createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710335525313
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2441000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose18-04-2024 16:30:00
tenderQueryClose21-03-2024 17:30:00
technicalBidOpen22-04-2024 11:30:00
publishedDate13-03-2024 21:56:43
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate22-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee2341000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710335525343
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9837
titlePkg-793 Improvements to Road K.R.Nagara Bettadpura via K.R.Nagara -Malali -Hosakote -Ravanduru -Tunga Ch9.20 KM to 17.00 KM (in selected reaches) in K.R.Nagara Taluk of Mysuru District.
descriptionPkg-793 Improvements to Road K.R.Nagara Bettadpura via K.R.Nagara -Malali -Hosakote -Ravanduru -Tunga Ch9.20 KM to 17.00 KM (in selected reaches) in K.R.Nagara Taluk of Mysuru District.
categoryWORKS
categoryTextWorks
ecv195071990.01
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-793/HUN/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103355250000NoneNoneRoadsPkg-793 Improvements to Road K.R.Nagara Bettadpura via K.R.Nagara -Malali -Hosakote -Ravanduru -Tunga Ch9.20 KM to 17.00 KM (in selected reaches) in K.R.Nagara Taluk of Mysuru District.131514462.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049176103116None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5(ii)a / Page No. 9) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm463.74463.74180.0FalseNoneNoneFalseNoneFalse83473.20
3049177103116None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges 2023-24 ( Item No.VOL-III-3.5 / Page No. 17) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.087.0831875.0FalseNoneNoneFalseNoneFalse225675.00
3049178103116None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-1.12 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum112.1112.12534.98FalseNoneNoneFalseNoneFalse284171.2580
3049179103116None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-1.12 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum112.1112.18158.32FalseNoneNoneFalseNoneFalse914547.6720
3049180103116None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-3.6 / Page No.17) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum140.42140.428808.14FalseNoneNoneFalseNoneFalse1236839.01880
3049181103116None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 ( Item No.VOL-I-1.8 / Page No. 07) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum559.32559.328349.54FalseNoneNoneFalseNoneFalse4670064.71280
3049182103116None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-3.6 / Page No.17) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum581.74581.7410880.0FalseNoneNoneFalseNoneFalse6329331.20
3049183103116None4.2b(v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-4.2-B (v) / Page No. 23) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2783.622783.6210515.1FalseNoneNoneFalseNoneFalse29270042.6620
3049184103116None4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-4.17 / Page No. 26) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3019.623019.6212681.0FalseNoneNoneFalseNoneFalse38291801.220
3049185103116None5.1-A-iProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges-2023-24 ( Item No.VOL-III-5.1-A-i / Page No. 31) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm48.3848.3848664.0FalseNoneNoneFalseNoneFalse2354364.320
3049186103116None5.4.iiTack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.4-ii/ Page No. 31) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm16.5216.5248664.0FalseNoneNoneFalseNoneFalse803929.280
3049187103116None5.12-CDense Graded Bituminous Macadam Grading - II for traffic Less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, at 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates MORTH Specification No. 201 Voume-3 Schedule of Rates PW,P & IWTD,Mysore Circle 2023-24 (Item No.5.12-C VOL-III- /PageNo. 35) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11149.8211149.822433.2FalseNoneNoneFalseNoneFalse27129742.0240
3049188103116None5.16-CBituminous Concrete Grading II for traffic Less thand 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, at 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates MORTH Specification No. 201 Voume-3 Schedule of Rates PW,P & IWTD,Mysore Circle 2023-24 (Item No.5.16(C) VOL-III-/PageNo. 38) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12925.7212925.721459.92FalseNoneNoneFalseNoneFalse18870517.14240
3049189103116None6.8.4Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions more than 20MSA upto 50MSA & for Arterial streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.(WMM/WBM, Base, DLC to be paid separately as per relevant technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (PWD SoR for Roads & Bridges - 2023-24 Item No.VOL-III-6.8.4 / Page No. 52 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1749.941749.94600.0FalseNoneNoneFalseNoneFalse1049964.00
17103355250000NoneNoneRoadsCONSTRUCTION OF RCC SIDE DRAINS9406947.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049190103117None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.361575.0FalseNoneNoneFalseNoneFalse189567.00
3049191103117None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 ( Item No.VOL-I-2.1.3 / Page No. 15)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.02175.0FalseNoneNoneFalseNoneFalse1236728.50
3049192103117None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-I-2.4.2 / Page No. 16)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10072.5410072.54525.0FalseNoneNoneFalseNoneFalse5288083.50
3049193103117None2.11-hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structuresPWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-I-2.11 h / Page No. 18)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.9828.88FalseNoneNoneFalseNoneFalse2692568.46240
17103355250000NoneNoneRoadsSub Estimates of Road Furniture9159092.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049194103118None8.15Providing and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35 2015.The finished surface to be level, uniform and free from streaks and holes. Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.15/ Page No. 67) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm625.4625.41700.0FalseNoneNoneFalseNoneFalse1063180.00
3049195103118None16.29The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 nessages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3049196103118None8.5aiiProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022-60 cm x 60 cm square inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24-VOL-III-Item No.-8.6 A (xiii) Page No. 65 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5665.185665.186.0FalseNoneNoneFalseNoneFalse33991.080
3049197103118None8.5aivRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC 67 2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC 67 2022. 60 cm equilateral triangle- TYPE XI Schedule of Rates Volume -3 PW,P & IWTD, 2023-24Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5527.125527.126.0FalseNoneNoneFalseNoneFalse33162.720
3049198103118None8.5ivRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary mandatory and informatory sign as per IRC 67 2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC 67 2022. 60 cm equilateral triangle- TYPE XI Schedule of Rates Volume -3 PW,P & IWTD, Mysore Circle 2023-24Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4219.684219.686.0FalseNoneNoneFalseNoneFalse25318.080
3049199103118None8.6AViiiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC 67 2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC 67 2022. (viii) 60 cm circular TYPE XI Schedule of Rates Volume -3 PW,P & IWTD,Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5131.825131.826.0FalseNoneNoneFalseNoneFalse30790.920
3049200103118None8.6AxvRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC 67 2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC 67 2022. 90 cm High Octagon TYPE XI Schedule of Rates Volume -3 PW,P & IWTD,Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach7817.57817.56.0FalseNoneNoneFalseNoneFalse46905.00
3049201103118None8.7Providing and erecting direction and place identification retro-reflectorised sign as per IRC 67 2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Direction and Place Identification Signs upto 0.9 m2 Size Board. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2021-22 ( Item No.VOL-III-8.7 / Page No. 55)PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.7 / Page No. 65)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm10631.810631.85.4FalseNoneNoneFalseNoneFalse57411.720
3049202103118None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.43 / Page No. 74)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo430.7430.71048.0FalseNoneNoneFalseNoneFalse451373.60
3049203103118None8.16iiReinforced cement concrete M15grade kilometre stone of standard design as per IRC 8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.16-ii / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3453.863453.869.0FalseNoneNoneFalseNoneFalse31084.740
3049204103118None8.16iiiReinforced cement concrete M15grade kilometre stone of standard design as per IRC 8-1980, fixing in position including painting and printing etc 200 m stone (precast). etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.16-iii / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach993.56993.5643.0FalseNoneNoneFalseNoneFalse42723.080
3049205103118None8.25iProviding and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS 1367 and IS 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete asper clause 811PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.25-i/ Page No. 69)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4295.24295.21700.0FalseNoneNoneFalseNoneFalse7301840.00
3049206103118None8.16 iReinforced cement concrete M-15 Grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per specifications.including additional M-15 concrete pedestal of 0.2mt. height above G.L. MORTH Specification No.(i) 5th kilometre stone (precast) TYPE XI Schedule of Rates Volume -3 PW,P & IWTD, ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5081.05081.01.0FalseNoneNoneFalseNoneFalse5081.00
17103355250000NoneNoneRoadsConstruction of Hume Pipe Culvert of 1 rows and 1200mm Dia8749833.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049207103119None2.8iiADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum848.42848.42151.2FalseNoneNoneFalseNoneFalse128281.1040
3049208103119None2.17ixADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ix) Removing all Type of Hume Pipes and stacking including Earthwork and Dismantiling of Masonry Works. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1129.261129.26120.0FalseNoneNoneFalseNoneFalse135511.20
3049209103119None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.36789.77FalseNoneNoneFalseNoneFalse95056.71720
3049210103119None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1 3 6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.0250.16FalseNoneNoneFalseNoneFalse354481.72320
3049211103119None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.985.48FalseNoneNoneFalseNoneFalse510916.73040
3049212103119None2.2.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8058.038058.03703.73FalseNoneNoneFalseNoneFalse5670677.45190
3049213103119None9.1iiLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (i). 1200 mm dia Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm12705.0612705.06120.0FalseNoneNoneFalseNoneFalse1524607.20
3049214103119None14.4aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2256.162256.16146.4FalseNoneNoneFalseNoneFalse330301.8240
17103355250000NoneNoneRoadsConstruction of Hume Pipe Culvert of 2 rows and 1200mm Dia1144770.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049215103120None2.8iiADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum848.42848.4212.6FalseNoneNoneFalseNoneFalse10690.0920
3049216103120None2.17ixADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ix) Removing all Type of Hume Pipes and stacking including Earthwork and Dismantiling of Masonry Works. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1129.261129.2610.0FalseNoneNoneFalseNoneFalse11292.60
3049217103120None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.36102.33FalseNoneNoneFalseNoneFalse12316.43880
3049218103120None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1 3 6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.026.04FalseNoneNoneFalseNoneFalse42684.80080
3049219103120None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.980.59FalseNoneNoneFalseNoneFalse55007.45820
3049220103120None2.2.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8058.038058.0388.72FalseNoneNoneFalseNoneFalse714908.42160
3049221103120None9.1iiLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (i). 1200 mm dia Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm12705.0612705.0620.0FalseNoneNoneFalseNoneFalse254101.20
3049222103120None14.4aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2256.162256.1619.4FalseNoneNoneFalseNoneFalse43769.5040
17103355250000NoneNoneRoadsConstruction of Hume Pipe Culvert of 3 rows and 1200mm Dia1483164.21
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049223103121None2.8iiADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum848.42848.4212.6FalseNoneNoneFalseNoneFalse10690.0920
3049224103121None2.17ixADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ix) Removing all Type of Hume Pipes and stacking including Earthwork and Dismantiling of Masonry Works. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1129.261129.2610.0FalseNoneNoneFalseNoneFalse11292.60
3049225103121None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.36135.64FalseNoneNoneFalseNoneFalse16325.63040
3049226103121None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1 3 6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.027.6FalseNoneNoneFalseNoneFalse53709.3520
3049227103121None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.980.66FalseNoneNoneFalseNoneFalse61533.76680
3049228103121None2.2.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8058.038058.03113.28FalseNoneNoneFalseNoneFalse912813.63840
3049229103121None9.1iiLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (i). 1200 mm dia Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm12705.0612705.0630.0FalseNoneNoneFalseNoneFalse381151.80
3049230103121None14.4aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2256.162256.1615.8FalseNoneNoneFalseNoneFalse35647.3280
17103355250000NoneNoneRoadsESTIMATE FOR BOX CULVERT1091435.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049231103122None2.8iiaDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Lime /Cement Concrete ,etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. By Mechanical Means Cement Concrete Grade M-15 & M-20 PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum848.42848.4211.03FalseNoneNoneFalseNoneFalse9358.07260
3049232103122None2.11iiDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. A).Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.11(ii) (A) Page No.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum212.4212.414.88FalseNoneNoneFalseNoneFalse3160.5120
3049233103122None1.141Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting &stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.3647.94FalseNoneNoneFalseNoneFalse5770.05840
3049234103122None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1 3 6 Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.027.79FalseNoneNoneFalseNoneFalse55052.08580
3049235103122None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.983.68FalseNoneNoneFalseNoneFalse343097.36640
3049236103122None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 25) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 Page No.16) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7850.37850.336.69FalseNoneNoneFalseNoneFalse288027.5070
3049237103122None2.4.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M-25 Using 20 mm nominal size graded crushed coarse aggregates Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 Page No.16) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8074.68074.65.46FalseNoneNoneFalseNoneFalse44087.3160
3049238103122None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5.2 / Page No. 16) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9689.699689.6911.9FalseNoneNoneFalseNoneFalse115307.3110
3049239103122None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.8 Page No.121) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8036.988036.983.96FalseNoneNoneFalseNoneFalse31826.44080
3049240103122None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.9 Page No.122) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13965.313965.34.8FalseNoneNoneFalseNoneFalse67033.440
3049241103122None13.2Reinforced cement concrete M30 grade for wearing coarse including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.2 Page No.122) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16485.7816485.782.16FalseNoneNoneFalseNoneFalse35609.28480
3049242103122None8.10Painting Two Coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm128.62128.623.35FalseNoneNoneFalseNoneFalse430.8770
3049243103122None14.4aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Stone/Boulder etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-14.4(a) Page No.129) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2256.162256.1617.25FalseNoneNoneFalseNoneFalse38918.760
3049244103122None12.3aBack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3A Page No.117) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1378.241378.2437.85FalseNoneNoneFalseNoneFalse52166.3840
3049245103122None8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.4 Page No.63) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.061.061500.0FalseNoneNoneFalseNoneFalse1590.00
17103355250000NoneNoneRoadsESTIMATE FOR FIELD PIPE CULVERT2145840.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049246103123None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum120.36120.36309.51FalseNoneNoneFalseNoneFalse37252.62360
3049247103123None2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7067.027067.0217.5FalseNoneNoneFalseNoneFalse123672.850
3049248103123None2.11hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne93232.9893232.982.16FalseNoneNoneFalseNoneFalse201383.23680
3049249103123None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 20) Using 20 mm nominal size graded crushed coarse aggregate Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8058.038058.03105.98FalseNoneNoneFalseNoneFalse853990.01940
3049250103123None16.15cProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (iII). 750 mm dia UNI SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.15(C)) Page No. 146Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm3935.33935.3112.5FalseNoneNoneFalseNoneFalse442721.250
3049251103123None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specificationsCommon SR-2023-24 ( Item No.VOL-I-1.10 / Page No. 07)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum188.8188.890.0FalseNoneNoneFalseNoneFalse16992.00
3049252103123None8.29Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service SR 2021-22 & 2023-24 SR Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2610.162610.16180.0FalseNoneNoneFalseNoneFalse469828.80
17103355250000NoneNoneRoadsMaintenance Activities for Third Year656140.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049253103124None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm519.39519.39102.0FalseNoneNoneFalseNoneFalse52977.780
3049254103124None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr7.937.936800.0FalseNoneNoneFalseNoneFalse53924.00
3049255103124None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm51.5451.54765.0FalseNoneNoneFalseNoneFalse39428.10
3049256103124None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm128.2128.2382.5FalseNoneNoneFalseNoneFalse49036.50
3049257103124None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm207.49207.49233.75FalseNoneNoneFalseNoneFalse48500.78750
3049258103124None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2622.052622.058.5FalseNoneNoneFalseNoneFalse22287.4250
3049259103124None16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach272.25272.2551.0FalseNoneNoneFalseNoneFalse13884.750
3049260103124None1.14.1Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum134.8134.8675.0FalseNoneNoneFalseNoneFalse90990.00
3049261103124None8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.05144.051979.25FalseNoneNoneFalseNoneFalse285110.96250
17103355250000NoneNoneRoadsMaintenance Activities for Fourth Year1023369.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049262103125None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm537.94537.94102.0FalseNoneNoneFalseNoneFalse54869.880
3049263103125None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.218.216800.0FalseNoneNoneFalseNoneFalse55828.00
3049264103125None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm53.3853.38765.0FalseNoneNoneFalseNoneFalse40835.70
3049265103125None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm132.77132.775100.0FalseNoneNoneFalseNoneFalse677127.00
3049266103125None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm214.9214.9467.5FalseNoneNoneFalseNoneFalse100465.750
3049267103125None1.14.1Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means.Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum139.62139.62675.0FalseNoneNoneFalseNoneFalse94243.50
17103355250000NoneNoneRoadsMaintenance Activities for Fifth Year1110675.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049268103126None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm556.49556.49102.0FalseNoneNoneFalseNoneFalse56761.980
3049269103126None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.58.56800.0FalseNoneNoneFalseNoneFalse57800.00
3049270103126None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm55.2255.22765.0FalseNoneNoneFalseNoneFalse42243.30
3049271103126None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm137.35137.355100.0FalseNoneNoneFalseNoneFalse700485.00
3049272103126None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm222.31222.31701.25FalseNoneNoneFalseNoneFalse155894.88750
3049273103126None1.14.1Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means.Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum144.43144.43675.0FalseNoneNoneFalseNoneFalse97490.250
17103355250000NoneNoneRoadsEstimates for Renewal after maintenance period25945562.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049274103127None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2902.992902.998.5FalseNoneNoneFalseNoneFalse24675.4150
3049275103127None16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo301.42301.4251.0FalseNoneNoneFalseNoneFalse15372.420
3049276103127None1.14.1Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum149.25149.25675.0FalseNoneNoneFalseNoneFalse100743.750
3049277103127None8.10Painting of Parapet walls of CD work. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm159.49159.491979.25FalseNoneNoneFalseNoneFalse315670.58250
3049278103127None5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.3-i / Page No. 31)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.5617.5647374.0FalseNoneNoneFalseNoneFalse831887.440
3049279103127None5.16bProviding and laying Bituminous Concrete Grading II for traffic less than 20 MSA with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.16-B / Page No. 37)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16027.8916027.891421.22FalseNoneNoneFalseNoneFalse22779157.82580
3049280103127None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.15 / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm775.5775.51700.0FalseNoneNoneFalseNoneFalse1318350.00
3049281103127None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.43 / Page No. 74)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo534.07534.071048.0FalseNoneNoneFalseNoneFalse559705.360
17103355250000NoneNoneRoadsEstimate for Shifting of PVC Water Supply Pipe Lines860676.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049282103128None1.17Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m PWD SoR - 2023-24 ( Item No.VOL-I-1.17 / Page No. 10)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum309.16309.16848.45FalseNoneNoneFalseNoneFalse262306.8020
3049283103128None9.2.3 Vol-5Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For : HDPE Grade PE80-PN8.0,90mm dia PWD SoR - 2023-24 ( Item No.VOL-V-9.2.3 / Page No. 96)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr450.76450.761000.0FalseNoneNoneFalseNoneFalse450760.00
3049284103128None9.2.1 Vol-5Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For : HDPE Grade PE80-PN8.0,63mm dia PWD SoR - 2023-24 ( Item No.VOL-V-9.2.1 / Page No. 96)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr258.42258.42571.2FalseNoneNoneFalseNoneFalse147609.5040
17103355250000NoneNoneRoadsElectrical pole shifting780017.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049285103129None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8349.688349.6820.0FalseNoneNoneFalseNoneFalse166993.60
3049286103129None2.02Labour for RCC pole (V-6 ESCOM P.No 44/ 30/2.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1313.341313.3420.0FalseNoneNoneFalseNoneFalse26266.80
3049287103129None2.08LT 2 Pin Cross Arm GI(V-6 ESCOM P.No 4/18/2.08) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo204.14204.1420.0FalseNoneNoneFalseNoneFalse4082.80
3049288103129None5.01Labour for 2 Pin Cross Arm (V-6 ESCOM P.No 45/50/5.01) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo188.8188.820.0FalseNoneNoneFalseNoneFalse3776.00
3049289103129None12.2.0211 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo574.66574.6613.0FalseNoneNoneFalseNoneFalse7470.580
3049290103129None5.04Labour for Horizontal Cross Arm (V-6 ESCOM P.No 45/52/5.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo188.8188.813.0FalseNoneNoneFalseNoneFalse2454.40
3049291103129None6.0611 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo241.9241.920.0FalseNoneNoneFalseNoneFalse4838.00
3049292103129None6.1011 kV, 45 KN Polymeric Insulator (V-6 ESCOM P.No 5/56/6.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo219.48219.4818.0FalseNoneNoneFalseNoneFalse3950.640
3049293103129None2.06LT 4 Pin Cross Arm GI (Escom Pg 4 I.No 16/2.06) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo447.22447.2216.0FalseNoneNoneFalseNoneFalse7155.520
3049294103129None5.02Labour for 4 Pin Cross Arm (Escom Pg 45 I.No 50/5.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo188.8188.816.0FalseNoneNoneFalseNoneFalse3020.80
3049295103129None21.05Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo26581.8626581.863.0FalseNoneNoneFalseNoneFalse79745.580
3049296103129None3.02Labour For DP TC Set (V-6 ESCOM P.No 44/39/3.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo7036.347036.343.0FalseNoneNoneFalseNoneFalse21109.020
3049297103129None1.9Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (V-6 ESCOM P.No 44/ 30/2.02) (1113*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2495.342495.346.0FalseNoneNoneFalseNoneFalse14972.040
3049298103129None7.02Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Labour (Escom Pg 46, I.No 67/7.02)(5233*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm11732.3811732.3826.2FalseNoneNoneFalseNoneFalse307388.3560
3049299103129None1.9Erection of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo3564.783564.782.0FalseNoneNoneFalseNoneFalse7129.560
3049300103129NoneCDS 26Erection of 11kV/433V, 100 kVA, 3 Phase 50 Cys Distribution Transformer BEE - 5 Star Rated with Oil Using 9 Mtr RCC Pole DPTC (303940 -221952) (CDS-26)(With out Transformer) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo96745.8496745.841.0FalseNoneNoneFalseNoneFalse96745.840
3049301103129NoneCDS 26Labour For Erection TC (CDS-26) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo22917.9622917.961.0FalseNoneNoneFalseNoneFalse22917.960
17103355250000NoneNoneRoads1st Maintainance Activity0.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049302103130None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049303103130None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049304103130None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049305103130None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049306103130None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049307103130None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049308103130None16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049309103130None1.14.1Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049310103130None8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
17103355250000NoneNoneRoads2 Maintenance activities for Second Year0.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049311103131None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049312103131None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049313103131None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049314103131None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049315103131None10.4Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049316103131None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049317103131None16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049318103131None1.14.1Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1.01.00.01FalseNoneNoneFalseNoneFalse0.010
3049319103131None8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1.01.00.01FalseNoneNoneFalseNoneFalse0.010
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103355260000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103355260000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103355260001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103355480000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103355510000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103355540000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103355570000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103355650000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17103355690000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103355720000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103355740000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17103355810000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103355870000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103355910000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103355950000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103355980000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103356010000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103356040000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103356070000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103356100000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17103356130000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17103356150000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17103356190000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17103356220000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17103356250000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.975.36Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent Bill copies shall not be accepted
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have Executed in any one year the following minimum quantities of work (Earth Work for Embankment-Subgrade-Shoulders -26306.46 Cum 2. GSB or WMM -18556.88Cum 3.BM/SDBC/DBM/BC 3114.50Cum 4.Plain Cement Concrete PCC-198.21 Cum 5.Reinforced Cement Concrete (RCC) M20 higher grades -734.20cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned: 1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No 2.Mechanical Paver Finisher:1 No 3. Static Road Roller: 1 No. 4. Vibratory Road Roller: 1 No. 5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own
NoneNoneNoneNonei) Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill : 1 No 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No 6.Excavator 0.90 Cum Bucket Capacity:2 No 7.Tipper Trucks:6 Nos 8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos 9. Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNone3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3901.44 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNone3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.585.22 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
EPF registrationFalseTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsMysuruKrishnarajanagaraMysoreKRISHNARAJANAGARK.R.Nagara TalukNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1710336391000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer, SHDP, Bangalore
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone