tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710426222000 | 0 | None | None | Roads | Widening & Strengthening | 63903860.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075573 | 105139 | None | Item No. VOL-III-2.5-ii-A Page No.9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light jungle
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 482.29 | 482.29 | 90.11 | False | None | None | False | None | False | 43459.1519 | 0 | 3075574 | 105139 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 116.58 | 116.58 | 5406.48 | False | None | None | False | None | False | 630287.4384 | 0 | 3075575 | 105139 | None | Item No. VOL-I-16.19 Page No.147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | m | 7.36 | 7.36 | 1227.7 | False | None | None | False | None | False | 9035.872 | 0 | 3075576 | 105139 | None | Item No. VOL-I-1.7 Page No.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 146.04 | 146.04 | 4325.18 | False | None | None | False | None | False | 631649.2872 | 0 | 3075577 | 105139 | None | Item No. VOL-III-3.6 Page No.17 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 605.01 | 605.01 | 3148.94 | False | None | None | False | None | False | 1905140.1894 | 0 | 3075578 | 105139 | None | Item No. VOL-III-4.2-v Page No.23 | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 2894.96 | 2894.96 | 2776.37 | False | None | None | False | None | False | 8037480.0952 | 0 | 3075579 | 105139 | None | Item No. VOL-III-4.17 Page No.26 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 3140.4 | 3140.4 | 3744.74 | False | None | None | False | None | False | 11759981.496 | 0 | 3075580 | 105139 | None | Item No. VOL-III-5.1-A Page No.31 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 50.32 | 50.32 | 13477.2 | False | None | None | False | None | False | 678172.704 | 0 | 3075581 | 105139 | None | Item No. VOL-III-5.3 Page No.31 | Tack coat on Bituminous surface
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 14.73 | 14.73 | 42171.85 | False | None | None | False | None | False | 621191.3505 | 0 | 3075582 | 105139 | None | Item No. VOL-III-5.23-i Page No.40 | Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 57.68 | 57.68 | 262.82 | False | None | None | False | None | False | 15159.4576 | 0 | 3075583 | 105139 | None | Item No. VOL-III-5.12-C Page No.35 | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 11595.81 | 11595.81 | 1997.89 | False | None | None | False | None | False | 23167152.8409 | 0 | 3075584 | 105139 | None | Item No. VOL-III-5.16-C Page No.38 | Bituminous Concrete Grading II for traffic less than 20 MSA KSRRB M500-19. Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction in all respects complete as per specifications. Clause 507 of MORTH V revision : using 40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (30 mm to 40 mm) with 5.4% VG-30 Bitumen ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 13442.75 | 13442.75 | 1198.76 | False | None | None | False | None | False | 16114630.99 | 0 | 3075585 | 105139 | None | Item No. VOL-I-1.8 Page No.7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 581.69 | 581.69 | 499.44 | False | None | None | False | None | False | 290519.2536 | 0 |
| 1710426222000 | 0 | None | None | Roads | ROAD SAFETY FURNITURES | 2372545.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075586 | 105140 | None | Item No. VOL-III-16.29 Page No.149 | i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 18839.97 | 18839.97 | 2.0 | False | None | None | False | None | False | 37679.94 | 0 | 3075587 | 105140 | None | Item No. VOL-III-8.16-ii Page No.67 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc-
(ii) Ordinary kilometer stone (precast) MORTH Specification No. 804 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 3592.01 | 3592.01 | 4.0 | False | None | None | False | None | False | 14368.04 | 0 | 3075588 | 105140 | None | Item No. VOL-III-8.16-iii Page No.67 | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) MORTH Specification No. 804 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 1033.3 | 1033.3 | 15.0 | False | None | None | False | None | False | 15499.5 | 0 | 3075589 | 105140 | None | Item No. VOL-III-8.15 Page No.67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 650.42 | 650.42 | 1259.25 | False | None | None | False | None | False | 819041.385 | 0 | 3075590 | 105140 | None | Item No. VOL-III-8.5-ii Page No.64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 5748.2 | 5748.2 | 48.0 | False | None | None | False | None | False | 275913.6 | 0 | 3075591 | 105140 | None | Item No. VOL-III-8.5-viii Page No.64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 5273.28 | 5273.28 | 56.0 | False | None | None | False | None | False | 295303.68 | 0 | 3075592 | 105140 | None | Item No. VOL-III-8.6-(x) Page No.65 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XI
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 6755.74 | 6755.74 | 6.0 | False | None | None | False | None | False | 40534.44 | 0 | 3075593 | 105140 | None | Item No. VOL-III-8.5-iv Page No.64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle
Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 4388.47 | 4388.47 | 7.0 | False | None | None | False | None | False | 30719.29 | 0 | 3075594 | 105140 | None | Item No. VOL-III-8.6-(xv) Page No.65 | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XI
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 8130.2 | 8130.2 | 6.0 | False | None | None | False | None | False | 48781.2 | 0 | 3075595 | 105140 | None | Item No. VOL-III-8.7 Page No.65 | Direction and Place Identification Signs upto 0.9 sqm Size Board: Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60 cm, 60 em below ground level as per approved drawing. ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 11057.07 | 11057.07 | 10.8 | False | None | None | False | None | False | 119416.356 | 0 | 3075596 | 105140 | None | Item No. VOL-III-8.10 Page No.66 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 133.76 | 133.76 | 86.4 | False | None | None | False | None | False | 11556.864 | 0 | 3075597 | 105140 | None | Item No. VOL-III-8.4 Page No.63 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | cm | 1.1 | 1.1 | 4800.0 | False | None | None | False | None | False | 5280.0 | 0 | 3075598 | 105140 | None | Item No. VOL-III-8.43 Page No.74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | No | 447.93 | 447.93 | 920.0 | False | None | None | False | None | False | 412095.6 | 0 | 3075599 | 105140 | None | Item No. VOL-III-8.17 Page No.67 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 2480.17 | 2480.17 | 48.0 | False | None | None | False | None | False | 119048.16 | 0 | 3075600 | 105140 | None | Item No. VOL-III-8.60.2-iii Page No.80 | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | No | 63653.64 | 63653.64 | 2.0 | False | None | None | False | None | False | 127307.28 | 0 |
| 1710426222000 | 0 | None | None | Roads | Widening of Existing Culvert (1.5 m X 1.5 m - 1 Vent (for 1.25m Length) on Both sides | 2557495.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075601 | 105141 | None | Item No. VOL-III-2.11-II-(a) Page No.10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry, By Mechanical Means Dismantling Brick / Tile work / rubble masonry / pitching / etc
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 220.9 | 220.9 | 24.61 | False | None | None | False | None | False | 5436.349 | 0 | 3075602 | 105141 | None | Item No. VOL-I-1.14.1 Page No.8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting &stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 125.17 | 125.17 | 128.86 | False | None | None | False | None | False | 16129.4062 | 0 | 3075603 | 105141 | None | Item No. VOL-I-2.1.3 Page No.15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 7349.7 | 7349.7 | 15.65 | False | None | None | False | None | False | 115022.805 | 0 | 3075604 | 105141 | None | Item No. VOL-I-2.11-h Page No.18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structures Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Tonne | 96962.3 | 96962.3 | 9.92 | False | None | None | False | None | False | 961866.016 | 0 | 3075605 | 105141 | None | Item No. VOL-I-2.4.3 (20 for centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (20% for centring)
Common SOR For Engineering Departments 2023 - 2024
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 9330.65 | 9330.65 | 72.82 | False | None | None | False | None | False | 679457.933 | 0 | 3075606 | 105141 | None | Item No.VOL-I-2.5.2 Page No. 16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Common SR-2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 10077.28 | 10077.28 | 30.29 | False | None | None | False | None | False | 305240.8112 | 0 | 3075607 | 105141 | None | Item No. VOL-III-14.4(a) Page No.129 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Stone/Boulder etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 2346.41 | 2346.41 | 94.5 | False | None | None | False | None | False | 221735.745 | 0 | 3075608 | 105141 | None | Item No. VOL-III-8.18 Page No.67 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard Stone etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 917.95 | 917.95 | 72.0 | False | None | None | False | None | False | 66092.4 | 0 | 3075609 | 105141 | None | Item No. VOL-III-12.3-A Page No.117 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular Material
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 1433.37 | 1433.37 | 33.6 | False | None | None | False | None | False | 48161.232 | 0 | 3075610 | 105141 | None | Item No. VOL-I-2.4.3 (8 for centring) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (8% for centring)
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 8397.58 | 8397.58 | 3.84 | False | None | None | False | None | False | 32246.7072 | 0 | 3075611 | 105141 | None | Item No. VOL-III-13.2 Page No.121 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 17145.21 | 17145.21 | 2.12 | False | None | None | False | None | False | 36347.8452 | 0 | 3075612 | 105141 | None | Item No. VOL-III-13.9 Page No.122 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 14532.91 | 14532.91 | 4.8 | False | None | None | False | None | False | 69757.968 | 0 |
| 1710426222000 | 0 | None | None | Roads | Construction of CC DRAIN 0.60 x 0.60m without Duct | 3979158.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075613 | 105142 | None | Item No.VOL-I-1.14.1 Page No. 8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 125.17 | 125.17 | 750.0 | False | None | None | False | None | False | 93877.5 | 0 | 3075614 | 105142 | None | Item No.VOL-I-2.1.3 Page No. 15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 7349.7 | 7349.7 | 93.75 | False | None | None | False | None | False | 689034.375 | 0 | 3075615 | 105142 | None | Item No.VOL-I-2.11 h Page No. 18 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structuresPWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Tonne | 96962.3 | 96962.3 | 8.69 | False | None | None | False | None | False | 842602.387 | 0 | 3075616 | 105142 | None | Item No.VOL-I-2.4.2 Page No. 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 For Raft (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 10475.44 | 10475.44 | 135.0 | False | None | None | False | None | False | 1414184.4 | 0 | 3075617 | 105142 | None | Item No.VOL-I-2.5.2 Page No. 16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring )
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 10077.28 | 10077.28 | 41.25 | False | None | None | False | None | False | 415687.8 | 0 | 3075618 | 105142 | None | Item No. VOL-I-2.4.2 Page No.16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 7759.59 | 7759.59 | 67.5 | False | None | None | False | None | False | 523772.325 | 0 |
| 1710426222000 | 0 | None | None | Roads | Shifting of Water Supply Pipe Lines | 751209.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075619 | 105143 | None | Item No.VOL-I-1.17 Page No. 10 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 593.96 | 593.96 | 459.0 | False | None | None | False | None | False | 272627.64 | 0 | 3075620 | 105143 | None | Item No. VOL-5 - 9.2.3 Page No.96 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used.For :HDPE PE 80 PN 8.0PWD SOR for Water Supply & Sewerage Works - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 468.79 | 468.79 | 850.0 | False | None | None | False | None | False | 398471.5 | 0 | 3075621 | 105143 | None | Item No. VOL-I-1.10 Page No.7 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specificationsPWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 196.35 | 196.35 | 408.0 | False | None | None | False | None | False | 80110.8 | 0 |
| 1710426222000 | 0 | None | None | Roads | Shifting of 11KV line as per Site Condition (Electrical Works) | 522799.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075622 | 105144 | None | I-1 | PSCC Pole - 9 Mtr Long, 200 Kg WL
(Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 ,11KV system, P No-3, I no-1.06, Material code-200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 6330.7 | 6330.7 | 2.0 | False | None | None | False | None | False | 12661.4 | 0 | 3075623 | 105144 | None | I-2 | PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 P No-3, I no-1.05, Material code-200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 5464.58 | 5464.58 | 2.0 | False | None | None | False | None | False | 10929.16 | 0 | 3075624 | 105144 | None | I-3 | 11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.01, Material code-279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 564.04 | 564.04 | 4.0 | False | None | None | False | None | False | 2256.16 | 0 | 3075625 | 105144 | None | I-4 | HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.11, Material code-279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 232.46 | 232.46 | 4.0 | False | None | None | False | None | False | 929.84 | 0 | 3075626 | 105144 | None | I-5 | LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.07, Material code-279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 280.84 | 280.84 | 4.0 | False | None | None | False | None | False | 1123.36 | 0 | 3075627 | 105144 | None | I-6 | 11 kV, 45 kN Polymeric Insulator . (C SR 2023-24 P No-5, I no-6.10, Material code-283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 219.48 | 219.48 | 4.0 | False | None | None | False | None | False | 877.92 | 0 | 3075628 | 105144 | None | I-7 | 11 kV, 5 kN Composite/Polymeric Pin Insulator. (C SR 2023-24 P No-5, I no-6.06, Material code-283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 241.9 | 241.9 | 4.0 | False | None | None | False | None | False | 967.6 | 0 | 3075629 | 105144 | None | I-8 | Guy Set ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Set | 1439.6 | 1439.6 | 4.0 | False | None | None | False | None | False | 5758.4 | 0 | 3075630 | 105144 | None | I-9 | Rabbit ACSR conductor (C SR 2023-24 P No-5, I no-7.02, Material code-284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Km | 57941.54 | 57941.54 | 4.0 | False | None | None | False | None | False | 231766.16 | 0 | 3075631 | 105144 | None | I-10 | Loading & Unloading of 9mt pole. (C SR 2023-24 P No-218, I no-26.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 108.56 | 108.56 | 4.0 | False | None | None | False | None | False | 434.24 | 0 | 3075632 | 105144 | None | I-11 | Loading & Unloading of 8mt pole. (C SR 2023-24 P No-218, I no-26.01) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 81.42 | 81.42 | 4.0 | False | None | None | False | None | False | 325.68 | 0 | 3075633 | 105144 | None | I-12 | R&R of 9mt pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 1375.88 | 1375.88 | 4.0 | False | None | None | False | None | False | 5503.52 | 0 | 3075634 | 105144 | None | I-13 | R&R of X-Arm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 4.0 | False | None | None | False | None | False | 500.32 | 0 | 3075635 | 105144 | None | I-14 | R&R of HTST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 4.0 | False | None | None | False | None | False | 500.32 | 0 | 3075636 | 105144 | None | I-15 | R&R of Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 3385.42 | 3385.42 | 4.0 | False | None | None | False | None | False | 13541.68 | 0 | 3075637 | 105144 | None | I-16 | RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. (C SR 2023-24 11 KV system, P No-3, I no-1.02, Material code-200106) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 1375.88 | 1375.88 | 14.0 | False | None | None | False | None | False | 19262.32 | 0 | 3075638 | 105144 | None | I-17 | PSCC Pole - 9 Mtr Long, 200 Kg WL
(Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 ,11KV system, P No-3, I no-1.06, Material code-200006) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 1375.88 | 1375.88 | 9.0 | False | None | None | False | None | False | 12382.92 | 0 | 3075639 | 105144 | None | I-18 | PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. (C SR 2023-24 P No-3, I no-1.05, Material code-200004) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 1099.76 | 1099.76 | 9.0 | False | None | None | False | None | False | 9897.84 | 0 | 3075640 | 105144 | None | I-19 | 11 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.01, Material code-279020) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 32.0 | False | None | None | False | None | False | 4002.56 | 0 | 3075641 | 105144 | None | I-20 | HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.11, Material code-279092) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 32.0 | False | None | None | False | None | False | 4002.56 | 0 | 3075642 | 105144 | None | I-21 | LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). (C SR 2023-24 P No-3, I no-2.07, Material code-279012) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 32.0 | False | None | None | False | None | False | 4002.56 | 0 | 3075643 | 105144 | None | I-22 | Guy Set Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Set | 460.2 | 460.2 | 32.0 | False | None | None | False | None | False | 14726.4 | 0 | 3075644 | 105144 | None | I-23 | Loading & Unloading of 9mt pole. (C SR 2023-24 P No-218, I no-26.02) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 108.56 | 108.56 | 32.0 | False | None | None | False | None | False | 3473.92 | 0 | 3075645 | 105144 | None | I-24 | Loading & Unloading of 8mt pole. (C SR 2023-24 P No-218, I no-26.01) Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 81.42 | 81.42 | 32.0 | False | None | None | False | None | False | 2605.44 | 0 | 3075646 | 105144 | None | I-25 | R&R of 9mt pole Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 1375.88 | 1375.88 | 32.0 | False | None | None | False | None | False | 44028.16 | 0 | 3075647 | 105144 | None | I-26 | R&R of X-Arm Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 32.0 | False | None | None | False | None | False | 4002.56 | 0 | 3075648 | 105144 | None | I-27 | R&R of HTST Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 125.08 | 125.08 | 32.0 | False | None | None | False | None | False | 4002.56 | 0 | 3075649 | 105144 | None | I-28 | R&R of Rabbit Shifting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Nos | 3385.42 | 3385.42 | 32.0 | False | None | None | False | None | False | 108333.44 | 0 |
| 1710426222000 | 0 | None | None | Roads | Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075650 | 105145 | None | Item No.VOL-III-2.5 ii) b) Page No. 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle
PWD SOR for Roads & Bridges - 2023-24(Qty 0.45) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075651 | 105145 | None | Item No.VOL-III-16.19 Page No. 147 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24(Qty 3003.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075652 | 105145 | None | Item No.VOL-III-10.3 Page No. 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Qty 225.27) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075653 | 105145 | None | Item No.VOL-III-10.2 Page No. 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24(Qty 750.90) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075654 | 105145 | None | Item No.VOL-III-10.5 Page No. 91 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075655 | 105145 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 (Qty 180) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 |
| 1710426222000 | 0 | None | None | Roads | Road Maintenance - Activities to be carried out for the Second Year. (No Payment will be made for the activities) | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075656 | 105146 | None | Item No.VOL-III-2.5 ii) b) Page No. 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle
PWD SOR for Roads & Bridges - 2023-24(Qty 45.05) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075657 | 105146 | None | Item No.VOL-III-16.19 Page No. 147 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Qty 3003.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075658 | 105146 | None | Item No.VOL-III-10.3 Page No. 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 (Qty 225.27) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075659 | 105146 | None | Item No.VOL-III-10.2 Page No. 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24(Qty 750.90) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075660 | 105146 | None | Item No.VOL-III-10.5 Page No. 91 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 (Qty 262.82) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3075661 | 105146 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 (Qty 180) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 |
| 1710426222000 | 0 | None | None | Roads | Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE) | 386891.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075662 | 105147 | None | Item No.VOL-III-2.5 ii) b) Page No. 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 540.16 | 540.16 | 45.05 | False | None | None | False | None | False | 24334.208 | 0 | 3075663 | 105147 | None | Item No.VOL-III-16.19 Page No. 147 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 8.25 | 8.25 | 3003.6 | False | None | None | False | None | False | 24779.7 | 0 | 3075664 | 105147 | None | Item No.VOL-III-10.3 Page No. 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 53.61 | 53.61 | 337.9 | False | None | None | False | None | False | 18114.819 | 0 | 3075665 | 105147 | None | Item No.VOL-III-10.2 Page No. 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 133.32 | 133.32 | 1126.35 | False | None | None | False | None | False | 150164.982 | 0 | 3075666 | 105147 | None | Item No.VOL-III-16.22 Page No. 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910
PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Km | 2726.94 | 2726.94 | 3.75 | False | None | None | False | None | False | 10226.025 | 0 | 3075667 | 105147 | None | Item No.VOL-III-16.24 i Page No. 148 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Km | 283.14 | 283.14 | 3.75 | False | None | None | False | None | False | 1061.775 | 0 | 3075668 | 105147 | None | Item No.VOL-III-10.5 Page No. 91 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 585.52 | 585.52 | 131.41 | False | None | None | False | None | False | 76943.1832 | 0 | 3075669 | 105147 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 130.57 | 130.57 | 180.0 | False | None | None | False | None | False | 23502.6 | 0 | 3075670 | 105147 | None | Item No. VOL-III-8.10 Page No.66 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 149.82 | 149.82 | 90.0 | False | None | None | False | None | False | 13483.8 | 0 | 3075671 | 105147 | None | Item No. VOL-III-8.4 Page No.63 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
PWD SOR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | cm | 1.23 | 1.23 | 36000.0 | False | None | None | False | None | False | 44280.0 | 0 |
| 1710426222000 | 0 | None | None | Roads | Estimates for Maintenance - Activities to be carried out for the Fourth Year (PAID MAINTENANCE) | 484724.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075672 | 105148 | None | Item No.VOL-III-2.5 ii) b) Page No. 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 33.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 559.46 | 559.46 | 45.05 | False | None | None | False | None | False | 25203.673 | 0 | 3075673 | 105148 | None | Item No.VOL-III-16.19 Page No. 147 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 8.54 | 8.54 | 3003.6 | False | None | None | False | None | False | 25650.744 | 0 | 3075674 | 105148 | None | Item No.VOL-III-10.3 Page No. 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 55.52 | 55.52 | 337.9 | False | None | None | False | None | False | 18760.208 | 0 | 3075675 | 105148 | None | Item No.VOL-III-10.2 Page No. 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 138.09 | 138.09 | 2252.7 | False | None | None | False | None | False | 311075.343 | 0 | 3075676 | 105148 | None | Item No.VOL-III-10.5 Page No. 91 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 606.43 | 606.43 | 131.41 | False | None | None | False | None | False | 79690.9663 | 0 | 3075677 | 105148 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 135.24 | 135.24 | 180.0 | False | None | None | False | None | False | 24343.2 | 0 |
| 1710426222000 | 1 | None | None | Roads | Estimates for Maintenance - Activities to be carried out for the Fifth Year (PAID MAINTENANCE) | 583889.6 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075678 | 105149 | None | Item No.VOL-III-2.5 ii) b) Page No. 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer in-charge of the work-In area of light jungle
PWD SOR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) (Qty 33.6) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | 100 Sqm | 578.75 | 578.75 | 45.05 | False | None | None | False | None | False | 26072.6875 | 0 | 3075679 | 105149 | None | Item No.VOL-III-16.19 Page No. 147 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1908. PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Rmtr | 8.84 | 8.84 | 3003.6 | False | None | None | False | None | False | 26551.824 | 0 | 3075680 | 105149 | None | Item No.VOL-III-10.3 Page No. 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 57.43 | 57.43 | 337.9 | False | None | None | False | None | False | 19405.597 | 0 | 3075681 | 105149 | None | Item No.VOL-III-10.2 Page No. 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.. MORTH Specification No.3003PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 142.85 | 142.85 | 2252.7 | False | None | None | False | None | False | 321798.195 | 0 | 3075682 | 105149 | None | Item No.VOL-III-10.5 Page No. 91 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as
per clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smooth continuous surface, all as per clause 3004.2 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 627.34 | 627.34 | 262.82 | False | None | None | False | None | False | 164877.4988 | 0 | 3075683 | 105149 | None | Item No. VOL-I-1.12 Page No.8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Common SOR For Engineering Departments 2023 - 2024 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 139.91 | 139.91 | 180.0 | False | None | None | False | None | False | 25183.8 | 0 |
| 1710426222000 | 0 | None | None | Roads | Package 739 - Improvements to road connecting Hesaraghatta tank bund Road (SH-39) from Ch 6.00 KM to 13.40 KM (in selected reaches) in Yelahanka Taluk of Bangalore District. Sixth year Maintenance | 21702401.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3075684 | 105150 | None | Item No.VOL-III-16.22 Page No. 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Clause 1910 PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Km | 3019.1 | 3019.1 | 7.6 | False | None | None | False | None | False | 22945.16 | 0 | 3075685 | 105150 | None | Item No.VOL-III-16.24 i Page No. 148 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Km | 313.47 | 313.47 | 3.8 | False | None | None | False | None | False | 1191.186 | 0 | 3075686 | 105150 | None | Item No.VOL-III-8.10 Page No. 66 | Painting of Parapet walls of CD work. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 803PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 165.86 | 165.86 | 76.32 | False | None | None | False | None | False | 12658.4352 | 0 | 3075687 | 105150 | None | Item No.VOL-III-5.3-i Page No. 31 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 18.26 | 18.26 | 75090.0 | False | None | None | False | None | False | 1371143.4 | 0 | 3075688 | 105150 | None | Item No.VOL-III-5.16-C Page No. 37 | Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Cum | 16669.0 | 16669.0 | 1126.35 | False | None | None | False | None | False | 18775128.15 | 0 | 3075689 | 105150 | None | Item No.VOL-III-8.15 Page No. 67 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 (Rates are inclusive of GST 18%) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Sqm | 806.51 | 806.51 | 1250.25 | False | None | None | False | None | False | 1008339.1275 | 0 | 3075690 | 105150 | None | Item No.VOL-III-8.43 Page No. 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
PWD SoR for Roads & Bridges - 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST. | Each | 555.43 | 555.43 | 920.0 | False | None | None | False | None | False | 510995.6 | 0 |
|
|
---|