createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710314880839
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1300.00
emd52000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-03-2024 17:00:00
tenderQueryClose18-03-2024 12:00:00
technicalBidOpen22-03-2024 17:30:00
publishedDate13-03-2024 16:55:55
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate16-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee27000.00
emdCash25000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710314880872
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9476
titleConstruction of Three Class Rooms,Head master room, Digital Library, Dining hall and providing furnitures & other facilities to Government Higher Primary School at Susheelanagara village in Sandur taluk, Ballari district under 2515 KKRDB (Macro Projects) for the year 2023-24 (Reserved for ST Category)
descriptionConstruction of Three Class Rooms,Head master room, Digital Library, Dining hall and providing furnitures & other facilities to Government Higher Primary School at Susheelanagara village in Sandur taluk, Ballari district under 2515 KKRDB (Macro Projects) for the year 2023-24 (Reserved for ST Category)
categoryWORKS
categoryTextWorks
ecv5197695.04
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount6195000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SANDUR/KKRDB/2023-24/SUSHEELANAGARA
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103148810000NoneNoneBuildingsGROUND FLOOR2925464.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3032116102173NoneCSR 2023-24 Vol-1, Pg No 5, Sl.no- 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.7518.3FalseNoneNoneFalseNoneFalse1825.4250
3032117102173NoneCSR 2023-2024 Vol-2 Sl No. 4.1 P.No-5Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm123.9123.9121.99FalseNoneNoneFalseNoneFalse15114.5610
3032118102173NoneCSR 2023-2024 Vol-1 Sl No 1.14.1 P.No-8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m Note: Cost of De-watering upto 5 % of (A+B) may be added, where required assessment for dewatering shall be made as per site condition In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1171.14FalseNoneNoneFalseNoneFalse18329.0940
3032119102173NoneCSR 2023-24 Volume-1 Item Code-2.1.2 P.no 15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8(M10) Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5947.25947.231.35FalseNoneNoneFalseNoneFalse186444.720
3032120102173NoneCSR 2023-24 Volume-2 sl.no-5.4 P.no 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6708.456708.4514.47FalseNoneNoneFalseNoneFalse97071.27150
3032121102173NoneCSR 2023-2024 Vol-1 Sl No. 1.9 P.No-7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.3118.85FalseNoneNoneFalseNoneFalse33194.8050
3032122102173NoneCSR 2023-24 Volume-I Sl.no-1.8 P.No-7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7100.68FalseNoneNoneFalseNoneFalse50108.4360
3032123102173NoneCSR 2023-24 Volume-I Sl.no-2.2.3Footing:-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.819.81FalseNoneNoneFalseNoneFalse131791.9680
3032124102173NoneCorrigendum GF1Additionalities for Formwork, Centering & Scaffolding 8% for footings. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum532.22532.2219.81FalseNoneNoneFalseNoneFalse10543.27820
3032125102173NoneCSR 2023-24 Vol-I Sl.no 2.2.3Columns-Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.82.92FalseNoneNoneFalseNoneFalse19426.1760
3032126102173NoneCorrigendum GF2Additionalities for Formwork, Centering & Scaffolding 70% for Columns. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4656.964656.962.92FalseNoneNoneFalseNoneFalse13598.32320
3032127102173NoneCSR 2023-24 Volume-I Sl.no-2.3.2Plinth Beam-Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregate ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6804.06804.013.96FalseNoneNoneFalseNoneFalse94983.840
3032128102173NoneCorrigendum GF3Additionalities for Formwork, Centering & Scaffolding 20% for Beam ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3402.03402.01.5FalseNoneNoneFalseNoneFalse5103.00
3032129102173NoneCorrigendum GF4Additionalities for Formwork, Centering & Scaffolding 10% for Earth Retaining Structure CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum680.4680.412.46FalseNoneNoneFalseNoneFalse8477.7840
3032130102173NoneCSR 2023-24 Volume-I Sl.no-2.5.2Columns Above Plinth-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.154.67FalseNoneNoneFalseNoneFalse33554.65050
3032131102173NoneCorrigendum GF4Additionalities for Formwork, Centering & Scaffolding 70% for Columns. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5029.615029.614.68FalseNoneNoneFalseNoneFalse23538.57480
3032132102173NoneCSR 2023-24 Vol-1 Sl.no-2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1525.56FalseNoneNoneFalseNoneFalse183652.4340
3032133102173NoneCorrigendum GF5Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4311.094311.097.02FalseNoneNoneFalseNoneFalse30263.85180
3032134102173NoneCorrigendum GF6Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3592.573592.5718.54FalseNoneNoneFalseNoneFalse66606.24780
3032135102173NoneCSR 2023-24 Vol-1 Sl.no-2.5.1 P.No-16Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6961.56961.50.72FalseNoneNoneFalseNoneFalse5012.280
3032136102173NoneCorrigendum GF7Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3132.683132.680.72FalseNoneNoneFalseNoneFalse2255.52960
3032137102173NoneCSR 2023-2024 Vol-1 Sl No. 2.1.4 P.No-15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6527.856527.850.88FalseNoneNoneFalseNoneFalse5744.5080
3032138102173NoneCorrigendum GF8Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel. CSR 2023-24 Addendum I P.No 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3916.713916.710.88FalseNoneNoneFalseNoneFalse3446.70480
3032139102173NoneCSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18,Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs93929.8593929.856.7FalseNoneNoneFalseNoneFalse629329.9950
3032140102173NoneCSR 2023-2024 Vol-2 Sl No. 6.8 P.No-14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8367.458367.4529.79FalseNoneNoneFalseNoneFalse249266.33550
3032141102173NoneCSR 2023-24 Vol 2 Sl.no-12.13.1, Pg.no: 100Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum103755.75103755.750.12FalseNoneNoneFalseNoneFalse12450.690
3032142102173NoneCSR 2023-24 Volume-2 Sl.no-12.51, Pg.no: 104Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1066.81066.82.0FalseNoneNoneFalseNoneFalse2133.60
3032143102173NoneCSR 2023-24 Volume-II Sl.no-12.57.5 P.No 105Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 35 mm thick one side teak and one side commercial ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4091.854091.855.76FalseNoneNoneFalseNoneFalse23569.0560
3032144102173NoneCSR 2023-24 Volume-II Sl.no-11.3 P.No 77Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm8689.88689.87.2FalseNoneNoneFalseNoneFalse62566.560
3032145102173NoneCSR 2023-24 Vol-2 Sl.no-12.86 P.No 109Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixturesand separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5659.55659.518.9FalseNoneNoneFalseNoneFalse106964.550
3032146102173NoneCSR 2023-24 Vol-2 Sl.no-12.85, P.No 109Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6004.956004.951.44FalseNoneNoneFalseNoneFalse8647.1280
3032147102173NoneCSR 2023-2024 Vol-2 Sl No.11.34A P.No.86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs176.4176.4747.18FalseNoneNoneFalseNoneFalse131802.5520
3032148102173NoneCSR 2023-24 Vol-2 Sl.no-8.1.2 P.No 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm253.05253.05220.57FalseNoneNoneFalseNoneFalse55815.23850
3032149102173NoneCSR 2023-2024 Vol-2 Sl No.8.8 P.No.42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm389.55389.55208.98FalseNoneNoneFalseNoneFalse81408.1590
3032150102173NoneCSR 2023-24 Vol-2 Sl.no-8.51 p.no 50Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm105.0105.0321.66FalseNoneNoneFalseNoneFalse33774.30
3032151102173None2018 19 PWP IWTD Ballari circle DSR Item No. 4.21KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6518.0FalseNoneNoneFalseNoneFalse623.70
3032152102173NoneCSR 2023-2024 Vol-2 Sl No.8.25 P.No 45Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm143.85143.85321.67FalseNoneNoneFalseNoneFalse46272.22950
3032153102173NoneCSR 2023-2024 Vol-2 Sl No.8.28 P.No 45Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar dropsb and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm93.4593.45172.92FalseNoneNoneFalseNoneFalse16159.3740
3032154102173NoneCSR 2023-2024 Vol-2 Sl No.8.29 P.No.45Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm297.15297.1536.06FalseNoneNoneFalseNoneFalse10715.2290
3032155102173NoneCSR 2023-2024 (Vol-2) Sl No.8.34.1 P.No.47Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm55.6555.6513.82FalseNoneNoneFalseNoneFalse769.0830
3032156102173NoneCSR rate 2023-24 Vol-2 Sl.no 8.40Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm144.9144.913.82FalseNoneNoneFalseNoneFalse2002.5180
3032157102173NoneCSR rate 2023-24 Vol-2 Sl.no 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm120.75120.7535.58FalseNoneNoneFalseNoneFalse4296.2850
3032158102173NoneCSR 2023-2024 Vol-2 Sl No.9.24 P.No.63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2994.62994.620.16FalseNoneNoneFalseNoneFalse60371.1360
3032159102173NoneCSR 2023-2024 Vol-2 Sl No.10.2 P.No.69Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr344.4344.428.8FalseNoneNoneFalseNoneFalse9918.720
3032160102173NoneCSR 2023-2024 Vol-2 Sl No.9.23 P.No 64Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2589.32589.3109.37FalseNoneNoneFalseNoneFalse283191.7410
3032161102173NoneCSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs144.9144.9324.0FalseNoneNoneFalseNoneFalse46947.60
3032162102173NoneCSR 2023-2024 Vol-2 Sl No 12.73.1 P.No 107Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.25.0FalseNoneNoneFalseNoneFalse231.00
3032163102173NoneCSR 2023-2024 Vol-2 Sl No 12.74.1 P.No 107Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.110.0FalseNoneNoneFalseNoneFalse1071.00
3032164102173NoneCSR 2023-2024 Vol-2 Sl No 12.72 P.No 107Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.13.0FalseNoneNoneFalseNoneFalse258.30
3032165102173NoneCSR 2023-2024 Vol-2 Sl No 12.63 P.No 105Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each136.5136.55.0FalseNoneNoneFalseNoneFalse682.50
3032166102173NoneCorrigendum 110220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.02.0FalseNoneNoneFalseNoneFalse1266.00
3032167102173NoneCSR 2023-2024 Vol-2 Sl No 8.84 P.No 55Providing wall black board in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc complete . ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm498.75498.755.76FalseNoneNoneFalseNoneFalse2872.80
17103148810000NoneNoneBuildingsFIRST FLOOR1514481.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3032168102174NoneCSR 2023-24 Volume-I Iteam Code-2.5.2Columns--Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.04.44FalseNoneNoneFalseNoneFalse32221.080
3032169102174None2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 70% for Columns CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5079.95079.94.44FalseNoneNoneFalseNoneFalse22554.7560
3032170102174NoneCSR 2023-24 Volume-I Iteam Code-2.5.2Beam,Lintel & Roof-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately))-M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7257.07257.016.14FalseNoneNoneFalseNoneFalse117127.980
3032171102174NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 60% for Beam & Lintel CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum4354.24354.23.93FalseNoneNoneFalseNoneFalse17112.0060
3032172102174NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 50 % for Roof slab & Staircase CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3628.53628.512.21FalseNoneNoneFalseNoneFalse44303.9850
3032173102174NoneCSR 2023-24 Volume-I Sl.no 2.5.1Chejjas-Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) -M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7031.127031.120.43FalseNoneNoneFalseNoneFalse3023.38160
3032174102174NoneCSR 2023-24 Addendum I P no 111Additionalities for Formwork, Centering & Scaffolding 45% for Chejjas CSR 2023-24 Addendum I P no 111 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3164.03164.00.43FalseNoneNoneFalseNoneFalse1360.520
3032175102174NoneCSR 2023-2024 (Vol-1) Sl No. 2.1.4 P.No-15Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6593.136593.130.64FalseNoneNoneFalseNoneFalse4219.60320
3032176102174NoneCSR 2023-2024 Vol-2 Sl No. 2.11 P.No-18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne94869.1494869.142.77FalseNoneNoneFalseNoneFalse262787.51780
3032177102174NoneCSR 2023-2024 (Vol-2) Sl No. 6.8 P.No-14Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8451.128451.1237.91FalseNoneNoneFalseNoneFalse320381.95920
3032178102174NoneCSR 2023-24 Volume-II Iteam Code-6.12Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm1063.681063.6832.78FalseNoneNoneFalseNoneFalse34867.43040
3032179102174NoneCSR 2023-2024 (Vol-2) Sl No. 12.51Providing Salwood frames of doors, windows, clerestory windows,ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum104793.31104793.310.06FalseNoneNoneFalseNoneFalse6287.59860
3032180102174NoneCSR 2023-24 Volume-II Sl.no-12.57.5 p no 105Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1077.471077.471.0FalseNoneNoneFalseNoneFalse1077.470
3032181102174NoneCSR 2023-24 Vol-2 Sl.no-12.86 p no 109Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.35 mm thick one side teak and one side commercial ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4132.774132.772.88FalseNoneNoneFalseNoneFalse11902.37760
3032182102174NoneCSR 2023-24 Vol-2 Sl.no-12.86 p no 109Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock.Wall thickness of frame & sash shall be of 1.8+-0.2 mm. Maximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm5716.095716.098.1FalseNoneNoneFalseNoneFalse46300.3290
3032183102174NoneCSR 2023-2024 Vol-2 Sl No.11.34A P.No.85Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs178.16178.16214.2FalseNoneNoneFalseNoneFalse38161.8720
3032184102174NoneCSR 2023-24 Volume-2 Sl.no-8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm255.58255.58200.3FalseNoneNoneFalseNoneFalse51192.6740
3032185102174NoneCSR 2023-23 Volume-2 Sl.no -8.3.2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm353.15353.15245.21FalseNoneNoneFalseNoneFalse86595.91150
3032186102174NoneCSR 2023-2024 Vol-2 Sl No.8.51 P.No.41Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm106.05106.05254.05FalseNoneNoneFalseNoneFalse26942.00250
3032187102174None2018-19 PWP&IWTD Ballari circle DSR Item No. 4.21 KSRB 4-2.12 ; Extra for providing throating or drip moulding to RCC chajja with plastering (labour charges only ) as per specification. Specification No. KBS ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr34.6534.6543.2FalseNoneNoneFalseNoneFalse1496.880
3032188102174NoneCSR 2023-2024 Vol-2 Sl No.8.39 P.No.48Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm134.68134.68254.05FalseNoneNoneFalseNoneFalse34215.4540
3032189102174NoneCSR 2023-2024 Vol-2 Sl No.8.29 P.No.45Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm184.53184.53202.27FalseNoneNoneFalseNoneFalse37324.88310
3032190102174NoneCSR 2023-2024 Vol-2 Sl No.8.34.1 P.No.47Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm300.12300.1242.56FalseNoneNoneFalseNoneFalse12773.10720
3032191102174NoneCSR2023-2024 (Vol-2) Sl No.8.33.2 P.No.46Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm56.2156.216.91FalseNoneNoneFalseNoneFalse388.41110
3032192102174NoneCSR2023-2024 (Vol-2) Sl No.8.33.2 P.No.46Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm146.34146.346.91FalseNoneNoneFalseNoneFalse1011.20940
3032193102174NoneCSR 2023-24 Volume-2 Sl.no -8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm121.96121.9610.2FalseNoneNoneFalseNoneFalse1243.9920
3032194102174NoneCSR 2023-2024 Vol-2 Sl No.9.24 P.No.63Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including ubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm3024.543024.5423.64FalseNoneNoneFalseNoneFalse71500.12560
3032195102174NoneCSR 2023-2024 PWD SR Vol-2 Sl No.10.2 P.No.69Providing edge moulding to 18mm thick Granite stone counters, vanitiesetc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm347.84347.8428.8FalseNoneNoneFalseNoneFalse10017.7920
3032196102174NoneCSR 2023-2024 Vol-2 Sl No.9.23 P.No 64Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm2615.192615.1937.58FalseNoneNoneFalseNoneFalse98278.84020
3032197102174NoneCSR 2023-2024 Vol-2 Sl No.11.26.1 P.No.84Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kgs146.35146.3581.0FalseNoneNoneFalseNoneFalse11854.350
3032198102174NoneCSR 2023-2024 Vol-2 Sl No.15.11 P.No.151Newly Constructed Roof/Bathroom/Toilet/balcony/utility with Cementatius Waterproof coating Below 500 m2 Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious waterproofing coating with a mix ratio of (5 Liquid :7 Powder) to the RCC surface like Roof, bathroom, toilet, balcony & utility area applied @ 2.2kg/m2 in 2 coats to achieve 1.2mm DFT, having Elongation at break 120% as per ASTM D 412, Tensile strength 1N/mm2 as per ASTM D 412, Adhesion strength 0.80N/mm2 as per ASTM D 4541, crack bridging upto 2mm as per ASTM C 836. The finished cost to include surface preparation, making coving of 50 mm X 50mm at all right angles of wall Junction with Polymer Repair Mortar and lay 45 gsm glass fibre mesh over the angle fillet when the first coat in still wet, treatment of cracks completely as per specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.76556.76113.9FalseNoneNoneFalseNoneFalse63414.9640
3032199102174NoneCSR 2023-2024 Vol-2 Sl No 12.73.1 p no 107Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete :125mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each46.246.216.0FalseNoneNoneFalseNoneFalse739.20
3032200102174NoneCSR 2023-2024 Vol-2 Sl No 12.74.1 p no 107Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete :125x64x1.90mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each107.1107.132.0FalseNoneNoneFalseNoneFalse3427.20
3032201102174NoneCSR 2023-2024 Vol-2 Sl No 12.72 p no 107Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each86.186.18.0FalseNoneNoneFalseNoneFalse688.80
3032202102174NoneCSR 2023-2024 Vol-2 Sl No 12.63 p no 105Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos136.5136.532.0FalseNoneNoneFalseNoneFalse4368.00
3032203102174NoneCorrigendum-10220 Locking arrangements ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos633.0633.08.0FalseNoneNoneFalseNoneFalse5064.00
3032204102174NoneCSR 2023-2024 Vol-2 Sl No 8.84 p no 55Providing wall black boards in CM 1:3 with two coats of black paint including finishing etc., including cost of materials, labour, HOM complete as per specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm503.74503.7414.4FalseNoneNoneFalseNoneFalse7253.8560
3032205102174NoneCSR 2023-2024 Vol-2 Sl No.8.49 P.No.49Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.cm4.24.25000.0FalseNoneNoneFalseNoneFalse21000.00
17103148810000NoneNoneBuildingsElectrification work288528.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3032206102175NonePWD Ele SR (6)-1.2.1PVC Conduit Pipes Supplying heavy gauge PVC conduit pipe ……mm dia .......mm thick confirming to IS 2509 with suitable size bends,metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr66.066.0380.0FalseNoneNoneFalseNoneFalse25080.00
3032207102175NonePWD Ele SR (6)-1.2.225mm dia 2mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr78.078.0120.0FalseNoneNoneFalseNoneFalse9360.00
3032208102175NonePWD Ele SR (6)-1.2.332mm dia 2.5mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr103.0103.020.0FalseNoneNoneFalseNoneFalse2060.00
3032209102175NonePWD Ele SR (6)-1.2.440 mm dia 2.5 mm thick ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr147.0147.012.0FalseNoneNoneFalseNoneFalse1764.00
3032210102175NonePWD Ele SR (6)- 1.4.1Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 75x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each106.0106.02.0FalseNoneNoneFalseNoneFalse212.00
3032211102175NonePWD Ele SR (6)- 1.4.2100x75x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each118.0118.08.0FalseNoneNoneFalseNoneFalse944.00
3032212102175NonePWD Ele SR (6)- 1.4.3135 x 75 x 65 mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each139.0139.04.0FalseNoneNoneFalseNoneFalse556.00
3032213102175NonePWD Ele SR (6)- 1.4.4180X90X65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
3032214102175NonePWD Ele SR (6)- 1.4.5200x90x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each179.0179.08.0FalseNoneNoneFalseNoneFalse1432.00
3032215102175NonePWD Ele SR (6)- 1.4.7200x200x65mm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each348.0348.08.0FalseNoneNoneFalseNoneFalse2784.00
3032216102175NonePWD Ele SR (6)-1.2.1Supplying and fixing PVC/metal conduit Deep junction box 19/20mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each49.049.020.0FalseNoneNoneFalseNoneFalse980.00
3032217102175NonePWD Ele SR (6)-1.2.225mm Deep Junction Box ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each56.056.010.0FalseNoneNoneFalseNoneFalse560.00
3032218102175NonePWD Ele SR (6)-1.7.1Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete.upto 50mm Conduit in Brick Walls ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr29.029.0120.0FalseNoneNoneFalseNoneFalse3480.00
3032219102175NonePWD Ele SR (6)- 1.13Supplying And Fixing Metal Fan Box with Round Hook. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos117.0117.012.0FalseNoneNoneFalseNoneFalse1404.00
3032220102175NonePWD Ele SR (6)-2.2.1Point wiring A Short piont up to 3 Mtr from tapping piont out let via switch. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point269.0269.040.0FalseNoneNoneFalseNoneFalse10760.00
3032221102175NonePWD Ele SR (6)-2.2.2A medium point above 3m to 6 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point379.0379.012.0FalseNoneNoneFalseNoneFalse4548.00
3032222102175NonePWD Ele SR (6)-2.2.3A Short piont up to 10 Mtr from tapping piont out ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Point555.0555.016.0FalseNoneNoneFalseNoneFalse8880.00
3032223102175NonePWD Ele SR (6)- 2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr26.026.0240.0FalseNoneNoneFalseNoneFalse6240.00
3032224102175NonePWD Ele SR (6)-2.3.32.5 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr42.042.0200.0FalseNoneNoneFalseNoneFalse8400.00
3032225102175NonePWD Ele SR (6)-2.3.44 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr63.063.020.0FalseNoneNoneFalseNoneFalse1260.00
3032226102175NonePWD Ele SR (6)-3.5.2Supplying and fixing superior quality switch mounting poly carbonate plate 1 to 3 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each161.0161.02.0FalseNoneNoneFalseNoneFalse322.00
3032227102175NonePWD Ele SR (6)-3.5.34 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each175.0175.08.0FalseNoneNoneFalseNoneFalse1400.00
3032228102175NonePWD Ele SR (6)-3.5.46 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each234.0234.04.0FalseNoneNoneFalseNoneFalse936.00
3032229102175NonePWD Ele SR (6)-3.5.58Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each284.0284.02.0FalseNoneNoneFalseNoneFalse568.00
3032230102175NonePWD Ele SR (6)-3.5.610-12 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each344.0344.08.0FalseNoneNoneFalseNoneFalse2752.00
3032231102175NonePWD Ele SR (6)-3.5.716 Module ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each397.0397.08.0FalseNoneNoneFalseNoneFalse3176.00
3032232102175NonePWD Ele SR (6)- 3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6Amps one way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each102.0102.038.0FalseNoneNoneFalseNoneFalse3876.00
3032233102175NonePWD Ele SR (6)- 3.6.26Amps two way ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each166.0166.02.0FalseNoneNoneFalseNoneFalse332.00
3032234102175NonePWD Ele SR (6)- 3.6.4Stepped fan regulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each357.0357.012.0FalseNoneNoneFalseNoneFalse4284.00
3032235102175NonePWD Ele SR (6)- 3.6.716Amps one way switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each180.0180.016.0FalseNoneNoneFalseNoneFalse2880.00
3032236102175NonePWD Ele SR (6)- 3.6.932Amps DP switch ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each326.0326.02.0FalseNoneNoneFalseNoneFalse652.00
3032237102175NonePWD Ele SR (6)- 3.6.106/16Amps universal socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each236.0236.025.0FalseNoneNoneFalseNoneFalse5900.00
3032238102175NonePWD Ele SR (6)- 3.6.11TV/Telephone socket ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each156.0156.01.0FalseNoneNoneFalseNoneFalse156.00
3032239102175NonePWD Ele SR (6)- 3.7Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts,50Hz AC supply & completely wired on existing box. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each646.0646.01.0FalseNoneNoneFalseNoneFalse646.00
3032240102175NonePWD Ele SR (6)- 5.2.1Supplying fully automatic star-delta starter unit push button type with suitable wires, 3 contactors, one adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/440 volts 3 phase and wired after fixing to the existing wooden board for motor. Upto 12.5HP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each7455.07455.01.0FalseNoneNoneFalseNoneFalse7455.00
3032241102175NonePWD Ele SR (6)- 5.18.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.6-32 Amps SP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each415.0415.01.0FalseNoneNoneFalseNoneFalse415.00
3032242102175NonePWD Ele SR (6)- 5.18.36-32 Amps DP ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each739.0739.01.0FalseNoneNoneFalseNoneFalse739.00
3032243102175None5.19.9Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.II - Double Door 12 Way SP & N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2329.02329.01.0FalseNoneNoneFalseNoneFalse2329.00
3032244102175None5.19.11III - Double Door 4 Way TP&N ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4038.04038.01.0FalseNoneNoneFalseNoneFalse4038.00
3032245102175NoneI-5.21Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9255.09255.01.0FalseNoneNoneFalseNoneFalse9255.00
3032246102175None5.40.2Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. 250Amps 4x30x10mm Aluminium Strips ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3435.03435.01.0FalseNoneNoneFalseNoneFalse3435.00
3032247102175None5.33Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9315.09315.01.0FalseNoneNoneFalseNoneFalse9315.00
3032248102175None5.31Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4390.04390.01.0FalseNoneNoneFalseNoneFalse4390.00
3032249102175None12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3510.03510.01.0FalseNoneNoneFalseNoneFalse3510.00
3032250102175NoneBESCOM III-32.07Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 3.5 core 25 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr139.55139.5530.0FalseNoneNoneFalseNoneFalse4186.50
3032251102175NoneBESCOM IV-32.07Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. 25 sqmm to 75 sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr23.6423.6430.0FalseNoneNoneFalseNoneFalse709.20
3032252102175NoneBESCOM-IV--29.01Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc.,complete.(As per Civil SR KSRB I-2, P-7) In Soil (Ordinary) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr889.0889.030.0FalseNoneNoneFalseNoneFalse26670.00
3032253102175NoneBESCOM-IV--29.07Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr58.058.030.0FalseNoneNoneFalseNoneFalse1740.00
3032254102175NoneBESCOM-III--35.01Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each382.0382.08.0FalseNoneNoneFalseNoneFalse3056.00
3032255102175None6.2.1Supplying of 1440rpm heavy duty exhaust fan with bracketblades suitable to operate on 230V 50Hz, AC Supply complete. Exhaust Fans12 Sweep (300mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2969.02969.01.0FalseNoneNoneFalseNoneFalse2969.00
3032256102175None6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-3741979 and with double ball bearing system. Ceiling Fans 48" Sweep (1200mm) Regular model ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2984.02984.012.0FalseNoneNoneFalseNoneFalse35808.00
3032257102175None11.3.2Supplying of .feet - PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting 1 x4 20/22 w ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each690.0690.010.0FalseNoneNoneFalseNoneFalse6900.00
3032258102175None11.5.2Supply of round/square recess/surface mounted rolling type LED Down light with W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each885.0885.012.0FalseNoneNoneFalseNoneFalse10620.00
3032259102175None12.21Supplying and fixing of 5'-80 Watts of T8 Fluorescent Tube with 54W power consumption with low 3mg Mercury content less phosphor coating. Operating voltage range from 180V to 265V, 50Hz AC power Supply ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos520.0520.012.0FalseNoneNoneFalseNoneFalse6240.00
3032260102175None12.25.2Supplying of patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired with HF Electronic Ballast, Operating voltage range from 180V to 265V, 50Hz AC power supply excluding Tube. 1 x 4' Tube light fitting. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each340.0340.012.0FalseNoneNoneFalseNoneFalse4080.00
3032261102175None12.46Supplying & Fixing of 70-150 Watts lamp holder 2 Pin ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos63.063.012.0FalseNoneNoneFalseNoneFalse756.00
3032262102175None13.7.1Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall / ceiling / Rafter / Girders ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each122.0122.034.0FalseNoneNoneFalseNoneFalse4148.00
3032263102175None13.11Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each315.0315.012.0FalseNoneNoneFalseNoneFalse3780.00
3032264102175None13.13Fixingoneexhaustfanaftermakingasuitablenotchinthewallandfinishingwithcementmortarandcolouringtomatchtheexistingwallorbrackets,withboltsandnutsanda5A,ceilingrosewithsufficientlengthof23/0.0076inchPVCinsulatedtwincorewireofapproved make with wire mesh and wooden frame. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each707.0707.01.0FalseNoneNoneFalseNoneFalse707.00
3032265102175None13.19Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each490.0490.022.0FalseNoneNoneFalseNoneFalse10780.00
3032266102175None5.34Supplying, fixing and wiring 50/5 to 400/5Amps 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound., with all lead, lifts, loading, un-loading charges, including cost of all materials, cost oflabour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental andequipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each562.0562.01.0FalseNoneNoneFalseNoneFalse562.00
3032267102175None5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440v A.C. 50 Hz 12/24v D.C. 125 Amps 25kA. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each515.0515.02.0FalseNoneNoneFalseNoneFalse1030.00
17103148810000NoneNoneBuildingsFURNITURES469220.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3032268102176NoneGem 1Stainless Steel Rectangular Dining Table with C3431E Round fixed Chair ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each19999.019999.010.0FalseNoneNoneFalseNoneFalse199990.00
3032269102176NoneGem 2Met-l-wood Newspaper and Magazine Stand Wrought Iron 1065 mm and 990 mm tapered ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm4500.04500.02.0FalseNoneNoneFalseNoneFalse9000.00
3032270102176Nonegem 3computer Table consists of Computer cum Printer table with key board pullout tray and table top Type of Computer Table ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm7985.07985.04.0FalseNoneNoneFalseNoneFalse31940.00
3032271102176NoneGEM 4Intel Pentium Gold G7400 (6 MB cache, 2 cores, 4 threads, up to 3.70 GHz, 46 W) No Operating System included for NSeries ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each57072.557072.54.0FalseNoneNoneFalseNoneFalse228290.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103148820000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103148820000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103148820000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17103149210000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17103149280000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement on or before the last date and time of bid submission.None
17103149330000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103149400000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103149460000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17103149530000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17103149600000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17103149660000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17103149730000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103149800000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17103149870000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17103149930000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17103149990000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17103150050000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period.None
17103150120000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building during the defect liability period.None
17103150180000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24. And Value at 2023-24 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2023-24) in the Technical Qualification Criteria mentioned in the next section.None
17103150240000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17103150310000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17103150370000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the KP-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17103150440000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17103150510000NoneNoneELIGIBILITYThe time stipulated for completion of work is 6 (Six) calendar months including rainy season.None
17103150570000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17103150620000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17103150680000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17103150760000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17103150820000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17103150880000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17103150960000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17103151010000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement on or before the last date of bid submission.None
17103151080000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP Procurement portal due to internet connectivity issues and technical glitches.None
17103151140000NoneNoneELIGIBILITYEMD Payments through KP-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17103151200000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082099 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works, Ports and Inlnad Water Transport Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works, Ports and Inlnad Water Transport Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17103151360000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17103151440000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17103151510000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separatelyNone
17103151580000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17103151650000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17103151720000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17103151790000NoneNoneELIGIBILITYIn accordance with the notification of Government of Karnataka No. DPAL 22 SHASHANA 2016, Bengaluru dated 29-06-2017 and 17-07-2017 and as per the Finance Secretariat Notification No. FD 876 Exp-12-2017, Bengaluru, dated 15-09-2017, this work is reserved for Scheduled Caste/Scheduled Tribe contractors (specified in the Name of work), and only Scheduled caste/Scheduled Tribe contractors shall have to participate in the tender. The Scheduled caste/Scheduled Caste contractors participating in the tender should compulsorily furnish the Caste certificate issued by a competent authority, failing which the tender is liable for rejection.None
17103151860000NoneNoneELIGIBILITYThe scheduled caste/scheduled tribe contractor participating in the tender shall be domicile of State of Karnataka for more than 10 (ten) years.None
17103151940000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17103152020000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial implementation calendar format before last date of tender receipt in the kpp portal.None
17103152090000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17103152160000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply etc., before commencement of the work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 - satisfactorily completed as prime contractor, at least one construction work of value not less than Rs.26.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.52.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment : 233.00 Cum, (b) SSM/BBM : 66.00 Cum, (c) PCC/RCC : 98.00 Cum, (d) Flooring : 153.00 Sqm, (e) Plastering : 701.00 Sqm, (f) Steel : 7.60 t & (g) Wood : 0.15 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.16.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers Certificate - Information in Format-9
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD under Class-I category
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Physical and financial implementation calendar formatTrueTechnical Bid
Annual Turnover Certificate with UDIN for the last five years duly attested by the Notary or Government Gazetted Officer and Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Work Done Certificate as Prime Certificate at least one Construction work from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Quantity wise breakup statementTrueTechnical Bid
Reserved ST Category CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710315735000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, PWD, Division, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone