1710503478000 | 0 | None | None | Water supply/sewage lines | Providing and Laying UGD pipeline and Construction of machineholes at Shivaji road, Seemenne colony, Shaneshwara layout street to Nisaar mosque and from N.R Mohalla Layol world to Subhash nagar OHT, Mysore | 8304624.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3094925 | 106397 | None | code01 | Cutting asphalt Road surface by Machine cutting to demarcate the trench width of the surface. | Cum | 1064.7 | 1064.7 | 142.05 | False | None | None | False | None | False | 151240.635 | 0 | 3094926 | 106397 | None | code02 | Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications for: Macadam Road | Cum | 945.0 | 945.0 | 213.08 | False | None | None | False | None | False | 201360.6 | 0 | 3094927 | 106397 | None | code03 | Cutting Cement Concrete Road surface by Machine cutting to demarcate the trench width of the surface. | Cum | 1137.15 | 1137.15 | 82.35 | False | None | None | False | None | False | 93644.3025 | 0 | 3094928 | 106397 | None | code04 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the vailable excavated earth locally for the work etc., and all other appurtenances complete in the following strata.In all kinds of soils 0 to 1.5 M depth: | Cum | 275.1 | 275.1 | 2734.13 | False | None | None | False | None | False | 752159.163 | 0 | 3094929 | 106397 | None | code05 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the vailable excavated earth locally for the work etc., and all other appurtenances complete in the following strata.In all kinds of soils 1.5 to 3.0 M depth: | Cum | 347.55 | 347.55 | 772.79 | False | None | None | False | None | False | 268583.1645 | 0 | 3094930 | 106397 | None | code06 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the vailable excavated earth locally for the work etc., and all other appurtenances complete in the following strata. Ordinary/soft rock (without requiring blasting) 0 to 1.5 M depth: | Cum | 476.7 | 476.7 | 683.53 | False | None | None | False | None | False | 325838.751 | 0 | 3094931 | 106397 | None | code07 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the vailable excavated earth locally for the work etc., and all other appurtenances complete in the following strata. Ordinary/soft rock (without requiring blasting) 1.50 to 3.0 M depth: | Cum | 584.85 | 584.85 | 90.92 | False | None | None | False | None | False | 53174.562 | 0 | 3094932 | 106397 | None | code08 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the vailable excavated earth locally for the work etc., and all other appurtenances complete in the following strata. hard rock (Blasting Prohibited) 1.50 to 3.0 M depth: | Cum | 789.6 | 789.6 | 45.46 | False | None | None | False | None | False | 35895.216 | 0 | 3094933 | 106397 | None | code09 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line
and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as
directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 300mm dia RCC pipe | Rmtr | 1398.6 | 1398.6 | 600.0 | False | None | None | False | None | False | 839160.0 | 0 | 3094934 | 106397 | None | code10 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line
and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as
directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 350mm dia RCC pipe | Rmtr | 2137.8 | 2137.8 | 480.0 | False | None | None | False | None | False | 1026144.0 | 0 | 3094935 | 106397 | None | code11 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line
and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as
directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 450mm dia RCC pipe | Rmtr | 2470.65 | 2470.65 | 270.0 | False | None | None | False | None | False | 667075.5 | 0 | 3094936 | 106397 | None | code12 | Providing lowering laying, jointing, testing and commissioning of following diameters glazed stone ware pipes, conforming to IS 651:1992, (with 5th revision) in all respects jointing with EPDM rubber rings (seals according to EN 681 & ASPM 425) The rubber seals joints pipe will have groves in interior of socket and exterior of the spigot. The rubber gasket shall be prefixed at the factory by the manufacturer rigidly with approved glue to have leak proof joint including conveying of pipe to work site and rolling and lowering into trenches, laying true to line, level and perfect linking at joints testing and commissoning including loading and unloading at both destinations and cuts of pipes herever necessary including jointing of GSW pipes and specials, with rubber gaskets conforming to EN 681 and ASTM C-425 including cleaning the socket and spigot with soapsolution and applying talcum powder for detecting crack, then applying glue and before inserting of rubber gaskets, jacking and fixing in perfect condition including the cost of soap solution, talcum powder and glue etc. and giving necessary hydraulic test to the required pressure of water head with all lead and lifts including costing of jointing materials and all necessary survey works for laying of sewers etc., and disposal of debris as directed etc., complete. (Contractor will make his own
arrangements for procuring water for testing) with Rubber ring gasket joints. 200mm dia SW pipe | Rmtr | 772.8 | 772.8 | 557.0 | False | None | None | False | None | False | 430449.6 | 0 | 3094937 | 106397 | None | code13 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or elected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:PVC pipes 110mm dia., 6 kg/sqcm & class 3 | Rmtr | 431.55 | 431.55 | 200.0 | False | None | None | False | None | False | 86310.0 | 0 | 3094938 | 106397 | None | code14 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 :63 mm dia-SN4-M020A | Rmtr | 198.45 | 198.45 | 60.0 | False | None | None | False | None | False | 11907.0 | 0 | 3094939 | 106397 | None | code15 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 :90 mm dia-SN4-M020C | Rmtr | 337.05 | 337.05 | 30.0 | False | None | None | False | None | False | 10111.5 | 0 | 3094940 | 106397 | None | code16 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 :110 mm dia-SN4-M020D | Rmtr | 492.45 | 492.45 | 28.0 | False | None | None | False | None | False | 13788.6 | 0 | 3094941 | 106397 | None | code17 | Supplying of special moulded variety PVC couplers as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark and with its latest amendments to walk site etc. complete 110mm dia PVC couplers | Each | 179.55 | 179.55 | 5.0 | False | None | None | False | None | False | 897.75 | 0 | 3094942 | 106397 | None | code18 | Supply and delivery at site special moulded variety PVC elbows as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 110 mm dia PVC Elbows | Each | 317.1 | 317.1 | 20.0 | False | None | None | False | None | False | 6342.0 | 0 | 3094943 | 106397 | None | code19 | Supply and delivery at site special moulded variety PVC tee as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 110 mm dia PVC Tee | Each | 263.55 | 263.55 | 5.0 | False | None | None | False | None | False | 1317.75 | 0 | 3094944 | 106397 | None | code20 | Providing and installation of Class SN8 Double Wall Corrugated HDPE Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two "O" rings and a coupler of suitable size, including loading and unloading at both destination and cutting of pipes where ever necessary including jointing with all labour, all lead and lift including encasing the Specials around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done the contractor shall have to make his own arrangement for procuring water for testing etc 63 MM ELECTRO FUSION COUPLER | Each | 148.05 | 148.05 | 12.0 | False | None | None | False | None | False | 1776.6 | 0 | 3094945 | 106397 | None | code21 | Providing and installation of Class SN8 Double Wall Corrugated HDPE Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two "O" rings and a coupler of suitable size, including loading and unloading at both destination and cutting of pipes where ever necessary including jointing with all labour, all lead and lift including encasing the Specials around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done the contractor shall have to make his own arrangement for procuring water for testing etc 63 MM ELECTRO FUSION TEE | Each | 258.3 | 258.3 | 15.0 | False | None | None | False | None | False | 3874.5 | 0 | 3094946 | 106397 | None | code22 | Providing and installation of Class SN8 Double Wall Corrugated HDPE Specials outer wall corrugated and inner wall smooth piping system in accordance with IS 16098 part 2 and conveying to work site and lowering into trenches, laying true to line and level and perfect linking at joints with the help of two "O" rings and a coupler of suitable size, including loading and unloading at both destination and cutting of pipes where ever necessary including jointing with all labour, all lead and lift including encasing the Specials around to a depth of not less than 15 cm with screened soft soil available from the excavated soil. The testing commissioning including necessary hydraulic test to the required pressure as per ISS shall be done the contractor shall have to make his own arrangement for procuring water for testing etc 63 MM ELECTRO FUSION Elbow | Each | 259.35 | 259.35 | 10.0 | False | None | None | False | None | False | 2593.5 | 0 | 3094947 | 106397 | None | code23 | Providing & fixing electro fusion saddle comply with BS EN12201 -3:2011, PN-12.5 rating and food grade raw material as per BS 6920 with material of construction PE 80 or PE 100 and colour of fitting - Blue/Black for water applications, EF tapping saddle is V-Regarding type. Designed to fuse at a fusion voltage of 40 volt AC. EF tapping saddle shall have moulded SS/Brass metal female threaded outlet. EF tapping saddle is fused by using a top loading piller type pressure exerting 1500N (150 kg apprx.) top load on EF saddle. Fusion time is 170 secs and cooling time is 10mins, Exerted pressure shoud be removed after completing the 10 mins cooling time.63x20,75x20,90x20,110x20,140x20 etc. complete. electrofusion saddle | Each | 367.5 | 367.5 | 10.0 | False | None | None | False | None | False | 3675.0 | 0 | 3094948 | 106397 | None | code24 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.20 M.depth | No | 30891.42 | 30891.42 | 12.0 | False | None | None | False | None | False | 370697.04 | 0 | 3094949 | 106397 | None | code25 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.30M.depth | No | 33212.66 | 33212.66 | 10.0 | False | None | None | False | None | False | 332126.6 | 0 | 3094950 | 106397 | None | code26 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.40 M.depth | No | 35533.89 | 35533.89 | 10.0 | False | None | None | False | None | False | 355338.9 | 0 | 3094951 | 106397 | None | code27 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.50 M.depth | No | 37855.13 | 37855.13 | 8.0 | False | None | None | False | None | False | 302841.04 | 0 | 3094952 | 106397 | None | code28 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.60 M.depth | No | 40176.36 | 40176.36 | 7.0 | False | None | None | False | None | False | 281234.52 | 0 | 3094953 | 106397 | None | code29 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.70 M.depth | No | 42497.6 | 42497.6 | 7.0 | False | None | None | False | None | False | 297483.2 | 0 | 3094954 | 106397 | None | code29 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)1.80 M.depth | No | 44818.83 | 44818.83 | 9.0 | False | None | None | False | None | False | 403369.47 | 0 | 3094955 | 106397 | None | code30 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, uring,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. For 1.2m dia (including Manhole Frame and cover)2.00 M.depth | No | 49461.3 | 49461.3 | 5.0 | False | None | None | False | None | False | 247306.5 | 0 | 3094956 | 106397 | None | code31 | Refilling pipeline trenches and foundation with selected available earth from trench excavation and foundation including watering, consolidation in layers of 15 cms., thickness including disposing off the surplus earth with all lead and lift. | Cum | 168.0 | 168.0 | 4326.83 | False | None | None | False | None | False | 726907.44 | 0 |
|