tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710576393000 | 0 | None | None | Buildings | Construction of office room in the prenmises of Sri.Venkataramana Swamy Temple in Malekal Tirupati village ,Kasaba hobli, Arasikere tq.(Civil Work) | 1717510.38 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3123582 | 107277 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth(Page No. 8, Item No. 1.12 of PWD SR 2023-24 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 112.1 | 112.1 | 17.6 | False | None | None | False | None | False | 1972.96 | 0 | 3123583 | 107277 | None | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m 2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications(Page No. 5, Item No. 4.1 of PWD SR 2023-24 Volume-2 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 139.24 | 139.24 | 88.0 | False | None | None | False | None | False | 12253.12 | 0 | 3123584 | 107277 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workIn all kinds of soils Depth upto 3 m(Page No. 8, Item No. 1.14.1 of PWD SR 2023-24 Volume-1 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 120.36 | 120.36 | 62.14 | False | None | None | False | None | False | 7479.1704 | 0 | 3123585 | 107277 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specification sMix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(Page No. 15, Item No. 2.1.3 of PWD SR 2023-24 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7067.02 | 7067.02 | 13.62 | False | None | None | False | None | False | 96252.8124 | 0 | 3123586 | 107277 | None | 2.5.2 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Page No. 16, Item No. 2.5.2 of PWD SR 2023-24 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 8074.74 | 8074.74 | 39.12 | False | None | None | False | None | False | 315883.8288 | 0 | 3123587 | 107277 | None | Page 115 Vol-1 | Providing and removing form work /Centering For Footing ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 242.24 | 242.24 | 9.0 | False | None | None | False | None | False | 2180.16 | 0 | 3123588 | 107277 | None | Page 115 Vol-1 | Providing and removing form work /Centering For Plinth beam ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4037.37 | 4037.37 | 1.47 | False | None | None | False | None | False | 5934.9339 | 0 | 3123589 | 107277 | None | Page 115 Vol-1 | Providing and removing form work /Centering For Chajja ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 3633.63 | 3633.63 | 0.47 | False | None | None | False | None | False | 1707.8061 | 0 | 3123590 | 107277 | None | page 115 Vol 1 | Providing and removing form work /Centering For Lintel Beam, Roof beam, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4844.84 | 4844.84 | 5.4 | False | None | None | False | None | False | 26162.136 | 0 | 3123591 | 107277 | None | page 115 vol 1 | Providing and removing form work /Centering For Roof slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 4037.37 | 4037.37 | 9.65 | False | None | None | False | None | False | 38960.6205 | 0 | 3123592 | 107277 | None | page 115 vol 1 | Providing and removing form work /Centering For Column ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 5652.32 | 5652.32 | 2.09 | False | None | None | False | None | False | 11813.3488 | 0 | 3123593 | 107277 | None | 5.2 | Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand (Page No. 9, Item No. 5.2 of PWD SR 2023-24 Volume-II ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7809.24 | 7809.24 | 9.38 | False | None | None | False | None | False | 73250.6712 | 0 | 3123594 | 107277 | None | 5.3 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Page No. 9, Item No. 5.3 of PWD SR 2023-24 Volume-II ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7321.9 | 7321.9 | 7.29 | False | None | None | False | None | False | 53376.651 | 0 | 3123595 | 107277 | None | 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Page No. 9, Item No. 5.4 of PWD SR 2023-24 Volume-II ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 7539.02 | 7539.02 | 5.42 | False | None | None | False | None | False | 40861.4884 | 0 | 3123596 | 107277 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(Page No. 7, Item No. 1.8 of PWD SR 2022-23 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 510.94 | 510.94 | 28.63 | False | None | None | False | None | False | 14628.2122 | 0 | 3123597 | 107277 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (Page No. 7, Item No. 1.9 of PWD SR 2023-24 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 313.88 | 313.88 | 50.79 | False | None | None | False | None | False | 15941.9652 | 0 | 3123598 | 107277 | None | 2.11(a) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification. a.Buildings.( Page No.18, Item No.2.11(a) of PWD SR 2023-24 Volume-1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Tonne | 105559.26 | 105559.26 | 3.09 | False | None | None | False | None | False | 326178.1134 | 0 | 3123599 | 107277 | None | 21.10 | Providing ruled pointing to coursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost all materials, labour, usage charges of machinery, curing complete as per specification.(Page No. 214, Item No. 21.10 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 352.82 | 352.82 | 13.16 | False | None | None | False | None | False | 4643.1112 | 0 | 3123600 | 107277 | None | 6.7 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Page No. 13, Item No. 6.7 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 9688.98 | 9688.98 | 20.72 | False | None | None | False | None | False | 200755.6656 | 0 | 3123601 | 107277 | None | 12.12 | Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications(Page No.99, Item No.12.12 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Cum | 146558.36 | 146558.36 | 0.45 | False | None | None | False | None | False | 65951.262 | 0 | 3123602 | 107277 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (Page No.104, Item No. 12.51 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Nos | 1198.88 | 1198.88 | 1.0 | False | None | None | False | None | False | 1198.88 | 0 | 3123603 | 107277 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick Both side teak(Page No.105, Item No. 12.57.1 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 4770.74 | 4770.74 | 3.15 | False | None | None | False | None | False | 15027.831 | 0 | 3123604 | 107277 | None | 12.32 | Providing and fixing in position Mathi / Nandi wood fully panelled shutters for windows with stiles and rails of 25mm. thick, 75mm wide in two halves with panels of 20mm thick including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures)(P.No. 102, I.No.12.32 f PWD SR 2022 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 4563.06 | 4563.06 | 10.92 | False | None | None | False | None | False | 49828.6152 | 0 | 3123605 | 107277 | None | 8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge(Page No.41, Item No. 8.1.2 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 284.38 | 284.38 | 86.14 | False | None | None | False | None | False | 24496.4932 | 0 | 3123606 | 107277 | None | 8.3.2 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per direc- tions of Engineer-in-charge(Page No.41, Item No. 8.3.2of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 392.94 | 392.94 | 151.93 | False | None | None | False | None | False | 59699.3742 | 0 | 3123607 | 107277 | None | 9.12.3 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 800x800 mm (P.No.60 , I.No, 9.12.3 SR of 2023-24 , Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1483.26 | 1483.26 | 61.62 | False | None | None | False | None | False | 91398.4812 | 0 | 3123608 | 107277 | None | 8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. (Page No.50, Item No. 8.54.2 ofPWD SR 2023-24 Volume-2 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 129.8 | 129.8 | 143.11 | False | None | None | False | None | False | 18575.678 | 0 | 3123609 | 107277 | None | 8.30 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge .(Page No.46, Item No. 8.30 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 205.32 | 205.32 | 151.93 | False | None | None | False | None | False | 31194.2676 | 0 | 3123610 | 107277 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Page No.50, Item No. 8.51of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 118.0 | 118.0 | 143.11 | False | None | None | False | None | False | 16886.98 | 0 | 3123611 | 107277 | None | 8.34.2 | Applying priming coat: With ready mixed aluminium primer of approved brand and manufacture on resinous wood and plywood including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Page No.47, Item No. 8.34.2 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 68.44 | 68.44 | 33.77 | False | None | None | False | None | False | 2311.2188 | 0 | 3123612 | 107277 | None | 8.38 | Painting with oil type wood preservative of approved brand and manufacture :New work (two coats) to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P.No. 48, I.No. 8.38 of PWD 2023-24 Volume-2 ).( ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 47.2 | 47.2 | 33.77 | False | None | None | False | None | False | 1593.944 | 0 | 3123613 | 107277 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge.(Page No.149, Item No.15.1 of PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 964.06 | 964.06 | 64.32 | False | None | None | False | None | False | 62008.3392 | 0 | 3123614 | 107277 | None | 11.37.3 | Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of
engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 8 mm thickness (weight not less than 20 kg/ m²) including cost of materials, labour, usage charges of machinery
complete as per specifications.(Page No 89 Item No. 11.37.3 Pof PWD SR 2023-24 Volume-2) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sqm | 1539.9 | 1539.9 | 17.6 | False | None | None | False | None | False | 27102.24 | 0 |
| 1710576394000 | 1 | None | None | Buildings | Construction of office room in the prenmises of Sri.Venkataramana Swamy Temple in Malekal Tirupati village ,Kasaba hobli, Arasikere tq.(Electrical) | 116976.98 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3123615 | 107278 | None | 1.2.2 | Concealed Conduit System : Supplying heavy gauge PVC conduit pipe ……mm dia . mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25mm dia 2mm thick a) 25 mm dia 2mm thick [Chapter-1, .I.no. 1.2.2] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 94.8 | 94.8 | 50.0 | False | None | None | False | None | False | 4740.0 | 0 | 3123616 | 107278 | None | 1.3.2 | Supplying heavy gauge PVC Conduit Pipe ….dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. a) 25 mm dia 2mm thick [Chapter-1,.I.no.1.3.2] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 96.02 | 96.02 | 15.0 | False | None | None | False | None | False | 1440.3 | 0 | 3123617 | 107278 | None | 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep junction box [Chapter-1.I.no.1.5.2] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 68.06 | 68.06 | 2.0 | False | None | None | False | None | False | 136.12 | 0 | 3123618 | 107278 | None | 1.13 | Supplyin and Fixing Metal Fan Box with Round Hook. [ Chapter-1.I.no.1.13] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 142.2 | 142.2 | 6.0 | False | None | None | False | None | False | 853.2 | 0 | 3123619 | 107278 | None | 2.2.2 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. [Chapter-2.I.no. 2.2.2,b) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Point | 460.64 | 460.64 | 12.0 | False | None | None | False | None | False | 5527.68 | 0 | 3123620 | 107278 | None | 2.3.3 | Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. [Chapter-2.I.no. , 2.3.3]c) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Point | 674.55 | 674.55 | 5.0 | False | None | None | False | None | False | 3372.75 | 0 | 3123621 | 107278 | None | 2.3.1 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. [Chapter-2 .I.no.2.3.1,a) 1.0 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 23.09 | 23.09 | 70.0 | False | None | None | False | None | False | 1616.3 | 0 | 3123622 | 107278 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. [Chapter-2 .I.no2.3.3 ) 2.5 sqmm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Mtr | 51.05 | 51.05 | 140.0 | False | None | None | False | None | False | 7147.0 | 0 | 3123623 | 107278 | None | 3.4.6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/ C.C wall [ Chapter-3,I.no. 3.4.6] a) 10-12 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 387.71 | 387.71 | 6.0 | False | None | None | False | None | False | 2326.26 | 0 | 3123624 | 107278 | None | 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. b) 10-12 Module [ Chapter-3,I.no. 3.5.6] b) 10-12 Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 418.1 | 418.1 | 8.0 | False | None | None | False | None | False | 3344.8 | 0 | 3123625 | 107278 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. [ Chapter-3, I.No.3.6.1 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 123.97 | 123.97 | 25.0 | False | None | None | False | None | False | 3099.25 | 0 | 3123626 | 107278 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. [ Chapter-3, I.No.3.6.3,) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 207.83 | 207.83 | 8.0 | False | None | None | False | None | False | 1662.64 | 0 | 3123627 | 107278 | None | 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. [ Chapter-3, I.No.3.6.4, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 433.9 | 433.9 | 6.0 | False | None | None | False | None | False | 2603.4 | 0 | 3123628 | 107278 | None | 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. [ Chapter-3, I.No3.6.9] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 396.22 | 396.22 | 1.0 | False | None | None | False | None | False | 396.22 | 0 | 3123629 | 107278 | None | 3.14.6 | Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board. a )6 Amps Pendent holder [Chapter-3.I.no. 3.14.6] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | No | 86.29 | 86.29 | 11.0 | False | None | None | False | None | False | 949.19 | 0 | 3123630 | 107278 | None | 5.7.2 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32Amps. [Chapter-5.I.no.5.7.2] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 292.91 | 292.91 | 2.0 | False | None | None | False | None | False | 585.82 | 0 | 3123631 | 107278 | None | 5.18.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP [Chapter-5 .I.no.5.18.4] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 898.18 | 898.18 | 1.0 | False | None | None | False | None | False | 898.18 | 0 | 3123632 | 107278 | None | 5.30 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20Amps single phase Class-1 Accuracy with Temper Proof Energy Meter.[Chapter-5 .I.no.5.30] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1677.25 | 1677.25 | 1.0 | False | None | None | False | None | False | 1677.25 | 0 | 3123633 | 107278 | None | 5.42.2 | Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 16SWG [[Chapter-5. I.no.5.42.2] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Sq CM | 0.52 | 0.52 | 7000.0 | False | None | None | False | None | False | 3640.0 | 0 | 3123634 | 107278 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200mm) Regular model [Chapter-6.I.no.6.3.1] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 3626.75 | 3626.75 | 6.0 | False | None | None | False | None | False | 21760.5 | 0 | 3123635 | 107278 | None | 11.3.3 | Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70percentage lumen maintenance with CRIl greaterthan 80. Power Input: 220-240V @ 50/60Hz & Power factor greaterthan 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4'-36/40 w [Chapter-11.I.no.11.3.3] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 1542.34 | 1542.34 | 10.0 | False | None | None | False | None | False | 15423.4 | 0 | 3123636 | 107278 | None | 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc.,is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia [Chapter-12.I.no.12.56] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 4266.05 | 4266.05 | 2.0 | False | None | None | False | None | False | 8532.1 | 0 | 3123637 | 107278 | None | 13.7.1 | Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. .On wall / ceiling / Rafter / Girders [Chapter-13.I.no.13.7.1] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 148.28 | 148.28 | 10.0 | False | None | None | False | None | False | 1482.8 | 0 | 3123638 | 107278 | None | 13.10 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook with fan regulator to the existing board together with supplying and fixing 5 amps. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. [Chapter-13.I.no.13.10] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Each | 207.83 | 207.83 | 6.0 | False | None | None | False | None | False | 1246.98 | 0 | 3123639 | 107278 | None | 32.02 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 2 Core, (9 GI Strips - 4 x 0.8 mm) [BESCO.SR 2023-24.Material commom SR.P.No.13, I.No.32.02 ] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Km | 96298.57 | 96298.57 | 0.04 | False | None | None | False | None | False | 3851.9428 | 0 | 3123640 | 107278 | None | 21.05 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm [BESCO.SR 2023-24.Labour commom SR.P.No.52, I.No.21.05 ]
---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | Km | 25384.84 | 25384.84 | 0.04 | False | None | None | False | None | False | 1015.3936 | 0 | 3123641 | 107278 | None | 1.6.1 | Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils. Depth upto 1.50m [PWD Civil SR ,Volume-1, Chapter-1, P.No.6, I.No.1.6.1 ] ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work. | m | 588.25 | 588.25 | 30.0 | False | None | None | False | None | False | 17647.5 | 0 |
|
|
---|