noticeInvitingTenderDTO
createdTs1710304328619
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1939964.19
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate13-03-2024 10:21:09
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1839964.19
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710304328656
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9804
titlePKG-782 (A)Road from B.N road to Join S3 Road ( via Uramarakasalagere) at Yeliyuru kodi From Ch1.75 KM to 3.70 KM in ShrirangapatanaTaluk (B) Road from Chinnanayakanahalli to Tubinakere From Ch12.5 KM to 14.65 KM in Shrirangapatana Taluk(C) Road SH-279 Alur-Siddapura (Somawarapete) to Sathanur connecting (NH-948) from Ch 153.64 KM to 190.74 KM in Mandya Taluk (D) Road Madya Taluk to Maddur Taluk Border Joining road via Chiranahalli From Ch3.188 KM to 4.850 KM in Mandya Taluk of Mandya District
descriptionPKG-782 (A)Improvements to Road from B.N road to Join S3 Road ( via Uramarakasalagere) at Yeliyuru kodi From Ch1.75 KM to 3.70 KM (In Selected reaches) in ShrirangapatanaTaluk of Mandya District. (B)Improvements to Road from Chinnanayakanahalli to Tubinakere From Ch12.5 KM to 14.65 KM (In Selected reaches) in Shrirangapatana Taluk of Mandya District. (C)Improvements to Road SH-279 Alur-Siddapura (Somawarapete) to Sathanur connecting (NH-948) from Ch 153.64 KM to 190.74 KM (In Selected reaches) in Mandya Taluk of Mandya District. (D)Improvements to Road Madya Taluk to Maddur Taluk Border Joining road via Chiranahalli From Ch3.188 KM to 4.850 KM (In Selected reaches) in Mandya Taluk of Mandya District.
categoryWORKS
categoryTextWorks
ecv193996419.90
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-782/MANDYA/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103043290000NoneNoneRoadsPKG-782 (A)Improvements to Road from B.N road to Join S3 Road ( via Uramarakasalagere) at Yeliyuru kodi From Ch1.75 KM to 3.70 KM (In Selected reaches) in ShrirangapatanaTaluk of Mandya District. - Road Estimates35684593.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026588101821NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm463.74463.7446.8FalseNoneNoneFalseNoneFalse21703.0320
3026589101821NoneItem No. 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Item No. 3.5 / Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.083656.25FalseNoneNoneFalseNoneFalse25886.250
3026590101821NoneItem No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Item No. 1.12/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.11755.0FalseNoneNoneFalseNoneFalse196735.50
3026591101821NoneItem No. 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (Item No. 1.7/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.421404.0FalseNoneNoneFalseNoneFalse197149.680
3026592101821NoneItem No. 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Item No. 1.8/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.326681.21FalseNoneNoneFalseNoneFalse3736934.37720
3026593101821NoneItem No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.743334.5FalseNoneNoneFalseNoneFalse1939812.030
3026594101821NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.622595.58FalseNoneNoneFalseNoneFalse7225108.39960
3026595101821NoneItem No. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.623227.87FalseNoneNoneFalseNoneFalse9746940.80940
3026596101821NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3812467.52FalseNoneNoneFalseNoneFalse603178.61760
3026597101821NoneItem No. 5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5212467.52FalseNoneNoneFalseNoneFalse205963.43040
3026598101821NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.82623.38FalseNoneNoneFalseNoneFalse6950574.79160
3026599101821NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72374.03FalseNoneNoneFalseNoneFalse4834607.05160
17103043290000NoneNoneRoadsROad Furnitures662074.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026600101822NoneItem No. 8.5 ARetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1216.0FalseNoneNoneFalseNoneFalse88433.920
3026601101822NoneNo. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.462.0FalseNoneNoneFalseNoneFalse10140.920
3026602101822NoneItem No. 8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.364.0FalseNoneNoneFalseNoneFalse30689.440
3026603101822NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC-67-2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.486.0FalseNoneNoneFalseNoneFalse25388.880
3026604101822NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.81.8FalseNoneNoneFalseNoneFalse19137.240
3026605101822NoneItem No. 16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.361.0FalseNoneNoneFalseNoneFalse18115.360
3026606101822NoneItem No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4405.0FalseNoneNoneFalseNoneFalse253287.00
3026607101822NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7220.0FalseNoneNoneFalseNoneFalse94754.00
3026608101822NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3026609101822NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.568.0FalseNoneNoneFalseNoneFalse7948.480
3026610101822NoneItem No. 8.60.2 (ii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos53635.7253635.722.0FalseNoneNoneFalseNoneFalse107271.440
17103043290000NoneNoneRoadsRCC Drain2268723.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026611101823NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36558.2FalseNoneNoneFalseNoneFalse67184.9520
3026612101823NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0244.8FalseNoneNoneFalseNoneFalse316602.4960
3026613101823NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7461.147461.1436.0FalseNoneNoneFalseNoneFalse268601.040
3026614101823NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.5457.6FalseNoneNoneFalseNoneFalse580178.3040
3026615101823Noneitem No. 2.5.1IProviding and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (item No. 2.5.1/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.0834.0FalseNoneNoneFalseNoneFalse319194.720
3026616101823NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.987.69FalseNoneNoneFalseNoneFalse716961.61620
17103043290000NoneNoneRoadsWater Supply69567.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026617101824NoneItem No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Item No. 1.17.1/ Page No. 10/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.1641.4FalseNoneNoneFalseNoneFalse12799.2240
3026618101824NoneItem No. 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,63mm dia (Item No. 9.2.1/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm258.42258.4215.0FalseNoneNoneFalseNoneFalse3876.30
3026619101824NoneItem No. 19.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.76100.0FalseNoneNoneFalseNoneFalse45076.00
3026620101824NoneItem No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Item No. 1.10/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.841.4FalseNoneNoneFalseNoneFalse7816.320
17103043290000NoneNoneRoadsBox Culvert (1.0 x 1.0) 1Vent at Ch. 2.67km, Ch. 3.03km, Ch. 3.14km, Ch. 3.33km1870689.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026621101825NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4211.7FalseNoneNoneFalseNoneFalse9926.5140
3026622101825NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.431.2FalseNoneNoneFalseNoneFalse6626.880
3026623101825NoneItem No. 2.17 (ix) BRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (Item No. 2.17 (ix) B/ Page No. 11/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1293.281293.2822.5FalseNoneNoneFalseNoneFalse29098.80
3026624101825NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36124.8FalseNoneNoneFalseNoneFalse15020.9280
3026625101825NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0217.28FalseNoneNoneFalseNoneFalse122118.10560
3026626101825NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7862.64FalseNoneNoneFalseNoneFalse561992.29920
3026627101825NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6938.3FalseNoneNoneFalseNoneFalse371115.1270
3026628101825NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.988.06FalseNoneNoneFalseNoneFalse751457.81880
3026629101825NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6218.0FalseNoneNoneFalseNoneFalse2315.160
3026630101825NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06960.0FalseNoneNoneFalseNoneFalse1017.60
17103043290000NoneNoneRoadsElectrical SHifting352514.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026631101826Nonecode01Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.885.0FalseNoneNoneFalseNoneFalse49064.40
3026632101826Nonecode02Line Supports (Pole) PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.06 Page No 03/81 Material No -200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4954.824954.822.0FalseNoneNoneFalseNoneFalse9909.640
3026633101826Nonecode03Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.347.0FalseNoneNoneFalseNoneFalse9193.380
3026634101826Nonecode04Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.822.0FalseNoneNoneFalseNoneFalse8729.640
3026635101826Nonecode05Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.962.0FalseNoneNoneFalseNoneFalse2175.920
3026636101826Nonecode06Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.361.0FalseNoneNoneFalseNoneFalse20888.360
3026637101826Nonecode07Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.921.0FalseNoneNoneFalseNoneFalse3001.920
3026638101826Nonecode0811 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.9612.0FalseNoneNoneFalseNoneFalse5267.520
3026639101826Nonecode09HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.3836.0FalseNoneNoneFalseNoneFalse3865.680
3026640101826Nonecode10Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.1636.0FalseNoneNoneFalseNoneFalse4757.760
3026641101826Nonecode11LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.767.0FalseNoneNoneFalseNoneFalse1090.320
3026642101826Nonecode12LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.027.0FalseNoneNoneFalseNoneFalse2387.140
3026643101826Nonecode13Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.814.0FalseNoneNoneFalseNoneFalse2643.20
3026644101826Nonecode1411 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.4810.0FalseNoneNoneFalseNoneFalse2194.80
3026645101826Nonecode1511 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.914.0FalseNoneNoneFalseNoneFalse3386.60
3026646101826Nonecode16Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.061.6FalseNoneNoneFalseNoneFalse97169.6960
3026647101826Nonecode22Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit1187.081187.0824.0FalseNoneNoneFalseNoneFalse28489.920
3026648101826Nonecode23R&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.3517.0FalseNoneNoneFalseNoneFalse42420.950
3026649101826Nonecode24R&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.7212.0FalseNoneNoneFalseNoneFalse4304.640
3026650101826Nonecode25R&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos251.1251.148.0FalseNoneNoneFalseNoneFalse12052.80
3026651101826Nonecode26R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.144.0FalseNoneNoneFalseNoneFalse39520.560
17103043290000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026652101827None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026653101827None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026654101827None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026655101827None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026656101827None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026657101827None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026658101828None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026659101828None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026660101828None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026661101828None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026662101828None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026663101828None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads3rd Year Maintenance211196.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026664101829None2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm519.39519.3923.4FalseNoneNoneFalseNoneFalse12153.7260
3026665101829None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.931560.0FalseNoneNoneFalseNoneFalse12370.80
3026666101829None10.3 Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54263.25FalseNoneNoneFalseNoneFalse13567.9050
3026667101829None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.2877.5FalseNoneNoneFalseNoneFalse112495.50
3026668101829None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.053.62FalseNoneNoneFalseNoneFalse30188.060
3026669101829None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.051.95FalseNoneNoneFalseNoneFalse5112.99750
3026670101829None16.24 i Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.251.95FalseNoneNoneFalseNoneFalse530.88750
3026671101829None1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.55180.0FalseNoneNoneFalseNoneFalse22599.00
3026672101829None8.1Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.0515.12FalseNoneNoneFalseNoneFalse2178.0360
17103043290000NoneNoneRoads4th Year Maintanance210626.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026673101830NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm537.94537.9423.4FalseNoneNoneFalseNoneFalse12587.7960
3026674101830None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.211560.0FalseNoneNoneFalseNoneFalse12807.60
3026675101830None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38263.25FalseNoneNoneFalseNoneFalse14052.2850
3026676101830None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.77877.5FalseNoneNoneFalseNoneFalse116505.6750
3026677101830None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.1153.62FalseNoneNoneFalseNoneFalse31266.35820
3026678101830None1,12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.04180.0FalseNoneNoneFalseNoneFalse23407.20
17103043290000NoneNoneRoads5th year Maintenance250252.09
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026679101831NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm556.49556.4923.4FalseNoneNoneFalseNoneFalse13021.8660
3026680101831None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.51560.0FalseNoneNoneFalseNoneFalse13260.00
3026681101831None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22263.25FalseNoneNoneFalseNoneFalse14536.6650
3026682101831None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.35877.5FalseNoneNoneFalseNoneFalse120524.6250
3026683101831None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22107.25FalseNoneNoneFalseNoneFalse64695.3450
3026684101831None1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.52180.0FalseNoneNoneFalseNoneFalse24213.60
17103043290000NoneNoneRoads6th Year Renewal after Maintanance6655821.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026685101832None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.991.95FalseNoneNoneFalseNoneFalse5660.83050
3026686101832None16.24Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.421.95FalseNoneNoneFalseNoneFalse587.7690
3026687101832None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (Item No. 8.1/ Page No.66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4918.0FalseNoneNoneFalseNoneFalse2870.820
3026688101832None8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.321.32960.0FalseNoneNoneFalseNoneFalse1267.20
3026689101832NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5612468.72FalseNoneNoneFalseNoneFalse218950.72320
3026690101832None5.16 cBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89374.03FalseNoneNoneFalseNoneFalse5994911.69670
3026691101832None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5405.0FalseNoneNoneFalseNoneFalse314077.50
3026692101832None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07220.0FalseNoneNoneFalseNoneFalse117495.40
17103043290000NoneNoneRoadsPKG-782 (B)Improvements to Road from Chinnanayakanahalli to Tubinakere From Ch12.5 KM to 14.65 KM (In Selected reaches) in Shrirangapatana Taluk of Mandya District. - Road Works37828570.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026693101833NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm463.74463.7451.6FalseNoneNoneFalseNoneFalse23928.9840
3026694101833None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Item No. 3.5 / Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.088062.5FalseNoneNoneFalseNoneFalse57082.50
3026695101833None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No. 16.19/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.087.084300.0FalseNoneNoneFalseNoneFalse30444.00
3026696101833None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Item No. 1.8/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.324888.24FalseNoneNoneFalseNoneFalse2734090.39680
3026697101833None3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.743676.5FalseNoneNoneFalseNoneFalse2138767.110
3026698101833NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -III Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2813.122813.122150.0FalseNoneNoneFalseNoneFalse6048208.00
3026699101833NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.621411.75FalseNoneNoneFalseNoneFalse3929775.5350
3026700101833None4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.623305.39FalseNoneNoneFalseNoneFalse9981021.75180
3026701101833NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3812755.54FalseNoneNoneFalseNoneFalse617113.02520
3026702101833None5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5212755.54FalseNoneNoneFalseNoneFalse210721.52080
3026703101833NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.82637.78FalseNoneNoneFalseNoneFalse7111132.19960
3026704101833NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72382.67FalseNoneNoneFalseNoneFalse4946285.27240
17103043290000NoneNoneRoadsRoad Furnitures807705.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026705101834NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1220.0FalseNoneNoneFalseNoneFalse110542.40
3026706101834None8.17Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings./ (Item No. 8.17 Page No. 8.17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach2384.782384.7824.0FalseNoneNoneFalseNoneFalse57234.720
3026707101834NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.484.0FalseNoneNoneFalseNoneFalse16925.920
3026708101834None8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.462.0FalseNoneNoneFalseNoneFalse10140.920
3026709101834None8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.365.0FalseNoneNoneFalseNoneFalse38361.80
3026710101834NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC-67-2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.486.0FalseNoneNoneFalseNoneFalse25388.880
3026711101834NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.81.8FalseNoneNoneFalseNoneFalse19137.240
3026712101834None16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.361.0FalseNoneNoneFalseNoneFalse18115.360
3026713101834None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4451.0FalseNoneNoneFalseNoneFalse282055.40
3026714101834None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7250.0FalseNoneNoneFalseNoneFalse107675.00
3026715101834NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3026716101834NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.568.0FalseNoneNoneFalseNoneFalse7948.480
3026717101834NoneItem No. 8.60.2 (ii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos53635.7253635.722.0FalseNoneNoneFalseNoneFalse107271.440
17103043290000NoneNoneRoadsConstruction of Box Culvert (3.0 x 2.0) 1Vent at Ch 14.225 Km1531618.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026718101835NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4218.11FalseNoneNoneFalseNoneFalse15364.88620
3026719101835NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36142.92FalseNoneNoneFalseNoneFalse17201.85120
3026720101835NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0212.36FalseNoneNoneFalseNoneFalse87348.36720
3026721101835NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7849.13FalseNoneNoneFalseNoneFalse440783.55140
3026722101835NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8074.68074.615.49FalseNoneNoneFalseNoneFalse125075.5540
3026723101835NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6922.24FalseNoneNoneFalseNoneFalse215498.70560
3026724101835NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.986.74FalseNoneNoneFalseNoneFalse628390.28520
3026725101835NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6215.19FalseNoneNoneFalseNoneFalse1953.73780
3026726101835NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.061.0FalseNoneNoneFalseNoneFalse1.060
17103043290000NoneNoneRoadsBox Culvert (1.0 x 1.0) 1Vent at Ch 13450 Mts, Ch 13750 Mts827264.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026727101836NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4211.24FalseNoneNoneFalseNoneFalse9536.24080
3026728101836NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.41.8FalseNoneNoneFalseNoneFalse382.320
3026729101836NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3631.2FalseNoneNoneFalseNoneFalse3755.2320
3026730101836NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.027.92FalseNoneNoneFalseNoneFalse55970.79840
3026731101836NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7831.32FalseNoneNoneFalseNoneFalse280996.14960
3026732101836NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6912.67FalseNoneNoneFalseNoneFalse122768.37230
3026733101836NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.983.78FalseNoneNoneFalseNoneFalse352420.66440
3026734101836NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.627.2FalseNoneNoneFalseNoneFalse926.0640
3026735101836NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06480.0FalseNoneNoneFalseNoneFalse508.80
17103043290000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026736101837None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026737101837None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026738101837None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026739101837None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026740101837None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026741101837None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026742101838None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026743101838None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026744101838None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026745101838None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026746101838None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026747101838None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads3rd Year Maintenance225393.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026748101839NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm519.39519.3925.8FalseNoneNoneFalseNoneFalse13400.2620
3026749101839None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.931720.0FalseNoneNoneFalseNoneFalse13639.60
3026750101839None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54290.25FalseNoneNoneFalseNoneFalse14959.4850
3026751101839None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.2967.5FalseNoneNoneFalseNoneFalse124033.50
3026752101839None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.059.12FalseNoneNoneFalseNoneFalse33284.560
3026753101839None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.052.15FalseNoneNoneFalseNoneFalse5637.40750
3026754101839None16.24 i Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.252.15FalseNoneNoneFalseNoneFalse585.33750
3026755101839NoneNo.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.55135.0FalseNoneNoneFalseNoneFalse16949.250
3026756101839None8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.0520.16FalseNoneNoneFalseNoneFalse2904.0480
17103043290000NoneNoneRoads4th Year Maintanance223977.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026757101840NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm537.94537.9425.8FalseNoneNoneFalseNoneFalse13878.8520
3026758101840None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.211720.0FalseNoneNoneFalseNoneFalse14121.20
3026759101840None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38290.25FalseNoneNoneFalseNoneFalse15493.5450
3026760101840None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.77967.5FalseNoneNoneFalseNoneFalse128454.9750
3026761101840None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.1159.12FalseNoneNoneFalseNoneFalse34473.46320
3026762101840None1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.04135.0FalseNoneNoneFalseNoneFalse17555.40
17103043290000NoneNoneRoads5th year Maintenance267382.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026763101841NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm556.49556.4925.8FalseNoneNoneFalseNoneFalse14357.4420
3026764101841NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.51720.0FalseNoneNoneFalseNoneFalse14620.00
3026765101841NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22290.25FalseNoneNoneFalseNoneFalse16027.6050
3026766101841NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.35967.5FalseNoneNoneFalseNoneFalse132886.1250
3026767101841NoneItem No.VOL-III-10.5 Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22118.25FalseNoneNoneFalseNoneFalse71330.7650
3026768101841NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.52135.0FalseNoneNoneFalseNoneFalse18160.20
17103043290000NoneNoneRoads6th Year Renewal after Maintanance6852058.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026769101842NoneItem No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.992.15FalseNoneNoneFalseNoneFalse6241.42850
3026770101842NoneItem No. 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.422.15FalseNoneNoneFalseNoneFalse648.0530
3026771101842NoneItem No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (Item No. 8.1/ Page No.66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4922.39FalseNoneNoneFalseNoneFalse3570.98110
3026772101842NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.321.32720.0FalseNoneNoneFalseNoneFalse950.40
3026773101842NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5612755.54FalseNoneNoneFalseNoneFalse223987.28240
3026774101842NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89382.67FalseNoneNoneFalseNoneFalse6133392.66630
3026775101842NoneItem No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5451.0FalseNoneNoneFalseNoneFalse349750.50
3026776101842NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07250.0FalseNoneNoneFalseNoneFalse133517.50
17103043290000NoneNoneRoadsPKG-782 (C)Improvements to Road SH-279 Alur-Siddapura (Somawarapete) to Sathanur connecting (NH-948) from Ch 153.64 KM to 190.74 KM (In Selected reaches) in Mandya Taluk of Mandya District. - Road Works29860030.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026777101843NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm463.74463.74109.2FalseNoneNoneFalseNoneFalse50640.4080
3026778101843NoneItem No. 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Item No. 3.5 / Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.088500.0FalseNoneNoneFalseNoneFalse60180.00
3026779101843NoneItem No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.741592.5FalseNoneNoneFalseNoneFalse926420.950
3026780101843NoneItem No. 10.15 (ii)Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick- Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15 (ii)/ Page No. 93/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm586.46586.46750.75FalseNoneNoneFalseNoneFalse440284.8450
3026781101843NoneItem No. 5.28 (i)Stress Absorbing Membrane (SAM) crack width less than 6 mm Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using modified binder complying with IRC- SP-53-2010, sprayed at the rate of 9 kg per 10 m2 and spreading 5.6 mm crushed stone aggregates @ 0.11 m3 per 10 m2 with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902. (Item No. 5.28 (i)/ Page No. 41/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm83.7883.78750.75FalseNoneNoneFalseNoneFalse62897.8350
3026782101843NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.62336.0FalseNoneNoneFalseNoneFalse935296.320
3026783101843NoneItem No. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.62420.0FalseNoneNoneFalseNoneFalse1268240.40
3026784101843NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.381612.5FalseNoneNoneFalseNoneFalse78012.750
3026785101843NoneItem No. 5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5226637.5FalseNoneNoneFalseNoneFalse440051.50
3026786101843NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.821369.41FalseNoneNoneFalseNoneFalse15268675.00620
3026787101843NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72799.13FalseNoneNoneFalseNoneFalse10329330.62360
17103043290000NoneNoneRoadsRoad Furnitures1586465.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026788101844NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1248.0FalseNoneNoneFalseNoneFalse265301.760
3026789101844NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.484.0FalseNoneNoneFalseNoneFalse16925.920
3026790101844NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.464.0FalseNoneNoneFalseNoneFalse20281.840
3026791101844NoneItem No. 8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.365.0FalseNoneNoneFalseNoneFalse38361.80
3026792101844NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.83.6FalseNoneNoneFalseNoneFalse38274.480
3026793101844NoneItem No. 16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.361.0FalseNoneNoneFalseNoneFalse18115.360
3026794101844NoneItem No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4955.0FalseNoneNoneFalseNoneFalse597257.00
3026795101844NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7550.0FalseNoneNoneFalseNoneFalse236885.00
3026796101844NoneItem No. 8.16 (i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) (Item No. 8.16 (i)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3026797101844NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3026798101844NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.5617.0FalseNoneNoneFalseNoneFalse16890.520
3026799101844NoneItem No. 8.60.2 (ii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos53635.7253635.726.0FalseNoneNoneFalseNoneFalse321814.320
17103043290000NoneNoneRoadsRCC Drain948576.58
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026800101845NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36240.0FalseNoneNoneFalseNoneFalse28886.40
3026801101845NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0220.0FalseNoneNoneFalseNoneFalse141340.40
3026802101845NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7834.27834.216.0FalseNoneNoneFalseNoneFalse125347.20
3026803101845NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.5424.0FalseNoneNoneFalseNoneFalse241740.960
3026804101845NoneItem No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.1/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.0816.0FalseNoneNoneFalseNoneFalse150209.280
3026805101845NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.982.8FalseNoneNoneFalseNoneFalse261052.3440
17103043290000NoneNoneRoadsWater Supply73944.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026806101846NoneItem No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Item No. 1.17.1/ Page No. 10/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.1645.0FalseNoneNoneFalseNoneFalse13912.20
3026807101846NoneItem No. 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,63mm dia (Item No. 9.2.1/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm258.42258.4225.0FalseNoneNoneFalseNoneFalse6460.50
3026808101846NoneItem No. 19.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.76100.0FalseNoneNoneFalseNoneFalse45076.00
3026809101846NoneItem No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Item No. 1.10/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.845.0FalseNoneNoneFalseNoneFalse8496.00
17103043290000NoneNoneRoadsBox Culvert (2.0 x 1.0) 1Vent645351.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026810101847NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.412.0FalseNoneNoneFalseNoneFalse2548.80
3026811101847NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3656.25FalseNoneNoneFalseNoneFalse6770.250
3026812101847NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.026.56FalseNoneNoneFalseNoneFalse46359.65120
3026813101847NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7823.75FalseNoneNoneFalseNoneFalse213079.7750
3026814101847NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6910.61FalseNoneNoneFalseNoneFalse102807.61090
3026815101847NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.982.93FalseNoneNoneFalseNoneFalse273172.63140
3026816101847NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.622.79FalseNoneNoneFalseNoneFalse358.84980
3026817101847NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103043290000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026818101848None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026819101848None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026820101848None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026821101848None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026822101848None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026823101848None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026824101849None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026825101849None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026826101849None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026827101849None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026828101849None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026829101849None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads3rd Year Maintenance387811.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026830101850NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm519.39519.3954.6FalseNoneNoneFalseNoneFalse28358.6940
3026831101850NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.933640.0FalseNoneNoneFalseNoneFalse28865.20
3026832101850NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54477.75FalseNoneNoneFalseNoneFalse24623.2350
3026833101850NoneItem No.VOL-III-10.2 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.21592.5FalseNoneNoneFalseNoneFalse204158.50
3026834101850NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.0125.12FalseNoneNoneFalseNoneFalse70442.560
3026835101850NoneItem No.VOL-III-16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.054.55FalseNoneNoneFalseNoneFalse11930.32750
3026836101850NoneItem No.VOL-III-16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.254.55FalseNoneNoneFalseNoneFalse1238.73750
3026837101850NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.55135.0FalseNoneNoneFalseNoneFalse16949.250
3026838101850NoneItem No.VOL-III-8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.058.64FalseNoneNoneFalseNoneFalse1244.5920
17103043290000NoneNoneRoads4th Year Maintanance386708.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026839101851NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm537.94537.9454.6FalseNoneNoneFalseNoneFalse29371.5240
3026840101851NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.213640.0FalseNoneNoneFalseNoneFalse29884.40
3026841101851NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38477.75FalseNoneNoneFalseNoneFalse25502.2950
3026842101851NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.771592.5FalseNoneNoneFalseNoneFalse211436.2250
3026843101851NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.11125.12FalseNoneNoneFalseNoneFalse72958.72320
3026844101851NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.04135.0FalseNoneNoneFalseNoneFalse17555.40
17103043290000NoneNoneRoads5th year Maintenance475551.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026845101852NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm556.49556.4954.6FalseNoneNoneFalseNoneFalse30384.3540
3026846101852NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.53640.0FalseNoneNoneFalseNoneFalse30940.00
3026847101852NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22477.75FalseNoneNoneFalseNoneFalse26381.3550
3026848101852NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.351592.5FalseNoneNoneFalseNoneFalse218729.8750
3026849101852NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22250.25FalseNoneNoneFalseNoneFalse150955.8050
3026850101852NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.52135.0FalseNoneNoneFalseNoneFalse18160.20
17103043290000NoneNoneRoads6th Year Renewal after Maintanance14398917.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026851101853NoneItem No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.994.55FalseNoneNoneFalseNoneFalse13208.60450
3026852101853NoneItem No. 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.424.55FalseNoneNoneFalseNoneFalse1371.4610
3026853101853NoneItem No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (Item No. 8.1/ Page No.66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4913.59FalseNoneNoneFalseNoneFalse2167.46910
3026854101853NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.321.32960.0FalseNoneNoneFalseNoneFalse1267.20
3026855101853NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5626778.78FalseNoneNoneFalseNoneFalse470235.37680
3026856101853NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89803.37FalseNoneNoneFalseNoneFalse12876325.98930
3026857101853NoneItem No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5955.0FalseNoneNoneFalseNoneFalse740602.50
3026858101853NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07550.0FalseNoneNoneFalseNoneFalse293738.50
17103043290000NoneNoneRoadsPKG-782 (D)Improvements to Road Madya Taluk to Maddur Taluk Border Joining road via Chiranahalli From Ch3.188 KM to 4.850 KM (In Selected reaches) in Mandya Taluk of Mandya District.- Road Works25858457.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026859101854NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm463.74463.7419.2FalseNoneNoneFalseNoneFalse8903.8080
3026860101854NoneItem No. 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Item No. 3.5 / Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.088250.0FalseNoneNoneFalseNoneFalse58410.00
3026861101854NoneItem No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No. 16.19/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.081600.0FalseNoneNoneFalseNoneFalse11328.00
3026862101854NoneItem No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Item No. 1.12/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.13645.45FalseNoneNoneFalseNoneFalse408654.9450
3026863101854NoneItem No. 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (Item No. 1.7/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.422916.36FalseNoneNoneFalseNoneFalse409515.27120
3026864101854NoneItem No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.742712.5FalseNoneNoneFalseNoneFalse1577969.750
3026865101854NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.621818.37FalseNoneNoneFalseNoneFalse5061651.09940
3026866101854NoneItem No. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.622229.86FalseNoneNoneFalseNoneFalse6733329.85320
3026867101854NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.388610.43FalseNoneNoneFalseNoneFalse416572.60340
3026868101854NoneItem No. 5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5215760.43FalseNoneNoneFalseNoneFalse260362.30360
3026869101854NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.82430.52FalseNoneNoneFalseNoneFalse4800220.50640
3026870101854NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72472.82FalseNoneNoneFalseNoneFalse6111538.93040
17103043290000NoneNoneRoadsRoad Furnitures5279813.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026871101855NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1238.0FalseNoneNoneFalseNoneFalse210030.560
3026872101855NoneItem No. 8.25 (i)Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (Item No. 8.25 (i)/ Page No. 69/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm4295.24295.21000.0FalseNoneNoneFalseNoneFalse4295200.00
3026873101855NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.488.0FalseNoneNoneFalseNoneFalse33851.840
3026874101855NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.464.0FalseNoneNoneFalseNoneFalse20281.840
3026875101855NoneItem No. 8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.365.0FalseNoneNoneFalseNoneFalse38361.80
3026876101855NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.81.8FalseNoneNoneFalseNoneFalse19137.240
3026877101855NoneItem No. 16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.361.0FalseNoneNoneFalseNoneFalse18115.360
3026878101855NoneItem No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4605.0FalseNoneNoneFalseNoneFalse378367.00
3026879101855NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7320.0FalseNoneNoneFalseNoneFalse137824.00
3026880101855NoneItem No. 8.16 (i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) (Item No. 8.16 (i)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3026881101855NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.861.0FalseNoneNoneFalseNoneFalse3453.860
3026882101855NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.5612.0FalseNoneNoneFalseNoneFalse11922.720
3026883101855NoneItem No. 8.60.2 (ii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos53635.7253635.722.0FalseNoneNoneFalseNoneFalse107271.440
17103043290000NoneNoneRoadsRCC Drain1605896.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026884101856NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36387.25FalseNoneNoneFalseNoneFalse46609.410
3026885101856NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0226.0FalseNoneNoneFalseNoneFalse183742.520
3026886101856NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7834.27834.226.0FalseNoneNoneFalseNoneFalse203689.20
3026887101856NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.5436.0FalseNoneNoneFalseNoneFalse362611.440
3026888101856NoneItem No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.1/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.0828.5FalseNoneNoneFalseNoneFalse267560.280
3026889101856NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.985.81FalseNoneNoneFalseNoneFalse541683.61380
17103043290000NoneNoneRoadsWater Supply73944.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026890101857NoneItem No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Item No. 1.17.1/ Page No. 10/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.1645.0FalseNoneNoneFalseNoneFalse13912.20
3026891101857NoneItem No. 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,63mm dia (Item No. 9.2.1/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm258.42258.4225.0FalseNoneNoneFalseNoneFalse6460.50
3026892101857NoneItem No. 19.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.76100.0FalseNoneNoneFalseNoneFalse45076.00
3026893101857NoneItem No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Item No. 1.10/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.845.0FalseNoneNoneFalseNoneFalse8496.00
17103043290000NoneNoneRoadsNew Construction of Box Culvert (1.5 x 1.5) 1Vent590116.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026894101858NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4211.47FalseNoneNoneFalseNoneFalse9731.37740
3026895101858NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.49.3FalseNoneNoneFalseNoneFalse1975.320
3026896101858NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3621.0FalseNoneNoneFalseNoneFalse2527.560
3026897101858NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.025.4FalseNoneNoneFalseNoneFalse38161.9080
3026898101858NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7823.1FalseNoneNoneFalseNoneFalse207248.1180
3026899101858NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.699.58FalseNoneNoneFalseNoneFalse92827.23020
3026900101858NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.982.54FalseNoneNoneFalseNoneFalse236811.76920
3026901101858NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.624.5FalseNoneNoneFalseNoneFalse578.790
3026902101858NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103043290000NoneNoneRoadsNew Construction of Box Culvert (2.0 x 2.0) 1Vent1356925.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026903101859NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4229.7FalseNoneNoneFalseNoneFalse25198.0740
3026904101859NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.431.0FalseNoneNoneFalseNoneFalse6584.40
3026905101859NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3696.0FalseNoneNoneFalseNoneFalse11554.560
3026906101859NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0211.4FalseNoneNoneFalseNoneFalse80564.0280
3026907101859NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7852.26FalseNoneNoneFalseNoneFalse468865.22280
3026908101859NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6920.07FalseNoneNoneFalseNoneFalse194472.07830
3026909101859NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.986.09FalseNoneNoneFalseNoneFalse567788.84820
3026910101859NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6210.8FalseNoneNoneFalseNoneFalse1389.0960
3026911101859NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06480.0FalseNoneNoneFalseNoneFalse508.80
17103043290000NoneNoneRoadsWidening of Box Culvert(One Side Widening Only) (1.5 x 1.5) 1Vent195001.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026912101860NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.44.65FalseNoneNoneFalseNoneFalse987.660
3026913101860NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.364.38FalseNoneNoneFalseNoneFalse527.17680
3026914101860NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.021.12FalseNoneNoneFalseNoneFalse7915.06240
3026915101860NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.784.81FalseNoneNoneFalseNoneFalse43154.26180
3026916101860NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8074.68074.68.0FalseNoneNoneFalseNoneFalse64596.80
3026917101860NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.692.6FalseNoneNoneFalseNoneFalse25193.1940
3026918101860NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.980.56FalseNoneNoneFalseNoneFalse52210.46880
3026919101860NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.622.25FalseNoneNoneFalseNoneFalse289.3950
3026920101860NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06120.0FalseNoneNoneFalseNoneFalse127.20
17103043290000NoneNoneRoadsNew Construction of Box Culvert (3.0 x 2.0) 1Vent3018599.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026921101861NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4224.56FalseNoneNoneFalseNoneFalse20837.19520
3026922101861NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.425.5FalseNoneNoneFalseNoneFalse5416.20
3026923101861NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36292.5FalseNoneNoneFalseNoneFalse35205.30
3026924101861NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0226.16FalseNoneNoneFalseNoneFalse184873.24320
3026925101861NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7889.53FalseNoneNoneFalseNoneFalse803243.46340
3026926101861NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8074.68074.657.6FalseNoneNoneFalseNoneFalse465096.960
3026927101861NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6934.49FalseNoneNoneFalseNoneFalse334197.40810
3026928101861NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.9812.49FalseNoneNoneFalseNoneFalse1164479.92020
3026929101861NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6236.86FalseNoneNoneFalseNoneFalse4740.93320
3026930101861NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06480.0FalseNoneNoneFalseNoneFalse508.80
17103043290000NoneNoneRoadsShifting of Electrical Poles1033459.67
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026931101862NoneItem No 1.02Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.8815.0FalseNoneNoneFalseNoneFalse147193.20
3026932101862NoneItem No 2.02Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.3415.0FalseNoneNoneFalseNoneFalse19700.10
3026933101862NoneItem No 1.05Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.825.0FalseNoneNoneFalseNoneFalse21824.10
3026934101862NoneItem No 2.01Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.965.0FalseNoneNoneFalseNoneFalse5439.80
3026935101862NoneItem No 1.07Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.363.0FalseNoneNoneFalseNoneFalse62665.080
3026936101862NoneItem No 2.05Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.923.0FalseNoneNoneFalseNoneFalse9005.760
3026937101862NoneItem No 2.0111 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.9625.0FalseNoneNoneFalseNoneFalse10974.00
3026938101862NoneItem No 2.11HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.3875.0FalseNoneNoneFalseNoneFalse8053.50
3026939101862NoneItem No 5.06Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.1675.0FalseNoneNoneFalseNoneFalse9912.00
3026940101862NoneItem No 2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.7615.0FalseNoneNoneFalseNoneFalse2336.40
3026941101862NoneItem No 2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.0215.0FalseNoneNoneFalseNoneFalse5115.30
3026942101862NoneItem No 5.01 & 5.02Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.830.0FalseNoneNoneFalseNoneFalse5664.00
3026943101862NoneItem No 6.111 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.4812.0FalseNoneNoneFalseNoneFalse2633.760
3026944101862NoneItem No 6.0611 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.930.0FalseNoneNoneFalseNoneFalse7257.00
3026945101862NoneItem No 7.02Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.062.0FalseNoneNoneFalseNoneFalse121462.120
3026946101862NoneCost Data Sheet - 25Erection of 3 Phase, 11kV/433V, 63 kVA BEE - 4/5 Star Rated Distribution Transformer Centre Using 9 Mtr RCC Pole DPTC ( WithOut Transformer) - Cost Data Sheet - 25 ( Common SR - 2023-24, ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet115431.14115431.143.0FalseNoneNoneFalseNoneFalse346293.420
3026947101862NoneItem No 51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( Common SR - 2023-24, Item No 51.01 Page No 22/81 Material No -281674) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos880.28880.286.0FalseNoneNoneFalseNoneFalse5281.680
3026948101862NoneItem No 51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ( Common SR - 2023-24, Item No 51.02 Page No 22/81 Material No -600095) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos797.68797.686.0FalseNoneNoneFalseNoneFalse4786.080
3026949101862NoneItem No 51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ( Common SR - 2023-24, Item No 51.03 Page No 22/81 Material No -607054) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesBag365.8365.86.0FalseNoneNoneFalseNoneFalse2194.80
3026950101862NoneItem No 51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ( Common SR - 2023-24, Item No 51.04 Page No 23/81 Material No -281685) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2562.962562.966.0FalseNoneNoneFalseNoneFalse15377.760
3026951101862NoneItem No 1.2.2Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit1187.081187.0850.0FalseNoneNoneFalseNoneFalse59354.00
3026952101862Nonecode22R&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.3535.0FalseNoneNoneFalseNoneFalse87337.250
3026953101862Nonecode23R&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.7225.0FalseNoneNoneFalseNoneFalse8968.00
3026954101862Nonecode24R&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos251.1251.1100.0FalseNoneNoneFalseNoneFalse25110.00
3026955101862NoneItem No 7.02 & 7.04R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.144.0FalseNoneNoneFalseNoneFalse39520.560
17103043290000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026956101863None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026957101863None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026958101863None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026959101863None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026960101863None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026961101863None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026962101864None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026963101864None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026964101864None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026965101864None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026966101864None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026967101864None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103043290000NoneNoneRoads3rd Year Maintenance285877.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026968101865NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm519.39519.3933.6FalseNoneNoneFalseNoneFalse17451.5040
3026969101865NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.932240.0FalseNoneNoneFalseNoneFalse17763.20
3026970101865NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54378.0FalseNoneNoneFalseNoneFalse19482.120
3026971101865NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.21260.0FalseNoneNoneFalseNoneFalse161532.00
3026972101865NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.077.0FalseNoneNoneFalseNoneFalse43351.00
3026973101865NoneItem No.VOL-III-16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.052.8FalseNoneNoneFalseNoneFalse7341.740
3026974101865NoneItem No.VOL-III-16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.252.8FalseNoneNoneFalseNoneFalse762.30
3026975101865NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.55135.0FalseNoneNoneFalseNoneFalse16949.250
3026976101865NoneItem No.VOL-III-8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.058.64FalseNoneNoneFalseNoneFalse1244.5920
17103043290000NoneNoneRoads4th Year Maintanance286387.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026977101866NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm537.94537.9433.6FalseNoneNoneFalseNoneFalse18074.7840
3026978101866NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.212240.0FalseNoneNoneFalseNoneFalse18390.40
3026979101866NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38378.0FalseNoneNoneFalseNoneFalse20177.640
3026980101866NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.771260.0FalseNoneNoneFalseNoneFalse167290.20
3026981101866NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.1177.0FalseNoneNoneFalseNoneFalse44899.470
3026982101866NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.04135.0FalseNoneNoneFalseNoneFalse17555.40
17103043290000NoneNoneRoads5th year Maintenance342728.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026983101867NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm556.49556.4933.6FalseNoneNoneFalseNoneFalse18698.0640
3026984101867NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.52240.0FalseNoneNoneFalseNoneFalse19040.00
3026985101867NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22378.0FalseNoneNoneFalseNoneFalse20873.160
3026986101867NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.351260.0FalseNoneNoneFalseNoneFalse173061.00
3026987101867NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22154.0FalseNoneNoneFalseNoneFalse92895.880
3026988101867NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.52135.0FalseNoneNoneFalseNoneFalse18160.20
17103043290000NoneNoneRoads6th Year Renewal after Maintanance8505823.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026989101868NoneItem No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.992.5FalseNoneNoneFalseNoneFalse7257.4750
3026990101868NoneItem No. 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.422.5FalseNoneNoneFalseNoneFalse753.550
3026991101868NoneItem No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (Item No. 8.1/ Page No.66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4910.8FalseNoneNoneFalseNoneFalse1722.4920
3026992101868NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.321.32720.0FalseNoneNoneFalseNoneFalse950.40
3026993101868NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5615760.43FalseNoneNoneFalseNoneFalse276753.15080
3026994101868NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89472.82FalseNoneNoneFalseNoneFalse7578306.94980
3026995101868NoneItem No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5605.0FalseNoneNoneFalseNoneFalse469177.50
3026996101868NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07320.0FalseNoneNoneFalseNoneFalse170902.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103043300000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103043300000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103043300001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17103043510000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17103043610000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103043680000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103043740000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103043790000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103043870000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17103043930000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103043990000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103044050000NoneNoneELIGIBILITYContractors should be registered with KPWD Class I Registration.None
17103044120000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103044180000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103044240000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103044300000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103044360000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103044420000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103044490000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103044550000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103044650000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17103044700000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including 18 percent GST.None
17103044780000NoneNoneELIGIBILITYGST shall not be paid separately.None
17103044870000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP and maintenance period.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.969.98Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDETAILS OF COMMITTED WORKSPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- DETAILS OF COMMITTED WORKS
NoneNoneNoneNoneKPWD REGISTRATION CERTIFICATECapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(b) Machineries to be owned and on lease as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- a) Availability by owning(b) Machineries to be owned and on lease as per KW4
NoneNoneNoneNoneBID CAPACITY AS PER KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 24300.00 Cum 2. GSB/WMM : 14000.00Cum 3. BM/SDBC/DBM/BC : 4070.00Cum 4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 140.00cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades :670.00cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneCOPIES OF TAX REGISTRATIONCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3879.92 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.581.99 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Small Scale Industries CertificateTrueTechnical Bid
UDIN CERTIFICATETrueTechnical Bid
EPF registrationTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
Copies of Tax RegistrationTrueTechnical Bid
DrawingsTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
OTHER DOCUMENTS AS PER SBDTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710305279000
version0
createdDateNone
modifiedDateNone
blockNumberO/O CHIEF PROJECT OFFICER, PIU SHDP, PWD ANNEXE BUILDING KR CIRCLE BANGALORE
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone