noticeInvitingTenderDTO
createdTs1710354775754
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1456000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate14-03-2024 04:01:31
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1356000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710354775783
version9
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT10479
titlePKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.
descriptionPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.
categoryWORKS
categoryTextWorks
ecv97092477.62
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount100000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-813/TMK/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-road construction63533219.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056093103555Nonevol- 3ItemNo16.29PageNo149Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25m x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 (rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNo18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3056094103555Nonevol- 3ItemNo3.5PageNo17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm7.087.0811375.0FalseNoneNoneFalseNoneFalse80535.00
3056095103555Nonevol- 3ItemNo2.5(ii) APageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) A, Page No: 9 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm463.74463.7449.63FalseNoneNoneFalseNoneFalse23015.41620
3056096103555Nonevol- 1ItemNo1.12PageNo8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum112.1112.116354.42FalseNoneNoneFalseNoneFalse1833330.4820
3056097103555Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm7.087.085020.0FalseNoneNoneFalseNoneFalse35541.60
3056098103555Nonevol- 3ItemNo4.2 (v)PageNo23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum2783.622783.624510.95FalseNoneNoneFalseNoneFalse12556770.6390
3056099103555Nonevol- 3ItemNo4.17PageNo26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum3019.623019.624264.78FalseNoneNoneFalseNoneFalse12878014.98360
3056100103555Nonevol- 3ItemNo5.1 A (I)PageNo31Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm48.3848.3816527.14FalseNoneNoneFalseNoneFalse799583.03320
3056101103555Nonevol- 3ItemNo5.4PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm16.5216.5216527.14FalseNoneNoneFalseNoneFalse273028.35280
3056102103555Nonevol- 3ItemNo5.12 (C)PageNo35Dense Graded Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.12 (C) , Page No: 35 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum11149.8211149.82826.35FalseNoneNoneFalseNoneFalse9213653.7570
3056103103555Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic less than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum12925.7212925.72495.83FalseNoneNoneFalseNoneFalse6408959.74760
3056104103555Nonevol- 3ItemNo3.6PageNo17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum581.74581.744092.22FalseNoneNoneFalseNoneFalse2380608.06280
3056105103555Nonevol- 3, Item No: 6.1 , Page No: 49Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. Schedule of Rates PWD 2023-24 vol- 3, Item No: 6.1 , Page No: 49 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum5805.65805.6700.0FalseNoneNoneFalseNoneFalse4063920.00
3056106103555Nonevol- 3, Item No: 6.5 , Page No 50Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid using Paver Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing. Schedule of Rates PWD 2023-24 vol- 3, Item No: 6.5 , Page No: 50 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum9250.029250.021400.0FalseNoneNoneFalseNoneFalse12950028.00
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-Road furnitures2128221.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056107103556Nonevol- 3ItemNo8.16 (ii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (ii) , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3056108103556Nonevol- 3ItemNo8.16 (iii)PageNo67Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (iii) , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach993.56993.5615.0FalseNoneNoneFalseNoneFalse14903.40
3056109103556Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67(Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm625.4625.4818.85FalseNoneNoneFalseNoneFalse512108.790
3056110103556Nonevol- 3ItemNo8.5 iiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 ii , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach5527.125527.1223.0FalseNoneNoneFalseNoneFalse127123.760
3056111103556Nonevol- 3ItemNo8.5 iiiPageNo65Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 75 cm equilateral triangle Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 iii , Page No: 65 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach4809.684809.6812.0FalseNoneNoneFalseNoneFalse57716.160
3056112103556Nonevol- 3ItemNo8.5 xvPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 xv , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach7672.367672.364.0FalseNoneNoneFalseNoneFalse30689.440
3056113103556Nonevol- 3ItemNo8.5 xiiPageNo64Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xii) 60 cm x 45 cm rectangular Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.5 xii , Page No: 64 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach4984.324984.3264.0FalseNoneNoneFalseNoneFalse318996.480
3056114103556Nonevol- 3ItemNo8.7PageNo65Direction and Place Identification Signs upto 0.9 m2 SizeBoard. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.7 , Page No: 65 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm10631.810631.811.7FalseNoneNoneFalseNoneFalse124392.060
3056115103556Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74(Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNo430.7430.7728.0FalseNoneNoneFalseNoneFalse313549.60
3056116103556Nonevol- 3ItemNo8.17PageNo67Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.17 , Page No: 67 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTEach2384.782384.7820.0FalseNoneNoneFalseNoneFalse47695.60
3056117103556Nonevol- 3ItemNo8.31PageNo71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.31 , Page No: 71 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm221.84221.84165.0FalseNoneNoneFalseNoneFalse36603.60
3056118103556Nonevol- 3ItemNo8.60.2 iiPageNo80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.60.2 ii , Page No: 80(Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNo53635.7253635.726.0FalseNoneNoneFalseNoneFalse321814.320
3056119103556Nonevol- 3ItemNo8.29 (i)PageNo71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29 (i) , Page No: 71(Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm2610.162610.1680.0FalseNoneNoneFalseNoneFalse208812.80
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-RCC Drain12339560.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056120103557Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11 (ii) A, Page No: 10 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum212.4212.479.92FalseNoneNoneFalseNoneFalse16975.0080
3056121103557Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum120.36120.362538.0FalseNoneNoneFalseNoneFalse305473.680
3056122103557Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum7067.027067.02264.9FalseNoneNoneFalseNoneFalse1872053.5980
3056123103557Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTTonne93232.9893232.9833.54FalseNoneNoneFalseNoneFalse3127034.14920
3056124103557Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum7461.147461.14219.2FalseNoneNoneFalseNoneFalse1635481.8880
3056125103557Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum10072.5410072.54324.6FalseNoneNoneFalseNoneFalse3269546.4840
3056126103557Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum8953.378953.37236.0FalseNoneNoneFalseNoneFalse2112995.320
17103547760001NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-box culvert7585073.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056127103558Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11 (ii) A, Page No: 10 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum212.4212.444.59FalseNoneNoneFalseNoneFalse9470.9160
3056128103558Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum120.36120.36696.64FalseNoneNoneFalseNoneFalse83847.59040
3056129103558Nonevol- 1ItemNo2.1.5PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.5 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum7067.027067.02100.83FalseNoneNoneFalseNoneFalse712567.62660
3056130103558Nonevol- 1ItemNo2.11 HPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTTonne93232.9893232.9822.94FalseNoneNoneFalseNoneFalse2138764.56120
3056131103558Nonevol- 1ItemNo2.4.3PageNo15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum8971.778971.77103.89FalseNoneNoneFalseNoneFalse932077.18530
3056132103558Nonevol- 1ItemNo2.5.2PageNo16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 16 (Rate inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum9689.699689.6927.3FalseNoneNoneFalseNoneFalse264528.5370
3056133103558Nonevol- 1ItemNo2.4.3PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.3 , Page No: 16 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum8074.68074.681.69FalseNoneNoneFalseNoneFalse659614.0740
3056134103558Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum3158.863158.86125.98FalseNoneNoneFalseNoneFalse397953.18280
3056135103558Nonevol- 1ItemNo2.2.1PageNo15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.2.1 , Page No: 15 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum7418.667418.66129.75FalseNoneNoneFalseNoneFalse962571.1350
3056136103558Nonevol- 3ItemNo13.8PageNo121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.8 , Page No: 121(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum8036.988036.9821.0FalseNoneNoneFalseNoneFalse168776.580
3056137103558Nonevol- 3ItemNo13.9PageNo122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.9 , Page No: 122 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum13965.313965.363.0FalseNoneNoneFalseNoneFalse879813.90
3056138103558Nonevol- 3ItemNo13.2PageNo121Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum16485.7816485.785.62FalseNoneNoneFalseNoneFalse92650.08360
3056139103558Nonevol- 3ItemNo13.16PageNo124Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.16 , Page No: 124(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm2118.12118.160.0FalseNoneNoneFalseNoneFalse127086.00
3056140103558Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm128.62128.6256.03FalseNoneNoneFalseNoneFalse7206.57860
3056141103558Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTPer cm Height Per Letter1.061.06900.0FalseNoneNoneFalseNoneFalse954.00
3056142103558Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum2256.162256.1665.24FalseNoneNoneFalseNoneFalse147191.87840
17103547760001NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-pipe culvert1148715.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056143103559Nonevol- 3ItemNo2.11(ii)APageNo10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead II) By Mechanical means, A) Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.11 (ii) A, Page No: 10 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum212.4212.412.0FalseNoneNoneFalseNoneFalse2548.80
3056144103559Nonevol- 3ItemNo2.17 (ix) BPageNo11Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm1293.281293.2815.0FalseNoneNoneFalseNoneFalse19399.20
3056145103559Nonevol- 1ItemNo1.14.1PageNo8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum120.36120.3666.03FalseNoneNoneFalseNoneFalse7947.37080
3056146103559Nonevol- 1ItemNo2.1.3PageNo15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum7067.027067.027.08FalseNoneNoneFalseNoneFalse50034.50160
3056147103559Nonevol- 1ItemNo2.11 hPageNo18Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTTonne93232.9893232.980.86FalseNoneNoneFalseNoneFalse80180.36280
3056148103559Nonevol- 1ItemNo2.4.2PageNo16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 16 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum8058.038058.0360.97FalseNoneNoneFalseNoneFalse491298.08910
3056149103559Nonevol- 3ItemNo9.1.iiPageNo87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . (i). 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No: 9.1.ii , Page No: 87 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm12705.0612705.0620.0FalseNoneNoneFalseNoneFalse254101.20
3056150103559Nonevol- 3ItemNo12.3APageNo117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum1378.241378.2421.87FalseNoneNoneFalseNoneFalse30142.10880
3056151103559Nonevol- 3ItemNo14.2PageNo129Boulder Apron Laid in Wire Crates Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum2895.722895.7213.5FalseNoneNoneFalseNoneFalse39092.220
3056152103559Nonevol- 3ItemNo14.4(a)PageNo129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum2256.162256.1644.38FalseNoneNoneFalseNoneFalse100128.38080
3056153103559Nonevol- 3ItemNo12.4PageNo117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.4 , Page No: 117 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum3158.863158.8622.19FalseNoneNoneFalseNoneFalse70095.10340
3056154103559Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm128.62128.6222.55FalseNoneNoneFalseNoneFalse2900.3810
3056155103559Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTPer cm Height Per Letter1.061.06800.0FalseNoneNoneFalseNoneFalse848.00
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-Electric pole shifting738467.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056156103560NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil (SR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos742.22742.22130.0FalseNoneNoneFalseNoneFalse96488.60
3056157103560NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of PSC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil.PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos1313.341313.34130.0FalseNoneNoneFalseNoneFalse170734.20
3056158103560NoneSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43Digging of Pits 1.8 mtr depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC supports as per approved Drawing - Ordinary Soil PWDSR 2023-24, Vol-6, Item Code- 1.1.1, Page No-43)(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos742.22742.22130.0FalseNoneNoneFalseNoneFalse96488.60
3056159103560NonePWD Elec SR 2023-24 Item Code 2.02, pg. no. 44Erection of RCC poles 9 to 10 mtr long but in a pit of 1.8 mtr depth. - Ordinary Soil (material code-"02 00 105-RCC Pole-9.0M Long 145 kg WL)PWD Elec SR 2023-24 Item Code 2.02, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos1313.341313.34130.0FalseNoneNoneFalseNoneFalse170734.20
3056160103560NonePWD Elec SR 2023-24 Item Code 5.03, pg. no. 45Fixing of V-Shape/Horizontal cross arm including single top support Braces and Insulators fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.03, pg. no. 45(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSet303.26303.26130.0FalseNoneNoneFalseNoneFalse39423.80
3056161103560NonePWD Elec SR 2023-24 Item Code 5.04, pg. no. 44Fixing of V-Shape/Horizontal cross arm for DC Line including Braces and Insulators fxing. (Without Single Top Support) - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.04, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNo188.8188.8130.0FalseNoneNoneFalseNoneFalse24544.00
3056162103560NonePWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44Digging of Pit for GUY SET - Ordinary Soil.PWD Elec SR 2023-24 Item Code 1.7.1, pg. no. 44(Rate inclusive of GST 18 percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos385.86385.86130.0FalseNoneNoneFalseNoneFalse50161.80
3056163103560NonePWD Elec SR 2023-24 Item Code 5.10, pg. no. 44Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanized steel wire with turn buckle and anchoring arrangement as per approved drawing. (Excluding excavation of PIT) - Ordinary Soil.PWD Elec SR 2023-24 Item Code 5.10, pg. no. 44 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos313.88313.88130.0FalseNoneNoneFalseNoneFalse40804.40
3056164103560NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos188.8188.8130.0FalseNoneNoneFalseNoneFalse24544.00
3056165103560NonePWD Elec SR 2023-24 Item Code 5.2, pg. no. 44Fixing of 4 Pin cross arm with insulator and Braces fxing. - Ordinary Soil PWD Elec SR 2023-24 Item Code 5.2, pg. no. 44 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNos188.8188.8130.0FalseNoneNoneFalseNoneFalse24544.00
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-water supply pipeline shifting1007521.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056166103561Nonevol1ItemNo1.17.1PageNo10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. (Rates Inclusive of GST 18 Percent) (i) All kinds of soils. Depth upto 1.50 m ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum309.16309.16756.0FalseNoneNoneFalseNoneFalse233724.960
3056167103561Nonevol5ItemNo9.2.3PageNo96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest amendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0. HDPE Grade PE80-PN8.0,90mm dia Schedule of Rates PWD 2023-24 vol- 5, Item No: 9.2.3, Page No: 96 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum450.76450.761400.0FalseNoneNoneFalseNoneFalse631064.00
3056168103561NoneVol1Itemno1.10Page No7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications. Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.10 , Page No: 7 (Rates inclusive of GSt 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum188.8188.8756.0FalseNoneNoneFalseNoneFalse142732.80
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-1st year maintainanace0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056169103562Nonevol- 3ItemNo2.5PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (net qty=15.06) Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3056170103562Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Net Qty = 1506) Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3056171103562Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. (Net Qty=225.30) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056172103562Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment (Net Qty=753) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3056173103562Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Net Qty=0) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Have to Rectify Irrespective of Quantity) (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3056174103562Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (Net Qty=450) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-2nd year maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056175103563Nonevol- 3ItemNo2.5(ii)APageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Net Qty=22.59) Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 (ii) a , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056176103563Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Net Qty=2008) Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056177103563Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. (Net Qty=225.9) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056178103563Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment (Net qty=753) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056179103563Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (Net Qty=0) Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Have to Rectify Irrespective of Quantity) (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3056180103563Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (Net Qty=450) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17103547760001NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-3rd year maintainance273953.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056181103564Nonevol- 3ItemNo2.5PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm519.39519.3922.59FalseNoneNoneFalseNoneFalse11733.02010
3056182103564Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm7.937.932008.0FalseNoneNoneFalseNoneFalse15923.440
3056183103564Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm51.5451.54225.9FalseNoneNoneFalseNoneFalse11642.8860
3056184103564Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm128.2128.2753.0FalseNoneNoneFalseNoneFalse96534.60
3056185103564Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm563.0563.069.02FalseNoneNoneFalseNoneFalse38858.260
3056186103564Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTKm2622.052622.053.21FalseNoneNoneFalseNoneFalse8416.78050
3056187103564Nonevol- 3ItemNo16.24iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTKm272.25272.253.21FalseNoneNoneFalseNoneFalse873.92250
3056188103564Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum125.55125.55450.0FalseNoneNoneFalseNoneFalse56497.50
3056189103564Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm144.05144.05217.5FalseNoneNoneFalseNoneFalse31330.8750
3056190103564Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates Inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTPer cm Height Per Letter1.191.191800.0FalseNoneNoneFalseNoneFalse2142.00
17103547760001NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-4th year maintainance239436.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056191103565Nonevol- 3ItemNo2.5PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm537.94537.9422.59FalseNoneNoneFalseNoneFalse12152.06460
3056192103565Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm8.218.212008.0FalseNoneNoneFalseNoneFalse16485.680
3056193103565Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm53.3853.38225.9FalseNoneNoneFalseNoneFalse12058.5420
3056194103565Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm132.77132.77753.0FalseNoneNoneFalseNoneFalse99975.810
3056195103565Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm583.11583.1169.02FalseNoneNoneFalseNoneFalse40246.25220
3056196103565Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8(Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum130.04130.04450.0FalseNoneNoneFalseNoneFalse58518.00
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District-5th year maintainance289346.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056197103566Nonevol- 3ItemNo2.5PageNo9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 , Page No: 9 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GST100 Sqm556.49556.4922.59FalseNoneNoneFalseNoneFalse12571.10910
3056198103566Nonevol- 3ItemNo16.19PageNo147Maintenance of Drains The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTm8.58.52008.0FalseNoneNoneFalseNoneFalse17068.00
3056199103566Nonevol- 3ItemNo10.3PageNo91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.3 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm55.2255.22225.9FalseNoneNoneFalseNoneFalse12474.1980
3056200103566Nonevol- 3ItemNo10.2PageNo91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm137.35137.35753.0FalseNoneNoneFalseNoneFalse103424.550
3056201103566Nonevol- 3ItemNo10.5PageNo91Filling Pot-holes and Patch Repairs with Open-Graded Premix surfacing, 20mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm603.22603.22138.05FalseNoneNoneFalseNoneFalse83274.5210
3056202103566Nonevol- 1ItemNo1.12PageNo8NALA TRAINING: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum134.52134.52450.0FalseNoneNoneFalseNoneFalse60534.00
17103547760000NoneNoneRoadsPKG 813 Improvements to road Kyathsandra-Belagumba MDR from Ch 0.00 KM to 4.00 KM of (in selected reahes) in Tumkur Taluk of Tumkur District.-6th year maintainance7808961.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3056203103567Nonevol- 3ItemNo16.22PageNo147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTKm2902.992902.993.21FalseNoneNoneFalseNoneFalse9318.59790
3056204103567Nonevol- 3ItemNo16.24 iPageNo148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 148 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTKm301.42301.423.21FalseNoneNoneFalseNoneFalse967.55820
3056205103567Nonevol- 3ItemNo8.1PageNo66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.1 , Page No: 66 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm159.49159.4978.58FalseNoneNoneFalseNoneFalse12532.72420
3056206103567Nonevol- 3ItemNo8.4PageNo63Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTPer cm Height Per Letter1.321.32900.0FalseNoneNoneFalseNoneFalse1188.00
3056207103567Nonevol- 3ItemNo5.3PageNo31Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm17.5617.5613805.0FalseNoneNoneFalseNoneFalse242415.80
3056208103567Nonevol- 3ItemNo5.16 CPageNo38Bituminous Concrete Grading II for traffic more than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTCum16027.8916027.89414.15FalseNoneNoneFalseNoneFalse6637950.64350
3056209103567Nonevol- 3ItemNo8.15PageNo67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTSqm775.5775.5665.1FalseNoneNoneFalseNoneFalse515785.050
3056210103567Nonevol- 3ItemNo8.43PageNo74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74 (Rates inclusive of GST 18 Percent) ---- All the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the work Rates inclusive of GSTNo534.07534.07728.0FalseNoneNoneFalseNoneFalse388802.960
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103547790001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptableNone
17103547790001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17103547790001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103607670000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103607770000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103607940000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidderNone
17103608020000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103608340000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17103608470000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103608590000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103608700000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I RegistrationNone
17103608810000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103608910000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103609080000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103609200000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103609310000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103609420000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103609490000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103609560000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103609640000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17103609710000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17103609860000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17103609940000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17103610030000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17103610160000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.485.46 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent, Bill copies shall not be accepted
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 22024.94 Cum 2. GSB/WMM : 7020.60 Cum 3. BM/SDBC/DBM/BC : 1389.07 Cum 4 PCC/DLC M10 & M15 : 875.05 Cum 5 Pavement Quality Concrete (PQC) M30/M40 : 1120.00 Cum 6. Reinforced Cement Concrete (RCC) M20 & higher grades :821.20 cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate:(ii) Machineries could be on Lease/Hire:1.Wet Mix Plant / Pug mill : 1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4..Excavator 0.90 Cum Bucket Capacity:2 No 5.Tipper Trucks:3 Nos 6.Self Loading Concrete Mixer 2 M3 Capacity:1 No 7.Water Tanker: 2 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No 2.Mechanical Paver Finisher:1 No 3. Static Road Roller: 1 No. 4. Vibratory Road Roller: 1 No. 5. Tippers:4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.1941.84 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs 291.28 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAffidavitOthersAffidavit
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOTHERS
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersOthers
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
EPF registrationFalseTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710362176000
version0
createdDateNone
modifiedDateNone
blockNumberOFFICE OF THE CHIEF PROJECT OFFICER, PROJECT IMPLEMENTAION UNIT, STATE HIGHWAY DEVELOPMENT PROJECT, PWD ANNEX BUILDING, K R CIRCLE , BENGALURU
streetNone
cityBENGALURU
stateKarnataka
pin560001
tenderRecallDTONone