noticeInvitingTenderDTO
createdTs1710336127184
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1935000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate13-03-2024 21:55:27
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1835000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710336127215
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9865
titleImprovements to road from NE-29 Ujjini (SH-45) to Tumbarguddi Road, Sunkadakallu, Nagalapur, Kudligi, Sovenahalli, Vaderahalli, Choranur from Ch 0.00 KM to 30.45 KM (in selected reaches) in Kudligi Taluk of Vijayanagar District.
descriptionImprovements to road from NE-29 Ujjini (SH-45) to Tumbarguddi Road, Sunkadakallu, Nagalapur, Kudligi, Sovenahalli, Vaderahalli, Choranur from Ch 0.00 KM to 30.45 KM (in selected reaches) in Kudligi Taluk of Vijayanagar District.
categoryWORKS
categoryTextWorks
ecv193873599.88
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-635/VIJAYANAGARA/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103361270000NoneNoneRoadsROAD ESTIMATE147534020.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049422103138NoneUNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in RECTANGULAR shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3049423103138NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.93149.28FalseNoneNoneFalseNoneFalse72688.91040
3049424103138NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.4334292.0FalseNoneNoneFalseNoneFalse254789.560
3049425103138NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.7113446.11FalseNoneNoneFalseNoneFalse1582741.60810
3049426103138NoneUNI SR 2023-24, V-1,Pg. No. 7 I. No.1.7.Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum147.44147.444352.93FalseNoneNoneFalseNoneFalse641795.99920
3049427103138NoneUNI SR 2023-24, V-1,Pg. No. 7 I. No.1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage and all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 percent per cum for every 1.50 m height or part there of Deduct 5 percent per cum if rollers are not used and tamping is done manually Add 8 percent per cum for works under foul & sullage situation ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.299477.3FalseNoneNoneFalseNoneFalse5565923.5170
3049428103138NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.8315604.4FalseNoneNoneFalseNoneFalse9531635.6520
3049429103138NoneUNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.812358.63FalseNoneNoneFalseNoneFalse36121803.7640
3049430103138NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.612122.98FalseNoneNoneFalseNoneFalse38437120.3880
3049431103138NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.842522.0FalseNoneNoneFalseNoneFalse2160117.60
3049432103138NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.4Tack coat on Granular surface treated with primerProviding and applying tack coat with RS1 Bitumenous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.3517.3542522.0FalseNoneNoneFalseNoneFalse737756.70
3049433103138NoneUNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (C)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSAProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11707.3111707.312126.1FalseNoneNoneFalseNoneFalse24890911.7910
3049434103138NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16 (C)Bituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13572.0113572.011275.66FalseNoneNoneFalseNoneFalse17313270.27660
3049435103138NonePWD SR 2023-24, V-3,Pg. No. 50 I. No.6.5Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid using Paver Construction of M30 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9712.529712.52120.0FalseNoneNoneFalseNoneFalse1165502.40
3049436103138NonePWD SR 2023-24, V-2,Pg. No. 52 I. No.6.8.3Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions more than 10MSA upto 20MSA for Industrial Streets, Bus & Truck parking of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1610.71610.75600.0FalseNoneNoneFalseNoneFalse9019920.00
17103361270000NoneNoneRoadsTraffic Safety3905722.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049437103139NoneUNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7.Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.3911163.397.2FalseNoneNoneFalseNoneFalse80376.4080
3049438103139NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (iiProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle 8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5803.485803.4822.0FalseNoneNoneFalseNoneFalse127676.560
3049439103139NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (viiiProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 60 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5323.985323.989.0FalseNoneNoneFalseNoneFalse47915.820
3049440103139NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xii)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5233.545233.5436.0FalseNoneNoneFalseNoneFalse188407.440
3049441103139NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach8055.988055.983.0FalseNoneNoneFalseNoneFalse24167.940
3049442103139NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.672097.57FalseNoneNoneFalseNoneFalse1377411.29190
3049443103139NoneUNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo452.24452.241214.0FalseNoneNoneFalseNoneFalse549019.360
3049444103139NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.556.0FalseNoneNoneFalseNoneFalse21759.30
3049445103139NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1043.241043.2425.0FalseNoneNoneFalseNoneFalse26081.00
3049446103139NoneUNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iiiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo64265.6964265.692.0FalseNoneNoneFalseNoneFalse128531.380
3049447103139NoneUNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo56317.5156317.515.0FalseNoneNoneFalseNoneFalse281587.550
3049448103139NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80- 100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.0224.0FalseNoneNoneFalseNoneFalse60096.480
3049449103139NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38486.0FalseNoneNoneFalseNoneFalse61420.680
3049450103139NoneUNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i)Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2740.672740.67337.5FalseNoneNoneFalseNoneFalse924976.1250
3049451103139None8.16(i)Kilometre Stone Reinforced cement concrete M15 grade kilometer stone of standard design IRC: 8-1980 5th kilometer stone ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
17103361270000NoneNoneRoadsJunction Estimate2374900.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049452103140NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.931.92FalseNoneNoneFalseNoneFalse934.90560
3049453103140NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.43845.0FalseNoneNoneFalseNoneFalse6278.350
3049454103140NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.7164.8FalseNoneNoneFalseNoneFalse7627.6080
3049455103140NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.83256.78FalseNoneNoneFalseNoneFalse156848.92740
3049456103140NoneUNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.8211.48FalseNoneNoneFalseNoneFalse618113.7440
3049457103140NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.6217.26FalseNoneNoneFalseNoneFalse688844.5560
3049458103140NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.8845.0FalseNoneNoneFalseNoneFalse42926.00
3049459103140NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bitumenous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.3517.35845.0FalseNoneNoneFalseNoneFalse14660.750
3049460103140NoneUNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (C)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSAProviding and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11707.3111707.3142.26FalseNoneNoneFalseNoneFalse494750.92060
3049461103140NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16 (C)Bituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13572.0113572.0125.34FalseNoneNoneFalseNoneFalse343914.73340
17103361270000NoneNoneRoadsWATER SUPPLY PIPE LINE1360587.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049462103141NoneUNI SR WS&UW 2023-24 , V-1 Pg No. ,10 I.No 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum324.62324.62966.6FalseNoneNoneFalseNoneFalse313777.6920
3049463103141NoneUNI SR WS& UW 2023-24 , V-5 Pg No. ,95 I.No 9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80 - PN 8 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm473.3473.31790.0FalseNoneNoneFalseNoneFalse847207.00
3049464103141NoneUNI SR WS&UW2023-24 , V-5 Pg No. ,121 I.No 10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum111.51111.511790.0FalseNoneNoneFalseNoneFalse199602.90
17103361270000NoneNoneRoadsVALVE CHAMBERS415823.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049465103142NonePWD SR 2023-24,V-1,Page No 8 Item No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3832.08FalseNoneNoneFalseNoneFalse4054.27040
3049466103142NonePWD SR 2023-24,V-1,Page No 15 Item No 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.374.36FalseNoneNoneFalseNoneFalse32352.81320
3049467103142NonePWD SR 2023-24,V-1,Page No 16 Item No 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8331.288331.2818.65FalseNoneNoneFalseNoneFalse155378.3720
3049468103142NonePWD SR 2023-24,V-1,Page No 16 Item No 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8242.828242.822.3FalseNoneNoneFalseNoneFalse18958.4860
3049469103142NonePWD SR 2023-24,V-1,Page No 18 Item No 2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg97.8997.892095.0FalseNoneNoneFalseNoneFalse205079.550
17103361270000NoneNoneRoadsElectrical Pole shifting1612845.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049470103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit779.33779.3341.0FalseNoneNoneFalseNoneFalse31952.530
3049471103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.1.1RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit8767.168767.1641.0FalseNoneNoneFalseNoneFalse359453.560
3049472103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.011379.0141.0FalseNoneNoneFalseNoneFalse56539.410
3049473103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018) as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos5202.565202.5610.0FalseNoneNoneFalseNoneFalse52025.60
3049474103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.011379.0110.0FalseNoneNoneFalseNoneFalse13790.10
3049475103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1089.081089.0841.0FalseNoneNoneFalseNoneFalse44652.280
3049476103143NoneElectrical CSR 2023-24 Va-6 Item Code11 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet890.84890.8441.0FalseNoneNoneFalseNoneFalse36524.440
3049477103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos254.0254.0123.0FalseNoneNoneFalseNoneFalse31242.00
3049478103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos631.89631.8914.0FalseNoneNoneFalseNoneFalse8846.460
3049479103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.7.1 Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3049480103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km4970.874970.875.535FalseNoneNoneFalseNoneFalse27513.765450
3049481103143NoneElectrical CSR 2023-24 Va-6 Item Code 7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKms57283.9357283.935.535FalseNoneNoneFalseNoneFalse317066.552550
3049482103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.02Stringing of Rabbit Conductor (including pin binding, providing jumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km6483.696483.695.535FalseNoneNoneFalseNoneFalse35887.224150
3049483103143NoneElectrical CSR 2023-24 Va-6 Item Code 9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo126.38126.38123.0FalseNoneNoneFalseNoneFalse15544.740
3049484103143NoneElectrical CSR 2023-24 Va-6 Item Code 10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet391.52391.52123.0FalseNoneNoneFalseNoneFalse48156.960
3049485103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo358.07358.073.0FalseNoneNoneFalseNoneFalse1074.210
3049486103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo163.55163.553.0FalseNoneNoneFalseNoneFalse490.650
3049487103143NoneElectrical CSR 2023-24 Va-6 Item Code 5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.163.0FalseNoneNoneFalseNoneFalse453.480
3049488103143NoneElectrical CSR 2023-24 Va-6 Item Code 5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.163.0FalseNoneNoneFalseNoneFalse453.480
3049489103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.031.1 kV Ceramic Pin Insulator (Shell only) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos38.4138.4115.0FalseNoneNoneFalseNoneFalse576.150
3049490103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos33.4533.4515.0FalseNoneNoneFalseNoneFalse501.750
3049491103143NoneElectrical CSR 2023-24 Va-6 Item Code 2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos296.12296.1251.0FalseNoneNoneFalseNoneFalse15102.120
3049492103143NoneElectrical CSR 2023-24 Va-6 Item Code 4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr115.23115.2357.4FalseNoneNoneFalseNoneFalse6614.2020
3049493103143NoneElectrical CSR 2023-24 Va-6 Item Code 24.0111 kV, GOS a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.552.0FalseNoneNoneFalseNoneFalse23417.10
3049494103143NoneElectrical CSR 2023-24 Va-6 Item Code 13.02Labour for 11 kV, GOS a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1367.861367.862.0FalseNoneNoneFalseNoneFalse2735.720
3049495103143NoneElectrical CSR 2023-24Va-6 Item Code 1.8.1aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach338.25338.2551.0FalseNoneNoneFalseNoneFalse17250.750
3049496103143NoneElectrical CSR 2023-24Va-6 Item Code 1.8.2.bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach438.61438.6151.0FalseNoneNoneFalseNoneFalse22369.110
3049497103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.8.2aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3912.763912.7651.0FalseNoneNoneFalseNoneFalse199550.760
3049498103143NoneElectrical CSR 2023-24 Va-6 Item Code 1.8.2.gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach247.8247.82.0FalseNoneNoneFalseNoneFalse495.60
3049499103143NoneElectrical CSR 2023-24 Va-6 Item Code 21.02Transporation by Head Load where ever there is no accessability for transporation by vechicle" for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pole353.12353.1241.0FalseNoneNoneFalseNoneFalse14477.920
3049500103143NoneElectrical CSR 2023-24 Va-6 Item Code 22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Kg152.4152.45.535FalseNoneNoneFalseNoneFalse843.5340
3049501103143NoneElectrical CSR 2023-24 Va-6 Item Code 26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading." 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo175.94175.9441.0FalseNoneNoneFalseNoneFalse7213.540
3049502103143NoneElectrical CSR 2023-24 Va-6 Item CodeFixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach138.77138.7741.0FalseNoneNoneFalseNoneFalse5689.570
3049503103143NoneElectrical CSR 2023-24 Va-6 Item Code 3.01Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing For 25/63/100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Structure7093.287093.282.0FalseNoneNoneFalseNoneFalse14186.560
3049504103143NoneElectrical CSR 2023-24 Va-6 Item Code 24.04Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet29815.329815.32.0FalseNoneNoneFalseNoneFalse59630.60
3049505103143NoneElectrical CSR 2023-24 Va-6 Item code 6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo631.89631.8914.0FalseNoneNoneFalseNoneFalse8846.460
3049506103143NoneElectrical CSR 2023-24 Va-6 Item Code 19.0210 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1962.581962.586.0FalseNoneNoneFalseNoneFalse11775.480
3049507103143NoneElectrical CSR 2023-24 Va-6 Item Code 26.01DP Set (2 Pole Strucrure Kit) as per IS1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet7930.847930.842.0FalseNoneNoneFalseNoneFalse15861.680
3049508103143NoneElectrical CSR 2023-24 Va-6 Item Code 67.2Supplying & Fixing Chemical earthling for grounding. Conduits, IC cut-outs & other equipments backfill compound which is non-corrosive, thermally conductive, potential to permissible limits, superior Fault conduction capacity, non toxic, weather resistance & capable of achieving ohmic value less than one ohm (44/6.19)Using 6ft. Copper bonded rod with backfill compound (44/6.19.2) Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo185.85185.852.0FalseNoneNoneFalseNoneFalse371.70
3049509103143NoneElectrical CSR 2023-24 Va-6 Item Code 4.02Anti Climbing Device (12 Mtr GI Barbed wire) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo110.27110.272.0FalseNoneNoneFalseNoneFalse220.540
3049510103143NoneElectrical CSR 2023-24 Va-6 Item Code 6.18.3Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. (43/6.18) 52 6.18.3 8 SWG GI Wire (44/6.18.3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr23.5423.54300.0FalseNoneNoneFalseNoneFalse7062.00
3049511103143NoneElectrical CSR 2023-24 Va-6 Item Code 17.01LT Protection Kit (Dwg No. For KPTCL & ESCOMs/GM/QS&S/10 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2506.52506.52.0FalseNoneNoneFalseNoneFalse5013.00
3049512103143NoneElectrical CSR 2023-24 Va-6 Item Code 15.17.1LT Wiring Kit 63/100 KVA (87/15.17.1) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet5263.525263.522.0FalseNoneNoneFalseNoneFalse10527.040
3049513103143NoneElectrical CSR 2023-24 Va-6 Item Code 20.01GOS as per IS-9921, IS-1977 174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.552.0FalseNoneNoneFalseNoneFalse23417.10
3049514103143NoneElectrical CSR 2023-24 Va-6 Item Code 24.04H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/61 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet5367.355367.352.0FalseNoneNoneFalseNoneFalse10734.70
3049515103143NoneElectrical CSR 2023-24 Va-6 Item Code 27.0227 Loading & Unloading of Transformer (when maintaince men for loading and unloading are not available in store) Loading 46.1 27.01 63 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo353.12353.122.0FalseNoneNoneFalseNoneFalse706.240
3049516103143NoneElectrical CSR 2023-24 Va-6 Item Code 27.0827 Loading & Unloading of Transformer (when maintaince men for loading and unloading are not available in store) Loading ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo353.12353.122.0FalseNoneNoneFalseNoneFalse706.240
3049517103143NoneElectrical CSR 2023-24 Va-6 Item Code 24.02Transporation by Head Load where ever there is no accessability for transporation by vechicle Distribution Transformer 63 kVA & 100 kVA 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Tr1172.091172.092.0FalseNoneNoneFalseNoneFalse2344.180
3049518103143NoneElectrical CSR 2023-24 Va-6 Item Code 54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo920.58920.588.0FalseNoneNoneFalseNoneFalse7364.640
3049519103143NoneElectrical CSR 2023-24 Va-6 Item Code 54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo837.56837.568.0FalseNoneNoneFalseNoneFalse6700.480
3049520103143NoneElectrical CSR 2023-24 Va-6 Item Code 54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo384.09384.098.0FalseNoneNoneFalseNoneFalse3072.720
3049521103143NoneElectrical CSR 2023-24 Va-6 Item Code 54.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2691.112691.118.0FalseNoneNoneFalseNoneFalse21528.880
3049522103143None20.0111 KV HG FUSE UNIT WITH SOLID CORE INSULATOR ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1324.491324.492.0FalseNoneNoneFalseNoneFalse2648.980
17103361270000NoneNoneRoads1st Year maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049523103144None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 64) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049524103144None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 4800) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049525103144None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =720) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049526103144None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049527103144None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049528103144None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =540) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103361270000NoneNoneRoads2nd year Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049529103145None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =96) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049530103145None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =6400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049531103145None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =720) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049532103145None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2400) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049533103145None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Have to rectify irrespective of quantity) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3049534103145None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =540) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103361270000NoneNoneRoads3rd Year Maintenance665905.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049535103146NoneUNI SR 2023-24, V-3, Page No. 9, Item No. 2.5 (iiClearing and grubbing (ii) By Mechanical Means using Dozer road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3674.64FalseNoneNoneFalseNoneFalse40705.67040
3049536103146NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.338.334976.0FalseNoneNoneFalseNoneFalse41450.080
3049537103146NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12653.1FalseNoneNoneFalseNoneFalse35345.7720
3049538103146NoneUNI SR 2023-24, V-3, Page No. 91, Item No. .Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.6134.62177.0FalseNoneNoneFalseNoneFalse293024.20
3049539103146NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm591.15591.15211.17FalseNoneNoneFalseNoneFalse124833.14550
3049540103146NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.83315.0FalseNoneNoneFalseNoneFalse41526.450
3049541103146NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.166.22FalseNoneNoneFalseNoneFalse17124.65520
3049542103146NoneUNI SR 2023-24, V-3, Page No. 148, Item No. 16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.866.22FalseNoneNoneFalseNoneFalse1778.04920
3049543103146NoneUNI SR 2023-24, V-3, Page No. 66, Item No. 8.1Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.26151.26371.0FalseNoneNoneFalseNoneFalse56117.460
3049544103146NoneUNI SR 2023-24, V-3, Page No. 63, Item No. 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.251.2511200.0FalseNoneNoneFalseNoneFalse14000.00
17103361270000NoneNoneRoads4th Year Maintenance597455.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049545103147NoneUNI SR 2023-24, V-3, Page No. 9, Item No. 2.5 (iiClearing and grubbing (ii) By Mechanical Means using Dozer road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8474.64FalseNoneNoneFalseNoneFalse42159.65760
3049546103147NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.624976.0FalseNoneNoneFalseNoneFalse42893.120
3049547103147NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05653.1FalseNoneNoneFalseNoneFalse36606.2550
3049548103147NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.412177.0FalseNoneNoneFalseNoneFalse303495.570
3049549103147NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.26211.17FalseNoneNoneFalseNoneFalse129290.94420
3049550103147NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.54315.0FalseNoneNoneFalseNoneFalse43010.10
17103361270000NoneNoneRoads5th Year Maintenance751840.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049551103148NoneUNI SR 2023-24, V-3, Page No.9, Item No. 2.5 (ii)Clearing and grubbing (ii) By Mechanical Means using Dozer road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3174.64FalseNoneNoneFalseNoneFalse43612.89840
3049552103148NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.928.924976.0FalseNoneNoneFalseNoneFalse44385.920
3049553103148NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9957.99653.1FalseNoneNoneFalseNoneFalse37873.2690
3049554103148NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.222177.0FalseNoneNoneFalseNoneFalse313966.940
3049555103148NoneUNI SR 2023-24, V-3, Page No. 91, Item No. 10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm633.38633.38422.35FalseNoneNoneFalseNoneFalse267508.0430
3049556103148NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.25315.0FalseNoneNoneFalseNoneFalse44493.750
17103361270000NoneNoneRoads6th Year (Renewal)23945693.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049557103149NoneUNI SR 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3048.143048.146.22FalseNoneNoneFalseNoneFalse18959.43080
3049558103149NoneUNI SR 2023-24, V-3, Page No. 148, Item No. 16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm316.43316.436.22FalseNoneNoneFalseNoneFalse1968.19460
3049559103149NoneUNI SR 2023-24, V-3, Page No. 66, Item No. 8.1Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm167.46167.46371.0FalseNoneNoneFalseNoneFalse62127.660
3049560103149NoneUNI SR 2023-24, V-3, Page No. 63, Item No. 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.381.3811200.0FalseNoneNoneFalseNoneFalse15456.00
3049561103149NoneUNI SR 2023-24, V-3, Page No. 31, Item No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm18.4418.4442602.0FalseNoneNoneFalseNoneFalse785580.880
3049562103149NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16 (C)Bituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16829.2916829.291278.06FalseNoneNoneFalseNoneFalse21508842.37740
3049563103149NoneUNI SR 2023-24, V-3, Page No. 67, Item No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm814.27814.271382.85FalseNoneNoneFalseNoneFalse1126013.26950
3049564103149NoneUNI SR 2023-24, V-3, Page No. 74, Item No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos560.77560.77761.0FalseNoneNoneFalseNoneFalse426745.970
17103361270000NoneNoneRoadsConstruction of Box Culvert 2 VENT 3X3m5134253.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049565103150NoneCSR For 2023-24 Item No 2.8 ii A Page No 10Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum890.84890.8411.25FalseNoneNoneFalseNoneFalse10021.950
3049566103150NoneCSR For 2023-24 Item No 2.10.B Page No 10Dismantling Stone Masonry. Rubble stone masonry in cement mortar. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7940.5FalseNoneNoneFalseNoneFalse30609.4950
3049567103150NoneCSR For 2023-24 Item No 1.14.1 Page No 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38345.46FalseNoneNoneFalseNoneFalse43659.23480
3049568103150NoneCSR For 2023-24 Item No 1.23 Page No 11Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3323.03323.024.88FalseNoneNoneFalseNoneFalse82676.240
3049569103150NoneCSR For 2023-24 Item No 1.8 Page No 07Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29319.3FalseNoneNoneFalseNoneFalse187521.6970
3049570103150NoneCSR For 2023-24 Item No 2.1.3 Page No 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3731.57FalseNoneNoneFalseNoneFalse234261.08090
3049571103150NoneCSR For 2023-24 Item No 2.4.1 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8331.288331.286.64FalseNoneNoneFalseNoneFalse55319.69920
3049572103150NoneCSR For 2023-24 Item No 2.4.3 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.369420.3697.12FalseNoneNoneFalseNoneFalse914905.36320
3049573103150NoneCSR For 2023-24 Item No 2.4.3 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8478.338478.3367.28FalseNoneNoneFalseNoneFalse570422.04240
3049574103150NoneCSR For 2023-24 Item No 2.5.2 Page No 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.1744.45FalseNoneNoneFalseNoneFalse452241.85650
3049575103150NoneCSR For 2023-24 Item No 2.11.h Page No 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.638.61FalseNoneNoneFalseNoneFalse842872.76430
3049576103150NoneCSR For 2023-24 Item No 2.11.h Page No 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.633.55FalseNoneNoneFalseNoneFalse347525.93650
3049577103150NoneCSR For 2023-24 Item No 13.8 Page No 121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8316.2FalseNoneNoneFalseNoneFalse136709.0460
3049578103150NoneCSR For 2023-24 Item No 13.9 Page No 122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum15396.7415396.7427.0FalseNoneNoneFalseNoneFalse415711.980
3049579103150NoneCSR For 2023-24 Item No 13.16 Page No 124Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0124.0FalseNoneNoneFalseNoneFalse53376.240
3049580103150NoneCSR For 2023-24 Item No 13.2.A Page No 121M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18175.5718175.5714.57FalseNoneNoneFalseNoneFalse264818.05490
3049581103150NoneCSR For 2023-24 Item No 14.2 Page No 129Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.5125.17FalseNoneNoneFalseNoneFalse76529.63670
3049582103150NoneCSR For 2023-24 Item No 12.4 Page No 117Behind Box end Wall ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.887.43FalseNoneNoneFalseNoneFalse289987.8240
3049583103150NoneCSR For 2023-24 Item No 12.2 Page No 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr296.12296.1230.0FalseNoneNoneFalseNoneFalse8883.60
3049584103150NoneCSR For 2023-24 Item No 8.18 Page No 67Boundary pillar / Guard stoneReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7716.0FalseNoneNoneFalseNoneFalse14828.320
3049585103150NoneCSR For 2023-24 Item No 13.7 Page No 121Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo4052.774052.774.0FalseNoneNoneFalseNoneFalse16211.080
3049586103150NoneCSR For 2023-24 Item No 13.14 Page No 123Painting on concrete surfaceProviding and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm104.08104.08122.14FalseNoneNoneFalseNoneFalse12712.33120
3049587103150NoneCSR For 2023-24 Item No 16.15.C Page No 146Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4132.074132.0715.0FalseNoneNoneFalseNoneFalse61981.050
3049588103150NoneCSR For 2023-24 Item No 8.5 A xii Page No 64Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum5233.545233.542.0FalseNoneNoneFalseNoneFalse10467.080
17103361270000NoneNoneRoadsESTIMATE OF BOX CULVERT1 VENT 2X2 m2289850.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049589103151NoneCSR For 2023-24 Item No 2.10 B Page No 10Head wall ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7914.76FalseNoneNoneFalseNoneFalse11155.46040
3049590103151NoneCSR For 2023-24 Item No 2.17 Page No 11Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 900 mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1702.391702.3915.0FalseNoneNoneFalseNoneFalse25535.850
3049591103151NoneCSR For 2023-24 Item No 1.14.1 Page No 08Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38139.92FalseNoneNoneFalseNoneFalse17683.08960
3049592103151NoneCSR For 2023-24 Item No 1.23 Page No 11Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3323.03323.011.99FalseNoneNoneFalseNoneFalse39842.770
3049593103151NoneCSR For 2023-24 Item No 1.8 Page No 07Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29136.67FalseNoneNoneFalseNoneFalse80264.92430
3049594103151NoneCSR For 2023-24 Item No 2.1.3 Page No 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3713.91FalseNoneNoneFalseNoneFalse103217.34670
3049595103151NoneCSR For 2023-24 Item No 2.4.1 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8331.288331.283.08FalseNoneNoneFalseNoneFalse25660.34240
3049596103151NoneCSR For 2023-24 Item No 2.4.3 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.369420.3638.79FalseNoneNoneFalseNoneFalse365415.76440
3049597103151NoneCSR For 2023-24 Item No 2.4.3 Page No 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8478.338478.3326.78FalseNoneNoneFalseNoneFalse227049.67740
3049598103151NoneCSR For 2023-24 Item No 2.5.2 Page No 16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.1712.97FalseNoneNoneFalseNoneFalse131958.98490
3049599103151NoneCSR For 2023-24 Item No 2.11.h Page No 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.633.45FalseNoneNoneFalseNoneFalse337736.47350
3049600103151NoneCSR For 2023-24 Item No 2.11.h Page No 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.631.04FalseNoneNoneFalseNoneFalse101810.41520
3049601103151NoneCSR For 2023-24 Item No 13.8 Page No 121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8310.8FalseNoneNoneFalseNoneFalse91139.3640
3049602103151NoneCSR For 2023-24 Item No 13.9 Page No 122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum15396.7415396.7418.0FalseNoneNoneFalseNoneFalse277141.320
3049603103151NoneCSR For 2023-24 Item No 13.16 Page No 124Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0124.0FalseNoneNoneFalseNoneFalse53376.240
3049604103151NoneCSR For 2023-24 Item No 13.2.a Page No 121M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18175.5718175.577.74FalseNoneNoneFalseNoneFalse140678.91180
3049605103151NoneCSR For 2023-24 Item No 14.2 Page No 129Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.514.56FalseNoneNoneFalseNoneFalse13864.72560
3049606103151NoneCSR For 2023-24 Item No 12.4 Page No 117Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.851.59FalseNoneNoneFalseNoneFalse171113.7120
3049607103151NoneCSR For 2023-24 Item No 12.2 Page No 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr296.12296.1214.4FalseNoneNoneFalseNoneFalse4264.1280
3049608103151NoneCSR For 2023-24 Item No 8.18 Page No 67Boundary pillar / Guard stoneReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7716.0FalseNoneNoneFalseNoneFalse14828.320
3049609103151NoneCSR For 2023-24 Item No 13.7Page No 121Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo4052.774052.772.0FalseNoneNoneFalseNoneFalse8105.540
3049610103151NoneCSR For 2023-24 Item No 13.14 Page No 123Painting on concrete surfaceProviding and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm104.08104.0862.93FalseNoneNoneFalseNoneFalse6549.75440
3049611103151NoneCSR For 2023-24 Item No 16.15.C Page No 146Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4132.074132.077.5FalseNoneNoneFalseNoneFalse30990.5250
3049612103151NoneCSR For 2023-24 Item No 8.5 A xii Page No 64Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm5233.545233.542.0FalseNoneNoneFalseNoneFalse10467.080
17103361270000NoneNoneRoadsPIPE CULVERT 1 ROW 1200mm DIA697399.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049613103152NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B)Dismantling Stone Masonry. Rubble stone masonry in cement mortar ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7910.08FalseNoneNoneFalseNoneFalse7618.36320
3049614103152NoneUNI SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ix) (Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1357.941357.947.5FalseNoneNoneFalseNoneFalse10184.550
3049615103152NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3832.06FalseNoneNoneFalseNoneFalse4051.74280
3049616103152NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.2987.06FalseNoneNoneFalseNoneFalse51129.46740
3049617103152NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.1513.95FalseNoneNoneFalseNoneFalse20187.74250
3049618103152NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.372.37FalseNoneNoneFalseNoneFalse17586.27690
3049619103152NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9334.02FalseNoneNoneFalseNoneFalse287840.83860
3049620103152NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iiLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm13340.3113340.3112.5FalseNoneNoneFalseNoneFalse166753.8750
3049621103152NoneUNI SR 2023 -24 ,V-3,Page No 129 Item No14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.973.64FalseNoneNoneFalseNoneFalse8623.05080
3049622103152NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3049623103152NoneUNI SR 2023-24,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTt97894.6397894.630.8FalseNoneNoneFalseNoneFalse78315.7040
3049624103152NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3049625103152NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm130.1130.140.37FalseNoneNoneFalseNoneFalse5252.1370
17103361270000NoneNoneRoadsCD REPAIRS370292.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049626103153NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.71140.0FalseNoneNoneFalseNoneFalse16479.40
3049627103153NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.938.59FalseNoneNoneFalseNoneFalse72679.38870
3049628103153NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.9796.0FalseNoneNoneFalseNoneFalse227421.120
3049629103153NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTt97894.6397894.630.17FalseNoneNoneFalseNoneFalse16642.08710
3049630103153NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7740.0FalseNoneNoneFalseNoneFalse37070.80
17103361270000NoneNoneRoadsFIELD APPROACH2217007.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3049631103154NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1`Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38119.55FalseNoneNoneFalseNoneFalse15108.7290
3049632103154NoneUNI SR 2023 - 24 ,V-3,Page No 146 Item No16.15.Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row. Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6750 mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4132.074132.07127.5FalseNoneNoneFalseNoneFalse526838.9250
3049633103154NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29718.94FalseNoneNoneFalseNoneFalse422226.27260
3049634103154NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.379.35FalseNoneNoneFalseNoneFalse69380.45950
3049635103154NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.93111.41FalseNoneNoneFalseNoneFalse942632.21130
3049636103154NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTt97894.6397894.632.46FalseNoneNoneFalseNoneFalse240820.78980
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103361280000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103361280000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103361280000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17103361420000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptableNone
17103361480000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union TerritoryNone
17103361530000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionNone
17103361600000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17103361660000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17103361720000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidderNone
17103361780000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17103361860000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17103361920000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17103361980000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement PortalNone
17103362040000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I RegistrationNone
17103362100000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17103362160000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tenderNone
17103362250000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the workNone
17103362300000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17103362360000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17103362410000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approvalNone
17103362480000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejectedNone
17103362550000NoneNoneELIGIBILITYOriginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid documentNone
17103362620000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence Bidder must quote the rates including GSTNone
17103362700000NoneNoneELIGIBILITYGST Shall Not be paid separatelyNone
17103362760000NoneNoneELIGIBILITYPotholes & other Maintenance items shall be rectified irrespective of the quantity during the period of DLP & MaintenanceNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneKPWD Registration CertificatePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.967.65Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work 1. Earth Work for Embankment/ Subgrade/ Shoulders :26751.88Cum2. GSB/WMM : 19928.27Cum3. BM/SDBC/DBM/BC :3797.94Cum4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 46.63Cum5. Reinforced Cement Concrete (RCC) M20 & higher grades :371.40CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No2.Mechanical Paver Finisher:1 No3. Static Road Roller: 1 No.4. Vibratory Road Roller: 1 No.5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- As per KW4 Document
NoneNoneNoneNoneMachineries could be on Lease/Hire:1.Wet Mix Plant / Pug mill : 1 No. 2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No. 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No6.Excavator 0.90 Cum Bucket Capacity:2 No7.Tipper Trucks:6 Nos8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos 9. Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- As per KW4 Document
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDrawingsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Drawings
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3870.54Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.580.58Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneDetails of Committed WorksFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneCopies of Tax RegistrationFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copies of Tax Registration
NoneNoneNoneNoneEPF registrationFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneValid EPF Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710337157000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Project Officer PIU SHDP Annex Building Gate-2 K R Circle
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone