1710162481000 | 0 | None | None | Other Works | Construction of Pathway and Open Stage at Saptagiri Park Garden in Ward No. 40, Hubballi | 3016448.67 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
2991238 | 99363 | None | 001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means, In area of light jungle | ha | 176715.0 | 176715.0 | 0.05 | False | None | None | False | None | False | 8835.75 | 0 | 2991239 | 99363 | None | 002 | Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils upto 1.50 mtr , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. | Cum | 195.3 | 195.3 | 104.11 | False | None | None | False | None | False | 20332.683 | 0 | 2991240 | 99363 | None | 003 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates. | Cum | 5378.1 | 5378.1 | 40.59 | False | None | None | False | None | False | 218297.079 | 0 | 2991241 | 99363 | None | 004 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work | Cum | 422.1 | 422.1 | 187.44 | False | None | None | False | None | False | 79118.424 | 0 | 2991242 | 99363 | None | 005 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6104.7 | 6104.7 | 12.717 | False | None | None | False | None | False | 77633.4699 | 0 | 2991243 | 99363 | None | 006 | Form Work - Appendix I Additionalities for Foundation upto Plinth All other types | Cum | 183.14 | 183.14 | 4.86 | False | None | None | False | None | False | 890.0604 | 0 | 2991244 | 99363 | None | 007 | Form Work - Appendix I Additionalities for Formwork, Centering & Scaffolding 12. Beams & Lintels of Building | Cum | 1221.99 | 1221.99 | 7.857 | False | None | None | False | None | False | 9601.17543 | 0 | 2991245 | 99363 | None | 008 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge | Kgs | 106.05 | 106.05 | 11872.0 | False | None | None | False | None | False | 1259025.6 | 0 | 2991246 | 99363 | None | 009 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) | Sqm | 5580.75 | 5580.75 | 27.014 | False | None | None | False | None | False | 150758.3805 | 0 | 2991247 | 99363 | None | 010 | Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) | Kgs | 94.5 | 94.5 | 1271.7 | False | None | None | False | None | False | 120175.65 | 0 | 2991248 | 99363 | None | 011 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. | Sqm | 316.05 | 316.05 | 9.0 | False | None | None | False | None | False | 2844.45 | 0 | 2991249 | 99363 | None | 012 | Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size, shape and colour with a minimum compressive strength of 281 kg per m2 over 50mm thick sand bed ( average thickness ) and compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction of paver surface joints into its final level , including cost of materials, labour and Usage charges of machinery complete as per specifications. | Sqm | 1251.6 | 1251.6 | 343.6 | False | None | None | False | None | False | 430049.76 | 0 | 2991250 | 99363 | None | 013 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 300 x 200 x 150 mm Kerb Stone | Mtr | 316.05 | 316.05 | 343.6 | False | None | None | False | None | False | 108594.78 | 0 | 2991251 | 99363 | None | 014 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge | Sqm | 287.7 | 287.7 | 36.0 | False | None | None | False | None | False | 10357.2 | 0 | 2991252 | 99363 | None | 015 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge | Sqm | 69.3 | 69.3 | 36.0 | False | None | None | False | None | False | 2494.8 | 0 | 2991253 | 99363 | None | 016 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge | Sqm | 136.5 | 136.5 | 103.08 | False | None | None | False | None | False | 14070.42 | 0 | 2991254 | 99363 | None | 017 | Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m² | Sqm | 834.75 | 834.75 | 416.0 | False | None | None | False | None | False | 347256.0 | 0 | 2991255 | 99363 | None | 018 | Providing and laying red oxide flooring 40 mm thick, with an under layer of 30mm thick M-15 cement concrete and top layer of 10mm thick plaster with 1:3 cement mortar mixed with red oxide finished with floating coat of neat cement mixed with red oxide ( mix of same proportion ) , including cost of materials, labour, curing, complete as per specifications. | Sqm | 618.45 | 618.45 | 200.0 | False | None | None | False | None | False | 123690.0 | 0 | 2991256 | 99363 | None | 019 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 111.3 | 111.3 | 237.44 | False | None | None | False | None | False | 26427.072 | 0 | 2991257 | 99363 | None | 020 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work | Cum | 33.6 | 33.6 | 178.45 | False | None | None | False | None | False | 5995.92 | 0 |
|