tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710341528000 | 0 | None | None | Roads | Pkg-775 Bantvala Taluk of Dakshina Kannada District. | 63659430.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050906 | 103266 | None | 16.29 | i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectagular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1
Rates are inclusive of GST 18 Percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 20289.2 | 20289.2 | 2.0 | False | None | None | False | None | False | 40578.4 | 0 | 3050907 | 103266 | None | 2.5 (ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
In Area of light jungle
Rates are inclusive of GST 18 Percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 a , Page No: 9".
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 110.4 | False | None | None | False | None | False | 57340.656 | 0 | 3050908 | 103266 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead
Rates are inclusive of GST 18 Percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.93 | 7.93 | 12000.0 | False | None | None | False | None | False | 95160.0 | 0 | 3050909 | 103266 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 5106.19 | False | None | None | False | None | False | 641082.1545 | 0 | 3050910 | 103266 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.
Royallty Shall be recovered @ Rs 60/ cum
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 157.27 | 157.27 | 3751.86 | False | None | None | False | None | False | 590055.0222 | 0 | 3050911 | 103266 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 626.44 | 626.44 | 2153.87 | False | None | None | False | None | False | 1349270.3228 | 0 | 3050912 | 103266 | None | 4.2 B (v) | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 5705.93 | False | None | None | False | None | False | 17789092.6645 | 0 | 3050913 | 103266 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3381.97 | 3381.97 | 4951.12 | False | None | None | False | None | False | 16744539.3064 | 0 | 3050914 | 103266 | None | 5.1 A (I) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.19 | 54.19 | 19178.12 | False | None | None | False | None | False | 1039262.3228 | 0 | 3050915 | 103266 | None | 5.4 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 18.5 | 18.5 | 19178.12 | False | None | None | False | None | False | 354795.22 | 0 | 3050916 | 103266 | None | 5.12 (C) | Dense Graded Bituminous Macadam Grading - II for traffic greater then 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 4, Item No: 5.12 (c) , Page No: 35.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12487.8 | 12487.8 | 958.88 | False | None | None | False | None | False | 11974301.664 | 0 | 3050917 | 103266 | None | 5.16 c | Bituminous Concrete Grading II for traffic Greater than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14476.81 | 14476.81 | 648.63 | False | None | None | False | None | False | 9390093.2703 | 0 | 3050918 | 103266 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 651.55 | 651.55 | 4901.54 | False | None | None | False | None | False | 3193598.387 | 0 | 3050919 | 103266 | None | 14.4(a) | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2526.9 | 2526.9 | 158.4 | False | None | None | False | None | False | 400260.96 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Sub Estimates of Road Furniture | 3317566.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050920 | 103267 | None | Item Code 8.16 (ii) | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC8 1980, fixing in position including painting and printing etc ii Ordinary kilometer stone precastSchedule of Rates PWD 2023 24 vol 3, Item No 8.16 ii , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 3868.32 | 3868.32 | 3.2 | False | None | None | False | None | False | 12378.624 | 0 | 3050921 | 103267 | None | Item Code 8.16 (iii) | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC8 1980, fixing in position including painting and printing etc iii 200 m stone precastSchedule of Rates PWD 2023 24 vol 3, Item No 8.16 iii , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1112.79 | 1112.79 | 12.8 | False | None | None | False | None | False | 14243.712 | 0 | 3050922 | 103267 | None | Item Code 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g per m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes.Schedule of Rates PWD 2023 24 vol 3, Item No 8.15 , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 700.45 | 700.45 | 677.56 | False | None | None | False | None | False | 474596.902 | 0 | 3050923 | 103267 | None | Item Code 8.6 (xi) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly esigned foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of
IRC:67:2022. 60 mm x 50 mm rectangula
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 (xi) , Page No: 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5879.8 | 5879.8 | 140.0 | False | None | None | False | None | False | 823172.0 | 0 | 3050924 | 103267 | None | Item Code 8.15 (B) IV | Retro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. ii 60 cm equilateral triangleSchedule of Rates PWD 2023 24 vol 3, Item No 8.5 iv , Page No 64. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4726.04 | 4726.04 | 31.0 | False | None | None | False | None | False | 146507.24 | 0 | 3050925 | 103267 | None | Item Code 8.15 (B) viii | Retro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. viii 60 cm circularSchedule of Rates PWD 2023 24 vol 3, Item No 8.5 viii , Page No 64. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5678.92 | 5678.92 | 3.0 | False | None | None | False | None | False | 17036.76 | 0 | 3050926 | 103267 | None | Item Code 8.7 | Direction and Place Identification Signs upto 0.9 m2 SizeBoard.
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.7 , Page No: 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11907.62 | 11907.62 | 3.6 | False | None | None | False | None | False | 42867.432 | 0 | 3050927 | 103267 | None | Item Code 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers per Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +per 5 degree. The strength of detachment of the integrated cylindrical shanks, of diameter not less than 19 +per 2 mm and height not less than 30+per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel, to the Engineer.Schedule of Rates PWD 2023 24 vol 3, Item No 8.43 , Page No 74. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 482.38 | 482.38 | 1080.0 | False | None | None | False | None | False | 520970.4 | 0 | 3050928 | 103267 | None | Item Code 8.17 | Road DelineatorsSupplying and installation of delineators road way indicators, hazard markers, object markers, 80 100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC 79 2019 and the drawings. rates inclusive of GSTSchedule of Rates PWD 2023 24 vol 3, Item No 8.17 , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2670.95 | 2670.95 | 64.0 | False | None | None | False | None | False | 170940.8 | 0 | 3050929 | 103267 | None | Item Code 8.48 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge.
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.48 , Page No: 76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4739.26 | 4739.26 | 45.0 | False | None | None | False | None | False | 213266.7 | 0 | 3050930 | 103267 | None | Item Code 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15 20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. rates inclusive of GSTSchedule of Rates PWD 2023 24 vol 4, Item No 8.31 , Page No 71. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 248.46 | 248.46 | 82.5 | False | None | None | False | None | False | 20497.95 | 0 | 3050931 | 103267 | None | Item Code 8.29(i) | Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29(i) , Page No: 71 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 2923.28 | 2923.28 | 130.0 | False | None | None | False | None | False | 380026.4 | 0 | 3050932 | 103267 | None | Item Code 8.25 (i) | Metal Beam Crash Barrier
(i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on
the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.25( i) , Page No: 69 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 4810.62 | 4810.62 | 100.0 | False | None | None | False | None | False | 481062.0 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 ESTIMATE FOR BOX CULVERT | 7820122.65 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050933 | 103268 | None | Item Code 2.11 II A | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol-3, Item No: 2.11 , Page No: 10 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 237.89 | 237.89 | 52.64 | False | None | None | False | None | False | 12522.5296 | 0 | 3050934 | 103268 | None | Item Code 2.17 (ix) B | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means B. Above 600 mm to 900 mm dia
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 1448.47 | 1448.47 | 62.5 | False | None | None | False | None | False | 90529.375 | 0 | 3050935 | 103268 | None | Item Code 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023 24 vol 1, Item No. 1.14.1 , Page No. 8 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 386.84 | False | None | None | False | None | False | 52146.032 | 0 | 3050936 | 103268 | None | Item Code 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1.3.6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 vol 1, Item No. 2.1.3 , Page No. 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 34.84 | False | None | None | False | None | False | 275760.6904 | 0 | 3050937 | 103268 | None | Item Code 2.11 H | Steel FabricationSupplying, fitting and placing TMT FE 550 per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping per welding joints, tying with binding wire per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023 24 vol 1, Item No. 2.11 h , Page No. 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 11.697 | False | None | None | False | None | False | 1221411.73518 | 0 | 3050938 | 103268 | None | Item Code 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule Rate PWD 2023 24 vol 1, Item No. 2.4.3 ,Rate inclusive form work Page No. 16 plus rate inclusive of form work 20 percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10048.39 | 10048.39 | 101.8 | False | None | None | False | None | False | 1022926.102 | 0 | 3050939 | 103268 | None | Item Code 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023 24 vol 1, Item No. 2.4.3 , Page No. 16 plus rate inclusive of form work 8 Percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9043.55 | 9043.55 | 55.04 | False | None | None | False | None | False | 497756.992 | 0 | 3050940 | 103268 | None | Item Code 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 , Item No. 2.5.2 , Page No. 16 plus rate inclusive of form work 20 percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10852.45 | 10852.45 | 37.8 | False | None | None | False | None | False | 410222.61 | 0 | 3050941 | 103268 | None | Item Code 12.2 | Providing weep holes in Brick masonry per Plain per Reinforced concrete abutment, wing wall per return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V .20H towards drawing foce. Complete as per drawing and Technical Specifications Schedule of Rates PWD 2023 24 vol 3, Item No. 12.2 , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 315.86 | 315.86 | 32.0 | False | None | None | False | None | False | 10107.52 | 0 | 3050942 | 103268 | None | Item Code 12.4 | Providing and laying of Filter media with granular materials per stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023 24 vol 3, Item No. 12.4 , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3537.92 | 3537.92 | 54.24 | False | None | None | False | None | False | 191896.7808 | 0 | 3050943 | 103268 | None | Item Code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 vol 1, Item No. 2.4.3 , Page No. 16 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10027.77 | 10027.77 | 16.84 | False | None | None | False | None | False | 168867.6468 | 0 | 3050944 | 103268 | None | Item Code 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS. 280 & IS.4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extrafor laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023 24 vol 3, Item No. 14.2 , Page No. 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3243.21 | 3243.21 | 8.36 | False | None | None | False | None | False | 27113.2356 | 0 | 3050945 | 103268 | None | Item Code 4.2 (v) | By Mix in Place Method Construction of Granular Sub Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading V Material Schedule of Rates PWD 2023 24 vol 3, Item No. 4.2 v , Page No. 23 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 56.0 | False | None | None | False | None | False | 174588.4 | 0 | 3050946 | 103268 | None | Item Code 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023 24 vol 3, Item No. 13.8 , Page No. 121 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9001.42 | 9001.42 | 86.4 | False | None | None | False | None | False | 777722.688 | 0 | 3050947 | 103268 | None | Item Code 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification Batching Plant Schedule of Rates PWD 2023 24 vol 3, Item No. 13.9 , Page No. 122 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 15641.14 | 15641.14 | 140.0 | False | None | None | False | None | False | 2189759.6 | 0 | 3050948 | 103268 | None | Item Code 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
Rates are inclusive of GST 18 percent
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 18464.07 | 18464.07 | 8.33 | False | None | None | False | None | False | 153805.7031 | 0 | 3050949 | 103268 | None | Item Code 13.16 | Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm in traffic direction, covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS. 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking per backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023 24 vol 3, Item No. 13.16 , Page No. 124 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2372.27 | 2372.27 | 160.0 | False | None | None | False | None | False | 379563.2 | 0 | 3050950 | 103268 | None | Item Code 8.1 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023 24 vol 3, Item No. 8.1 , Page No. 66 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 272.25 | 272.25 | 44.76 | False | None | None | False | None | False | 12185.91 | 0 | 3050951 | 103268 | None | Item Code 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3, Item No. 8.4 , Page No. 63 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 200.0 | False | None | None | False | None | False | 238.0 | 0 | 3050952 | 103268 | None | Item Code 12.3A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular material Schedule of Rates PWD 2023 24 vol 3, Item No. 12.3A , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1543.63 | 1543.63 | 97.82 | False | None | None | False | None | False | 150997.8866 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Construction of Drains between Ch-0.0km to 4.0km at selected reaches | 3819991.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050953 | 103269 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 38 Item No1.14.1
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 856.8 | False | None | None | False | None | False | 115496.64 | 0 | 3050954 | 103269 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.6 | 7915.6 | 54.0 | False | None | None | False | None | False | 427442.4 | 0 | 3050955 | 103269 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 9.603 | False | None | None | False | None | False | 1002754.28682 | 0 | 3050956 | 103269 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8356.48 | 8356.48 | 70.2 | False | None | None | False | None | False | 586624.896 | 0 | 3050957 | 103269 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11281.24 | 11281.24 | 108.0 | False | None | None | False | None | False | 1218373.92 | 0 | 3050958 | 103269 | None | 2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecifications.M20DesignMixUsing20mmnominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10027.77 | 10027.77 | 46.8 | False | None | None | False | None | False | 469299.636 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Estimate for Shifting of PVC Water Supply Pipe Lines | 1478773.44 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050959 | 103270 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 346.26 | 346.26 | 1944.0 | False | None | None | False | None | False | 673129.44 | 0 | 3050960 | 103270 | None | 10.14.11 | ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 110 mm DiaRates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 473.13 | 473.13 | 1200.0 | False | None | None | False | None | False | 567756.0 | 0 | 3050961 | 103270 | None | 10.14.2 | ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 75 mm DiaRates are inclusive of GST 18%PWD SoR - 2023-24 ( Item No.VOL-V-10.14.2 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 212.78 | 212.78 | 600.0 | False | None | None | False | None | False | 127668.0 | 0 | 3050962 | 103270 | None | 14.8 | ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 63 mm DiaRates are inclusive of GST 18%PWD SoR - 2023-24 ( Item No.VOL-V-10.14.8 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 183.7 | 183.7 | 600.0 | False | None | None | False | None | False | 110220.0 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Construction of Retaining Wall (180 m Long) | 1755281.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050963 | 103271 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 110.25 | False | None | None | False | None | False | 14861.7 | 0 | 3050964 | 103271 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 9.98 | False | None | None | False | None | False | 78992.2988 | 0 | 3050965 | 103271 | None | 2.11 h | Steel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperations complete as per drawing and technical specification. All other type of structuresRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h, Page No: 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 9.57 | False | None | None | False | None | False | 999308.3958 | 0 | 3050966 | 103271 | None | 2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9192.12 | 9192.12 | 23.62 | False | None | None | False | None | False | 217117.8744 | 0 | 3050967 | 103271 | None | 2.4.2 | ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 Additionalities for Formwork, Centering & Scaffolding- For Box Culvert @ 10%, as PWD Vol-1, Pg No. 111 (Corrigendum-3, Pg-2) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9192.12 | 9192.12 | 48.04 | False | None | None | False | None | False | 441589.4448 | 0 | 3050968 | 103271 | None | 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 315.86 | 315.86 | 10.8 | False | None | None | False | None | False | 3411.288 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050969 | 103272 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 25.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050970 | 103272 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 1920) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050971 | 103272 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050972 | 103272 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050973 | 103272 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespective of quantity
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =240.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050974 | 103272 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =95.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Road Maintenance - Activities to be carried out for the Second Year. | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050975 | 103273 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =38.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050976 | 103273 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =2560.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050977 | 103273 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050978 | 103273 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050979 | 103273 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 Have to rectify irrespective of quantity
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =120.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3050980 | 103273 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =180.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE) | 323533.29 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050981 | 103274 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 581.72 | 581.72 | 38.4 | False | None | None | False | None | False | 22338.048 | 0 | 3050982 | 103274 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.89 | 8.89 | 2560.0 | False | None | None | False | None | False | 22758.4 | 0 | 3050983 | 103274 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.73 | 57.73 | 288.0 | False | None | None | False | None | False | 16626.24 | 0 | 3050984 | 103274 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 143.58 | 143.58 | 960.0 | False | None | None | False | None | False | 137836.8 | 0 | 3050985 | 103274 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 630.56 | 630.56 | 88.0 | False | None | None | False | None | False | 55489.28 | 0 | 3050986 | 103274 | None | 1.12 | Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 140.62 | 140.62 | 360.0 | False | None | None | False | None | False | 50623.2 | 0 | 3050987 | 103274 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2936.7 | 2936.7 | 3.2 | False | None | None | False | None | False | 9397.44 | 0 | 3050988 | 103274 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 304.92 | 304.92 | 3.2 | False | None | None | False | None | False | 975.744 | 0 | 3050989 | 103274 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 161.34 | 161.34 | 46.0 | False | None | None | False | None | False | 7421.64 | 0 | 3050990 | 103274 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.33 | 1.33 | 50.0 | False | None | None | False | None | False | 66.5 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Estimates for Maintenance - Activities to be carried out for the fourth Year (PAID MAINTENANCE) | 316560.96 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050991 | 103275 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 602.5 | 602.5 | 38.4 | False | None | None | False | None | False | 23136.0 | 0 | 3050992 | 103275 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 9.2 | 9.2 | 2560.0 | False | None | None | False | None | False | 23552.0 | 0 | 3050993 | 103275 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 59.79 | 59.79 | 288.0 | False | None | None | False | None | False | 17219.52 | 0 | 3050994 | 103275 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 148.7 | 148.7 | 960.0 | False | None | None | False | None | False | 142752.0 | 0 | 3050995 | 103275 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 653.08 | 653.08 | 88.0 | False | None | None | False | None | False | 57471.04 | 0 | 3050996 | 103275 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 145.64 | 145.64 | 360.0 | False | None | None | False | None | False | 52430.4 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Estimates for Maintenance - Activities to be carried out for the fifth Year (PAID MAINTENANCE) | 386924.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3050997 | 103276 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 623.26 | 623.26 | 38.4 | False | None | None | False | None | False | 23933.184 | 0 | 3050998 | 103276 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 9.51 | 9.51 | 2560.0 | False | None | None | False | None | False | 24345.6 | 0 | 3050999 | 103276 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 61.86 | 61.86 | 288.0 | False | None | None | False | None | False | 17815.68 | 0 | 3051000 | 103276 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 153.84 | 153.84 | 960.0 | False | None | None | False | None | False | 147686.4 | 0 | 3051001 | 103276 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 675.6 | 675.6 | 176.0 | False | None | None | False | None | False | 118905.6 | 0 | 3051002 | 103276 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 150.66 | 150.66 | 360.0 | False | None | None | False | None | False | 54237.6 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Estimates for Renewal after maintenance period | 11235048.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3051003 | 103277 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3251.35 | 3251.35 | 3.2 | False | None | None | False | None | False | 10404.32 | 0 | 3051004 | 103277 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 337.59 | 337.59 | 3.2 | False | None | None | False | None | False | 1080.288 | 0 | 3051005 | 103277 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 178.63 | 178.63 | 20.0 | False | None | None | False | None | False | 3572.6 | 0 | 3051006 | 103277 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.47 | 1.47 | 200.0 | False | None | None | False | None | False | 294.0 | 0 | 3051007 | 103277 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 19.67 | 19.67 | 18559.36 | False | None | None | False | None | False | 365062.6112 | 0 | 3051008 | 103277 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 17951.24 | 17951.24 | 556.78 | False | None | None | False | None | False | 9994891.4072 | 0 | 3051009 | 103277 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 868.56 | 868.56 | 640.0 | False | None | None | False | None | False | 555878.4 | 0 | 3051010 | 103277 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 598.16 | 598.16 | 508.0 | False | None | None | False | None | False | 303865.28 | 0 |
| 1710341528000 | 0 | None | None | Roads | Pkg-775 Electrical Pole Shifting | 467381.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3051011 | 103278 | None | M 1.06 P-01 L 1.1.1 P-43 Vol-6 | 2 00 006-PSC Pole-9.0M Long 200 kg WL Disging or Pits 1.8 mir depth for errcction or 9 10 10 mtr Long Siccl/ RCC/PSC supporis n.per approved Drawing Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 6380.68 | 6380.68 | 6.0 | False | None | None | False | None | False | 38284.08 | 0 | 3051012 | 103278 | None | M 1.06 P- 01, L 2.02 P- 44 vol-6 | 02 00 006-PSC Pole-9.0M
Long 200 kg WL Erectiion of PSC poles 9 to 10 mtr long but in
4199.00
a pil of 1.8 mir dcpth. - Ordinary SoiL
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 6.0 | False | None | None | False | None | False | 8825.64 | 0 | 3051013 | 103278 | None | M 24 (B) p- 06, L1.7.1 P-44 Vol-6 | Guy set with 2 Nos. 15 simain
insulator and Concreting
matcrials as pcr Drwg No BESCOM/GMCPNIDI.24.10.07-G1 Digging of Pit for GUY SET - Ordinary Soil
Digging of Pit for GUY SET - Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2056.4 | 2056.4 | 20.0 | False | None | None | False | None | False | 41128.0 | 0 | 3051014 | 103278 | None | M 24 (B) P-06, L-5.11 VOL-6 | Fixing orGUY Scts with break insulalors making usc of 7/3.15 mm (7/10 SWG)galvaniscd sicel wire with turn buckle and anchoring arrangemcnt as pcr approved using 2 strain insulators (No.15) for-
drawing.(Excluding cxcavation or PIT) bul
Anticlimbing D. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 408.37 | 408.37 | 20.0 | False | None | None | False | None | False | 8167.4 | 0 | 3051015 | 103278 | None | M 24 (A) P-06, L 1.7.1 P-44 VOL-6 | Guy set with No. 15 strain
insulator & Concreting
meterials as per Drwg
No.BESCONGMCP/DL.
24.10.07-GI
Digging of Pit for GUY SET - Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1978.43 | 1978.43 | 17.0 | False | None | None | False | None | False | 33633.31 | 0 | 3051016 | 103278 | None | M 24(A) P-06, L 5.10 P-03, VOL-6 | Guy set with No. 15 strain
insulator & Concreting
materials as per Drwg
No.BESCONGMCP/DL.
24.10.07-GI
Fixing of GUY Sets with break insulators making use of 7/3.15 mm(7/10SWG)galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing.(Excluding excavation of PIT)Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 351.54 | 351.54 | 17.0 | False | None | None | False | None | False | 5976.18 | 0 | 3051017 | 103278 | None | M 24(C) P-06, L 1.7.1 P-44, vol-6 | Guy set with No. 8 strain insulator & Concreting materials as per Drawing
No.BESCOM/GM/CPnmDt;
24.10.07-GI
Digging or Pit for GUY SET- Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1936.14 | 1936.14 | 5.0 | False | None | None | False | None | False | 9680.7 | 0 | 3051018 | 103278 | None | M 24 (C) P-06, L 5.10 P-03, VOL-6 | Guy set with No. 8 strain insulator & Concreting materials as per Drwg
No.BESCOM/GM/CPnmDt;
24.10.07-GI
Fixing or GUY Sets with break insulators making use of 7/3.15 mm (7/0 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing.(Excluding excavation or PIT) Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 351.14 | 351.14 | 5.0 | False | None | None | False | None | False | 1755.7 | 0 | 3051019 | 103278 | None | M 10(B) P-03, L 5.03 P-03, VOL-06 | 11 kV Horizontal cross arm with HT Single Top support.clamp,bolts. nuts and washers For PSCC Polcs 140 KG WL-GI
Fixing of V-Shape/Horizontal cross arm including single lop support Braces and Insulators fixing. -Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1444.5 | 1444.5 | 8.0 | False | None | None | False | None | False | 11556.0 | 0 | 3051020 | 103278 | None | M 6.06 P-03, VOL-06 | 02 83 008-1IkV. 5KN
Composite/Polymcric Pin
Insulator(24mm dia FP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 270.92 | 270.92 | 24.0 | False | None | None | False | None | False | 6502.08 | 0 | 3051021 | 103278 | None | M 6.10 P-03, VOL-06 | 02 83 320-Silcon rubbcr
composite disk
insulator/1IkV 45 kN
Polymcric insulator Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 245.81 | 245.81 | 12.0 | False | None | None | False | None | False | 2949.72 | 0 | 3051022 | 103278 | None | M 2.06 P-02, L 5.02 P-03,VOL-06 | 02 80 014-LT 4 Pin X Arms-
GI Fixing of 4 Pin cross arm with insulator and
Braces fixing. - Ordinary Soil
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 712.34 | 712.34 | 6.0 | False | None | None | False | None | False | 4274.04 | 0 | 3051023 | 103278 | None | M 5.06 P-2, VOL-06 | 02 83 158-No8 Strain
Insulator Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 138.76 | 138.76 | 6.0 | False | None | None | False | None | False | 832.56 | 0 | 3051024 | 103278 | None | M 61.17 P-27 VOL-06 | 02 80 623-B & N Size
16x100mm-Gl Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kg | 175.2 | 175.2 | 10.0 | False | None | None | False | None | False | 1752.0 | 0 | 3051025 | 103278 | None | M 6.03 P-3,VOL-06 | 02 83 003-1.1kV Ceramic Pin
Insulator (Shell only) Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 40.96 | 40.96 | 24.0 | False | None | None | False | None | False | 983.04 | 0 | 3051026 | 103278 | None | M 6.04 P-03 VOL-06 | 02 83 053-1.1kV GI Pin FOR
2/1.1kV Cermaic shell
Insulator
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 46.25 | 46.25 | 24.0 | False | None | None | False | None | False | 1110.0 | 0 | 3051027 | 103278 | None | M 8.02 P-03 VOL-06 | 02 81 008-8 SWG GI Wire ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kg | 99.17 | 99.17 | 30.0 | False | None | None | False | None | False | 2975.1 | 0 | 3051028 | 103278 | None | M 8.01 P-03 VOL-06 | 02 81 1107/10 SWG Guy WIRE Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kg | 102.04 | 102.04 | 30.0 | False | None | None | False | None | False | 3061.2 | 0 | 3051029 | 103278 | None | M 6.02 P-46 VOL-06 | Releasing of ReFixing rabbit ASCR Conductar - ordinary soil
Rates inclusive of 18 percent GST
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 10949.45 | 10949.45 | 11.0 | False | None | None | False | None | False | 120443.95 | 0 | 3051030 | 103278 | None | M 2.02 P- 44, VOL- 06 | Releasing of ReFixing PSC Pole 9 mtr long 200 kg WL Ordinary soil
Rates inclusive of 18 percent GST
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4289.91 | 4289.91 | 37.0 | False | None | None | False | None | False | 158726.67 | 0 | 3051031 | 103278 | None | M 13.11 P-06 VOL-06 | Releasing & Refixing of Over Head Service Mains (Single Phase/Three Phase) for consumer installation and street lighting and similar work (While replacing existing Pole) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 136.12 | 136.12 | 35.0 | False | None | None | False | None | False | 4764.2 | 0 |
|
|
---|