noticeInvitingTenderDTO
createdTs1710444371923
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2401000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate15-03-2024 01:56:28
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee2301000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710444371956
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9895
titlePackage740 - A) Improvement to road connecting Rajanakunte to Bagaluru Ch 0.00 KM to15.00 KM (in selected reaches) in Bangalore North TalukB) Improvements to road connecting (NH-7) Doddajaala to MailanahalliCh 0.0 KM to 6.98 KM (in selected reaches) in Bangalore North Taluk. C) Improvements to road connecting Reva college junction to Bhudigere crossCh 0.00 KM to 14.7 KM (in selected reaches) in Bangalore North Taluk of Bangalore District.
descriptionPackage740 - C) Improvements to Road connecting reva College Junction to Bhudigere Cross Via Country Club saathanru -Baagaluru-Maarenahalli from ch.Km 0.00 to 14.7Km (in selected Reaches) in Banglore North Taluk of Banglore District. B) Improvements to Road connecting (NH-7) Doddajaala to Mailanahalli via Shettigere-Beguru-Muttugadahalli from ch.Km 0.00 to 6.98Km (in selected Reaches) in Banglore North Taluk of Banglore District. A) Improvements to Road connecting Rajanakunte to Bengaluru Via Rajanakunte-Thimmasandra -Tarahunase -Bettalasuru-Sonnappanahalli -Vidyanagara cross -huttanahalli-Razak palya from ch.Km 0.00 to 15.0 Km (in selected Reaches) in Banglore North Taluk of Banglore District
categoryWORKS
categoryTextWorks
ecv240062537.74
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/BNG/PKG-740/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17104443720000NoneNoneRoadsRECONSTRUCTION REACHES (Pkg-740 C)61493060.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079474105518NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm477.65477.6540.8FalseNoneNoneFalseNoneFalse19488.120
3079475105518NoneItem No.VOL-III-3.5 Page No. 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm7.297.2923800.0FalseNoneNoneFalseNoneFalse173502.00
3079476105518NoneItem No. VOL-III- 4.20 Page No.27Construction of Median and Island with Soil Taken from Borrow Areas Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408 PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum659.96659.96408.0FalseNoneNoneFalseNoneFalse269263.680
3079477105518NoneItem No. VOL-III-4.1-iii Page No.23Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. For Grading -III Material PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3051.873051.874284.0FalseNoneNoneFalseNoneFalse13074211.080
3079478105518NoneItem No. VOL-III-4.17 Page No.26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3110.213110.216120.0FalseNoneNoneFalseNoneFalse19034485.20
3079479105518NoneItem No. VOL-III-5.1-A Page No.31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm49.8349.8345237.5FalseNoneNoneFalseNoneFalse2254184.6250
3079480105518NoneItem No. VOL-III-5.4 Page No.31Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm17.0217.0224237.5FalseNoneNoneFalseNoneFalse412522.250
3079481105518NoneItem No.VOL-III-5.12-C Page No. 35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum11484.3111484.311211.88FalseNoneNoneFalseNoneFalse13917605.60280
3079482105518NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum13313.4913313.49727.12FalseNoneNoneFalseNoneFalse9680504.84880
3079483105518NoneItem No. VOL-III-8.42.3 Page No.74Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 150 mm size PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm562.73562.733412.0FalseNoneNoneFalseNoneFalse1920034.760
3079484105518NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates... complete as directed as per the specification and direction of Engineer-in-charge of the work Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7279.037279.0351.18FalseNoneNoneFalseNoneFalse372540.75540
3079485105518NoneItem No. VOL-III-8.10 Page No.66KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm132.48132.481535.4FalseNoneNoneFalseNoneFalse203409.7920
3079486105518NoneItem No.VOL-III-8.29 i Page No. 71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m2688.462688.4660.0FalseNoneNoneFalseNoneFalse161307.60
17104443720000NoneNoneRoadsSides Widening with Strengthening Reaches (Pkg-740 C)27476066.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079487105519NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm477.65477.6526.4FalseNoneNoneFalseNoneFalse12609.960
3079488105519NoneItem No. VOL-III-3.6 Page No.17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum599.19599.191450.79FalseNoneNoneFalseNoneFalse869298.86010
3079489105519NoneItem No. VOL-III- 4.20 Page No.27Construction of Median and Island with Soil Taken from Borrow Areas Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408 PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum659.96659.96308.0FalseNoneNoneFalseNoneFalse203267.680
3079490105519NoneItem No. VOL-III-4.2-iii Page No.23Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -III Material PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2897.512897.511342.0FalseNoneNoneFalseNoneFalse3888458.420
3079491105519NoneItem No. VOL-III-4.17 Page No.26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3110.213110.211457.5FalseNoneNoneFalseNoneFalse4533131.0750
3079492105519NoneItem No. VOL-III-5.1-A Page No.31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm49.8349.835500.0FalseNoneNoneFalseNoneFalse274065.00
3079493105519NoneItem No. VOL-III-5.3 Page No.31Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm14.5814.5816275.0FalseNoneNoneFalseNoneFalse237289.50
3079494105519NoneItem No.VOL-III-5.12-C Page No. 37Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum11484.3111484.31813.76FalseNoneNoneFalseNoneFalse9345472.10560
3079495105519NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum13313.4913313.49488.24FalseNoneNoneFalseNoneFalse6500178.35760
3079496105519NoneItem No. VOL-III-8.42.3 Page No.74Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 150 mm size PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm562.73562.732204.0FalseNoneNoneFalseNoneFalse1240256.920
3079497105519NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates... complete as directed as per the specification and direction of Engineer-in-charge of the work Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7279.037279.0333.06FalseNoneNoneFalseNoneFalse240644.73180
3079498105519NoneItem No. VOL-III-8.10 Page No.66KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm132.48132.48991.8FalseNoneNoneFalseNoneFalse131393.6640
17104443720000NoneNoneRoadsROAD SAFETY FURNITURES (Pkg-740 C)5878772.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079499105520NoneItem No. VOL-III-16.29 Page No.149i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos18658.8218658.822.0FalseNoneNoneFalseNoneFalse37317.640
3079500105520NoneItem No. VOL-III-8.16-ii Page No.67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) MORTH Specification No. 804 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each3557.483557.483.0FalseNoneNoneFalseNoneFalse10672.440
3079501105520NoneItem No. VOL-III-8.16-iii Page No.67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) MORTH Specification No. 804 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each1023.371023.3711.0FalseNoneNoneFalseNoneFalse11257.070
3079502105520NoneItem No. VOL-III-8.15 Page No.67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm644.16644.161915.8FalseNoneNoneFalseNoneFalse1234081.7280
3079503105520NoneItem No. VOL-III-8.5-ii Page No.64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5692.935692.9342.0FalseNoneNoneFalseNoneFalse239103.060
3079504105520NoneItem No. VOL-III-8.5-viii Page No.64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5222.575222.5746.0FalseNoneNoneFalseNoneFalse240238.220
3079505105520NoneItem No. VOL-III-8.6-(x) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XI PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each6690.786690.784.0FalseNoneNoneFalseNoneFalse26763.120
3079506105520NoneItem No. VOL-III-8.5-iv Page No.64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each4346.274346.275.0FalseNoneNoneFalseNoneFalse21731.350
3079507105520NoneItem No. VOL-III-8.6-(xv) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XI PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each8052.038052.034.0FalseNoneNoneFalseNoneFalse32208.120
3079508105520NoneItem No. VOL-III-8.7 Page No.65Direction and Place Identification Signs upto 0.9 sqm Size Board: Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60 cm, 60 em below ground level as per approved drawing. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm10950.7510950.7510.8FalseNoneNoneFalseNoneFalse118268.10
3079509105520NoneItem No. VOL-III-8.4 Page No.63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.cm1.091.092400.0FalseNoneNoneFalseNoneFalse2616.00
3079510105520NoneItem No. VOL-III-8.43 Page No.74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No443.62443.62968.0FalseNoneNoneFalseNoneFalse429424.160
3079511105520NoneItem No. VOL-III-8.60.2-iii Page No.80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No63041.5863041.586.0FalseNoneNoneFalseNoneFalse378249.480
3079512105520NoneItem No. VOL-III-8.25-i Page No.69Metal Beam Crash Barrier (i)Type - A, ""W"" : Metal Beam Crash Barrier Providing and erecting a ""W"" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 MORTH Specification No. 810 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m4424.064424.06700.0FalseNoneNoneFalseNoneFalse3096842.00
17104443720000NoneNoneRoadsConstruction of Field Culvert 750mm dia (Pkg-740 C)1117619.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079513105521NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 mCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum123.97123.97147.84FalseNoneNoneFalseNoneFalse18327.72480
3079514105521NoneItem No.VOL-I-2.1.3 Page No. 16Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7279.037279.0310.62FalseNoneNoneFalseNoneFalse77303.29860
3079515105521NoneItem No.VOL-I-2.11.h Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne96029.9796029.971.33FalseNoneNoneFalseNoneFalse127719.86010
3079516105521NoneItem No. VOL-I-2.4.2 Page No.16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.(M 20) Using 20 mm nominal size graded crushed coarse aggregateCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7685.077685.0788.93FalseNoneNoneFalseNoneFalse683433.27510
3079517105521NoneItem No.VOL-III-16.15(c)Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. c.750 mm diaCommon SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m4053.364053.3650.0FalseNoneNoneFalseNoneFalse202668.00
3079518105521NoneItem No.VOL-I-1.10 Page No. 07Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specificationsCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum194.46194.4642.0FalseNoneNoneFalseNoneFalse8167.320
17104443720000NoneNoneRoadsConstruction of Cover Slab 1.00 x 1.00m without Duct. (Pkg-740 C)8319801.15
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079519105522NoneItem No. VOL-I-2.11-h Page No.18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GTS 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne96029.9796029.9741.6FalseNoneNoneFalseNoneFalse3994846.7520
3079520105522NoneItem No. VOL-I-2.5.2 (20 percent for Slab CentringProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring ) Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8317.228317.22520.0FalseNoneNoneFalseNoneFalse4324954.40
17104443720000NoneNoneRoadsWater Supply Line Shifting. (Pkg-740 C)3063465.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079521105523NoneItem No.VOL-I-1.17.1 Page No. 10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum588.25588.251890.0FalseNoneNoneFalseNoneFalse1111792.50
3079522105523NoneItem No. VOL-5 - 9.2.3 Page No.96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used.For :HDPE PE 80 PN 8.0PWD SOR for Water Supply & Sewerage Works - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr464.28464.283500.0FalseNoneNoneFalseNoneFalse1624980.00
3079523105523NoneItem No. VOL-I-1.10 Page No.7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specificationsPWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum194.46194.461680.0FalseNoneNoneFalseNoneFalse326692.80
17104443720000NoneNoneRoadsShifting of 11KV line as per Site Condition (Pkg-740 C)3189478.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079524105524NoneI-1PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 ,11KV system, P No-3, I no-1.06, Material code-200006) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No4954.824954.8224.0FalseNoneNoneFalseNoneFalse118915.680
3079525105524NoneI-2PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 P No-3, I no-1.05, Material code-200004) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos4364.824364.8228.0FalseNoneNoneFalseNoneFalse122214.960
3079526105524NoneI-311 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.01, Material code-279020) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Set438.96438.9652.0FalseNoneNoneFalseNoneFalse22825.920
3079527105524NoneI-4HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.11, Material code-279092) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos107.38107.3852.0FalseNoneNoneFalseNoneFalse5583.760
3079528105524NoneI-5LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.07, Material code-279012) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos155.76155.7652.0FalseNoneNoneFalseNoneFalse8099.520
3079529105524NoneI-611 kV, 45 kN Polymeric Insulator . (C SR 2023-24 P No-5, I no-6.10, Material code-283320) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No219.48219.4852.0FalseNoneNoneFalseNoneFalse11412.960
3079530105524NoneI-711 kV, 5 kN Composite/Polymeric Pin Insulator. (C SR 2023-24 P No-5, I no-6.06, Material code-283008) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No241.9241.952.0FalseNoneNoneFalseNoneFalse12578.80
3079531105524NoneI-8Guy Set (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No979.4979.452.0FalseNoneNoneFalseNoneFalse50928.80
3079532105524NoneI-9Rabbit ACSR conductor (C SR 2023-24 P No-5, I no-7.02, Material code-284108) (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.No54556.1254556.1252.0FalseNoneNoneFalseNoneFalse2836918.240
17104443720000NoneNoneRoadsRoad Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) (Pkg-740 C)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079533105525NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 0.34) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079534105525NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 2240) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079535105525NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079536105525NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 840) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079537105525NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) (Qty 840) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104443720000NoneNoneRoadsRoad Maintenance - Activities to be carried out for the Second Year. (No Payment will be made for the activities) (Pkg-740 C)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079538105526NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 33.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079539105526NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 2240) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079540105526NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079541105526NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 840) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3079542105526NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) (Qty 392) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17104443720000NoneNoneRoadsEstimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE) (Pkg-740 C)239443.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079543105527NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 33.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm453.36453.3633.6FalseNoneNoneFalseNoneFalse15232.8960
3079544105527NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr6.926.922240.0FalseNoneNoneFalseNoneFalse15500.80
3079545105527NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm44.9944.99252.0FalseNoneNoneFalseNoneFalse11337.480
3079546105527NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm111.9111.9840.0FalseNoneNoneFalseNoneFalse93996.00
3079547105527NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2288.742288.742.8FalseNoneNoneFalseNoneFalse6408.4720
3079548105527NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km237.64237.642.8FalseNoneNoneFalseNoneFalse665.3920
3079549105527NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm491.34491.34196.0FalseNoneNoneFalseNoneFalse96302.640
17104443720000NoneNoneRoadsEstimates for Maintenance - Activities to be carried out for the Fourth Year (PAID MAINTENANCE) (Pkg-740 C)338052.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079550105528NoneItem No.VOL-III-2.5 ii) b) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm469.55469.5533.6FalseNoneNoneFalseNoneFalse15776.880
3079551105528NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr7.177.172240.0FalseNoneNoneFalseNoneFalse16060.80
3079552105528NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm46.646.6252.0FalseNoneNoneFalseNoneFalse11743.20
3079553105528NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm115.9115.91680.0FalseNoneNoneFalseNoneFalse194712.00
3079554105528NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm508.98508.98196.0FalseNoneNoneFalseNoneFalse99760.080
17104443720000NoneNoneRoadsEstimates for Maintenance - Activities to be carried out for the Fifth Year (PAID MAINTENANCE) (Pkg-740 C)1005920.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079555105529NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm485.74485.7433.6FalseNoneNoneFalseNoneFalse16320.8640
3079556105529NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr13.613.62240.0FalseNoneNoneFalseNoneFalse30464.00
3079557105529NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm88.3788.37252.0FalseNoneNoneFalseNoneFalse22269.240
3079558105529NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm219.8219.81680.0FalseNoneNoneFalseNoneFalse369264.00
3079559105529NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm965.31965.31588.0FalseNoneNoneFalseNoneFalse567602.280
17104443720000NoneNoneRoadsCOST ESTIMATE FOR RENEWAL AFTER ROAD MAINTENANCE PERIOD (Pkg-740 C)22088825.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079560105530NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2990.082990.085.6FalseNoneNoneFalseNoneFalse16744.4480
3079561105530NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km310.46310.462.8FalseNoneNoneFalseNoneFalse869.2880
3079562105530NoneItem No.VOL-III-5.3-i Page No. 31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm18.0818.0839200.0FalseNoneNoneFalseNoneFalse708736.00
3079563105530NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSA KSRRB M500-19. Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction in all respects complete as per specifications. Clause 507 of MORTH V revision : using 40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (30 mm to 40 mm) with 5.4% VG-30 Bitumen ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum16508.7316508.731176.0FalseNoneNoneFalseNoneFalse19414266.480
3079564105530NoneItem No.VOL-III-8.15 Page No. 67Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm798.76798.761772.4FalseNoneNoneFalseNoneFalse1415722.2240
3079565105530NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each550.09550.09968.0FalseNoneNoneFalseNoneFalse532487.120
17104443720000NoneNoneRoadsReconstruction (Pkg-740B)17900174.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079566105531NoneItem No. VOL-III-2.5-ii-A Page No.9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light junglePWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm463.74463.7423.9FalseNoneNoneFalseNoneFalse11083.3860
3079567105531NoneItem No. VOL-I-1.12 Page No.8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum112.1112.11033.98FalseNoneNoneFalseNoneFalse115909.1580
3079568105531NoneItem No. VOL-III-3.5 Page No.17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead etc…complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm7.087.085500.0FalseNoneNoneFalseNoneFalse38940.00
3079569105531NoneItem No. VOL-I-1.7 Page No.7KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum140.42140.42672.59FalseNoneNoneFalseNoneFalse94445.08780
3079570105531NoneItem No. VOL-I-1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum559.32559.32687.41FalseNoneNoneFalseNoneFalse384482.16120
3079571105531NoneItem No. VOL-III-3.6 Page No.17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum581.74581.741209.54FalseNoneNoneFalseNoneFalse703637.79960
3079572105531NoneItem No. VOL-III-4.1-iii Page No.23Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. For Grading -III MaterialPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2962.982962.981364.52FalseNoneNoneFalseNoneFalse4043045.46960
3079573105531NoneItem No. VOL-III-4.17 Page No.26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3019.623019.621792.8FalseNoneNoneFalseNoneFalse5413574.7360
3079574105531NoneItem No. VOL-III-5.1-A Page No.31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm48.3848.386972.0FalseNoneNoneFalseNoneFalse337305.360
3079575105531NoneItem No. VOL-III-5.4 Page No.31Tack coat on Granular surface treated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm16.5216.526972.0FalseNoneNoneFalseNoneFalse115177.440
3079576105531NoneItem No. VOL-III-5.12-C Page No.35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum11149.8211149.82348.6FalseNoneNoneFalseNoneFalse3886827.2520
3079577105531NoneItem No. VOL-III-5.16-C Page No.38Bituminous Concrete Grading II for traffic less than 20 MSA KSRRB M500-19. Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction in all respects complete as per specifications. Clause 507 of MORTH V revision : using 40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (30 mm to 40 mm) with 5.4% VG-30 Bitumen ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum12925.7212925.72209.16FalseNoneNoneFalseNoneFalse2703543.59520
3079578105531NoneItem No. VOL-III-8.29-i Page No.71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility servicePWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m2610.162610.1620.0FalseNoneNoneFalseNoneFalse52203.20
17104443720001NoneNoneRoadsWidening & Strengthening (Pkg-740B)18585323.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079579105532NoneItem No.VOL-I-1.12 Page No. 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum112.1112.13773.81FalseNoneNoneFalseNoneFalse423044.1010
3079580105532NoneItem No.VOL-I-1.7 Page No. 07Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum140.42140.422761.88FalseNoneNoneFalseNoneFalse387823.18960
3079581105532NoneItem No.VOL-I-1.8 Page No. 07Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum559.32559.321262.7FalseNoneNoneFalseNoneFalse706253.3640
3079582105532NoneItem No.VOL-III-3.6 Page No.17Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum581.74581.742001.94FalseNoneNoneFalseNoneFalse1164608.57560
3079583105532NoneItem No. VOL-III-4.2-iii Page No.23Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -III MaterialPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2813.122813.12898.43FalseNoneNoneFalseNoneFalse2527391.40160
3079584105532NoneItem No.VOL-III-4.17 Page No. 26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3019.623019.62700.61FalseNoneNoneFalseNoneFalse2115575.96820
3079585105532NoneItem No.VOL-III-5.1-A-i Page No. 31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm48.3848.382472.75FalseNoneNoneFalseNoneFalse119631.6450
3079586105532NoneItem No.VOL-III-5.3-i Page No. 31Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm16.5216.5211539.5FalseNoneNoneFalseNoneFalse190632.540
3079587105532NoneItem No. VOL-III-5.23-i Page No.40Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm55.4655.46110.22FalseNoneNoneFalseNoneFalse6112.80120
3079588105532NoneItem No.VOL-III-5.12-C Page No. 35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum11149.8211149.82578.9FalseNoneNoneFalseNoneFalse6454630.7980
3079589105532NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum12925.7212925.72347.34FalseNoneNoneFalseNoneFalse4489619.58480
17104443720000NoneNoneRoadsConstruction of New RCC Box Culverts. (Pkg-740B)3666021.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079590105533NoneItem No. VOL-I-1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting &stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.36187.04FalseNoneNoneFalseNoneFalse22512.13440
3079591105533NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.0227.41FalseNoneNoneFalseNoneFalse193707.01820
3079592105533NoneItem No. VOL-I-2.11-h Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structures Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.9810.91FalseNoneNoneFalseNoneFalse1017171.81180
3079593105533NoneItem No.VOL-I-2.4.3 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8971.788971.78113.0FalseNoneNoneFalseNoneFalse1013811.140
3079594105533NoneItem No. VOL-I-2.4.3 (8 for Page No.16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (8% for centring)Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8074.68074.618.48FalseNoneNoneFalseNoneFalse149218.6080
3079595105533NoneItem No.VOL-I-2.5.2 Page No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum9689.699689.6940.4FalseNoneNoneFalseNoneFalse391463.4760
3079596105533NoneItem No. VOL-III-13.2 Page No.121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum16485.7816485.787.65FalseNoneNoneFalseNoneFalse126116.2170
3079597105533NoneItem No. VOL-I-2.1.2 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregatesCommon SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum6683.526683.5219.8FalseNoneNoneFalseNoneFalse132333.6960
3079598105533NoneItem No. VOL-III-13.9 Page No.122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum13965.313965.324.0FalseNoneNoneFalseNoneFalse335167.20
3079599105533NoneItem No. VOL-III-14.4(a) Page No.129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Stone/Boulder etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2256.162256.1678.75FalseNoneNoneFalseNoneFalse177672.60
3079600105533NoneItem No. VOL-III-8.18 Page No.67Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard Stone etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each882.64882.6460.0FalseNoneNoneFalseNoneFalse52958.40
3079601105533NoneItem No. VOL-III-12.3A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum1378.241378.2439.1FalseNoneNoneFalseNoneFalse53889.1840
17104443720000NoneNoneRoadsConstruction of Field Culverts. (Pkg-740B)591832.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079602105534NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 mCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.3673.92FalseNoneNoneFalseNoneFalse8897.01120
3079603105534NoneItem No.VOL-I-2.1.3 Page No. 16Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.025.2FalseNoneNoneFalseNoneFalse36748.5040
3079604105534NoneItem No.VOL-I-2.11.h Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.980.65FalseNoneNoneFalseNoneFalse60601.4370
3079605105534NoneItem No. VOL-I-2.4.2 Page No.16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.(M 20) Using 20 mm nominal size graded crushed coarse aggregateCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8058.038058.0344.46FalseNoneNoneFalseNoneFalse358260.01380
3079606105534NoneItem No.VOL-III-16.15Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. c.750 mm diaCommon SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m3935.33935.325.0FalseNoneNoneFalseNoneFalse98382.50
3079607105534NoneItem No. VOL-III-12.3-A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular MaterialPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum1378.241378.2421.0FalseNoneNoneFalseNoneFalse28943.040
17104443720000NoneNoneRoadsConstruction of RCC Drain (Pkg-740B)2231801.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079608105535NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.36416.0FalseNoneNoneFalseNoneFalse50069.760
3079609105535NoneItem No.VOL-I-2.1.3 Page No. 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.0244.0FalseNoneNoneFalseNoneFalse310948.880
3079610105535NoneItem No.VOL-I-2.11 h Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structuresPWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.986.6FalseNoneNoneFalseNoneFalse615337.6680
3079611105535NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 For Raft (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7461.147461.1436.0FalseNoneNoneFalseNoneFalse268601.040
3079612105535NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 For Side walls (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum10072.5410072.5472.0FalseNoneNoneFalseNoneFalse725222.880
3079613105535NoneItem No. VOL-I-2.5.2 (20 for Slab Page No.16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring ) Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum9689.689689.6827.0FalseNoneNoneFalseNoneFalse261621.360
17104443720000NoneNoneRoadsRoad Furnitures (Pkg-740B)1564033.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079614105536NoneItem No. VOL-III-16.29 Page No.149i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3079615105536NoneItem No.VOL-III-8.16-ii Page No. 67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3079616105536NoneItem No.VOL-III-8.16-iii Page No. 67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each993.56993.5611.0FalseNoneNoneFalseNoneFalse10929.160
3079617105536NoneItem No.VOL-III-8.15 Page No. 67Providing and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfacePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm625.4625.4616.17FalseNoneNoneFalseNoneFalse385352.7180
3079618105536NonePage No.54 Item No.VOL-III-8.5 A (ii) Page No. 64Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below round level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5527.125527.1240.0FalseNoneNoneFalseNoneFalse221084.80
3079619105536NoneItem No. VOL-III-8.5-viii Page No.64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circularIncluding cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5070.465070.4672.0FalseNoneNoneFalseNoneFalse365073.120
3079620105536NoneItem No. VOL-III-8.6-(x) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XIPWD SOR for Roads & Bridges - 2023-24 ( ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each6495.96495.92.0FalseNoneNoneFalseNoneFalse12991.80
3079621105536NoneItem No. VOL-III-8.5-iv Page No.64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each4219.684219.686.0FalseNoneNoneFalseNoneFalse25318.080
3079622105536NoneItem No. VOL-III-8.6-(xv) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XIPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each7817.57817.52.0FalseNoneNoneFalseNoneFalse15635.00
3079623105536NoneItem No.VOL-III-8.7 Page No. 65Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Direction and Place Identification Signs upto 0.9 m2 Size Board.PWD SoR for Roads & Bridges - 2021-22 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm10631.810631.83.6FalseNoneNoneFalseNoneFalse38274.480
3079624105536NoneItem No. VOL-III-8.10 Page No.66KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm128.62128.6236.0FalseNoneNoneFalseNoneFalse4630.320
3079625105536NoneItem No. VOL-III-8.4 Page No.63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and RomanPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1.061.062500.0FalseNoneNoneFalseNoneFalse2650.00
3079626105536NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each430.7430.7340.0FalseNoneNoneFalseNoneFalse146438.00
3079627105536NoneItem No. VOL-III-8.17 Page No.67Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each2384.782384.7820.0FalseNoneNoneFalseNoneFalse47695.60
3079628105536NoneItem No. VOL-III-8.60.2-iii Page No.80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 mPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos61205.4261205.424.0FalseNoneNoneFalseNoneFalse244821.680
17104443720000NoneNoneRoadsWater Supply Line Shifting (Pkg-740B)552362.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079629105537NoneItem No.VOL-I-1.17 Page No. 10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum571.12571.12351.0FalseNoneNoneFalseNoneFalse200463.120
3079630105537NoneItem No. VOL-5 - 9.2.3 Page No.96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 8.0, 90mm diaPWD SOR for Water Supply & Sewerage Works - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr450.76450.76650.0FalseNoneNoneFalseNoneFalse292994.00
3079631105537NoneItem No. VOL-I-1.10 Page No.7KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum188.8188.8312.0FalseNoneNoneFalseNoneFalse58905.60
17104443720000NoneNoneRoadsElectric Pole Shifting (Pkg-740B)1472021.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079632105538NoneI-1PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 ,11KV system, P No-3, I no-1.06, Material code-200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos4954.824954.8211.0FalseNoneNoneFalseNoneFalse54503.020
3079633105538NoneI-2PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 P No-3, I no-1.05, Material code-200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos4364.824364.8213.0FalseNoneNoneFalseNoneFalse56742.660
3079634105538NoneI-311 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.01, Material code-279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos438.96438.9624.0FalseNoneNoneFalseNoneFalse10535.040
3079635105538NoneI-4HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.11, Material code-279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos107.38107.3824.0FalseNoneNoneFalseNoneFalse2577.120
3079636105538NoneI-5LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.07, Material code-279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos155.76155.7624.0FalseNoneNoneFalseNoneFalse3738.240
3079637105538NoneI-611 kV, 45 kN Polymeric Insulator . (C SR 2023-24 P No-5, I no-6.10, Material code-283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos219.48219.4824.0FalseNoneNoneFalseNoneFalse5267.520
3079638105538NoneI-711 kV, 5 kN Composite/Polymeric Pin Insulator. (C SR 2023-24 P No-5, I no-6.06, Material code-283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos241.9241.924.0FalseNoneNoneFalseNoneFalse5805.60
3079639105538NoneI-8Guy Set ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Set979.4979.424.0FalseNoneNoneFalseNoneFalse23505.60
3079640105538NoneI-9Rabbit ACSR conductor (C SR 2023-24 P No-5, I no-7.02, Material code-284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km54556.1254556.1224.0FalseNoneNoneFalseNoneFalse1309346.880
17104443720000NoneNoneRoadsFirst year Maintenance (Pkg-740B)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079641105539NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Qty 0.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079642105539NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Qty 2115.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079643105539NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Qty 238.01) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079644105539NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Qty 793.35) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079645105539NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 115.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079646105539NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Qty 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104443720000NoneNoneRoadsSecond Year Maintenance (Pkg-740B)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079647105540NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Qty 11.95) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079648105540NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Qty 2115.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079649105540NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Qty 238.01) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079650105540NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Qty 793.35) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079651105540NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 35) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079652105540NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 50) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079653105540NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Qty 75) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104443720000NoneNoneRoadsThird Year Maintenance (Pkg-740B)180143.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079654105541NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm519.38519.3811.95FalseNoneNoneFalseNoneFalse6206.5910
3079655105541NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm51.5451.54238.0FalseNoneNoneFalseNoneFalse12266.520
3079656105541NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm128.19128.19793.35FalseNoneNoneFalseNoneFalse101699.53650
3079657105541NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2622.052622.051.0FalseNoneNoneFalseNoneFalse2622.050
3079658105541NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km272.25272.251.0FalseNoneNoneFalseNoneFalse272.250
3079659105541NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm563.0563.075.06FalseNoneNoneFalseNoneFalse42258.780
3079660105541NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum125.55125.5575.0FalseNoneNoneFalseNoneFalse9416.250
3079661105541NoneItem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm144.05144.0537.5FalseNoneNoneFalseNoneFalse5401.8750
17104443720000NoneNoneRoadsFourth Year Maintenance (Pkg-740B)522025.32
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079662105542NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm537.94537.9411.95FalseNoneNoneFalseNoneFalse6428.3830
3079663105542NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm99.499.4238.0FalseNoneNoneFalseNoneFalse23657.20
3079664105542NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm247.23247.231586.7FalseNoneNoneFalseNoneFalse392279.8410
3079665105542NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1085.791085.7975.06FalseNoneNoneFalseNoneFalse81499.39740
3079666105542NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum242.14242.1475.0FalseNoneNoneFalseNoneFalse18160.50
17104443720000NoneNoneRoadsFifth Year Maintenance (Pkg-740B)703345.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079667105543NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm1020.231020.2311.95FalseNoneNoneFalseNoneFalse12191.74850
3079668105543NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm101.24101.24238.0FalseNoneNoneFalseNoneFalse24095.120
3079669105543NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm251.81251.811586.7FalseNoneNoneFalseNoneFalse399546.9270
3079670105543NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1105.91105.9225.17FalseNoneNoneFalseNoneFalse249015.5030
3079671105543NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum246.62246.6275.0FalseNoneNoneFalseNoneFalse18496.50
17104443720000NoneNoneRoadsSixth Year Maintenance (Pkg-740B)9734689.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079672105544NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2902.992902.994.3FalseNoneNoneFalseNoneFalse12482.8570
3079673105544NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km301.42301.423.0FalseNoneNoneFalseNoneFalse904.260
3079674105544NoneItem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 803PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm159.49159.4963.6FalseNoneNoneFalseNoneFalse10143.5640
3079675105544NoneItem No. VOL-III-5.3 Page No.31Tack coat on Bituminous surfaceProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broomPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm17.5617.5618511.5FalseNoneNoneFalseNoneFalse325061.940
3079676105544NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum16027.8916027.89555.34FalseNoneNoneFalseNoneFalse8900928.43260
3079677105544NoneItem No. VOL-III-8.15 Page No.67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm775.5775.5391.47FalseNoneNoneFalseNoneFalse303584.9850
3079678105544NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each534.07534.07340.0FalseNoneNoneFalseNoneFalse181583.80
17104443720000NoneNoneRoadsReconstruction (Pkg-740 A)33065209.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079679105545NoneItem No. VOL-III-2.5-ii-A Page No.9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light junglePWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm463.74463.7412.0FalseNoneNoneFalseNoneFalse5564.880
3079680105545NoneItem No. VOL-I-1.12 Page No.8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum112.1112.11545.75FalseNoneNoneFalseNoneFalse173278.5750
3079681105545NoneItem No. VOL-III-3.5 Page No.17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead etc…complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm7.087.085500.0FalseNoneNoneFalseNoneFalse38940.00
3079682105545NoneItem No. VOL-I-1.7 Page No.7KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum140.42140.421236.6FalseNoneNoneFalseNoneFalse173643.3720
3079683105545NoneItem No. VOL-I-1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum559.32559.325838.4FalseNoneNoneFalseNoneFalse3265533.8880
3079684105545NoneItem No. VOL-III-3.6 Page No.17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum581.74581.741214.4FalseNoneNoneFalseNoneFalse706465.0560
3079685105545NoneItem No. VOL-III-4.1-iii Page No.23Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. For Grading -III MaterialPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2962.982962.982120.0FalseNoneNoneFalseNoneFalse6281517.60
3079686105545NoneItem No. VOL-III-4.17 Page No.26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum3019.623019.623050.0FalseNoneNoneFalseNoneFalse9209841.00
3079687105545NoneItem No. VOL-III-5.1-A Page No.31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm48.3848.3812241.3FalseNoneNoneFalseNoneFalse592234.0940
3079688105545NoneItem No. VOL-III-5.4 Page No.31Tack coat on Granular surface treated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm16.5216.5212241.3FalseNoneNoneFalseNoneFalse202226.2760
3079689105545NoneItem No. VOL-III-5.12-C Page No.35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum11149.8211149.82612.07FalseNoneNoneFalseNoneFalse6824470.32740
3079690105545NoneItem No. VOL-III-5.16-C Page No.38Bituminous Concrete Grading II for traffic less than 20 MSA KSRRB M500-19. Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction in all respects complete as per specifications. Clause 507 of MORTH V revision : using 40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (30 mm to 40 mm) with 5.4% VG-30 Bitumen ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum12925.7212925.72367.24FalseNoneNoneFalseNoneFalse4746841.41280
3079691105545NoneItem No. VOL-III- 4.20 Page No.27Construction of Median and Island with Soil Taken from Borrow Areas Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum640.74640.74150.0FalseNoneNoneFalseNoneFalse96111.00
3079692105545NoneItem No. VOL-III-8.42.3 Page No.74Kerb StonesSupplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) 600 x 300 x 150 mm sizePWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m546.34546.341004.0FalseNoneNoneFalseNoneFalse548525.360
3079693105545NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.0220.08FalseNoneNoneFalseNoneFalse141905.76160
3079694105545NoneItem No. VOL-III-8.10 Page No.66KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm128.62128.62451.8FalseNoneNoneFalseNoneFalse58110.5160
17104443720000NoneNoneRoadsRoad Furnitures (Pkg-740 A)965110.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079695105546NoneItem No. VOL-III-16.29 Page No.149i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3079696105546NoneItem No.VOL-III-8.16-ii Page No. 67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast)PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each3453.863453.861.0FalseNoneNoneFalseNoneFalse3453.860
3079697105546NoneItem No.VOL-III-8.16-iii Page No. 67Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast)PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each993.56993.564.0FalseNoneNoneFalseNoneFalse3974.240
3079698105546NoneItem No.VOL-III-8.15 Page No. 67Providing and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfacePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm625.4625.4461.5FalseNoneNoneFalseNoneFalse288622.10
3079699105546NonePage No.54 Item No.VOL-III-8.5 A (ii) Page No. 64Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below round level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5527.125527.1218.0FalseNoneNoneFalseNoneFalse99488.160
3079700105546NoneItem No. VOL-III-8.5-viii Page No.64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circularIncluding cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each5070.465070.4628.0FalseNoneNoneFalseNoneFalse141972.880
3079701105546NoneItem No. VOL-III-8.6-(x) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XIPWD SOR for Roads & Bridges - 2023-24 ( ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each6495.96495.92.0FalseNoneNoneFalseNoneFalse12991.80
3079702105546NoneItem No. VOL-III-8.5-iv Page No.64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each4219.684219.683.0FalseNoneNoneFalseNoneFalse12659.040
3079703105546NoneItem No. VOL-III-8.6-(xv) Page No.65Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XIPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each7817.57817.52.0FalseNoneNoneFalseNoneFalse15635.00
3079704105546NoneItem No.VOL-III-8.7 Page No. 65Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67:2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Direction and Place Identification Signs upto 0.9 m2 Size Board.PWD SoR for Roads & Bridges - 2021-22 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm10631.810631.83.6FalseNoneNoneFalseNoneFalse38274.480
3079705105546NoneItem No. VOL-III-8.10 Page No.66KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm128.62128.627.2FalseNoneNoneFalseNoneFalse926.0640
3079706105546NoneItem No. VOL-III-8.4 Page No.63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and RomanPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1.061.06500.0FalseNoneNoneFalseNoneFalse530.00
3079707105546NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each430.7430.7130.0FalseNoneNoneFalseNoneFalse55991.00
3079708105546NoneItem No. VOL-III-8.17 Page No.67Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each2384.782384.784.0FalseNoneNoneFalseNoneFalse9539.120
3079709105546NoneItem No. VOL-III-8.60.2-iii Page No.80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 mPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos61205.4261205.424.0FalseNoneNoneFalseNoneFalse244821.680
17104443720000NoneNoneRoadsConstruction of New RCC Box Culverts (Pkg-740 A)3287456.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079710105547NoneItem No. VOL-I-1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting &stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.36145.05FalseNoneNoneFalseNoneFalse17458.2180
3079711105547NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.0222.15FalseNoneNoneFalseNoneFalse156534.4930
3079712105547NoneItem No. VOL-I-2.11-h Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structures Common SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.9812.38FalseNoneNoneFalseNoneFalse1154224.29240
3079713105547NoneItem No.VOL-I-2.4.3 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8971.788971.78109.92FalseNoneNoneFalseNoneFalse986178.05760
3079714105547NoneItem No. VOL-I-2.4.3 (8 for Page No.16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (8% for centring)Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8074.68074.69.24FalseNoneNoneFalseNoneFalse74609.3040
3079715105547NoneItem No.VOL-I-2.5.2 Page No. 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum9689.699689.6960.17FalseNoneNoneFalseNoneFalse583028.64730
3079716105547NoneItem No. VOL-III-13.2 Page No.121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum16485.7816485.789.11FalseNoneNoneFalseNoneFalse150185.45580
3079717105547NoneItem No. VOL-I-2.1.2 Page No.15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregatesCommon SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum6683.526683.523.96FalseNoneNoneFalseNoneFalse26466.73920
3079718105547NoneItem No. VOL-III-13.9 Page No.122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum13965.313965.34.8FalseNoneNoneFalseNoneFalse67033.440
3079719105547NoneItem No. VOL-III-14.4(a) Page No.129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Stone/Boulder etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum2256.162256.1615.75FalseNoneNoneFalseNoneFalse35534.520
3079720105547NoneItem No. VOL-III-8.18 Page No.67Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard Stone etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each882.64882.6412.0FalseNoneNoneFalseNoneFalse10591.680
3079721105547NoneItem No. VOL-III-12.3A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum1378.241378.2416.2FalseNoneNoneFalseNoneFalse22327.4880
3079722105547NoneItem No. VOL-III-2.11-II-(a) Page No.10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry, By Mechanical Means Dismantling Brick / Tile work / rubble masonry / pitching / etc PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum212.4212.415.46FalseNoneNoneFalseNoneFalse3283.7040
17104443720000NoneNoneRoadsConstruction of Field Culverts (Pkg-740 A)118349.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079723105548NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 mCommon SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.3614.78FalseNoneNoneFalseNoneFalse1778.92080
3079724105548NoneItem No.VOL-I-2.1.3 Page No. 16Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.021.04FalseNoneNoneFalseNoneFalse7349.70080
3079725105548NoneItem No.VOL-I-2.11.h Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.980.13FalseNoneNoneFalseNoneFalse12120.28740
3079726105548NoneItem No. VOL-I-2.4.2 Page No.16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.(M 20) Using 20 mm nominal size graded crushed coarse aggregateCommon SOR For Engineering Departments 2023 - 2024 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum8058.038058.038.89FalseNoneNoneFalseNoneFalse71635.88670
3079727105548NoneItem No.VOL-III-16.15Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. c.750 mm diaCommon SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.m3935.33935.35.0FalseNoneNoneFalseNoneFalse19676.50
3079728105548NoneItem No. VOL-III-12.3-A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular MaterialPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum1378.241378.244.2FalseNoneNoneFalseNoneFalse5788.6080
17104443720000NoneNoneRoadsConstruction of RCC Drain (Pkg-740 A)1673851.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079729105549NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum120.36120.36312.0FalseNoneNoneFalseNoneFalse37552.320
3079730105549NoneItem No.VOL-I-2.1.3 Page No. 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7067.027067.0233.0FalseNoneNoneFalseNoneFalse233211.660
3079731105549NoneItem No.VOL-I-2.11 h Page No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structuresPWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Tonne93232.9893232.984.95FalseNoneNoneFalseNoneFalse461503.2510
3079732105549NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 For Raft (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum7461.147461.1427.0FalseNoneNoneFalseNoneFalse201450.780
3079733105549NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 For Side walls (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum10072.5410072.5454.0FalseNoneNoneFalseNoneFalse543917.160
3079734105549NoneItem No. VOL-I-2.5.2 (20 for Slab Page No.16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring ) Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum9689.689689.6820.25FalseNoneNoneFalseNoneFalse196216.020
17104443720000NoneNoneRoadsWater Supply Line Shifting (Pkg-740 A)339915.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079735105550NoneItem No.VOL-I-1.17 Page No. 10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum571.12571.12216.0FalseNoneNoneFalseNoneFalse123361.920
3079736105550NoneItem No. VOL-5 - 9.2.3 Page No.96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 8.0, 90mm diaPWD SOR for Water Supply & Sewerage Works - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr450.76450.76400.0FalseNoneNoneFalseNoneFalse180304.00
3079737105550NoneItem No. VOL-I-1.10 Page No.7KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum188.8188.8192.0FalseNoneNoneFalseNoneFalse36249.60
17104443720000NoneNoneRoadsElectric Pole Shifting (Pkg-740 A)1594739.32
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079738105551NoneI-1PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 ,11KV system, P No-3, I no-1.06, Material code-200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos4954.824954.8212.0FalseNoneNoneFalseNoneFalse59457.840
3079739105551NoneI-2PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 P No-3, I no-1.05, Material code-200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos4364.824364.8214.0FalseNoneNoneFalseNoneFalse61107.480
3079740105551NoneI-311 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.01, Material code-279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos438.96438.9626.0FalseNoneNoneFalseNoneFalse11412.960
3079741105551NoneI-4HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.11, Material code-279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos107.38107.3826.0FalseNoneNoneFalseNoneFalse2791.880
3079742105551NoneI-5LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.07, Material code-279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos155.76155.7626.0FalseNoneNoneFalseNoneFalse4049.760
3079743105551NoneI-611 kV, 45 kN Polymeric Insulator . (C SR 2023-24 P No-5, I no-6.10, Material code-283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos219.48219.4826.0FalseNoneNoneFalseNoneFalse5706.480
3079744105551NoneI-711 kV, 5 kN Composite/Polymeric Pin Insulator. (C SR 2023-24 P No-5, I no-6.06, Material code-283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Nos241.9241.926.0FalseNoneNoneFalseNoneFalse6289.40
3079745105551NoneI-8Guy Set ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Set979.4979.426.0FalseNoneNoneFalseNoneFalse25464.40
3079746105551NoneI-9Rabbit ACSR conductor (C SR 2023-24 P No-5, I no-7.02, Material code-284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km54556.1254556.1226.0FalseNoneNoneFalseNoneFalse1418459.120
17104443720000NoneNoneRoadsFirst year Maintenance (Pkg-740 A)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079747105552NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Qty 0.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079748105552NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Qty 800) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079749105552NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Qty 90) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079750105552NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Qty 300) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079751105552NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079752105552NoneV-III Page No.91. Item No.10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 50) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079753105552NoneItem No. VOL-I-1.12 Page No.8Nala Training:Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Common SOR For Engineering Departments 2023 - 2024 (Qty 15) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104443720000NoneNoneRoadsSecond Year Maintenance. (Pkg-740 A)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079754105553NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Qty 12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079755105553NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Qty 800) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Rmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079756105553NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the work PWD SOR for Roads & Bridges - 2023-24 (Qty 3000) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079757105553NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Qty 300) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079758105553NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079759105553NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Qty 50) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3079760105553NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Qty 15) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17104443720000NoneNoneRoadsThird Year Maintenance (Pkg-740 A)88966.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079761105554NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm519.38519.3812.0FalseNoneNoneFalseNoneFalse6232.560
3079762105554NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm51.5451.5490.0FalseNoneNoneFalseNoneFalse4638.60
3079763105554NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm128.19128.19300.0FalseNoneNoneFalseNoneFalse38457.00
3079764105554NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2622.052622.051.0FalseNoneNoneFalseNoneFalse2622.050
3079765105554NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km272.25272.251.0FalseNoneNoneFalseNoneFalse272.250
3079766105554NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm563.0563.035.0FalseNoneNoneFalseNoneFalse19705.00
3079767105554NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum125.55125.5515.0FalseNoneNoneFalseNoneFalse1883.250
3079768105554NoneItem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm144.05144.057.5FalseNoneNoneFalseNoneFalse1080.3750
3079769105554NoneItem No. VOL-III-10.5 Page No.91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm563.0563.025.0FalseNoneNoneFalseNoneFalse14075.00
17104443720000NoneNoneRoadsFourth Year Maintenance (Pkg-740 A)232543.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079770105555NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm537.94537.9412.0FalseNoneNoneFalseNoneFalse6455.280
3079771105555NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm99.499.490.0FalseNoneNoneFalseNoneFalse8946.00
3079772105555NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm247.23247.23600.0FalseNoneNoneFalseNoneFalse148338.00
3079773105555NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1085.791085.7935.0FalseNoneNoneFalseNoneFalse38002.650
3079774105555NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum242.14242.1415.0FalseNoneNoneFalseNoneFalse3632.10
3079775105555NoneItem No. VOL-III-10.5 Page No.91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1086.791086.7925.0FalseNoneNoneFalseNoneFalse27169.750
17104443720000NoneNoneRoadsFifth Year Maintenance. (Pkg-740 A)375200.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079776105556NoneItem No.VOL-III-2.5 ii) a) Page No. 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light junglePWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.100 Sqm1020.231020.2312.0FalseNoneNoneFalseNoneFalse12242.760
3079777105556NoneItem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm101.24101.2490.0FalseNoneNoneFalseNoneFalse9111.60
3079778105556NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm251.81251.81600.0FalseNoneNoneFalseNoneFalse151086.00
3079779105556NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1105.91105.9105.0FalseNoneNoneFalseNoneFalse116119.50
3079780105556NoneV 1 Page No.8. Item No.1.12Nala TrainingEarth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other eleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD, Bangalore, SR:2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum246.62246.6215.0FalseNoneNoneFalseNoneFalse3699.30
3079781105556NoneItem No. VOL-III-10.5 Page No.91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm1105.891105.8975.0FalseNoneNoneFalseNoneFalse82941.750
17104443720000NoneNoneRoadsSixth Year Maintenance (Pkg-740 A)6406912.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3079782105557NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km2902.992902.992.0FalseNoneNoneFalseNoneFalse5805.980
3079783105557NoneItem No.VOL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Km301.42301.421.0FalseNoneNoneFalseNoneFalse301.420
3079784105557NoneItem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 803PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm159.49159.4912.72FalseNoneNoneFalseNoneFalse2028.71280
3079785105557NoneItem No. VOL-III-5.3 Page No.31Tack coat on Bituminous surfaceProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broomPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm17.5617.5612000.0FalseNoneNoneFalseNoneFalse210720.00
3079786105557NoneItem No.VOL-III-5.16-C Page No. 37Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Cum16027.8916027.89360.0FalseNoneNoneFalseNoneFalse5770040.40
3079787105557NoneItem No. VOL-III-8.15 Page No.67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Sqm775.5775.5449.5FalseNoneNoneFalseNoneFalse348587.250
3079788105557NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST.Each534.07534.07130.0FalseNoneNoneFalseNoneFalse69429.10
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17104443740000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17104443740000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17104443740000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17104455560000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17104455680000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17104455770000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17104455850000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17104456820000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17104456930000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17104457020000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17104457100000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17104457170000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17104457260000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17104457330000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17104457410000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17104457490000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17104457570000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17104457650000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17104457740000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17104457800000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17104457890000NoneNoneELIGIBILITYAll Item rates are inclusive of 18% GST. Hence GST will not be paid separately.None
17104457990000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4801.25 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Earth Work for Embankment-Subgrade-Shoulders -22873.01 Cum 2. GSB or WMM -18503.89 Cum 3.BM/SDBC/DBM/BC 6236.52 Cum 4. Reinforced Cement Concrete (RCC) M20 higher grades -1036.24 cum) 5.Steel 62.8 Tonnes (80% of peak rate of construction)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning (i) Machineries to be owned: 1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No, 2.Mechanical Paver Finisher:1 No, 3. Static Road Roller: 1 No., 4. Vibratory Road Roller: 1 No., 5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries to be owned-Original purchase invoice, Rc book for own
NoneNoneNoneNoneSection 2 ITT 3.3(b) (ii) Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill : 1 No., 2.Truck mounted Bitumen Sprayer: 1 No., 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos., 5.Tandem Roller: 1No., 6.Excavator 0.90 Cum Bucket Capacity: 2 No., 7.Tipper Trucks:6 Nos., 8. Water Tanker: 3 No. 9.Self Loading Concrete Mixer 2 M3 Capacity: 3 NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries could be on Lease/Hire: Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under - Assessed available tender capacity (AxNx1.5-B) Where, A- Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N -Number of years prescribed for completion of the works for which tenders are invited. B -Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1200.31 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.720.19 Lakh. (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneKPWD Contractor License Registration CertificateOthersKPWD Registration Certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneDetails of Committed WorksOthersDetails of Committed Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Registration CertificateTrueTechnical Bid
Turnover certificate from Registered Chartered Accountant with UDIN, Balance sheet and Income tax returnsTrueTechnical Bid
Work done certificate issued by an officer of rank not below the rank of EE or equivalentTrueTechnical Bid
Line of creditTrueTechnical Bid
GST CertificateTrueTechnical Bid
Original purchase invoice, RC book for own machineriesTrueTechnical Bid
Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hireTrueTechnical Bid
EPF registrationFalseTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
Details of Committed WorksTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsBengaluru UrbanBengaluru NorthBangalore NorthNoneBangalore North Taluk of Bangalore District.NoneNoneNoneNoneNoneNone
tenderAddress
createdTs1710446688000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer, SHDP, Bengaluru
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone