createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710301526841
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1948400.65
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate13-03-2024 09:38:43
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1848400.65
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710301526875
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT10578
titlePKG-780 (A)Improvements to Road Malavalli - Purigali Road from Ch0.00 KM to 17.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District.(B)Improvements to Road NH-209 to SH-33 via Mathithaleshwara Temple road from Ch1.35 KM to 2.00 KM & Ch 2.90 KM to 4.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District.
descriptionPKG-780 (A)Improvements to Road Malavalli - Purigali Road from Ch0.00 KM to 17.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District.(B)Improvements to Road NH-209 to SH-33 via Mathithaleshwara Temple road from Ch1.35 KM to 2.00 KM & Ch 2.90 KM to 4.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District.
categoryWORKS
categoryTextWorks
ecv194840065.81
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount2000000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-780/MDY/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17103015270000NoneNoneRoadsPKG-780 (A)Improvements to Road Malavalli - Purigali Road from Ch0.00 KM to 17.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District. - Road Works89762713.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025946101754NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm463.74463.74115.8FalseNoneNoneFalseNoneFalse53701.0920
3025947101754NoneItem No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Item No. 1.12/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.112672.0FalseNoneNoneFalseNoneFalse1420531.20
3025948101754NoneItem No. 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (Item No. 1.7/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.4211404.8FalseNoneNoneFalseNoneFalse1601462.0160
3025949101754NoneItem No. 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Item No. 1.8/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.322412.25FalseNoneNoneFalseNoneFalse1349219.670
3025950101754NoneItem No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.748178.6FalseNoneNoneFalseNoneFalse4757818.7640
3025951101754NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.623168.0FalseNoneNoneFalseNoneFalse8818508.160
3025952101754NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -III Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2813.122813.121977.17FalseNoneNoneFalseNoneFalse5562016.47040
3025953101754NoneItem No. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.624356.19FalseNoneNoneFalseNoneFalse13154038.44780
3025954101754NoneItem No. 10.15 (ii)Patching of Deep Potholes using WBM Gr l & SDBC Gr lI 25 mm thick- Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -I with 1ype Sereenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. (Item No. 10.15 (ii)/ Page No. 93/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm586.46586.46387.2FalseNoneNoneFalseNoneFalse227077.3120
3025955101754NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3817590.75FalseNoneNoneFalseNoneFalse851040.4850
3025956101754NoneItem No. 5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5251040.75FalseNoneNoneFalseNoneFalse843193.190
3025957101754NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.822552.05FalseNoneNoneFalseNoneFalse28454898.1310
3025958101754NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.721531.23FalseNoneNoneFalseNoneFalse19792250.23560
3025959101754NoneItem No. 6.8.2Precast Cement Concrete Interlocking Blocks Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63-2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (Item No. 6.8.2/ Page No. 51/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm1369.981369.982100.0FalseNoneNoneFalseNoneFalse2876958.00
17103015270000NoneNoneRoadsRoad Furnitures2600242.1
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025960101755NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1256.0FalseNoneNoneFalseNoneFalse309518.720
3025961101755NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.468.0FalseNoneNoneFalseNoneFalse40563.680
3025962101755NoneItem No. 8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.3617.0FalseNoneNoneFalseNoneFalse130430.120
3025963101755NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.4810.0FalseNoneNoneFalseNoneFalse42314.80
3025964101755NoneItem No. 8.17Road Delineators Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings./ (Item No. 8.17 Page No. 8.17/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach2384.782384.7820.0FalseNoneNoneFalseNoneFalse47695.60
3025965101755NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.87.2FalseNoneNoneFalseNoneFalse76548.960
3025966101755NoneItem No. 16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3025967101755NoneItem No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.41843.6FalseNoneNoneFalseNoneFalse1152987.440
3025968101755NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7800.0FalseNoneNoneFalseNoneFalse344560.00
3025969101755NoneItem No. 8.16 (i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) (Item No. 8.16 (i)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5995.585995.582.0FalseNoneNoneFalseNoneFalse11991.160
3025970101755NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3025971101755NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.5630.0FalseNoneNoneFalseNoneFalse29806.80
3025972101755NoneItem No. 8.60.2 (ii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos61205.4261205.426.0FalseNoneNoneFalseNoneFalse367232.520
17103015270000NoneNoneRoadsRCC Drain7352054.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025973101756NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.361764.4FalseNoneNoneFalseNoneFalse212363.1840
3025974101756NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.02143.6FalseNoneNoneFalseNoneFalse1014824.0720
3025975101756NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7461.147461.14123.2FalseNoneNoneFalseNoneFalse919212.4480
3025976101756NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.54180.0FalseNoneNoneFalseNoneFalse1813057.20
3025977101756NoneItem No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.1/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.08127.2FalseNoneNoneFalseNoneFalse1194163.7760
3025978101756NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.9823.58FalseNoneNoneFalseNoneFalse2198433.66840
17103015270000NoneNoneRoadsWater Supply517612.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025979101757NoneItem No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Item No. 1.17.1/ Page No. 10/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.16315.0FalseNoneNoneFalseNoneFalse97385.40
3025980101757NoneItem No. 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,63mm dia (Item No. 9.2.1/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm258.42258.42175.0FalseNoneNoneFalseNoneFalse45223.50
3025981101757NoneItem No. 19.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.76700.0FalseNoneNoneFalseNoneFalse315532.00
3025982101757NoneItem No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Item No. 1.10/ Page No. 7/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.8315.0FalseNoneNoneFalseNoneFalse59472.00
17103015270000NoneNoneRoadsNEW 1200 dia Hume Pipe Culvert at Ch- 0.315 Km, 0.97 Km, 2.155 Km, 2.455 Km, 2.555 Km, 5.00 Km, 5.20 Km Widening 1200 dia Hume Pipe Culvert at Ch- 1.92 Km Widening 1000 dia Hume Pipe Culvert at Ch- 1.89 Km, Ch-12.39 Km3748579.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025983101758NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.478.0FalseNoneNoneFalseNoneFalse16567.20
3025984101758NoneItem No. 2.17 (ix) BRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (Item No. 2.17 (ix) B/ Page No. 11/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1293.281293.2852.5FalseNoneNoneFalseNoneFalse67897.20
3025985101758NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36340.57FalseNoneNoneFalseNoneFalse40991.00520
3025986101758NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0223.51FalseNoneNoneFalseNoneFalse166145.64020
3025987101758NoneItem No. 9.1 (ii)Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 1200 mm dia (Item No. 9.1 (ii)/ Page No. 87/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12705.0612705.0687.5FalseNoneNoneFalseNoneFalse1111692.750
3025988101758NoneItem No. 9.1 (i)Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 1000 mm dia (Item No. 9.1 (i)/ Page No. 87/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11503.8211503.8210.0FalseNoneNoneFalseNoneFalse115038.20
3025989101758NoneItem No. 2.2.1 Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.2.1 Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8012.158012.15241.08FalseNoneNoneFalseNoneFalse1931569.1220
3025990101758NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.983.0FalseNoneNoneFalseNoneFalse279698.940
3025991101758NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.62108.0FalseNoneNoneFalseNoneFalse13890.960
3025992101758NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.064800.0FalseNoneNoneFalseNoneFalse5088.00
17103015270000NoneNoneRoadsBox Culvert594365.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3025993101759NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.427.13FalseNoneNoneFalseNoneFalse6049.23460
3025994101759NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.413.6FalseNoneNoneFalseNoneFalse2888.640
3025995101759NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3637.7FalseNoneNoneFalseNoneFalse4537.5720
3025996101759NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.026.12FalseNoneNoneFalseNoneFalse43250.16240
3025997101759NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7822.19FalseNoneNoneFalseNoneFalse199083.79820
3025998101759NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.699.32FalseNoneNoneFalseNoneFalse90307.91080
3025999101759NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.982.65FalseNoneNoneFalseNoneFalse247067.3970
3026000101759NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.627.2FalseNoneNoneFalseNoneFalse926.0640
3026001101759NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103015270000NoneNoneRoadsWideining of Box Culvert (1.0 x 1.0) 1Vent at Ch 2.70 Mts594619.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026002101760NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.427.13FalseNoneNoneFalseNoneFalse6049.23460
3026003101760NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.46.8FalseNoneNoneFalseNoneFalse1444.320
3026004101760NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3631.2FalseNoneNoneFalseNoneFalse3755.2320
3026005101760NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.024.32FalseNoneNoneFalseNoneFalse30529.52640
3026006101760NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7815.66FalseNoneNoneFalseNoneFalse140498.07480
3026007101760NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.696.34FalseNoneNoneFalseNoneFalse61432.63460
3026008101760NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.981.86FalseNoneNoneFalseNoneFalse173413.34280
3026009101760NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.623.6FalseNoneNoneFalseNoneFalse463.0320
3026010101760NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
3026011101760NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.46.8FalseNoneNoneFalseNoneFalse1444.320
3026012101760NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.366.5FalseNoneNoneFalseNoneFalse782.340
3026013101760NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.021.8FalseNoneNoneFalseNoneFalse12720.6360
3026014101760NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.786.53FalseNoneNoneFalseNoneFalse58585.72340
3026015101760NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.692.98FalseNoneNoneFalseNoneFalse28875.27620
3026016101760NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.980.79FalseNoneNoneFalseNoneFalse73654.05420
3026017101760NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.623.6FalseNoneNoneFalseNoneFalse463.0320
3026018101760NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103015270000NoneNoneRoadsNew Construction of Box Culvert (1.5 x 1.5) 1Vent at Ch. 0.28 Km781494.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026019101761NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.427.9FalseNoneNoneFalseNoneFalse5925.960
3026020101761NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3626.25FalseNoneNoneFalseNoneFalse3159.450
3026021101761NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.026.75FalseNoneNoneFalseNoneFalse47702.3850
3026022101761NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7828.88FalseNoneNoneFalseNoneFalse259105.00640
3026023101761NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6915.56FalseNoneNoneFalseNoneFalse150771.57640
3026024101761NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.983.35FalseNoneNoneFalseNoneFalse312330.4830
3026025101761NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6213.5FalseNoneNoneFalseNoneFalse1736.370
3026026101761NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06720.0FalseNoneNoneFalseNoneFalse763.20
17103015270000NoneNoneRoadsWideining of Box Culvert (2.0 x 1.0) 1Vent at Ch 0.48 Mts and Ch 1.07 Mts541368.61
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026027101762NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.425.0FalseNoneNoneFalseNoneFalse5310.00
3026028101762NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3622.5FalseNoneNoneFalseNoneFalse2708.10
3026029101762NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.025.25FalseNoneNoneFalseNoneFalse37101.8550
3026030101762NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7819.0FalseNoneNoneFalseNoneFalse170463.820
3026031101762NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6910.04FalseNoneNoneFalseNoneFalse97284.48760
3026032101762NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.982.43FalseNoneNoneFalseNoneFalse226556.14140
3026033101762NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6211.16FalseNoneNoneFalseNoneFalse1435.39920
3026034101762NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06480.0FalseNoneNoneFalseNoneFalse508.80
17103015270000NoneNoneRoadsNew Construction of Box Culvert (3.0 x 2.0) 1Vent at Ch. 5.635 Km1653477.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026035101763NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4221.56FalseNoneNoneFalseNoneFalse18291.93520
3026036101763NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.425.5FalseNoneNoneFalseNoneFalse5416.20
3026037101763NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36150.12FalseNoneNoneFalseNoneFalse18068.44320
3026038101763NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0213.03FalseNoneNoneFalseNoneFalse92083.27060
3026039101763NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7849.13FalseNoneNoneFalseNoneFalse440783.55140
3026040101763NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8074.68074.628.8FalseNoneNoneFalseNoneFalse232548.480
3026041101763NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6922.89FalseNoneNoneFalseNoneFalse221797.00410
3026042101763NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.986.67FalseNoneNoneFalseNoneFalse621863.97660
3026043101763NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6218.43FalseNoneNoneFalseNoneFalse2370.46660
3026044101763NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103015270000NoneNoneRoadsWidening of Box Culvert (4.0 x 2.0) 1Vent at Ch. 11.715 Km1014882.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026045101764NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.422.88FalseNoneNoneFalseNoneFalse2443.44960
3026046101764NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36106.5FalseNoneNoneFalseNoneFalse12818.340
3026047101764NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.029.54FalseNoneNoneFalseNoneFalse67419.37080
3026048101764NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7820.81FalseNoneNoneFalseNoneFalse186702.74180
3026049101764NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8074.68074.628.8FalseNoneNoneFalseNoneFalse232548.480
3026050101764NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6915.21FalseNoneNoneFalseNoneFalse147380.18490
3026051101764NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.983.89FalseNoneNoneFalseNoneFalse362676.29220
3026052101764NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6220.52FalseNoneNoneFalseNoneFalse2639.28240
3026053101764NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06240.0FalseNoneNoneFalseNoneFalse254.40
17103015270000NoneNoneRoadsELECTRICAL POLE SHIFTING1263257.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026054101765NoneItem No 1.02Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.886.0FalseNoneNoneFalseNoneFalse58877.280
3026055101765NoneItem No 1.06Line Supports (Pole) PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.06 Page No 03/81 Material No -200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4954.824954.823.0FalseNoneNoneFalseNoneFalse14864.460
3026056101765NoneItem No 2.02Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.349.0FalseNoneNoneFalseNoneFalse11820.060
3026057101765NoneItem No 1.05Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.823.0FalseNoneNoneFalseNoneFalse13094.460
3026058101765NoneItem No 2.01Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.963.0FalseNoneNoneFalseNoneFalse3263.880
3026059101765NoneItem No 1.07Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.362.0FalseNoneNoneFalseNoneFalse41776.720
3026060101765NoneItem No 2.05Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.922.0FalseNoneNoneFalseNoneFalse6003.840
3026061101765NoneItem No 2.0111 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.9615.0FalseNoneNoneFalseNoneFalse6584.40
3026062101765NoneItem No 2.11HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.3845.0FalseNoneNoneFalseNoneFalse4832.10
3026063101765NoneItem No 5.06Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.1645.0FalseNoneNoneFalseNoneFalse5947.20
3026064101765NoneItem No 2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.769.0FalseNoneNoneFalseNoneFalse1401.840
3026065101765NoneItem No 2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.029.0FalseNoneNoneFalseNoneFalse3069.180
3026066101765NoneItem No 5.01Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.818.0FalseNoneNoneFalseNoneFalse3398.40
3026067101765NoneItem No 6.111 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.4818.0FalseNoneNoneFalseNoneFalse3950.640
3026068101765NoneItem No 6.0611 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.918.0FalseNoneNoneFalseNoneFalse4354.20
3026069101765NoneItem No 7.02Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.063.0FalseNoneNoneFalseNoneFalse182193.180
3026070101765NoneCost Data Sheet - 25 Erection of 3 Phase, 11kV/433V, 63 kVA BEE - 4/5 Star Rated Distribution Transformer Centre Using 9 Mtr RCC Pole DPTC ( WithOut Transformer) - Cost Data Sheet - 25 ( Common SR - 2023-24, ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet115431.14115431.146.0FalseNoneNoneFalseNoneFalse692586.840
3026071101765NoneItem No 51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( Common SR - 2023-24, Item No 51.01 Page No 22/81 Material No -281674) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos880.28880.2812.0FalseNoneNoneFalseNoneFalse10563.360
3026072101765NoneItem No 51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ( Common SR - 2023-24, Item No 51.02 Page No 22/81 Material No -600095) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos797.68797.6812.0FalseNoneNoneFalseNoneFalse9572.160
3026073101765NoneItem No 51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ( Common SR - 2023-24, Item No 51.03 Page No 22/81 Material No -607054) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesBag365.8365.812.0FalseNoneNoneFalseNoneFalse4389.60
3026074101765NoneItem No 51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ( Common SR - 2023-24, Item No 51.04 Page No 23/81 Material No -281685) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2562.962562.9612.0FalseNoneNoneFalseNoneFalse30755.520
3026075101765NoneItem No 1.2.2Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit1187.081187.0830.0FalseNoneNoneFalseNoneFalse35612.40
3026076101765Nonecode23R&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.3521.0FalseNoneNoneFalseNoneFalse52402.350
3026077101765Nonecode24R&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.7215.0FalseNoneNoneFalseNoneFalse5380.80
3026078101765Nonecode25R&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos251.1251.160.0FalseNoneNoneFalseNoneFalse15066.00
3026079101765NoneItem No 7.02 & 7.04R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.144.2FalseNoneNoneFalseNoneFalse41496.5880
17103015270000NoneNoneRoadsMaintenance cost for 1ST Years0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026080101766None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026081101766None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026082101766None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026083101766None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026084101766None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026085101766None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103015270000NoneNoneRoadsMaintenance cost for 2nd Years0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026086101767None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026087101767None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026088101767None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026089101767None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026090101767None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026091101767None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103015270000NoneNoneRoads3rd Year Maintenance475714.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026092101768NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm519.39519.3984.48FalseNoneNoneFalseNoneFalse43878.06720
3026093101768NoneItem No.VOL-III-16.19 Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.935632.0FalseNoneNoneFalseNoneFalse44661.760
3026094101768NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54633.6FalseNoneNoneFalseNoneFalse32655.7440
3026095101768NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.22112.0FalseNoneNoneFalseNoneFalse270758.40
3026096101768NoneItem No. 10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm207.49207.49246.4FalseNoneNoneFalseNoneFalse51125.5360
3026097101768NoneItem No.VOL-III-16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.057.04FalseNoneNoneFalseNoneFalse18459.2320
3026098101768NoneItem No.VOL-III-16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.257.04FalseNoneNoneFalseNoneFalse1916.640
3026099101768NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.5590.0FalseNoneNoneFalseNoneFalse11299.50
3026100101768NoneItem No.VOL-III-8.10Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.056.66FalseNoneNoneFalseNoneFalse959.3730
17103015270000NoneNoneRoads4th Year Maintenance470570.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026101101769NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm537.94537.9484.48FalseNoneNoneFalseNoneFalse45445.17120
3026102101769NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.215632.0FalseNoneNoneFalseNoneFalse46238.720
3026103101769NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38633.6FalseNoneNoneFalseNoneFalse33821.5680
3026104101769NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.772112.0FalseNoneNoneFalseNoneFalse280410.240
3026105101769NoneItem No. 10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm214.9214.9246.4FalseNoneNoneFalseNoneFalse52951.360
3026106101769NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.0490.0FalseNoneNoneFalseNoneFalse11703.60
17103015270000NoneNoneRoads5th Year Maintenance541616.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026107101770NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm556.49556.4984.48FalseNoneNoneFalseNoneFalse47012.27520
3026108101770NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.55632.0FalseNoneNoneFalseNoneFalse47872.00
3026109101770NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22633.6FalseNoneNoneFalseNoneFalse34987.3920
3026110101770NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.352112.0FalseNoneNoneFalseNoneFalse290083.20
3026111101770NoneItem No.VOL-III-10.4Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm222.31222.31492.8FalseNoneNoneFalseNoneFalse109554.3680
3026112101770NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.5290.0FalseNoneNoneFalseNoneFalse12106.80
17103015270000NoneNoneRoads6th Year Renewal after Maintenance Period22645461.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026113101771NoneItem No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.997.04FalseNoneNoneFalseNoneFalse20437.04960
3026114101771NoneItem No. 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.427.04FalseNoneNoneFalseNoneFalse2121.99680
3026115101771NoneItem No. 8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (Item No. 8.1/ Page No.66/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.498.1FalseNoneNoneFalseNoneFalse1291.8690
3026116101771NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5649912.0FalseNoneNoneFalseNoneFalse876454.720
3026117101771NoneItem No. 5.17 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.17 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13282.0813282.081497.37FalseNoneNoneFalseNoneFalse19888188.12960
3026118101771NoneItem No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.51843.6FalseNoneNoneFalseNoneFalse1429711.80
3026119101771NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07800.0FalseNoneNoneFalseNoneFalse427256.00
17103015270000NoneNoneRoadsPKG-780 (B)Improvements to Road NH-209 to SH-33 via Mathithaleshwara Temple road from Ch1.35 KM to 2.00 KM & Ch 2.90 KM to 4.00 KM (In Selected reaches) in Malavalli Taluk of Mandya District.Road Estimate39359289.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026120101772NoneItem No. 2.5 (ii) bClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) b/ Page No. 9/Vol.03/Common SR-2023-24) Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm463.74463.7415.6FalseNoneNoneFalseNoneFalse7234.3440
3026121101772NoneItem No. 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (Item No. 3.5 / Page No. 17/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.085190.0FalseNoneNoneFalseNoneFalse36745.20
3026122101772NoneItem No. 16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (Item No. 16.19/ Page No.147/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.084875.0FalseNoneNoneFalseNoneFalse34515.00
3026123101772NoneItem No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Item No. 1.12/ Page No. 8/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.12268.0FalseNoneNoneFalseNoneFalse254242.80
3026124101772NoneItem No. 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (Item No. 1.7/ Page No. 7/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.422041.2FalseNoneNoneFalseNoneFalse286625.3040
3026125101772NoneItem No. 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Item No. 1.8/ Page No. 7/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.32659.21FalseNoneNoneFalseNoneFalse368709.33720
3026126101772NoneItem No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Item No. 3.6/ Page No. 17/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.74838.5FalseNoneNoneFalseNoneFalse487788.990
3026127101772NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -III Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2813.122813.121665.0FalseNoneNoneFalseNoneFalse4683844.80
3026128101772NoneItem No. 4.2 B (v)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 By Mix in Place Method (v) For Grading -V Material (Item No. 4.2 B (v)/ Page No. 23/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.621616.97FalseNoneNoneFalseNoneFalse4501030.03140
3026129101772NoneItem No. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.623844.08FalseNoneNoneFalseNoneFalse11607660.84960
3026130101772NoneItem No. 5.1 A (i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (Item No. 5.1 A (i)/ Page No. 31/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3812524.73FalseNoneNoneFalseNoneFalse605946.43740
3026131101772NoneItem No. 5.4Tack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface (Item No. 5.4/ Page No. 31/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5212524.73FalseNoneNoneFalseNoneFalse206908.53960
3026132101772NoneItem No. 5.12 CDense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Item No. 5.12 C/ Page No. 35/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.82626.24FalseNoneNoneFalseNoneFalse6982463.27680
3026133101772NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72375.75FalseNoneNoneFalseNoneFalse4856839.290
3026134101772NoneItem No. 6.8.2Precast Cement Concrete Interlocking Blocks Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (Item No. 6.8.2/ Page No. 51/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm1369.981369.983240.0FalseNoneNoneFalseNoneFalse4438735.20
17103015270000NoneNoneRoadsRoad Furnitures804090.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026135101773NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1215.0FalseNoneNoneFalseNoneFalse82906.80
3026136101773NoneItem No. 8.5 A (x)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class BType XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 80 mm x 60 mm rectangular (Item No. 8.5 A (x)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach6392.066392.068.0FalseNoneNoneFalseNoneFalse51136.480
3026137101773NoneItem No. 8.5 A (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (iv) 60 cm Circular (Item No. 8.5 A (ii)/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.462.0FalseNoneNoneFalseNoneFalse10140.920
3026138101773NoneItem No. 8.5 A (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class BType XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.364.0FalseNoneNoneFalseNoneFalse30689.440
3026139101773NoneItem No. 8.48Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.488.0FalseNoneNoneFalseNoneFalse33851.840
3026140101773NoneItem No. 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (Item No. 8.7/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.81.8FalseNoneNoneFalseNoneFalse19137.240
3026141101773NoneItem No. 16.29Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3026142101773NoneItem No. 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No. 67/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4495.4FalseNoneNoneFalseNoneFalse309823.160
3026143101773NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo430.7430.7210.0FalseNoneNoneFalseNoneFalse90447.00
3026144101773NoneItem No. 8.16 (ii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (Item No. 8.16 (ii)/ Page No. 67/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.863.0FalseNoneNoneFalseNoneFalse10361.580
3026145101773NoneItem No. 8.16 (iii)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (Item No. 8.16 (iii)/ Page No. 67/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.567.0FalseNoneNoneFalseNoneFalse6954.920
3026146101773NoneItem No. 8.60.2 (iii)Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m (Item No. 8.60.2 (iii) / Page No. 80/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos61205.4261205.422.0FalseNoneNoneFalseNoneFalse122410.840
17103015270000NoneNoneRoadsRCC Drain10775598.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026147101774NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.362551.0FalseNoneNoneFalseNoneFalse307038.360
3026148101774NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.02204.0FalseNoneNoneFalseNoneFalse1441672.080
3026149101774NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7461.147461.14164.0FalseNoneNoneFalseNoneFalse1223626.960
3026150101774NoneItem No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.54264.0FalseNoneNoneFalseNoneFalse2659150.560
3026151101774NoneItem No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.1/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.08194.0FalseNoneNoneFalseNoneFalse1821287.520
3026152101774NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.9835.64FalseNoneNoneFalseNoneFalse3322823.40720
17103015270000NoneNoneRoadsShifting of Water Supply Pipeline778906.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026153101775NoneItem No. 1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Item No. 1.17.1/ Page No. 10/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.16469.8FalseNoneNoneFalseNoneFalse145243.3680
3026154101775NoneItem No. 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,63mm dia (Item No. 9.2.1/ Page No. 96/Vol.05/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm258.42258.42225.0FalseNoneNoneFalseNoneFalse58144.50
3026155101775NoneItem No. 19.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.761080.0FalseNoneNoneFalseNoneFalse486820.80
3026156101775NoneItem No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Item No. 1.10/ Page No. 7/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.8469.8FalseNoneNoneFalseNoneFalse88698.240
17103015270000NoneNoneRoadsBox Culvert (1.0 x 1.0) 1Vent at Ch 1570 Mts, & Box Culvert (1.5 x 1.0) 1Vent at Ch 1745 Mts908058.32
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026157101776NoneItem No. 2.8 (ii) aDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.4210.12FalseNoneNoneFalseNoneFalse8586.01040
3026158101776NoneItem No. 2.11 (ii) ADismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.425.8FalseNoneNoneFalseNoneFalse5479.920
3026159101776NoneItem No. 1.14Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (Item No. 1.14/ Page No. 8/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.3668.4FalseNoneNoneFalseNoneFalse8232.6240
3026160101776NoneItem No. 2.1.3Providing and laying in Position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Item No. 2.1.3/ Page No. 15/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.029.54FalseNoneNoneFalseNoneFalse67419.37080
3026161101776NoneItem No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Item No. 2.4.3/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.7833.12FalseNoneNoneFalseNoneFalse297145.35360
3026162101776NoneItem No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6914.66FalseNoneNoneFalseNoneFalse142050.85540
3026163101776NoneItem No. 2.11 hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (Item No. 2.11 h/ Page No. 18/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne93232.9893232.984.05FalseNoneNoneFalseNoneFalse377593.5690
3026164101776NoneItem No. 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (Item No. 8.10/ Page No. 66/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.628.1FalseNoneNoneFalseNoneFalse1041.8220
3026165101776NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.06480.0FalseNoneNoneFalseNoneFalse508.80
17103015270000NoneNoneRoadsShifting of Electrical Poles613906.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026166101777NoneItem No 1.02Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.886.0FalseNoneNoneFalseNoneFalse58877.280
3026167101777NoneItem No 1.06Line Supports (Pole) PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.06 Page No 03/81 Material No -200006) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4954.824954.823.0FalseNoneNoneFalseNoneFalse14864.460
3026168101777NoneItem No 2.02Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.349.0FalseNoneNoneFalseNoneFalse11820.060
3026169101777NoneItem No 1.05Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.823.0FalseNoneNoneFalseNoneFalse13094.460
3026170101777NoneItem No 2.01Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.963.0FalseNoneNoneFalseNoneFalse3263.880
3026171101777NoneItem No 1.07Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.362.0FalseNoneNoneFalseNoneFalse41776.720
3026172101777NoneItem No 2.05Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.922.0FalseNoneNoneFalseNoneFalse6003.840
3026173101777NoneItem No 2.0111 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.9615.0FalseNoneNoneFalseNoneFalse6584.40
3026174101777NoneItem No 2.11HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.3845.0FalseNoneNoneFalseNoneFalse4832.10
3026175101777NoneItem No 5.06Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.1645.0FalseNoneNoneFalseNoneFalse5947.20
3026176101777NoneItem No 2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.769.0FalseNoneNoneFalseNoneFalse1401.840
3026177101777NoneItem No 2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.029.0FalseNoneNoneFalseNoneFalse3069.180
3026178101777NoneItem No 5.01 & 5.02Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.818.0FalseNoneNoneFalseNoneFalse3398.40
3026179101777NoneItem No 6.111 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.486.0FalseNoneNoneFalseNoneFalse1316.880
3026180101777NoneItem No 6.0611 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.918.0FalseNoneNoneFalseNoneFalse4354.20
3026181101777NoneItem No 7.02Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.061.0FalseNoneNoneFalseNoneFalse60731.060
3026182101777NoneCost Data Sheet - 25Erection of 3 Phase, 11kV/433V, 63 kVA BEE - 4/5 Star Rated Distribution Transformer Centre Using 9 Mtr RCC Pole DPTC ( WithOut Transformer) - Cost Data Sheet - 25 ( Common SR - 2023-24, ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos115431.14115431.142.0FalseNoneNoneFalseNoneFalse230862.280
3026183101777NoneItem No 51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( Common SR - 2023-24, Item No 51.01 Page No 22/81 Material No -281674) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos880.28880.284.0FalseNoneNoneFalseNoneFalse3521.120
3026184101777NoneItem No 51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ( Common SR - 2023-24, Item No 51.02 Page No 22/81 Material No -600095) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos797.68797.684.0FalseNoneNoneFalseNoneFalse3190.720
3026185101777NoneItem No 51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ( Common SR - 2023-24, Item No 51.03 Page No 22/81 Material No -607054) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos365.8365.84.0FalseNoneNoneFalseNoneFalse1463.20
3026186101777NoneItem No 51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ( Common SR - 2023-24, Item No 51.04 Page No 23/81 Material No -281685) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2562.962562.964.0FalseNoneNoneFalseNoneFalse10251.840
3026187101777NoneItem No 1.2.2Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1187.081187.0830.0FalseNoneNoneFalseNoneFalse35612.40
3026188101777Nonecode23R&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.3521.0FalseNoneNoneFalseNoneFalse52402.350
3026189101777Nonecode24R&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.7215.0FalseNoneNoneFalseNoneFalse5380.80
3026190101777Nonecode25R&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos251.1251.160.0FalseNoneNoneFalseNoneFalse15066.00
3026191101777NoneItem No 7.02 & 7.04R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.141.5FalseNoneNoneFalseNoneFalse14820.210
17103015270000NoneNoneRoadsMaintenance cost for 1ST Years0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026192101778None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026193101778None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026194101778None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026195101778None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026196101778None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026197101778None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103015270000NoneNoneRoads2nd Year Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026198101779None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026199101779None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026200101779None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026201101779None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026202101779None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3026203101779None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17103015270000NoneNoneRoads3rd Year Maintenance87544.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026204101780NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm519.39519.397.8FalseNoneNoneFalseNoneFalse4051.2420
3026205101780NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm7.937.93520.0FalseNoneNoneFalseNoneFalse4123.60
3026206101780NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.5458.5FalseNoneNoneFalseNoneFalse3015.090
3026207101780NoneItem No.VOL-III-10.2 Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.2195.0FalseNoneNoneFalseNoneFalse24999.00
3026208101780NoneItem No.VOL-III-10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.5 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.060.55FalseNoneNoneFalseNoneFalse34089.650
3026209101780NoneItem No.VOL-III-16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.051.73FalseNoneNoneFalseNoneFalse4536.14650
3026210101780NoneItem No.VOL-III-16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.251.73FalseNoneNoneFalseNoneFalse470.99250
3026211101780NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.5590.0FalseNoneNoneFalseNoneFalse11299.50
3026212101780NoneItem No.VOL-III-8.10Painting of Parapet walls of CD work KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.056.66FalseNoneNoneFalseNoneFalse959.3730
17103015270000NoneNoneRoads4th Year Maintenance84488.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026213101781NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm537.94537.947.8FalseNoneNoneFalseNoneFalse4195.9320
3026214101781NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm8.218.21520.0FalseNoneNoneFalseNoneFalse4269.20
3026215101781NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.3858.5FalseNoneNoneFalseNoneFalse3122.730
3026216101781NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.77195.0FalseNoneNoneFalseNoneFalse25890.150
3026217101781NoneItem No.VOL-III-10.4Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.1160.55FalseNoneNoneFalseNoneFalse35307.31050
3026218101781NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.0490.0FalseNoneNoneFalseNoneFalse11703.60
17103015270000NoneNoneRoads5th Year Maintenance123930.98
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026219101782NoneItem No. 2.5 (ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle (Item No. 2.5 (ii) a/ Page No. 9/Vol.03/Common SR-2023-24) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm556.49556.497.8FalseNoneNoneFalseNoneFalse4340.6220
3026220101782NoneItem No.VOL-III-16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm8.58.5520.0FalseNoneNoneFalseNoneFalse4420.00
3026221101782NoneItem No.VOL-III-10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.2258.5FalseNoneNoneFalseNoneFalse3230.370
3026222101782NoneItem No.VOL-III-10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.35195.0FalseNoneNoneFalseNoneFalse26783.250
3026223101782NoneItem No.VOL-III-10.4Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 ( Item No.VOL-III-10.4 / Page No. 91) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22121.1FalseNoneNoneFalseNoneFalse73049.9420
3026224101782NoneItem No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m In all kinds of soils upto 300 mm depth including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.5290.0FalseNoneNoneFalseNoneFalse12106.80
17103015270000NoneNoneRoads6th Year Renewal after Maintenance Period6746220.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3026225101783NoneItem No. 16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (Item No. 16.22/ Page No.147/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.991.73FalseNoneNoneFalseNoneFalse5022.17270
3026226101783NoneItem No. 16.24 iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (Item No. 16.24 i/ Page No.148/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm301.42301.421.73FalseNoneNoneFalseNoneFalse521.45660
3026227101783Nonecode03Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 8.166 --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.498.1FalseNoneNoneFalseNoneFalse1291.8690
3026228101783NoneItem No. 8.4Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.321.32480.0FalseNoneNoneFalseNoneFalse633.60
3026229101783NoneItem No. 5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom (Item No. 5.3i/ Page No.31/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5612524.73FalseNoneNoneFalseNoneFalse219934.25880
3026230101783NoneItem No. 5.16 CBituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, at 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Item No. 5.16 C/ Page No. 38/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89375.75FalseNoneNoneFalseNoneFalse6022479.66750
3026231101783NoneItem No. 8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Item No. 8.15/ Page No.67/Vol.03/Common SR-2023-24) --- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5495.4FalseNoneNoneFalseNoneFalse384182.70
3026232101783NoneItem No. 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 Plus/Minus 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 Plus/Minus 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 Plus/Minus 2 mm and height not less than 30 Plus/Minus 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (Item No. 8.43/ Page No. 74/Vol.03/Common SR-2023-24) Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07210.0FalseNoneNoneFalseNoneFalse112154.70
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17103015280000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17103015280000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17103015280001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submissionNone
17103015600000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17103015710000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17103015790000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17103015860000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17103015940000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17103016010000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17103016070000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17103016140000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17103016230000NoneNoneELIGIBILITYContractors should be registered with KPWD Class I Registration.None
17103016290000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17103016350000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17103016400000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17103016460000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17103016540000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17103016610000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17103016670000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17103016730000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17103016820000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17103016880000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including 18 percent GST.None
17103016980000NoneNoneELIGIBILITYGST shall not be paid separately.None
17103017050000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP and maintenance period.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.969.98Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDetails of Committed worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed works
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(b) Machineries to be owned and on lease as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- a) Availability by owning(b) Machineries to be owned and on lease as per KW4
NoneNoneNoneNoneBid capacity as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 24300.00 Cum 2. GSB/WMM : 14000.00Cum 3. BM/SDBC/DBM/BC : 4070.00Cum 4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 140.00cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades :670.00cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneCopies of Tax RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3879.92 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.581.99 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual Turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Small Scale Industries CertificateTrueTechnical Bid
UDIN CERTIFICATETrueTechnical Bid
EPF registrationTrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
DrawingsTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationTrueTechnical Bid
OTHER DOCUMENTS AS PER SBDTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710302687000
version0
createdDateNone
modifiedDateNone
blockNumberO/O CHIEF PROJECT OFFICER, PIU SHDP, PWD ANNEXE BUILDING KR CIRCLE BANGALORE
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone