tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710343814000 | 1 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Road Work | 70814897.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053322 | 103384 | None | 16.29 Vol 3 | The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1
Rates are inclusive of GST 18
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.29 ,Page No: 149
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 20289.2 | 20289.2 | 2.0 | False | None | None | False | None | False | 40578.4 | 0 | 3053323 | 103384 | None | 2.5 (a) ii vol3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.In area of light jungle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 ii a , Page No: 9 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 492.98 | 492.98 | 102.15 | False | None | None | False | None | False | 50357.907 | 0 | 3053324 | 103384 | None | 3.5 vol3 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.5 , Page No: 17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.53 | 7.53 | 12485.0 | False | None | None | False | None | False | 94012.05 | 0 | 3053325 | 103384 | None | 1.12 vol1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 119.17 | 119.17 | 8046.36 | False | None | None | False | None | False | 958884.7212 | 0 | 3053326 | 103384 | None | 1.7 vol 1 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures grade
d with desired compaction. ( royalty shall be recovered @ Rs 60 / cum
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.7 , Page No: 7 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 149.27 | 149.27 | 5845.2 | False | None | None | False | None | False | 872513.004 | 0 | 3053327 | 103384 | None | 1.8 vol1 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.8 , Page No: 7 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 594.59 | 594.59 | 2332.8 | False | None | None | False | None | False | 1387059.552 | 0 | 3053328 | 103384 | None | 4.2 B (V) vol3 | By Mix in Place Method
Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.2 (v) , Page No: 23 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2959.13 | 2959.13 | 3734.68 | False | None | None | False | None | False | 11051403.6284 | 0 | 3053329 | 103384 | None | 4.17 vol3 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3210.01 | 3210.01 | 5662.32 | False | None | None | False | None | False | 18176103.8232 | 0 | 3053330 | 103384 | None | 5.1 A(i) vol3 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.1 A (I) , Page No: 31 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 51.43 | 51.43 | 22224.24 | False | None | None | False | None | False | 1142992.6632 | 0 | 3053331 | 103384 | None | 5.4 vol3 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.4 , Page No: 31 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 23311.74 | False | None | None | False | None | False | 409354.1544 | 0 | 3053332 | 103384 | None | 5.13C Vol3 | Dense Graded Bituminous Macadam Grading - II for traffic Greater than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP usingcrushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.13 C , Page No: 35
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 12252.98 | 12252.98 | 1631.83 | False | None | None | False | None | False | 19994780.3534 | 0 | 3053333 | 103384 | None | 5.17C | Bituminous Concrete Grading II for traffic Greater than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve thedesired compaction as per MORTH specification clause No. 507 complete in all respects
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.17 C , Page No: 38 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14231.17 | 14231.17 | 932.46 | False | None | None | False | None | False | 13269996.7782 | 0 | 3053334 | 103384 | None | 3.6 VOL3 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 3.6 , Page No: 17
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 618.42 | 618.42 | 3256.94 | False | None | None | False | None | False | 2014156.8348 | 0 | 3053335 | 103384 | None | 14.4 a vol3 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specification
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.4(a) , Page No: 129 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2398.41 | 2398.41 | 564.0 | False | None | None | False | None | False | 1352703.24 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District.Part B Road safety components | 3800097.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053336 | 103385 | None | 8.16 i vol3 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (i) 5th kilometre stone (precast)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (i) , Page No: 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 6373.61 | 6373.61 | 1.0 | False | None | None | False | None | False | 6373.61 | 0 | 3053337 | 103385 | None | 8.16 ii vol3 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (ii) , Page No: 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 3671.63 | 3671.63 | 1.0 | False | None | None | False | None | False | 3671.63 | 0 | 3053338 | 103385 | None | 8.16 iii vol3 | Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.16 (iii) , Page No: 67
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 1056.2 | 1056.2 | 10.0 | False | None | None | False | None | False | 10562.0 | 0 | 3053339 | 103385 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 664.83 | 664.83 | 573.42 | False | None | None | False | None | False | 381226.8186 | 0 | 3053340 | 103385 | None | 8.6 ii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 ii , Page No: 64 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5955.89 | 5955.89 | 48.0 | False | None | None | False | None | False | 285882.72 | 0 | 3053341 | 103385 | None | 8.6 iv vol3 | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 iv , Page No: 64
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4520.86 | 4520.86 | 31.0 | False | None | None | False | None | False | 140146.66 | 0 | 3053342 | 103385 | None | 8.6 viii | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.6 viii , Page No: 64
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5455.39 | 5455.39 | 2.0 | False | None | None | False | None | False | 10910.78 | 0 | 3053343 | 103385 | None | 8.7 vol3 | Direction and Place Identification Signs upto 0.9 m2 SizeBoard.
Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.7 , Page No: 65
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11302.14 | 11302.14 | 3.6 | False | None | None | False | None | False | 40687.704 | 0 | 3053344 | 103385 | None | 8.43 vol3 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 457.86 | 457.86 | 719.0 | False | None | None | False | None | False | 329201.34 | 0 | 3053345 | 103385 | None | 8.17 voll | Road Delineators
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.17 , Page No: 67
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2535.14 | 2535.14 | 4.0 | False | None | None | False | None | False | 10140.56 | 0 | 3053346 | 103385 | None | 8.48 vol3 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.48 , Page No: 76
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 4498.28 | 4498.28 | 21.0 | False | None | None | False | None | False | 94463.88 | 0 | 3053347 | 103385 | None | 8.31 vol3 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 4, Item No: 8.31 , Page No: 71
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 235.83 | 235.83 | 105.0 | False | None | None | False | None | False | 24762.15 | 0 | 3053348 | 103385 | None | 8.29 (i) vol3 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.29 , Page No: 71
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 2774.73 | 2774.73 | 132.0 | False | None | None | False | None | False | 366264.36 | 0 | 3053349 | 103385 | None | 8.25i vol3 | Metal Beam Crash Barrier
(i)Type - A, ""W"" : Metal Beam Crash Barrier Providing and erecting a ""W"" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on
the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.25( i ) ,\Page No: 69
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 4566.02 | 4566.02 | 459.0 | False | None | None | False | None | False | 2095803.18 | 0 |
| 1710343814000 | 1 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part C Construction of Pipe Culverts | 539603.45 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053350 | 103386 | None | 2.8 ii A Vol3 | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.8(ii)A , Page No: 10
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 901.91 | 901.91 | 2.16 | False | None | None | False | None | False | 1948.1256 | 0 | 3053351 | 103386 | None | 2.10 iv B | Dismantling of Structures
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.10 (iv) (B) , Page No: 10 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 765.18 | 765.18 | 12.0 | False | None | None | False | None | False | 9182.16 | 0 | 3053352 | 103386 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 127.95 | 127.95 | 52.32 | False | None | None | False | None | False | 6694.344 | 0 | 3053353 | 103386 | None | 2.1.3 VOL1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7512.6 | 7512.6 | 3.58 | False | None | None | False | None | False | 26895.108 | 0 | 3053354 | 103386 | None | 2.11 h vol1 | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 99111.4 | 99111.4 | 0.22 | False | None | None | False | None | False | 21804.508 | 0 | 3053355 | 103386 | None | 2.4.2 vol1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9024.99 | 9024.99 | 36.48 | False | None | None | False | None | False | 329231.6352 | 0 | 3053356 | 103386 | None | 9.1 iii vol3 | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (i). 1500 mm dia
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 9.1.iii , Page No: 87
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 13921.33 | 13921.33 | 5.0 | False | None | None | False | None | False | 69606.65 | 0 | 3053357 | 103386 | None | 12.3A Vol3 | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1465.14 | 1465.14 | 10.71 | False | None | None | False | None | False | 15691.6494 | 0 | 3053358 | 103386 | None | 14.2 vol3 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 14.2 , Page No: 129
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3078.3 | 3078.3 | 19.02 | False | None | None | False | None | False | 58549.266 | 0 |
| 1710343814000 | 1 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part D construction of Retaining wall | 1125130.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053359 | 103387 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.14.1 , Page No: 8 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 127.95 | 127.95 | 94.5 | False | None | None | False | None | False | 12091.275 | 0 | 3053360 | 103387 | None | 2.1.3 vol1 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.1.3 , Page No: 15
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7512.6 | 7512.6 | 8.55 | False | None | None | False | None | False | 64232.73 | 0 | 3053361 | 103387 | None | 2.11h | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.11 h , Page No: 18
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 99111.4 | 99111.4 | 6.14 | False | None | None | False | None | False | 608543.996 | 0 | 3053362 | 103387 | None | 2.4.2 vol1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9192.12 | 9192.12 | 20.25 | False | None | None | False | None | False | 186140.43 | 0 | 3053363 | 103387 | None | 2.4.2 vol1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9192.12 | 9192.12 | 27.45 | False | None | None | False | None | False | 252323.694 | 0 | 3053364 | 103387 | None | 12.2 vol3 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.2 , Page No: 117
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 299.8 | 299.8 | 6.0 | False | None | None | False | None | False | 1798.8 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. E Shifting of PVC WaterSupply Pipe lines Providing CableDuct and | 2861102.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053365 | 103388 | None | 1.17 vol1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m
PWD SoR - 2023-24 ( Item No.VOL-I-1.17 / Page No. 10)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 346.26 | 346.26 | 3240.0 | False | None | None | False | None | False | 1121882.4 | 0 | 3053366 | 103388 | None | VOL-V-10.14.11 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 110 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.11 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 473.13 | 473.13 | 2000.0 | False | None | None | False | None | False | 946260.0 | 0 | 3053367 | 103388 | None | VOL-V-10.14.2 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 75 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.2 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 212.78 | 212.78 | 2000.0 | False | None | None | False | None | False | 425560.0 | 0 | 3053368 | 103388 | None | VOL-V-10.14.8 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all liftcharges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete. - 6 kg/sqcm - 63 mm Dia
PWD SoR - 2023-24 ( Item No.VOL-V-10.14.8 / Page No. 120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 183.7 | 183.7 | 2000.0 | False | None | None | False | None | False | 367400.0 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part F Road Maintenance Activities to be carried out for the Third Year. | 227290.42 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053369 | 103389 | None | 2.5 ii a vol3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.In area of light jungle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 ii a , Page No: 9
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | ha | 581.72 | 581.72 | 27.24 | False | None | None | False | None | False | 15846.0528 | 0 | 3053370 | 103389 | None | 16.19 vol3 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.89 | 8.89 | 1816.0 | False | None | None | False | None | False | 16144.24 | 0 | 3053371 | 103389 | None | 10.3 vol3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 57.73 | 57.73 | 204.3 | False | None | None | False | None | False | 11794.239 | 0 | 3053372 | 103389 | None | 10.20 vol3 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2 , Page No: 91
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 143.58 | 143.58 | 681.0 | False | None | None | False | None | False | 97777.98 | 0 | 3053373 | 103389 | None | 10.5 vol3 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using Vg-30 grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 630.56 | 630.56 | 113.5 | False | None | None | False | None | False | 71568.56 | 0 | 3053374 | 103389 | None | 16.22 vol3 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2936.7 | 2936.7 | 2.27 | False | None | None | False | None | False | 6666.309 | 0 | 3053375 | 103389 | None | 16.24i vol3 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paintRates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24i , Page No: 148
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 304.92 | 304.92 | 2.27 | False | None | None | False | None | False | 692.1684 | 0 | 3053376 | 103389 | None | 1.12 vol1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 140.62 | 140.62 | 45.0 | False | None | None | False | None | False | 6327.9 | 0 | 3053377 | 103389 | None | 8.10 vol3 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.10 , Page No: 66
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 161.34 | 161.34 | 2.88 | False | None | None | False | None | False | 464.6592 | 0 | 3053378 | 103389 | None | 8.4 vol3 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.33 | 1.33 | 6.25 | False | None | None | False | None | False | 8.3125 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part G Maintenance -Activities to becarried out for the Forth Year | 227277.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053379 | 103390 | None | 2.5ii a vol3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.In area of light jungle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 ii a , Page No: 9
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 602.5 | 602.5 | 27.24 | False | None | None | False | None | False | 16412.1 | 0 | 3053380 | 103390 | None | 16.19 vol3 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 9.2 | 9.2 | 1816.0 | False | None | None | False | None | False | 16707.2 | 0 | 3053381 | 103390 | None | 10.3 vol3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 59.79 | 59.79 | 204.3 | False | None | None | False | None | False | 12215.097 | 0 | 3053382 | 103390 | None | 10.20 vol3 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 148.7 | 148.7 | 681.0 | False | None | None | False | None | False | 101264.7 | 0 | 3053383 | 103390 | None | 10.5 vol3 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using Vg-30 grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 653.08 | 653.08 | 113.5 | False | None | None | False | None | False | 74124.58 | 0 | 3053384 | 103390 | None | 1.12 vol1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 145.64 | 145.64 | 45.0 | False | None | None | False | None | False | 6553.8 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part H Maintenance -Activities to becarried out for the Fifth Year | 311791.7 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053385 | 103391 | None | 2.5 ii a vol3 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.In area of light jungle
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 2.5 ii a , Page No: 9 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 623.26 | 623.26 | 27.24 | False | None | None | False | None | False | 16977.6024 | 0 | 3053386 | 103391 | None | 16.19 vol3 | Maintenance of Drains
The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.19 , Page No: 147
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 9.51 | 9.51 | 1816.0 | False | None | None | False | None | False | 17270.16 | 0 | 3053387 | 103391 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 61.86 | 61.86 | 204.3 | False | None | None | False | None | False | 12637.998 | 0 | 3053388 | 103391 | None | 10.2 vol3 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 153.84 | 153.84 | 681.0 | False | None | None | False | None | False | 104765.04 | 0 | 3053389 | 103391 | None | 10.5 vol3 | Filling Pot-holes and Patch Repairs with Bituminous
concrete, 40mm (using Vg-30 grade Bitumen)Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page No: 91
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 675.6 | 675.6 | 227.0 | False | None | None | False | None | False | 153361.2 | 0 | 3053390 | 103391 | None | 1.12 vol1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth)
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 150.66 | 150.66 | 45.0 | False | None | None | False | None | False | 6779.7 | 0 |
| 1710343814000 | 1 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part i Renewal after maintenance period | 13698328.99 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053391 | 103392 | None | 16.22 vol3 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.22 , Page No: 147
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 3251.35 | 3251.35 | 2.27 | False | None | None | False | None | False | 7380.5645 | 0 | 3053392 | 103392 | None | 16.24 i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 16.24 i , Page No: 148
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 337.59 | 337.59 | 2.27 | False | None | None | False | None | False | 766.3293 | 0 | 3053393 | 103392 | None | 8.10 vol3 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.10 , Page No: 66 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 178.63 | 178.63 | 5.75 | False | None | None | False | None | False | 1027.1225 | 0 | 3053394 | 103392 | None | 8.4 vol3 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 1.47 | 1.47 | 25.0 | False | None | None | False | None | False | 36.75 | 0 | 3053395 | 103392 | None | 5.3 vol3 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.3 , Page No: 31
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 19.67 | 19.67 | 23002.14 | False | None | None | False | None | False | 452452.0938 | 0 | 3053396 | 103392 | None | 5.16 c vol3 | Bituminous Concrete Grading II for traffic Greater than 20 MSA
Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 5.16 C , Page No: 38
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 17951.24 | 17951.24 | 690.07 | False | None | None | False | None | False | 12387612.1868 | 0 | 3053397 | 103392 | None | 8.15 vol3 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.15 , Page No: 67
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 868.56 | 868.56 | 529.9 | False | None | None | False | None | False | 460249.944 | 0 | 3053398 | 103392 | None | 8.43 vol3 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.43 , Page No: 74
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 598.16 | 598.16 | 650.0 | False | None | None | False | None | False | 388804.0 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. Part electric estimation | 1450670.66 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053399 | 103393 | None | L1.6.1 P-O1 VOL-06 | Earthing Material Set Digging of pit. For providing GI Pipe type
Earthing - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 3288.14 | 3288.14 | 12.0 | False | None | None | False | None | False | 39457.68 | 0 | 3053400 | 103393 | None | L 8.05 P-04 VOL-06 | Earthing Material Set Providing GI Pipe Earthing for lightning
arresters Transformer Neutral and
Transformer Metal parts (Excluding digging
of pits) - Ordinary Soil(Rates Or Including 18 percent GST)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 251.1 | 251.1 | 12.0 | False | None | None | False | None | False | 3013.2 | 0 | 3053401 | 103393 | None | L 2.02 P-44 VOL-06 | eleasing and Refixing-RCC Pole-9.0M
Long 145 kg WL - Ordinary Soil 1.90 x 1113 (Basic Rate) =2114.7 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4374.22 | 4374.22 | 8.0 | False | None | None | False | None | False | 34993.76 | 0 | 3053402 | 103393 | None | Non SR | Releasing and Refixing-Distribution
Transformer-25kVA Almunium Wdg.
(Conventional) - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 2995.66 | 2995.66 | 3.0 | False | None | None | False | None | False | 8986.98 | 0 | 3053403 | 103393 | None | Non SR | Releasing and Refixing-Distribution
Transformer-63kVA Almunium Wdg. -
Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 2995.66 | 2995.66 | 1.0 | False | None | None | False | None | False | 2995.66 | 0 | 3053404 | 103393 | None | Non SR | Releasing and Refixing-Transformer
Structure Complete with Cross Arms Braces,
Clamps ,Bolts and Nuts and Washers - For
25/63 KVA 3 Star- Using 2 nos of 9 Mtr
RCC Poles - Ordinary Soil(Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 12248.84 | 12248.84 | 4.0 | False | None | None | False | None | False | 48995.36 | 0 | 3053405 | 103393 | None | Non SR | Releasing and Refixing Lightning Arresters
9kV 5kA Polymeric type - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 298.8 | 298.8 | 12.0 | False | None | None | False | None | False | 3585.6 | 0 | 3053406 | 103393 | None | M 1.01 P-01 L1.1.1 P-43 VOL-06 |
02 00 105-RCC Pole-9.0M
Long 145 kg WL
Digging of Pits 1.8 mtr depth for errection of
9 to 10 mtr Long Steel/ RCC/PSC supports as
per approved Drawing - Ordinary Soil P G 03 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 10182.92 | 10182.92 | 6.0 | False | None | None | False | None | False | 61097.52 | 0 | 3053407 | 103393 | None | M 1.01 P 01, L 2.02 P-44 VOL-06 | 02 00 105-RCC Pole-9.0M
Long 145 kg WL erection of RCC poles 9 to 10 mtr long but in
a pit of 1.8 mtr depth. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 6.0 | False | None | None | False | None | False | 8825.64 | 0 | 3053408 | 103393 | None | M1.06 P-01, L 1.1.1 P-43 VOL-06 |
02 00 006-PSC Pole-9.0M
Long 200 kg WL
Digging of Pits 1.8 mtr depth for errection of
9 to 10 mtr Long Steel/ RCC/PSC supports as
per approved Drawing - Ordinary Soil P G 03 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 6380.68 | 6380.68 | 11.0 | False | None | None | False | None | False | 70187.48 | 0 | 3053409 | 103393 | None | M 1.06 P-01, L 2.02 P-44 VOL-06 |
02 00 006-PSC Pole-9.0M
Long 200 kg WL Erection of PSC poles 9 to 10 mtr long but in
a pit of 1.8 mtr depth. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1470.94 | 1470.94 | 11.0 | False | None | None | False | None | False | 16180.34 | 0 | 3053410 | 103393 | None | M 10 (B) P-03, L 5.03 P-03 VOL-06 | 11 kV Horizontal cross arm
with HT Single Top support,
clamp,bolts, nuts and washers
For RCC Poles 140 KG WL
-GI
Fixing of V-Shape/Horizontal cross arm
including single top support Braces and
Insulators fixing. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1463.01 | 1463.01 | 6.0 | False | None | None | False | None | False | 8778.06 | 0 | 3053411 | 103393 | None | M 10 (C) P-03, L 5.03 P-03 VOL-06 | 11 kV, Horizontal Cross Arm
with HT Single Top supports,
clamps, bolts, nuts &
washers For PSCC Pole 200
KG WL- GI
Fixing of V-Shape/Horizontal cross arm
including single top support Braces and
Insulators fixing. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1457.72 | 1457.72 | 40.0 | False | None | None | False | None | False | 58308.8 | 0 | 3053412 | 103393 | None | M 6.06 P-03 VOL-06 | 02 83 008-11kV, 5KN
Composite/Polymeric Pin
Insulator(24mm dia FP Rod) (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 270.92 | 270.92 | 80.0 | False | None | None | False | None | False | 21673.6 | 0 | 3053413 | 103393 | None | M 6.10 P-03 VOL-06 | 02 83 320-Silcon rubber
composite disk
insulator/11kV 45 kN
Polymeric insulator (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 245.81 | 245.81 | 60.0 | False | None | None | False | None | False | 14748.6 | 0 | 3053414 | 103393 | None | M 24(A) P-06, L 5.10 P-03 VOL-06 | Guy set with 2 Nos. 15 strain
insulator & Concreting
materials as per Drwg No.
BESCOM/GM/CP/7/Dt;
24.10.07-GI
Digging of Pit for GUY SET - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2056.4 | 2056.4 | 35.0 | False | None | None | False | None | False | 71974.0 | 0 | 3053415 | 103393 | None | M 24(C) P-06,L 1.7.1 P-44 VOL-06 | Guy set with 2 Nos. 15 strain
insulator & Concreting
materials as per Drwg No.
BESCOM/GM/CP/7/Dt;
24.10.07-GI
Fixing of GUY Sets with break insulators
making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and
anchoring arrangement as per approved
drawing. (Excluding excavation of PIT) but
using 2 strain insulators (No.15) for -
Anticlimbing D - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 408.37 | 408.37 | 35.0 | False | None | None | False | None | False | 14292.95 | 0 | 3053416 | 103393 | None | M 7.02 P-03, L 6.02 P-03 VOL-06 |
02 84 108-Rabbit ACSR
Conductor
Stringing of conductor Rabbit ACSR
binding of conductor on each insulator and
dead ending on strain or disc/strain insulator
by means of clamps. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 83125.99 | 83125.99 | 5.2 | False | None | None | False | None | False | 432255.148 | 0 | 3053417 | 103393 | None | M 2.16 P-03,L 2.08 P-02 VOL-06 |
02 81 683-Spiral Earth
Electrode
Providing spiral earth electrode type earthing
along with pole (without charcoal, salt etc.,) -
Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 438.77 | 438.77 | 80.0 | False | None | None | False | None | False | 35101.6 | 0 | 3053418 | 103393 | None | L 2.02 P-44 VOL-06 | Releasing and Refixing-RCC Pole-9.0M
Long 145 kg WL - Ordinary Soil 1.90 x 1113 (Basic Rate)=2114.7 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4374.22 | 4374.22 | 6.0 | False | None | None | False | None | False | 26245.32 | 0 | 3053419 | 103393 | None | L 6.02 P-46 VOL-06 | Releasing and Refixing-Rabbit ACSR
Conductor - Ordinary Soil 1.9 x 4361 (Basic Rate)=8285 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 10950.64 | 10950.64 | 8.04 | False | None | None | False | None | False | 88043.1456 | 0 | 3053420 | 103393 | None | L 30.02 P-48 VOL-06 |
Releasing and Refixing-11kV 200Amps
Single Break GOS - Ordinary Soil 1.9 x 1104 (Basic Rate) =2097.62 (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 2772.17 | 2772.17 | 6.0 | False | None | None | False | None | False | 16633.02 | 0 | 3053421 | 103393 | None | L 2.02 P-44 VOL-06 | Releasing and Refixing-PSC Pole-9.0M
Long 200 kg WL - Ordinary Soil 1.9 x 1113 +1113=3246 (Rates Or Including 18 percent GST)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4443.12 | 4443.12 | 40.0 | False | None | None | False | None | False | 177724.8 | 0 | 3053422 | 103393 | None | M 1.05 P-01,L 1.2.1 P-01 VOL-06 |
02 00 004-PSC Pole-8.0M
Long 200 kg WL
Digging of Pits 1.5 mtr depth for errection of
7.5/8 mtr Long Steel/RCC/PSC/PCC
supports as per approved Drawing - Ordinary
Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 5553.36 | 5553.36 | 12.0 | False | None | None | False | None | False | 66640.32 | 0 | 3053423 | 103393 | None | L 2.01 P-02 VOL-06 | Erection of PSC poles of 7.5 to 8 mtr long in
pit of 1.5 mtr depth. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1218.51 | 1218.51 | 12.0 | False | None | None | False | None | False | 14622.12 | 0 | 3053424 | 103393 | None | M 14 (B) P-04,L 11 (A) P-05 VOL-06 |
4 Pin Cross Arm with pole
clamp, bolt & nuts & washers
for PSC Pole - GI
Fixing of 4 Pin cross arm with insulator and
Braces fixing. - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 925.12 | 925.12 | 25.0 | False | None | None | False | None | False | 23128.0 | 0 | 3053425 | 103393 | None | M 6.03 P-03 VOL-06 | 02 83 003-1.1kV Ceramic Pin
Insulator (Shell only) (Rates Or Including 18 percent GST)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 40.96 | 40.96 | 90.0 | False | None | None | False | None | False | 3686.4 | 0 | 3053426 | 103393 | None | M 6.04 P-03 VOL-06 |
02 83 053-1.1kV GI Pin FOR
1.1kV Cermaic shell
Insulator (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 46.25 | 46.25 | 90.0 | False | None | None | False | None | False | 4162.5 | 0 | 3053427 | 103393 | None | M 6.07 P-03 VOL-06 |
02 83 158-No8 Strain
Insulator (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 35.68 | 35.68 | 60.0 | False | None | None | False | None | False | 2140.8 | 0 | 3053428 | 103393 | None | M 24(C) P-06,L 1.7.1 P-44 VOL-06 | Guy set with No. 8 strain
insulator & Concreting
materials as per Drwg
No.BESCOM/GM/CP/7/Dt;
24.10.07-GI
Digging of Pit for GUY SET - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 1936.14 | 1936.14 | 25.0 | False | None | None | False | None | False | 48403.5 | 0 | 3053429 | 103393 | None | L 5.10 P-03 VOL-06 | Fixing of GUY Sets with break insulators
making use of 7/3.15 mm (7/10 SWG)
galvanised steel wire with turn buckle and
anchoring arrangement as per approved
drawing. (Excluding excavation of PIT) -
Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 298.68 | 298.68 | 25.0 | False | None | None | False | None | False | 7467.0 | 0 | 3053430 | 103393 | None | M 16(B) P-05 L 16(B) P-05 VOL -06 | 2 - Pin cross arm with pole
clamp , bolts, nuts and
washers with braces For
PSCC Poles 140 KG WL - GI
Fixing of 2 Pin cross arm with insulator and
Braces fixing - Ordinary Soil (Rates Or Including 18 percent GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 652.87 | 652.87 | 25.0 | False | None | None | False | None | False | 16321.75 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. 1ST YEAR Maintenance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053431 | 103394 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 21.92) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053432 | 103394 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 1644.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053433 | 103394 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053434 | 103394 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053435 | 103394 | None | 1.12 | Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053436 | 103394 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete,40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespeetine of quantity Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page
No:91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1710343814000 | 0 | None | None | Roads | Improvements to road SH- 37 Connecting Subramanya -Udupi Via Dharmsthala, Belthangadi and Karkala. From Ch-83.40 KM to 94.65 KM (In Selected Reaches) in Belthangadi Taluk of Dakshina Kannada District. 2nd Year Mainteance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3053437 | 103395 | None | 2.5(ii) a | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =32.88) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053438 | 103395 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =2192.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053439 | 103395 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol-3, Item No: 10.3,Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053440 | 103395 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)- Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003
Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.2, Page No: 91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053441 | 103395 | None | 1.12 | Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3053442 | 103395 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete,40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 Have to rectify irrespeetine of quantity Rates are inclusive of GST 18%
Schedule of Rates PWD 2023-24 vol- 3, Item No: 10.5 , Page
No:91 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
|
|
---|