1710315626000 | 0 | None | None | Buildings | Contraction of college room in Govt. Pre-Graduation in Hebbur Village in Hebbur GP in Tumkur Taluk | 11835268.87 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3032883 | 102197 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 285.56 | 285.56 | 231.76 | False | None | None | False | None | False | 66181.3856 | 0 | 3032884 | 102197 | None | code02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of e work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 6683.52 | 6683.52 | 103.19 | False | None | None | False | None | False | 689672.4288 | 0 | 3032885 | 102197 | None | code03 | Appendix I - Additionalities for Formwork,centering -1 Foundation upto plinth of buildings 8% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 598.12 | 598.12 | 49.52 | False | None | None | False | None | False | 29618.9024 | 0 | 3032886 | 102197 | None | code04 | Appendix I - Additionalities for Formwork,centering -1a Plinth beams of Building 50% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 3738.24 | 3738.24 | 18.03 | False | None | None | False | None | False | 67400.4672 | 0 | 3032887 | 102197 | None | code05 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS (The cost of steel reinforcement & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7476.48 | 7476.48 | 78.35 | False | None | None | False | None | False | 585782.208 | 0 | 3032888 | 102197 | None | code06 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7539.02 | 7539.02 | 80.25 | False | None | None | False | None | False | 605006.355 | 0 | 3032889 | 102197 | None | code07 | Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 7321.9 | 7321.9 | 37.59 | False | None | None | False | None | False | 275230.221 | 0 | 3032890 | 102197 | None | code08 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 313.88 | 313.88 | 443.72 | False | None | None | False | None | False | 139274.8336 | 0 | 3032891 | 102197 | None | code09 | Appendix I - Additionalities for Formwork,centering -8, columns & piers 70% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 5652.32 | 5652.32 | 10.18 | False | None | None | False | None | False | 57540.6176 | 0 | 3032892 | 102197 | None | code10 | Appendix I - Additionalities for Formwork,centering -12, Beams & lintels of buildings 60% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 4844.84 | 4844.84 | 29.2 | False | None | None | False | None | False | 141469.328 | 0 | 3032893 | 102197 | None | code11 | Appendix I - Additionalities for Formwork,centering - Chejja 45% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 3633.63 | 3633.63 | 0.54 | False | None | None | False | None | False | 1962.1602 | 0 | 3032894 | 102197 | None | code12 | Appendix I - Additionalities for Formwork,centering - Roof Slab and Staircase 50% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 4037.37 | 4037.37 | 67.38 | False | None | None | False | None | False | 272037.9906 | 0 | 3032895 | 102197 | None | code13 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Tonne | 105559.26 | 105559.26 | 22.14 | False | None | None | False | None | False | 2337082.0164 | 0 | 3032896 | 102197 | None | code14 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height.per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materialscodes , labour, Usage charges of machinery, curing and all other appurtenances, M25 Design Mix Using 20 mm nominal size graded crushed coarse with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 8074.74 | 8074.74 | 138.58 | False | None | None | False | None | False | 1118997.4692 | 0 | 3032897 | 102197 | None | code15 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 9699.6 | 9699.6 | 109.05 | False | None | None | False | None | False | 1057741.38 | 0 | 3032898 | 102197 | None | code16 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 417.72 | 417.72 | 1057.19 | False | None | None | False | None | False | 441609.4068 | 0 | 3032899 | 102197 | None | code17 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 348.1 | 348.1 | 912.77 | False | None | None | False | None | False | 317735.237 | 0 | 3032900 | 102197 | None | code18 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Kg | 162.84 | 162.84 | 554.4 | False | None | None | False | None | False | 90278.496 | 0 | 3032901 | 102197 | None | code19 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 164.02 | 164.02 | 124.65 | False | None | None | False | None | False | 20445.093 | 0 | 3032902 | 102197 | None | code20 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 205.32 | 205.32 | 1057.19 | False | None | None | False | None | False | 217062.2508 | 0 | 3032903 | 102197 | None | code21 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 118.0 | 118.0 | 912.77 | False | None | None | False | None | False | 107706.86 | 0 | 3032904 | 102197 | None | code22 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 149.86 | 149.86 | 912.77 | False | None | None | False | None | False | 136787.7122 | 0 | 3032905 | 102197 | None | code23 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 1351.1 | 1351.1 | 410.49 | False | None | None | False | None | False | 554613.039 | 0 | 3032906 | 102197 | None | code24 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 5284.04 | 5284.04 | 32.4 | False | None | None | False | None | False | 171202.896 | 0 | 3032907 | 102197 | None | code25 | Providing & fixing of 2.5 track x 2 panel sliding windows made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 94mm width x 45mm height with reinforcement of 1mm thickness and Sash with overall size of 39mm x 58mm with GI reinforcement of 1.5mm and mesh sash of size 25mm x 42mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 5mm plain float glass, standard hardware and single point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size - 1819mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&Ps shall not be made) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 7730.18 | 7730.18 | 17.28 | False | None | None | False | None | False | 133577.5104 | 0 | 3032908 | 102197 | None | code26 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Kg | 198.24 | 198.24 | 362.88 | False | None | None | False | None | False | 71937.3312 | 0 | 3032909 | 102197 | None | code27 | Providing and fixing on wall face unplasticised rigid pvc pipes including jointing with seal ring ,leaving 10mm gap for thermal expansion i) single pipe 100mm dia with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 343.38 | 343.38 | 28.0 | False | None | None | False | None | False | 9614.64 | 0 | 3032910 | 102197 | None | code28 | Providing wall black board in c 1:3 with two coats of black paint including finishing etc complete with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 560.5 | 560.5 | 15.0 | False | None | None | False | None | False | 8407.5 | 0 | 3032911 | 102197 | None | code29 | Providing and fixing precoated galvanised iron profile sheets (size, shap and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 670.24 | 670.24 | 25.5 | False | None | None | False | None | False | 17091.12 | 0 | 3032912 | 102197 | None | code30 | Appendix I - Additionalities for Formwork,centering -8, columns & piers 70% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 5708.84 | 5708.84 | 3.12 | False | None | None | False | None | False | 17811.5808 | 0 | 3032913 | 102197 | None | code31 | Appendix I - Additionalities for Formwork,centering -12, Beams & lintels of buildings 60% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 4893.29 | 4893.29 | 4.99 | False | None | None | False | None | False | 24417.5171 | 0 | 3032914 | 102197 | None | code32 | Appendix I - Additionalities for Formwork,centering -13, roof slab of building 50% with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 4077.75 | 4077.75 | 15.93 | False | None | None | False | None | False | 64958.5575 | 0 | 3032915 | 102197 | None | code33 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Tonne | 106614.85 | 106614.85 | 3.55 | False | None | None | False | None | False | 378482.7175 | 0 | 3032916 | 102197 | None | code34 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 8155.49 | 8155.49 | 33.87 | False | None | None | False | None | False | 276226.4463 | 0 | 3032917 | 102197 | None | code35 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Cum | 9796.6 | 9796.6 | 40.12 | False | None | None | False | None | False | 393039.592 | 0 | 3032918 | 102197 | None | code36 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 421.9 | 421.9 | 361.77 | False | None | None | False | None | False | 152630.763 | 0 | 3032919 | 102197 | None | code37 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 351.58 | 351.58 | 326.02 | False | None | None | False | None | False | 114622.1116 | 0 | 3032920 | 102197 | None | code38 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 207.37 | 207.37 | 361.77 | False | None | None | False | None | False | 75020.2449 | 0 | 3032921 | 102197 | None | code39 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 119.18 | 119.18 | 326.02 | False | None | None | False | None | False | 38855.0636 | 0 | 3032922 | 102197 | None | code40 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 151.36 | 151.36 | 326.02 | False | None | None | False | None | False | 49346.3872 | 0 | 3032923 | 102197 | None | code41 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 1364.61 | 1364.61 | 101.43 | False | None | None | False | None | False | 138412.3923 | 0 | 3032924 | 102197 | None | code42 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 5336.88 | 5336.88 | 6.84 | False | None | None | False | None | False | 36504.2592 | 0 | 3032925 | 102197 | None | code43 | Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey colou r having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 94mm width x 45mm heigh t with reinforcement of 1mm thickness and Sash with overall size of 39mm x 58mm with GI reinforcement of 1.5mm and mesh sash of size 25mm x 42mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size - 1819mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 7807.48 | 7807.48 | 4.32 | False | None | None | False | None | False | 33728.3136 | 0 | 3032926 | 102197 | None | code44 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Kg | 200.22 | 200.22 | 90.72 | False | None | None | False | None | False | 18163.9584 | 0 | 3032927 | 102197 | None | code45 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 165.66 | 165.66 | 23.83 | False | None | None | False | None | False | 3947.6778 | 0 | 3032928 | 102197 | None | code46 | Providing and fixing on wall face unplasticised rigid pvc pipes including jointing with seal ring ,leaving 10mm gap for thermal expansion i) single pipe 100mm dia with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 346.81 | 346.81 | 7.0 | False | None | None | False | None | False | 2427.67 | 0 | 3032929 | 102197 | None | code47 | Providing wall black board in c 1:3 with two coats of black paint including finishing etc complete with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Sqm | 566.11 | 566.11 | 3.6 | False | None | None | False | None | False | 2037.996 | 0 | 3032930 | 102197 | None | code48 | Supplying heavy gauge PVC conduit pipe mm dia mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 1.2.1 19/20 mm dia 2 mm thick with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 77.88 | 77.88 | 150.0 | False | None | None | False | None | False | 11682.0 | 0 | 3032931 | 102197 | None | code49 | Supplying heavy gauge PVC Conduit Pipe dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 1.3.1 19/20 mm dia 2 mm thick with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 80.24 | 80.24 | 100.0 | False | None | None | False | None | False | 8024.0 | 0 | 3032932 | 102197 | None | code50 | Supplying and fixing sheet Metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. - 75 x 75 x 65 mm with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 125.08 | 125.08 | 10.0 | False | None | None | False | None | False | 1250.8 | 0 | 3032933 | 102197 | None | code51 | Supplying and fixing sheet Metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. - 200 x 200 x 65 mm with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 410.64 | 410.64 | 5.0 | False | None | None | False | None | False | 2053.2 | 0 | 3032934 | 102197 | None | code52 | Supplying and fixing PVC/metal conduit Deep junction box 32 mm deep Junction box with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 71.98 | 71.98 | 35.0 | False | None | None | False | None | False | 2519.3 | 0 | 3032935 | 102197 | None | code53 | Supplying And Fixing Metal Fan Box with Round Hook. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 138.06 | 138.06 | 35.0 | False | None | None | False | None | False | 4832.1 | 0 | 3032936 | 102197 | None | code54 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Point | 447.22 | 447.22 | 50.0 | False | None | None | False | None | False | 22361.0 | 0 | 3032937 | 102197 | None | code55 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 49.56 | 49.56 | 250.0 | False | None | None | False | None | False | 12390.0 | 0 | 3032938 | 102197 | None | code56 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 mm2 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 74.34 | 74.34 | 250.0 | False | None | None | False | None | False | 18585.0 | 0 | 3032939 | 102197 | None | code57 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 30.68 | 30.68 | 100.0 | False | None | None | False | None | False | 3068.0 | 0 | 3032940 | 102197 | None | code58 | Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 3C x 4 mm2 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Mtr | 202.96 | 202.96 | 150.0 | False | None | None | False | None | False | 30444.0 | 0 | 3032941 | 102197 | None | code59 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 6 way with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 204.14 | 204.14 | 15.0 | False | None | None | False | None | False | 3062.1 | 0 | 3032942 | 102197 | None | code60 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete. - 16-18 way with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 307.98 | 307.98 | 15.0 | False | None | None | False | None | False | 4619.7 | 0 | 3032943 | 102197 | None | code61 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box - 6 way with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 276.12 | 276.12 | 15.0 | False | None | None | False | None | False | 4141.8 | 0 | 3032944 | 102197 | None | code62 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box - 16-18 way with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 405.92 | 405.92 | 15.0 | False | None | None | False | None | False | 6088.8 | 0 | 3032945 | 102197 | None | code63 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6A One Way Switch with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 120.36 | 120.36 | 40.0 | False | None | None | False | None | False | 4814.4 | 0 | 3032946 | 102197 | None | code64 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - Stepped Fan Regulator Two Module with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 421.26 | 421.26 | 20.0 | False | None | None | False | None | False | 8425.2 | 0 | 3032947 | 102197 | None | code65 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 16A One Way Switch with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 212.4 | 212.4 | 16.0 | False | None | None | False | None | False | 3398.4 | 0 | 3032948 | 102197 | None | code66 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - 6/16A Universal Socket with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 278.48 | 278.48 | 6.0 | False | None | None | False | None | False | 1670.88 | 0 | 3032949 | 102197 | None | code67 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. - RJ45/I.O Outlet Cat-6 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 397.66 | 397.66 | 6.0 | False | None | None | False | None | False | 2385.96 | 0 | 3032950 | 102197 | None | code68 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 489.7 | 489.7 | 5.0 | False | None | None | False | None | False | 2448.5 | 0 | 3032951 | 102197 | None | code69 | Supplying of feet -PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 814.2 | 814.2 | 35.0 | False | None | None | False | None | False | 28497.0 | 0 | 3032952 | 102197 | None | code70 | Supplying ,fixing ,wiring,earth electrode for grounding conduits, i.c cuouts and other equipments on meter board using 40 mmdia 2.90 mm thick GI pipe 2.5 mtr long buried in a pit .the pit br filled of salt and characoal 150mm allround the pipe to complete depth with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 4141.8 | 4141.8 | 1.0 | False | None | None | False | None | False | 4141.8 | 0 | 3032953 | 102197 | None | code71 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 1628.4 | 1628.4 | 1.0 | False | None | None | False | None | False | 1628.4 | 0 | 3032954 | 102197 | None | code72 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with \]double ball bearing system with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 3521.12 | 3521.12 | 20.0 | False | None | None | False | None | False | 70422.4 | 0 | 3032955 | 102197 | None | code73 | Bescom Deposite Including Dupervision and agreements Charges with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 1180.0 | 1180.0 | 1.0 | False | None | None | False | None | False | 1180.0 | 0 | 3032956 | 102197 | None | code74 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with \]double ball bearing system with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. | Each | 371.7 | 371.7 | 20.0 | False | None | None | False | None | False | 7434.0 | 0 |
|