tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710430547000 | 0 | None | None | Roads | Flexible Pavement | 68275300.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076465 | 105223 | None | PWD SR 2023-24 Vol -III Item no -2.5i Page no 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of thorny jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 482.29 | 482.29 | 98.88 | False | None | None | False | None | False | 47688.8352 | 0 | 3076466 | 105223 | None | PWD SR 2023-24 Vol -I Item no-1.12 Page n 8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 116.58 | 116.58 | 4887.9 | False | None | None | False | None | False | 569831.382 | 0 | 3076467 | 105223 | None | PWD SR 2023-24 Vol -III Item no -3.5 Page no 17 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead etc…complete as directed as per the specification and direction of Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.36 | 7.36 | 17387.5 | False | None | None | False | None | False | 127972.0 | 0 | 3076468 | 105223 | None | PWD SR 2023-24 Vol -I Item no -1.7 Page no 7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 146.04 | 146.04 | 3519.54 | False | None | None | False | None | False | 513993.6216 | 0 | 3076469 | 105223 | None | PWD SR 2023-24 Vol -I Item no -1.8 Page no 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 581.69 | 581.69 | 4495.06 | False | None | None | False | None | False | 2614731.4514 | 0 | 3076470 | 105223 | None | PWD SR 2023-24 Vol -III Item no -3.6 Page no 17 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 605.01 | 605.01 | 5772.95 | False | None | None | False | None | False | 3492692.4795 | 0 | 3076471 | 105223 | None | PWD SR 2023-24 Vol -III Item no -4.2v Page no 23 | Construction of Granular Sub-Base of required grading as per
design spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with front end
loader at OMC and compacting with vibratory roller to achieve
the desired density, complete as per clause 401 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2894.96 | 2894.96 | 5172.3 | False | None | None | False | None | False | 14973601.608 | 0 | 3076472 | 105223 | None | PWD SR 2023-24 Vol -III Item no -4.17 Page no 26 | Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing
the Material with water at OMC in mechanical mix plant carriage
of mixed Material by tipper to site, laying in uniform layers with
paver/grader in sub-base / base course on well prepared surface
and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3140.4 | 3140.4 | 6364.08 | False | None | None | False | None | False | 19985756.832 | 0 | 3076473 | 105223 | None | PWD SR 2023-24 Vol -III Item no -5.1A Page no 31 | Providing and applying primer coat with SS1 grade Bitumen
Emulsion on prepared surface of granular base including
cleaning of road surface and spraying primer at the rate of 0.70
kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 50.32 | 50.32 | 24622.3 | False | None | None | False | None | False | 1238994.136 | 0 | 3076474 | 105223 | None | PWD SR 2023-24 Vol -III Item no -5.4 Page no 31 | Providing and applying tack coat with RS1 Bituminous Emulsion
using emulsion pressure distributor at the rate of 0.25 kg/m2 on
Granular Surface. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 17.18 | 17.18 | 24622.3 | False | None | None | False | None | False | 423011.114 | 0 | 3076475 | 105223 | None | PWD SR 2023-24 Vol -III Item no -5.12C Page no 35 | Dense Graded Bituminous Macadam with Grading II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with
40/60 TPH capacity HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 4.5 per cent
by weight of total mix and filler, transporting the hot mix to work
site, laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11595.81 | 11595.81 | 1231.12 | False | None | None | False | None | False | 14275833.6072 | 0 | 3076476 | 105223 | None | PWD SR 2023-24 Vol -III Item no -5.16C Page no 38 | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH
capacity hot mix plant using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 5.4 per
cent of mix and filler, transporting the hot mix to work site,
laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MORTH
specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13442.75 | 13442.75 | 738.67 | False | None | None | False | None | False | 9929756.1425 | 0 | 3076477 | 105223 | None | PWD SR 2023-24 Vol -III Item no -8.29i Page no 71 | Providing and laying of a reinforced cement concrete pipe duct,
300 mm dia, across the road (new construction), extending
from drain to drain in cuts and toe of slope to toe of slope in fills,
constructing head walls at both ends, providing a minimum
fill of granular material over top and sides of RCC pipe as per
IRC:98-1997, bedded on a 0.3 m thick layer of granular material
free of rock pieces, outer to outer distance of pipe at least half
dia of pipe subject to minimum 450 mm in case of double and
triple row ducts, joints to be made leak proof, invert level of
duct to be above higher than ground level to prevent entry of
water and dirt, all as per IRC: 98 - 1997 and approved drawings Single row for one utility service ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2714.57 | 2714.57 | 30.0 | False | None | None | False | None | False | 81437.1 | 0 |
| 1710430547000 | 1 | None | None | Roads | Construction of New RCC Box Culvert | 1921289.82 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076478 | 105224 | None | PWD SR 2023-24 Vol -I Item no -1.14.1 Page no 8 | Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting
& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenaces
required to complete the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.17 | 125.17 | 93.06 | False | None | None | False | None | False | 11648.3202 | 0 | 3076479 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.1.3 Page no 15 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in
layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7349.7 | 7349.7 | 14.02 | False | None | None | False | None | False | 103042.794 | 0 | 3076480 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.11h Page no 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96962.3 | 96962.3 | 5.31 | False | None | None | False | None | False | 514869.813 | 0 | 3076481 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.4.2 Page no 16 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9311.5 | 9311.5 | 57.18 | False | None | None | False | None | False | 532431.57 | 0 | 3076482 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.4.2 Page no 16 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8380.35 | 8380.35 | 18.48 | False | None | None | False | None | False | 154868.868 | 0 | 3076483 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.5.2 Page no 16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10077.28 | 10077.28 | 20.25 | False | None | None | False | None | False | 204064.92 | 0 | 3076484 | 105224 | None | PWD SR 2023-24 Vol -III Item no -13.2 Page no 121 | Providing and laying Cement concrete wearing coat M-30 grade
including reinforcement complete as per drawing and Technical
Specifications. (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 17145.21 | 17145.21 | 4.1 | False | None | None | False | None | False | 70295.361 | 0 | 3076485 | 105224 | None | PWD SR 2023-24 Vol -I Item no -2.1.2 Page no 15 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in
layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications.Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 6950.86 | 6950.86 | 11.88 | False | None | None | False | None | False | 82576.2168 | 0 | 3076486 | 105224 | None | PWD SR 2023-24 Vol -III Item no -13.9 Page no 122 | Reinforced cement concrete M30 grade for approach slab
including reinforcement and formwork complete as per drawing
and Technical specification (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14523.91 | 14523.91 | 14.4 | False | None | None | False | None | False | 209144.304 | 0 | 3076487 | 105224 | None | PWD SR 2023-24 Vol -III Item no -8.18 Page no 67 | Reinforced cement concrete M15 grade boundary pillars of
standard design as per IRC:25, fixed in position including
finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 917.95 | 917.95 | 36.0 | False | None | None | False | None | False | 33046.2 | 0 | 3076488 | 105224 | None | PWD SR 2023-24 Vol -I Item no -1.10 Page no 7 | Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 196.35 | 196.35 | 27.0 | False | None | None | False | None | False | 5301.45 | 0 |
| 1710430547000 | 0 | None | None | Roads | Construction of Field Culvert | 1417954.24 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076489 | 105225 | None | PWD SR 2023-24 Vol -I Item no -1.14.1 Page no 8 | Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting
& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenaces
required to complete the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.17 | 125.17 | 177.4 | False | None | None | False | None | False | 22205.158 | 0 | 3076490 | 105225 | None | PWD SR 2023-24 Vol -I Item no -2.1.3 Page no 15 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in
layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7349.7 | 7349.7 | 12.75 | False | None | None | False | None | False | 93708.675 | 0 | 3076491 | 105225 | None | PWD SR 2023-24 Vol -I Item no -2.11h Page no 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96962.3 | 96962.3 | 1.57 | False | None | None | False | None | False | 152230.811 | 0 | 3076492 | 105225 | None | PWD SR 2023-24 Vol -I Item no -2.4.2 Page no 16 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8380.35 | 8380.35 | 106.72 | False | None | None | False | None | False | 894350.952 | 0 | 3076493 | 105225 | None | PWD SR 2023-24 Vol -III Item no16.15iiiPage no 146 | Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets
Clause 1101.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 4092.71 | 4092.71 | 60.0 | False | None | None | False | None | False | 245562.6 | 0 | 3076494 | 105225 | None | PWD SR 2023-24 Vol -I Item no -1.10 Page no 7 | Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 196.35 | 196.35 | 50.4 | False | None | None | False | None | False | 9896.04 | 0 |
| 1710430547000 | 0 | None | None | Roads | Construction of RCC Drain | 5362577.82 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076495 | 105226 | None | PWD SR 2023-24 Vol -I Item no -1.14.1 Page no 8 | Earth work excavation for Foundation by mechanical means for all works &
depth upto 3 m, as per drawing and technical specifications, including setting
out, shoring, strutting, barricading, caution lights, including dressing of
excavated surfaces, disposing off or levelling the excavated earth or sorting
& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenaces
required to complete the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 125.17 | 125.17 | 1248.0 | False | None | None | False | None | False | 156212.16 | 0 | 3076496 | 105226 | None | PWD SR 2023-24 Vol -I Item no -2.1.3 Page no 15 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in
layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7349.7 | 7349.7 | 130.0 | False | None | None | False | None | False | 955461.0 | 0 | 3076497 | 105226 | None | PWD SR 2023-24 Vol -I Item no -2.11h Page no 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and
technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | t | 96962.3 | 96962.3 | 13.26 | False | None | None | False | None | False | 1285720.098 | 0 | 3076498 | 105226 | None | PWD SR 2023-24 Vol -I Item no -2.4.2 Page no 16 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10475.44 | 10475.44 | 156.0 | False | None | None | False | None | False | 1634168.64 | 0 | 3076499 | 105226 | None | PWD SR 2023-24 Vol -I Item no -2.5.2 Page no 16 | Providing and laying in position Cement Concrete for all Super structures of
building , Road works, Water works, Irrigation works & super structure works
of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The
cost includes all lead & lifts, cost of all materials, quality confirming to the
requirements of relevant IS codes , labour, Usage charges of machinery, curing
and all other appurtenances required to complete the work as per technical
specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10077.28 | 10077.28 | 52.0 | False | None | None | False | None | False | 524018.56 | 0 | 3076500 | 105226 | None | PWD SR 2023-24 Vol -I Item no -2.4.2 Page no 16 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7759.59 | 7759.59 | 104.0 | False | None | None | False | None | False | 806997.36 | 0 |
| 1710430547000 | 0 | None | None | Roads | Road Furnitures | 1645086.58 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076501 | 105227 | None | PWD SR 2023-24 Vol III Item no 16.29 page no 149 | Providing and Fixing 'Logo' of SHDP Project
The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 nessages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 18839.97 | 18839.97 | 2.0 | False | None | None | False | None | False | 37679.94 | 0 | 3076502 | 105227 | None | PWD SR 2023-24 Vol III Item no 8.16i page no 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including
painting and printing etc 5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 6235.4 | 6235.4 | 1.0 | False | None | None | False | None | False | 6235.4 | 0 | 3076503 | 105227 | None | PWD SR 2023-24 Vol III Item no8.16ii page no 67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including
painting and printing etcOrdinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3592.01 | 3592.01 | 3.0 | False | None | None | False | None | False | 10776.03 | 0 | 3076504 | 105227 | None | PWD SR 2023-24 Vol III Item no8.16iii page no67 | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including
painting and printing etc200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1033.3 | 1033.3 | 16.0 | False | None | None | False | None | False | 16532.8 | 0 | 3076505 | 105227 | None | PWD SR 2023-24 Vol III Item no 8.15 page no 67 | Providing and laying of hot applied thermoplastic compound
2.5 mm thick including reflectorising glass beads @ 250 g/m2
area, thickness of 2.5 mm is exclusive of surface applied glass
beads as per IRC:35:2015.The finished surface to be level,
uniform and free from streaks and holes ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 650.42 | 650.42 | 845.4 | False | None | None | False | None | False | 549865.068 | 0 | 3076506 | 105227 | None | PWD SR 2023-24 Vol III Item no 8.5ii page no 64 | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 803.1, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022.90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5748.2 | 5748.2 | 44.0 | False | None | None | False | None | False | 252920.8 | 0 | 3076507 | 105227 | None | PWD SR 2023-24 Vol III Item no 8.5viiipage no 64 | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 803.1, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022.60 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5273.28 | 5273.28 | 52.0 | False | None | None | False | None | False | 274210.56 | 0 | 3076508 | 105227 | None | PWD SR 2023-24 Vol III Item no8.6x page no 65 | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022.80 mm x 60 mm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 6755.74 | 6755.74 | 4.0 | False | None | None | False | None | False | 27022.96 | 0 | 3076509 | 105227 | None | Item No. VOL-III-8.48-iv Page No.76 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum
skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint
and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials
equipment,machinery & Labour with all leads and lifts for satisfactory
completion of the work as directed by Engineer incharge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4400.74 | 4400.74 | 8.0 | False | None | None | False | None | False | 35205.92 | 0 | 3076510 | 105227 | None | PWD SR 2023-24 Vol III Item no8.6xv page no 65 | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 801.3, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022.90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 8130.2 | 8130.2 | 4.0 | False | None | None | False | None | False | 32520.8 | 0 | 3076511 | 105227 | None | PWD SR 2023-24 Vol III Item no8.7 page no 65 | Providing and erecting direction and place identification retroreflectorised
sign as per IRC:67:2022 made of high intensity
grade sheeting vide clause 801.3, fixed over aluminium
sheeting, 2 mm thick or Aluminium composite material sheet
with overall thickness of 4mm with area not exceeding 0.9
m2 fixed over back support frame of min 35 x 35 x 3mm angle
mounted on a mild steel circular pipe 65 NB, firmly fixed to the
ground by means of properly designed foundation with M25
grade cement concrete 45 x 45 x 60 cm, 60 cm below ground
level as per approved drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11057.07 | 11057.07 | 14.4 | False | None | None | False | None | False | 159221.808 | 0 | 3076512 | 105227 | None | PWD SR 2023-24 Vol III Item no8.10 page no 66 | Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 133.76 | 133.76 | 14.4 | False | None | None | False | None | False | 1926.144 | 0 | 3076513 | 105227 | None | PWD SR 2023-24 Vol III Item no8.43 page no 74 | Supplying and Fixing of Molded Shank Raised Pavement
Markers / Cat's Eye made of polycarbonate and ABS moulded
body and reflective panels with micro prismatic lens capable of
providing total internal reflection of the light entering the lens
face and shall support a load of 16000 kg tested in accordance
to ASTM D 4280 Type H and complying to Specifications of
Category A of MORTH Circular No RW/NH/33023/10-97
DO III Dt 11.06. 1997. The height, width and length shall not
exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum
reflective area of 13 cm2 on each side and the slope to the
base shall be 35 +/- 5 degree. The strength of detachment of
the integrated cylindrical shanks, (of diameter not less than
19 +/- 2 mm and height not less than 30+/- 2 mm) from
the body is to be a minimum value of 500 Kg. Fixing will be
by drilling holes on the road for the shanks to go inside,
without nails and using epoxy resin based adhesive as per
manufacturer's recommendation and complete as directed by
the engineer.The contractor shall submit a two year warranty
for satisfactory field performance including stipulated
retro-reflectance of the reflecting panel, to the Engineer ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 447.93 | 447.93 | 526.0 | False | None | None | False | None | False | 235611.18 | 0 | 3076514 | 105227 | None | PWD SR 2023-24 Vol III Item no8.17 page no 67 | Supplying and installation of delineators (road way indicators,
hazard markers, object markers), 80-100 cm high above ground
level, painted black and white in 15 cm wide strips, fitted with
80 x 100 mm rectangular or 75 mm dia circular reflectorised
panels at the top, buried or pressed into the ground and
conforming to IRC-79-2019 and the drawings ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2480.17 | 2480.17 | 2.16 | False | None | None | False | None | False | 5357.1672 | 0 |
| 1710430547000 | 0 | None | None | Roads | Third Year Road Maintenance(Paid Maintenance) | 329847.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076515 | 105228 | None | PWD SR 20234-24 Vol III Item no 2.5ii page no 9 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness By Mechanical Means using Dozer In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 540.16 | 540.16 | 50.04 | False | None | None | False | None | False | 27029.6064 | 0 | 3076516 | 105228 | None | PWD SR 20234-24 Vol III Item no16.19 page no 147 | The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains
as well as catch water drains as per technical specification
Clause 1908. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.24 | 8.24 | 3336.0 | False | None | None | False | None | False | 27488.64 | 0 | 3076517 | 105228 | None | PWD SR 20234-24 Vol III Item no 10.3 page no 91 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 53.6 | 53.6 | 375.3 | False | None | None | False | None | False | 20116.08 | 0 | 3076518 | 105228 | None | PWD SR 20234-24 Vol III Item no10.2 page no 91 | Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it
with appropriate equipment ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 133.32 | 133.32 | 1251.0 | False | None | None | False | None | False | 166783.32 | 0 | 3076519 | 105228 | None | PWD SR 20234-24 Vol III Item no10.5 page no 91 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 585.52 | 585.52 | 114.68 | False | None | None | False | None | False | 67147.4336 | 0 | 3076520 | 105228 | None | PWD SR 20234-24 Vol I Item no 1.12 page no 8 | Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated surfaces, disposing
off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,
usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 130.57 | 130.57 | 30.0 | False | None | None | False | None | False | 3917.1 | 0 | 3076521 | 105228 | None | PWD SR 20234-24 Vol III Item no 16.22 page no 147 | Maintenance of road signs by way of cleaning and repainting
of mandatory / requlatory / cautionary / informatory
and place identifications sign board as perdrawings and
technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2726.93 | 2726.93 | 4.17 | False | None | None | False | None | False | 11371.2981 | 0 | 3076522 | 105228 | None | PWD SR 20234-24 Vol III Item no 16.24 page no 148 | Maintenance of 200 m & km stones by way of refiting of tilted
stones repairing with cement mortar, cleaning, repairing
and lettering on 200 m & km stone and 5th km stone as per
drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 283.14 | 283.14 | 4.17 | False | None | None | False | None | False | 1180.6938 | 0 | 3076523 | 105228 | None | PWD SR 20234-24 Vol III Item no 8.10 page no 66 | Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 149.81 | 149.81 | 7.5 | False | None | None | False | None | False | 1123.575 | 0 | 3076524 | 105228 | None | PWD SR 20234-24 Vol III Item no 8.4 page no 63 | Printing new letter and figures of any shade with synthetic
enamel paint black or any other approved colour to give an
even shade English and Roman ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.23 | 1.23 | 3000.0 | False | None | None | False | None | False | 3690.0 | 0 |
| 1710430547000 | 0 | None | None | Roads | Fourth Year Maintenance(Paid Maintenance) | 496395.67 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076525 | 105229 | None | PWD SR 20234-24 Vol III Item no 2.5ii a page no 9 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 559.45 | 559.45 | 50.04 | False | None | None | False | None | False | 27994.878 | 0 | 3076526 | 105229 | None | PWD SR 20234-24 Vol III Item no 16.19 page no 147 | The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains
as well as catch water drains as per technical specification
Clause 1908. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.54 | 8.54 | 3336.0 | False | None | None | False | None | False | 28489.44 | 0 | 3076527 | 105229 | None | PWD SR 20234-24 Vol III Item no 10.3 page no 91 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 55.51 | 55.51 | 375.3 | False | None | None | False | None | False | 20832.903 | 0 | 3076528 | 105229 | None | PWD SR 20234-24 Vol III Item no 10.2 page no 91 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it
with appropriate equipment ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 138.08 | 138.08 | 2502.0 | False | None | None | False | None | False | 345476.16 | 0 | 3076529 | 105229 | None | PWD SR 20234-24 Vol III Item no 10.5 page no 91 | Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 606.43 | 606.43 | 114.68 | False | None | None | False | None | False | 69545.3924 | 0 | 3076530 | 105229 | None | PWD SR 20234-24 Vol I Item no 1.12 page no 8 | Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated surfaces, disposing
off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,
usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 135.23 | 135.23 | 30.0 | False | None | None | False | None | False | 4056.9 | 0 |
| 1710430547000 | 0 | None | None | Roads | Fifth Year Maintenance(Paid Maintenance) | 585433.62 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076531 | 105230 | None | PWD SR 20234-24 Vol III Item no 2.5ii page no 9 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 578.74 | 578.74 | 50.04 | False | None | None | False | None | False | 28960.1496 | 0 | 3076532 | 105230 | None | PWD SR 20234-24 Vol III Item no 16.19 page no 147 | The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains
as well as catch water drains as per technical specification
Clause 1908. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.83 | 8.83 | 3336.0 | False | None | None | False | None | False | 29456.88 | 0 | 3076533 | 105230 | None | PWD SR 20234-24 Vol III Item no 10.3 page no 91 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.43 | 57.43 | 375.3 | False | None | None | False | None | False | 21553.479 | 0 | 3076534 | 105230 | None | PWD SR 20234-24 Vol III Item no 10.2 page no 91 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it
with appropriate equipment ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 142.84 | 142.84 | 2502.0 | False | None | None | False | None | False | 357385.68 | 0 | 3076535 | 105230 | None | PWD SR 20234-24 Vol III Item no 10.5 page no 91 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 627.34 | 627.34 | 229.35 | False | None | None | False | None | False | 143880.429 | 0 | 3076536 | 105230 | None | PWD SR 20234-24 Vol I Item no 1.12 page no 8 | Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated surfaces, disposing
off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,
usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 139.9 | 139.9 | 30.0 | False | None | None | False | None | False | 4197.0 | 0 |
| 1710430547000 | 0 | None | None | Roads | Sixth Year Renewal Work | 12866580.89 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076537 | 105231 | None | PWD SR 2023-24 Vol -III Item no -16.22 Page no 147 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting
of mandatory / requlatory / cautionary / informatory
and place identifications sign board as perdrawings and
technical specification. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3019.1 | 3019.1 | 4.17 | False | None | None | False | None | False | 12589.647 | 0 | 3076538 | 105231 | None | PWD SR 2023-24 Vol -III Item no -16.24i Page no148 | Maintenance of 200 m and km stones Maintenance of 200 m & km stones by way of refiting of tilted
stones repairing with cement mortar, cleaning, repairing
and lettering on 200 m & km stone and 5th km stone as per
drawing and technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 313.47 | 313.47 | 4.17 | False | None | None | False | None | False | 1307.1699 | 0 | 3076539 | 105231 | None | PWD SR 2023-24 Vol -III Item no -5.3 Page no 31 | Providing and applying tack coat with RS1 Bituminous Emulsion
using emulsion pressure distributor at the rate of 0.20 kg/m2 on
the prepared bituminous surface cleaned with mechanical broom ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 18.26 | 18.26 | 22935.0 | False | None | None | False | None | False | 418793.1 | 0 | 3076540 | 105231 | None | PWD SR 2023-24 Vol -III Item no -5.16C Page no 38 | Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH
capacity hot mix plant using crushed aggregates of specified
grading, premixed with bituminous binder VG-30, @ 5.4 per
cent of mix and filler, transporting the hot mix to work site,
laying with mechanical paver finisher to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MORTH
specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16669.0 | 16669.0 | 688.05 | False | None | None | False | None | False | 11469105.45 | 0 | 3076541 | 105231 | None | PWD SR 2023-24 Vol -III Item no -8.15 Page no67 | Providing and laying of hot applied thermoplastic compound
2.5 mm thick including reflectorising glass beads @ 250 g/m2
area, thickness of 2.5 mm is exclusive of surface applied glass
beads as per IRC:35:2015.The finished surface to be level,
uniform and free from streaks and holes ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 806.51 | 806.51 | 834.0 | False | None | None | False | None | False | 672629.34 | 0 | 3076542 | 105231 | None | PWD SR 2023-24 Vol -III Item no -8.43 Page no 74 | Supplying and Fixing of Molded Shank Raised Pavement
Markers / Cat's Eye made of polycarbonate and ABS moulded
body and reflective panels with micro prismatic lens capable of
providing total internal reflection of the light entering the lens
face and shall support a load of 16000 kg tested in accordance
to ASTM D 4280 Type H and complying to Specifications of
Category A of MORTH Circular No RW/NH/33023/10-97
DO III Dt 11.06. 1997. The height, width and length shall not
exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum
reflective area of 13 cm2 on each side and the slope to the
base shall be 35 +/- 5 degree. The strength of detachment of
the integrated cylindrical shanks, (of diameter not less than
19 +/- 2 mm and height not less than 30+/- 2 mm) from
the body is to be a minimum value of 500 Kg. Fixing will be
by drilling holes on the road for the shanks to go inside,
without nails and using epoxy resin based adhesive as per
manufacturer's recommendation and complete as directed by
the engineer.The contractor shall submit a two year warranty
for satisfactory field performance including stipulated
retro-reflectance of the reflecting panel, to the Engineer ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 555.43 | 555.43 | 526.0 | False | None | None | False | None | False | 292156.18 | 0 |
| 1710430547000 | 0 | None | None | Roads | first year maintenance(No payment to be made) | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076543 | 105232 | None | PWD SR 20234-24 Vol III Item no 2.5ii a page no 9 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076544 | 105232 | None | PWD SR 20234-24 Vol III Item no 16.19 page no 147 | The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains
as well as catch water drains as per technical specification
Clause 1908. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076545 | 105232 | None | PWD SR 20234-24 Vol III Item no 10.3 page no 91 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076546 | 105232 | None | PWD SR 20234-24 Vol III Item no 10.2 page no 91 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it
with appropriate equipment ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076547 | 105232 | None | PWD SR 20234-24 Vol III Item no 10.5 page no 91 | Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076548 | 105232 | None | PWD SR 20234-24 Vol I Item no 1.12 page no 8 | Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated surfaces, disposing
off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,
usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 |
| 1710430547000 | 0 | None | None | Roads | Second Year Maintenance(No Payment to be made) | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076549 | 105233 | None | PWD SR 20234-24 Vol III Item no 2.5ii a page no 9 | Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable material to
be used or auctioned, including removal and disposal of top organic
soil not exceeding 150 mm in thickness. In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076550 | 105233 | None | PWD SR 20234-24 Vol III Item no 16.19 page no 147 | The maintenance of drains include erosion, repair, clearing,
cleaning, reshaping, regrading, deepening of side drains
as well as catch water drains as per technical specification
Clause 1908. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076551 | 105233 | None | PWD SR 20234-24 Vol III Item no 10.3 page no 91 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the
approved level and compacting with plate compactor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076552 | 105233 | None | PWD SR 20234-24 Vol III Item no 10.2 page no 91 | Maintenance of Earthen Shoulder (filling with fresh soil)Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it
with appropriate equipment ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076553 | 105233 | None | PWD SR 20234-24 Vol III Item no 10.5 page no 91 | Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3076554 | 105233 | None | PWD SR 20234-24 Vol I Item no 1.12 page no 8 | Earth work in surface excavation by mechanical means for lowering & leveling
the ground for all works other than foundation in all kinds of soils & upto depth
not exceeding 300mm as per drawing and technical specifications, including
setting out, shoring, strutting, barricading, caution lights, removal of stumps
and other deleterious matter including dressing of excavated surfaces, disposing
off or levelling the excavated earth or sorting & stacking the selected earth for
reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,
usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 |
| 1710430547000 | 1 | None | None | Roads | Electrical pole shifting | 2992827.26 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3076555 | 105234 | None | bescom SR | Supply & Fixing of RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 10405.24 | 10405.24 | 14.0 | False | None | None | False | None | False | 145673.36 | 0 | 3076556 | 105234 | None | bescom SR | Supply & Fixing of RCC Pole - 8 Mtr Long, 115 Kg WL (Dwg No. BESCOM/GM/QS&S/05 Dtd 24.11.2018) as per IS-785 for Stud pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 5062.2 | 5062.2 | 7.0 | False | None | None | False | None | False | 35435.4 | 0 | 3076557 | 105234 | None | bescom SR | Supply and erection of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL
(Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 26138.18 | 26138.18 | 3.0 | False | None | None | False | None | False | 78414.54 | 0 | 3076558 | 105234 | None | bescom SR | Supply and erection of Single H Frame without Transformer Seating and Seating angle support cross arm for 11 Mtr Spun Pole for 63/100/250/500 kVA (OH Line) - MS (Dwg No. BESCOM/GM/QS&S/68 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 18537.8 | 18537.8 | 3.0 | False | None | None | False | None | False | 55613.4 | 0 | 3076559 | 105234 | None | bescom SR | Supply and fixing of 11 kV, 200 Amps Single Break GOS
(Dwg No. BESCOM/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 12453.72 | 12453.72 | 5.0 | False | None | None | False | None | False | 62268.6 | 0 | 3076560 | 105234 | None | bescom SR | Supply and fixing of 11 kV, 400 Amps Single Break GOS
(Dwg No. BESCOM/GM/QS&S/22 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 26519.32 | 26519.32 | 1.0 | False | None | None | False | None | False | 26519.32 | 0 | 3076561 | 105234 | None | bescom SR | Supply and fixing of 11 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1151.68 | 1151.68 | 22.0 | False | None | None | False | None | False | 25336.96 | 0 | 3076562 | 105234 | None | bescom SR | Supply & Fixing 11 kV, Special 3 Pin Cross Arm - MS
(Dwg No. BESCOM/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1226.02 | 1226.02 | 18.0 | False | None | None | False | None | False | 22068.36 | 0 | 3076563 | 105234 | None | bescom SR | Supply & Fixing LT 4 Pin Cross Arm - MS
(Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 529.82 | 529.82 | 22.0 | False | None | None | False | None | False | 11656.04 | 0 | 3076564 | 105234 | None | bescom SR | Supply & Fixing LT 2 Pin Cross Arm - MS
(Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 344.56 | 344.56 | 22.0 | False | None | None | False | None | False | 7580.32 | 0 | 3076565 | 105234 | None | bescom SR | Supply & Fixing HT ST Support 50x8 mm Flat - MS
(Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 239.54 | 239.54 | 16.0 | False | None | None | False | None | False | 3832.64 | 0 | 3076566 | 105234 | None | bescom SR | Supply & Fixing RCC Pole Clamp - MS
(Dwg No. BESCOM/GM/QS&S/30 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 289.1 | 289.1 | 22.0 | False | None | None | False | None | False | 6360.2 | 0 | 3076567 | 105234 | None | bescom SR | Supply & Fixing Guy Set including all the accessories clamp,rod,turn buckle, Guy wire.
(Dwg No. BESCOM/GM/QS&S/07 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1722.99 | 1722.99 | 12.0 | False | None | None | False | None | False | 20675.88 | 0 | 3076568 | 105234 | None | bescom SR | Supply & stringing of Rabbit ACSR (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 59808.3 | 59808.3 | 0.7 | False | None | None | False | None | False | 41865.81 | 0 | 3076569 | 105234 | None | bescom SR | Supply & Fixing of PG Clamps Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 260.78 | 260.78 | 60.0 | False | None | None | False | None | False | 15646.8 | 0 | 3076570 | 105234 | None | bescom SR | Supply & Fixing of Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 391.76 | 391.76 | 65.0 | False | None | None | False | None | False | 25464.4 | 0 | 3076571 | 105234 | None | bescom SR | Supply and fixing of Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 271.4 | 271.4 | 10.0 | False | None | None | False | None | False | 2714.0 | 0 | 3076572 | 105234 | None | bescom SR | Supply and fixing of 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 42.0 | False | None | None | False | None | False | 10159.8 | 0 | 3076573 | 105234 | None | bescom SR | Supply and fixing of No. 15 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 69.62 | 69.62 | 16.0 | False | None | None | False | None | False | 1113.92 | 0 | 3076574 | 105234 | None | bescom SR | Supply and fixing of 1.1 kV Polymeric Pin Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 102.66 | 102.66 | 38.0 | False | None | None | False | None | False | 3901.08 | 0 | 3076575 | 105234 | None | bescom SR | Supply and fixing of 11 kV, 70 kN Composite/Polymeric Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 352.82 | 352.82 | 18.0 | False | None | None | False | None | False | 6350.76 | 0 | 3076576 | 105234 | None | bescom SR | Supplying and fixing of Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 382.32 | 382.32 | 25.0 | False | None | None | False | None | False | 9558.0 | 0 | 3076577 | 105234 | None | bescom SR | Supplying and fixing of FGRP Aerial Fuse Board 30 Amps - 6 Way ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1475.0 | 1475.0 | 25.0 | False | None | None | False | None | False | 36875.0 | 0 | 3076578 | 105234 | None | bescom SR | Releasing and Re-erection of 9mtr RCC/PSC Poles with digging of pits ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 3237.56 | 3237.56 | 51.0 | False | None | None | False | None | False | 165115.56 | 0 | 3076579 | 105234 | None | bescom SR | Releasing and Restringing of Rabbit ACSR Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per Km | 11732.38 | 11732.38 | 9.3 | False | None | None | False | None | False | 109111.134 | 0 | 3076580 | 105234 | None | bescom SR | Releasing and Re-fixing of V-Shape/Horizontal cross arm including Single Top Support Brace and Insulator fixing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 576.19 | 576.19 | 72.0 | False | None | None | False | None | False | 41485.68 | 0 | 3076581 | 105234 | None | bescom SR | Releasing and Re-Fixing of 4 Pin cross arm with Insulator and Braces fixing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 645.69 | 645.69 | 48.0 | False | None | None | False | None | False | 30993.12 | 0 | 3076582 | 105234 | None | bescom SR | Releasing & Refixing of Over Head Service Mains (Single Phase/3 phase) Per connection/installation (While replacing existing Pole) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per Km | 106.2 | 106.2 | 40.0 | False | None | None | False | None | False | 4248.0 | 0 | 3076583 | 105234 | None | bescom SR | Releasing and Refixing of Double pole structure Poles (RCC) complete ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 10752.86 | 10752.86 | 6.0 | False | None | None | False | None | False | 64517.16 | 0 | 3076584 | 105234 | None | bescom SR | Supply and Installation / Fixing / Provision of Outdoor type Thermoplastic Modular Panel enclosure with transparent Polycarbonate Lid, shock proof, IP65 (Weather Proof), rust proof, dust proof, water proof, corrosion proof having internally Embedded gasket on both lid and flap suitable to fix Single Phase / Three Phase Energy Meter in suitable base plate and having a provision for Fuse / MCB cut-out with suitable transparent hinged flap opening for operating MCB along with complete tamper proof SEALING facility.
300 mm x 450 mm x 214 mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 7272.34 | 7272.34 | 4.0 | False | None | None | False | None | False | 29089.36 | 0 | 3076585 | 105234 | None | bescom SR | Supply and Installation / Fixing / Provision of Pole box with HRC Fuse / MCB provision and suitable connector / terminal for 3 Ph/ 1 Ph connections with Loop-In & Loop- Out terminals for 10 mm2 /25 mm2 3.5 C AI/Ar/Cu/Ar Cable and branch out 2.5 mm2 2 core AI/Cu PVC Insulated cable, enclosed in a Thermoplastic, Polystyrene enclosure, which should be shock proof, safe, IP65(Weather Proof), rust proof, dust proof, water proof having Internally Embedded Gasket with provision for cable entry through IP65 Thermoplastic,polyamide glands and/or grommets.
200 mm x 200 mm x 98 mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2714.0 | 2714.0 | 4.0 | False | None | None | False | None | False | 10856.0 | 0 | 3076586 | 105234 | None | bescom SR | Supply and laying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 16 Sqmm, 4 Core, (11 GI Strips - 4 x 0.8 mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 192.01 | 192.01 | 220.0 | False | None | None | False | None | False | 42242.2 | 0 | 3076587 | 105234 | None | bescom SR | Releasing and Refixing of 1.1 kV, 3 Phase Aerial Bunched Cable of size 3x95+1x16+1x70 Sqmm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 76457.28 | 76457.28 | 1.44 | False | None | None | False | None | False | 110098.4832 | 0 | 3076588 | 105234 | None | bescom SR | Releasing and Refixing of Three Phase Distribution box for 6 Connections ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1424.81 | 1424.81 | 35.0 | False | None | None | False | None | False | 49868.35 | 0 | 3076589 | 105234 | None | bescom SR | Releasing and Refixng of Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Service Connections ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 295.58 | 295.58 | 86.0 | False | None | None | False | None | False | 25419.88 | 0 | 3076590 | 105234 | None | bescom SR | Releasing & Refixing of Piercing connector suitable for 16 Sqmm - 95 Sqmm AB Cable - Street Light Connections ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 207.83 | 207.83 | 36.0 | False | None | None | False | None | False | 7481.88 | 0 | 3076591 | 105234 | None | bescom SR | Releasing & Refixing of Suspension Clamp Assembly 16 to 70 mm (Excluding pole clamp & Eye Hook ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 207.83 | 207.83 | 32.0 | False | None | None | False | None | False | 6650.56 | 0 | 3076592 | 105234 | None | bescom SR | Releasing & Refixing of Pole clamp for HT/LT AB cable ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 369.48 | 369.48 | 30.0 | False | None | None | False | None | False | 11084.4 | 0 | 3076593 | 105234 | None | bescom SR | Releasing & Refixing of Dead End Clamp/Anchor Clamp Assembly 25 to 95 Sqmm (excluding pole clamps and Eye hook) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 877.51 | 877.51 | 36.0 | False | None | None | False | None | False | 31590.36 | 0 | 3076594 | 105234 | None | bescom SR | Releasing & Refixing of Universal Hook, Bolts & nuts ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 443.37 | 443.37 | 34.0 | False | None | None | False | None | False | 15074.58 | 0 | 3076595 | 105234 | None | bescom SR | Releasing & Refixing of existing Streetlight Fixtures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 191.16 | 191.16 | 40.0 | False | None | None | False | None | False | 7646.4 | 0 | 3076596 | 105234 | None | bescom SR | Supply and erection of Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 26138.18 | 26138.18 | 8.0 | False | None | None | False | None | False | 209105.44 | 0 | 3076597 | 105234 | None | bescom SR | Single H Frame with Transformer Seating and Seating angle support cross arm for 11 Mtr Spun Pole for 25 kVA (OH Line) - MS (Dwg No. BESCOM/GM/QS&S/66 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 33791.66 | 33791.66 | 8.0 | False | None | None | False | None | False | 270333.28 | 0 | 3076598 | 105234 | None | bescom SR | Supply and fixing of 11 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 980.58 | 980.58 | 24.0 | False | None | None | False | None | False | 23533.92 | 0 | 3076599 | 105234 | None | bescom SR | Supply and fixing of 11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 742.22 | 742.22 | 24.0 | False | None | None | False | None | False | 17813.28 | 0 | 3076600 | 105234 | None | bescom SR | Supply and stringing of Rabbit Conductor for Jumps (6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 59.7 | 59.7 | 400.0 | False | None | None | False | None | False | 23880.0 | 0 | 3076601 | 105234 | None | bescom SR | Supply and fixing of 11 KV, 5KN Polymeric Pin Insulator (24mm Dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 48.0 | False | None | None | False | None | False | 11611.2 | 0 | 3076602 | 105234 | None | bescom SR | Supply and fixing of Transparent Alkathine tube 19mm dia, 2mm
thick in coils of 30 mtrs ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Coil | 851.96 | 851.96 | 16.0 | False | None | None | False | None | False | 13631.36 | 0 | 3076603 | 105234 | None | bescom SR | Supply and fixing of Earthing materials pipe type for grounding as per Drawing No. BESCOM/GM/CP/15 & 34/Dt: 24.10.07. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per Set | 3160.04 | 3160.04 | 24.0 | False | None | None | False | None | False | 75840.96 | 0 | 3076604 | 105234 | None | bescom SR | Supply and fixing of 8 SWG GI Wire
(4.064 mm Dia), Std Wt: 131 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kgs | 88.54 | 88.54 | 40.0 | False | None | None | False | None | False | 3541.6 | 0 | 3076605 | 105234 | None | bescom SR | Supply and fixing of 7/10 SWG Guy Wire
(7/3.251 mm Dia), Std Wt: 680 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Kgs | 91.12 | 91.12 | 80.0 | False | None | None | False | None | False | 7289.6 | 0 | 3076606 | 105234 | None | bescom SR | Supply and fixing of 11 kV, HG Fuse Unit with Solid Core Insulator (Dwg No. BESCOM/GM/QS&S/21 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1541.08 | 1541.08 | 8.0 | False | None | None | False | None | False | 12328.64 | 0 | 3076607 | 105234 | None | bescom SR | Supply and fixing of 11 kV, 200 Amps Single Break GOS
(Dwg No. BESCOM/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 12453.72 | 12453.72 | 8.0 | False | None | None | False | None | False | 99629.76 | 0 | 3076608 | 105234 | None | bescom SR | Supply and fixing of LT Distribution Box for 250 kVA DTC with MCCB's (Sheet Metal)
(Dwg No. BESCOM/GM/QS&S/08 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 27374.82 | 27374.82 | 8.0 | False | None | None | False | None | False | 218998.56 | 0 | 3076609 | 105234 | None | bescom SR | Supply of Al Lead Wire - 240 Sqmm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Mtr | 307.23 | 307.23 | 480.0 | False | None | None | False | None | False | 147470.4 | 0 | 3076610 | 105234 | None | bescom SR | Supply and fixing of 240 Sqmm Copper Terminal, Apprx Wt: 218 Gm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 418.9 | 418.9 | 192.0 | False | None | None | False | None | False | 80428.8 | 0 | 3076611 | 105234 | None | bescom SR | Supply and fixing of PG Clamps Rabbit to 240 Sqmm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 483.8 | 483.8 | 64.0 | False | None | None | False | None | False | 30963.2 | 0 | 3076612 | 105234 | None | bescom SR | Supply and fixing of Spacers for DTC Wiring ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 49.56 | 49.56 | 128.0 | False | None | None | False | None | False | 6343.68 | 0 | 3076613 | 105234 | None | bescom SR | Supply and fixing of Fish Plate with necessary Clamps,bolts & nuts etc complete (Galvanised) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 92.04 | 92.04 | 32.0 | False | None | None | False | None | False | 2945.28 | 0 | 3076614 | 105234 | None | bescom SR | Labour charges for Wiring of 1 Circuit of LT Wiring for for 25/63/100 kVA DTC to the existing LT protection Kit/Distribution Box via metering box. (includes fixing of necessary supports like 2 Pin cross arm, Spacer etc) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1119.82 | 1119.82 | 8.0 | False | None | None | False | None | False | 8958.56 | 0 | 3076615 | 105234 | None | bescom SR | Supply and fixing of LT Metering Box for housing the ETV Meter without CT's busbar wiring etc ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos. | 6596.2 | 6596.2 | 8.0 | False | None | None | False | None | False | 52769.6 | 0 | 3076616 | 105234 | None | bescom SR | Supply and fixing of PVC Insulation Tapes19 mm wide and in rolls of 10Mtrs ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rolls | 17.7 | 17.7 | 24.0 | False | None | None | False | None | False | 424.8 | 0 | 3076617 | 105234 | None | bescom SR | Supply and fixing of 9 kV, 5 kA Lightning Arrester Metal Oxide Ceramic type with GROUND DISCONNECTOR
(Dwg No. BESCOM/GM/QS&S/26 Dtd 24.10.2007) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1226.02 | 1226.02 | 8.0 | False | None | None | False | None | False | 9808.16 | 0 | 3076618 | 105234 | None | bescom SR | Supply of Caution / Danger Board as per Drawing No.BESCOM/GM/CP/40/Dt:24.10.07 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 271.4 | 271.4 | 8.0 | False | None | None | False | None | False | 2171.2 | 0 | 3076619 | 105234 | None | bescom SR | Releasing and Re-erection of 11kV/433V, 25kVA - 63KVA, 3 Phase, 50 Cys Distribution Transformer with oil (1.9 * erection Charges 1193) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 2674.7 | 2674.7 | 6.0 | False | None | None | False | None | False | 16048.2 | 0 | 3076620 | 105234 | None | bescom SR | Releasing and Re-erection of 11kV/433V, 100kVA, 3 Phase, 50 Cys Distribution Transformer with oil (1.9 * erection Charges 1590) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 3564.78 | 3564.78 | 4.0 | False | None | None | False | None | False | 14259.12 | 0 | 3076621 | 105234 | None | bescom SR | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.
Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 6683.52 | 6683.52 | 1.65 | False | None | None | False | None | False | 11027.808 | 0 | 3076622 | 105234 | None | bescom SR | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 7418.66 | 7418.66 | 27.5 | False | None | None | False | None | False | 204013.15 | 0 |
|
|
---|