createdTs1710341528300
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1419000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate13-03-2024 21:51:29
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1319000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710341528335
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9786
titlePkg-775 Bantvala Taluk of Dakshina Kannada District.
descriptionPkg-775 Improvements to road Kanyana-Nellikatte-Mithanadka-Bedakallu-Anekallu MDR Ch-0.00 KM to 4.00 KM (In Selected Reaches) in Bantvala Taluk of Dakshina Kannada District.
categoryWORKS
categoryTextWorks
ecv94580614.92
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount100000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-775/DK/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103415280000NoneNoneRoadsPkg-775 Bantvala Taluk of Dakshina Kannada District.63659430.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050906103266None16.29i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectagular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 Rates are inclusive of GST 18 Percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 , Page No: 149 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos20289.220289.22.0FalseNoneNoneFalseNoneFalse40578.40
3050907103266None2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. In Area of light jungle Rates are inclusive of GST 18 Percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 a , Page No: 9". ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm519.39519.39110.4FalseNoneNoneFalseNoneFalse57340.6560
3050908103266None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Rates are inclusive of GST 18 Percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.937.9312000.0FalseNoneNoneFalseNoneFalse95160.00
3050909103266None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum125.55125.555106.19FalseNoneNoneFalseNoneFalse641082.15450
3050910103266None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Royallty Shall be recovered @ Rs 60/ cum Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum157.27157.273751.86FalseNoneNoneFalseNoneFalse590055.02220
3050911103266None1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum626.44626.442153.87FalseNoneNoneFalseNoneFalse1349270.32280
3050912103266None4.2 B (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3117.653117.655705.93FalseNoneNoneFalseNoneFalse17789092.66450
3050913103266None4.17Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3381.973381.974951.12FalseNoneNoneFalseNoneFalse16744539.30640
3050914103266None5.1 A (I)Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1954.1919178.12FalseNoneNoneFalseNoneFalse1039262.32280
3050915103266None5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm18.518.519178.12FalseNoneNoneFalseNoneFalse354795.220
3050916103266None5.12 (C)Dense Graded Bituminous Macadam Grading - II for traffic greater then 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 4, Item No: 5.12 (c) , Page No: 35. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12487.812487.8958.88FalseNoneNoneFalseNoneFalse11974301.6640
3050917103266None5.16 cBituminous Concrete Grading II for traffic Greater than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14476.8114476.81648.63FalseNoneNoneFalseNoneFalse9390093.27030
3050918103266None3.6Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum651.55651.554901.54FalseNoneNoneFalseNoneFalse3193598.3870
3050919103266None14.4(a)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2526.92526.9158.4FalseNoneNoneFalseNoneFalse400260.960
17103415280000NoneNoneRoadsPkg-775 Sub Estimates of Road Furniture3317566.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050920103267NoneItem Code 8.16 (ii)Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC8 1980, fixing in position including painting and printing etc ii Ordinary kilometer stone precastSchedule of Rates PWD 2023 24 vol 3, Item No 8.16 ii , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos3868.323868.323.2FalseNoneNoneFalseNoneFalse12378.6240
3050921103267NoneItem Code 8.16 (iii)Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC8 1980, fixing in position including painting and printing etc iii 200 m stone precastSchedule of Rates PWD 2023 24 vol 3, Item No 8.16 iii , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1112.791112.7912.8FalseNoneNoneFalseNoneFalse14243.7120
3050922103267NoneItem Code 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g per m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC352015.The finished surface to be level, uniform and free from streaks and holes.Schedule of Rates PWD 2023 24 vol 3, Item No 8.15 , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm700.45700.45677.56FalseNoneNoneFalseNoneFalse474596.9020
3050923103267NoneItem Code 8.6 (xi) Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly esigned foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 60 mm x 50 mm rectangula Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 (xi) , Page No: 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5879.85879.8140.0FalseNoneNoneFalseNoneFalse823172.00
3050924103267NoneItem Code 8.15 (B) IVRetro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. ii 60 cm equilateral triangleSchedule of Rates PWD 2023 24 vol 3, Item No 8.5 iv , Page No 64. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4726.044726.0431.0FalseNoneNoneFalseNoneFalse146507.240
3050925103267NoneItem Code 8.15 (B) viiiRetro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary, mandatory and informatory sign as per IRC672022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC672022. viii 60 cm circularSchedule of Rates PWD 2023 24 vol 3, Item No 8.5 viii , Page No 64. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5678.925678.923.0FalseNoneNoneFalseNoneFalse17036.760
3050926103267NoneItem Code 8.7Direction and Place Identification Signs upto 0.9 m2 SizeBoard. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.7 , Page No: 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11907.6211907.623.6FalseNoneNoneFalseNoneFalse42867.4320
3050927103267NoneItem Code 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers per Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +per 5 degree. The strength of detachment of the integrated cylindrical shanks, of diameter not less than 19 +per 2 mm and height not less than 30+per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel, to the Engineer.Schedule of Rates PWD 2023 24 vol 3, Item No 8.43 , Page No 74. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos482.38482.381080.0FalseNoneNoneFalseNoneFalse520970.40
3050928103267NoneItem Code 8.17Road DelineatorsSupplying and installation of delineators road way indicators, hazard markers, object markers, 80 100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC 79 2019 and the drawings. rates inclusive of GSTSchedule of Rates PWD 2023 24 vol 3, Item No 8.17 , Page No 67. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2670.952670.9564.0FalseNoneNoneFalseNoneFalse170940.80
3050929103267NoneItem Code 8.48Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.48 , Page No: 76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4739.264739.2645.0FalseNoneNoneFalseNoneFalse213266.70
3050930103267NoneItem Code 8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15 20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. rates inclusive of GSTSchedule of Rates PWD 2023 24 vol 4, Item No 8.31 , Page No 71. Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm248.46248.4682.5FalseNoneNoneFalseNoneFalse20497.950
3050931103267NoneItem Code 8.29(i)Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29(i) , Page No: 71 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr2923.282923.28130.0FalseNoneNoneFalseNoneFalse380026.40
3050932103267NoneItem Code 8.25 (i)Metal Beam Crash Barrier (i)Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.25( i) , Page No: 69 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr4810.624810.62100.0FalseNoneNoneFalseNoneFalse481062.00
17103415280000NoneNoneRoadsPkg-775 ESTIMATE FOR BOX CULVERT7820122.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050933103268NoneItem Code 2.11 II ADismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol-3, Item No: 2.11 , Page No: 10 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum237.89237.8952.64FalseNoneNoneFalseNoneFalse12522.52960
3050934103268NoneItem Code 2.17 (ix) BDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means B. Above 600 mm to 900 mm dia Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.17 (ix) B , Page No: 11 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1448.471448.4762.5FalseNoneNoneFalseNoneFalse90529.3750
3050935103268NoneItem Code 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023 24 vol 1, Item No. 1.14.1 , Page No. 8 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum134.8134.8386.84FalseNoneNoneFalseNoneFalse52146.0320
3050936103268NoneItem Code 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1.3.6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 vol 1, Item No. 2.1.3 , Page No. 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7915.067915.0634.84FalseNoneNoneFalseNoneFalse275760.69040
3050937103268NoneItem Code 2.11 HSteel FabricationSupplying, fitting and placing TMT FE 550 per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping per welding joints, tying with binding wire per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023 24 vol 1, Item No. 2.11 h , Page No. 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne104420.94104420.9411.697FalseNoneNoneFalseNoneFalse1221411.735180
3050938103268NoneItem Code 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule Rate PWD 2023 24 vol 1, Item No. 2.4.3 ,Rate inclusive form work Page No. 16 plus rate inclusive of form work 20 percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10048.3910048.39101.8FalseNoneNoneFalseNoneFalse1022926.1020
3050939103268NoneItem Code 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 vol 1, Item No. 2.4.3 , Page No. 16 plus rate inclusive of form work 8 Percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9043.559043.5555.04FalseNoneNoneFalseNoneFalse497756.9920
3050940103268NoneItem Code 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 , Item No. 2.5.2 , Page No. 16 plus rate inclusive of form work 20 percent And Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10852.4510852.4537.8FalseNoneNoneFalseNoneFalse410222.610
3050941103268NoneItem Code 12.2Providing weep holes in Brick masonry per Plain per Reinforced concrete abutment, wing wall per return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V .20H towards drawing foce. Complete as per drawing and Technical Specifications Schedule of Rates PWD 2023 24 vol 3, Item No. 12.2 , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr315.86315.8632.0FalseNoneNoneFalseNoneFalse10107.520
3050942103268NoneItem Code 12.4Providing and laying of Filter media with granular materials per stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023 24 vol 3, Item No. 12.4 , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3537.923537.9254.24FalseNoneNoneFalseNoneFalse191896.78080
3050943103268NoneItem Code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite per trap per basalt crushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023 24 vol 1, Item No. 2.4.3 , Page No. 16 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10027.7710027.7716.84FalseNoneNoneFalseNoneFalse168867.64680
3050944103268NoneItem Code 14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS. 280 & IS.4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extrafor laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023 24 vol 3, Item No. 14.2 , Page No. 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3243.213243.218.36FalseNoneNoneFalseNoneFalse27113.23560
3050945103268NoneItem Code 4.2 (v)By Mix in Place Method Construction of Granular Sub Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading V Material Schedule of Rates PWD 2023 24 vol 3, Item No. 4.2 v , Page No. 23 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3117.653117.6556.0FalseNoneNoneFalseNoneFalse174588.40
3050946103268NoneItem Code 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023 24 vol 3, Item No. 13.8 , Page No. 121 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9001.429001.4286.4FalseNoneNoneFalseNoneFalse777722.6880
3050947103268NoneItem Code 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification Batching Plant Schedule of Rates PWD 2023 24 vol 3, Item No. 13.9 , Page No. 122 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum15641.1415641.14140.0FalseNoneNoneFalseNoneFalse2189759.60
3050948103268NoneItem Code 13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) Rates are inclusive of GST 18 percent Schedule of Rates PWD 2023-24 vol- 3, Item No: 13.2 , Page No: 121 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18464.0718464.078.33FalseNoneNoneFalseNoneFalse153805.70310
3050949103268NoneItem Code 13.16Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm in traffic direction, covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS. 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking per backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023 24 vol 3, Item No. 13.16 , Page No. 124 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2372.272372.27160.0FalseNoneNoneFalseNoneFalse379563.20
3050950103268NoneItem Code 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023 24 vol 3, Item No. 8.1 , Page No. 66 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm272.25272.2544.76FalseNoneNoneFalseNoneFalse12185.910
3050951103268NoneItem Code 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3, Item No. 8.4 , Page No. 63 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.191.19200.0FalseNoneNoneFalseNoneFalse238.00
3050952103268NoneItem Code 12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification A. Granular material Schedule of Rates PWD 2023 24 vol 3, Item No. 12.3A , Page No. 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1543.631543.6397.82FalseNoneNoneFalseNoneFalse150997.88660
17103415280000NoneNoneRoadsPkg-775 Construction of Drains between Ch-0.0km to 4.0km at selected reaches3819991.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050953103269None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 38 Item No1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum134.8134.8856.8FalseNoneNoneFalseNoneFalse115496.640
3050954103269None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7915.67915.654.0FalseNoneNoneFalseNoneFalse427442.40
3050955103269None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne104420.94104420.949.603FalseNoneNoneFalseNoneFalse1002754.286820
3050956103269None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8356.488356.4870.2FalseNoneNoneFalseNoneFalse586624.8960
3050957103269None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11281.2411281.24108.0FalseNoneNoneFalseNoneFalse1218373.920
3050958103269None2.4.2 ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnicalspecifications.M20DesignMixUsing20mmnominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10027.7710027.7746.8FalseNoneNoneFalseNoneFalse469299.6360
17103415280000NoneNoneRoadsPkg-775 Estimate for Shifting of PVC Water Supply Pipe Lines1478773.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050959103270None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum346.26346.261944.0FalseNoneNoneFalseNoneFalse673129.440
3050960103270None10.14.11ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 110 mm DiaRates are inclusive of GST 18% ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm473.13473.131200.0FalseNoneNoneFalseNoneFalse567756.00
3050961103270None10.14.2 ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 75 mm DiaRates are inclusive of GST 18%PWD SoR - 2023-24 ( Item No.VOL-V-10.14.2 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm212.78212.78600.0FalseNoneNoneFalseNoneFalse127668.00
3050962103270None14.8ProvidingandinstallingatsiteofworkP.V.C.pipesincludingcostofpipesandspecialsandlabour,includingloweringintotrenches,layingtruetoline,levelandperfectlinkingatjointsleakproofincludingjointingofapprovedtypewithalllabourchargesandallliftcharges,handlingchargesincludingencasingthepipearoundtoadepthnotlessthan15cmswithgravelorselectedearthavailable from the excavation etc. complete. - 6 kg/sqcm - 63 mm DiaRates are inclusive of GST 18%PWD SoR - 2023-24 ( Item No.VOL-V-10.14.8 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm183.7183.7600.0FalseNoneNoneFalseNoneFalse110220.00
17103415280000NoneNoneRoadsPkg-775 Construction of Retaining Wall (180 m Long)1755281.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050963103271None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum134.8134.8110.25FalseNoneNoneFalseNoneFalse14861.70
3050964103271None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7915.067915.069.98FalseNoneNoneFalseNoneFalse78992.29880
3050965103271None2.11 hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperations complete as per drawing and technical specification. All other type of structuresRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h, Page No: 18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne104420.94104420.949.57FalseNoneNoneFalseNoneFalse999308.39580
3050966103271None2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9192.129192.1223.62FalseNoneNoneFalseNoneFalse217117.87440
3050967103271None2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusingneedlevibrators,providingweepholeswherevernecessary,includingalllead&lifts,costofallmaterialsofquality,confirmingtotherequirementsofrelevantIScodes,labour,Usagechargesofmachinery,curingandallotherappurtenancesrequiredtocompletetheworkaspertechnical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesRates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 Additionalities for Formwork, Centering & Scaffolding- For Box Culvert @ 10%, as PWD Vol-1, Pg No. 111 (Corrigendum-3, Pg-2) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9192.129192.1248.04FalseNoneNoneFalseNoneFalse441589.44480
3050968103271None12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm315.86315.8610.8FalseNoneNoneFalseNoneFalse3411.2880
17103415280000NoneNoneRoadsPkg-775 Road Maintenance Activities to be carried out for the First Year. (No Payment will be made for the activities)0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050969103272None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 25.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050970103272None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 1920) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050971103272None10.3Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050972103272None10.2Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050973103272None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespective of quantity UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =240.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050974103272None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =95.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103415280000NoneNoneRoadsPkg-775 Road Maintenance - Activities to be carried out for the Second Year.0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050975103273None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =38.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050976103273None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =2560.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050977103273None10.3Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050978103273None10.2Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050979103273None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 Have to rectify irrespective of quantity UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =120.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3050980103273None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =180.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103415280000NoneNoneRoadsPkg-775 Estimates for Maintenance - Activities to be carried out for the Third Year (PAID MAINTENANCE)323533.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050981103274None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm581.72581.7238.4FalseNoneNoneFalseNoneFalse22338.0480
3050982103274None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.898.892560.0FalseNoneNoneFalseNoneFalse22758.40
3050983103274None10.3Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.7357.73288.0FalseNoneNoneFalseNoneFalse16626.240
3050984103274None10.2Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm143.58143.58960.0FalseNoneNoneFalseNoneFalse137836.80
3050985103274None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm630.56630.5688.0FalseNoneNoneFalseNoneFalse55489.280
3050986103274None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum140.62140.62360.0FalseNoneNoneFalseNoneFalse50623.20
3050987103274None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2936.72936.73.2FalseNoneNoneFalseNoneFalse9397.440
3050988103274None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm304.92304.923.2FalseNoneNoneFalseNoneFalse975.7440
3050989103274None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm161.34161.3446.0FalseNoneNoneFalseNoneFalse7421.640
3050990103274None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.331.3350.0FalseNoneNoneFalseNoneFalse66.50
17103415280000NoneNoneRoadsPkg-775 Estimates for Maintenance - Activities to be carried out for the fourth Year (PAID MAINTENANCE)316560.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050991103275None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm602.5602.538.4FalseNoneNoneFalseNoneFalse23136.00
3050992103275None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr9.29.22560.0FalseNoneNoneFalseNoneFalse23552.00
3050993103275None10.3Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm59.7959.79288.0FalseNoneNoneFalseNoneFalse17219.520
3050994103275None10.2Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm148.7148.7960.0FalseNoneNoneFalseNoneFalse142752.00
3050995103275None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm653.08653.0888.0FalseNoneNoneFalseNoneFalse57471.040
3050996103275None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum145.64145.64360.0FalseNoneNoneFalseNoneFalse52430.40
17103415280000NoneNoneRoadsPkg-775 Estimates for Maintenance - Activities to be carried out for the fifth Year (PAID MAINTENANCE)386924.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3050997103276None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm623.26623.2638.4FalseNoneNoneFalseNoneFalse23933.1840
3050998103276None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr9.519.512560.0FalseNoneNoneFalseNoneFalse24345.60
3050999103276None10.3Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm61.8661.86288.0FalseNoneNoneFalseNoneFalse17815.680
3051000103276None10.2Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Rates are inclusive of GST 18% Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm153.84153.84960.0FalseNoneNoneFalseNoneFalse147686.40
3051001103276None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm675.6675.6176.0FalseNoneNoneFalseNoneFalse118905.60
3051002103276None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum150.66150.66360.0FalseNoneNoneFalseNoneFalse54237.60
17103415280000NoneNoneRoadsPkg-775 Estimates for Renewal after maintenance period11235048.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3051003103277None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3251.353251.353.2FalseNoneNoneFalseNoneFalse10404.320
3051004103277None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm337.59337.593.2FalseNoneNoneFalseNoneFalse1080.2880
3051005103277None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm178.63178.6320.0FalseNoneNoneFalseNoneFalse3572.60
3051006103277None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.471.47200.0FalseNoneNoneFalseNoneFalse294.00
3051007103277None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm19.6719.6718559.36FalseNoneNoneFalseNoneFalse365062.61120
3051008103277None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum17951.2417951.24556.78FalseNoneNoneFalseNoneFalse9994891.40720
3051009103277None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm868.56868.56640.0FalseNoneNoneFalseNoneFalse555878.40
3051010103277None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm598.16598.16508.0FalseNoneNoneFalseNoneFalse303865.280
17103415280000NoneNoneRoadsPkg-775 Electrical Pole Shifting467381.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3051011103278NoneM 1.06 P-01 L 1.1.1 P-43 Vol-62 00 006-PSC Pole-9.0M Long 200 kg WL Disging or Pits 1.8 mir depth for errcction or 9 10 10 mtr Long Siccl/ RCC/PSC supporis n.per approved Drawing Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos6380.686380.686.0FalseNoneNoneFalseNoneFalse38284.080
3051012103278NoneM 1.06 P- 01, L 2.02 P- 44 vol-602 00 006-PSC Pole-9.0M Long 200 kg WL Erectiion of PSC poles 9 to 10 mtr long but in 4199.00 a pil of 1.8 mir dcpth. - Ordinary SoiL Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1470.941470.946.0FalseNoneNoneFalseNoneFalse8825.640
3051013103278NoneM 24 (B) p- 06, L1.7.1 P-44 Vol-6Guy set with 2 Nos. 15 simain insulator and Concreting matcrials as pcr Drwg No BESCOM/GMCPNIDI.24.10.07-G1 Digging of Pit for GUY SET - Ordinary Soil Digging of Pit for GUY SET - Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet2056.42056.420.0FalseNoneNoneFalseNoneFalse41128.00
3051014103278NoneM 24 (B) P-06, L-5.11 VOL-6Fixing orGUY Scts with break insulalors making usc of 7/3.15 mm (7/10 SWG)galvaniscd sicel wire with turn buckle and anchoring arrangemcnt as pcr approved using 2 strain insulators (No.15) for- drawing.(Excluding cxcavation or PIT) bul Anticlimbing D. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet408.37408.3720.0FalseNoneNoneFalseNoneFalse8167.40
3051015103278NoneM 24 (A) P-06, L 1.7.1 P-44 VOL-6Guy set with No. 15 strain insulator & Concreting meterials as per Drwg No.BESCONGMCP/DL. 24.10.07-GI Digging of Pit for GUY SET - Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1978.431978.4317.0FalseNoneNoneFalseNoneFalse33633.310
3051016103278NoneM 24(A) P-06, L 5.10 P-03, VOL-6Guy set with No. 15 strain insulator & Concreting materials as per Drwg No.BESCONGMCP/DL. 24.10.07-GI Fixing of GUY Sets with break insulators making use of 7/3.15 mm(7/10SWG)galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing.(Excluding excavation of PIT)Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet351.54351.5417.0FalseNoneNoneFalseNoneFalse5976.180
3051017103278NoneM 24(C) P-06, L 1.7.1 P-44, vol-6Guy set with No. 8 strain insulator & Concreting materials as per Drawing No.BESCOM/GM/CPnmDt; 24.10.07-GI Digging or Pit for GUY SET- Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1936.141936.145.0FalseNoneNoneFalseNoneFalse9680.70
3051018103278NoneM 24 (C) P-06, L 5.10 P-03, VOL-6Guy set with No. 8 strain insulator & Concreting materials as per Drwg No.BESCOM/GM/CPnmDt; 24.10.07-GI Fixing or GUY Sets with break insulators making use of 7/3.15 mm (7/0 SWG) galvanised steel wire with turn buckle and anchoring arrangement as per approved drawing.(Excluding excavation or PIT) Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet351.14351.145.0FalseNoneNoneFalseNoneFalse1755.70
3051019103278NoneM 10(B) P-03, L 5.03 P-03, VOL-0611 kV Horizontal cross arm with HT Single Top support.clamp,bolts. nuts and washers For PSCC Polcs 140 KG WL-GI Fixing of V-Shape/Horizontal cross arm including single lop support Braces and Insulators fixing. -Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1444.51444.58.0FalseNoneNoneFalseNoneFalse11556.00
3051020103278NoneM 6.06 P-03, VOL-0602 83 008-1IkV. 5KN Composite/Polymcric Pin Insulator(24mm dia FP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos270.92270.9224.0FalseNoneNoneFalseNoneFalse6502.080
3051021103278NoneM 6.10 P-03, VOL-0602 83 320-Silcon rubbcr composite disk insulator/1IkV 45 kN Polymcric insulator Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos245.81245.8112.0FalseNoneNoneFalseNoneFalse2949.720
3051022103278NoneM 2.06 P-02, L 5.02 P-03,VOL-0602 80 014-LT 4 Pin X Arms- GI Fixing of 4 Pin cross arm with insulator and Braces fixing. - Ordinary Soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos712.34712.346.0FalseNoneNoneFalseNoneFalse4274.040
3051023103278NoneM 5.06 P-2, VOL-0602 83 158-No8 Strain Insulator Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos138.76138.766.0FalseNoneNoneFalseNoneFalse832.560
3051024103278NoneM 61.17 P-27 VOL-0602 80 623-B & N Size 16x100mm-Gl Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg175.2175.210.0FalseNoneNoneFalseNoneFalse1752.00
3051025103278NoneM 6.03 P-3,VOL-0602 83 003-1.1kV Ceramic Pin Insulator (Shell only) Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos40.9640.9624.0FalseNoneNoneFalseNoneFalse983.040
3051026103278NoneM 6.04 P-03 VOL-0602 83 053-1.1kV GI Pin FOR 2/1.1kV Cermaic shell Insulator Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos46.2546.2524.0FalseNoneNoneFalseNoneFalse1110.00
3051027103278NoneM 8.02 P-03 VOL-0602 81 008-8 SWG GI Wire ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg99.1799.1730.0FalseNoneNoneFalseNoneFalse2975.10
3051028103278NoneM 8.01 P-03 VOL-0602 81 1107/10 SWG Guy WIRE Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg102.04102.0430.0FalseNoneNoneFalseNoneFalse3061.20
3051029103278NoneM 6.02 P-46 VOL-06 Releasing of ReFixing rabbit ASCR Conductar - ordinary soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm10949.4510949.4511.0FalseNoneNoneFalseNoneFalse120443.950
3051030103278NoneM 2.02 P- 44, VOL- 06Releasing of ReFixing PSC Pole 9 mtr long 200 kg WL Ordinary soil Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4289.914289.9137.0FalseNoneNoneFalseNoneFalse158726.670
3051031103278NoneM 13.11 P-06 VOL-06Releasing & Refixing of Over Head Service Mains (Single Phase/Three Phase) for consumer installation and street lighting and similar work (While replacing existing Pole) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos136.12136.1235.0FalseNoneNoneFalseNoneFalse4764.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103415290000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103415290000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103415290001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103415480000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103415510000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103415550000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103415580000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103415650000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17103415680000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103415710000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103415740000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17103415770000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103415810000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103415860000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103415900000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103415930000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103415960000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103415990000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103416030000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103416060000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17103416090000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17103416110000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17103416160000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17103416190000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17103416220000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.472.90Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent, Bill copies shall not be accepted
NoneNoneNoneNone3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19,2019-20,2020-21,2021-22&2022-23 Executed in any one year the following minimum quantities of work (Earth Work for Embankment-Subgrade-Shoulders -8809.54 Cum 2. GSB or WMM -8525.64Cum 3.BM/SDBC/DBM/BC 1731.43Cum 4.Reinforced Cement Concrete (RCC) M20 higher grades -443.82cum)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No 2.Mechanical Paver Finisher:1 No 3. Static Road Roller: 1 No. 4. Vibratory Road Roller: 1 No. 5.Tippers : 4NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own
NoneNoneNoneNoneii) Machineries could be on Lease/Hire: 1.Wet Mix Plant / Pug mill : 1 No.,2.Truck mounted Bitumen Sprayer: 1 No, 3. Motor Grader: 1 No, 4. Vibratory Road Roller (6T to 10T): 2 Nos 5.Tandem Roller: 1No, 6.Excavator 0.90 Cum Bucket Capacity:2 No, 7.Tipper Trucks:6 Nos, 8.Self Loading Concrete Mixer 2 M3 Capacity:3 Nos, 9. Water Tanker: 3 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNone3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2018-19 to 2022-23 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2022-23 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.283.74 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.1891.60 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
NoneNoneNoneNoneNILOthersNIL
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NIL
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
EPF registrationFalseTechnical Bid
Copies of Tax RegistrationFalseTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
RoadsDakshina KannadaBantwalaMangaloreBANTWALBantwala talukNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1710342306000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer, SHDP, Bangalore
streetNone
cityBengaluru
stateKarnataka
pin560001