createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710241529051
version10
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd489500.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-03-2024 16:00:00
tenderQueryClose19-03-2024 17:30:00
technicalBidOpen22-03-2024 16:30:00
publishedDate13-03-2024 20:15:01
publishedByPostPWD_EE_DIV_SED
publishedByUserKPE14118 - DASHWANTH L GAJRE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate18-03-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSRI SHEKHAPPA TAMDADDI
splitEmdRequiredYnTrue
emdBankGuarantee389500.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08441276278
mobileNumber9901098011
tenderSupplierListNone
tenderSchedule
createdTs1710241529085
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9355
titleConstruction of Compound Wall (Balance), Landscaping & Slab Impermo to Regional Sub Science Center in Chittapur Town, Dist. Kalaburagi. Under KKRDB Macro For the year 2023-24
descriptionConstruction of Compound Wall (Balance), Landscaping & Slab Impermo to Regional Sub Science Center in Chittapur Town, Dist. Kalaburagi. Under KKRDB Macro For the year 2023-24
categoryWORKS
categoryTextWorks
ecv32614007.94
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1690
locationNamePWD Division Office Sedam
provisionalAmount38500000.0
groupOverheadTotal0.0
fileNumberPWD/SD/CHIT/KKRDB/2023-24/3
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17102415290001NoneNoneBuildingsConstruction of Compound Wall (Balance), Landscaping & Slab Impermo to Regional Sub Science Center in Chittapur Town, Dist. Kalaburagi. Under KKRDB Macro For the year 2023-2417424704.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3006851100311NoneVol-I I No. 1.5.1 Page No. 6Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depthCum313.95313.95700.61FalseNoneNoneFalseNoneFalse219956.50950
3006852100311NoneVol-I I No. 2.1.4 Page No. 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.8574.41FalseNoneNoneFalseNoneFalse485737.31850
3006853100311NoneVol-I I No. 2.2.1 Page No. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6601.356601.3589.86FalseNoneNoneFalseNoneFalse593197.3110
3006854100311NoneVol-I S R Sl No. 1 a Page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for Foundation upto Plinth Isolated add 8%Cum528.11528.1143.82FalseNoneNoneFalseNoneFalse23141.78020
3006855100311NoneVol-I S R Sl no. 9 Page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) add 70%Cum4620.944620.9414.05FalseNoneNoneFalseNoneFalse64924.2070
3006856100311NoneVol-I Sr Sl No. 2 Page No. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for Plinth Beams of Buildings add 50%Cum3300.673300.6731.99FalseNoneNoneFalseNoneFalse105588.43330
3006857100311NoneVol-I I No. 2.5.1 Page No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6961.56961.522.59FalseNoneNoneFalseNoneFalse157260.2850
3006858100311NoneVol-I S R Sl No. 9 Page no. 111Addendum I-Percentage Additionalities for Formwork, Centering & Scaffolding for RCC Columns / Shaft (Slip Centering) add 70%Cum4873.054873.0522.59FalseNoneNoneFalseNoneFalse110082.19950
3006859100311NoneVol-II I No. 5.1.1 Page No. 9Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5891.555891.55267.35FalseNoneNoneFalseNoneFalse1575105.89250
3006860100311NoneVol-II I No. 5.4 Page No. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6708.456708.4580.2FalseNoneNoneFalseNoneFalse538017.690
3006861100311NoneVol-II I No. 6.8 Page No. 14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8367.458367.45272.1FalseNoneNoneFalseNoneFalse2276783.1450
3006862100311NoneVol-II I No. 8.8 Page No. 42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm389.55389.553167.67FalseNoneNoneFalseNoneFalse1233965.84850
3006863100311NoneVol-II I no. 11.25.2 page No. 84Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-ChargeKg142.8142.821775.87FalseNoneNoneFalseNoneFalse3109594.2360
3006864100311NoneVol-II I No. 8.34.3 Page No. 47Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm52.552.5117.94FalseNoneNoneFalseNoneFalse6191.850
3006865100311NoneVol-II I No. 8.33.3 Page No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm145.95145.9514.26FalseNoneNoneFalseNoneFalse2081.2470
3006866100311NoneVol-II I No. 8.31 Page No. 46Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm186.9186.93167.67FalseNoneNoneFalseNoneFalse592037.5230
3006867100311NoneVol-I I no. 2.11 a Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.t93929.8593929.859.79FalseNoneNoneFalseNoneFalse919573.23150
3006868100311NoneVol-II I No. 19.30 Page No. 190Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.Sqm150.15150.151850.0FalseNoneNoneFalseNoneFalse277777.50
3006869100311NoneVol-II I No. 15.29 Page No. 157Providing waterproof treatment to Raft Slab using 2 coats of acrylic co polymer elastomeric Acrylic co-polymer elastomeric sealer & protector. The surface shall be prepared free of tar, dust, fungus, loose particles etc., The surface shall be applied with basecoat of healer sealer crystallization liquid and then Acrylic co-polymer elastomeric sealer & protector, wetting agent and liquid (1:1:6) over the prepared surface. In addition, making haunch at junction of Wall and Slab visible cracks are opened and sealed with flexicrack paste. Over this one coat of flexible cementations membrane (FCM), Spreading one layer of HDPE membrane as reinforcing material (over FCM) with one primer coat of Acrylic co-polymer elastomeric sealer & protector & applying second coat of Acrylic co-polymer elastomeric sealer & protector liquid over the primer coat - conforming to ASTM C 1202, DIN 1048 part 5, The work shall be carried out as per the directions of the Engineer in charge.Sqm1102.51102.51850.0FalseNoneNoneFalseNoneFalse2039625.00
3006870100311NoneVol-II I No. 8.31 Page No. 46Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm186.9186.91669.93FalseNoneNoneFalseNoneFalse312109.9170
3006871100311NoneVol-II I No. 8.39 Page No. 48Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm133.35133.354884.21FalseNoneNoneFalseNoneFalse651309.40350
3006872100311NoneVol-5 I No. 10.1.7 Page No. 113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3m431.55431.55200.0FalseNoneNoneFalseNoneFalse86310.00
3006873100311NoneVol-I I No. 1.13 Page No. 7Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/ Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work In Ordinary/Soft rock upto 300 mm depthCum380.1380.15378.41FalseNoneNoneFalseNoneFalse2044333.6410
17102415290000NoneNoneBuildingsLAWN DEVELEOPMENT AND PLANTATION6557166.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3006874100312NoneMexican Grass ITM.NO 12.10 I-C TRUF pag no.49-50SCRAPPINGANDREMOVINGTOPSOIL: Scrappingtheareabyremoving0.15msoilandremovingofunwantedplants,grassalongwithroots.25kminitialtransport,including lead, lift loading and unloading charges. (1x1x0.15mt) 1STDIGGING:Diggingoftheareafordevelopinglawnincludingremovingweeds,debris if any and breaking of clumps, watering etc. (1x1x0.45mt) 2NDDIGGING:Diggingofsoilbyremovinggrassetcifanyandlevellingofthesoiletc . (1x1x0.45mt) procurement of quality red earth/soil and heap around pit (1x1x0.15mt) Supplyofinputssuchassand,FYM,Redearthin1:3:6ratio.mixingandspreadingthe mixture to 7.50cm thickness wherever required Red soil 0.0075m3 Farm Yard manure 0.0225m3 Sand 0.045m3 Supply of Fertiliser 1m2 Super Phosphate 50 gram Neem oilcake 250gram Bone meal 250gram Potash 50gram Furadan 25gram Ammonium Sulphate 100gram Chlorophyriphos 0.05 mili ltr Procurement of quality lawn grassSqm614.25614.259909.94FalseNoneNoneFalseNoneFalse6087180.6450
3006875100312NoneItem no.12.1 Page No. 48clearing of land by cutting of thick and sparse growth plants(0.25 mt thickness plants and clearing of bushes along with roots( throwing away to 1.5mtr height and 50 mtr far) Normal soilSqm7.097.094954.96FalseNoneNoneFalseNoneFalse35130.66640
3006876100312Noneitem no.12.3 Page No.48Diggingpitsofsize0.45x0.45x0.45mfilling50%ofthepitwithtopsoilandremaining50%ofpitwith1:2:3proportionofsand(0.007),FYM(0.014cm)redearth(0.021cm) and and planting of well grown tree saplings (excluding cost of plants) Normal soilNo71.471.4250.0FalseNoneNoneFalseNoneFalse17850.00
3006877100312Noneitem no.12.4 Page No.48Diggingpitsofsize0.45x0.45x0.45mfilling50%ofthepitwithtopsoilandremaining50%ofpitwith1:2:3proportionofsand(0.007),FYM(0.014cm)redearth(0.021cm) and planting of well grown (excluding cost of plantsNo71.471.4200.0FalseNoneNoneFalseNoneFalse14280.00
3006878100312NoneAs per market rateCost of Shrubs As per the choise of Engineer incharge and consultantsNo25.025.0250.0FalseNoneNoneFalseNoneFalse6250.00
3006879100312NoneAs per market rateCost of Creepers As per the choise of Engineer incharge and consultantsNo10.010.0200.0FalseNoneNoneFalseNoneFalse2000.00
3006880100312Noneitem no.12.5 Page No.48Planting of Ground cover plants Diggingof1.0mx1.0mx0.45mareaandfilling50%oftheareawithtopsoilandremaining50%areawith1:2:3proportionofsand(0.0375cum),FYM(0.075cum)redearth(0.0112cum)andplantingofwellgrownsaplings/plants(excludingcostof plants) Normal soilNo332.85332.8550.0FalseNoneNoneFalseNoneFalse16642.50
3006881100312NoneAs per market rateCost of Ground cover Plants As per the choise of Engineer incharge and consultantsNo10.010.050.0FalseNoneNoneFalseNoneFalse500.00
3006882100312Noneitem no.12.7 Page No.48 (a)Growing of Flower beds Diggingof1.0mx1.0mx0.45mareaandfilling50%oftheareawithtopsoilandremaining50%areawith1:2:3proportionofsand(0.0375cum),FYM(0.075cum)redearth(0.0112cum)andplantingofwellgrownsaplings/plants(excludingcost of plants) Normal soilNo332.85332.85743.0FalseNoneNoneFalseNoneFalse247307.550
3006883100312NoneAs per market rateCost of Flower beds Plants As per the choise of Engineer incharge and consultantsNo35.035.0743.0FalseNoneNoneFalseNoneFalse26005.00
3006884100312NoneI No. 12.9 Page No. 49Growing of Hedges Diggingtrenchofsize1mx0.30mx0.45mandfilling50%ofthetrenchwithtopsoil andremaining50%trenchwith1:2:3proportionofsand(0.0112),FYM(0.0224cum) redearth (0.0336cum)andplantingofwellgrownplants(excluding cost of plants)Rmtr105.0105.0743.0FalseNoneNoneFalseNoneFalse78015.00
3006885100312NoneAs per market rateCost of Hedges As per the choise of Engineer incharge and consultantsNo35.035.0743.0FalseNoneNoneFalseNoneFalse26005.00
17102415290000NoneNoneBuildingsPATHWAY AREA6666409.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3006886100313NoneVol-I I no. 1.5.1 Page No. 6Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depthCum313.95313.95440.0FalseNoneNoneFalseNoneFalse138138.00
3006887100313NoneVol-I I No. 1.8 Page No. 7Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.77542.62FalseNoneNoneFalseNoneFalse3753961.9740
3006888100313NoneVol-III I No. 6.8.1 Page No. 51Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification)Sqm1121.41121.42200.0FalseNoneNoneFalseNoneFalse2467080.00
3006889100313NoneVol-III I No. 8.42.6 Page No. 74Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 100 mm sizem279.3279.31100.0FalseNoneNoneFalseNoneFalse307230.00
17102415290000NoneNoneBuildingsPRE CAST BENCHES359970.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3006890100314NoneGEM RatePrecast RCC benches PARTH FIBROTECH Labels bearing Type of material and Brand name / Manufacturer's name Precast Concrete Reinforced Bench Seat / plank length + or - 3 mm 1500 mm Seat height + or - 3 mm 450 mm Seat width + or - 3 mm 440 mm Total bench height ( including backrest ) + or - 3 mm 1000 mm Size of wider plank + or - 3 mm 1500 mm X 200 mm X 50 mm Size of smaller plank + or - 3 mm 1500 mm X 100 mm X 50 mm Plank hole dia + or - 3 mm 14 mm Connecting holes from each end + or - 3 mm 200 mm Leg width + or - 3 mm 140 mm Distance between both legs + or - 3 mm 340 mm Product id: 5116877-28742379527Each11999.011999.030.0FalseNoneNoneFalseNoneFalse359970.00
17102415290000NoneNoneBuildingsSolar Street Lights1605757.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3006891100315NoneVol-I I no. 1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.15.01FalseNoneNoneFalseNoneFalse536.5710
3006892100315NoneVol-I I No. 2.11 b Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Foundations of Bridgest90516.390516.31.48FalseNoneNoneFalseNoneFalse133964.1240
3006893100315NoneVol-I I No. 2.1.5 page No. 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregatesCum6463.86463.80.67FalseNoneNoneFalseNoneFalse4330.7460
3006894100315NoneVol-I I no. 2.2.1 page no. 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6601.356601.351.78FalseNoneNoneFalseNoneFalse11750.4030
3006895100315NoneVol-6 I No. 32.08 Page No. 131.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 25 Sqmm, 4 Core, (13 GI Strips - 4 x 0.8 mm)Km179844.0179844.00.85FalseNoneNoneFalseNoneFalse152867.40
3006896100315NoneVol-6 I no. 32.05 Page No. 131.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm)Km141842.0141842.00.7FalseNoneNoneFalseNoneFalse99289.40
3006897100315NoneVol-6 I no. 21.05 Page No. 52Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 SqmmKm20886.020886.01.05FalseNoneNoneFalseNoneFalse21930.30
3006898100315NoneVol-6 I No. 29.03 Page No. 63Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. In Hard SoilCum389.0389.0265.5FalseNoneNoneFalseNoneFalse103279.50
3006899100315NoneVol-6 I No. 29.07 page No. 63Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 MtrCum58.058.0260.0FalseNoneNoneFalseNoneFalse15080.00
3006900100315None2014-15 PWD KLB Ele SR I No. 7.20.2 Page No. 63Supply and laying double walled corrugated (DWC) HDPE Pipe including all necessary connecting Sockets/Couplings/Tees/Bends/End-caps of same materials in existing trench as per IS 14930 part -II suitable for drawing underground cables. 50mm OD / 38mm IDm151.0151.0700.0FalseNoneNoneFalseNoneFalse105700.00
3006901100315NoneVol-6 I No. 4.2.4 Page No. 11Fabricating, supplying and erection of .ms long hot dip Galvanized Octagonal hot dip Pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/s for .m Pole in single section and single joint welded as per IS 9595/IS10178AWS having dimensions bottom . mm , top. mm with 3 mm thick, suitable base plate and 4Nos of . long J bolts along with template and the Pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended.6 m Top 70 mm and Bottom 130 mm dia Each11800.011800.035.0FalseNoneNoneFalseNoneFalse413000.00
3006902100315NoneVol-6 I No. 4.6.2 page No. 12Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Single Arm Bracket with 1500 mm Standard 40/50 mm diaEach2100.02100.035.0FalseNoneNoneFalseNoneFalse73500.00
3006903100315NoneVol-6 I No. 11.8.4 Page no. 46Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiencygreater than1301m/w, nominal CRI greater than75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. LED Streetlight 90 WEach8860.08860.035.0FalseNoneNoneFalseNoneFalse310100.00
3006904100315NoneVol-6 I No. 2.5.7 Page No. 6Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990 2C x 2.5 mm2m82.082.0275.0FalseNoneNoneFalseNoneFalse22550.00
3006905100315NoneVol-6 I No. 5.44.4 Page No. 21Supply and Installation / Fixing / Provision of Outdoor type Thermoplastic Modular Panel enclosure with transparent Polycarbonate Lid, shock proof, IP65 (Weather Proof), rust proof, dust proof, water proof, corrosion proof having internally Embedded gasket on both lid and flap suitable to fix Single Phase / Three Phase Energy Meter in suitable base plate and having a provision for Fuse / MCB cut-out with suitable transparent hinged flap opening for operating MCB along with complete tamper proof SEALING facility. 600 mm x 600 mm x 170 mmEach14520.014520.03.0FalseNoneNoneFalseNoneFalse43560.00
3006906100315NoneVol-6 I No. 5.14.5 Page No. 16Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 65 AEach10141.010141.02.0FalseNoneNoneFalseNoneFalse20282.00
3006907100315NoneVol-6 I No. 5.15.9 Page No. 17Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuitwith adjustable thermal magnetic release, Micro processor release shall have Earth Fault as per IS/IEC 60947-2 . (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. FOUR Pole 100 A 25 kAEach8487.08487.01.0FalseNoneNoneFalseNoneFalse8487.00
3006908100315NoneVol-6 I No. 5.29 Page No. 19Supplying, fixing and wiring 3 Phase Digital Ammeter / VoltmeterEach1425.01425.03.0FalseNoneNoneFalseNoneFalse4275.00
3006909100315NoneVol-6 I No. 5.38 Page No. 19Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C.Each515.0515.09.0FalseNoneNoneFalseNoneFalse4635.00
3006910100315NoneVol-6 I No. 5.48 Page No. 21Supplying and fixing Microprocessor Based Astronomical timer Switch with using necessary bolts, nuts and washersEach4843.04843.02.0FalseNoneNoneFalseNoneFalse9686.00
3006911100315NoneVol-6 I No. 5.7.3 Page No. 14Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers 63 AEach401.0401.09.0FalseNoneNoneFalseNoneFalse3609.00
3006912100315NoneVol-6 I No. 12.56 Page No. 54Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm diaNo3510.03510.03.0FalseNoneNoneFalseNoneFalse10530.00
3006913100315NoneVol-6 I No. 5.18.1 Page No. 17Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SPEach415.0415.035.0FalseNoneNoneFalseNoneFalse14525.00
3006914100315None6.18.2Supplying & fixing GI wire (10 CWG GI wire)m15.015.0950.0FalseNoneNoneFalseNoneFalse14250.00
3006915100315None2021-22 S R I No. 64.02 BESCOM Part-IIISupplying & fixing Aluminium Terminals Lugs-16 sqmmNo3.03.030.0FalseNoneNoneFalseNoneFalse90.00
3006916100315NoneVol-6 I No. 5.41.2 Page No. 20Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 50 x 50 x 6 mmm395.0395.010.0FalseNoneNoneFalseNoneFalse3950.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17102415310000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17102415310000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17102415310001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of kppp portal on or before the last date and time of bid submission.None
17102415650000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17102415710000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17102415860000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17102416100000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17102416390000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17102416470000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the Bid. The Original Certificate/Certificates shall be produced at the time of opening of technical Bids for physical verification.None
17102416590000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year(both days inclusive).None
17102416700000NoneNoneELIGIBILITYThe Tenderer shall scan the Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machinery and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17102416790000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the BidderNone
17102416870000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reason.None
17102416930000NoneNoneELIGIBILITYThe defect liability period for this work is 365 daysNone
17102416990000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kppp portal.None
17102417060000NoneNoneELIGIBILITYThe rates of all the items appeared in Bill of Quantities are inclusive of all leads and liftsNone
17102417150000NoneNoneELIGIBILITYThe contractor shall bound to comply the prevailing rules and regulations with regard to the EPF rules and any modifications before and after execution of agreementNone
17102417220000NoneNoneELIGIBILITYAfter the award of the contract, the contractor has to furnish the details in respect of labour employed and the EPF details for this work in every RA bill.None
17102417290000NoneNoneELIGIBILITYBidders are advised to note that , 18% GST will be added to the contract amount.None
17102417350000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification Criteria mentioned in the next section.None
17102417430000NoneNoneELIGIBILITYThe bidder should mention the UDIN No on the turnover certificate, failing which bid is rejected.None
17102417490000NoneNoneELIGIBILITYf the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.None
17102417610000NoneNoneELIGIBILITYThe work should be completed in 11 (Eleven) Months ( including monsoon)None
17102417670000NoneNoneELIGIBILITYThe star rates inrespect of specified materials ( Cement, Steel and Bitumen) shall be payable as per CIRCULAR NO.PWD 159 CRM 2009 Bangalore Dated 30.09.2010None
17102417750000NoneNoneELIGIBILITYIn respect of work costing more than Rs. 1.00 crore, the contractor shall establish field laboratory at his cost with requisite equipment or as stipulated in the Agreement.None
17102418360000NoneNoneELIGIBILITYThe Tenderer shall furnish, as part of his tender, earnest money deposit in the amount as shown in column 4 of the Table of the IFT for this particular work.The Earnest Money Deposit Rs 4,89,500.00 Through e-payment OR it shall be in two parts. Part 1 Rs. 1,00,000 by epayment. Part 2 Rs 3,89,500 EMD shall be in favour of Executive Engineer PWD Division, Sedam , and may be in the form of Bankers Cheque/ Demand Draft/ Pay Order in favour of Executive Engineer, PWD Division, Sedam, payable at Sedam or cash orSpecified Small Savings Instruments pledged to the Executive Engineer, PWD Department, Sedam Division, Sedam or Bank Guarantee in the prescribed format obtained from any Nationalised/ Scheduled bank. The Part(2) of the EMD shall be delivered to the Executive Engineer before the prescribed date and time of opening of the technical Bids. Scanned Original of the The Part 2 of the EMD shall be uploaded alongwith the technical BidNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMaximum of Civil Engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. (Financial turn over of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter Head of the Tenderer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 b) Satisfactorily completed, as prime contractor, at least one similar work such as Building Work of value not less than Rs. 163.07 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20 2020-21, 2021-22 & 2022-23 c) Executed in any one year, the following minimum quantities of work: 1) Earth wrok/Emb/Subgrade 11465.75 Cum, 2) PCC/RCC- 151.448 Cum 3) Stone masonry/ Brick masonry 281.84 Cum, 4) Plastering- 253.00 Sqm 5) TMT FE 550 / 550D Steel Reinforcement- 9.02 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonea) Excavator JCB/Hitachi 1 Nos own or Lease b) Conerete Batch Mix Plant or Rotavator of suitable specification 1 Nos own or Lease c) Transit mixers 1 No. Own or Lease or Hire, d) Shuttering Materials - 2000 sqm 1000 Sqm.own and 1000 Sqm. Lease or Hire. e) Tippers 4Nos. 2 Nos.own and 2 Nos. Lease or Hire. f) Water Tanker 2Nos LeaseCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and scanned copies of the owership Documents & Hire commitment Agreements
NoneNoneNoneNoneQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Biodata of the personnel
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 652.28 lakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of no less than Rs. 88.95 lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etcFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReport on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneLatest Income Tax Clearance CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountOthersBid Capacity
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessement on the Letter Head of the Tenderer
NoneNoneNoneNoneConstitutional or Legal Status of the TendererOthersPWD Registration Certificate (Class I/II/III/IV)
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.Othersformat
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation on works which are yet to be completedOthersformat
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5 and Certificates in Format-3
NoneNoneNoneNoneThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.OthersCPM/PERT Chart
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- CPM/PERT Chart
NoneNoneNoneNoneValue at 2023-24 price level, of existing commitments and on-going works to be executed during the next 06 months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24), (Monthwise commitment shall be furnished).Othersformat
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter head of the tenderer
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted Tender.Othersformat
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2018-19 to 2022-23 Must be with the UDIN No Other Wise Turnover is not ConsideredTrueTechnical Bid
Similar nature of work done 50percent of APTTrueTechnical Bid
Line of CreditTrueTechnical Bid
Machinery DocumentsTrueTechnical Bid
Minimum quantities executedTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710327497000
version0
createdDateNone
modifiedDateNone
blockNumberPWD DIVISION OFFICE SEDAM
streetNone
citySEDAM
stateKarnataka
pin585222
tenderRecallDTONone