tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-Road Construction | 70923202.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052706 | 103347 | None | PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 | Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | No | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3052707 | 103347 | None | PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 (Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 7.08 | 7.08 | 17875.0 | False | None | None | False | None | False | 126555.0 | 0 | 3052708 | 103347 | None | PWD 2023-24 vol- 3, Item No: 2.5 (ii) a , Page No9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 463.74 | 463.74 | 92.48 | False | None | None | False | None | False | 42886.6752 | 0 | 3052709 | 103347 | None | PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 112.1 | 112.1 | 10648.24 | False | None | None | False | None | False | 1193667.704 | 0 | 3052710 | 103347 | None | PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 7.08 | 7.08 | 6500.0 | False | None | None | False | None | False | 46020.0 | 0 | 3052711 | 103347 | None | SR PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 140.42 | 140.42 | 3940.78 | False | None | None | False | None | False | 553364.3276 | 0 | 3052712 | 103347 | None | PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 2783.62 | 2783.62 | 5903.25 | False | None | None | False | None | False | 16432404.765 | 0 | 3052713 | 103347 | None | PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 3019.62 | 3019.62 | 7032.37 | False | None | None | False | None | False | 21235085.0994 | 0 | 3052714 | 103347 | None | PWD 2023-24 vol- 3, Item No: 5.1 A (I) ,Page No31 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 48.38 | 48.38 | 27439.4 | False | None | None | False | None | False | 1327518.172 | 0 | 3052715 | 103347 | None | PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 16.52 | 16.52 | 27439.4 | False | None | None | False | None | False | 453298.888 | 0 | 3052716 | 103347 | None | PWD 2023-24 vol- 3, Item No: 5.12 (C) , Page No:35 | Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA
Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MORTH specification clause No. 505 complete in all respects.Schedule of Rates PWD 2023-24 vol- 3, Item No:5.12 C , Page No: 35(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 11149.82 | 11149.82 | 1371.97 | False | None | None | False | None | False | 15297218.5454 | 0 | 3052717 | 103347 | None | PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 | Bituminous Concrete Grading II for traffic less than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 12925.72 | 12925.72 | 823.17 | False | None | None | False | None | False | 10640064.9324 | 0 | 3052718 | 103347 | None | Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 581.74 | 581.74 | 6083.28 | False | None | None | False | None | False | 3538887.3072 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District- Road furniture | 1886857.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052719 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.16 (i) , Page No: 6 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (i) , Page No: 67 (Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3052720 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.16 (ii) , Page No67 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (ii) , Page No: 67(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 3453.86 | 3453.86 | 2.0 | False | None | None | False | None | False | 6907.72 | 0 | 3052721 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.16 (iii) ,Page No67 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (iii) , Page No: 67(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 993.56 | 993.56 | 15.0 | False | None | None | False | None | False | 14903.4 | 0 | 3052722 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 625.4 | 625.4 | 1048.4 | False | None | None | False | None | False | 655669.36 | 0 | 3052723 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.6 ii , Page No: 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 ii , Page No: 64"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 5602.64 | 5602.64 | 29.0 | False | None | None | False | None | False | 162476.56 | 0 | 3052724 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.6 xv , Page No: 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 xv , Page No: 64"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 7817.5 | 7817.5 | 5.0 | False | None | None | False | None | False | 39087.5 | 0 | 3052725 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.6 iv , Page No: 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 iv , Page No: 64"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 4252.72 | 4252.72 | 1.0 | False | None | None | False | None | False | 4252.72 | 0 | 3052726 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.6 iii , Page No: 65 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 75 cm equilateral triangle
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 iii , Page No: 65 ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 4862.78 | 4862.78 | 4.0 | False | None | None | False | None | False | 19451.12 | 0 | 3052727 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.6 xii , Page No: 64 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xii) 60 cm x 45 cm rectangular
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 xii , Page No: 64"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 5042.14 | 5042.14 | 16.0 | False | None | None | False | None | False | 80674.24 | 0 | 3052728 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | No | 430.7 | 430.7 | 584.0 | False | None | None | False | None | False | 251528.8 | 0 | 3052729 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.17 , Page No:67 | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.17 , Page No: 67"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Each | 2384.78 | 2384.78 | 6.0 | False | None | None | False | None | False | 14308.68 | 0 | 3052730 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.31 , Page No: 71 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.31 , Page No: 71"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 221.84 | 221.84 | 367.5 | False | None | None | False | None | False | 81526.2 | 0 | 3052731 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.60.2 ii , Page No80 | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.60.2 ii , Page No: 80"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | No | 53635.72 | 53635.72 | 5.0 | False | None | None | False | None | False | 268178.6 | 0 | 3052732 | 103348 | None | PWD 2023-24 vol- 3, Item No: 8.29 (i) ,Page No71 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29 (i) , Page No: 71"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 2610.16 | 2610.16 | 108.0 | False | None | None | False | None | False | 281897.28 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District.- CC drain | 3607258.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052733 | 103349 | None | PWD 2023-24 vol- 3, Item No: 2.11 , Page No: 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11(ii)A , Page No: 10"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 212.4 | 212.4 | 37.8 | False | None | None | False | None | False | 8028.72 | 0 | 3052734 | 103349 | None | PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 120.36 | 120.36 | 768.0 | False | None | None | False | None | False | 92436.48 | 0 | 3052735 | 103349 | None | PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 7067.02 | 7067.02 | 80.0 | False | None | None | False | None | False | 565361.6 | 0 | 3052736 | 103349 | None | PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 7461.14 | 7461.14 | 64.0 | False | None | None | False | None | False | 477512.96 | 0 | 3052737 | 103349 | None | PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16" (Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 10072.54 | 10072.54 | 96.0 | False | None | None | False | None | False | 966963.84 | 0 | 3052738 | 103349 | None | PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 8953.37 | 8953.37 | 64.0 | False | None | None | False | None | False | 573015.68 | 0 | 3052739 | 103349 | None | PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | t | 93232.98 | 93232.98 | 9.91 | False | None | None | False | None | False | 923938.8318 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District- Box culvert | 2576802.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052740 | 103350 | None | PWD 2023-24 vol- 3, Item No: 2.11 , Page No: 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11 , Page No: 10"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 212.4 | 212.4 | 14.51 | False | None | None | False | None | False | 3081.924 | 0 | 3052741 | 103350 | None | PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 120.36 | 120.36 | 222.99 | False | None | None | False | None | False | 26839.0764 | 0 | 3052742 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15" Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 7067.02 | 7067.02 | 32.79 | False | None | None | False | None | False | 231727.5858 | 0 | 3052743 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | t | 93232.98 | 93232.98 | 7.43 | False | None | None | False | None | False | 692721.0414 | 0 | 3052744 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.2.3 , Page No: 15"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 8971.78 | 8971.78 | 34.68 | False | None | None | False | None | False | 311141.3304 | 0 | 3052745 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical
specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16" Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 9689.69 | 9689.69 | 7.56 | False | None | None | False | None | False | 73254.0564 | 0 | 3052746 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 8074.6 | 8074.6 | 27.23 | False | None | None | False | None | False | 219871.358 | 0 | 3052747 | 103350 | None | PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 3158.86 | 3158.86 | 49.66 | False | None | None | False | None | False | 156868.9876 | 0 | 3052748 | 103350 | None | PWD 2023-24 vol- 1, Item No: 2.2.1 , Page No: 15 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.2.1 , Page No: 15" Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 7418.66 | 7418.66 | 41.03 | False | None | None | False | None | False | 304387.6198 | 0 | 3052749 | 103350 | None | PWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 8036.98 | 8036.98 | 8.4 | False | None | None | False | None | False | 67510.632 | 0 | 3052750 | 103350 | None | PWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 13965.3 | 13965.3 | 25.2 | False | None | None | False | None | False | 351925.56 | 0 | 3052751 | 103350 | None | PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 16485.78 | 16485.78 | 1.57 | False | None | None | False | None | False | 25882.6746 | 0 | 3052752 | 103350 | None | PWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124 | Asphaltic Plug Joint
Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 2118.1 | 2118.1 | 24.0 | False | None | None | False | None | False | 50834.4 | 0 | 3052753 | 103350 | None | PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66" Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 128.62 | 128.62 | 17.09 | False | None | None | False | None | False | 2198.1158 | 0 | 3052754 | 103350 | None | PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63"Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Per cm Height Per Letter | 1.06 | 1.06 | 180.0 | False | None | None | False | None | False | 190.8 | 0 | 3052755 | 103350 | None | PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 12 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129"
(rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 2256.16 | 2256.16 | 25.87 | False | None | None | False | None | False | 58366.8592 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District.-Pipe culvert | 1377917.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052756 | 103351 | None | PWD 2023-24 vol- 3, Item No: 2.11 , Page No: 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead
II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5()ii)a , Page No: 9"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 212.4 | 212.4 | 18.24 | False | None | None | False | None | False | 3874.176 | 0 | 3052757 | 103351 | None | PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 1293.28 | 1293.28 | 20.0 | False | None | None | False | None | False | 25865.6 | 0 | 3052758 | 103351 | None | PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 120.36 | 120.36 | 81.73 | False | None | None | False | None | False | 9837.0228 | 0 | 3052759 | 103351 | None | PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15"(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 7067.02 | 7067.02 | 9.12 | False | None | None | False | None | False | 64451.2224 | 0 | 3052760 | 103351 | None | PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.
All other type of structures
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | t | 93232.98 | 93232.98 | 0.5 | False | None | None | False | None | False | 46616.49 | 0 | 3052761 | 103351 | None | PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 8058.03 | 8058.03 | 81.26 | False | None | None | False | None | False | 654795.5178 | 0 | 3052762 | 103351 | None | PWD 2023-24 vol- 3, Item No: 9.1.ii , Page No: 87 | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets . (i). 1200 mm dia
Schedule of Rates PWD 2023-24 vol- 3, Item No: 9.1.ii , Page No: 87"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 12705.06 | 12705.06 | 25.0 | False | None | None | False | None | False | 317626.5 | 0 | 3052763 | 103351 | None | PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 1378.24 | 1378.24 | 26.25 | False | None | None | False | None | False | 36178.8 | 0 | 3052764 | 103351 | None | PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 2895.72 | 2895.72 | 15.3 | False | None | None | False | None | False | 44304.516 | 0 | 3052765 | 103351 | None | PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 12 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 2256.16 | 2256.16 | 44.38 | False | None | None | False | None | False | 100128.3808 | 0 | 3052766 | 103351 | None | PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 3158.86 | 3158.86 | 22.19 | False | None | None | False | None | False | 70095.1034 | 0 | 3052767 | 103351 | None | PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 128.62 | 128.62 | 29.25 | False | None | None | False | None | False | 3762.135 | 0 | 3052768 | 103351 | None | PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Per cm Height Per Letter | 1.06 | 1.06 | 360.0 | False | None | None | False | None | False | 381.6 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-electric pole shifting | 653259.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052769 | 103352 | None | SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43 | Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 742.22 | 742.22 | 115.0 | False | None | None | False | None | False | 85355.3 | 0 | 3052770 | 103352 | None | PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44 | Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 1313.34 | 1313.34 | 115.0 | False | None | None | False | None | False | 151034.1 | 0 | 3052771 | 103352 | None | SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43 | Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC
supports as per approved Drawing - Ordinary Soil
PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 742.22 | 742.22 | 115.0 | False | None | None | False | None | False | 85355.3 | 0 | 3052772 | 103352 | None | PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44 | Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary
Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code
2.02, pg. no. 44(Rate inclusive of GST 18 percent ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 1313.34 | 1313.34 | 115.0 | False | None | None | False | None | False | 151034.1 | 0 | 3052773 | 103352 | None | PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45 | Fixing of V-Shape/Horizontal cross arm including single top support Braces and
Insulators fixing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive
of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 303.26 | 303.26 | 115.0 | False | None | None | False | None | False | 34874.9 | 0 | 3052774 | 103352 | None | PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44 |
Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and
Insulators fixing. (Without Single Top Support) - Ordinary Soil
PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 188.8 | 188.8 | 115.0 | False | None | None | False | None | False | 21712.0 | 0 | 3052775 | 103352 | None | PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44 | Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code
1.7.1, pg. no. 44(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 385.86 | 385.86 | 115.0 | False | None | None | False | None | False | 44373.9 | 0 | 3052776 | 103352 | None | PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44 | Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing.
(Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no.
44(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Nos | 313.88 | 313.88 | 115.0 | False | None | None | False | None | False | 36096.2 | 0 | 3052777 | 103352 | None | PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 | Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD
Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Set | 188.8 | 188.8 | 115.0 | False | None | None | False | None | False | 21712.0 | 0 | 3052778 | 103352 | None | PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 | Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil PWD
Elec SR 2023-24 Item Code 5.2, pg. no. 44(Rate inclusive of GST 18 percent)
---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Km | 188.8 | 188.8 | 115.0 | False | None | None | False | None | False | 21712.0 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District.-water supply shifting | 483903.84 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052779 | 103353 | None | SR PWD 2023-24 vol- 1, Item No: 1.17.1,Page No: 10 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated
earth locally for the work etc., and all other appurtenances complete in the following strata. (Rates Inclusive of GST 18 Percent)
(i) All kinds of soils. Depth upto 1.50 m
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.17.1, Page No: 10 ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 309.16 | 309.16 | 324.0 | False | None | None | False | None | False | 100167.84 | 0 | 3052780 | 103353 | None | PWD 2023-24 vol- 5, Item No: 9.2.3, Page No: 96 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0.
HDPE Grade PE80-PN8.0,90mm dia
Schedule of Rates PWD 2023-24 vol- 5, Item No: 9.2.3, Page No: 96"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 450.76 | 450.76 | 600.0 | False | None | None | False | None | False | 270456.0 | 0 | 3052781 | 103353 | None | PWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour
complete as per specifications
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 188.8 | 188.8 | 600.0 | False | None | None | False | None | False | 113280.0 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District.-1st year maintainance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052782 | 103354 | None | PWD 2023-24 vol- 3, Item No: 2.5(ii)a Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9 rate inclusive GST 18 Percent (net quantity 19.50 sqm) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 | 3052783 | 103354 | None | vol- 3ItemNo16.19PageNo147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 rate inclusive of GST 18 percent (net quantity 1950 m) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 | 3052784 | 103354 | None | vol- 3ItemNo10.3PageNo91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (net quantity 292.50 sqm) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052785 | 103354 | None | vol- 3ItemNo10.2PageNo91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (net quantity 975 sqm) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 | 3052786 | 103354 | None | vol- 3ItemNo10.5PageNo91 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91(net quantity 0)(Have to rectify irrespective of quantity) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 | 3052787 | 103354 | None | vol- 1ItemNo1.12PageNo8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(net quantity 630 cum) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District.-2nd year maintainance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052788 | 103355 | None | vol- 3ItemNo2.5PageNo9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No2.(ii)a, Page No: rate inclusive of GST 18 percent( net quantity 29.25 sqm) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052789 | 103355 | None | vol- 3ItemNo16.19PageNo147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (net quantity 2600 m) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052790 | 103355 | None | vol- 3ItemNo10.3PageNo91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91(net quantity 292.50) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052791 | 103355 | None | vol- 3ItemNo10.2PageNo91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91(net quantity 975 sqm) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052792 | 103355 | None | vol- 3ItemNo10.5PageNo91 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91(net quantity 0)(have to rectify irrespective of quantity) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3052793 | 103355 | None | vol- 1ItemNo1.12PageNo8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (net quantity 630 cum) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-3rd year maintainance | 383406.36 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052794 | 103356 | None | 24 vol- 3, Item No: 2.5 , Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii)a, Page No: 9"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 519.39 | 519.39 | 29.25 | False | None | None | False | None | False | 15192.1575 | 0 | 3052795 | 103356 | None | PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 7.93 | 7.93 | 2600.0 | False | None | None | False | None | False | 20618.0 | 0 | 3052796 | 103356 | None | PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 51.54 | 51.54 | 292.5 | False | None | None | False | None | False | 15075.45 | 0 | 3052797 | 103356 | None | PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 128.19 | 128.19 | 975.0 | False | None | None | False | None | False | 124985.25 | 0 | 3052798 | 103356 | None | PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 563.0 | 563.0 | 124.25 | False | None | None | False | None | False | 69952.75 | 0 | 3052799 | 103356 | None | PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Km | 2622.05 | 2622.05 | 3.55 | False | None | None | False | None | False | 9308.2775 | 0 | 3052800 | 103356 | None | PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Km | 272.25 | 272.25 | 3.55 | False | None | None | False | None | False | 966.4875 | 0 | 3052801 | 103356 | None | PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 | NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 125.55 | 125.55 | 630.0 | False | None | None | False | None | False | 79096.5 | 0 | 3052802 | 103356 | None | PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 | Painting on Parapet Walls of CD Work:
Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 144.05 | 144.05 | 304.5 | False | None | None | False | None | False | 43863.225 | 0 | 3052803 | 103356 | None | PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 | Painting on Parapet Walls of CD Work:
Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Per cm Height Per Letter | 1.19 | 1.19 | 3654.0 | False | None | None | False | None | False | 4348.26 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-4th year maintainance | 351882.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052804 | 103357 | None | PWD 2023-24 vol- 3, Item No: 2.5 (ii) a , Page No: | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 537.94 | 537.94 | 29.25 | False | None | None | False | None | False | 15734.745 | 0 | 3052805 | 103357 | None | PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 8.21 | 8.21 | 2840.0 | False | None | None | False | None | False | 23316.4 | 0 | 3052806 | 103357 | None | PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 53.38 | 53.38 | 319.5 | False | None | None | False | None | False | 17054.91 | 0 | 3052807 | 103357 | None | PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 132.77 | 132.77 | 1065.0 | False | None | None | False | None | False | 141400.05 | 0 | 3052808 | 103357 | None | PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 583.11 | 583.11 | 124.25 | False | None | None | False | None | False | 72451.4175 | 0 | 3052809 | 103357 | None | PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 | NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 130.04 | 130.04 | 630.0 | False | None | None | False | None | False | 81925.2 | 0 |
| 1710343436000 | 0 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-5th year maintainance | 438957.24 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052810 | 103358 | None | PWD 2023-24 vol- 3, Item No: 2.5 (ii) a ,Page No:9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5(ii)a , Page No: 9"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | 100 Sqm | 556.49 | 556.49 | 29.25 | False | None | None | False | None | False | 16277.3325 | 0 | 3052811 | 103358 | None | PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | m | 8.49 | 8.49 | 2840.0 | False | None | None | False | None | False | 24111.6 | 0 | 3052812 | 103358 | None | PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor.
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 55.22 | 55.22 | 319.5 | False | None | None | False | None | False | 17642.79 | 0 | 3052813 | 103358 | None | PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 137.35 | 137.35 | 1065.0 | False | None | None | False | None | False | 146277.75 | 0 | 3052814 | 103358 | None | PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 | Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 603.22 | 603.22 | 248.5 | False | None | None | False | None | False | 149900.17 | 0 | 3052815 | 103358 | None | PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 | NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8"
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 134.52 | 134.52 | 630.0 | False | None | None | False | None | False | 84747.6 | 0 |
| 1710343436000 | 1 | None | None | Roads | Pkg 750 Improvements to road from Kengal (on NH275) to Alur (on SH110L) via Kanva, Huliyurdurga, Yadiyur (NH 75) Mayasandra, Turvekere, Soravanahalli, (NH 150A) Bochihalli, Talkere, Aralikere Palya, Vishwanathpur (NH 150A), Edigarahatti, Doddakanagal Road SH-275 from Ch 91.00 KM to 97.90 KM (in selected reahes) in Turuvekere Taluk of Tumakuru District-6th year Overlay | 13903750.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3052816 | 103359 | None | PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Km | 2902.99 | 2902.99 | 3.55 | False | None | None | False | None | False | 10305.6145 | 0 | 3052817 | 103359 | None | PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 14 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 148
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Km | 301.42 | 301.42 | 3.55 | False | None | None | False | None | False | 1070.041 | 0 | 3052818 | 103359 | None | PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 | Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 159.49 | 159.49 | 46.34 | False | None | None | False | None | False | 7390.7666 | 0 | 3052819 | 103359 | None | PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Per cm Height Per Letter | 1.32 | 1.32 | 540.0 | False | None | None | False | None | False | 712.8 | 0 | 3052820 | 103359 | None | PWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 17.56 | 17.56 | 25945.0 | False | None | None | False | None | False | 455594.2 | 0 | 3052821 | 103359 | None | PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 | Bituminous Concrete Grading II for traffic less than 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30at 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Cum | 16027.89 | 16027.89 | 778.35 | False | None | None | False | None | False | 12475308.1815 | 0 | 3052822 | 103359 | None | PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | Sqm | 775.5 | 775.5 | 827.15 | False | None | None | False | None | False | 641454.825 | 0 | 3052823 | 103359 | None | PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74
(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST | No | 534.1 | 534.1 | 584.0 | False | None | None | False | None | False | 311914.4 | 0 |
|
|
---|