tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Reconstruction | 47336180.86 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070035 | 104674 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Sqm | 519.39 | 519.39 | 49.44 | False | None | None | False | None | False | 25678.6416 | 0 | 3070036 | 104674 | None | 2.1-A-i | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 300 mm to 600 mmPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-i Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT | Each | 786.35 | 786.35 | 7.0 | False | None | None | False | None | False | 5504.45 | 0 | 3070037 | 104674 | None | 2.1-A-ii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 600 mm to 900 mmPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-ii Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 1250.23 | 1250.23 | 7.0 | False | None | None | False | None | False | 8751.61 | 0 | 3070038 | 104674 | None | 2.1-A-iii | Cutting of Trees, excluding removal of stumps and roots of trees Girth from 900 mm to 1800 mmPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.1-A-iii Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 2340.55 | 2340.55 | 6.0 | False | None | None | False | None | False | 14043.3 | 0 | 3070039 | 104674 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 125.55 | 125.55 | 7457.57 | False | None | None | False | None | False | 936297.9135 | 0 | 3070040 | 104674 | None | 1.16.1 | Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the Work In Hard Rock ( requiring blasting) Depth upto 1.50mCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.16.1 Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 732.17 | 732.17 | 1464.15 | False | None | None | False | None | False | 1072006.7055 | 0 | 3070041 | 104674 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead etcPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-3.5 Page No.17) RATE ARE INCLUSIVE GST 18 PERCENT
| Sqm | 7.93 | 7.93 | 11330.0 | False | None | None | False | None | False | 89846.9 | 0 | 3070042 | 104674 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 157.27 | 157.27 | 6551.72 | False | None | None | False | None | False | 1030389.0044 | 0 | 3070043 | 104674 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-3.6 Page No.17) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 651.55 | 651.55 | 4067.27 | False | None | None | False | None | False | 2650029.7685 | 0 | 3070044 | 104674 | None | 4.2-v | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V MaterialPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.2-v Page No.23) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 3117.65 | 3117.65 | 3296.79 | False | None | None | False | None | False | 10278237.3435 | 0 | 3070045 | 104674 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.17 Page No.26)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 3381.97 | 3381.97 | 3994.41 | False | None | None | False | None | False | 13508974.7877 | 0 | 3070046 | 104674 | None | 5.1-A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.1-A(i) Page No.31) RATE ARE INCLUSIVE GST 18 PERCENT
| Sqm | 54.19 | 54.19 | 15596.99 | False | None | None | False | None | False | 845200.8881 | 0 | 3070047 | 104674 | None | 5.4 | Tack coat on Granular surface treated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.4 Page No.31)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 18.5 | 18.5 | 15596.96 | False | None | None | False | None | False | 288543.76 | 0 | 3070048 | 104674 | None | 5.12-C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.12-C Page No.35) RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 12487.8 | 12487.8 | 779.82 | False | None | None | False | None | False | 9738236.196 | 0 | 3070049 | 104674 | None | 5.16-C | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.16-C Page No.38)RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 14476.81 | 14476.81 | 467.94 | False | None | None | False | None | False | 6774278.4714 | 0 | 3070050 | 104674 | None | 8.29-i | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility servicePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.29-i Page No.71)
RATE ARE INCLUSIVE GST 18 PERCENT | m | 2923.38 | 2923.38 | 24.0 | False | None | None | False | None | False | 70161.12 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-WID & STR | 17828491.87 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070051 | 104675 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Sqm | 519.39 | 519.39 | 31.56 | False | None | None | False | None | False | 16391.9484 | 0 | 3070052 | 104675 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 125.55 | 125.55 | 4504.98 | False | None | None | False | None | False | 565600.239 | 0 | 3070053 | 104675 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 157.27 | 157.27 | 182.03 | False | None | None | False | None | False | 28627.8581 | 0 | 3070054 | 104675 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-3.6 Page No.17)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 651.55 | 651.55 | 2608.53 | False | None | None | False | None | False | 1699587.7215 | 0 | 3070055 | 104675 | None | 4.2-v | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V MaterialPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.2-v Page No.23)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 3117.65 | 3117.65 | 1013.88 | False | None | None | False | None | False | 3160922.982 | 0 | 3070056 | 104675 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-4.17 Page No.26)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 3381.97 | 3381.97 | 672.0 | False | None | None | False | None | False | 2272683.84 | 0 | 3070057 | 104675 | None | 5.1-A(i) | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.1-A(i) Page No.31)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 54.19 | 54.19 | 2525.1 | False | None | None | False | None | False | 136835.169 | 0 | 3070058 | 104675 | None | 5.3 | Tack coat on Bituminous surfaceProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broomPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.3 Page No.31)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 15.86 | 15.86 | 9444.1 | False | None | None | False | None | False | 149783.426 | 0 | 3070059 | 104675 | None | 5.23-i | Providing and laying slurry seal consisting of a mix of fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface ,2-3 mm thickness (Type-I)PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.23-i Page No.40)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 62.12 | 62.12 | 18.67 | False | None | None | False | None | False | 1159.7804 | 0 | 3070060 | 104675 | None | 5.12-C | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.12-C Page No.35)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 12487.8 | 12487.8 | 472.2 | False | None | None | False | None | False | 5896739.16 | 0 | 3070061 | 104675 | None | 5.29(b) | Providing and laying Bituminous Concrete with not less than 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.78% Bitumen and waste plastic 8% of Bitumen of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III- 5.29(b) Page No.42)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 13764.46 | 13764.46 | 283.35 | False | None | None | False | None | False | 3900159.741 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Road Furnitures | 2137970.66 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070062 | 104676 | None | 16.29 | i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the Rect Angle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year f installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.29 Page No.149) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 20289.2 | 20289.2 | 2.0 | False | None | None | False | None | False | 40578.4 | 0 | 3070063 | 104676 | None | 8.16-ii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) MORTH Specification No. 804 - complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.16-ii Page No.67)
RATE ARE INCLUSIVE GST 18 PERCENT | Each | 3868.32 | 3868.32 | 3.0 | False | None | None | False | None | False | 11604.96 | 0 | 3070064 | 104676 | None | 8.16-iii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) MORTH Specification No. 804 omplete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.16-iii Page No.67)
RATE ARE INCLUSIVE GST 18 PERCENT | Each | 1112.79 | 1112.79 | 13.0 | False | None | None | False | None | False | 14466.27 | 0 | 3070065 | 104676 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.15 Page No.67) RATE ARE INCLUSIVE GST 18 PERCENT
| Sqm | 700.45 | 700.45 | 852.0 | False | None | None | False | None | False | 596783.4 | 0 | 3070066 | 104676 | None | 8.5-ii | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangleIncluding cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-ii Page No.64) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 6190.37 | 6190.37 | 46.0 | False | None | None | False | None | False | 284757.02 | 0 | 3070067 | 104676 | None | 8.5-viii | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-viii Page No.64)
RATE ARE INCLUSIVE GST 18 PERCENT | Each | 5678.92 | 5678.92 | 64.0 | False | None | None | False | None | False | 363450.88 | 0 | 3070068 | 104676 | None | 8.6-(x) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular TYPE XIPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.6-(x) Page No.65)
RATE ARE INCLUSIVE GST 18 PERCENT | No | 7275.41 | 7275.41 | 2.0 | False | None | None | False | None | False | 14550.82 | 0 | 3070069 | 104676 | None | 8.5-iv | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.5-iv Page No.64)
RATE ARE INCLUSIVE GST 18 PERCENT | No | 4726.04 | 4726.04 | 10.0 | False | None | None | False | None | False | 47260.4 | 0 | 3070070 | 104676 | None | 8.6-(xv) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon Stop Board -TYPE XIPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.6-(xv) Page No.65)
RATE ARE INCLUSIVE GST 18 PERCENT | No | 8755.6 | 8755.6 | 2.0 | False | None | None | False | None | False | 17511.2 | 0 | 3070071 | 104676 | None | 8.7 | Direction and Place Identification Signs upto 0.9 sqm Size Board: Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60 cm, 60 em below ground level as per approved drawing. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.7 Page No.65)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 11907.62 | 11907.62 | 3.6 | False | None | None | False | None | False | 42867.432 | 0 | 3070072 | 104676 | None | 8.10 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 144.05 | 144.05 | 79.2 | False | None | None | False | None | False | 11408.76 | 0 | 3070073 | 104676 | None | 8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard StonePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.18 Page No.67)
RATE ARE INCLUSIVE GST 18 PERCENT | Sqm | 988.56 | 988.56 | 200.0 | False | None | None | False | None | False | 197712.0 | 0 | 3070074 | 104676 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.43 Page No.74)
RATE ARE INCLUSIVE GST 18 PERCENT | No | 482.38 | 482.38 | 494.0 | False | None | None | False | None | False | 238295.72 | 0 | 3070075 | 104676 | None | 8.17 | Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.17 Page No.67)
RATE ARE INCLUSIVE GST 18 PERCENT | Each | 2670.95 | 2670.95 | 28.0 | False | None | None | False | None | False | 74786.6 | 0 | 3070076 | 104676 | None | 14.4(a) | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-14.4(a) Page No.129) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 2526.9 | 2526.9 | 72.0 | False | None | None | False | None | False | 181936.8 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Box Culvert | 2322895.43 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070077 | 104677 | None | 2.8-ii-(a) | KSRRB M200-13.1. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. II. By Mechanical Means. A. Cement Concrete Grade M-15 &M-20. MORTH Specification No. 202 - complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 950.23 | 950.23 | 2.28 | False | None | None | False | None | False | 2166.5244 | 0 | 3070078 | 104677 | None | 2.11-II-(a) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Stone Masonry, By Mechanical Means Dismantling Brick / Tile work / rubble masonry / pitching / etc PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.11-II-(a) Page No.10) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 237.89 | 237.89 | 16.94 | False | None | None | False | None | False | 4029.8566 | 0 | 3070079 | 104677 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 134.8 | 134.8 | 75.04 | False | None | None | False | None | False | 10115.392 | 0 | 3070080 | 104677 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 13.35 | False | None | None | False | None | False | 105666.051 | 0 | 3070081 | 104677 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) RATE ARE INCLUSIVE GST 18 PERCENT
| t | 104420.94 | 104420.94 | 5.17 | False | None | None | False | None | False | 539856.2598 | 0 | 3070082 | 104677 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (20% for centring)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 (20% for centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 10048.39 | 10048.39 | 55.66 | False | None | None | False | None | False | 559293.3874 | 0 | 3070083 | 104677 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring ) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.5.2 (20% for Slab Centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 10852.45 | 10852.45 | 18.57 | False | None | None | False | None | False | 201529.9965 | 0 | 3070084 | 104677 | None | 3.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-13.2 Page No.121) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 18464.07 | 18464.07 | 3.92 | False | None | None | False | None | False | 72379.1544 | 0 | 3070085 | 104677 | None | 8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard StonePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.18 Page No.67) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 988.56 | 988.56 | 36.0 | False | None | None | False | None | False | 35588.16 | 0 | 3070086 | 104677 | None | 12.3-A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular MaterialPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3-A Page No.117) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 1543.63 | 1543.63 | 33.75 | False | None | None | False | None | False | 52097.5125 | 0 | 3070087 | 104677 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 157.27 | 157.27 | 162.0 | False | None | None | False | None | False | 25477.74 | 0 | 3070088 | 104677 | None | 16.15-iii | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 750mm. dia Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single rowPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.15-iii Page No.146) RATE ARE INCLUSIVE GST 18 PERCENT
| m | 4407.54 | 4407.54 | 15.0 | False | None | None | False | None | False | 66113.1 | 0 | 3070089 | 104677 | None | 2.8-ii-(a) | KSRRB M200-13.1. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. II. By Mechanical Means. A. Cement Concrete Grade M-15 &M-20. MORTH Specification No. 202 - complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 950.23 | 950.23 | 7.2 | False | None | None | False | None | False | 6841.656 | 0 | 3070090 | 104677 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 134.8 | 134.8 | 30.45 | False | None | None | False | None | False | 4104.66 | 0 | 3070091 | 104677 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 5.42 | False | None | None | False | None | False | 42899.6252 | 0 | 3070092 | 104677 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) RATE ARE INCLUSIVE GST 18 PERCENT
| t | 104420.94 | 104420.94 | 1.94 | False | None | None | False | None | False | 202576.6236 | 0 | 3070093 | 104677 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 25) Using 20 mm nominal size graded crushed coarse aggregate (20% for centring)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 (20% for centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 10048.39 | 10048.39 | 20.55 | False | None | None | False | None | False | 206494.4145 | 0 | 3070094 | 104677 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (20% for Slab centring ) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.5.2 (20% for Slab Centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 10852.45 | 10852.45 | 8.25 | False | None | None | False | None | False | 89532.7125 | 0 | 3070095 | 104677 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) complete as per specifications. MORTH Specification No. 2702PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-13.2 Page No.121) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 18464.07 | 18464.07 | 1.74 | False | None | None | False | None | False | 32127.4818 | 0 | 3070096 | 104677 | None | 8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard StonePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.18 Page No.67) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 988.56 | 988.56 | 12.0 | False | None | None | False | None | False | 11862.72 | 0 | 3070097 | 104677 | None | 12.3-A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular MaterialPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3-A Page No.117) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 1543.63 | 1543.63 | 11.25 | False | None | None | False | None | False | 17365.8375 | 0 | 3070098 | 104677 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 157.27 | 157.27 | 81.0 | False | None | None | False | None | False | 12738.87 | 0 | 3070099 | 104677 | None | 16.15-iii | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 750mm. dia Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single rowPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.15-iii Page No.146) RATE ARE INCLUSIVE GST 18 PERCENT
| m | 4407.54 | 4407.54 | 5.0 | False | None | None | False | None | False | 22037.7 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Pipe Culvert | 1185049.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070100 | 104678 | None | 2.8-ii-(a) | KSRRB M200-13.1. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications. II. By Mechanical Means. A. Cement Concrete Grade M-15 &M-20. MORTH Specification No. 202 - complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 950.23 | 950.23 | 8.49 | False | None | None | False | None | False | 8067.4527 | 0 | 3070101 | 104678 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 134.8 | 134.8 | 52.59 | False | None | None | False | None | False | 7089.132 | 0 | 3070102 | 104678 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 2.9 | False | None | None | False | None | False | 22953.674 | 0 | 3070103 | 104678 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18)
RATE ARE INCLUSIVE GST 18 PERCENT | t | 104420.94 | 104420.94 | 0.14 | False | None | None | False | None | False | 14618.9316 | 0 | 3070104 | 104678 | None | 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-2.2.1 (8% for Centring) Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 8973.61 | 8973.61 | 35.07 | False | None | None | False | None | False | 314704.5027 | 0 | 3070105 | 104678 | None | 9.1-ii | KSRRB M2900-2.1. Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets, curing including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 2900 & IS 458- 2003 B. 1200 mm dia - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work KSRRB M2900-2.2. -do- B. 1200 mm diaPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-9.1-ii Page No.87)
RATE ARE INCLUSIVE GST 18 PERCENT | m | 14229.67 | 14229.67 | 12.5 | False | None | None | False | None | False | 177870.875 | 0 | 3070106 | 104678 | None | 14.4(a) | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-14.4(a) Page No.129)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 2526.9 | 2526.9 | 11.1 | False | None | None | False | None | False | 28048.59 | 0 | 3070107 | 104678 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7)
RATE ARE INCLUSIVE GST 18 PERCENT | Cum | 157.27 | 157.27 | 100.66 | False | None | None | False | None | False | 15830.7982 | 0 | 3070108 | 104678 | None | 9.1-ii | KSRRB M2900-2.1. Laying Reinforced cement concrete pipe NP4/ prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets, curing including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 2900 & IS 458- 2003 B. 1200 mm dia - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work KSRRB M2900-2.2. -do- B. 1200 mm diaPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-9.1-ii Page No.87)
RATE ARE INCLUSIVE GST 18 PERCENT | m | 14229.67 | 14229.67 | 5.0 | False | None | None | False | None | False | 71148.35 | 0 | 3070109 | 104678 | None | 8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard StonePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.18 Page No.67) RATE ARE INCLUSIVE GST 18 PERCENT
| Each | 988.56 | 988.56 | 12.0 | False | None | None | False | None | False | 11862.72 | 0 | 3070110 | 104678 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 134.8 | 134.8 | 66.3 | False | None | None | False | None | False | 8937.24 | 0 | 3070111 | 104678 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 4.62 | False | None | None | False | None | False | 36567.5772 | 0 | 3070112 | 104678 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) RATE ARE INCLUSIVE GST 18 PERCENT
| t | 104420.94 | 104420.94 | 0.54 | False | None | None | False | None | False | 56387.3076 | 0 | 3070113 | 104678 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (8% for centring)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (8% for Centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 9024.99 | 9024.99 | 35.57 | False | None | None | False | None | False | 321018.8943 | 0 | 3070114 | 104678 | None | 16.15-iii | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 750mm. dia Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single rowPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.15-iii Page No.146) RATE ARE INCLUSIVE GST 18 PERCENT
| m | 4407.54 | 4407.54 | 20.0 | False | None | None | False | None | False | 88150.8 | 0 | 3070115 | 104678 | None | 1.7 | KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54. Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 -. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.7 Page No.7) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 157.27 | 157.27 | 11.4 | False | None | None | False | None | False | 1792.878 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Retaining Wall | 7960991.24 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070116 | 104679 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 134.8 | 134.8 | 891.0 | False | None | None | False | None | False | 120106.8 | 0 | 3070117 | 104679 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 67.5 | False | None | None | False | None | False | 534266.55 | 0 | 3070118 | 104679 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) RATE ARE INCLUSIVE GST 18 PERCENT
| t | 104420.94 | 104420.94 | 29.74 | False | None | None | False | None | False | 3105478.7556 | 0 | 3070119 | 104679 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (10% Earth retaining Structure)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (10% for Earth ret.Centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 9192.12 | 9192.12 | 425.25 | False | None | None | False | None | False | 3908949.03 | 0 | 3070120 | 104679 | None | 12.3-A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification-Granular MaterialPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3-A Page No.117) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 1543.63 | 1543.63 | 150.0 | False | None | None | False | None | False | 231544.5 | 0 | 3070121 | 104679 | None | 14.4(a) | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-14.4(a) Page No.129) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 2526.9 | 2526.9 | 24.0 | False | None | None | False | None | False | 60645.6 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Drain | 861216.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070122 | 104680 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the Work . In all kinds of soils Depth upto 3 mMORTH Specification No. 304 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 134.8 | 134.8 | 156.0 | False | None | None | False | None | False | 21028.8 | 0 | 3070123 | 104680 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 7915.06 | 7915.06 | 16.5 | False | None | None | False | None | False | 130598.49 | 0 | 3070124 | 104680 | None | 2.11-h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) RATE ARE INCLUSIVE GST 18 PERCENT
| t | 104420.94 | 104420.94 | 2.42 | False | None | None | False | None | False | 252698.6748 | 0 | 3070125 | 104680 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (35% for Drain centring)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 (35% for Drain Centring) Page No.16) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 11281.24 | 11281.24 | 40.5 | False | None | None | False | None | False | 456890.22 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Water Supply | 555331.84 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070126 | 104681 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 mCommon SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.17.1 Page No.10) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 346.26 | 346.26 | 378.0 | False | None | None | False | None | False | 130886.28 | 0 | 3070127 | 104681 | None | 9.2.3 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 8.0, 90mm diaPWD SOR for Water Supply & Sewerage Works - 2023-24 ( Item No. VOL-5 - 9.2.3 Page No.96) RATE ARE INCLUSIVE GST 18 PERCENT
| Rmtr | 504.85 | 504.85 | 700.0 | False | None | None | False | None | False | 353395.0 | 0 | 3070128 | 104681 | None | 1.10 | KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-1.10 Page No.7) RATE ARE INCLUSIVE GST 18 PERCENT
| Cum | 211.46 | 211.46 | 336.0 | False | None | None | False | None | False | 71050.56 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-Electrical Pole Shifting | 818225.86 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070129 | 104682 | None | 003 | RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 9351.64 | 9351.64 | 24.0 | False | None | None | False | None | False | 224439.36 | 0 | 3070130 | 104682 | None | 044 | Labour for RCC pole (V-6 ESCOM P.No 44/ 30/2.02) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 1470.94 | 1470.94 | 24.0 | False | None | None | False | None | False | 35302.56 | 0 | 3070131 | 104682 | None | 004 | LT 2 Pin Cross Arm GI(V-6 ESCOM P.No 4/18/2.08) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 228.64 | 228.64 | 12.0 | False | None | None | False | None | False | 2743.68 | 0 | 3070132 | 104682 | None | 045 | Labour for 2 Pin Cross Arm (V-6 ESCOM P.No 45/50/5.01) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3070133 | 104682 | None | 003 | 11 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 643.62 | 643.62 | 12.0 | False | None | None | False | None | False | 7723.44 | 0 | 3070134 | 104682 | None | 045 | Labour for Horizontal Cross Arm (V-6 ESCOM P.No 45/52/5.04) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3070135 | 104682 | None | 005 | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 270.93 | 270.93 | 12.0 | False | None | None | False | None | False | 3251.16 | 0 | 3070136 | 104682 | None | 005 | 11 kV, 45 KN Polymeric Insulator (V-6 ESCOM P.No 5/56/6.10) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 245.82 | 245.82 | 12.0 | False | None | None | False | None | False | 2949.84 | 0 | 3070137 | 104682 | None | 016 | LT 4 Pin Cross Arm GI (Escom Pg 4 I.No 16/2.06) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 500.89 | 500.89 | 12.0 | False | None | None | False | None | False | 6010.68 | 0 | 3070138 | 104682 | None | 050 | Labour for 4 Pin Cross Arm (Escom Pg 45 I.No 50/5.02) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 211.46 | 211.46 | 12.0 | False | None | None | False | None | False | 2537.52 | 0 | 3070139 | 104682 | None | 009 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS RATE ARE INCLUSIVE GST 18 PERCENT
| No | 29771.68 | 29771.68 | 2.0 | False | None | None | False | None | False | 59543.36 | 0 | 3070140 | 104682 | None | 044 | Labour For DP TC Set (V-6 ESCOM P.No 44/39/3.02) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 7880.7 | 7880.7 | 2.0 | False | None | None | False | None | False | 15761.4 | 0 | 3070141 | 104682 | None | 044 | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (V-6 ESCOM P.No 44/ 30/2.02) (1113*1.9) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 2794.79 | 2794.79 | 48.0 | False | None | None | False | None | False | 134149.92 | 0 | 3070142 | 104682 | None | 067 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Labour (Escom Pg 46, I.No 67/7.02)(5233*1.9) RATE ARE INCLUSIVE GST 18 PERCENT
| Km | 13140.27 | 13140.27 | 3.25 | False | None | None | False | None | False | 42705.8775 | 0 | 3070143 | 104682 | None | 046 | Erection of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*1.9) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 3992.55 | 3992.55 | 2.0 | False | None | None | False | None | False | 7985.1 | 0 | 3070144 | 104682 | None | 016 | Erection of 11kV/433V, 100 kVA, 3 Phase 50 Cys Distribution Transformer BEE - 5 Star Rated with Oil Using 9 Mtr RCC Pole DPTC (303940 -221952) (CDS-26)(With out Transformer) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 108355.34 | 108355.34 | 2.0 | False | None | None | False | None | False | 216710.68 | 0 | 3070145 | 104682 | None | 017 | Labour For Erection TC (CDS-26) RATE ARE INCLUSIVE GST 18 PERCENT
| No | 25668.12 | 25668.12 | 2.0 | False | None | None | False | None | False | 51336.24 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-1st year Maintainance | 0.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070146 | 104683 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) Rate are inclusive GST 18 percent + 4 percent addoc
| 100 Sqm | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 | 3070147 | 104683 | None | 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-16.19 Page No.147) Rate are inclusive GST 18 percent + 4 percent addoc
| m | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070148 | 104683 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.3 Page No.91) Rate are inclusive GST 18 percent + 4 percent addoc
| Sqm | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070149 | 104683 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.2 Page No.91) Rate are inclusive GST 18 percent + 4 percent addoc
| Sqm | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070150 | 104683 | None | 10.5 | KSRRB 3000 Filling Pot-holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm- KSRRB M3000-5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR:2018-19 Page No.259. Item No.35.5)(If there are pot holes on the road) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.5 Page No.91) Rate are inclusive GST 18 percent + 4 percent addoc
| Sqm | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070151 | 104683 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) Rate are inclusive GST 18 percent + 4 percent addoc
| Cum | 0.1 | 0.1 | 0.1 | False | None | None | False | None | False | 0.01 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-2nd year Maintainance | 0.1 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070152 | 104684 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) Rate are inclusive GST 18 percent + 8 percent addoc
| 100 Sqm | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070153 | 104684 | None | 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-16.19 Page No.147) Rate are inclusive GST 18 percent + 8 percent addoc
| m | 0.1 | 0.1 | 0.01 | False | None | None | False | None | False | 0.001 | 0 | 3070154 | 104684 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.3 Page No.91) ate are inclusive GST 18 percent + 8 percent addoc
| Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3070155 | 104684 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.2 Page No.91) Rate are inclusive GST 18 percent + 8 percent addoc
| Sqm | 0.01 | 0.01 | 0.1 | False | None | None | False | None | False | 0.001 | 0 | 3070156 | 104684 | None | 10.5 | KSRRB 3000 Filling Pot-holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm- KSRRB M3000-5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR:2018-19 Page No.259. Item No.35.5)(If there are pot holes on the road) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.5 Page No.91) Rate are inclusive GST 18 percent + 8 percent addoc
| Sqm | 0.01 | 0.01 | 0.1 | False | None | None | False | None | False | 0.001 | 0 | 3070157 | 104684 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) Rate are inclusive GST 18 percent + 8 percent addoc
| Sqm | 0.1 | 0.1 | 1.0 | False | None | None | False | None | False | 0.1 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-3rd year Maintainance | 310340.66 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070158 | 104685 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) Rate are inclusive GST 18 percent + 12 percent addoc
| 100 Sqm | 581.72 | 581.72 | 39.94 | False | None | None | False | None | False | 23233.8968 | 0 | 3070159 | 104685 | None | 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-16.19 Page No.147) Rate are inclusive GST 18 percent + 12 percent addoc
| m | 8.88 | 8.88 | 2594.4 | False | None | None | False | None | False | 23038.272 | 0 | 3070160 | 104685 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.3 Page No.91) Rate are inclusive GST 18 percent + 12 percent addoc
| Sqm | 57.73 | 57.73 | 291.87 | False | None | None | False | None | False | 16849.6551 | 0 | 3070161 | 104685 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.2 Page No.91) Rate are inclusive GST 18 percent + 12 percent addoc
| Sqm | 143.58 | 143.58 | 972.9 | False | None | None | False | None | False | 139688.982 | 0 | 3070162 | 104685 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Panchayat road SR 2018-19 Bangalore Circle Item no 15.9 page no 121) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.22 Page No.147) Rate are inclusive GST 18 percent + 12 percent addoc
| Km | 2936.7 | 2936.7 | 3.33 | False | None | None | False | None | False | 9779.211 | 0 | 3070163 | 104685 | None | 16.24 (i) | Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 (Panchayat Raj SR 2018-19 Bangalore circle item 15.11 page no 121 i) Painting two coats with synthetic enamel paint (I No. 15.11.i) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.24 (i) Page No.148) Rate are inclusive GST 18 percent + 12 percent addoc
| Km | 304.92 | 304.92 | 3.25 | False | None | None | False | None | False | 990.99 | 0 | 3070164 | 104685 | None | 10.5 | KSRRB 3000 Filling Pot-holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm- KSRRB M3000-5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR:2018-19 Page No.259. Item No.35.5)(If there are pot holes on the road) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.5 Page No.91) Rate are inclusive GST 18 percent + 12 percent addoc
| Sqm | 630.56 | 630.56 | 116.48 | False | None | None | False | None | False | 73447.6288 | 0 | 3070165 | 104685 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) Rate are inclusive GST 18 percent + 12 percent addoc
| Cum | 140.62 | 140.62 | 165.0 | False | None | None | False | None | False | 23202.3 | 0 | 3070166 | 104685 | None | 8.4 | Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and RomanPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.4 Page No.63) Rate are inclusive GST 18 percent + 12 percent addoc
| cm | 1.33 | 1.33 | 82.5 | False | None | None | False | None | False | 109.725 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-4th year Maintainance | 454844.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070167 | 104686 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) Rate are inclusive GST 18 percent + 16 percent addoc
| 100 Sqm | 602.49 | 602.49 | 39.94 | False | None | None | False | None | False | 24063.4506 | 0 | 3070168 | 104686 | None | 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-16.19 Page No.147) Rate are inclusive GST 18 percent + 16 percent addoc
| m | 9.2 | 9.2 | 2594.4 | False | None | None | False | None | False | 23868.48 | 0 | 3070169 | 104686 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.3 Page No.91) Rate are inclusive GST 18 percent + 16 percent addoc
| Sqm | 59.79 | 59.79 | 291.87 | False | None | None | False | None | False | 17450.9073 | 0 | 3070170 | 104686 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.2 Page No.91) Rate are inclusive GST 18 percent + 16 percent addoc
| Sqm | 148.71 | 148.71 | 1945.8 | False | None | None | False | None | False | 289359.918 | 0 | 3070171 | 104686 | None | 10.5 | KSRRB 3000 Filling Pot-holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm- KSRRB M3000-5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR:2018-19 Page No.259. Item No.35.5)(If there are pot holes on the road) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.5 Page No.91) Rate are inclusive GST 18 percent + 16 percent addoc
| Sqm | 653.08 | 653.08 | 116.48 | False | None | None | False | None | False | 76070.7584 | 0 | 3070172 | 104686 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) Rate are inclusive GST 18 percent + 16 percent addoc
| Cum | 145.64 | 145.64 | 165.0 | False | None | None | False | None | False | 24030.6 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-5th year Maintainance | 549213.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070173 | 104687 | None | 2.5-ii-A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In area of light jungle. MORTH Specification No. 201 . complete as directed as per the specification and direction of Engineer in-charge of the work-In area of Light junglePWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.5-ii-A Page No.9) Rate are inclusive GST 18 percent + 20 percent addoc
| 100 Sqm | 623.27 | 623.27 | 39.94 | False | None | None | False | None | False | 24893.4038 | 0 | 3070174 | 104687 | None | 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-I-16.19 Page No.147) Rate are inclusive GST 18 percent + 20 percent addoc
| m | 9.52 | 9.52 | 2594.4 | False | None | None | False | None | False | 24698.688 | 0 | 3070175 | 104687 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.3 Page No.91) Rate are inclusive GST 18 percent + 20 percent addoc
| Sqm | 61.85 | 61.85 | 291.87 | False | None | None | False | None | False | 18052.1595 | 0 | 3070176 | 104687 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.2 Page No.91) Rate are inclusive GST 18 percent + 20 percent addoc
| Sqm | 153.83 | 153.83 | 1945.8 | False | None | None | False | None | False | 299322.414 | 0 | 3070177 | 104687 | None | 10.5 | KSRRB 3000 Filling Pot-holes and Patch Repairs and attending to Ravelling/Rutting/Edge Breaking with Bituminous Concrete, 40 mm- KSRRB M3000-5. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of excavation at 2.5kg/1Osqm as per clause 500.3, filling back the pot holes with hot bituminous material as per clause 500.4, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3004.2 (PWD, Bangalore, SR:2018-19 Page No.259. Item No.35.5)(If there are pot holes on the road) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-10.5 Page No.91) Rate are inclusive GST 18 percent + 20 percent addoc
| Sqm | 675.6 | 675.6 | 232.96 | False | None | None | False | None | False | 157387.776 | 0 | 3070178 | 104687 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.12 Page No.8) Rate are inclusive GST 18 percent + 20 percent addoc
| Cum | 150.66 | 150.66 | 165.0 | False | None | None | False | None | False | 24858.9 | 0 |
| 1710412093000 | 0 | None | None | Roads | Improvements to SH-37 connecting Subramanya with Udupi via Dharmsthala, Belthangadi and Karkala from Ch 94.452 KM to 138.40 KM (in selected reaches) in Karkal Taluk of Udupi District-6th year Renewal | 14046719.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3070179 | 104688 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Panchayat road SR 2018-19 Bangalore Circle Item no 15.9 page no 121) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.22 Page No.147) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Km | 3251.35 | 3251.35 | 3.37 | False | None | None | False | None | False | 10957.0495 | 0 | 3070180 | 104688 | None | 16.24 (i) | Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 (Panchayat Raj SR 2018-19 Bangalore circle item 15.11 page no 121 i) Painting two coats with synthetic enamel paint (I No. 15.11.i) - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-16.24 (i) Page No.148) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Km | 337.59 | 337.59 | 3.37 | False | None | None | False | None | False | 1137.6783 | 0 | 3070181 | 104688 | None | 8.10 | KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Sqm | 178.63 | 178.63 | 69.96 | False | None | None | False | None | False | 12496.9548 | 0 | 3070182 | 104688 | None | 5.3 | Tack coat on Bituminous surfaceProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broomPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.3 Page No.31) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Sqm | 19.67 | 19.67 | 23296.0 | False | None | None | False | None | False | 458232.32 | 0 | 3070183 | 104688 | None | 5.16-C | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-5.16-C Page No.38) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Cum | 17951.24 | 17951.24 | 698.88 | False | None | None | False | None | False | 12545762.6112 | 0 | 3070184 | 104688 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.15 Page No.67)RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| Sqm | 868.56 | 868.56 | 832.0 | False | None | None | False | None | False | 722641.92 | 0 | 3070185 | 104688 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the workPWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.43 Page No.74) RATE ARE INCLUSIVE GST 18 PERCENT (ADD24% Addhoc)
| No | 598.16 | 598.16 | 494.0 | False | None | None | False | None | False | 295491.04 | 0 |
|
|
---|