1710504383000 | 0 | None | None | Roads | Construction of CC Road from GE company existing road to STP in NAC Shahabad limit | 704809.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3095367 | 106424 | None | Code 01 | Item Description : Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rankvegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of serviceable materials and stacking of serviceable materialto be used or auctioned,including removal and disposal of top organic soil not exceeding 150 mm in thickness By Mechanical Means using Dozer | ha | 165946.2 | 165946.2 | 0.05 | False | None | None | False | None | False | 8297.31 | 0 | 3095368 | 106424 | None | Code 02 | Item Description : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and chnicalspecifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter Includingdressing of excavated surfaces, disposing off orlevelling the excavatedearth or Sorting & stacking the selected earth for reuse in a radiusof 50 m and lift upto 1.5 m including cost of labour, tools, usage of achinery & other appurtenances required to complete the work | Cum | 68.25 | 68.25 | 78.0 | False | None | None | False | None | False | 5323.5 | 0 | 3095369 | 106424 | None | Code 03 | Item Description : Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work | Cum | 33.6 | 33.6 | 72.0 | False | None | None | False | None | False | 2419.2 | 0 | 3095370 | 106424 | None | Code 04 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction | Cum | 91.35 | 91.35 | 78.0 | False | None | None | False | None | False | 7125.3 | 0 | 3095371 | 106424 | None | Code 05 | Item Description :Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts &leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | Cum | 433.65 | 433.65 | 78.0 | False | None | None | False | None | False | 33824.7 | 0 | 3095372 | 106424 | None | Code 06 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in | Cum | 2513.7 | 2513.7 | 48.75 | False | None | None | False | None | False | 122542.875 | 0 | 3095373 | 106424 | None | Code 07 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. | Cum | 7178.85 | 7178.85 | 73.17 | False | None | None | False | None | False | 525276.4545 | 0 |
|