1710570270000 | 0 | None | None | Buildings | Providing and fixing of cobble stone, construction of conference hall dias, providing and fixing of conference table in Principals room, repair of toilets in principals and student hostels, painting of chemistry lab and store rooms, repair of flooring, aluminum partition in chemistry staff room. providing and fixing of partition and door, providing and fixing of wall partition in Exam board room and other repair work | 3660185.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3117335 | 107109 | None | 1.2 | Earth work in surface excavation for stripping, seating of bund, Road way by manual means for lowering & levelling the ground for all works other than foundation & depth in Ordinary rock and soft rock upto 300mm depth as per drawing and technical specifications, including setting out, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. (Page No.5 Item No.1.2 Common Schedule of Rate for Buildings 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 632.5 | 632.5 | 150.93 | False | None | None | False | None | False | 95463.225 | 0 | 3117336 | 107109 | None | 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.In ordinary/soft rock without blasting upto 1.5 m depth.complete as per specifications and as per directions of Engineer-in-charge.(Page No.5 Item No.1.4.1 for 2023-24 Common SR for Engineering Department Vol-1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 266.2 | 266.2 | 5.87 | False | None | None | False | None | False | 1562.594 | 0 | 3117337 | 107109 | None | 1.1 | Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.(Page No.5 Item No.1.1 for 2023-24 Common SR Vol-1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 100.1 | 100.1 | 4.08 | False | None | None | False | None | False | 408.408 | 0 | 3117338 | 107109 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (P. No -7, I. No - 1.10, S R 2023-24, Vol-1-For Engineering Department)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 176.0 | 176.0 | 113.19 | False | None | None | False | None | False | 19921.44 | 0 | 3117339 | 107109 | None | 19.7.3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.In cement mortar (Page No.187 Item No.19.7.3 for 2023-24 Common SR for Building Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1131.9 | 1131.9 | 17.5 | False | None | None | False | None | False | 19808.25 | 0 | 3117340 | 107109 | None | 19.2.1 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge. (Page No.187 Item No.19.2.1 for 2023-24 Common SR for Building Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1829.3 | 1829.3 | 2.83 | False | None | None | False | None | False | 5176.919 | 0 | 3117341 | 107109 | None | 19.22.1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material to the appropriate disposal area as per direction of Engineer-in-charge For thickness of tiles 10 mm to 25 mm (Page No.189 Item No.19.22.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 52.8 | 52.8 | 357.1 | False | None | None | False | None | False | 18854.88 | 0 | 3117342 | 107109 | None | 19.50 | Dismantling of flushing cistern of all types (C.I./PVC/Vitreous China) including stacking of useful materials near the site and disposal of unserviceable materials to the appropriate disposal area as per direction of Engineer-in-charge. (Page No.192, SR Vol-2,I No.19.50 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 735.9 | 735.9 | 1.0 | False | None | None | False | None | False | 735.9 | 0 | 3117343 | 107109 | None | 19.55 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground to the appropriate disposal area as per direction of Engineer-in-charge. (Page No.193, SR Vol-2,I No19.55 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 40.7 | 40.7 | 4.08 | False | None | None | False | None | False | 166.056 | 0 | 3117344 | 107109 | None | 19.2.1 | Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge.(Page No187 Item No.19.2.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1829.3 | 1829.3 | 0.82 | False | None | None | False | None | False | 1500.026 | 0 | 3117345 | 107109 | None | 19.12.1 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineer-in-charge.Of area 3 m² and below(Page.188/ I.No.19.12.1-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 264.0 | 264.0 | 1.8 | False | None | None | False | None | False | 475.2 | 0 | 3117346 | 107109 | None | 9.31 | Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per m2 over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level , including cost of materials, labour and Usage charges of machinery complete as per specifications. (Page No.64 Item No.9.31 Common Schedule of Rate for Buildings 2021-22 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1195.7 | 1195.7 | 518.85 | False | None | None | False | None | False | 620388.945 | 0 | 3117347 | 107109 | None | 8.42.1 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge.(The cost of PCC shall be paid extra) 600 x 200 x 100 mm size (Page No.74 Sl No.8.42.1 Common Schedule of Rate for Roads 2023-24 Vol-3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 275.0 | 275.0 | 250.0 | False | None | None | False | None | False | 68750.0 | 0 | 3117348 | 107109 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Page No.15 Item No.2.1.3 for 2023-24 Common SR for Engineering Department Vol-1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6587.9 | 6587.9 | 6.73 | False | None | None | False | None | False | 44336.567 | 0 | 3117349 | 107109 | None | 2.3.1 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Page No.16 Item No.2.3.1 for 2023-24 Common SR for Engineering Department Vol-1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6955.3 | 6955.3 | 0.95 | False | None | None | False | None | False | 6607.535 | 0 | 3117350 | 107109 | None | 2.1.2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (Page No.15 SR Vol-1,I No.2.1.2 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6230.4 | 6230.4 | 0.41 | False | None | None | False | None | False | 2554.464 | 0 | 3117351 | 107109 | None | 21.9.3 | Providing and constructing burnt brick masonry with approved quality of modular bricks of standard size of class designation 5.00 N/mm2 table moulded) with lime mortar for basement and superstructure including cost of materials, labour charges, scaffolding, curing complete as per specification - Do- in Lime mortar 1:3 Prop (Page No.214 Item No.21.9.3 for 2023-24 Common SR for Engineering Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 3678.4 | 3678.4 | 5.55 | False | None | None | False | None | False | 20415.12 | 0 | 3117352 | 107109 | None | 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (Page No.17 Item No.6.32 for 2023-24 Common SR for Engineering Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1441.0 | 1441.0 | 41.73 | False | None | None | False | None | False | 60132.93 | 0 | 3117353 | 107109 | None | 8.9 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Page No.42 Item No.8.9 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 423.5 | 423.5 | 55.3 | False | None | None | False | None | False | 23419.55 | 0 | 3117354 | 107109 | None | 9.17.2 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622,of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete.Size of Tile 600x600 mm (Page No.61 Item No.9.17.2 for 2023-24 Common SR for Engineering Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1292.5 | 1292.5 | 52.32 | False | None | None | False | None | False | 67623.6 | 0 | 3117355 | 107109 | None | 7.41 | Providing and Fixing 15 mm thick densified tegular edged eco friendly light weight calcium silicate false ceiling tiles of approved texture of size 595 x 595 mm in true horizontal level, suspended on inter locking metal grid of hot dipped galvanised steel sections (galvanising @ 120 grams per m2 including both side) consisting of main ‘T’ runner suitably spaced at joints to get required length and of size 24x38 mm made from 0.33 mm thick (minimum) sheet, spaced 1200 mm centre to centre, and cross “T” of size 24x28 mm made out of 0.33 mm (Minimum) sheet, 1200 mm long spaced between main’T’ at 600 mm centre to centre to form a grid of 1200x600 mm and secondary cross ‘T’ of length 600 mm and size 24 x28 mm made of 0.33 mm thick (Minimum) sheet to be inter locked at middle of the 1200x 600 mm panel to from grid of size 600x600 mm, resting on periphery walls /partitions on a Perimeter wall angle pre-coated steel of size(24x24X3000 mm made of 0.40 mm thick (minimum) sheet with the help of rawl plugs at 450 mm centre to centre with 25 mm long dry wall screws @ 230 mm interval
and laying 15 mm thick densified edges calicum silicate ceiling tiles of approved texture in the grid, including, cutting/ making opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc., wherever required. Main ‘T’ runners to be suspended from ceiling using G.I. slotted cleats of size 25x35x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long dash fasteners, 4 mm G.I. adjustable rods with galvanised steel level clips of size 85 x 30 x 0.8 mm, spaced at 1200 mm centre to centre along main ‘T’, bottom exposed with 24 mm of all T sections shall be pre-painted with polyster baked paint, for all heights, as per specifications, drawings and as directed by Engineer-in-Charge. (Page No.28 Item No.7.41 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1862.3 | 1862.3 | 114.7 | False | None | None | False | None | False | 213605.81 | 0 | 3117356 | 107109 | None | 39.9 | Providing, fabricating and fixing partition frame work consisting of 50mm x 50mm sal wood frame work at spacing not exceeding 600mm c/c fixed to the bottom and ceiling, the partition shall be skinned on both sides using 12mm thick commercial plywood of approved brand termite and water resistance, and top covered with 4mm thick approved quality veneer finished with melamine polish, complete including cost and conveyance of all materials, labour for all items of work, HOM of equipment as per specification (Page. 325/ Item No. 39.9 SR of 2018-19)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 16647.12 | 16647.12 | 53.14 | False | None | None | False | None | False | 884627.9568 | 0 | 3117357 | 107109 | None | 14.1.1 | Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests (Page No.131 Item No.14.1.1 for 2023-24 Common SR Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5274.72 | 5274.72 | 1.0 | False | None | None | False | None | False | 5274.72 | 0 | 3117358 | 107109 | None | 14.7.1 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps (Page No.132 Item No.14.7.1 for 2023-24 Common SR Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 3328.56 | 3328.56 | 1.0 | False | None | None | False | None | False | 3328.56 | 0 | 3117359 | 107109 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings.(Page No.133 Item No.14.8 for 2023-24 Common SR Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1536.84 | 1536.84 | 1.0 | False | None | None | False | None | False | 1536.84 | 0 | 3117360 | 107109 | None | 14.55 b | Providing and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Premium (Page No.139 item No.14.55 b Common SR 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 2620.08 | 2620.08 | 1.0 | False | None | None | False | None | False | 2620.08 | 0 | 3117361 | 107109 | None | ADR | Conference Table - woodenTable made out of 19mm thick ply wood for top and structure and edge finished with 40mmthickness and top covered with 4mm veneer for the entire exposed area. All the edges to be Finished using steam beach timber required shape and size . The veneer and beading to be neatly melamine polished after neat sanding and sealer coat including cost and conveyance of all materials, labour for all items of work, HOM of equipment with all lead and lift,loading and unloading, transportation charges and all other incidental charges etc., complete as per specifications, drawings and as directed by Engineer in charge of the work.(size 9.50*2.5) -Complete as per the specifications including the cost and conveyance of all materials, cost of labour, all lead and lifts, loading and unloading charges, transportation and all other incidental charges etc.,. The work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work.(Data rate Aprroved KIC)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 12000.0 | 12000.0 | 22.5 | False | None | None | False | None | False | 270000.0 | 0 | 3117362 | 107109 | None | 8462 | Supplying and providing contract visitors Contact-SL type Visitor chairs with fixed arms with sledge base of Featherlite make. Etc. the work includes cost of all materials, labour . All lead and lift, loading and unloading and all other incident charges etc. complete. (ADR: No. 8462 Date: 17-01-2014, Sl. No. 3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 6700.0 | 6700.0 | 32.0 | False | None | None | False | None | False | 214400.0 | 0 | 3117363 | 107109 | None | 559 | Providing and Supplying of Medium Back Revolving chairs with Mesh back and soft Cushioning Seat, Fixed lumber Support an Gas Lift, Knee tilt Mechanism of featherlite / Godrej or equivalent make, including the cost of all materials, labour and transportation lead lift etc.,as per the directions of the Engineer in charge of the works (Alpha MB) (ADR No No. 559/21-22 Dated:21.06.2021 Sl.No.36)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 11400.0 | 11400.0 | 1.0 | False | None | None | False | None | False | 11400.0 | 0 | 3117364 | 107109 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Page No.15 Item No.2.1.3 for 2023-24 Common SR for Engineering Department Vol-1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6785.54 | 6785.54 | 24.57 | False | None | None | False | None | False | 166720.7178 | 0 | 3117365 | 107109 | None | 8.5.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Page -42/Item no.8.5.2 for 2023-24 Common SR Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 383.9 | 383.9 | 18.04 | False | None | None | False | None | False | 6925.556 | 0 | 3117366 | 107109 | None | 15.1 | Polyurethane based Single Component for New Surface- Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification.(Page No.149 Item No.15.1 for 2023-24 Common SR by Building Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 925.66 | 925.66 | 327.6 | False | None | None | False | None | False | 303246.216 | 0 | 3117367 | 107109 | None | 4.3.3 | Crack Filling Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm. (Page -92/Item no.10.6 Ref. To MoRT&H Spec. 300 4.3.3 for 2023-24 Common SR Vol-3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 5.5 | 5.5 | 90.2 | False | None | None | False | None | False | 496.1 | 0 | 3117368 | 107109 | None | 1.4D | Loading & unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum charges Rs 87.00 and Item No. 1.4D Lead Charges Rs 5.00 Ton/Km is Rs 195.00 (5.00 x1.30x30.00) Basic Rate 87.00+195.00=282.00 rs/Cum
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 310.2 | 310.2 | 35.71 | False | None | None | False | None | False | 11077.242 | 0 | 3117369 | 107109 | None | 20.88 | Repairs to plaster in patches of 2.5 m2 and less in walls, ceilings 10 to 20mm thick in cement mortar 1:3 including cutting the patches in proper shape and replastering the surface of the wall including disposal of rubbish with a lead of 50m including curing cost of materials, labour, complete as per specification. (Page No.206, SR Vol-2,I No.20.88 SR 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 438.9 | 438.9 | 99.4 | False | None | None | False | None | False | 43626.66 | 0 | 3117370 | 107109 | None | 13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes (Page No.122 Item No.13.32.2 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 416.9 | 416.9 | 6.0 | False | None | None | False | None | False | 2501.4 | 0 | 3117371 | 107109 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3 (Page No.134 Sl.No.10.1.7 COMMON SCHEDULE OF RATES 2023-24 Vol-V)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 452.1 | 452.1 | 6.0 | False | None | None | False | None | False | 2712.6 | 0 | 3117372 | 107109 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 (Page No.134 Sl.No.10.1.5 COMMON SCHEDULE OF RATES 2023-24 Vol-V)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 242.0 | 242.0 | 6.0 | False | None | None | False | None | False | 1452.0 | 0 | 3117373 | 107109 | None | 15.29 | Terrace/ Raft & Sunken Slab Waterproofing Providing waterproof treatment to Raft Slab using 2 coats of acrylic co polymer elastomeric Acrylic co-polymer elastomeric sealer & protector. The surface shall be prepared free of tar, dust, fungus, loose particles etc., The surface shall be applied with basecoat of healer sealer crystallization liquid and then Acrylic co-polymer elastomeric sealer & protector, wetting agent and liquid (1:1:6) over the prepared surface. In addition, making haunch at junction of Wall and Slab visible cracks are opened and sealed with flexicrack paste. Over this one coat of flexible cementations membrane (FCM), Spreading one layer of HDPE membrane as reinforcing material (over FCM) with one primer coat of Acrylic co-polymer elastomeric sealer & protector & applying second coat of Acrylic co-polymer elastomeric sealer & protector liquid over the primer coat - conforming to ASTM C 1202, DIN 1048 part 5, The work shall be carried out as per the directions of the Engineer in charge. (Page No.157 Item No.15.29 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1155.0 | 1155.0 | 25.42 | False | None | None | False | None | False | 29360.1 | 0 | 3117374 | 107109 | None | 9.39 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (Page No.65 item No.9.39 Common SR 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1593.9 | 1593.9 | 25.42 | False | None | None | False | None | False | 40516.938 | 0 | 3117375 | 107109 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(Page No.60 item No.9.11 Common SR 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 977.9 | 977.9 | 4.08 | False | None | None | False | None | False | 3989.832 | 0 | 3117376 | 107109 | None | 14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (Page No.131 Item No.14.3.1 Common SR for 2023-24 Vol-2) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 6574.7 | 6574.7 | 1.0 | False | None | None | False | None | False | 6574.7 | 0 | 3117377 | 107109 | None | 14.7A | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (Page No.133 Item No.14.7A Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 4533.1 | 4533.1 | 1.0 | False | None | None | False | None | False | 4533.1 | 0 | 3117378 | 107109 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings (Page No.133 Item No.14.8 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1565.3 | 1565.3 | 1.0 | False | None | None | False | None | False | 1565.3 | 0 | 3117379 | 107109 | None | 14.28.1.1 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.Semi rigid pipe 32 mm dia (Page No.136 Item No.14.28.1.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 83.6 | 83.6 | 2.0 | False | None | None | False | None | False | 167.2 | 0 | 3117380 | 107109 | None | 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete.(Page No.136 Item No.14.31 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1342.0 | 1342.0 | 1.0 | False | None | None | False | None | False | 1342.0 | 0 | 3117381 | 107109 | None | 14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour.600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. (Page No.137 Item No.14.40.2 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 545.6 | 545.6 | 1.0 | False | None | None | False | None | False | 545.6 | 0 | 3117382 | 107109 | None | 13.3.1 | Providing and fixing brass stop cock of approved quality :15 mm nominal bore (Page No.117 Item No.13.3.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 328.9 | 328.9 | 1.0 | False | None | None | False | None | False | 328.9 | 0 | 3117383 | 107109 | None | 13.2.1 | Providing and fixing brass bib cock of approved quality :15 mm nominal bore (Page No.117 Item No.13.2.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 314.6 | 314.6 | 1.0 | False | None | None | False | None | False | 314.6 | 0 | 3117384 | 107109 | None | 13.8.2.1 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 15 mm nominal bore (Page No.118 Item No.13.8.2.1 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 100.1 | 100.1 | 1.0 | False | None | None | False | None | False | 100.1 | 0 | 3117385 | 107109 | None | 13.9.2 | Providing and fixing C.P. brass shower rose with 15 or 20 mm inlet : 150 mm diameter (Page No.118 Item No.13.9.2 Common SR for 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 306.9 | 306.9 | 1.0 | False | None | None | False | None | False | 306.9 | 0 | 3117386 | 107109 | None | 12.97.1 | Providing and fixing to existing door frames Glass Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS: 14856, including fixing to frames. 30 mm thickness (Page No.112/ Item No.12.97.1 for Schedule of Rate for Buildings 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3564.0 | 3564.0 | 1.89 | False | None | None | False | None | False | 6735.96 | 0 | 3117387 | 107109 | None | 12.96 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross- section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame (Page No.112/ Item No.12.96 for Schedule of Rate for Buildings 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 707.3 | 707.3 | 6.0 | False | None | None | False | None | False | 4243.8 | 0 | 3117388 | 107109 | None | 11.32 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) complete as per specifications and as per directions of Engineer-in-charge.(Page No.84 Item No.11.32 for 2021-22 Common SR for Building Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 99.0 | 99.0 | 102.51 | False | None | None | False | None | False | 10148.49 | 0 | 3117389 | 107109 | None | 13.33.7 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes conforming to IS 15778 having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings, this includes jointing of pipes and fittings with one step solvent cement, trenching, refilling & testing of joints complete. as per direction of Engineer in charge. external work 65mm Nominal dia Pipes (Page No.123 Item No.13.33.7 for 2023-24 Common SR for Building Department Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1540.0 | 1540.0 | 10.0 | False | None | None | False | None | False | 15400.0 | 0 | 3117390 | 107109 | None | 11.16.1 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Page.82/I.No.11.16.1-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 149.6 | 149.6 | 550.0 | False | None | None | False | None | False | 82280.0 | 0 | 3117391 | 107109 | None | 20.50 | Removing white wash or colour wash by steel brushing and / or scraping, sand papering and preparing wall surface smooth including repairs to scraches including cost of labour, material complete as per specifications. (Page.203/I.No.20.50-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 14.3 | 14.3 | 163.21 | False | None | None | False | None | False | 2333.903 | 0 | 3117392 | 107109 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Page.50/I.No.8.51-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 110.0 | 110.0 | 163.21 | False | None | None | False | None | False | 17953.1 | 0 | 3117393 | 107109 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page.48/I.No.8.39-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 139.7 | 139.7 | 263.21 | False | None | None | False | None | False | 36770.437 | 0 | 3117394 | 107109 | None | 8.39 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Page.48/I.No.8.39-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 183.7 | 183.7 | 44.66 | False | None | None | False | None | False | 8204.042 | 0 | 3117395 | 107109 | None | 14.9.1 | Providing and fixing kitchen sink with C.I. brackets, C.P. brass chain with rubber plug, 40 mm C.P. brass waste complete, including painting the fittings and brackets, cutting and making good the walls wherever required: White glazed fire clay kitchen sink of size 600x450x 250 mm (Page.133/I.No.14.9.1-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 3279.1 | 3279.1 | 9.0 | False | None | None | False | None | False | 29511.9 | 0 | 3117396 | 107109 | None | 14.55 b | Providing and fixing Bib cock with wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class Premium (Page.139/I.No.14.55 b-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 2668.6 | 2668.6 | 12.0 | False | None | None | False | None | False | 32023.2 | 0 | 3117397 | 107109 | None | 20.9 | Providing and fixing 16 mm M.S. Fan clamps of standard shape and size in existing R.C.C. slab, including cutting chase, anchoring clamp to reinforcement bar, including cleaning, refilling, making good the chase with matching concrete, plastering and painting the exposed portion of the clamps complete(Page.197/I.No.20.9-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 512.6 | 512.6 | 64.0 | False | None | None | False | None | False | 32806.4 | 0 | 3117398 | 107109 | None | 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. (Page.63/ I.No.9.24-2023-24 Common SR for Buildings Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3137.2 | 3137.2 | 2.16 | False | None | None | False | None | False | 6776.352 | 0 | 3117399 | 107109 | None | 37.34 | Cleaning of glazed tiles. Including cost of all materials, hire charges of equipment machinery, with all lead and lift, labour, loading and unloading, including cost of all other incidental charges for the successful completion of work as per specification in charge of the work. (CSR 2018-19, PAGE 264, Item 37.34).
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 74.8 | 74.8 | 11.61 | False | None | None | False | None | False | 868.428 | 0 | 3117400 | 107109 | None | 11.37.2 | Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 5 mm thickness (weight not less than 12.50 kg/m²) including cost of materials, labour, usage charges of machinery complete as per specifications. (Page -89/ Item no.11.37.2 Common SR 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1288.1 | 1288.1 | 23.61 | False | None | None | False | None | False | 30412.041 | 0 | 3117401 | 107109 | None | 19.59 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge to the appropriate disposal area. (Page No.193 Item No.19.59 Common Schedule of Rate for Buildings 2023-24 Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 400.4 | 400.4 | 75.47 | False | None | None | False | None | False | 30218.188 | 0 |
|