None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9811.99FalseNoneNoneFalseNoneFalse1117863.43020
3056502103597None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8971.788971.7869.37FalseNoneNoneFalseNoneFalse622372.37860
3056503103597None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum9689.699689.6921.0FalseNoneNoneFalseNoneFalse203483.490
3056504103597None12.3 ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum1378.241378.2460.84FalseNoneNoneFalseNoneFalse83852.12160
3056505103597None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum3158.863158.8616.2FalseNoneNoneFalseNoneFalse51173.5320
3056506103597None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum7461.147461.144.66FalseNoneNoneFalseNoneFalse34768.91240
3056507103597None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum2256.162256.1611.7FalseNoneNoneFalseNoneFalse26397.0720
3056508103597None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8036.988036.9822.68FalseNoneNoneFalseNoneFalse182278.70640
3056509103597None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum13965.313965.336.0FalseNoneNoneFalseNoneFalse502750.80
3056510103597None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16485.7816485.785.4FalseNoneNoneFalseNoneFalse89023.2120
3056511103597None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2118.12118.172.0FalseNoneNoneFalseNoneFalse152503.20
3056512103597None8.10Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm128.62128.6223.25FalseNoneNoneFalseNoneFalse2990.4150
3056513103597None2.17(IX(C)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . Removal of all types of Hume pipes above 900 mm dia and stacking including earthwork and dismantling of masonry works PWD SR 2023-24, Vol-3 Page No 11 Item No 2.17(IX(A)) Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTm1621.321621.327.5FalseNoneNoneFalseNoneFalse12159.90
3056514103597None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8720.728720.72113.26FalseNoneNoneFalseNoneFalse987708.74720
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056515103598None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed=31.60 ) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056516103598None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed=2610.00) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056517103598None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =391.50) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056518103598None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =1305.00) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056519103598None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rates inclusive of 18 percentage (QTY Executed is 0.0) (Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056520103598None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =360.00 ) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.Road Maintenance Activities to be carried out for the Second Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056521103599None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =47.40) ---- item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056522103599None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =3480.00) ---- item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056523103599None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =391.50) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056524103599None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =1305.0) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056525103599None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2(PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) Rates inclusive of 18 percentage (Qty Executed is0.0) (Have to Rectify Irrespective of Quantity) ---- item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3056526103599None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =360) ---- item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Third Year. (Payment Made)397105.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056527103600None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm519.39519.3947.4FalseNoneNoneFalseNoneFalse24619.0860
3056528103600None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr7.937.933480.0FalseNoneNoneFalseNoneFalse27596.40
3056529103600None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm51.5451.54391.5FalseNoneNoneFalseNoneFalse20177.910
3056530103600None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm128.19128.191305.0FalseNoneNoneFalseNoneFalse167287.950
3056531103600None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm563.0563.0152.25FalseNoneNoneFalseNoneFalse85716.750
3056532103600None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum125.55125.55360.0FalseNoneNoneFalseNoneFalse45198.00
3056533103600None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm2622.052622.054.35FalseNoneNoneFalseNoneFalse11405.91750
3056534103600None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm272.25272.2522.0FalseNoneNoneFalseNoneFalse5989.50
3056535103600None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm144.05144.0563.0FalseNoneNoneFalseNoneFalse9075.150
3056536103600None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTcm1.191.1932.4FalseNoneNoneFalseNoneFalse38.5560
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Fourth Year. (Payment Made)472603.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056537103601None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm537.94537.9447.4FalseNoneNoneFalseNoneFalse25498.3560
3056538103601None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr8.218.213480.0FalseNoneNoneFalseNoneFalse28570.80
3056539103601None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm53.3853.38391.5FalseNoneNoneFalseNoneFalse20898.270
3056540103601None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm132.77132.771305.0FalseNoneNoneFalseNoneFalse173264.850
3056541103601None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm583.11583.11304.5FalseNoneNoneFalseNoneFalse177556.9950
3056542103601None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum130.04130.04360.0FalseNoneNoneFalseNoneFalse46814.40
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( Road Maintenance Activities to be carried out for the Fifth Year. (Payment Made)580731.15
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056543103602None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GST100 Sqm556.49556.4947.4FalseNoneNoneFalseNoneFalse26377.6260
3056544103602None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTRmtr8.498.493480.0FalseNoneNoneFalseNoneFalse29545.20
3056545103602None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm55.2255.22391.5FalseNoneNoneFalseNoneFalse21618.630
3056546103602None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm137.35137.351305.0FalseNoneNoneFalseNoneFalse179241.750
3056547103602None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm603.22603.22456.75FalseNoneNoneFalseNoneFalse275520.7350
3056548103602None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum134.52134.52360.0FalseNoneNoneFalseNoneFalse48427.20
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. ( Road Maintenance Activities to be carried out for the Sixth Year. (Payment Made)16345998.27
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056549103603None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm2902.992902.994.35FalseNoneNoneFalseNoneFalse12628.00650
3056550103603None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm301.42301.424.35FalseNoneNoneFalseNoneFalse1311.1770
3056551103603None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm159.49159.4963.0FalseNoneNoneFalseNoneFalse10047.870
3056552103603None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTcm1.321.3213500.0FalseNoneNoneFalseNoneFalse17820.00
3056553103603None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm17.5617.5630282.0FalseNoneNoneFalseNoneFalse531751.920
3056554103603None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum16027.8916027.89908.46FalseNoneNoneFalseNoneFalse14560696.94940
3056555103603None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSqm775.5775.51062.55FalseNoneNoneFalseNoneFalse824007.5250
3056556103603None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTm534.07534.07726.0FalseNoneNoneFalseNoneFalse387734.820
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. (WATER SUPPLY LINE Shifting)600485.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056557103604None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (PWD SR Rates 2023-2024, Volume-1, Page No. 10,Item. No. 1.17.1) Rate is Inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum309.16309.16216.0FalseNoneNoneFalseNoneFalse66778.560
3056558103604None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm450.76450.76400.0FalseNoneNoneFalseNoneFalse180304.00
3056559103604None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum188.8188.8212.84FalseNoneNoneFalseNoneFalse40184.1920
3056560103604None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service(PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29.), Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2610.162610.16120.0FalseNoneNoneFalseNoneFalse313219.20
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist. (Electrical Pole Shifting)325613.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056561103605None1.0R&R of Rabbit ACSR wire (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm9777.369777.367.92FalseNoneNoneFalseNoneFalse77436.69120
3056562103605None2.0R&R of Horizontal X Arms (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet609.82609.8299.0FalseNoneNoneFalseNoneFalse60372.180
3056563103605None3.0R&R of 9Mtr Poles (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo3905.563905.5633.0FalseNoneNoneFalseNoneFalse128883.480
3056564103605None4.0R&R of DP Structure (9Mtr Poles) (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet12088.912088.93.0FalseNoneNoneFalseNoneFalse36266.70
3056565103605None5.0R&R of 45 kN Disc Insulator (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo68.4468.4412.0FalseNoneNoneFalseNoneFalse821.280
3056566103605None6.0Spl.Earth Electrode type Earthing (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo109.74109.7433.0FalseNoneNoneFalseNoneFalse3621.420
3056567103605None7.0Guy set with NO15 insulator & concreting (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo699.74699.7410.0FalseNoneNoneFalseNoneFalse6997.40
3056568103605None8.0R&R of 11 kV Pin Insulator (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo56.6456.64198.0FalseNoneNoneFalseNoneFalse11214.720
17103622920000NoneNoneRoadsImprovements to Road Bagepally - Halaguru SH-94 from ch 97.90 Km to ch 103.87 Km (in selected reaches) in Koratagere taluk of Tumkur Dist.( BOX CULVERTS)1684305.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056569103606None2.11 Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.11)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum212.4212.424.25FalseNoneNoneFalseNoneFalse5150.70
3056570103606None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum120.36120.3684.37FalseNoneNoneFalseNoneFalse10154.77320
3056571103606None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum7067.027067.0213.85FalseNoneNoneFalseNoneFalse97878.2270
3056572103606None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.985.86FalseNoneNoneFalseNoneFalse546345.26280
3056573103606None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rate is Inclusive of 18 percent GST PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.3 (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum8971.788971.7830.07FalseNoneNoneFalseNoneFalse269781.42460
3056574103606None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum9689.699689.6912.25FalseNoneNoneFalseNoneFalse118698.70250
3056575103606None12.3 ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material(PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum1378.241378.2420.28FalseNoneNoneFalseNoneFalse27950.70720
3056576103606None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTCum3158.863158.865.4FalseNoneNoneFalseNoneFalse17057.8440
3056577103606None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates(PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum7461.147461.145.6FalseNoneNoneFalseNoneFalse41782.3840
3056578103606None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.(PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum2256.162256.164.8FalseNoneNoneFalseNoneFalse10829.5680
3056579103606None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum8036.988036.987.56FalseNoneNoneFalseNoneFalse60759.56880
3056580103606None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum13965.313965.312.0FalseNoneNoneFalseNoneFalse167583.60
3056581103606None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)(PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2.)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTCum16485.7816485.783.15FalseNoneNoneFalseNoneFalse51930.2070
3056582103606None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTm2118.12118.124.0FalseNoneNoneFalseNoneFalse50834.40
3056583103606None8.10Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.(PWD SR 2023-24, Vol-3 Page No 66 Item No 8.10)Rates are inclusive of GST 18 percent ---- item rates are inclusive of 18 percent GSTSqm128.62128.6213.0FalseNoneNoneFalseNoneFalse1672.060
3056584103606None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.5.2 Rates inclusive of 18 percent GST ---- item rates are inclusive of 18 percent GSTCum8720.728720.7223.61FalseNoneNoneFalseNoneFalse205896.19920
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( RCC DRAIN))18185480.98
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056585103607None1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.(PWD SR Rates 2023-2024,olume-1, Page No. 8,Item. No. 1.14.1) ---- item rates are inclusive of 18 percent GSTCum120.36120.362640.0FalseNoneNoneFalseNoneFalse317750.40
3056586103607None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.1.3) ---- item rates are inclusive of 18 percent GSTCum7067.027067.02264.0FalseNoneNoneFalseNoneFalse1865693.280
3056587103607None2.11hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures.(UNI SR Rates 2023-2024, Volume-1, Page No. 18,Item. No. 2.11 h) ---- item rates are inclusive of 18 percent GSTTonne93232.9893232.9843.2FalseNoneNoneFalseNoneFalse4027664.7360
3056588103607None2.4.2Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) ---- item rates are inclusive of 18 percent GSTCum7859.497859.49324.0FalseNoneNoneFalseNoneFalse2546474.760
3056589103607None2.4.2Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) top slab ---- item rates are inclusive of 18 percent GSTCum8953.378953.37324.0FalseNoneNoneFalseNoneFalse2900891.880
3056590103607None2.4.2Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.(PWD SR Rates 2023-2024, Volume-1, Page No. 15,Item. No. 2.4.2) ---- item rates are inclusive of 18 percent GSTCum10072.5410072.54648.0FalseNoneNoneFalseNoneFalse6527005.920
17103622920000NoneNoneRoadsImprovements to Road Madhugiri - Hindupur SH-158 from Ch 9.50 Km to Ch 11.50 Km and from Ch 13.50 Km to Ch 15.00 Km (in selected reaches) in Madhugiri taluk of Tumkur Dist.( Electrical WORK)414260.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056591103608None2.0PSC Poles 9 Mtr 300 kg WL ---- item rates are inclusive of 18 percent GSTNo6886.06886.04.0FalseNoneNoneFalseNoneFalse27544.00
3056592103608None3.0PSC Poles 11 Mtr 365 kg WL ---- item rates are inclusive of 18 percent GSTNo9476.09476.02.0FalseNoneNoneFalseNoneFalse18952.00
3056593103608None4.0Horizantal X-arm with HTS ---- item rates are inclusive of 18 percent GSTSet1118.01118.08.0FalseNoneNoneFalseNoneFalse8944.00
3056594103608None5.04 Pin X-arm ---- item rates are inclusive of 18 percent GSTSet602.0602.06.0FalseNoneNoneFalseNoneFalse3612.00
3056595103608None7.011 KV Polymeric Pin Insulators ---- item rates are inclusive of 18 percent GSTSet212.0212.015.0FalseNoneNoneFalseNoneFalse3180.00
3056596103608None8.01.1 KV Pin Insulators with GI Pin ---- item rates are inclusive of 18 percent GSTSet57.057.020.0FalseNoneNoneFalseNoneFalse1140.00
3056597103608None9.045 KN Disc Insulators ---- item rates are inclusive of 18 percent GSTNo193.0193.018.0FalseNoneNoneFalseNoneFalse3474.00
3056598103608None10.08 KV Strain Insulators ---- item rates are inclusive of 18 percent GSTNo19.019.030.0FalseNoneNoneFalseNoneFalse570.00
3056599103608None11.0Guy Set (Complete) ---- item rates are inclusive of 18 percent GSTSet1572.01572.010.0FalseNoneNoneFalseNoneFalse15720.00
3056600103608None13.0Rabbit conductor with 1.5% Sag ---- item rates are inclusive of 18 percent GSTKm62898.062898.00.6FalseNoneNoneFalseNoneFalse37738.80
3056601103608None17.0PG Clamps Rabbit conductor ---- item rates are inclusive of 18 percent GSTNo84.084.030.0FalseNoneNoneFalseNoneFalse2520.00
3056602103608None18.0Spiral Earth Electrode"s ---- item rates are inclusive of 18 percent GSTNo291.0291.04.0FalseNoneNoneFalseNoneFalse1164.00
3056603103608None19.0Loading & Unloading of 9mtr poles ---- item rates are inclusive of 18 percent GSTNo142.0142.04.0FalseNoneNoneFalseNoneFalse568.00
3056604103608None1.19mtrRCC DP Transformer structure ---- item rates are inclusive of 18 percent GSTNo38537.038537.01.0FalseNoneNoneFalseNoneFalse38537.00
3056605103608None1.211 KV Pin Insulators with GI Pin ---- item rates are inclusive of 18 percent GSTSet149.0149.03.0FalseNoneNoneFalseNoneFalse447.00
3056606103608None1.345 KN Disc Insulators ---- item rates are inclusive of 18 percent GSTNo186.0186.03.0FalseNoneNoneFalseNoneFalse558.00
3056607103608None1.4Guy set(complete) ---- item rates are inclusive of 18 percent GSTSet1572.01572.03.0FalseNoneNoneFalseNoneFalse4716.00
3056608103608None1.5Earthing materials pipe type for grounding ---- item rates are inclusive of 18 percent GSTNo2678.02678.03.0FalseNoneNoneFalseNoneFalse8034.00
3056609103608None1.6Guy Wire 7/10SWG ---- item rates are inclusive of 18 percent GSTKg79.079.010.0FalseNoneNoneFalseNoneFalse790.00
3056610103608None1.7G.I Wire 8SWG ---- item rates are inclusive of 18 percent GSTKg77.077.05.0FalseNoneNoneFalseNoneFalse385.00
3056611103608None1.811KV Lightening Arrestor, ---- item rates are inclusive of 18 percent GSTSet1039.01039.01.0FalseNoneNoneFalseNoneFalse1039.00
3056612103608None1.90LT Protection Kit ---- item rates are inclusive of 18 percent GSTKit2379.02379.01.0FalseNoneNoneFalseNoneFalse2379.00
3056613103608None1.10ALT Wiring Kit 25/63 KVA TC"S(AL lead wire - 50 sq mtr) ---- item rates are inclusive of 18 percent GSTMtr45.045.064.0FalseNoneNoneFalseNoneFalse2880.00
3056614103608None1.10BCopper lugs -50 sq mm ---- item rates are inclusive of 18 percent GSTNo30.030.058.0FalseNoneNoneFalseNoneFalse1740.00
3056615103608None1.10cPG Clamps Rabbit -50 sq mm ---- item rates are inclusive of 18 percent GSTNo93.093.04.0FalseNoneNoneFalseNoneFalse372.00
3056616103608None1.10DSpacer's for DTC wiring ---- item rates are inclusive of 18 percent GSTNo48.048.08.0FalseNoneNoneFalseNoneFalse384.00
3056617103608None1.10EFish plate with clamp's ,bolt's & nut's ---- item rates are inclusive of 18 percent GSTNo185.0185.02.0FalseNoneNoneFalseNoneFalse370.00
3056618103608None1.10FLT Wiring Kit 25/63 KVA TC"S ---- item rates are inclusive of 18 percent GSTJob979.0979.01.0FalseNoneNoneFalseNoneFalse979.00
3056619103608None1.11Caution/Danger Board as perDrawing No,BESCOM/GM/CP/40/Dt,24.10.07, ---- item rates are inclusive of 18 percent GSTNo229.0229.01.0FalseNoneNoneFalseNoneFalse229.00
3056620103608None1.12Transparent Alkithene tube19 mm Dia,2mm thick in Coil's of 30 mtr ---- item rates are inclusive of 18 percent GSTCoil517.0517.068.4FalseNoneNoneFalseNoneFalse35362.80
3056621103608None1.1311KV 200A Single Break GOS ---- item rates are inclusive of 18 percent GSTSet10552.010552.01.0FalseNoneNoneFalseNoneFalse10552.00
3056622103608None1.14HG Fuse Unit ---- item rates are inclusive of 18 percent GSTSet1306.01306.01.0FalseNoneNoneFalseNoneFalse1306.00
3056623103608None1.15Loading & un loading of 9 mtr pole's ---- item rates are inclusive of 18 percent GSTNo142.0142.02.0FalseNoneNoneFalseNoneFalse284.00
3056624103608None2.20Releasing& errection 9mtr Pole;s ---- item rates are inclusive of 18 percent GSTNo1834.01834.068.4FalseNoneNoneFalseNoneFalse125445.60
3056625103608None2.4R & R of Rabbit Conductor ---- item rates are inclusive of 18 percent GSTKms4361.04361.07.45FalseNoneNoneFalseNoneFalse32489.450
3056626103608None2.5Releasing & Refixingof H X-arm's ---- item rates are inclusive of 18 percent GSTSet272.0272.038.0FalseNoneNoneFalseNoneFalse10336.00
3056627103608None2.6Releasing & Refixing of 4 pinX-arm's ---- item rates are inclusive of 18 percent GSTSet167.0167.057.0FalseNoneNoneFalseNoneFalse9519.00
17103622920000NoneNoneRoadsImprovements to road connecting NH48 (Nelahal 158 New SH via Koratagere, Bairenahalli Marga State Highway-158 (Chikkamalur) Road SH-261 from Ch 22.60 KM to 30.00 KM(Shrinivaspura to Jampenahalli cross )(in Selected Reaches ) in Koratagere Taluk of Tumkur District. (ELECTRICAL ESTIMATE)437841.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056628103609None1.0PSCC Pole-9 Mtr Long, 200 Kg WL (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNos7010.387010.385.0FalseNoneNoneFalseNoneFalse35051.90
3056629103609None2.011KV Horizontal cross arm with clamp (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet1151.681151.686.0FalseNoneNoneFalseNoneFalse6910.080
3056630103609None3.011 kV Insulator with GI pins\ (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet241.9241.990.0FalseNoneNoneFalseNoneFalse21771.00
3056631103609None4.0Guy set (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet2465.022465.025.0FalseNoneNoneFalseNoneFalse12325.10
3056632103609None5.0Rabbit conductor with 1.5% sag (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTKm74219.6474219.640.5FalseNoneNoneFalseNoneFalse37109.820
3056633103609None6.0Earthing materials pipe type for grounding as per drawing no (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTSet2907.522907.523.0FalseNoneNoneFalseNoneFalse8722.560
3056634103609None7.0R&R of Poles (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo3905.563905.5646.0FalseNoneNoneFalseNoneFalse179655.760
3056635103609None8.0R&R of SPTC set (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo11669.4111669.411.0FalseNoneNoneFalseNoneFalse11669.410
3056636103609None9.0R&R of H cross Arms (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo576.19576.19110.0FalseNoneNoneFalseNoneFalse63380.90
3056637103609None10.0R&R of 25KVA TC (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo2580.542580.541.0FalseNoneNoneFalseNoneFalse2580.540
3056638103609None11.0R&R of Rabbit conductor (Rate is inclusive of 18% GST) ---- item rates are inclusive of 18 percent GSTNo9777.369777.366.0FalseNoneNoneFalseNoneFalse58664.160
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103622940000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103622940000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103622940001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103623860000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103623940000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17103624000000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103624060000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103624140000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17103624220000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103624290000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103624360000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17103624420000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103624490000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103624600000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103624690000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103624770000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103624830000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103624890000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103624970000NoneNoneELIGIBILITYOriginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103625050000NoneNoneELIGIBILITYAll Item rates are inclusive of 18% GST. Hence GST will not be paid separately.None
17103625130000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1208.06 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bill copies shall not be accepted, Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: Earth Work for Embankment/ Subgrade/ Shoulders :34745.70 Cum Granular Sub-Base (GSB)/ Wet Mix Macadam (WMM) :20434.21 Cum Bituminous Base and Surface Course (DBM, BM, BC & SDBC): 4630.16 Cum Pavement Quality Concrete (PQC) M30/M40: 985.60 Cum PCC/DLC M10 & M15: 1051.38 cum Reinforced Cement Concrete (RCC) M20 & higher grades: 1926.07 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned: Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity:1 No, Mechanical Paver Finisher :1 No, Static Road Roller :1 No, Vibratory Road Roller :1 No, Tippers :4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneMachineries could be on Lease/ Hire,Wet Mix Plant / Pug mill: 1 No, Truck mounted Bitumen Sprayer: 1 No, Motor Grader:1 No, Vibratory Road Roller (6T to 10T):2 no, Tandem Roller:1 No, Excavator 0.90 Cum Bucket Capacity: 2 No, Tipper Trucks: 6 No, Self Loading Concrete Mixer 2 M3 Capacity:3 No, Water Tanker:3 No, Concrete batching plant:1 No, Concrete Road paving machine:1No, Transit Truck Agitator 5m3 capacity:1NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying the name of work
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity : (AxNx1.5 - B) Where, A : Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N : Number of years prescribed for completion of the works for which tenders are invited. B : Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4832.21 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.724.83 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAs given in KW-4OthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration certificateTrueTechnical Bid
Annual Turnover Certificate along with UDINTrueTechnical Bid
Work done Certificate Issued by not below Rank of Executive EngineerTrueTechnical Bid
Bid Capacity Calculation as per KW 4 DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalised Bank as per KW-4TrueTechnical Bid
EPF registrationFalseTechnical Bid
Details of committed worksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710364292000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer, PIU SHDP, Bengaluru
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone