noticeInvitingTenderDTO
createdTs1710448647131
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1929000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate15-03-2024 04:50:24
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1829000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710448647167
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9908
titlePkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. (C) Kottagerepalya to Magadi border from Ch 0.00 KM to 10.00 KM (in selected reahes) in Kunigal Taluk of Tumakuru District.
descriptionPkg 751 (A) Improvements to road from Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Via Doddaganganavadi, Verupasandra, Thavarekere, Chowdanakuppe, SH-85, Ippadi, Seenappanahalli, Gavimata, Sh-33, Kothipura, Heruru, Gowdagere, Kodagihalli, Amruthuru Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. (B) Improvements to road from Kothagere- CS Pura Koppa Road to Magadi Border Via Janagere Vanagere,Vaddarakuppe, Tharedakuppe, Ananthapura, Karishanaiahnapalya, Gidadapalya Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. (C) Improvements to road from Kottagerepalya to Magadi border Via Bagenahalli, Shettigere from Ch 0.00 KM to 10.00 KM (in selected reahes) in Kunigal Taluk of Tumakuru District.
categoryWORKS
categoryTextWorks
ecv192913564.98
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-751/TMK/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District.-Road construction76688449.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080036105576Nonevol- 3ItemNo16.29PageNo149i) Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3080037105576Nonevol- 3ItemNo3.5PageNo17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No 3.5 , Page No 17 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm7.087.0819250.0FalseNoneNoneFalseNoneFalse136290.00
3080038105576Nonevol- 3ItemNo2.5(ii) a PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5(ii)a , Page No 9 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm463.74463.74101.38FalseNoneNoneFalseNoneFalse47013.96120
3080039105576Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum112.1112.16394.42FalseNoneNoneFalseNoneFalse716814.4820
3080040105576Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr7.087.089000.0FalseNoneNoneFalseNoneFalse63720.00
3080041105576Nonevol- 1ItemNo1.7PageNo7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Schedule of Rates PWD 2023-24 vol- 1, Item No 1.7 , Page No 7 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum140.42140.425115.54FalseNoneNoneFalseNoneFalse718324.12680
3080042105576Nonevol- 3ItemNo4.2 (v)PageNo23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No 4.2 (v) , Page No 23 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2783.622783.627254.53FalseNoneNoneFalseNoneFalse20193854.79860
3080043105576Nonevol- 3ItemNo4.17PageNo26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No 4.17 , Page No 26 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3019.623019.627208.1FalseNoneNoneFalseNoneFalse21765722.9220
3080044105576Nonevol- 3ItemNo5.1 A (I)PageNo31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.1 A (I) , Page No 31 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm48.3848.3827908.38FalseNoneNoneFalseNoneFalse1350207.42440
3080045105576Nonevol- 3ItemNo5.4PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface Schedule of Rates PWD 2023-24 vol- 3, Item No 5.4 , Page No 31 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm16.5216.5227908.38FalseNoneNoneFalseNoneFalse461046.43760
3080046105576Nonevol- 3ItemNo5.12 (C)PageNo35Dense Graded Bituminous Macadam Grading - II for traffic Less Than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.12 (C) , Page No 35 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum11149.8211149.821395.43FalseNoneNoneFalseNoneFalse15558793.32260
3080047105576Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic Less Than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No 5.16 C , Page No 38 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72837.25FalseNoneNoneFalseNoneFalse10822059.070
3080048105576Nonevol- 3ItemNo3.6PageNo17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 Percentage) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Schedule of Rates PWD 2023-24 vol- 3, Item No 3.6 , Page No 17 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum581.74581.743941.86FalseNoneNoneFalseNoneFalse2293137.63640
3080049105576Nonevol- 1, Item No: 1.8 , Page No: 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum559.32559.324514.83FalseNoneNoneFalseNoneFalse2525234.71560
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District.-Road furnitures2553331.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080050105577Nonevol- 3ItemNo8.16 (i)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (i) , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3080051105577Nonevol- 3ItemNo8.16 (ii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (ii) , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach3453.863453.865.0FalseNoneNoneFalseNoneFalse17269.30
3080052105577Nonevol- 3ItemNo8.16 (iii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (iii) , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach993.56993.5620.0FalseNoneNoneFalseNoneFalse19871.20
3080053105577Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.15 , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.41086.3FalseNoneNoneFalseNoneFalse679372.020
3080054105577Nonevol- 3ItemNo8.5 iiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 ii , Page No 64 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5602.645602.6428.0FalseNoneNoneFalseNoneFalse156873.920
3080055105577Nonevol- 3ItemNo8.5 iiiPageNo65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 75 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 iii , Page No 65 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4862.784862.7814.0FalseNoneNoneFalseNoneFalse68078.920
3080056105577Nonevol- 3ItemNo8.5 ivPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 60 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 iv , Page No 64 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4252.724252.722.0FalseNoneNoneFalseNoneFalse8505.440
3080057105577Nonevol- 3ItemNo8.5 xvPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xv) 90 cm high octagon Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 xv , Page No 64 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach7817.57817.56.0FalseNoneNoneFalseNoneFalse46905.00
3080058105577Nonevol- 3ItemNo8.5 xiiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xii) 60 cm x 45 cm rectangular Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 xii , Page No 64 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5042.145042.14103.0FalseNoneNoneFalseNoneFalse519340.420
3080059105577Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 /- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 /- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 /- 2 mm and height not less than 30/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.43 , Page No 74 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.7852.0FalseNoneNoneFalseNoneFalse366956.40
3080060105577Nonevol- 3ItemNo8.17PageNo67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.17 , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach2384.772384.7710.0FalseNoneNoneFalseNoneFalse23847.70
3080061105577Nonevol- 3ItemNo8.31PageNo71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.31 , Page No 71 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm221.84221.84165.0FalseNoneNoneFalseNoneFalse36603.60
3080062105577Nonevol- 3ItemNo8.60.2 iiPageNo80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 992018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m Schedule of Rates PWD 2023-24 vol- 3, Item No 8.60.2 ii , Page No 80 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo53635.7253635.726.0FalseNoneNoneFalseNoneFalse321814.320
3080063105577Nonevol- 3ItemNo8.29 (i)PageNo71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC 98 - 1997 and approved drawings. Single row for one utility service Schedule of Rates PWD 2023-24 vol- 3, Item No 8.29 (i) , Page No 71 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr2610.162610.16108.0FalseNoneNoneFalseNoneFalse281897.280
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -box culvert1717490.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080064105578Nonevol- 3ItemNo2.8(ii)APageNo10Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means. a Cement Concrete Grade M-15 & M-20 Schedule of Rates PWD 2023-24 vol- 3, Item No 2.8(ii)A , Page No 10 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum848.42848.423.63FalseNoneNoneFalseNoneFalse3079.76460
3080065105578Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36221.07FalseNoneNoneFalseNoneFalse26607.98520
3080066105578Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0233.7FalseNoneNoneFalseNoneFalse238158.5740
3080067105578Nonevol- 1ItemNo2.11 HPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.985.02FalseNoneNoneFalseNoneFalse468029.55960
3080068105578Nonevol- 1ItemNo2.4.3PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.3 , Page No 16 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8971.778971.7712.98FalseNoneNoneFalseNoneFalse116453.57460
3080069105578Nonevol- 1ItemNo2.4.3PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.3 , Page No 16 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8074.598074.5927.23FalseNoneNoneFalseNoneFalse219871.08570
3080070105578Nonevol- 1ItemNo2.5.2PageNo16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.5.2 , Page No 16 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum9689.689689.682.7FalseNoneNoneFalseNoneFalse26162.1360
3080071105578Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 12.4 , Page No 117 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8633.45FalseNoneNoneFalseNoneFalse105663.8670
3080072105578Nonevol- 1ItemNo2.2.1PageNo15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.2.1 , Page No 15 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7418.667418.6644.06FalseNoneNoneFalseNoneFalse326866.15960
3080073105578Nonevol- 3ItemNo13.8PageNo121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 13.8 , Page No 121 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8036.988036.982.1FalseNoneNoneFalseNoneFalse16877.6580
3080074105578Nonevol- 3ItemNo13.9PageNo122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No 13.9 , Page No 122 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum13965.313965.36.3FalseNoneNoneFalseNoneFalse87981.390
3080075105578Nonevol- 3ItemNo13.2PageNo121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No 13.2 , Page No 121 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16485.7816485.780.49FalseNoneNoneFalseNoneFalse8078.03220
3080076105578Nonevol- 3ItemNo13.16PageNo124Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023-24 vol- 3, Item No 13.16 , Page No 124 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr2118.12118.16.0FalseNoneNoneFalseNoneFalse12708.60
3080077105578Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6218.62FalseNoneNoneFalseNoneFalse2394.90440
3080078105578Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.06180.0FalseNoneNoneFalseNoneFalse190.80
3080079105578Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 14.4(a) , Page No 129 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1625.87FalseNoneNoneFalseNoneFalse58366.85920
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -pipe culvert8032517.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080080105579Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No 2.11 (ii) A, Page No 10 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.452.0FalseNoneNoneFalseNoneFalse11044.80
3080081105579Nonevol- 3ItemNo2.17 (ix) BPageNo11Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 2.17 (ix) B , Page No 11 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr1293.281293.28105.0FalseNoneNoneFalseNoneFalse135794.40
3080082105579Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36287.05FalseNoneNoneFalseNoneFalse34549.3380
3080083105579Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0240.7FalseNoneNoneFalseNoneFalse287627.7140
3080084105579Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.984.1FalseNoneNoneFalseNoneFalse382255.2180
3080085105579Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8058.038058.03286.68FalseNoneNoneFalseNoneFalse2310076.04040
3080086105579Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 12 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 9.1.ii , Page No 87 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr12705.0612705.06150.0FalseNoneNoneFalseNoneFalse1905759.00
3080087105579Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No 12.3A , Page No 117 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum1378.241378.241661.53FalseNoneNoneFalseNoneFalse2289987.10720
3080088105579Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS 280 & IS4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No 14.2 , Page No 129 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2895.722895.7251.3FalseNoneNoneFalseNoneFalse148550.4360
3080089105579Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 14.4(a) , Page No 129 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.16133.14FalseNoneNoneFalseNoneFalse300385.14240
3080090105579Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 12.4 , Page No 117 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8666.57FalseNoneNoneFalseNoneFalse210285.31020
3080091105579Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.62106.2FalseNoneNoneFalseNoneFalse13659.4440
3080092105579Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.062400.0FalseNoneNoneFalseNoneFalse2544.00
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -Electric pole shifting397636.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080093105580NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos742.22742.2270.0FalseNoneNoneFalseNoneFalse51955.40
3080094105580NoneSR 2023-24 Item Code 2.02, pg. no.44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos1313.341313.3470.0FalseNoneNoneFalseNoneFalse91933.80
3080095105580NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos742.22742.2270.0FalseNoneNoneFalseNoneFalse51955.40
3080096105580NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos1313.341313.3470.0FalseNoneNoneFalseNoneFalse91933.80
3080097105580NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) Is BuyBack: No ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos303.26303.2670.0FalseNoneNoneFalseNoneFalse21228.20
3080098105580NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos188.8188.870.0FalseNoneNoneFalseNoneFalse13216.00
3080099105580NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos385.86385.8670.0FalseNoneNoneFalseNoneFalse27010.20
3080100105580NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos313.88313.8870.0FalseNoneNoneFalseNoneFalse21971.60
3080101105580NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos188.8188.870.0FalseNoneNoneFalseNoneFalse13216.00
3080102105580NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos188.8188.870.0FalseNoneNoneFalseNoneFalse13216.00
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -1st year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080103105581Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a, Page No: 9 (Rate inclusive of GST 18 Percent)(Net Quantity 18 ) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080104105581Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity2760 m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080105105581Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 276 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080106105581Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 920 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080107105581Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 0)(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080108105581Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rate inclusive of GST 18 Percent)(Net Quantity 585cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -2nd year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080109105582Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (II) A, Page No: 9 (Rate inclusive of GST 18 Percent)(Net Quantity 27.6sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080110105582Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity 3680m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080111105582Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 276sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080112105582Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 920 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080113105582Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 0) (Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080114105582Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rate inclusive of GST 18 Percent)(Net Quantity 585cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -3rd year maintainance390456.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080115105583Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm519.38519.3827.0FalseNoneNoneFalseNoneFalse14023.260
3080116105583Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr7.927.923600.0FalseNoneNoneFalseNoneFalse28512.00
3080117105583Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm51.5451.54270.0FalseNoneNoneFalseNoneFalse13915.80
3080118105583Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.19128.19900.0FalseNoneNoneFalseNoneFalse115371.00
3080119105583Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm563.0563.0157.5FalseNoneNoneFalseNoneFalse88672.50
3080120105583Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No 16.22 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2622.052622.054.5FalseNoneNoneFalseNoneFalse11799.2250
3080121105583Nonevol- 3ItemNo16.24iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No 16.24i , Page No 148 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm272.24272.244.5FalseNoneNoneFalseNoneFalse1225.080
3080122105583Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum125.55125.55585.0FalseNoneNoneFalseNoneFalse73446.750
3080123105583Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm144.05144.05282.75FalseNoneNoneFalseNoneFalse40730.13750
3080124105583Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.181.182340.0FalseNoneNoneFalseNoneFalse2761.20
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -4th year maintainance345891.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080125105584Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm537.93537.9327.0FalseNoneNoneFalseNoneFalse14524.110
3080126105584Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr8.218.213600.0FalseNoneNoneFalseNoneFalse29556.00
3080127105584Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm53.3853.38270.0FalseNoneNoneFalseNoneFalse14412.60
3080128105584Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm132.77132.77900.0FalseNoneNoneFalseNoneFalse119493.00
3080129105584Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm583.1583.1157.5FalseNoneNoneFalseNoneFalse91838.250
3080130105584Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum130.03130.03585.0FalseNoneNoneFalseNoneFalse76067.550
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -5th year maintainance452818.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080131105585Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 , Page No 9 (Rates Inclusive of GST 18Percentage)(ii) a ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm556.48556.4827.0FalseNoneNoneFalseNoneFalse15024.960
3080132105585Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workMtr8.498.493600.0FalseNoneNoneFalseNoneFalse30564.00
3080133105585Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm55.2255.22270.0FalseNoneNoneFalseNoneFalse14909.40
3080134105585Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm137.35137.35900.0FalseNoneNoneFalseNoneFalse123615.00
3080135105585Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm603.21603.21315.0FalseNoneNoneFalseNoneFalse190011.150
3080136105585Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum134.52134.52585.0FalseNoneNoneFalseNoneFalse78694.20
17104486470000NoneNoneRoadsPkg 751 (A) Doddaganganvadi Gate SH-94 to Amruthuru (SH-84) Road SH-111 from Ch 12.00 KM to 13.20 KM and Ch 39.65 KM to 51.65 KM (in selected reaches) in Kunigal Taluk of Tumakuru District. -6th year maintainance14374400.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080137105586Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No 16.22 , Page No 147 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2902.982902.984.5FalseNoneNoneFalseNoneFalse13063.410
3080138105586Nonevol- 3ItemNo16.24 iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No 16.24 i , Page No 148 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm301.41301.414.5FalseNoneNoneFalseNoneFalse1356.3450
3080139105586Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm159.48159.48124.22FalseNoneNoneFalseNoneFalse19810.60560
3080140105586Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.311.311260.0FalseNoneNoneFalseNoneFalse1650.60
3080141105586Nonevol- 3ItemNo5.3PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Schedule of Rates PWD 2023-24 vol- 3, Item No 5.3 , Page No 31 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm17.5517.5526400.0FalseNoneNoneFalseNoneFalse463320.00
3080142105586Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic Less Than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No 5.16 C , Page No 38 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16027.8916027.89792.0FalseNoneNoneFalseNoneFalse12694088.880
3080143105586Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.15 , Page No 67 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm775.49775.49936.3FalseNoneNoneFalseNoneFalse726091.2870
3080144105586Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 /- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 /- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 /- 2 mm and height not less than 30/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.43 , Page No 74 (Rates Inclusive of GST 18Percentage) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo534.06534.06852.0FalseNoneNoneFalseNoneFalse455019.120
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -road construction40218916.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080145105587Nonevol- 3ItemNo16.29PageNo149Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3080146105587Nonevol- 3ItemNo3.5PageNo17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No 3.5 , Page No 17 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm7.087.0810215.0FalseNoneNoneFalseNoneFalse72322.20
3080147105587Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm463.74463.7475.89FalseNoneNoneFalseNoneFalse35193.22860
3080148105587Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum112.1112.112839.54FalseNoneNoneFalseNoneFalse1439312.4340
3080149105587Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.087.084700.0FalseNoneNoneFalseNoneFalse33276.00
3080150105587Nonevol- 1ItemNo1.7PageNo7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Schedule of Rates PWD 2023-24 vol- 1, Item No 1.7 , Page No 7 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum140.42140.42374.14FalseNoneNoneFalseNoneFalse52536.73880
3080151105587Nonevol- 3ItemNo4.2 (v)PageNo23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No 4.2 (v) , Page No 23 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2783.622783.622811.7FalseNoneNoneFalseNoneFalse7826704.3540
3080152105587Nonevol- 3ItemNo4.17PageNo26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No 4.17 , Page No 26 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3019.623019.624115.76FalseNoneNoneFalseNoneFalse12428031.21120
3080153105587Nonevol- 3ItemNo5.1 A (I)PageNo31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.1 A (I) , Page No 31 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm48.3848.3815981.05FalseNoneNoneFalseNoneFalse773163.1990
3080154105587Nonevol- 3ItemNo5.4PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/sqm on Granular surface Schedule of Rates PWD 2023-24 vol- 3, Item No 5.4 , Page No 31 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm16.5216.5215981.05FalseNoneNoneFalseNoneFalse264006.9460
3080155105587Nonevol- 3ItemNo5.12 (C)PageNo35Dense Graded Bituminous Macadam Grading - II for traffic Less Than20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023-24 vol- 3, Item No 5.12 (C) , Page No 35 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum11149.8211149.82799.05FalseNoneNoneFalseNoneFalse8909263.6710
3080156105587Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic Less Than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No 5.16 C , Page No 38 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72479.44FalseNoneNoneFalseNoneFalse6197107.19680
3080157105587Nonevol- 3ItemNo3.6PageNo17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 Percent) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Schedule of Rates PWD 2023-24 vol- 3, Item No 3.6 , Page No 17 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum581.74581.743698.85FalseNoneNoneFalseNoneFalse2151768.9990
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -road furnitures1479473.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080158105588Nonevol- 3ItemNo8.16 (i)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (i) , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3080159105588Nonevol- 3ItemNo8.16 (ii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (ii) , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3080160105588Nonevol- 3ItemNo8.16 (iii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No 8.16 (iii) , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach993.56993.5616.0FalseNoneNoneFalseNoneFalse15896.960
3080161105588Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.15 , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.4585.8FalseNoneNoneFalseNoneFalse366359.320
3080162105588Nonevol- 3ItemNo8.5 iiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 ii , Page No 64 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5527.125527.1210.0FalseNoneNoneFalseNoneFalse55271.20
3080163105588Nonevol- 3ItemNo8.5 iiiPageNo65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (ii) 75 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 iii , Page No 65 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4809.684809.6811.0FalseNoneNoneFalseNoneFalse52906.480
3080164105588Nonevol- 3ItemNo8.5 xvPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xv) 90 cm high octagon Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 xv , Page No 64 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach7672.367672.363.0FalseNoneNoneFalseNoneFalse23017.080
3080165105588Nonevol- 3ItemNo8.5 xiiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. (xii) 60 cm x 45 cm rectangular Schedule of Rates PWD 2023-24 vol- 3, Item No 8.5 xii , Page No 64 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4984.324984.3249.0FalseNoneNoneFalseNoneFalse244231.680
3080166105588Nonevol- 3ItemNo8.7PageNo65Direction and Place Identification Signs upto 0.9 sqm SizeBoard. Providing and erecting direction and place identification retroreflectorised sign as per IRC672022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 sqm fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with sqm5 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Schedule of Rates PWD 2023-24 vol- 3, Item No 8.7 , Page No 65 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm10631.810631.82.7FalseNoneNoneFalseNoneFalse28705.860
3080167105588Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 /- 2 mm and with minimum reflective area of 13 csqm on each side and the slope to the base shall be 35 /- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 /- 2 mm and height not less than 30/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.43 , Page No 74 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.7722.0FalseNoneNoneFalseNoneFalse310965.40
3080168105588Nonevol- 3ItemNo8.17PageNo67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.17 , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach2384.772384.774.0FalseNoneNoneFalseNoneFalse9539.080
3080169105588Nonevol- 3ItemNo8.31PageNo71Provision of 15 no rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.31 , Page No 71 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm221.84221.8441.25FalseNoneNoneFalseNoneFalse9150.90
3080170105588Nonevol- 3ItemNo8.60.2 iiPageNo80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 992018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 no. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m Schedule of Rates PWD 2023-24 vol- 3, Item No 8.60.2 ii , Page No 80 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo53635.7253635.723.0FalseNoneNoneFalseNoneFalse160907.160
3080171105588Nonevol- 3ItemNo8.29 (i)PageNo71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC 98 - 1997 and approved drawings. Single row for one utility service Schedule of Rates PWD 2023-24 vol- 3, Item No 8.29 (i) , Page No 71 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2610.162610.1670.0FalseNoneNoneFalseNoneFalse182711.20
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -CC Drain2250099.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080172105589Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36480.0FalseNoneNoneFalseNoneFalse57772.80
3080173105589Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0250.0FalseNoneNoneFalseNoneFalse353351.00
3080174105589Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.986.2FalseNoneNoneFalseNoneFalse578044.4760
3080175105589Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix using 20mm Nominal size graded crushed course aggregate Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum10072.5310072.5360.0FalseNoneNoneFalseNoneFalse604351.80
3080176105589Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix using 20mm Nominal size graded crushed course aggregate Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7461.137461.1340.0FalseNoneNoneFalseNoneFalse298445.20
3080177105589Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. sqm0 Design Mix using 20mm Nominal size graded crushed course aggregate Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8953.368953.3640.0FalseNoneNoneFalseNoneFalse358134.40
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -Pipe culvert1353957.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080178105590Nonevol- 3ItemNo2.11PageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No 2.11 , Page No 10 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.411.75FalseNoneNoneFalseNoneFalse2495.70
3080179105590Nonevol- 3ItemNo2.17 (ix) BPageNo11Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 2.17 (ix) B , Page No 11 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm1293.281293.2815.0FalseNoneNoneFalseNoneFalse19399.20
3080180105590Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No 1.14.1 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.3681.73FalseNoneNoneFalseNoneFalse9837.02280
3080181105590Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 136 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No 2.1.3 , Page No 15 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.028.3FalseNoneNoneFalseNoneFalse58656.2660
3080182105590Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No 2.11 h , Page No 18 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.981.13FalseNoneNoneFalseNoneFalse105353.26740
3080183105590Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix using 20mm Nominal size graded crushed course aggregate Schedule of Rates PWD 2023-24 vol- 1, Item No 2.4.2 , Page No 16 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8058.038058.0381.26FalseNoneNoneFalseNoneFalse654795.51780
3080184105590Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 12 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No 9.1.ii , Page No 87 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm12705.0612705.0620.0FalseNoneNoneFalseNoneFalse254101.20
3080185105590Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No 12.3A , Page No 117 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum1378.241378.2421.87FalseNoneNoneFalseNoneFalse30142.10880
3080186105590Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS 280 & IS4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No 14.2 , Page No 129 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2895.722895.7215.3FalseNoneNoneFalseNoneFalse44304.5160
3080187105590Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No 14.4(a) , Page No 129 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1644.38FalseNoneNoneFalseNoneFalse100128.38080
3080188105590Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No 12.4 , Page No 117 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8622.19FalseNoneNoneFalseNoneFalse70095.10340
3080189105590Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6229.55FalseNoneNoneFalseNoneFalse3800.7210
3080190105590Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.06800.0FalseNoneNoneFalseNoneFalse848.00
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -Electric pole shifting908883.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080191105591NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22160.0FalseNoneNoneFalseNoneFalse118755.20
3080192105591NoneSR 2023-24 Item Code 2.02, pg. no. 44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34160.0FalseNoneNoneFalseNoneFalse210134.40
3080193105591NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo742.22742.22160.0FalseNoneNoneFalseNoneFalse118755.20
3080194105591NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo1313.341313.34160.0FalseNoneNoneFalseNoneFalse210134.40
3080195105591NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSet303.26303.26160.0FalseNoneNoneFalseNoneFalse48521.60
3080196105591NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm188.8188.8160.0FalseNoneNoneFalseNoneFalse30208.00
3080197105591NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo385.86385.86160.0FalseNoneNoneFalseNoneFalse61737.60
3080198105591NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanized steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo313.88313.88160.0FalseNoneNoneFalseNoneFalse50220.80
3080199105591NoneSRPWD2023-24Fixing of 4 Pin cross arm with insulator and Braces fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 (Rate inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8160.0FalseNoneNoneFalseNoneFalse30208.00
3080200105591NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 (Rates Inclusive og GSt 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo188.8188.8160.0FalseNoneNoneFalseNoneFalse30208.00
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -water supply431795.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080201105592NoneVol 1ItemNo1.17.1PageNo10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (i) All kinds of soils. Depth upto 1.50 m (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum309.16309.16324.0FalseNoneNoneFalseNoneFalse100167.840
3080202105592NoneVol 5ItemNo9.2.3PageNo96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE Upto 110mm dia Coil shall be used. For HDPE PE 80 PN 6.0. HDPE Grade PE80-PN8.0,90mm dia Schedule of Rates PWD 2023-24 vol- 5, Item No 9.2.3, Page No 96 (Rates Inclusive of 18Percent GST) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum450.76450.76600.0FalseNoneNoneFalseNoneFalse270456.00
3080203105592NoneVol1itemNo1.10Page No7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7 (rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum188.8188.8324.0FalseNoneNoneFalseNoneFalse61171.20
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -1st year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080204105593Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a, Page No: 9 (Rate inclusive of GST 18 Percent)(Net Quantity 15.90sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080205105593Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity1590 m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080206105593Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 238.50 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080207105593Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 795 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080208105593Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Have to rectify Irrespective of Quantity) (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080209105593Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rate inclusive of GST 18 Percent)(Net Quantity 270 cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -2nd year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080210105594Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a, Page No: 9 (Rate inclusive of GST 18 Percent)(Net Quantity 23.85 ) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080211105594Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity 2120 m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080212105594Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 238.50 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080213105594Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 795sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080214105594Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 0) (Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080215105594Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rate inclusive of GST 18 Percent)(Net Quantity 270) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -3rd year maintainance246053.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080216105595Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm519.38519.3823.85FalseNoneNoneFalseNoneFalse12387.2130
3080217105595Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.927.922120.0FalseNoneNoneFalseNoneFalse16790.40
3080218105595Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm51.5451.54238.5FalseNoneNoneFalseNoneFalse12292.290
3080219105595Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.19128.19795.0FalseNoneNoneFalseNoneFalse101911.050
3080220105595Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm563.0563.072.88FalseNoneNoneFalseNoneFalse41031.440
3080221105595Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No 16.22 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2622.052622.052.65FalseNoneNoneFalseNoneFalse6948.43250
3080222105595Nonevol- 3ItemNo16.24iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No 16.24i , Page No 148 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm272.24272.242.65FalseNoneNoneFalseNoneFalse721.4360
3080223105595Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum125.55125.55270.0FalseNoneNoneFalseNoneFalse33898.50
3080224105595Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm144.05144.05130.5FalseNoneNoneFalseNoneFalse18798.5250
3080225105595Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.181.181080.0FalseNoneNoneFalseNoneFalse1274.40
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -4th year maintainance226122.54
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080226105596Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm537.93537.9323.85FalseNoneNoneFalseNoneFalse12829.63050
3080227105596Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.218.212120.0FalseNoneNoneFalseNoneFalse17405.20
3080228105596Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm53.3853.38238.5FalseNoneNoneFalseNoneFalse12731.130
3080229105596Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm132.77132.77795.0FalseNoneNoneFalseNoneFalse105552.150
3080230105596Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm583.1583.172.88FalseNoneNoneFalseNoneFalse42496.3280
3080231105596Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum130.03130.03270.0FalseNoneNoneFalseNoneFalse35108.10
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -5th year maintainance277870.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080232105597Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No 2.5 (ii) a, Page No 9 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm556.48556.4823.85FalseNoneNoneFalseNoneFalse13272.0480
3080233105597Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No 16.19 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.498.492120.0FalseNoneNoneFalseNoneFalse17998.80
3080234105597Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm55.2255.22238.5FalseNoneNoneFalseNoneFalse13169.970
3080235105597Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm137.35137.35795.0FalseNoneNoneFalseNoneFalse109193.250
3080236105597Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No 10.5 , Page No 91 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm603.2603.2145.75FalseNoneNoneFalseNoneFalse87916.40
3080237105597Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No 1.12 , Page No 8 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum134.52134.52270.0FalseNoneNoneFalseNoneFalse36320.40
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -6th year maintainance8224911.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080238105598Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No 16.22 , Page No 147 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2902.982902.982.65FalseNoneNoneFalseNoneFalse7692.8970
3080239105598Nonevol- 3ItemNo16.24 iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No 16.24 i , Page No 148 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm301.41301.412.65FalseNoneNoneFalseNoneFalse798.73650
3080240105598Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No 8.1 , Page No 66 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm159.48159.4814.62FalseNoneNoneFalseNoneFalse2331.59760
3080241105598Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No 8.4 , Page No 63 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.321.321080.0FalseNoneNoneFalseNoneFalse1425.60
3080242105598Nonevol- 3ItemNo5.3PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous surface cleaned with mechanical broom Schedule of Rates PWD 2023-24 vol- 3, Item No 5.3 , Page No 31 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm17.5517.5514875.0FalseNoneNoneFalseNoneFalse261056.250
3080243105598Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic Less Than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No 5.16 C , Page No 38 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16027.8916027.89446.25FalseNoneNoneFalseNoneFalse7152445.91250
3080244105598Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.15 , Page No 67 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm775.49775.49533.3FalseNoneNoneFalseNoneFalse413568.8170
3080245105598Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 /- 2 mm and with minimum reflective area of 13 csqm on each side and the slope to the base shall be 35 /- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 /- 2 mm and height not less than 30/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No 8.43 , Page No 74 (Rates Inclusive of GSt 18Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo534.06534.06722.0FalseNoneNoneFalseNoneFalse385591.320
17104486470000NoneNoneRoadsPkg 751 (C) Kottagerepalya to Magadi border from Ch 0.00 KM to 10.00 KM (in selected reahes) in Kunigal Taluk of Tumakuru District.-Road construction19017960.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080246105599Nonevol- 3ItemNo16.29PageNo149Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149: 16.29 , Page No: 149 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3080247105599Nonevol- 3ItemNo3.5PageNo17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm7.087.085006.25FalseNoneNoneFalseNoneFalse35444.250
3080248105599Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a, Page No: 9 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm463.74463.7437.06FalseNoneNoneFalseNoneFalse17186.20440
3080249105599Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum112.1112.13066.36FalseNoneNoneFalseNoneFalse343738.9560
3080250105599Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.087.082550.0FalseNoneNoneFalseNoneFalse18054.00
3080251105599Nonevol- 1ItemNo1.7PageNo7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum140.42140.421928.52FalseNoneNoneFalseNoneFalse270802.77840
3080252105599Nonevol- 3ItemNo4.2 (v)PageNo23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2783.622783.621306.0FalseNoneNoneFalseNoneFalse3635407.720
3080253105599Nonevol- 3ItemNo4.17PageNo26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3019.623019.621960.75FalseNoneNoneFalseNoneFalse5920719.9150
3080254105599Nonevol- 3ItemNo5.1 A (I)PageNo31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm48.3848.387576.03FalseNoneNoneFalseNoneFalse366528.33140
3080255105599Nonevol- 3ItemNo5.4PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm16.5216.527576.03FalseNoneNoneFalseNoneFalse125156.01560
3080256105599Nonevol- 3ItemNo5.12 (C)PageNo35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.12 (C) , Page No: 35 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum11149.8211149.82378.81FalseNoneNoneFalseNoneFalse4223663.31420
3080257105599Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic less than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum12925.7212925.72227.27FalseNoneNoneFalseNoneFalse2937628.38440
3080258105599Nonevol- 3ItemNo3.6PageNo17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum581.74581.741869.22FalseNoneNoneFalseNoneFalse1087400.04280
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -road furnitures955752.21
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080259105600Nonevol- 3ItemNo8.16 (ii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (ii) , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach3453.863453.861.0FalseNoneNoneFalseNoneFalse3453.860
3080260105600Nonevol- 3ItemNo8.16 (iii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (iii) , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach993.56993.566.0FalseNoneNoneFalseNoneFalse5961.360
3080261105600Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm625.4625.4313.75FalseNoneNoneFalseNoneFalse196219.250
3080262105600Nonevol- 3ItemNo8.5 iiPageNo64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 ii , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach5527.125527.1212.0FalseNoneNoneFalseNoneFalse66325.440
3080263105600Nonevol- 3ItemNo8.5 iiiPageNo65Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 75 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 iii , Page No: 65 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4809.684809.683.0FalseNoneNoneFalseNoneFalse14429.040
3080264105600Nonevol- 3ItemNo8.5 xvPageNo64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 xv , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach7672.367672.362.0FalseNoneNoneFalseNoneFalse15344.720
3080265105600Nonevol- 3ItemNo8.5 xiiPageNo64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xii) 60 cm x 45 cm rectangular Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 xii , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach4984.324984.3245.0FalseNoneNoneFalseNoneFalse224294.40
3080266105600Nonevol- 3ItemNo8.7PageNo65Direction and Place Identification Signs upto 0.9 m2 SizeBoard. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.7 , Page No: 65 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm10631.810631.85.4FalseNoneNoneFalseNoneFalse57411.720
3080267105600Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo430.7430.7276.0FalseNoneNoneFalseNoneFalse118873.20
3080268105600Nonevol- 3ItemNo8.17PageNo67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.17 , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workEach2384.782384.786.0FalseNoneNoneFalseNoneFalse14308.680
3080269105600Nonevol- 3ItemNo8.31PageNo71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.31 , Page No: 71 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm221.84221.84123.75FalseNoneNoneFalseNoneFalse27452.70
3080270105600Nonevol- 3ItemNo8.60.2 iiPageNo80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.60.2 ii , Page No: 80 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo53635.7253635.722.0FalseNoneNoneFalseNoneFalse107271.440
3080271105600Nonevol- 3ItemNo8.29 (i)PageNo71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29 (i) , Page No: 71 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2610.162610.1640.0FalseNoneNoneFalseNoneFalse104406.40
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -Box culvert7114162.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080272105601Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11 (ii) A, Page No: 10 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.453.39FalseNoneNoneFalseNoneFalse11340.0360
3080273105601Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.36659.74FalseNoneNoneFalseNoneFalse79406.30640
3080274105601Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.0296.66FalseNoneNoneFalseNoneFalse683098.15320
3080275105601Nonevol- 1ItemNo2.11 HPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.9820.58FalseNoneNoneFalseNoneFalse1918734.72840
3080276105601Nonevol- 1ItemNo2.4.3PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8971.778971.7789.81FalseNoneNoneFalseNoneFalse805754.66370
3080277105601Nonevol- 1ItemNo2.4.3PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8074.598074.5981.69FalseNoneNoneFalseNoneFalse659613.25710
3080278105601Nonevol- 1ItemNo2.5.2PageNo16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum9689.689689.6818.9FalseNoneNoneFalseNoneFalse183134.9520
3080279105601Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.86138.15FalseNoneNoneFalseNoneFalse436396.5090
3080280105601Nonevol- 1ItemNo2.2.1PageNo15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.2.1 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7418.667418.66123.12FalseNoneNoneFalseNoneFalse913385.41920
3080281105601Nonevol- 3ItemNo13.8PageNo121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8036.988036.9821.0FalseNoneNoneFalseNoneFalse168776.580
3080282105601Nonevol- 3ItemNo13.9PageNo122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum13965.313965.363.0FalseNoneNoneFalseNoneFalse879813.90
3080283105601Nonevol- 3ItemNo13.2PageNo121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16485.7816485.783.89FalseNoneNoneFalseNoneFalse64129.68420
3080284105601Nonevol- 3ItemNo13.16PageNo124Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm2118.12118.160.0FalseNoneNoneFalseNoneFalse127086.00
3080285105601Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6251.72FalseNoneNoneFalseNoneFalse6652.22640
3080286105601Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.061620.0FalseNoneNoneFalseNoneFalse1717.20
3080287105601Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1677.62FalseNoneNoneFalseNoneFalse175123.13920
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -Pipe culvert676934.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080288105602Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11(ii)A , Page No: 10 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum212.4212.48.0FalseNoneNoneFalseNoneFalse1699.20
3080289105602Nonevol- 3ItemNo2.17 (ix) BPageNo11Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm1293.281293.287.5FalseNoneNoneFalseNoneFalse9699.60
3080290105602Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum120.36120.3640.86FalseNoneNoneFalseNoneFalse4917.90960
3080291105602Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum7067.027067.024.15FalseNoneNoneFalseNoneFalse29328.1330
3080292105602Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workt93232.9893232.980.56FalseNoneNoneFalseNoneFalse52210.46880
3080293105602Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum8058.038058.0340.63FalseNoneNoneFalseNoneFalse327397.75890
3080294105602Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No: 9.1.ii , Page No: 87 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm12705.0612705.0610.0FalseNoneNoneFalseNoneFalse127050.60
3080295105602Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum1378.241378.2410.94FalseNoneNoneFalseNoneFalse15077.94560
3080296105602Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2895.722895.727.65FalseNoneNoneFalseNoneFalse22152.2580
3080297105602Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum2256.162256.1622.19FalseNoneNoneFalseNoneFalse50064.19040
3080298105602Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum3158.863158.8611.09FalseNoneNoneFalseNoneFalse35031.75740
3080299105602Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.62128.6214.62FalseNoneNoneFalseNoneFalse1880.42440
3080300105602Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.061.06400.0FalseNoneNoneFalseNoneFalse424.00
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -electric pole shifting227220.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080301105603NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43 Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos742.22742.2240.0FalseNoneNoneFalseNoneFalse29688.80
3080302105603NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos1313.341313.3440.0FalseNoneNoneFalseNoneFalse52533.60
3080303105603NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos742.22742.2240.0FalseNoneNoneFalseNoneFalse29688.80
3080304105603NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos1313.341313.3440.0FalseNoneNoneFalseNoneFalse52533.60
3080305105603NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSet303.26303.2640.0FalseNoneNoneFalseNoneFalse12130.40
3080306105603NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fixing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm188.8188.840.0FalseNoneNoneFalseNoneFalse7552.00
3080307105603NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos385.86385.8640.0FalseNoneNoneFalseNoneFalse15434.40
3080308105603NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44(Rate inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos313.88313.8840.0FalseNoneNoneFalseNoneFalse12555.20
3080309105603NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos188.8188.840.0FalseNoneNoneFalseNoneFalse7552.00
3080310105603NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNos188.8188.840.0FalseNoneNoneFalseNoneFalse7552.00
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -1st year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080311105604Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9(Rate inclusive of GST 18 Percent)(Net Quantity 10.20 ) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080312105604Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity 765 m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080313105604Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 114.75 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080314105604Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91(Rate inclusive of GST 18 Percent)(Net Quantity 382.50sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080315105604Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Have to rectify Irrespective of Quantity)(Net Quantity 0) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3080316105604Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(Rate inclusive of GST 18 Percent)(Net Quantity 405 cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -2nd year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080317105605Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9(Rate inclusive of GST 18 Percent)(Net Quantity 15.30 sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080318105605Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 Percent)(Net Quantity 1020m) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080319105605Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 114.75sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080320105605Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91(Rate inclusive of GST 18 Percent)(Net Quantity 382.50sqm) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080321105605Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rate inclusive of GST 18 Percent)(Net Quantity 0)(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3080322105605Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rate inclusive of GST 18 Percent)(Net Quantity 405cum) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -3rd year maintainance175372.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080323105606Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm519.38519.3815.3FalseNoneNoneFalseNoneFalse7946.5140
3080324105606Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm7.927.921020.0FalseNoneNoneFalseNoneFalse8078.40
3080325105606Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm51.5451.54114.75FalseNoneNoneFalseNoneFalse5914.2150
3080326105606Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm128.19128.19382.5FalseNoneNoneFalseNoneFalse49032.6750
3080327105606Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm563.0563.035.06FalseNoneNoneFalseNoneFalse19738.780
3080328105606Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2622.052622.051.28FalseNoneNoneFalseNoneFalse3356.2240
3080329105606Nonevol- 3ItemNo16.24iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm272.24272.241.28FalseNoneNoneFalseNoneFalse348.46720
3080330105606Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum125.55125.55405.0FalseNoneNoneFalseNoneFalse50847.750
3080331105606Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm144.05144.05195.75FalseNoneNoneFalseNoneFalse28197.78750
3080332105606Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.181.181620.0FalseNoneNoneFalseNoneFalse1911.60
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -4th year maintainance146620.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080333105607Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm537.93537.9315.3FalseNoneNoneFalseNoneFalse8230.3290
3080334105607Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.218.211020.0FalseNoneNoneFalseNoneFalse8374.20
3080335105607Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm53.3853.38114.75FalseNoneNoneFalseNoneFalse6125.3550
3080336105607Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm132.77132.77382.5FalseNoneNoneFalseNoneFalse50784.5250
3080337105607Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm583.11583.1135.06FalseNoneNoneFalseNoneFalse20443.83660
3080338105607Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum130.03130.03405.0FalseNoneNoneFalseNoneFalse52662.150
17104486470000NoneNoneRoadsPkg 751 (C) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -5th year maintainance172824.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080339105608Nonevol- 3ItemNo2.5(ii)aPageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the work100 Sqm556.48556.4815.3FalseNoneNoneFalseNoneFalse8514.1440
3080340105608Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workm8.498.491020.0FalseNoneNoneFalseNoneFalse8659.80
3080341105608Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm55.2255.22114.75FalseNoneNoneFalseNoneFalse6336.4950
3080342105608Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm137.35137.35382.5FalseNoneNoneFalseNoneFalse52536.3750
3080343105608Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm603.21603.2170.12FalseNoneNoneFalseNoneFalse42297.08520
3080344105608Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum134.52134.52405.0FalseNoneNoneFalseNoneFalse54480.60
17104486470000NoneNoneRoadsPkg 751 (B) Kothagere- CS Pura Koppa Road to Magadi Border Road MDR from Ch 0.00 KM to 17.50 KM (in selected reahes) in Kunigal Taluk of Tumakuru District. -6th year maintainance3855640.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3080345105609Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm2902.982902.981.28FalseNoneNoneFalseNoneFalse3715.81440
3080346105609Nonevol- 3ItemNo16.24 iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 148 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workKm301.42301.421.28FalseNoneNoneFalseNoneFalse385.81760
3080347105609Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm159.48159.4865.89FalseNoneNoneFalseNoneFalse10508.13720
3080348105609Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workPer cm Height Per Letter1.321.32720.0FalseNoneNoneFalseNoneFalse950.40
3080349105609Nonevol- 3ItemNo5.3PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm17.5617.567012.5FalseNoneNoneFalseNoneFalse123139.50
3080350105609Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic less than20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workCum16027.8916027.89210.37FalseNoneNoneFalseNoneFalse3371787.21930
3080351105609Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workSqm775.49775.49255.0FalseNoneNoneFalseNoneFalse197749.950
3080352105609Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74 (Rates Inclusive of GST 18 Percent) ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc...along with 18 Percent GST complete as directed as per the specification and direction of Engineer-in-charge of the workNo534.07534.07276.0FalseNoneNoneFalseNoneFalse147403.320
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17104486510001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17104486510001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17104486510001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17104490190000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17104490280000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17104490370000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17104490440000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17104490570000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17104490640000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17104490710000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17104490810000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17104490880000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17104490960000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tenderNone
17104491060000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17104491150000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17104491230000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17104491310000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17104491390000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17104491450000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17104491510000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17104491570000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17104491630000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17104491690000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17104491740000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17104491800000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.964.57 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent, Bill copies shall not be accepted
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 43065.46. Cum 2. GSB/WMM : 19725.50 Cum 3. BM/SDBC/DBM/BC : 4452.72 Cum4 PCC/DLC M10 & M15 : 205.29 Cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades :818.18 cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No 2.Mechanical Paver Finisher:1 No 3. Static Road Roller: 1 No. 4. Vibratory Road Roller: 1 No. 5. Tippers:4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate:(ii) Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill : 1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4.Vibratory Road Roller (6T to 10T): 2 No 5.Tandem Roller:1 No 6.Excavator 0.90 Cum Bucket Capacity:2 No 7.Tipper Trucks:6 Nos 8.Self Loading Concrete Mixer 2 M3 Capacity:3 No 9.Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3858.28 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs 578.74 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAffidavitOthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
EPF registrationFalseTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710451046000
version0
createdDateNone
modifiedDateNone
blockNumberOFFICE OF THE CHIEF PROJECT OFFICER, PROJECT IMPLEMENTAION UNIT, STATE HIGHWAY DEVELOPMENT PROJECT, PWD ANNEX BUILDING, K R CIRCLE , BENGALURU
streetNone
cityBENGALURU
stateKarnataka
pin560001
tenderRecallDTONone