createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710322660042
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1448000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate13-03-2024 15:19:34
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1348000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710322660071
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9766
titlePKG-616 Improvements to road from Kamthana-Dharmapur via Khasimpur (P) Yakatpur, Tadpalli, Rajgira and Hokarana (B) (MDR) Road from Ch 20.00 KM to 24.00 KM (in selected reaches) in Bidar Taluk of Bidar District
descriptionPKG-616 Improvements to road from Kamthana-Dharmapur via Khasimpur (P) Yakatpur, Tadpalli, Rajgira and Hokarana (B) (MDR) Road from Ch 20.00 KM to 24.00 KM (in selected reaches) in Bidar Taluk of Bidar District
categoryWORKS
categoryTextWorks
ecv96486396.10
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount1000000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-616/BIDAR/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103226600000NoneNoneRoadsRoad Estimate73087284.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037586102507NoneUNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in RECTANGLE shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3037587102507NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.93486.9393.12FalseNoneNoneFalseNoneFalse45342.92160
3037588102507NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5.Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.4313580.0FalseNoneNoneFalseNoneFalse100899.40
3037589102507NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.78392.05FalseNoneNoneFalseNoneFalse987744.2850
3037590102507NoneUNI SR 2023-24, V-1,Pg. No. 7 I. No.1.7.Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum147.44147.441740.02FalseNoneNoneFalseNoneFalse256548.54880
3037591102507NoneUNI SR 2023-24, V-1,Pg. No. 7 I. No.1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 per m for every 1.50 m height or part there of Deduct 5 per m if rollers are not used and tamping is done manually Add 8 per m for works under foul & sullage situation ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.28587.286053.6FalseNoneNoneFalseNoneFalse3555158.2080
3037592102507NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.8314742.84FalseNoneNoneFalseNoneFalse9005368.95720
3037593102507NoneUNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.86114.59FalseNoneNoneFalseNoneFalse17871723.6520
3037594102507NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.65727.65FalseNoneNoneFalseNoneFalse18160087.090
3037595102507NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.821747.2FalseNoneNoneFalseNoneFalse1104757.760
3037596102507NoneUNI SR 2023-24, v-3,Pg. No. 31 I. No.5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.3521747.2FalseNoneNoneFalseNoneFalse377313.920
3037597102507NoneUNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.311087.36FalseNoneNoneFalseNoneFalse12730060.60160
3037598102507NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.0652.39FalseNoneNoneFalseNoneFalse8854237.080
17103226600000NoneNoneRoadsTRAFFIC SAFETY2232382.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037599102508NoneUNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7.Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm11163.3911163.395.4FalseNoneNoneFalseNoneFalse60282.3060
3037600102508NoneUNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 90 cm equilateral triangle 8.5 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5803.485803.4848.0FalseNoneNoneFalseNoneFalse278567.040
3037601102508None8.5 (A) (viii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022" 60 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5323.985323.987.0FalseNoneNoneFalseNoneFalse37267.860
3037602102508None8.5 (A) (xii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5233.545233.5428.0FalseNoneNoneFalseNoneFalse146539.120
3037603102508None8.5 (A) (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 90 cm high octagon ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach8208.378208.373.0FalseNoneNoneFalseNoneFalse24625.110
3037604102508NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm656.67656.671064.18FalseNoneNoneFalseNoneFalse698815.08060
3037605102508NoneUNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos452.23452.23666.0FalseNoneNoneFalseNoneFalse301185.180
3037606102508NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
3037607102508NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3626.553626.554.0FalseNoneNoneFalseNoneFalse14506.20
3037608102508NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1043.241043.2415.0FalseNoneNoneFalseNoneFalse15648.60
3037609102508NoneUNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iiiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo64265.6964265.695.0FalseNoneNoneFalseNoneFalse321328.450
3037610102508NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach2504.022504.0214.0FalseNoneNoneFalseNoneFalse35056.280
3037611102508NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.38144.0FalseNoneNoneFalseNoneFalse18198.720
3037612102508NoneUNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i)Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm2740.672740.67100.0FalseNoneNoneFalseNoneFalse274067.00
17103226600000NoneNoneRoadsCDs Repairs461609.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037613102509NoneUNI SR 2023 - 24 ,V-3,Page No 8 Item No 1.12.Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.7348.0FalseNoneNoneFalseNoneFalse40959.60
3037614102509NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. " ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9324.13FalseNoneNoneFalseNoneFalse204162.24090
3037615102509NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9740.5FalseNoneNoneFalseNoneFalse95943.2850
3037616102509NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiest97894.6997894.690.19FalseNoneNoneFalseNoneFalse18599.99110
3037617102509NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.77110.0FalseNoneNoneFalseNoneFalse101944.70
17103226600000NoneNoneRoadsSUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 1 ROWS OF 1200mm730388.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037618102510NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (iDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum890.84890.8414.16FalseNoneNoneFalseNoneFalse12614.29440
3037619102510None2.17 (ix) B V-3Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (b) Above 600 mm to 900 mm dia Hume pipe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1357.941357.947.5FalseNoneNoneFalseNoneFalse10184.550
3037620102510NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3832.06FalseNoneNoneFalseNoneFalse4051.74280
3037621102510NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.2987.06FalseNoneNoneFalseNoneFalse51129.46740
3037622102510NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum1447.151447.1513.95FalseNoneNoneFalseNoneFalse20187.74250
3037623102510NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.372.37FalseNoneNoneFalseNoneFalse17586.27690
3037624102510NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9336.55FalseNoneNoneFalseNoneFalse309246.99150
3037625102510NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iProviding and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3112.5FalseNoneNoneFalseNoneFalse166753.8750
3037626102510NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.1(Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.973.64FalseNoneNoneFalseNoneFalse8623.05080
3037627102510NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3037628102510NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiest97894.6397894.630.86FalseNoneNoneFalseNoneFalse84189.38180
3037629102510NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3037630102510NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.0544.17FalseNoneNoneFalseNoneFalse5965.15850
17103226600000NoneNoneRoadsSUB-ESTIMATE FOR RECONSTRUCTION OF HUME PIPE CULVERT OF 4 ROWS OF 1200mm1979678.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037631102511NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.8 (Dismantling Stone Masonry. Rubble stone masonry in cement mortar. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum755.79755.7999.84FalseNoneNoneFalseNoneFalse75458.07360
3037632102511NoneUNI SR 2023 - 24 ,V-3,Page No 11 Item No2.17(iRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (c) Above 900 mm dia Hume pipe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1702.391702.3930.0FalseNoneNoneFalseNoneFalse51071.70
3037633102511NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3887.53FalseNoneNoneFalseNoneFalse11062.04140
3037634102511NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.29139.23FalseNoneNoneFalseNoneFalse81768.38670
3037635102511NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum1447.151447.1565.95FalseNoneNoneFalseNoneFalse95439.54250
3037636102511NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.375.49FalseNoneNoneFalseNoneFalse40737.83130
3037637102511NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9382.57FalseNoneNoneFalseNoneFalse698618.99010
3037638102511NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iProviding and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3150.0FalseNoneNoneFalseNoneFalse667015.50
3037639102511NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.1(Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9711.89FalseNoneNoneFalseNoneFalse28167.05330
3037640102511NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3037641102511NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiest97894.6397894.631.84FalseNoneNoneFalseNoneFalse180126.11920
3037642102511NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3037643102511NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.0576.69FalseNoneNoneFalseNoneFalse10356.98450
17103226600000NoneNoneRoadsField Approach2004747.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037644102512NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3895.41FalseNoneNoneFalseNoneFalse12057.91580
3037645102512NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3182.5FalseNoneNoneFalseNoneFalse1100575.5750
3037646102512NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.2912.78FalseNoneNoneFalseNoneFalse7505.56620
3037647102512NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.376.05FalseNoneNoneFalseNoneFalse44893.23850
3037648102512NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9376.8FalseNoneNoneFalseNoneFalse649799.4240
3037649102512NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiest97894.6997894.691.94FalseNoneNoneFalseNoneFalse189915.69860
17103226600000NoneNoneRoadsESTIMATE OF WATER SUPPLY PIPE LINE152020.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037650102513NoneUNI SR 2023-24 , V-1 Pg No. ,10 I.No 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum324.62324.62108.0FalseNoneNoneFalseNoneFalse35058.960
3037651102513NoneUNI SR 2023-24 , V-5 Pg No. ,95 I.No 9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm473.3473.3200.0FalseNoneNoneFalseNoneFalse94660.00
3037652102513NoneUNI SR 2023-24 , V-5 Pg No. ,121 I.No 10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning (Contractor will make his own arrangements for procuring water for testing) etc. complete for: ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm111.51111.51200.0FalseNoneNoneFalseNoneFalse22302.00
17103226600000NoneNoneRoadsJUNCTIONS399639.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037653102514NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.75486.750.48FalseNoneNoneFalseNoneFalse233.640
3037654102514NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.5.Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.43137.5FalseNoneNoneFalseNoneFalse1021.6250
3037655102514NoneUNI SR 2023-24, V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.716.2FalseNoneNoneFalseNoneFalse1906.740
3037656102514NoneUNI SR 2023-24, V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.8348.87FalseNoneNoneFalseNoneFalse29851.26210
3037657102514NoneUNI SR 2023-24, V-3,Pg. No. 23 I. No.4.2.(B) (5)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.836.62FalseNoneNoneFalseNoneFalse107032.9360
3037658102514NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.635.88FalseNoneNoneFalseNoneFalse113761.1280
3037659102514NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.8137.5FalseNoneNoneFalseNoneFalse6985.00
3037660102514NoneUNI SR 2023-24, v-3,Pg. No. 31 I. No.5.4Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3417.34137.5FalseNoneNoneFalseNoneFalse2384.250
3037661102514NoneUNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c)Dense Graded Bituminous Macadam Grading II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.316.88FalseNoneNoneFalseNoneFalse80546.29280
3037662102514NoneUNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.04.12FalseNoneNoneFalseNoneFalse55916.640
17103226600000NoneNoneRoadsMaintenance of First Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037663102515None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037664102515None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037665102515None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037666102515None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037667102515None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037668102515None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103226600000NoneNoneRoadsMaintenance of Second Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037669102516None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037670102516None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037671102516None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037672102516None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037673102516None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3037674102516None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103226600000NoneNoneRoadsMaintenance of Third Year376272.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037675102517NoneUNI 2023-24, V-3, Page No. 9, Item No. 2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm545.35545.3546.56FalseNoneNoneFalseNoneFalse25391.4960
3037676102517NoneUNI 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.338.333104.0FalseNoneNoneFalseNoneFalse25856.320
3037677102517NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm54.1254.12349.2FalseNoneNoneFalseNoneFalse18898.7040
3037678102517NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm134.6134.61164.0FalseNoneNoneFalseNoneFalse156674.40
3037679102517NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm591.15591.15106.7FalseNoneNoneFalseNoneFalse63075.7050
3037680102517NoneUNI 2023-24, V-1, Page No. 8, Item No. 1.12.Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum131.83131.83174.6FalseNoneNoneFalseNoneFalse23017.5180
3037681102517NoneUNI 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2753.162753.163.88FalseNoneNoneFalseNoneFalse10682.26080
3037682102517NoneUNI 2023-24, V-3, Page No. 148, Item No. 16.24 (Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm285.86285.863.88FalseNoneNoneFalseNoneFalse1109.13680
3037683102517NoneUNI 2023-24, V-3, Page No. 66, Item No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm151.26151.26212.0FalseNoneNoneFalseNoneFalse32067.120
3037684102517NoneUNI 2023-24, V-3, Page No. 63, Item No. 8.4.Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.251.2515600.0FalseNoneNoneFalseNoneFalse19500.00
17103226600000NoneNoneRoadsMaintenance of Fourth Year324068.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037685102518NoneUNI 2023-24, V-3, Page No. 9, Item No. 2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm564.83564.8346.56FalseNoneNoneFalseNoneFalse26298.48480
3037686102518NoneUNI 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.628.623104.0FalseNoneNoneFalseNoneFalse26756.480
3037687102518NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm56.0556.05349.2FalseNoneNoneFalseNoneFalse19572.660
3037688102518NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm139.41139.411164.0FalseNoneNoneFalseNoneFalse162273.240
3037689102518NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm612.26612.26106.7FalseNoneNoneFalseNoneFalse65328.1420
3037690102518NoneUNI 2023-24, V-1, Page No. 8, Item No. 1.12.Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum136.54136.54174.6FalseNoneNoneFalseNoneFalse23839.8840
17103226600000NoneNoneRoadsMaintenance of Fifth Year402840.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037691102519NoneUNI 2023-24, V-3, Page No. 9, Item No. 2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm584.31584.3146.56FalseNoneNoneFalseNoneFalse27205.47360
3037692102519NoneUNI 2023-24, V-3, Page No. 147, Item No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.928.923104.0FalseNoneNoneFalseNoneFalse27687.680
3037693102519NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.3.Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm57.9957.99349.2FalseNoneNoneFalseNoneFalse20250.1080
3037694102519NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.2.Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.22144.221164.0FalseNoneNoneFalseNoneFalse167872.080
3037695102519NoneUNI 2023-24, V-3, Page No. 91, Item No. 10.5.Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm633.38633.38213.4FalseNoneNoneFalseNoneFalse135163.2920
3037696102519NoneUNI 2023-24, V-1, Page No. 8, Item No. 1.12.Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum141.25141.25174.6FalseNoneNoneFalseNoneFalse24662.250
17103226600000NoneNoneRoadsMaintenance of Sixth Year12323424.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037697102520NoneUNI 2023-24, V-3, Page No. 147, Item No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm3048.143048.143.88FalseNoneNoneFalseNoneFalse11826.78320
3037698102520NoneUNI 2023-24, V-3, Page No. 148, Item No. 16.24 (Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. Painting two coats with synthetic enamel paint ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm316.49316.493.88FalseNoneNoneFalseNoneFalse1227.98120
3037699102520NoneUNI 2023-24, V-3, Page No. 66, Item No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm167.46167.46205.64FalseNoneNoneFalseNoneFalse34436.47440
3037700102520NoneUNI 2023-24, V-3, Page No. 63, Item No. 8.4.Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.381.3815600.0FalseNoneNoneFalseNoneFalse21528.00
3037701102520NoneUNI 2023-24, V-3, Page No. 31, Item No. 5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm18.4418.4421747.2FalseNoneNoneFalseNoneFalse401018.3680
3037702102520NoneUNI 2023-24, V-3, Page No. 38, Item No. 5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16829.2916829.29652.39FalseNoneNoneFalseNoneFalse10979260.50310
3037703102520NoneUNI 2023-24, V-3, Page No. 67, Item No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm814.27814.27776.0FalseNoneNoneFalseNoneFalse631873.520
3037704102520NoneUNI 2023-24, V-3, Page No. 72, Item No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos560.77560.77432.0FalseNoneNoneFalseNoneFalse242252.640
17103226600000NoneNoneRoadsEletrical Pole Shifting2012037.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3037705102521None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. 1.1.1 Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit779.33779.3352.0FalseNoneNoneFalseNoneFalse40525.160
3037706102521None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos8767.168767.1652.0FalseNoneNoneFalseNoneFalse455892.320
3037707102521None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.011379.0152.0FalseNoneNoneFalseNoneFalse71708.520
3037708102521None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018) as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos5202.565202.5613.0FalseNoneNoneFalseNoneFalse67633.280
3037709102521None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.011379.0113.0FalseNoneNoneFalseNoneFalse17927.130
3037710102521None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo1089.081089.0852.0FalseNoneNoneFalseNoneFalse56632.160
3037711102521None3.0111 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet890.84890.8452.0FalseNoneNoneFalseNoneFalse46323.680
3037712102521None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet254.0254.0156.0FalseNoneNoneFalseNoneFalse39624.00
3037713102521None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos631.89631.8918.0FalseNoneNoneFalseNoneFalse11374.020
3037714102521None1.7.1Digging of Pit for GUY SEt 1.7.1 Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3037715102521None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km4970.874970.877.02FalseNoneNoneFalseNoneFalse34895.50740
3037716102521None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKms57283.9357283.937.02FalseNoneNoneFalseNoneFalse402133.18860
3037717102521None6.02Stringing of Rabbit Conductor (including pin binding, providing jumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km6483.696483.697.02FalseNoneNoneFalseNoneFalse45515.50380
3037718102521None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo126.38126.38156.0FalseNoneNoneFalseNoneFalse19715.280
3037719102521None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet391.52391.52156.0FalseNoneNoneFalseNoneFalse61077.120
3037720102521None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo358.07358.073.0FalseNoneNoneFalseNoneFalse1074.210
3037721102521None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo163.55163.553.0FalseNoneNoneFalseNoneFalse490.650
3037722102521None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.163.0FalseNoneNoneFalseNoneFalse453.480
3037723102521None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.163.0FalseNoneNoneFalseNoneFalse453.480
3037724102521None6.031.1 kV Ceramic Pin Insulator (Shell only) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos38.4138.4115.0FalseNoneNoneFalseNoneFalse576.150
3037725102521None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos33.4533.4515.0FalseNoneNoneFalseNoneFalse501.750
3037726102521None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos296.12296.1265.0FalseNoneNoneFalseNoneFalse19247.80
3037727102521None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr115.23115.2372.8FalseNoneNoneFalseNoneFalse8388.7440
3037728102521None24.0111 kV, GOS a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.553.0FalseNoneNoneFalseNoneFalse35125.650
3037729102521None13.02Labour for 11 kV, GOS a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1367.861367.863.0FalseNoneNoneFalseNoneFalse4103.580
3037730102521None1.8.1aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach338.25338.2565.0FalseNoneNoneFalseNoneFalse21986.250
3037731102521None1.8.1.bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach438.61438.6165.0FalseNoneNoneFalseNoneFalse28509.650
3037732102521None1.8.2aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3912.763912.7665.0FalseNoneNoneFalseNoneFalse254329.40
3037733102521None1.8.2gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach247.8247.83.0FalseNoneNoneFalseNoneFalse743.40
3037734102521None21.02Transporation by Head Load where ever there is no accessability for transporation by vechicle" for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pole353.12353.1252.0FalseNoneNoneFalseNoneFalse18362.240
3037735102521None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km152.4152.47.02FalseNoneNoneFalseNoneFalse1069.8480
3037736102521None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading." 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo175.94175.9452.0FalseNoneNoneFalseNoneFalse9148.880
3037737102521None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach138.77138.7752.0FalseNoneNoneFalseNoneFalse7216.040
3037738102521None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo631.89631.8918.0FalseNoneNoneFalseNoneFalse11374.020
3037739102521None24.01GOS as per IS-9921, IS-1977 174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.553.0FalseNoneNoneFalseNoneFalse35125.650
3037740102521None27.0327 Loading & Unloading of Transformer (when maintaince men for loading and unloading are not available in store) Loading" 100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo529.05529.052.0FalseNoneNoneFalseNoneFalse1058.10
3037741102521None27.08100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo529.05529.052.0FalseNoneNoneFalseNoneFalse1058.10
3037742102521None54.01 GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet920.58920.588.0FalseNoneNoneFalseNoneFalse7364.640
3037743102521None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet837.56837.568.0FalseNoneNoneFalseNoneFalse6700.480
3037744102521None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet384.09384.098.0FalseNoneNoneFalseNoneFalse3072.720
3037745102521None54.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet2691.112691.118.0FalseNoneNoneFalseNoneFalse21528.880
3037746102521None3.01Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing For 25/63/100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Structure7093.287093.282.0FalseNoneNoneFalseNoneFalse14186.560
3037747102521None24.04H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/61 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet5367.355367.352.0FalseNoneNoneFalseNoneFalse10734.70
3037748102521None19.02 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1962.581962.586.0FalseNoneNoneFalseNoneFalse11775.480
3037749102521None26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet7930.847930.842.0FalseNoneNoneFalseNoneFalse15861.680
3037750102521None67.2Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos185.85185.852.0FalseNoneNoneFalseNoneFalse371.70
3037751102521None4.02Anti Climbing Device (12 Mtr GI Barbed wire ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos110.27110.272.0FalseNoneNoneFalseNoneFalse220.540
3037752102521None6.18.38 SWG GI Wire (44/6.18.3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr23.5423.54300.0FalseNoneNoneFalseNoneFalse7062.00
3037753102521None17.01LT Protection Kit (Dwg No. For KPTCL & ESCOMs/GM/QS&S/10 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2506.52506.52.0FalseNoneNoneFalseNoneFalse5013.00
3037754102521None15.17.1LT Wiring Kit 63/100 KVA (87/15.17.1) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet5263.525263.522.0FalseNoneNoneFalseNoneFalse10527.040
3037755102521None20.0111 kV, HG Fuse Unit with Solid Core Insulator 302122 852 (Dwg No. For KPTCL & ESCOMs/GM/QS&S/21 Dtd 24.11.2018) (3 Nos) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1324.491324.492.0FalseNoneNoneFalseNoneFalse2648.980
3037756102521None24.02Transporation by Head Load where ever there is no accessability for transporation by vechicle Distribution Transformer 63 kVA & 100 kVA 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Tr1172.091172.092.0FalseNoneNoneFalseNoneFalse2344.180
3037757102521None21.04Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet29815.329815.32.0FalseNoneNoneFalseNoneFalse59630.60
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103226610000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103226610000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103226610001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103226870000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17103226920000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103226980000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103227030000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103227080000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103227160000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17103227220000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103227280000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103227340000NoneNoneELIGIBILITYContractors should be registered with KPWD Class I Registration.None
17103227400000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103227450000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103227500000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103227560000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103227610000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103227660000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103227730000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103227780000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103227840000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17103227900000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including 18 percent GST.None
17103227970000NoneNoneELIGIBILITYGST shall not be paid separately.None
17103228030000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP and maintenance period.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.482.43Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDetails of Committed WorksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(b) Machineries to be owned and on lease as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- a) Availability by owning(b) Machineries to be owned and on lease as per KW4
NoneNoneNoneNoneBID CAPACITY AS PER KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 16867.52 Cum 2. GSB/WMM : 9531.79 Cum 3. BM/SDBC/DBM/BC : 1922.51 Cum 4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 11.13cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades 176.07cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneCopies of Tax RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.1929.72 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Small Scale Industries CertificateTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
UDIN CERTIFICATETrueTechnical Bid
EPF registrationTrueTechnical Bid
DrawingsTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationTrueTechnical Bid
OTHER DOCUMENTS AS PER SBDTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710323239000
version0
createdDateNone
modifiedDateNone
blockNumberO/O CHIEF PROJECT OFFICER, PIU SHDP, PWD ANNEX BUILDING KR CIRCLE BANGALORE
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone