tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710334518000 | 0 | None | None | Roads | Pkg-792 Hunsur Taluk of Mysuru District | 65337324.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3048954 | 103090 | None | 2.5(ii)a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5(ii)a / Page No. 9) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 463.74 | 463.74 | 72.48 | False | None | None | False | None | False | 33611.8752 | 0 | 3048955 | 103090 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges 2023-24 ( Item No.VOL-III-3.5 / Page No. 17) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 14700.0 | False | None | None | False | None | False | 104076.0 | 0 | 3048956 | 103090 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-1.12 / Page No. 8) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 1503.01 | False | None | None | False | None | False | 168487.421 | 0 | 3048957 | 103090 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SR-2023-24 ( Item No.VOL-I-1.12 / Page No. 8)
Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 3487.32 | False | None | None | False | None | False | 390928.572 | 0 | 3048958 | 103090 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-3.6 / Page No.17) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 4142.57 | False | None | None | False | None | False | 581699.6794 | 0 | 3048959 | 103090 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Common SR-2023-24 ( Item No.VOL-I-1.8 / Page No. 07) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 559.32 | 559.32 | 8208.05 | False | None | None | False | None | False | 4590926.526 | 0 | 3048960 | 103090 | None | 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-3.6 / Page No.17) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 5560.1 | False | None | None | False | None | False | 3234532.574 | 0 | 3048961 | 103090 | None | 4.2b(v) | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-4.2-B (v) / Page No. 23) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 5016.98 | False | None | None | False | None | False | 13965365.8676 | 0 | 3048962 | 103090 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-4.17 / Page No. 26) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 6105.3 | False | None | None | False | None | False | 18435685.986 | 0 | 3048963 | 103090 | None | 5.1-A-i | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges-2023-24 ( Item No.VOL-III-5.1-A-i / Page No. 31) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 23592.2 | False | None | None | False | None | False | 1141390.636 | 0 | 3048964 | 103090 | None | 5.4.ii | Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.4-ii/ Page No. 31) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 23592.2 | False | None | None | False | None | False | 389743.144 | 0 | 3048965 | 103090 | None | 5.12-C | Dense Graded Bituminous Macadam Grading - II for traffic Less than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, at 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Schedule of Rates MORTH Specification No. 201 Voume-3 Schedule of Rates PW,P & IWTD,Mysore Circle 2023-24 (Item No.5.12-C VOL-III- /PageNo. 35) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 1179.61 | False | None | None | False | None | False | 13152439.1702 | 0 | 3048966 | 103090 | None | 5.16-C | Bituminous Concrete Grading II for traffic Less thand 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, at 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Schedule of Rates MORTH Specification No. 201 Voume-3 Schedule of Rates PW,P & IWTD,Mysore Circle 2023-24 (Item No.5.16(C) VOL-III-/PageNo. 38) Rates are inclusive of GST 18 percent
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 707.77 | False | None | None | False | None | False | 9148436.8444 | 0 |
| 1710334518000 | 0 | None | None | Roads | CONSTRUCTION OF RCC SIDE DRAINS | 7124781.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3048967 | 103091 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 1074.14 | False | None | None | False | None | False | 129283.4904 | 0 | 3048968 | 103091 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD Common SoR for Engineering Departments - 2023-24 ( Item No.VOL-I-2.1.3 / Page No. 15)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 130.2 | False | None | None | False | None | False | 920126.004 | 0 | 3048969 | 103091 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-I-2.4.2 / Page No. 16)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10072.54 | 10072.54 | 412.3 | False | None | None | False | None | False | 4152908.242 | 0 | 3048970 | 103091 | None | 2.11-h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. All other type of structuresPWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-I-2.11 h / Page No. 18)Rates are inclusive GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 20.62 | False | None | None | False | None | False | 1922464.0476 | 0 |
| 1710334518000 | 0 | None | None | Roads | Sub Estimates of Road Furniture | 4377381.1 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3048971 | 103092 | None | 8.15 | Providing and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35 2015.The finished surface to be level, uniform and free from streaks and holes. Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.15/ Page No. 67) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 784.0 | False | None | None | False | None | False | 490313.6 | 0 | 3048972 | 103092 | None | 16.29 | The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate,SHDP logo on top plate shall be as per clause 1701.4.6 nessages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Rate inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3048973 | 103092 | None | 8.5.A.iv | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC 67 2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below round level as per approved drawing.The sign shall be maintained as per section 12 of IRC 67 2022. 60cm equilateral triangle. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SoR for Roads & Bridges-2023-24 Page No.54 Item No.VOL-III-8.5 A (ii) Page No. 65)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5665.18 | 5665.18 | 18.0 | False | None | None | False | None | False | 101973.24 | 0 | 3048974 | 103092 | None | 8.5.A.viii | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 803.1, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022. . 60 cm 60 cm circular- TYPE XI Schedule of Rates Volume -3 PW,P & IWTD, Mysore Circle 2023-24Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5070.46 | 5070.46 | 2.0 | False | None | None | False | None | False | 10140.92 | 0 | 3048975 | 103092 | None | 8.5.A.ii | Providing and fixing of retro- reflectorised cautionary,
mandatory and informatory sign as per IRC:67:2022 made
of Class B Type IV retro reflective sheeting fixed over 2 mm
thick aluminium sheeting vide clause 803.1, 3mm/4mm thick
Aluminium composite material sheet depending on the size of
the sign fixed over the back support frame of min 25 x 25 x
3mm angle mounted on a mild steel circular pipe 65 NB, 3.2
mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cm
x 45 cm x 60 cm, 60 cm below ground level as per approved
drawing.The sign shall be maintained as per section 12 of
IRC:67:2022. . 90 cm High Octagon TYPE XI Schedule of Rates Volume -3 PW,P & IWTD,Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 7672.36 | 7672.36 | 2.0 | False | None | None | False | None | False | 15344.72 | 0 | 3048976 | 103092 | None | 8.7 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC 67 2012 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing. Direction and Place Identification Signs upto 0.9 m2 Size Board. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2021-22 ( Item No.VOL-III-8.7 / Page No. 55)PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.7 / Page No. 65)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 2.7 | False | None | None | False | None | False | 28705.86 | 0 | 3048977 | 103092 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.43 / Page No. 74)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 430.7 | 430.7 | 522.0 | False | None | None | False | None | False | 224825.4 | 0 | 3048978 | 103092 | None | 8.16ii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC 8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast). etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.16-ii / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3453.86 | 3453.86 | 4.0 | False | None | None | False | None | False | 13815.44 | 0 | 3048979 | 103092 | None | 8.16iii | Reinforced cement concrete M15grade kilometre stone of standard design as per IRC 8-1980, fixing in position including painting and printing etc 200 m stone (precast). etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.16-iii / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 993.56 | 993.56 | 20.0 | False | None | None | False | None | False | 19871.2 | 0 | 3048980 | 103092 | None | 8.25i | Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS 1367 and IS 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete asper clause 811PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.25-i/ Page No. 69)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 4295.2 | 4295.2 | 800.0 | False | None | None | False | None | False | 3436160.0 | 0 |
| 1710334518000 | 0 | None | None | Roads | Construction of Hume Pipe Culvert of 1 rows and 1200mm Dia | 1452707.37 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3048981 | 103093 | None | 2.8iiA | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 848.42 | 848.42 | 25.2 | False | None | None | False | None | False | 21380.184 | 0 | 3048982 | 103093 | None | 2.17ixA | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ix) Removing all Type of Hume Pipes and stacking including Earthwork and Dismantiling of Masonry Works. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1129.26 | 1129.26 | 20.0 | False | None | None | False | None | False | 22585.2 | 0 | 3048983 | 103093 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m
Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 131.63 | False | None | None | False | None | False | 15842.9868 | 0 | 3048984 | 103093 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1 3 6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 8.36 | False | None | None | False | None | False | 59080.2872 | 0 | 3048985 | 103093 | None | 2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 0.91 | False | None | None | False | None | False | 84842.0118 | 0 | 3048986 | 103093 | None | 2.2.1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 20) Using 20 mm nominal size graded crushed coarse aggregate
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8012.15 | 8012.15 | 117.3 | False | None | None | False | None | False | 939825.195 | 0 | 3048987 | 103093 | None | 9.1ii | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets (i). 1200 mm dia Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 12705.06 | 12705.06 | 20.0 | False | None | None | False | None | False | 254101.2 | 0 | 3048988 | 103093 | None | 14.4a | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification. Schedule of Rates Volume -3PWD Common SR2023-24 Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 24.4 | False | None | None | False | None | False | 55050.304 | 0 |
| 1710334518000 | 0 | None | None | Roads | ESTIMATE FOR BOX CULVERT | 3403901.01 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3048989 | 103094 | None | 2.8iia | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Lime /Cement Concrete ,etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. By Mechanical Means Cement Concrete Grade M-15 & M-20 PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.8-ii-(a) Page No.10) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 848.42 | 848.42 | 33.1 | False | None | None | False | None | False | 28082.702 | 0 | 3048990 | 103094 | None | 2.11ii | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. A).Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-2.11(ii) (A) Page No.10) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 44.64 | False | None | None | False | None | False | 9481.536 | 0 | 3048991 | 103094 | None | 1.141 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting &stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-1.14.1 Page No.8) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 143.83 | False | None | None | False | None | False | 17311.3788 | 0 | 3048992 | 103094 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1 3 6 Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.1.3 Page No.15) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 23.36 | False | None | None | False | None | False | 165085.5872 | 0 | 3048993 | 103094 | None | 2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.11-h Page No.18) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 11.11 | False | None | None | False | None | False | 1035818.4078 | 0 | 3048994 | 103094 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M 25) Using 20 mm nominal size graded crushed coarse aggregate
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 110.04 | False | None | None | False | None | False | 987254.6712 | 0 | 3048995 | 103094 | None | 2.4.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the
work as per technical specifications, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (M-25 Using 20 mm nominal size graded crushed coarse aggregates
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.3 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8074.6 | 8074.6 | 16.38 | False | None | None | False | None | False | 132261.948 | 0 | 3048996 | 103094 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5.2 / Page No. 16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 35.68 | False | None | None | False | None | False | 345728.1392 | 0 | 3048997 | 103094 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.8 Page No.121) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 11.88 | False | None | None | False | None | False | 95479.3224 | 0 | 3048998 | 103094 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.9 Page No.122) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 14.4 | False | None | None | False | None | False | 201100.32 | 0 | 3048999 | 103094 | None | 13.2 | Reinforced cement concrete M30 grade for wearing coarse including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-III-13.2 Page No.122) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 6.49 | False | None | None | False | None | False | 106992.7122 | 0 | 3049000 | 103094 | None | 8.10 | Painting Two Coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.10 Page No.66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 10.05 | False | None | None | False | None | False | 1292.631 | 0 | 3049001 | 103094 | None | 14.4a | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Stone/Boulder etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-14.4(a) Page No.129) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 51.75 | False | None | None | False | None | False | 116756.28 | 0 | 3049002 | 103094 | None | 12.3a | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-12.3A Page No.117) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 113.54 | False | None | None | False | None | False | 156485.3696 | 0 | 3049003 | 103094 | None | 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
PWD SOR for Roads & Bridges - 2023-24 ( Item No. VOL-III-8.4 Page No.63) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.06 | 1.06 | 4500.0 | False | None | None | False | None | False | 4770.0 | 0 |
| 1710334518000 | 0 | None | None | Roads | ESTIMATE FOR FIELD PIPE CULVERT | 714549.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049004 | 103095 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. In all kinds of soils Depth upto 3 m Common SR-2023-24 ( Item No.VOL-I-1.14.1 / Page No. 8)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 89.63 | False | None | None | False | None | False | 10787.8668 | 0 | 3049005 | 103095 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6( M10) Using 40 mm nominal size graded crushed coarse aggregates etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SR-2023-24 ( Item No.VOL-I-2.1.3 / Page No. 16)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 6.1 | False | None | None | False | None | False | 43108.822 | 0 | 3049006 | 103095 | None | 2.11h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
Common SR-2023-24 ( Item No.VOL-I-2.11.h / Page No. 18)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 0.71 | False | None | None | False | None | False | 66195.4158 | 0 | 3049007 | 103095 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.
(M 20) Using 20 mm nominal size graded crushed coarse aggregate
Common SOR For Engineering Departments 2023 - 2024 ( Item No. VOL-I-2.4.2 Page No.16) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8058.03 | 8058.03 | 35.32 | False | None | None | False | None | False | 284609.6196 | 0 | 3049008 | 103095 | None | 16.15c | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6.etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. (iII). 750 mm dia UNI SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.15(C)) Page No. 146Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 3935.3 | 3935.3 | 37.5 | False | None | None | False | None | False | 147573.75 | 0 | 3049009 | 103095 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specificationsCommon SR-2023-24 ( Item No.VOL-I-1.10 / Page No. 07)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 30.0 | False | None | None | False | None | False | 5664.0 | 0 | 3049010 | 103095 | None | 8.29 | Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct,
300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material
free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.
Single row for one utility service SR 2021-22 & 2023-24 SR Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 60.0 | False | None | None | False | None | False | 156609.6 | 0 |
| 1710334518000 | 0 | None | None | Roads | Maintenance Activities for Third Year | 254514.55 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049011 | 103096 | None | 2.6 | Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 519.39 | 519.39 | 47.04 | False | None | None | False | None | False | 24432.1056 | 0 | 3049012 | 103096 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 3136.0 | False | None | None | False | None | False | 24868.48 | 0 | 3049013 | 103096 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 352.8 | False | None | None | False | None | False | 18183.312 | 0 | 3049014 | 103096 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 128.2 | 128.2 | 176.4 | False | None | None | False | None | False | 22614.48 | 0 | 3049015 | 103096 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 207.49 | 207.49 | 107.8 | False | None | None | False | None | False | 22367.422 | 0 | 3049016 | 103096 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 3.92 | False | None | None | False | None | False | 10278.436 | 0 | 3049017 | 103096 | None | 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 272.25 | 272.25 | 23.52 | False | None | None | False | None | False | 6403.32 | 0 | 3049018 | 103096 | None | 1.14.1 | Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 134.8 | 134.8 | 225.0 | False | None | None | False | None | False | 30330.0 | 0 | 3049019 | 103096 | None | 8.10 | Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 659.75 | False | None | None | False | None | False | 95036.9875 | 0 |
| 1710334518000 | 0 | None | None | Roads | Maintenance Activities for Fourth Year | 459905.7 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049020 | 103097 | None | 2.6 | Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 537.94 | 537.94 | 47.04 | False | None | None | False | None | False | 25304.6976 | 0 | 3049021 | 103097 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 3136.0 | False | None | None | False | None | False | 25746.56 | 0 | 3049022 | 103097 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 352.8 | False | None | None | False | None | False | 18832.464 | 0 | 3049023 | 103097 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 2352.0 | False | None | None | False | None | False | 312275.04 | 0 | 3049024 | 103097 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 214.9 | 214.9 | 215.6 | False | None | None | False | None | False | 46332.44 | 0 | 3049025 | 103097 | None | 1.14.1 | Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means.Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 139.62 | 139.62 | 225.0 | False | None | None | False | None | False | 31414.5 | 0 |
| 1710334518000 | 0 | None | None | Roads | Maintenance Activities for Fifth Year | 499753.91 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049026 | 103098 | None | 2.6 | Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 556.49 | 556.49 | 47.04 | False | None | None | False | None | False | 26177.2896 | 0 | 3049027 | 103098 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 8.5 | 8.5 | 3136.0 | False | None | None | False | None | False | 26656.0 | 0 | 3049028 | 103098 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 55.22 | 55.22 | 352.8 | False | None | None | False | None | False | 19481.616 | 0 | 3049029 | 103098 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 137.35 | 137.35 | 2352.0 | False | None | None | False | None | False | 323047.2 | 0 | 3049030 | 103098 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 222.31 | 222.31 | 323.4 | False | None | None | False | None | False | 71895.054 | 0 | 3049031 | 103098 | None | 1.14.1 | Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means.Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 144.43 | 144.43 | 225.0 | False | None | None | False | None | False | 32496.75 | 0 |
| 1710334518000 | 0 | None | None | Roads | Estimates for Renewal after maintenance period | 12368954.46 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049032 | 103099 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 3.92 | False | None | None | False | None | False | 11379.7208 | 0 | 3049033 | 103099 | None | 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 301.42 | 301.42 | 24.0 | False | None | None | False | None | False | 7234.08 | 0 | 3049034 | 103099 | None | 1.14.1 | Nala Training: Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.14.1)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 149.25 | 149.25 | 225.0 | False | None | None | False | None | False | 33581.25 | 0 | 3049035 | 103099 | None | 8.10 | Painting of Parapet walls of CD work.
Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 659.75 | False | None | None | False | None | False | 105223.5275 | 0 | 3049036 | 103099 | None | 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.3-i / Page No. 31)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 22347.2 | False | None | None | False | None | False | 392416.832 | 0 | 3049037 | 103099 | None | 5.16b | Providing and laying Bituminous Concrete Grading II for traffic less than 20 MSA with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-5.16-B / Page No. 37)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 670.42 | False | None | None | False | None | False | 10745418.0138 | 0 | 3049038 | 103099 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.15 / Page No. 67)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 784.0 | False | None | None | False | None | False | 607992.0 | 0 | 3049039 | 103099 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of tachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.43 / Page No. 74)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 534.07 | 534.07 | 872.0 | False | None | None | False | None | False | 465709.04 | 0 |
| 1710334518000 | 0 | None | None | Roads | Estimate for Shifting of HDPE Water Supply Pipe Lines | 1027093.9 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049040 | 103100 | None | 1.17 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m
PWD SoR - 2023-24 ( Item No.VOL-I-1.17 / Page No. 10)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 309.16 | 309.16 | 1010.88 | False | None | None | False | None | False | 312523.6608 | 0 | 3049041 | 103100 | None | 9.2.3 | Providing, laying and jointing HDPE pipes of specified grade and
conforming to IS 4984-2016 with latest ammendments and conveying
to work site including loading and unloading at both destinations and
rolling and lowering into trenches, laying true to line and jointing of
pipes and specials with electrofusion welding, giving hydraulic test
as per relevant ISS with all lead and lifts including encasing the pipe
alround to a depth of not less than 15 cms. with soft gravel or selected
earth available from the excation, testing and commissioning. The
rate is exclusive of required specials and fittings wherever necessary
like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete
(Contractor will make his own arrangements for procuring water for
testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used.
For :HDPE PE 80 PN 6.0 - HDPE Grade PE80-PN8.0,90mm dia
PWD SoR - 2023-24 ( Item No.VOL-V-9.2.4 / Page No. 96)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 450.76 | 450.76 | 1200.0 | False | None | None | False | None | False | 540912.0 | 0 | 3049042 | 103100 | None | 9.2.1 | Providing, laying and jointing HDPE pipes of specified grade and
conforming to IS 4984-2016 with latest ammendments and conveying
to work site including loading and unloading at both destinations and
rolling and lowering into trenches, laying true to line and jointing of
pipes and specials with electrofusion welding, giving hydraulic test
as per relevant ISS with all lead and lifts including encasing the pipe
alround to a depth of not less than 15 cms. with soft gravel or selected
earth available from the excation, testing and commissioning. The
rate is exclusive of required specials and fittings wherever necessary
like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete
(Contractor will make his own arrangements for procuring water for
testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used.
For :HDPE PE 80 PN 6.0 - HDPE Grade PE80-PN8.0,63mm dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.8 / Page No. 120)Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 258.42 | 258.42 | 672.0 | False | None | None | False | None | False | 173658.24 | 0 |
| 1710334518000 | 0 | None | None | Roads | Electrical pole shifting | 536748.78 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049043 | 103101 | None | 1.01 | RCC Pole - 9 Mtr Long, 145 Kg WL (V-6 ESCOM P.No 3/ 1/1.01) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 8349.68 | 8349.68 | 10.0 | False | None | None | False | None | False | 83496.8 | 0 | 3049044 | 103101 | None | 2.02 | Labour for RCC pole (V-6 ESCOM P.No 44/ 30/2.02) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1313.34 | 1313.34 | 10.0 | False | None | None | False | None | False | 13133.4 | 0 | 3049045 | 103101 | None | 2.08 | LT 2 Pin Cross Arm GI(V-6 ESCOM P.No 4/18/2.08) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 204.14 | 204.14 | 10.0 | False | None | None | False | None | False | 2041.4 | 0 | 3049046 | 103101 | None | 5.01 | Labour for 2 Pin Cross Arm (V-6 ESCOM P.No 45/50/5.01) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 188.8 | 188.8 | 10.0 | False | None | None | False | None | False | 1888.0 | 0 | 3049047 | 103101 | None | 12.2.02 | 11 kV, Horizontal Cross Arm (V-6 ESCOM P.No 3/12.2.02) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 574.66 | 574.66 | 8.0 | False | None | None | False | None | False | 4597.28 | 0 | 3049048 | 103101 | None | 5.04 | Labour for Horizontal Cross Arm (V-6 ESCOM P.No 45/52/5.04) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 188.8 | 188.8 | 8.0 | False | None | None | False | None | False | 1510.4 | 0 | 3049049 | 103101 | None | 52.6.06 | 11 kV, 5 KN Composite/Polymeric Pin Insulator (24 mm Dia FRP Rod) (V-6 ESCOM P.No 5/52.6.06) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 249.9 | 249.9 | 24.0 | False | None | None | False | None | False | 5997.6 | 0 | 3049050 | 103101 | None | 6.10 | 11 kV, 45 KN Polymeric Insulator (V-6 ESCOM P.No 5/56/6.10) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 219.48 | 219.48 | 18.0 | False | None | None | False | None | False | 3950.64 | 0 | 3049051 | 103101 | None | 2.06 | LT 4 Pin Cross Arm GI (Escom Pg 4 I.No 16/2.06) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 447.22 | 447.22 | 8.0 | False | None | None | False | None | False | 3577.76 | 0 | 3049052 | 103101 | None | 5.02 | Labour for 4 Pin Cross Arm (Escom Pg 45 I.No 50/5.02) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 188.8 | 188.8 | 8.0 | False | None | None | False | None | False | 1510.4 | 0 | 3049053 | 103101 | None | 21.05 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 (V-6 ESCOM P.No 9/144/21.05) For 100/300 kVA 4/5 Star Rated Transformer on PSCC Pole - 9 Mtr Long, 300 Kg WL - MS ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 26581.86 | 26581.86 | 2.0 | False | None | None | False | None | False | 53163.72 | 0 | 3049054 | 103101 | None | 3.02 | Labour For DP TC Set (V-6 ESCOM P.No 44/39/3.02) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 7036.34 | 7036.34 | 2.0 | False | None | None | False | None | False | 14072.68 | 0 | 3049055 | 103101 | None | 2.02 | Releasing and Refixing of RCC Pole - 9 Mtr Long, 145 Kg WL Labour (V-6 ESCOM P.No 44/ 30/2.02) (1113*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 2495.34 | 2495.34 | 3.0 | False | None | None | False | None | False | 7486.02 | 0 | 3049056 | 103101 | None | 7.02 | Releasing and Restringing of Conductor (including pin binding, providing jumps, dead ending, etc.,) Labour (Escom Pg 46, I.No 67/7.02)(5233*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 11732.38 | 11732.38 | 18.2 | False | None | None | False | None | False | 213529.316 | 0 | 3049057 | 103101 | None | 8.01 | Erection of 100 kVA Transformer on Transformer Structure (Escom Pg 46, /72/8.01) (1193*1.9) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 3564.78 | 3564.78 | 2.0 | False | None | None | False | None | False | 7129.56 | 0 | 3049058 | 103101 | None | CDS-26 | Erection of 11kV/433V, 100 kVA, 3 Phase 50 Cys Distribution Transformer BEE - 5 Star Rated with Oil Using 9 Mtr RCC Pole DPTC (303940 -221952) (CDS-26)(With out Transformer) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 96745.84 | 96745.84 | 1.0 | False | None | None | False | None | False | 96745.84 | 0 | 3049059 | 103101 | None | CDS-26 | Labour For Erection TC (CDS-26) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 22917.96 | 22917.96 | 1.0 | False | None | None | False | None | False | 22917.96 | 0 |
| 1710334518000 | 0 | None | None | Roads | Maintenance activities for First Year | 0.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049060 | 103102 | None | 2.6 | Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049061 | 103102 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049062 | 103102 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049063 | 103102 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049064 | 103102 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049065 | 103102 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049066 | 103102 | None | 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049067 | 103102 | None | 1.14.1 | Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049068 | 103102 | None | 8.10 | Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 |
| 1710334518000 | 0 | None | None | Roads | Maintenance activities for Second Year | 0.09 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3049069 | 103103 | None | 2.6 | Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049070 | 103103 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049071 | 103103 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049072 | 103103 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049073 | 103103 | None | 10.4 | Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.4 / Page No. 91) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049074 | 103103 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049075 | 103103 | None | 16.24 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049076 | 103103 | None | 1.14.1 | Nala Training Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete. PWD, Bangalore, SR 2023-24 V 1 Page No.8. Item No.1.14.1)-do- in all kinds of soil by mechanical means. Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 | 3049077 | 103103 | None | 8.10 | Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803
PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) Rates are inclusive of GST 18 percent ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 1.0 | 1.0 | 0.01 | False | None | None | False | None | False | 0.01 | 0 |
|
|
---|