createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1709989549673
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3170.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-03-2024 16:00:00
tenderQueryClose16-03-2024 16:00:00
technicalBidOpen01-04-2024 11:30:00
publishedDate11-03-2024 20:46:18
publishedByPostPWD_EE_DIV_KPL
publishedByUserKPE15981 - P HEMANTHARAJ
bidValidityPeriod90
noOfCalls1
preBidMeetingDate15-03-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonP Hemantharaj
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08539222318
mobileNumber9448021564
tenderSupplierListNone
tenderSchedule
createdTs1709989549714
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT8909
titleConstruction of 3 Class Rooms for GHPS Konsagar, 3 Class Rooms for GHPS Basapur & 4 Class Rooms for KPS GHPS Bandi (Total 10 Class Rooms) in Yelburga Taluk, in Koppal District.
descriptionConstruction of 3 Class Rooms for GHPS Konsagar, 3 Class Rooms for GHPS Basapur & 4 Class Rooms for KPS GHPS Bandi (Total 10 Class Rooms) in Yelburga Taluk, in Koppal District.
categoryWORKS
categoryTextWorks
ecv12656444.67
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1696
locationNamePWD Division Office Koppala
provisionalAmount15000000.0
groupOverheadTotal0.0
fileNumberAEE/PWD/KKRDBBUILDING/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17099895500001NoneNoneBuildingsConstruction of 3 class rooms for GHPS Konsagar, 3 class rooms for GHPS Basapur & 4 class rooms for KPS GHPS Bandi (Total 10 Class rooms) in Yelburga Taluk under KKRDB 2023-24 MICRO-GENERAL (AKSHARA AAVISHKARA) Ground Floor8692235.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297595598695NoneV-1, Pg. No: 8 , Item.No:1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- including cost of all materials, labour, HOM, I Cum107.1107.1557.17FalseNoneNoneFalseNoneFalse59672.9070
297595698695NoneV-1, Pg. No: 7, Item.No:1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost of all materials, labour, HOM, I Cum279.3279.345.51FalseNoneNoneFalseNoneFalse12710.9430
297595798695NoneV-1, Pg. No:7, Item.No:1.8Construction of Embankment by excavating the available approved GravelMurrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work ---- including cost of all materials, labour, HOM, I Cum497.7497.7484.67FalseNoneNoneFalseNoneFalse241220.2590
297595898695NoneV-2, Page No.9, Item No:5.1.1)Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labour, HOM, I Cum5891.555891.5545.96FalseNoneNoneFalseNoneFalse270775.6380
297595998695NoneV2Page No.9 Item No:5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labour, HOM, I Cum6515.256515.2521.93FalseNoneNoneFalseNoneFalse142879.43250
297596098695NoneV-1, Page No:15 , Item.No:2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately).Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6527.856527.85132.01FalseNoneNoneFalseNoneFalse861741.47850
297596198695NoneV-1, Pg. No:16 , Item.No:2.4.2Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, labour, HOM, I Cum6639.156639.15101.38FalseNoneNoneFalseNoneFalse673077.0270
297596298695NoneV-1, Pg. No:16 , It.No:2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications . (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate ---- including cost of all materials, labour, HOM, I Cum6961.56961.5108.48FalseNoneNoneFalseNoneFalse755183.520
297596398695NoneV-1, Pg. No:111 SL.NO.1 (a)Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum531.13531.1365.8FalseNoneNoneFalseNoneFalse34948.3540
297596498695NoneV-1, Pg. No:111 SL .NO. 2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum3319.583319.5819.16FalseNoneNoneFalseNoneFalse63603.15280
297596598695NoneV-1, Pg. No:111 SL .NO. 9 it no 2.4.3Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Plinth Beam Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum4647.414647.419.33FalseNoneNoneFalseNoneFalse43360.33530
297596698695NoneV-1, Pg. No:112sl.no 16, Item.No:2.4.3Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Neck Column Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum3319.583319.587.09FalseNoneNoneFalseNoneFalse23535.82220
297596798695NoneV-1, Pg. No:17, Item.No:2.4.2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Ramp & Entrance Step Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum4873.054873.0514.81FalseNoneNoneFalseNoneFalse72169.87050
297596898695NoneV-1, Pg. No:17 , Item.No:2.5.2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Columns Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum4176.94176.920.35FalseNoneNoneFalseNoneFalse84999.9150
297596998695NoneV-1, Pg. No:112 Sl.No.15 it no 2.5.2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Beam Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum3480.753480.7559.73FalseNoneNoneFalseNoneFalse207905.19750
297597098695NoneV-1, Pg. No:112 Sl.No.15 it no 2.5.2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Slabs Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum4176.94176.93.0FalseNoneNoneFalseNoneFalse12530.70
297597198695NoneV-1, Pg. No:112 Sl.No.14 it no 2.5.2Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Lintels Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum3132.683132.681.0FalseNoneNoneFalseNoneFalse3132.680
297597298695NoneV-1, Pg. No:112Sl.No. 19 it no 2.4.3Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building Chajjas Total concrete Quantity ---- including cost of all materials, labour, HOM, I Cum3480.753480.757.43FalseNoneNoneFalseNoneFalse25861.97250
297597398695NoneV-1, Pg. No:18, Item.No:2.11(aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- including cost of all materials, labour, HOM, I t93929.8593929.8521.4FalseNoneNoneFalseNoneFalse2010098.790
297597498695NoneV-2, Pg. No:14, Item.No:6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labour, HOM, I Cum8367.458367.45102.37FalseNoneNoneFalseNoneFalse856575.85650
297597598695NoneV-2, Pg. No:41, Item.No:8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge Ground Floor ---- including cost of all materials, labour, HOM, I Sqm253.05253.05591.6FalseNoneNoneFalseNoneFalse149704.380
297597698695NoneV-2, Pg. No:42, Item.No:8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I Sqm389.55389.55632.1FalseNoneNoneFalseNoneFalse246234.5550
297597798695NoneV-2, Pg. No:50, Item.No:8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- including cost of all materials, labour, HOM, I Sqm105.0105.0738.22FalseNoneNoneFalseNoneFalse77513.10
297597898695NoneV-2, Pg. No:64, It.No:9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications SKIRTING ---- including cost of all materials, labour, HOM, I Sqm1622.251622.25372.07FalseNoneNoneFalseNoneFalse603590.55750
297597998695NoneV-2, Pg. No:64, It.No:9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications ---- including cost of all materials, labour, HOM, I Sqm1622.251622.2563.83FalseNoneNoneFalseNoneFalse103548.21750
297598098695NoneV-2, Page No:59, Item.No:9.6.2Providing and laying Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) Medium shade pigment using 50% white cement 50% Grey cement ---- including cost of all materials, labour, HOM, I Sqm1251.61251.639.15FalseNoneNoneFalseNoneFalse49000.140
297598198695NoneV-2, Pg. No:45, It.No:8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I Sqm143.85143.85838.0FalseNoneNoneFalseNoneFalse120546.30
297598298695NoneV-2, Pg. No:46, It.No:8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) ---- including cost of all materials, labour, HOM, I Sqm165.9165.9768.67FalseNoneNoneFalseNoneFalse127522.3530
297598398695NoneV-2, Pg. No:84, It.No:11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Kg144.9144.9434.7FalseNoneNoneFalseNoneFalse62988.030
297598498695NoneV-2, Pg. No:80, It.No:11.14.1.1Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile B Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I m493.5493.540.32FalseNoneNoneFalseNoneFalse19897.920
297598598695NoneV-2, Pg. No:77, It.No:11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Sqm4454.14454.120.16FalseNoneNoneFalseNoneFalse89794.6560
297598698695NoneV-2, Pg. No:80, It.No:11.13.1Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer: Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Kg130.2130.21389.6FalseNoneNoneFalseNoneFalse180925.920
297598798695NoneV-2, Pg. No:48, It.No:8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I Sqm120.75120.7563.72FalseNoneNoneFalseNoneFalse7694.190
297598898695NonePage No. 149 Item no. 15.1 . Volumn -2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- including cost of all materials, labour, HOM, I Sqm866.02866.02159.84FalseNoneNoneFalseNoneFalse138424.63680
297598998695NonePage No. 125 Item no. 13.47 . Volume -2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter ---- including cost of all materials, labour, HOM, I m206.85206.859.72FalseNoneNoneFalseNoneFalse2010.5820
297599098695NoneV-1, Pg. No: 11 , Item.No 1.23Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications. ---- including cost of all materials, labour, HOM, I Cum2816.12816.191.21FalseNoneNoneFalseNoneFalse256856.4810
17099895500000NoneNoneBuildingsConstruction of 3 class rooms for GHPS Konsagar, 3 class rooms for GHPS Basapur & 4 class rooms for KPS GHPS Bandi (Total 10 Class rooms) in Yelburga Taluk under KKRDB 2023-24 MICRO-GENERAL (AKSHARA AAVISHKARA) FIRST FLOOR3022057.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297599198696NoneV-1, Pg. No:16 , It.No:2.5.1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications . (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregate ---- including cost of all materials, labour, HOM, I Cum7027.87027.850.53FalseNoneNoneFalseNoneFalse355114.7340
297599298696NoneV-1, Pg. No:17 , Item.No:2.5.2 Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum4919.464919.469.36FalseNoneNoneFalseNoneFalse46046.14560
297599398696NoneV-1, Pg. No:112 Sl.No.15Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum4216.684216.6810.34FalseNoneNoneFalseNoneFalse43600.47120
297599498696NoneV-1, Pg. No:112 Sl.No.16Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum3513.93513.921.88FalseNoneNoneFalseNoneFalse76884.1320
297599598696NoneV-1, Pg. No:112 Sl.No.14Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work of building ---- including cost of all materials, labour, HOM, I Cum4216.684216.682.35FalseNoneNoneFalseNoneFalse9909.1980
297599698696NoneV-1, Pg. No:19 , Item.No:2.5.2 Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum3162.513162.510.43FalseNoneNoneFalseNoneFalse1359.87930
297599798696NoneV-1, Pg. No:18, Item.No:2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- including cost of all materials, labour, HOM, I t94824.4294824.427.62FalseNoneNoneFalseNoneFalse722562.08040
297599898696NoneV-2, Pg. No:13, Item.No:6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including cost of all materials, labour, HOM, I Cum8447.148447.1464.47FalseNoneNoneFalseNoneFalse544587.11580
297599998696NoneV-1, Page No:15 , Item.No:2.1.4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. The cost of steel reinforcement & formwork shall be paid separately.Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6590.026590.021.74FalseNoneNoneFalseNoneFalse11466.63480
297600098696NoneV-2, Pg. No:41, Item.No:8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I Sqm255.46255.46351.43FalseNoneNoneFalseNoneFalse89776.30780
297600198696NoneV-2, Pg. No:42, Item.No:8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I Sqm393.26393.26493.13FalseNoneNoneFalseNoneFalse193928.30380
297600298696NoneV-2, Pg. No:50, Item.No:8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge ---- including cost of all materials, labour, HOM, I Sqm106.0106.0361.59FalseNoneNoneFalseNoneFalse38328.540
297600398696NoneV-2, Pg. No:61, It.No:9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications ---- including cost of all materials, labour, HOM, I Sqm1637.71637.7167.07FalseNoneNoneFalseNoneFalse273610.5390
297600498696NoneV-2, Pg. No:64, It.No:9.34Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications ---- including cost of all materials, labour, HOM, I Sqm1637.71637.740.94FalseNoneNoneFalseNoneFalse67047.4380
297600598696NoneV-2, Pg. No:45, It.No:8.25Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- including cost of all materials, labour, HOM, I Sqm145.22145.22457.03FalseNoneNoneFalseNoneFalse66369.89660
297600698696NoneV-2, Pg. No:46, It.No:8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50 @ 60 degree angle with 10 years life ---- including cost of all materials, labour, HOM, I Sqm167.48167.48475.36FalseNoneNoneFalseNoneFalse79613.29280
297600798696NoneV-2, Pg. No:84, It.No:11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Kg146.28146.28118.8FalseNoneNoneFalseNoneFalse17378.0640
297600898696NoneV-2, Pg. No:80, It.No:11.14.1.1Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile B Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- including cost of all materials, labour, HOM, I m498.2498.223.04FalseNoneNoneFalseNoneFalse11478.5280
297600998696NoneV-2, Pg. No:77, It.No:11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Sqm4496.524496.5212.96FalseNoneNoneFalseNoneFalse58274.89920
297601098696NoneV-2, Pg. No:80, It.No:11.13.1Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer: Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I Kg131.44131.44648.0FalseNoneNoneFalseNoneFalse85173.120
297601198696NoneV-2, Pg. No:48, It.No:8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I Sqm121.9121.935.28FalseNoneNoneFalseNoneFalse4300.6320
297601298696NoneV-2, Pg. No:21, It.No:7.1.1Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge ---- including cost of all materials, labour, HOM, I m931.74931.7415.67FalseNoneNoneFalseNoneFalse14600.36580
297601398696NonePage No. 149 Item no. 15.1 . Volume -2 Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- including cost of all materials, labour, HOM, I Sqm866.02866.02211.86FalseNoneNoneFalseNoneFalse183474.99720
297601498696NoneV-1, Pg. No:111,Sl.No.16Providing centering,shuttering,formwork,scaffolding,etc, Finished rate of concrete work iof building ---- including cost of all materials, labour, HOM, I Cum3513.93513.96.19FalseNoneNoneFalseNoneFalse21751.0410
297601598696NonePage No. 125 Item no. 13.47 . Volume -2 Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 75 mm diameter ---- including cost of all materials, labour, HOM, I m197.0197.027.52FalseNoneNoneFalseNoneFalse5421.440
17099895500000NoneNoneBuildingsConstruction of 3 class rooms for GHPS Konsagar, 3 class rooms for GHPS Basapur & 4 class rooms for KPS GHPS Bandi (Total 10 Class rooms) in Yelburga Taluk under KKRDB 2023-24 MICRO-GENERAL (AKSHARA AAVISHKARA) Electricals443751.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297601698697NoneP.No.2, I.No.1.2 (1.2.2) vol.-6Concealed Conduit System Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I Mtr78.078.0310.0FalseNoneNoneFalseNoneFalse24180.00
297601798697NoneP.No.2, I.No.1.3 (1.3.2) vol-6Supplying heavy gauge PVC Conduit Pipe ….dia .mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I Mtr79.079.0130.0FalseNoneNoneFalseNoneFalse10270.00
297601898697NoneP.No.2, I.No.1.7 (1.7.7) vol-6Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering,finishing upto wall surface complete. Upto 50 mm conduit in brick wall (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I Mtr29.029.0130.0FalseNoneNoneFalseNoneFalse3770.00
297601998697NoneP.No.2 & 3, I.No.1.5(1.5.2) vol-6Supplying and fixing PVC/metal conduit Deep junction box (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I Each56.056.080.0FalseNoneNoneFalseNoneFalse4480.00
297602098697NoneP.No.4, I.No.1.12 vol-6Supplying And Fixing Metal Fan Box with Round Hook. (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I No160.0160.040.0FalseNoneNoneFalseNoneFalse6400.00
297602198697NoneP.No.2, I.No.2.1 (2.1.2)vol-6Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2(Phase & Neutral)& 1x1.0 mm2(Earth wire) FRLS multi strand PVC insulatedcopper wire (confirming to IS-694: and latest amendments) witha 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch ---- including cost of all materials, labour, HOM, I Point394.0394.0110.0FalseNoneNoneFalseNoneFalse43340.00
297602298697NoneP.No.5, I.No.2.3 (2.3.1) vol-6 (1.0 Sq.mm)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A. (Elec SR -2023-24) ---- including cost of all materials, labour, HOM, I Mtr19.019.01980.0FalseNoneNoneFalseNoneFalse37620.00
297602398697NoneP.No.5, I.No.2.3 (2.3.2) vol-6 Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A. (Elec SR -2023-24)(1.5 Sq.mm) ---- including cost of all materials, labour, HOM, I Mtr26.026.0396.0FalseNoneNoneFalseNoneFalse10296.00
297602498697NoneP.No.5, I.No.2.3 (2.3.3) vol-6 (2.5 Sq.mm)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand Copper with low conductor resistance single core wire in open or concealed system of wiring with specified IS-694:1990 & confirming to GTP of GROUP -A. (Elec SR -2023-24)(2.5 Sq.mm) ---- including cost of all materials, labour, HOM, I Mtr59.059.0197.0FalseNoneNoneFalseNoneFalse11623.00
297602598697NoneP.No.8, I.No.3.4 (3.4.5) vol-6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Elec SR 2023-24)(8 Way) ---- including cost of all materials, labour, HOM, I Mtr261.0261.020.0FalseNoneNoneFalseNoneFalse5220.00
297602698697NoneP.No.8, I.No.3.5 (3.5.5) )vol-6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate withrequired nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box (Elec SR -2023-24)(8 Way ---- including cost of all materials, labour, HOM, I Each284.0284.020.0FalseNoneNoneFalseNoneFalse5680.00
297602798697NoneP.No.9, I.No.3.6 (3.6.1) vol6Supply and fixing of Bakelite D.P/Socket/ switch with/without neon indicator over existing wood board or flush mounting in plastic plates/nitches as per IS 1293 and IS 3854 GROUP A(Elec SR -2023-24)(6A One Way Switchs) ---- including cost of all materials, labour, HOM, I Each102.0102.076.0FalseNoneNoneFalseNoneFalse7752.00
297602898697NoneP.No.9, I.No.3.6 (3.6.3) vol-6Supply and fixing of Bakelite D.P/Socket/ switch with/without neon indicator over existing wood board or flush mounting in plastic plates/nitches as per IS 1293 and IS 3854 GROUP A(Elec SR -2023-24)(6A Three Way socket ---- including cost of all materials, labour, HOM, I Each171.0171.020.0FalseNoneNoneFalseNoneFalse3420.00
297602998697NoneP.No.9, I.No.3.6 (3.6.4) vol6Supply and fixing of Bakelite D.P/Socket/ switch with/without neon indicator over existing wood board or flush mounting in plastic plates/nitches as per IS 1293 and IS 3854 GROUP A(Elec SR -2023-24)(Stepped Fan Regulator Two Modul) ---- including cost of all materials, labour, HOM, I Each357.0357.040.0FalseNoneNoneFalseNoneFalse14280.00
297603098697NoneP.No.9, I.No.3.6 (3.6.10) vol6Supply and fixing of Bakelite D.P/Socket/ switch with/without neon indicator over existing wood board or flush mounting in plastic plates/nitches as per IS 1293 and IS 3854 GROUP A(Elec SR -2023-24)(6/16A Universal Socket) ---- including cost of all materials, labour, HOM, I Each236.0236.010.0FalseNoneNoneFalseNoneFalse2360.00
297603198697NoneP.No.30, I.No.6.3 (6.3.1)vol6 Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. 48" Sweep (1200mm) (Elec SR -2023-24)(Ceiling Fan) ---- including cost of all materials, labour, HOM, I Each2984.02984.040.0FalseNoneNoneFalseNoneFalse119360.00
297603298697NoneP.No.43 ITEM NO. 11.3.2vol6Supplying of .feet -PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defectworking under standard electrical condition.(Elec SR-2023-24) (LED light fitting 1 x 4 ---- including cost of all materials, labour, HOM, I No690.0690.054.0FalseNoneNoneFalseNoneFalse37260.00
297603398697NoneP.No.47 ITEM NO. 11.11.5 vol6Supplying & fixing of retrofit type - LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.(Elec SR -2023-24)( 12W Bulb) ---- including cost of all materials, labour, HOM, I No269.0269.010.0FalseNoneNoneFalseNoneFalse2690.00
297603498697NoneP.No.17, I.No.5.18. (5.18.4) vol6Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coatedpainting Made out of 14 SWG MS enclosure. (Elec SR -2023-24)( 6-32- A DP ) ---- including cost of all materials, labour, HOM, I Each739.0739.040.0FalseNoneNoneFalseNoneFalse29560.00
297603598697NoneP.No.18 ITEM NO. 5.19 (5.19.3 ) vol6Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure.(Elec SR -2023-24)( 8 Way SP & N ) ---- including cost of all materials, labour, HOM, I No1492.01492.010.0FalseNoneNoneFalseNoneFalse14920.00
297603698697NoneP.No.18 ITEM NO. 5.20 (5.20.4 ) vol6Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V upto 300mA sensitivity on existing wood/panel board. .(Elec SR -2023-24)( 32-40 A 2 pol ---- including cost of all materials, labour, HOM, I No4559.04559.010.0FalseNoneNoneFalseNoneFalse45590.00
297603798697NoneSL. No . 393 PAGE No 23 ITEM NO 51.05 vol6Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specifiedBentonite clay slurry for earthing in 50 Kg Bag ---- including cost of all materials, labour, HOM, I Bag368.0368.010.0FalseNoneNoneFalseNoneFalse3680.00
17099895500000NoneNoneBuildingsConstruction of 3 class rooms for GHPS Konsagar, 3 class rooms for GHPS Basapur & 4 class rooms for KPS GHPS Bandi (Total 10 Class rooms) in Yelburga Taluk under KKRDB 2023-24 MICRO-GENERAL (AKSHARA AAVISHKARA) GEM ITEMS SUPPLY498400.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
297603898698NonePROUDCT ID : 5116877-87512899456ALWIN Three seater classroom desking drawing ALWINR (Bapl/Classroom Desk Bench/02 DESKING & SEATING ---- including cost of all materials, labour, HOM, I No13000.013000.020.0FalseNoneNoneFalseNoneFalse260000.00
297603998698NonePROUDCT ID :5116877-41366975331Storage one side Total Number of Storage Units single storage Table Top Material and Thickness (+/-2 mm) 20 mm thick MDF Board of grade SBG II conforming to IS 12406 laminated with minimum 0.6 mm thick on Top side of type S, P or F having index 3.2.3 conforming to IS 2046 and minimum 0.5 mm thick balancing laminate on the other side Padestal Under structure Mild Steel Square Section of outside side minimum 25 mm and wall thickness minimum 1.2 mm Table Top Length +/-10(mm) 1000 millimeter Table Top Width +/-10(mm) 470 millimeter Table Height 5(mm)735 millimeter Storage Unit and Drawer Units Material 0.6 mm M S Sheet (Not as per IS 8126 STEEL TABLE WOODEN TOP ---- including cost of all materials, labour, HOM, I No8800.08800.08.0FalseNoneNoneFalseNoneFalse70400.00
297604098698NonePROUDCT ID : 5116877-92877296306Chair Features Others Furniture Assembly Already Assembled Material Other Natural Materials CUSION CHAIRS ---- including cost of all materials, labour, HOM, I No3500.03500.08.0FalseNoneNoneFalseNoneFalse28000.00
297604198698NonePROUDCT ID : 5116877-46591856449Purpose Writing Mounting type Wall mounts Frame (All round framing) With Writing board placed on Core material and its backing material Top Surface materials (Used for white board surface) Steel Top surface material thickness 1.5 mm to 1.6 mm Frame material Anodized extruded aluminum alloy hollow section designation 63400 conforming to IS 1285 (With latest amendment) Core material N.A Core material thickness 9 mm Dimension (mm x mm) 1200 x 2400 GREEN BOARD ---- including cost of all materials, labour, HOM, I No14000.014000.010.0FalseNoneNoneFalseNoneFalse140000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17099895510000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17099895510000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17099895510001NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17100695380000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17100696000000NoneNoneELIGIBILITYThe agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules.None
17100696190000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The department is not responsible for any delayin accessing KPPP portal.None
17100696620000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17100696910000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17100696990000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17100697080000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year. (both days inclusive)None
17100697560000NoneNoneELIGIBILITYconstructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall be executed as directed by the Engineer-in-charge of the work.None
17100697710000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification.None
17100697830000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17100697980000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17100698150000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification.None
17100698960000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder.None
17100699370000NoneNoneELIGIBILITYAll materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the work.None
17100699480000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theron.None
17100699790000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply.None
17100699880000NoneNoneELIGIBILITYIf the office happens to be closed on the dates notified, next working day will holds good.None
17100699980000NoneNoneELIGIBILITYThe field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalizedNone
17100700140000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964None
17100700290000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17100700430000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any law as concerned.None
17100700520000NoneNoneELIGIBILITY18%GST shall be paid to the tendered amount separately.None
17100700610000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17100700740000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17100700920000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/ EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for purchases, but not for works.None
17100701060000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsible.None
17100701360000NoneNoneELIGIBILITYThe construction materials (Minerals Metal, Sand and Murum, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013.None
17100701460000NoneNoneELIGIBILITYThe defect liability period is one (1) year from the date of actual completion of work.None
17100701560000NoneNoneELIGIBILITYFinancial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2023-24 in the technical qualification criteria.None
17100701730000NoneNoneELIGIBILITYAs per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the required machineries for various activities involved in construction as per MORTH specification.None
17100702210000NoneNoneELIGIBILITYThe tender period for completion of work is 11(Eleven) Calendar months. (Including monsoon period)None
17100702760000NoneNoneELIGIBILITYThe Earnest Money Deposit Rs. 2,00,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option(CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 1,0,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids.None
17100703110000NoneNoneELIGIBILITYThe tenderer has to quote the rates are exclusive of GST and As per Government CIRCULAR NO:FD/447/EXPENDITURENone
17100703460000NoneNoneELIGIBILITYEstimate rates are excluding GST and the prevailing GST 18 percent of APT is added in the form of Lumpsum in santioned estimate as per the guidelines in common SR 2021-22 GO PWD51 RDF 2019 Bengaluru dt 18-03-2022. Therefore, APT or ECV is excluding GST. In kppp portal there is no option to add GST separately over and above APT during DTS process. Hence even through the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence GST will be paid separately for the quoted amount as per the Govt. circular no FD/447/expenditure/12/2022/dt -30-07-2022. Therefore GST declaration certificate must be uploaded mandatory by the prospective bidders.None
17100703710000NoneNoneELIGIBILITYAll necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed.None
17100703800000NoneNoneELIGIBILITYAbove Tender amount will not be given.None
17100704520000NoneNoneELIGIBILITYAs per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 Crores is exempted. However it is obligatory for the contractor to use the required machinates for various activities involved in construction as per MORTH specification.None
17100705170000NoneNoneELIGIBILITYThe Tenderer or his identified sub contractor sholud possess required valid electrical license for executing building electrification works.None
17100705390000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17100705530000NoneNoneELIGIBILITYThe awarded Contractor has to submit his bills through e-MB for payment. (Billing is through e-Mb i.e., Contractor has to produce Soft copy and hard Copy of RA or Final bill for payments), as per the G.O. No. FD 56 Pro. Cell 2004, Bangalore Dated 18th January 2005.None
17100705840000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17100706180000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD 72 BMS 2013 dated 31-07-2013. also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own artificial sand manufacturing plant unit.None
17100706400000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion should be furnished by the successful tenderer at the time of agreement.None
17100706560000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17100706890000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneAs per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018- 19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar work such as Building Work of value not less than Rs. 63.29 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.2(c) To qualify for award of this contract, each Tenderer in its nameshould have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 (c) executed in any one year, the following minimum quantities of work (a)Earthwork-833.00 Cum (b)RCC/ PCC-316.00 Cum (c)RRM/SSM/BBM-188.00Cum(d)TMT Steel- 24.00 Tonne(e)Plastering-1655.00 Sqm (f)All types of Flooring/Cladding/Dadoing-547.00Sqm.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (a) achieved in at least two financial years a minimum financial turn over (in all classes ofcivil engineering construction works only) of Rs. 253.13Lakhs. (usually not less than two times the estimated annual payments under this contract)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAs per Clause 3.3(c) : To qualify for award of this contract, Each Tenderer should further demonstrate: Liquid assets and /or availability of credit facilities of not less than Rs. 34.52 Lakhs.(Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Profit and loss statements and auditors reports
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneCost of work for which Tender acceptance letters received.OthersInformation in Format
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format
NoneNoneNoneNoneLitigation in which the Tenderer is involved.OthersInformation in Format
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format
NoneNoneNoneNonePrincipal Place of BusinessOthersPrincipal Place of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Principal Place of Business
NoneNoneNoneNoneCopy of RegistrationOthersCopy of Registration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneCost of work for which Tenders submitted.OthersCost of work for which Tenders submitted.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Registration CertificateTrueTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710080240000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of The Executive Engineer, PWD Division Koppal
streetNone
cityKoppal
stateKarnataka
pin583231
tenderRecallDTONone