tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710441746000 | 0 | None | None | Roads | Pkg-776 Road Work | 143009361.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078916 | 105473 | None | 16.29 | Providing and fixing of typical shdp informatory sign
board with Logo as per MORTH specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangualar shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 Schedule of Rates PWD 2023-24 vol- 3 Page No: 149 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Nos | 20289.2 | 20289.2 | 4.0 | False | None | None | False | None | False | 81156.8 | 0 | 3078917 | 105473 | None | 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3,Page No: 9 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 279.0 | False | None | None | False | None | False | 144909.81 | 0 | 3078918 | 105473 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead
Schedule of Rates PWD 2023-24 vol- 3, Page No: 17 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 7.93 | 7.93 | 12110.0 | False | None | None | False | None | False | 96032.3 | 0 | 3078919 | 105473 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 27233.0 | False | None | None | False | None | False | 3419103.15 | 0 | 3078920 | 105473 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.
Schedule of Rates PWD 2023-24 vol- 1,Page No: 7 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 157.27 | 157.27 | 1879.6 | False | None | None | False | None | False | 295604.692 | 0 | 3078921 | 105473 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1,Page No: 15 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 84.6 | False | None | None | False | None | False | 669614.076 | 0 | 3078922 | 105473 | None | 8.42.3 | Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)600 x 300 x 150 mm size
Schedule of Rates PWD 2023-24 vol- 3, Page No: 74 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 611.9 | 611.9 | 3760.0 | False | None | None | False | None | False | 2300744.0 | 0 | 3078923 | 105473 | None | 4.19 | Construction of Median and Island with Soil Taken from Roadway Cutting Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 408 Schedule of Rates PWD 2023-24 vol- 3,Page No: 27 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 485.03 | 485.03 | 883.6 | False | None | None | False | None | False | 428572.508 | 0 | 3078924 | 105473 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Schedule of Rates PWD 2023-24 vol- 3,Page No: 17 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 651.55 | 651.55 | 3857.76 | False | None | None | False | None | False | 2513523.528 | 0 | 3078925 | 105473 | None | 4.2 (i) | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (i) For Grading -I Material
Schedule of Rates PWD 2023-24 vol- 3, Page No: 23 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3118.98 | 3118.98 | 4379.97 | False | None | None | False | None | False | 13661038.8306 | 0 | 3078926 | 105473 | None | 6.1 | Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.
Schedule of Rates PWD 2023-24 vol- 3, Page No: 49 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 6502.27 | 6502.27 | 4216.88 | False | None | None | False | None | False | 27419292.3176 | 0 | 3078927 | 105473 | None | 6.2.1 | Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3
Schedule of Rates PWD 2023-24 vol- 3, Page No: 49 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 11975.02 | 11975.02 | 7680.97 | False | None | None | False | None | False | 91979769.3694 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Road Safety Components | 11447967.25 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078928 | 105474 | None | 8.16 (i) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast)
Schedule of Rates PWD 2023-24 vol- 3, Page No: 67 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Nos | 6715.05 | 6715.05 | 1.0 | False | None | None | False | None | False | 6715.05 | 0 | 3078929 | 105474 | None | 8.16 (ii) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast)
Schedule of Rates PWD 2023-24 vol- 3 Page No: 67 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Nos | 3868.32 | 3868.32 | 1.0 | False | None | None | False | None | False | 3868.32 | 0 | 3078930 | 105474 | None | 8.16 (iii) | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Page No: 67
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Nos | 1112.79 | 1112.79 | 8.0 | False | None | None | False | None | False | 8902.32 | 0 | 3078931 | 105474 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
Schedule of Rates PWD 2023-24 vol- 3,Page No: 67 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Sqm | 700.45 | 700.45 | 1402.56 | False | None | None | False | None | False | 982423.152 | 0 | 3078932 | 105474 | None | 8.6 ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Page No: 64 Rates are including 18% GST ---- Item rates are inclusive of 18 percent GST | Each | 6270.96 | 6270.96 | 170.0 | False | None | None | False | None | False | 1066063.2 | 0 | 3078933 | 105474 | None | 8.6 iv | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle
Schedule of Rates PWD 2023-24 vol- 3,Page No: 64 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Each | 7463.05 | 7463.05 | 6.0 | False | None | None | False | None | False | 44778.3 | 0 | 3078934 | 105474 | None | 8.6 viii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular
Schedule of Rates PWD 2023-24 vol- 3,Page No: 64 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Each | 5747.64 | 5747.64 | 14.0 | False | None | None | False | None | False | 80466.96 | 0 | 3078935 | 105474 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 SizeBoard.
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Schedule of Rates PWD 2023-24 vol- 3,Page No: 65 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 11907.62 | 11907.62 | 3.6 | False | None | None | False | None | False | 42867.432 | 0 | 3078936 | 105474 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
Schedule of Rates PWD 2023-24 vol- 3, Page No: 74 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Nos | 482.38 | 482.38 | 1444.0 | False | None | None | False | None | False | 696556.72 | 0 | 3078937 | 105474 | None | 8.17 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
Schedule of Rates PWD 2023-24 vol- 3,Page No: 67 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Each | 2670.95 | 2670.95 | 12.0 | False | None | None | False | None | False | 32051.4 | 0 | 3078938 | 105474 | None | 8.48 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge.
Schedule of Rates PWD 2023-24 vol- 3, Page No: 76 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Nos | 4739.26 | 4739.26 | 112.0 | False | None | None | False | None | False | 530797.12 | 0 | 3078939 | 105474 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 4, Page No: 71 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 248.46 | 248.46 | 210.0 | False | None | None | False | None | False | 52176.6 | 0 | 3078940 | 105474 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service
Schedule of Rates PWD 2023-24 vol- 3,Page No: 71 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 2923.38 | 2923.38 | 1386.0 | False | None | None | False | None | False | 4051804.68 | 0 | 3078941 | 105474 | None | 8.25( i) | Metal Beam Crash Barrier
(i)Type - A, ""W"" : Metal Beam Crash Barrier Providing and erecting a ""W"" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on
the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811
Schedule of Rates PWD 2023-24 vol- 3, Page No: 69 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Rmtr | 4810.62 | 4810.62 | 800.0 | False | None | None | False | None | False | 3848496.0 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Box Cell Culvert (1 mX 1 m - Vent)2 | 4644806.69 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078942 | 105475 | None | 2.11 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol-3, Page No: 10 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 237.89 | 237.89 | 30.0 | False | None | None | False | None | False | 7136.7 | 0 | 3078943 | 105475 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1,Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 201.1 | False | None | None | False | None | False | 27108.28 | 0 | 3078944 | 105475 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1 Page No: 15 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 20.23 | False | None | None | False | None | False | 160121.6638 | 0 | 3078945 | 105475 | None | 2.11 h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Schedule of Rates PWD 2023-24 vol- 1,Page No: 18 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 7.44 | False | None | None | False | None | False | 776891.7936 | 0 | 3078946 | 105475 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10048.39 | 10048.39 | 68.31 | False | None | None | False | None | False | 686405.5209 | 0 | 3078947 | 105475 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, , Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 9043.55 | 9043.55 | 30.96 | False | None | None | False | None | False | 279988.308 | 0 | 3078948 | 105475 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10852.45 | 10852.45 | 25.99 | False | None | None | False | None | False | 282055.1755 | 0 | 3078949 | 105475 | None | 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Schedule of Rates PWD 2023-24 vol- 3,Page No: 117 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Rmtr | 315.86 | 315.86 | 24.0 | False | None | None | False | None | False | 7580.64 | 0 | 3078950 | 105475 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1Page No: 16 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 10341.14 | 10341.14 | 6.04 | False | None | None | False | None | False | 62460.4856 | 0 | 3078951 | 105475 | None | 14.2 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Schedule of Rates PWD 2023-24 vol- 3, Page No: 129 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3243.21 | 3243.21 | 2.78 | False | None | None | False | None | False | 9016.1238 | 0 | 3078952 | 105475 | None | 4.2 (v) | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Page No: 23 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 32.4 | False | None | None | False | None | False | 101011.86 | 0 | 3078953 | 105475 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3,Page No: 121 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 9001.42 | 9001.42 | 50.22 | False | None | None | False | None | False | 452051.3124 | 0 | 3078954 | 105475 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3,Page No: 122 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 15641.14 | 15641.14 | 81.0 | False | None | None | False | None | False | 1266932.34 | 0 | 3078955 | 105475 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3,Page No: 121 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 18464.07 | 18464.07 | 5.77 | False | None | None | False | None | False | 106537.6839 | 0 | 3078956 | 105475 | None | 13.16 | Asphaltic Plug Joint
Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural stee conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.
Schedule of Rates PWD 2023-24 vol- 3, Page No: 124 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 2372.27 | 2372.27 | 108.0 | False | None | None | False | None | False | 256205.16 | 0 | 3078957 | 105475 | None | 8.1 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3,Page No: 66 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 138.77 | 138.77 | 18.0 | False | None | None | False | None | False | 2497.86 | 0 | 3078958 | 105475 | None | 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3,Page No: 63 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 15000.0 | False | None | None | False | None | False | 17850.0 | 0 | 3078959 | 105475 | None | 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material
Schedule of Rates PWD 2023-24 vol- 3, Page No: 117 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 1543.63 | 1543.63 | 40.56 | False | None | None | False | None | False | 62609.6328 | 0 | 3078960 | 105475 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawin and Technical Specification.
Schedule of Rates PWD 2023-24 vol- 3,Page No: 117 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 3537.92 | 3537.92 | 22.71 | False | None | None | False | None | False | 80346.1632 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Construction of Box Cell Culvert (1.5 m X 1.5 m - 1 Vent) | 6595243.26 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078961 | 105476 | None | 2.11 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Schedule of Rates PWD 2023-24 vol-3, Item No: 2.11 , Page No: 10 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 237.89 | 237.89 | 30.0 | False | None | None | False | None | False | 7136.7 | 0 | 3078962 | 105476 | None | 2.17 (ix) B | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means B. Above 600 mm to 900 mm dia
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 1448.47 | 1448.47 | 40.0 | False | None | None | False | None | False | 57938.8 | 0 | 3078963 | 105476 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 249.7 | False | None | None | False | None | False | 33659.56 | 0 | 3078964 | 105476 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 28.6 | False | None | None | False | None | False | 226370.716 | 0 | 3078965 | 105476 | None | 2.11 H | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 12.67 | False | None | None | False | None | False | 1323013.3098 | 0 | 3078966 | 105476 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10048.39 | 10048.39 | 109.89 | False | None | None | False | None | False | 1104217.5771 | 0 | 3078967 | 105476 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Culvert | 9043.55 | 9043.55 | 30.96 | False | None | None | False | None | False | 279988.308 | 0 | 3078968 | 105476 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10852.45 | 10852.45 | 41.85 | False | None | None | False | None | False | 454175.0325 | 0 | 3078969 | 105476 | None | 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.2 , Page No: 117 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Rmtr | 315.86 | 315.86 | 24.0 | False | None | None | False | None | False | 7580.64 | 0 | 3078970 | 105476 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawin and Technical Specification.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3537.92 | 3537.92 | 62.91 | False | None | None | False | None | False | 222570.5472 | 0 | 3078971 | 105476 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10341.14 | 10341.14 | 6.78 | False | None | None | False | None | False | 70112.9292 | 0 | 3078972 | 105476 | None | 14.2 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3243.21 | 3243.21 | 3.24 | False | None | None | False | None | False | 10508.0004 | 0 | 3078973 | 105476 | None | 4.2 (v) | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3117.65 | 3117.65 | 39.6 | False | None | None | False | None | False | 123458.94 | 0 | 3078974 | 105476 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 9001.42 | 9001.42 | 61.38 | False | None | None | False | None | False | 552507.1596 | 0 | 3078975 | 105476 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 15641.14 | 15641.14 | 99.0 | False | None | None | False | None | False | 1548472.86 | 0 | 3078976 | 105476 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 18464.07 | 18464.07 | 9.48 | False | None | None | False | None | False | 175039.3836 | 0 | 3078977 | 105476 | None | 13.16 | Asphaltic Plug Joint
Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural stee conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 2372.27 | 2372.27 | 132.0 | False | None | None | False | None | False | 313139.64 | 0 | 3078978 | 105476 | None | 8.1 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 138.77 | 138.77 | 23.25 | False | None | None | False | None | False | 3226.4025 | 0 | 3078979 | 105476 | None | 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 15000.0 | False | None | None | False | None | False | 17850.0 | 0 | 3078980 | 105476 | None | 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 1543.63 | 1543.63 | 41.64 | False | None | None | False | None | False | 64276.7532 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Construction of PipeCulvert 1200mm Dia 1-Row | 2035523.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078981 | 105477 | None | 2.11 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Schedule of Rates PWD 2023-24 vol-3, Item No: 2.11 , Page No: 10
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 237.89 | 237.89 | 23.4 | False | None | None | False | None | False | 5566.626 | 0 | 3078982 | 105477 | None | 2.17(ix)C | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means C. Above 900 mm dia
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) C , Page No: 11 ---- Item rates are inclusive of 18 percent GST | m | 1815.88 | 1815.88 | 30.0 | False | None | None | False | None | False | 54476.4 | 0 | 3078983 | 105477 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 199.23 | False | None | None | False | None | False | 26856.204 | 0 | 3078984 | 105477 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 12.75 | False | None | None | False | None | False | 100917.015 | 0 | 3078985 | 105477 | None | 2.11H | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 1.23 | False | None | None | False | None | False | 128437.7562 | 0 | 3078986 | 105477 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 10636.6 | 10636.6 | 97.98 | False | None | None | False | None | False | 1042174.068 | 0 | 3078987 | 105477 | None | 9.1.ii | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (i). 1200 mm dia
Schedule of Rates PWD 2023-24 vol- 3, Item No: 9.1.ii , Page No: 87 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Rmtr | 14229.67 | 14229.67 | 30.0 | False | None | None | False | None | False | 426890.1 | 0 | 3078988 | 105477 | None | 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 1543.63 | 1543.63 | 53.55 | False | None | None | False | None | False | 82661.3865 | 0 | 3078989 | 105477 | None | 14.2 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 3243.21 | 3243.21 | 36.6 | False | None | None | False | None | False | 118701.486 | 0 | 3078990 | 105477 | None | 14.2 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 3243.21 | 3243.21 | 15.06 | False | None | None | False | None | False | 48842.7426 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Construction of Retaining Wall (100 m Long) | 5469321.53 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078991 | 105478 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 315.0 | False | None | None | False | None | False | 42462.0 | 0 | 3078992 | 105478 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 28.5 | False | None | None | False | None | False | 225579.21 | 0 | 3078993 | 105478 | None | 2.11h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 28.01 | False | None | None | False | None | False | 2924830.5294 | 0 | 3078994 | 105478 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 10833.58 | 10833.58 | 67.5 | False | None | None | False | None | False | 731266.65 | 0 | 3078995 | 105478 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 10833.58 | 10833.58 | 141.75 | False | None | None | False | None | False | 1535659.965 | 0 | 3078996 | 105478 | None | 12.20 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.2 , Page No: 117 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Rmtr | 315.86 | 315.86 | 30.15 | False | None | None | False | None | False | 9523.179 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Construction of Drainsat selected reaches | 8875508.56 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3078997 | 105479 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 1904.0 | False | None | None | False | None | False | 256659.2 | 0 | 3078998 | 105479 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 7915.06 | 7915.06 | 105.0 | False | None | None | False | None | False | 831081.3 | 0 | 3078999 | 105479 | None | 2.11h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Tonne | 104420.94 | 104420.94 | 19.32 | False | None | None | False | None | False | 2017412.5608 | 0 | 3079000 | 105479 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 for raft Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 9848.7 | 9848.7 | 136.5 | False | None | None | False | None | False | 1344347.55 | 0 | 3079001 | 105479 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 for WALL
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 13295.75 | 13295.75 | 252.0 | False | None | None | False | None | False | 3350529.0 | 0 | 3079002 | 105479 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 11818.45 | 11818.45 | 91.0 | False | None | None | False | None | False | 1075478.95 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimate for Shifting ofPVC Water Supply PipeLines & Providing Cable Duct | 3011522.88 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079003 | 105480 | None | 1.17 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m
PWD SoR - 2023-24 ( Item No.VOL-I-1.17 / Page No. 10) Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Cum | 346.26 | 346.26 | 2268.0 | False | None | None | False | None | False | 785317.68 | 0 | 3079004 | 105480 | None | 14.11 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 110 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.11 / Page No. 120)Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Rmtr | 473.13 | 473.13 | 1400.0 | False | None | None | False | None | False | 662382.0 | 0 | 3079005 | 105480 | None | 14.11 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 75 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.2 / Page No. 120) Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Rmtr | 212.78 | 212.78 | 700.0 | False | None | None | False | None | False | 148946.0 | 0 | 3079006 | 105480 | None | 10.14.8 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 63 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.8 / Page No. 120) Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Rmtr | 183.7 | 183.7 | 700.0 | False | None | None | False | None | False | 128590.0 | 0 | 3079007 | 105480 | None | 8.29.i | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ( Item No.VOL-III-8.29 i / Page No. 71) Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Rmtr | 2923.38 | 2923.38 | 440.0 | False | None | None | False | None | False | 1286287.2 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimates forMaintenance - Activitiesto be carried out for theThird Year (PAIDMAINTENANCE) | 166864.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079008 | 105481 | None | 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | 100 Sqm | 581.72 | 581.72 | 22.56 | False | None | None | False | None | False | 13123.6032 | 0 | 3079009 | 105481 | None | 16.19 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 8.89 | 8.89 | 1504.0 | False | None | None | False | None | False | 13370.56 | 0 | 3079010 | 105481 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Sqm | 57.73 | 57.73 | 169.2 | False | None | None | False | None | False | 9767.916 | 0 | 3079011 | 105481 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Sqm | 143.58 | 143.58 | 564.0 | False | None | None | False | None | False | 80979.12 | 0 | 3079012 | 105481 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Km | 2936.7 | 2936.7 | 1.88 | False | None | None | False | None | False | 5520.996 | 0 | 3079013 | 105481 | None | 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | Km | 304.92 | 304.92 | 1.88 | False | None | None | False | None | False | 573.2496 | 0 | 3079014 | 105481 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 140.62 | 140.62 | 270.0 | False | None | None | False | None | False | 37967.4 | 0 | 3079015 | 105481 | None | 8.1 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 Parapet
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 155.42 | 155.42 | 34.5 | False | None | None | False | None | False | 5361.99 | 0 | 3079016 | 105481 | None | 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63
Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | cm | 1.33 | 1.33 | 150.0 | False | None | None | False | None | False | 199.5 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimates forMaintenance - Activitiesto be carried out for theFourth Year (PAIDMAINTENANCE) | 160735.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079017 | 105482 | None | 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | 100 Sqm | 602.5 | 602.5 | 22.56 | False | None | None | False | None | False | 13592.4 | 0 | 3079018 | 105482 | None | 16.19 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 9.2 | 9.2 | 1504.0 | False | None | None | False | None | False | 13836.8 | 0 | 3079019 | 105482 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 59.79 | 59.79 | 169.2 | False | None | None | False | None | False | 10116.468 | 0 | 3079020 | 105482 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 148.7 | 148.7 | 564.0 | False | None | None | False | None | False | 83866.8 | 0 | 3079021 | 105482 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 145.64 | 145.64 | 270.0 | False | None | None | False | None | False | 39322.8 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimates forMaintenance - Activitiesto be carried out for theFifth Year (PAIDMAINTENANCE) | 166274.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079022 | 105483 | None | 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 Rates are including 18% gst
---- Item rates are inclusive of 18 percent GST | 100 Sqm | 623.26 | 623.26 | 22.56 | False | None | None | False | None | False | 14060.7456 | 0 | 3079023 | 105483 | None | 16.19 | Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | m | 9.51 | 9.51 | 1504.0 | False | None | None | False | None | False | 14303.04 | 0 | 3079024 | 105483 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 61.86 | 61.86 | 169.2 | False | None | None | False | None | False | 10466.712 | 0 | 3079025 | 105483 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 153.84 | 153.84 | 564.0 | False | None | None | False | None | False | 86765.76 | 0 | 3079026 | 105483 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Cum | 150.66 | 150.66 | 270.0 | False | None | None | False | None | False | 40678.2 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimates for Renewalafter maintenanceperiod | 1153104.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079027 | 105484 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Km | 3251.35 | 3251.35 | 1.88 | False | None | None | False | None | False | 6112.538 | 0 | 3079028 | 105484 | None | 16.24 i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 148 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Km | 337.59 | 337.59 | 1.88 | False | None | None | False | None | False | 634.6692 | 0 | 3079029 | 105484 | None | 13.14 | Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.14 , Page No: 123 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 137.66 | 137.66 | 607.3 | False | None | None | False | None | False | 83600.918 | 0 | 3079030 | 105484 | None | 8.40 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 1.47 | 1.47 | 150.0 | False | None | None | False | None | False | 220.5 | 0 | 3079031 | 105484 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 Rates are including 18% gst ---- Item rates are inclusive of 18 percent GST | Sqm | 868.56 | 868.56 | 1223.33 | False | None | None | False | None | False | 1062535.5048 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 Estimate for shifting ofHT/LT Lines forwidening of road fromBolwar to Padeel as perrequest of AEE PWDNo4 Subdivision Putturin Puttur townsection,CSD Puttur. | 2922755.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079032 | 105485 | None | M 1.07 P-1 VOL 06 | 02 00 120-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 23394.96 | 23394.96 | 24.0 | False | None | None | False | None | False | 561479.04 | 0 | 3079033 | 105485 | None | L 1.5.1 P-43 VOL-06 | Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing - Ordinary Soil
Errection Charges
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 2517.65 | 2517.65 | 24.0 | False | None | None | False | None | False | 60423.6 | 0 | 3079034 | 105485 | None | M 2.05 P- 44 VOL-06 | Erection of Poles Erection of 11mtr long Concrete spun pole in a pit of2.5 mtr depth. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 3362.15 | 3362.15 | 24.0 | False | None | None | False | None | False | 80691.6 | 0 | 3079035 | 105485 | None | M 1.01 P-01 VOL-06 | 02 00 105-RCC Pole-9.0M
Long 145 kg WL
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 9531.64 | 9531.64 | 9.0 | False | None | None | False | None | False | 85784.76 | 0 | 3079036 | 105485 | None | L 1.1.1 P-43 VOL-06 | Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Errection Charges
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 831.29 | 831.29 | 9.0 | False | None | None | False | None | False | 7481.61 | 0 | 3079037 | 105485 | None | L 2.02 P-44 VOL-06 | Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 9.0 | False | None | None | False | None | False | 13238.46 | 0 | 3079038 | 105485 | None | M 1.06 P-01 VOL-06 | 02 00 006-PSC Pole-9.0M
Long 200 kg WL
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 4199.0 | 4199.0 | 5.0 | False | None | None | False | None | False | 20995.0 | 0 | 3079039 | 105485 | None | L 1.1.1 P-43 VOL-06 | Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 831.29 | 831.29 | 5.0 | False | None | None | False | None | False | 4156.45 | 0 | 3079040 | 105485 | None | L 2.02 P-44 VOL-06 | Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 5.0 | False | None | None | False | None | False | 7354.7 | 0 | 3079041 | 105485 | None | M 10(a) P-03 VOL-06 | 11 kV Horizontal cross arm with HT Single Top support, clamp,bolts, nuts and washers For RCC Poles 140 KG WL
-GI
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 1123.36 | 1123.36 | 40.0 | False | None | None | False | None | False | 44934.4 | 0 | 3079042 | 105485 | None | L 5.03 P-45 VOL-06 | Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil Rates are inclusive of GST 18 Percent
---- Item rates are inclusive of 18 percent GST | Set | 339.65 | 339.65 | 40.0 | False | None | None | False | None | False | 13586.0 | 0 | 3079043 | 105485 | None | M 3 | 02 83 007-11kV Pin Insulator (Both Shell and G.I. Pin) - Polymeric Rates are inclusive of GST 18 Percent
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 205.0 | 205.0 | 65.0 | False | None | None | False | None | False | 13325.0 | 0 | 3079044 | 105485 | None | M 6.10 P-03 VOL-06 | 02 83 320-Silcon rubber composite disk insulator/11kV 45 kN Polymeric insulator
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | No | 245.82 | 245.82 | 30.0 | False | None | None | False | None | False | 7374.6 | 0 | 3079045 | 105485 | None | 014 | 02 79 861-11kV
G.O.S.Mounting H-Frame set for 400A Double break"
---- Item rates are inclusive of 18 percent GST | Set | 4134.0 | 4134.0 | 2.0 | False | None | None | False | None | False | 8268.0 | 0 | 3079046 | 105485 | None | L 2.09 P-44 VOL-06 | Erection of H Frame. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 426.88 | 426.88 | 2.0 | False | None | None | False | None | False | 853.76 | 0 | 3079047 | 105485 | None | M 7.02 P-3 VOL-06 | 02 84 108-Rabbit ACSR
Conductor"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Km | 77362.5 | 77362.5 | 5.76 | False | None | None | False | None | False | 445608.0 | 0 | 3079048 | 105485 | None | L 6.02 P-46 VOL-06 | Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Km | 5763.5 | 5763.5 | 5.76 | False | None | None | False | None | False | 33197.76 | 0 | 3079049 | 105485 | None | M 7.03 P-01 VOL-06 | 02 84 116-Coyote ACSR
Conductor"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Km | 183702.4 | 183702.4 | 1.2 | False | None | None | False | None | False | 220442.88 | 0 | 3079050 | 105485 | None | M 14 (A) P-4 VOL-06 | 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - GI
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 732.17 | 732.17 | 20.0 | False | None | None | False | None | False | 14643.4 | 0 | 3079051 | 105485 | None | L 5.02 P- 45 VOL-06 | Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 211.46 | 211.46 | 20.0 | False | None | None | False | None | False | 4229.2 | 0 | 3079052 | 105485 | None | M 16(A) P-5 VOL-06 | 2 - Pin cross arm with pole clamp , bolts, nuts and washers with braces For RCC Poles - GI
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 459.92 | 459.92 | 10.0 | False | None | None | False | None | False | 4599.2 | 0 | 3079053 | 105485 | None | L 5.01 P-45 VOL-06 | Fixing of 2 Pin cross arm with insulator and Braces fixing - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 211.46 | 211.46 | 10.0 | False | None | None | False | None | False | 2114.6 | 0 | 3079054 | 105485 | None | M 24 (a) P-06 VOL-06 | Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07-GI
Rates are inclusive of GST 18 Percent
---- Item rates are inclusive of 18 percent GST | Set | 1546.27 | 1546.27 | 25.0 | False | None | None | False | None | False | 38656.75 | 0 | 3079055 | 105485 | None | L 1.7.1 P-44 VOL-06 | Digging of Pit for GUY SET - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 432.16 | 432.16 | 25.0 | False | None | None | False | None | False | 10804.0 | 0 | 3079056 | 105485 | None | L 5.11 P-45 VOL-06 | Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 351.55 | 351.55 | 25.0 | False | None | None | False | None | False | 8788.75 | 0 | 3079057 | 105485 | None | L 1.6.1 P-01 VOL-06 | Digging of pit. For providing GI Pipe type Earthing - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 1003.09 | 1003.09 | 9.0 | False | None | None | False | None | False | 9027.81 | 0 | 3079058 | 105485 | None | L 8.05 P-41 VOL-06 | Providing GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parts (Excluding digging of pits) - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 251.1 | 251.1 | 9.0 | False | None | None | False | None | False | 2259.9 | 0 | 3079059 | 105485 | None | M 16(A) P-06 VOL-06 | Guarding Materials above 40 mtrs span
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 4916.35 | 4916.35 | 10.0 | False | None | None | False | None | False | 49163.5 | 0 | 3079060 | 105485 | None | L 5.12 P-45 VOL-06 | Fixing guarding including fixing of necessary cross arms between HT and LT line above a span of 40 mtrs for - Anticlimbing Device - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 2384.16 | 2384.16 | 10.0 | False | None | None | False | None | False | 23841.6 | 0 | 3079061 | 105485 | None | M 6.03 P-03 VOL-06 | 02 83 003-1.1kV Ceramic Pin Insulator (Shell only)
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 40.97 | 40.97 | 80.0 | False | None | None | False | None | False | 3277.6 | 0 | 3079062 | 105485 | None | M 6.04 P-03 VOL-06 | 02 83 053-1.1kV GI Pin FOR
1.1kV Cermaic shell Insulator"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 46.26 | 46.26 | 80.0 | False | None | None | False | None | False | 3700.8 | 0 | 3079063 | 105485 | None | M 6.07 P-4 VOL-06 | 02 83 158-No8 Strain Insulator
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 35.68 | 35.68 | 40.0 | False | None | None | False | None | False | 1427.2 | 0 | 3079064 | 105485 | None | M 24.04 P-9 VOL-06 | 03 04 224-11kV G.O.S 400A
Double break"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 28097.22 | 28097.22 | 2.0 | False | None | None | False | None | False | 56194.44 | 0 | 3079065 | 105485 | None | L 13.03 P-48 VOL-6 | Fixing of GOS including wiring g (11kV SB 400A) - Ordinary Soil
Rates are inclusive of GST 18 Percent
---- Item rates are inclusive of 18 percent GST | Set | 1181.51 | 1181.51 | 2.0 | False | None | None | False | None | False | 2363.02 | 0 | 3079066 | 105485 | None | L 17.05.2 P-51 VOL-6 | Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles
-RCC Pole-9.0M Long 145 kg WL - Ordinary Soil"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 187.67 | 187.67 | 9.0 | False | None | None | False | None | False | 1689.03 | 0 | 3079067 | 105485 | None | L 17.05.2 P-51 VOL-6 | Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles
-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL - Ordinary Soil"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 187.67 | 187.67 | 24.0 | False | None | None | False | None | False | 4504.08 | 0 | 3079068 | 105485 | None | L 17.05.2 P-51 VOL-6 | Loading and unloading of poles (loading of poles to vehicles at stores and unloading at workspot) - 9 mtr RCC/PSC poles
-PSC Pole-9.0M Long 200 kg WL - Ordinary Soil"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 187.67 | 187.67 | 5.0 | False | None | None | False | None | False | 938.35 | 0 | 3079069 | 105485 | None | L 2.02 P-44 VOL-6 | Releasing and Refixing-RCC Pole-9.0M Long 145 kg WL - Ordinary Soil 1.9x 1113(basic rate )= 2114.7
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 4374.23 | 4374.23 | 14.0 | False | None | None | False | None | False | 61239.22 | 0 | 3079070 | 105485 | None | L 6.02 P-46 VOL-6 | Releasing and Refixing-Rabbit ACSR Conductor - Ordinary Soil 1.9X 4361(basic rate )=8285.90
L 6.02 P-46 VOL-6 ---- Item rates are inclusive of 18 percent GST | Km | 10950.65 | 10950.65 | 8.82 | False | None | None | False | None | False | 96584.733 | 0 | 3079071 | 105485 | None | KPTCL SR | Releasing and Refixing-Coyote ACSR Conductor - Ordinary Soil 1.9x 8006 (basic rate )15200
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Km | 20088.32 | 20088.32 | 5.256 | False | None | None | False | None | False | 105584.20992 | 0 | 3079072 | 105485 | None | L 2.09 P-44 VOL-6 | Releasing and Refixing-H - Frame Set for 11kV, 200Amps Single Break GOS Mounting - MS - Ordinary Soil 1.9 X323(basic rate )= 613.70
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 811.07 | 811.07 | 3.0 | False | None | None | False | None | False | 2433.21 | 0 | 3079073 | 105485 | None | L 5.03 P-45 VOL-6 | Releasing and Refixing-11 kV Horizontal Cross Arm with single top support, clamp, Bolt & Nuts with washers for RCC Poles - MS - Ordinary Soil 1.9X 257(BASIC RATE )=488.30
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 645.34 | 645.34 | 90.0 | False | None | None | False | None | False | 58080.6 | 0 | 3079074 | 105485 | None | L 5.02 P-45 VOL-6 | Releasing and Refixing-4 Pin Cross Arm with pole clamp, bolt & nuts & washers for RCC Pole - MS - Ordinary Soil 1.9 x 160(basic rate ) =304
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 401.77 | 401.77 | 13.0 | False | None | None | False | None | False | 5223.01 | 0 | 3079075 | 105485 | None | L 5.01 P-45 VOL-06 | Releasing and Refixing-2 Pin Cross Arm with pole clamp, bolts & nuts & washers for RCC Pole - MS - Ordinary Soil 1.9X160(basic rate) =304
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 401.77 | 401.77 | 6.0 | False | None | None | False | None | False | 2410.62 | 0 | 3079076 | 105485 | None | L 2.02 P-44 VOL-6 | Releasing and Refixing-PSC Pole-9.0M Long 200 kg WL - Ordinary Soil 1.9X 1113+1132 (basic rate )=3246
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 4289.91 | 4289.91 | 33.0 | False | None | None | False | None | False | 141567.03 | 0 | 3079077 | 105485 | None | L 1.8.2 P-60 VOL-6 | Pole concreting with CC 1:2:4 (without coping), 11 mtrs Spun pole (1000x1000x2500mm)
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 18507.69 | 18507.69 | 24.0 | False | None | None | False | None | False | 444184.56 | 0 | 3079078 | 105485 | None | L 28.09 P-56 VOL-6 | Spreading and forming with sand all round the cable to a depth of 75 mm and width of 500 mm.
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Km | 19572.9 | 19572.9 | 0.156 | False | None | None | False | None | False | 3053.3724 | 0 | 3079079 | 105485 | None | L 5.04 P-45 VOL-6 | Dismantling work-11kV Horizontal X Arms
- Mild Steel (MS)"
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 190.31 | 190.31 | 10.0 | False | None | None | False | None | False | 1903.1 | 0 | 3079080 | 105485 | None | L 5.02 P-45 VOL-6 | Dismantling work-LT 4 Pin X Arms - MS
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 190.31 | 190.31 | 15.0 | False | None | None | False | None | False | 2854.65 | 0 | 3079081 | 105485 | None | L 13.06 P-48 VOL-06 | Releasing and Refixing-Lightning Arresters -9kV 5kA Polymeric type - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 298.81 | 298.81 | 2.0 | False | None | None | False | None | False | 597.62 | 0 | 3079082 | 105485 | None | L 15.03 P-49 VOL-6 | Releasing and Refixing-LT Protection kit - Ordinary Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 893.93 | 893.93 | 5.0 | False | None | None | False | None | False | 4469.65 | 0 | 3079083 | 105485 | None | L 13.02 P- 48 VOL-6 | Releasing and Refixing-11kV 200Amps Single Break GOS - Ordinary Soil 1.9x 11.04 ( BASIC RATE ) =2097
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 2772.19 | 2772.19 | 5.0 | False | None | None | False | None | False | 13860.95 | 0 | 3079084 | 105485 | None | L 15.05 P- 45 VOL-6 | Releasing and Refixing-L.T.Wiring kit - For 63 kVA DTC double circuit - Ordinary Soil 1.9x 1519 (Basic Rate)=2886.10
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 3814.27 | 3814.27 | 1.0 | False | None | None | False | None | False | 3814.27 | 0 | 3079085 | 105485 | None | L 13.01 P-48 VOL-6 | Releasing and Refixing-HG Fuse 11KV Class Solid Core Type - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 595.12 | 595.12 | 2.0 | False | None | None | False | None | False | 1190.24 | 0 | 3079086 | 105485 | None | L 8.01 P-46 VOL-6 | Releasing and Refixing-Distribution Transformer-63kVA - Ordinary Soil 1.9x 1193(Basic Rate ) =2266.7
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 2995.67 | 2995.67 | 1.0 | False | None | None | False | None | False | 2995.67 | 0 | 3079087 | 105485 | None | L 8.02 P-46 VOL-6 | Releasing and Refixing-Distribution Transformer-100kVA - Ordinary Soil 1.9X1590(Basic rate)=3021
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Nos | 3992.55 | 3992.55 | 1.0 | False | None | None | False | None | False | 3992.55 | 0 | 3079088 | 105485 | None | L 45.03 P-21 VOL-6 | 02 88 315-Heat Shrinkable type transition jointing kit for XLPE cable -3x400 Sq.mm
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Set | 17044.68 | 17044.68 | 4.0 | False | None | None | False | None | False | 68178.72 | 0 | 3079089 | 105485 | None | KPWD SR | Earth work excavation for cable trench of 0.5 to 0.75 mtr. Width and Depth upto 1 mtr. including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails Sign Boards etc In Hard Soil
Rates are inclusive of GST 18 Percent ---- Item rates are inclusive of 18 percent GST | Cum | 150.66 | 150.66 | 180.0 | False | None | None | False | None | False | 27118.8 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 1ST YEAR MAINTANCE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079090 | 105486 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 21.92) ---- Item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079091 | 105486 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 1644.00) ---- Item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079092 | 105486 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079093 | 105486 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per sA inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079094 | 105486 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079095 | 105486 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete,40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespeetine of quantity Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page
No:91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 2ND YEAR MAINTANCE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079096 | 105487 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =32.88) ---- Item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079097 | 105487 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =2192.00) ---- Item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079098 | 105487 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079099 | 105487 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079100 | 105487 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3079101 | 105487 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete,40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespeetine of quantity Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page
No:91 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710441746000 | 0 | None | None | Roads | Pkg-776 ELECTRIC ESTIMATE | 2774318.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3079102 | 105488 | None | M 1.01 P-01 VOL-06 | 02 00 105-RCC Pole-9.0M
Long 145 kg WL"
Rates are inclusive of GST 18%
---- Item rates are inclusive of 18 percent GST | Nos | 9531.64 | 9531.64 | 22.0 | False | None | None | False | None | False | 209696.08 | 0 | 3079103 | 105488 | None | L 1.1.1 P- 43 VOL-06 | Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 629.0 | 629.0 | 22.0 | False | None | None | False | None | False | 13838.0 | 0 | 3079104 | 105488 | None | L 2.02 P-44 VOL-06 | Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 22.0 | False | None | None | False | None | False | 32360.68 | 0 | 3079105 | 105488 | None | M (10)A P-03 VOL-06 | 11 kV Horizontal cross arm with HT Single Top support, clamp,bolts, nuts and washers For RCC Poles 140 KG WL
-GI"
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 1123.36 | 1123.36 | 22.0 | False | None | None | False | None | False | 24713.92 | 0 | 3079106 | 105488 | None | L 5.03 P-45 VOL-6 | Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 339.65 | 339.65 | 22.0 | False | None | None | False | None | False | 7472.3 | 0 | 3079107 | 105488 | None | VOL-06 | 11 kV Horizontal cross arm with HT Single Top support, clamp,bolts, nuts and washers For PSCC Poles 140 KG WL
-GI"
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 1104.86 | 1104.86 | 44.0 | False | None | None | False | None | False | 48613.84 | 0 | 3079108 | 105488 | None | L 5.03 P-45 VOL-6 | Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fixing. - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 339.65 | 339.65 | 44.0 | False | None | None | False | None | False | 14944.6 | 0 | 3079109 | 105488 | None | VOL-06 | 02 83 008-11kV, 5KN
Composite/Polymeric Pin Insulator(24mm dia FP Rod)"
---- Item rates are inclusive of 18 percent GST | Nos | 270.93 | 270.93 | 594.0 | False | None | None | False | None | False | 160932.42 | 0 | 3079110 | 105488 | None | M 6.10 P-0.3 VOL-6 | 02 83 320-Silcon rubber composite disk insulator/11kV 45 kN Polymeric insulator
---- Item rates are inclusive of 18 percent GST | Nos | 245.82 | 245.82 | 48.0 | False | None | None | False | None | False | 11799.36 | 0 | 3079111 | 105488 | None | M 14 (B) P-4 VOL-6 | 4 Pin Cross Arm with pole clamp, bolt & nuts & washers for PSC Pole - GI
---- Item rates are inclusive of 18 percent GST | Set | 713.66 | 713.66 | 44.0 | False | None | None | False | None | False | 31401.04 | 0 | 3079112 | 105488 | None | L 5.02 P-45 VOL-06 | Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 211.46 | 211.46 | 44.0 | False | None | None | False | None | False | 9304.24 | 0 | 3079113 | 105488 | None | M 6.03 P-03 VOL-06 | 02 83 003-1.1kV Ceramic Pin Insulator (Shell only)
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 40.97 | 40.97 | 220.0 | False | None | None | False | None | False | 9013.4 | 0 | 3079114 | 105488 | None | M 6.04 P-3 VOL-06 | 02 83 053-1.1kV GI Pin FOR
1.1kV Cermaic shell Insulator"
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 46.26 | 46.26 | 220.0 | False | None | None | False | None | False | 10177.2 | 0 | 3079115 | 105488 | None | M 6.07 P-4 VOL-6 | 02 83 158-No8 Strain Insulator
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 35.68 | 35.68 | 40.0 | False | None | None | False | None | False | 1427.2 | 0 | 3079116 | 105488 | None | M 1.07 P-1 VOL-6 | 02 00 120-Pre - Stressed Tubular Spun Pole 11 Mtr Long - 500Kg WL
Rates are inclusive of GST 18%
---- Item rates are inclusive of 18 percent GST | Nos | 23394.96 | 23394.96 | 22.0 | False | None | None | False | None | False | 514689.12 | 0 | 3079117 | 105488 | None | L 1.5.1 P-43 VOL-06 | Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per approved Drawing - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 2517.65 | 2517.65 | 22.0 | False | None | None | False | None | False | 55388.3 | 0 | 3079118 | 105488 | None | M 2.05 P-44 VOL-6 | Erection of Poles Erection of 11mtr long Concrete spun pole in a pit of2.5 mtr depth. - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 3362.15 | 3362.15 | 22.0 | False | None | None | False | None | False | 73967.3 | 0 | 3079119 | 105488 | None | VOL-06 | Special Cross Arms Set - with EG Stirrups , Braces ,
Clamps ,Bolts Nuts and Washers Complete"
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 1986.36 | 1986.36 | 66.0 | False | None | None | False | None | False | 131099.76 | 0 | 3079120 | 105488 | None | VOL-06 | Labour for Special cross arm with cross arm for EG Stirrups, braces, clamps, bolts nuts and washers complete - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 528.64 | 528.64 | 66.0 | False | None | None | False | None | False | 34890.24 | 0 | 3079121 | 105488 | None | M 24(A) P-06 VOL-6 | Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07-GI
Rates are inclusive of GST 18%
---- Item rates are inclusive of 18 percent GST | Set | 1546.27 | 1546.27 | 98.0 | False | None | None | False | None | False | 151534.46 | 0 | 3079122 | 105488 | None | L 1.7.1 P-44 VOL-6 | Digging of Pit for GUY SET - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 432.16 | 432.16 | 98.0 | False | None | None | False | None | False | 42351.68 | 0 | 3079123 | 105488 | None | L 5.11 P-45 VOL-6 | Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 351.55 | 351.55 | 98.0 | False | None | None | False | None | False | 34451.9 | 0 | 3079124 | 105488 | None | VOL- 06 | 02 81 008-8 SWG GI Wire
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Kg | 99.12 | 99.12 | 50.0 | False | None | None | False | None | False | 4956.0 | 0 | 3079125 | 105488 | None | M 7.02 P-03 VOL-6 | 02 84 108-Rabbit ACSR
Conductor"
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Km | 77362.5 | 77362.5 | 1.0 | False | None | None | False | None | False | 77362.5 | 0 | 3079126 | 105488 | None | L 6.02 P-46 VOL-6 | Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps. - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Km | 5763.5 | 5763.5 | 1.0 | False | None | None | False | None | False | 5763.5 | 0 | 3079127 | 105488 | None | M 2.16 P-2 VOL-06 | 02 81 683-Spiral Earth Electrode
---- Item rates are inclusive of 18 percent GST | No | 315.86 | 315.86 | 44.0 | False | None | None | False | None | False | 13897.84 | 0 | 3079128 | 105488 | None | VOL-06 | Providing spiral earth electrode type earthing along with pole (without charcoal, salt etc.,) - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 122.91 | 122.91 | 44.0 | False | None | None | False | None | False | 5408.04 | 0 | 3079129 | 105488 | None | L 2.02 P-44 VOL-06 | Releasing and Refixing-RCC Pole-9.0M Long 145 kg WL - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 4374.23 | 4374.23 | 80.0 | False | None | None | False | None | False | 349938.4 | 0 | 3079130 | 105488 | None | VOL-06 | Releasing and Refixing-LT 4 Pin X Arms - MS - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 401.77 | 401.77 | 47.0 | False | None | None | False | None | False | 18883.19 | 0 | 3079131 | 105488 | None | VOL-06 | Releasing and Refixing-DP Sets - MS - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 4791.06 | 4791.06 | 4.0 | False | None | None | False | None | False | 19164.24 | 0 | 3079132 | 105488 | None | L 6.02 P-46 VOL-6 | Releasing and Refixing-Weasel ACSR Conductor - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Km | 10950.65 | 10950.65 | 12.0 | False | None | None | False | None | False | 131407.8 | 0 | 3079133 | 105488 | None | L 6.02 P-46 VOL-06 | Releasing and Refixing-Rabbit ACSR Conductor - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Km | 7885.11 | 7885.11 | 16.444 | False | None | None | False | None | False | 129662.74884 | 0 | 3079134 | 105488 | None | L 2.02 P-44 VOL-6 | Releasing and Refixing-PSC Pole-9.0M Long 200 kg WL - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 4289.91 | 4289.91 | 13.0 | False | None | None | False | None | False | 55768.83 | 0 | 3079135 | 105488 | None | L 5.03 P-45 VOL-6 | Releasing and Refixing-11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers For PSCC Pole 200 KG WL- MS - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 645.34 | 645.34 | 176.0 | False | None | None | False | None | False | 113579.84 | 0 | 3079136 | 105488 | None | VOL-06 | Releasing and Replacing Insulators 11KV Pin Insulators-1.1kV GI Pin FOR 1.1kV Cermaic shell Insulator - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | No | 63.44 | 63.44 | 185.0 | False | None | None | False | None | False | 11736.4 | 0 | 3079137 | 105488 | None | VOL-6 | Releasing and Replacing Insulators 11KV Pin Insulators-11kV GI Pin for 11kV Ceramic Shell Insulators - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 63.44 | 63.44 | 302.0 | False | None | None | False | None | False | 19158.88 | 0 | 3079138 | 105488 | None | Vol -6 | Releasing and Replacing Insulators 11KV Dead End Insulators Disc, Strain etc-No8 Strain Insulator - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Nos | 76.65 | 76.65 | 100.0 | False | None | None | False | None | False | 7665.0 | 0 | 3079139 | 105488 | None | vol-6 | Earthing Material Set
Rates are inclusive of GST 18%
---- Item rates are inclusive of 18 percent GST | Set | 2285.05 | 2285.05 | 15.0 | False | None | None | False | None | False | 34275.75 | 0 | 3079140 | 105488 | None | L 1.6.1 P-1 VOL-6 | Digging of pit. For providing GI Pipe type Earthing - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 1003.09 | 1003.09 | 15.0 | False | None | None | False | None | False | 15046.35 | 0 | 3079141 | 105488 | None | L 8.05 P-44 VOL-6 | Providing GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parts (Excluding digging of pits) - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 251.1 | 251.1 | 15.0 | False | None | None | False | None | False | 3766.5 | 0 | 3079142 | 105488 | None | M 24 (A) P-6 VOL-6 | Guy set with No.15 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CP/7/Dt; 24.10.07-GI
Rates are inclusive of GST 18%
---- Item rates are inclusive of 18 percent GST | Set | 1546.27 | 1546.27 | 10.0 | False | None | None | False | None | False | 15462.7 | 0 | 3079143 | 105488 | None | L 1.7.1 P-44 VOL-6 | Digging of Pit for GUY SET - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 432.16 | 432.16 | 10.0 | False | None | None | False | None | False | 4321.6 | 0 | 3079144 | 105488 | None | L 5.11 P-45 VOL-6 | Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 351.55 | 351.55 | 10.0 | False | None | None | False | None | False | 3515.5 | 0 | 3079145 | 105488 | None | VOL-6 | Releasing and Refixing-Double Pole TC Sets For 25/63kVA Transformer - MS - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 8786.13 | 8786.13 | 3.0 | False | None | None | False | None | False | 26358.39 | 0 | 3079146 | 105488 | None | VOL-06 | Releasing and Refixing-Double Pole TC Sets For 100/300kVA Transformer - MS - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 11894.8 | 11894.8 | 2.0 | False | None | None | False | None | False | 23789.6 | 0 | 3079147 | 105488 | None | VOL-6 | Releasing and Refixing-Distribution Transformer-25kVA - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 3524.31 | 3524.31 | 1.0 | False | None | None | False | None | False | 3524.31 | 0 | 3079148 | 105488 | None | L 8.01 P-46 VOL-06 | Releasing and Refixing-Distribution Transformer-63kVA - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 2995.67 | 2995.67 | 2.0 | False | None | None | False | None | False | 5991.34 | 0 | 3079149 | 105488 | None | L 8.02 P-46 VOL-06 | Releasing and Refixing-Distribution Transformer-100kVA - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | No | 3992.55 | 3992.55 | 2.0 | False | None | None | False | None | False | 7985.1 | 0 | 3079150 | 105488 | None | L 13.06 P-48 VOL-6 | Releasing and Refixing-Lightning Arresters 9kV 5kA Polymeric type - Ordinary Soil ---- Item rates are inclusive of 18 percent GST | Set | 298.81 | 298.81 | 5.0 | False | None | None | False | None | False | 1494.05 | 0 | 3079151 | 105488 | None | L 15.03 P-49 VOL-6 | Releasing and Refixing-LT Protection kit - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Nos | 893.93 | 893.93 | 9.0 | False | None | None | False | None | False | 8045.37 | 0 | 3079152 | 105488 | None | L 13.02 P-48 VOL-6 | Releasing and Refixing-11kV 200Amps Single Break GOS - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 2772.18 | 2772.18 | 5.0 | False | None | None | False | None | False | 13860.9 | 0 | 3079153 | 105488 | None | L 15.05 P-45 VOL-06 | Releasing and Refixing-L.T.Wiring kit For 25 kVA DTC single circuit - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 3814.27 | 3814.27 | 1.0 | False | None | None | False | None | False | 3814.27 | 0 | 3079154 | 105488 | None | L 15.05 P-45 VOL-6 | Releasing and Refixing-L.T.Wiring kit For 63 kVA DTC double circuit - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 3814.27 | 3814.27 | 2.0 | False | None | None | False | None | False | 7628.54 | 0 | 3079155 | 105488 | None | VOL -06 | Releasing and Refixing-L.T.Wiring kit through Distribution Box For 100 kVA DTC double circuit - Ordinary Soil
---- Item rates are inclusive of 18 percent GST | Set | 2021.39 | 2021.39 | 2.0 | False | None | None | False | None | False | 4042.78 | 0 | 3079156 | 105488 | None | L 13.01 P-48 VOL-06 | Releasing and Refixing-HG Fuse 11KV Class Solid Core Type - Ordinary Soil
Rates are inclusive of GST 18% ---- Item rates are inclusive of 18 percent GST | Set | 595.12 | 595.12 | 5.0 | False | None | None | False | None | False | 2975.6 | 0 |
|
|
---|