createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710251640412
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1949311.84
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose30-04-2024 17:30:00
tenderQueryClose28-03-2024 16:00:00
technicalBidOpen06-05-2024 11:30:00
publishedDate12-03-2024 21:03:51
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls1
preBidMeetingDate28-03-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1849311.84
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1710251640441
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9807
titlePKG-783 (A)Improvements to Road from Mandya-Thendekere road to Chinakuralli-Melukote road via Narayanapura Kammanayakanahalli Sanaba road PDP-31 at Ch0.00 KM to 5.10 KM In Selected reaches In Pandavapura Taluk of Mandya District.(B)Improvements to Road from Mandya Hadagalli to join Bevinakuppe-Shambuvinahalli via Shettihalli Anuvunahalli, Narahalli road PDP -56 at Ch0.00 KM to 9.60 KM In Selected reaches In Pandavapura Taluk of Mandya District.
descriptionPKG-783 (A)Improvements to Road from Mandya-Thendekere road to Chinakuralli-Melukote road via Narayanapura Kammanayakanahalli Sanaba road PDP-31 at Ch0.00 KM to 5.10 KM In Selected reaches In Pandavapura Taluk of Mandya District.(B)Improvements to Road from Mandya Hadagalli to join Bevinakuppe-Shambuvinahalli via Shettihalli Anuvunahalli, Narahalli road PDP -56 at Ch0.00 KM to 9.60 KM In Selected reaches In Pandavapura Taluk of Mandya District.
categoryWORKS
categoryTextWorks
ecv194931184.55
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-783/MANDYA/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17102516400000NoneNoneRoadsPKG-783 (A)Improvements to Road from Mandya-Thendekere road to Chinakuralli-Melukote road via Narayanapura Kammanayakanahalli Sanaba road PDP-31 at Ch0.00 KM to 5.10 KM In Selected reaches In Pandavapura Taluk of Mandya District. - Road Works100629425.77
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015899100785NoneItem No 2.5, Page no 9, Vol 3, PWD Common SR 2023Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm463.74463.74121.92FalseNoneNoneFalseNoneFalse56539.18080
3015900100785NoneItem No 3.5, Page no 17, Vol 3, PWD Common SR 202Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.0819155.0FalseNoneNoneFalseNoneFalse135617.40
3015901100785NoneItem No 1.12, Page no 8, Vol 1, PWD Common SR 202Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.18653.51FalseNoneNoneFalseNoneFalse970058.4710
3015902100785NoneItem No 1.7, Page no 7, Vol 1, PWD Common SR 2023Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.426654.75FalseNoneNoneFalseNoneFalse934459.9950
3015903100785NoneItem No 1.8, Page no 7, Vol 1, PWD Common SR 2023Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.3211802.41FalseNoneNoneFalseNoneFalse6601323.96120
3015904100785NoneItem No 3.6, Page no 17, Vol 3, PWD Common SR 202Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.748126.3FalseNoneNoneFalseNoneFalse4727393.7620
3015905100785NoneItem No 4.2 (v), Page no 23, Vol 3, PWD Common SRBy Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.627666.31FalseNoneNoneFalseNoneFalse21340093.84220
3015906100785NoneItem No. 4.17 Page No. 26 Vol.03Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.629516.53FalseNoneNoneFalseNoneFalse28736304.31860
3015907100785NoneItem No 5.1 A (I), Page no 31, Vol 3, PWD Common Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3836754.11FalseNoneNoneFalseNoneFalse1778163.84180
3015908100785NoneItem No 5.4, Page no 31, Vol 3, PWD Common SR 202Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5236754.11FalseNoneNoneFalseNoneFalse607177.89720
3015909100785NoneItem No 5.12 (B ), Page no 35, Vol 3, PWD Common Dense Graded Bituminous Macadam Grading - II for traffic20 MSA Providing and laying Dense Graded Bituminous Macadam with40/60 TPH capacity HMP using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 4.5 per centby weight of total mix and filler, transporting the hot mix to worksite, laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MoRTHspecification clause No. 505 complete in all respects." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.821837.71FalseNoneNoneFalseNoneFalse20490135.71220
3015910100785NoneItem No 5.24 B (ii), Page no 40, Vol 3, PWD CommoBituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site,laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MORTHspecification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.721102.62FalseNoneNoneFalseNoneFalse14252157.38640
17102516400000NoneNoneRoadsRoad Furnitures3657981.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015911100786NoneItem No 8.15, Page no 67, Vol 3, PWD Common SR 20Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/m2area, thickness of 2.5 mm is exclusive of surface applied glassbeads as per IRC:35:2015.The finished surface to be level,uniform and free from streaks and holes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.41220.0FalseNoneNoneFalseNoneFalse762988.00
3015912100786NoneItem No 16.29, Page no 150, Vol 3, PWD Common SR Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3015913100786NoneItem No 8.7, Page no 65, Vol 3, PWD Common SR 202Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorisedsign as per IRC:67:2022 made of high intensitygrade sheeting vide clause 801.3, fixed over aluminiumsheeting, 2 mm thick or Aluminium composite material sheetwith overall thickness of 4mm with area not exceeding 0.9m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to theground by means of properly designed foundation with M25grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.85.4FalseNoneNoneFalseNoneFalse57411.720
3015914100786NoneItem No 8.5 ii, Page no 64, Vol 3, PWD Common SR Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 madeof Class B Type XI retro reflective sheeting fixed over 2 mmthick aluminium sheeting vide clause 801.3, 3mm/4mm thickAluminium composite material sheet depending on the size ofthe sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properlydesigned foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 ofIRC:67:2022. (ii) 90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1236.0FalseNoneNoneFalseNoneFalse198976.320
3015915100786NoneItem No 8.5 viii, Page no 64, Vol 3, PWD Common SRetro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mmthick aluminium sheeting vide clause 801.3, 3mm/4mm thickAluminium composite material sheet depending on the size ofthe sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properlydesigned foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as perapproveddrawing.The sign shall be maintained as per section 12 ofIRC:67:2022. (viii) 60 cm circular" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.466.0FalseNoneNoneFalseNoneFalse30422.760
3015916100786NoneItem No 8.43, Page no 74, Vol 3, PWD Common SR 20Supplying and Fixing of Molded Shank Raised PavementMarkers / Cat's Eye made of polycarbonate and ABS mouldedbody and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications ofCategory A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall notexceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to thebase shall be 35 +/- 5 degree. The strength of detachment ofthe integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) fromthe body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulatedretro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7720.0FalseNoneNoneFalseNoneFalse310104.00
3015917100786NoneItem No 8.16 (ii), Page no 67, Vol 3, PWD Common Kilometre Stone Reinforced cement concrete M15grade kilometre stone oftandard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.864.0FalseNoneNoneFalseNoneFalse13815.440
3015918100786NoneItem No 8.16 (iii), Page no 67, Vol 3, PWD CommoKilometre Stone Reinforced cement concrete M15grade kilometre stone ofstandard design as per IRC:8-1980, fixing in position includingpainting and printing etc- (iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.5620.0FalseNoneNoneFalseNoneFalse19871.20
3015919100786NoneItem No. 8.5 A xv) Page No. 65 Vol.03Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.3610.0FalseNoneNoneFalseNoneFalse76723.60
3015920100786NoneItem No. 8.48 Page No. 76Vol.03Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.4820.0FalseNoneNoneFalseNoneFalse84629.60
3015921100786NoneItem No. 8.16 (i) Page No. 67 Vol.03Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) (Item No. 8.16 (i)/ Page No. 67/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5995.585995.582.0FalseNoneNoneFalseNoneFalse11991.160
3015922100786NoneItem No. 6.8.2 Page No. 51Vol.03Precast Cement Concrete Interlocking Blocks Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (Item No. 6.8.2/ Page No. 51/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm1369.981369.981176.0FalseNoneNoneFalseNoneFalse1611096.480
3015923100786NoneItem No. 8.42.6 Page No. 74 Vol.03Kerb Stones Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra) (Item No. 8.42.6/ Page No. 74/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm546.34546.34140.0FalseNoneNoneFalseNoneFalse76487.60
3015924100786NoneItem No. 8.60.2 (iii) Page No. 80 Vol.03Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 9.00 m (Item No. 8.60.2 (iii) / Page No. 80/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos61205.4261205.426.0FalseNoneNoneFalseNoneFalse367232.520
17102516400000NoneNoneRoadsRCC Drain7063602.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015925100787NoneItem No 1.14.1, Page no 8, Vol 1, PWD Common SR 2Earth work excavation for Foundationdepth upto 3 m, as per drawing and technicalout, shoring, strutting, barricading,excavated surfaces, disposing off or & stacking the selected earth for reusem including cost of labour, tools, usagerequired to complete the workIn all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.361632.95FalseNoneNoneFalseNoneFalse196541.8620
3015926100787NoneItem No 2.1.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the otherappurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.02233.4FalseNoneNoneFalseNoneFalse1649442.4680
3015927100787NoneItem No. 2.4.2 Page No. 16 Vol.01Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7461.147461.1494.0FalseNoneNoneFalseNoneFalse701347.160
3015928100787NoneItem No 2.4.2, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The granite/trap/basaltcrushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compactedusing needle vibrators, providing weep holes wherever necessary, includingall lead & lifts, cost of all materials of quality, confirming to the requirementsof relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.54151.44FalseNoneNoneFalseNoneFalse1525385.45760
3015929100787NoneItem No 2.5.1, Page no 16, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.08111.82FalseNoneNoneFalseNoneFalse1049775.10560
3015930100787NoneItem No 2.11 h, Page no 18, Vol 1, PWD Common SR Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMT93232.9893232.9820.82FalseNoneNoneFalseNoneFalse1941110.64360
17102516400000NoneNoneRoadsWater Supply1429158.42
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015931100788NoneItem No 1.17.1, Page no 10, Vol 1, PWD Common SR Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the followingstrata ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.16849.6FalseNoneNoneFalseNoneFalse262662.3360
3015932100788NoneItem No 9.2.1, Page no 96, Vol 5, PWD Common SR 2Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolli g and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e HDPE Grade PE80-PN8.0, 63mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr258.42258.42300.0FalseNoneNoneFalseNoneFalse77526.00
3015933100788NoneItem No 1.1, Page no 7, Vol 1, PWD Common SR 2023Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of alllabour complete as per specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.8849.6FalseNoneNoneFalseNoneFalse160404.480
3015934100788NoneItem No. 19.2.3 Page No. 96 Vol.05Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.762060.0FalseNoneNoneFalseNoneFalse928565.60
17102516400000NoneNoneRoadsConstruction of Box Culverts10104946.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015935100789NoneItem No 1.14.1, Page no 8, Vol 1, PWD Common SR 2Earth work excavation for Foundationdepth upto 3 m, as per drawing and technicalout, shoring, strutting, barricading,excavated surfaces, disposing off or& stacking the selected earth for reusem including cost of labour, tools, usagerequired to complete the workIn all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36748.8FalseNoneNoneFalseNoneFalse90125.5680
3015936100789NoneItem No 2.1.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid inlayers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges ofmachinery, curing, and all the otheappurtenances required to complete thework as per technical specifications.-Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.02103.68FalseNoneNoneFalseNoneFalse732708.63360
3015937100789NoneItem No 2.4.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The granite /trap/ basaltcrushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, includingall lead & lifts, cost of all materials of quality, confirming to the requirementsof relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. .M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.78375.84FalseNoneNoneFalseNoneFalse3371953.79520
3015938100789NoneItem No 2.11 h, Page no 18, Vol 1, PWD Common SR Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMT93232.9893232.9844.58FalseNoneNoneFalseNoneFalse4156326.24840
3015939100789NoneItem No 8.1, Page no 66, Vol 3, PWD Common SR 202Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6286.4FalseNoneNoneFalseNoneFalse11112.7680
3015940100789NoneItem No 8.4, Page no 15, Vol 1, PWD Common SR 202Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeper cm height" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.065760.0FalseNoneNoneFalseNoneFalse6105.60
3015941100789NoneItem No. 2.11 (ii) A Page No. 10 Vol.03Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.4156.48FalseNoneNoneFalseNoneFalse33236.3520
3015942100789NoneItem No. 2.17 (ix) B Page No. 11 Vol.03Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (Item No. 2.17 (ix) B/ Page No. 11/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1293.281293.28172.5FalseNoneNoneFalseNoneFalse223090.80
3015943100789NoneItem No. 2.5.2Page No. 16 Vol.01Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.69152.06FalseNoneNoneFalseNoneFalse1473414.26140
3015944100789NoneItem No. 2.8 (ii) a Page No. 10Vol.03Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (a)Cement Concrete Grade M-15 & M-20 (Item No. 2.8 (ii) a/ Page No. 10/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum848.42848.428.1FalseNoneNoneFalseNoneFalse6872.2020
17102516400000NoneNoneRoadsElectrical SHifting1563846.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015945100790None1.02Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.8821.0FalseNoneNoneFalseNoneFalse206070.480
3015946100790None2.02Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.3421.0FalseNoneNoneFalseNoneFalse27580.140
3015947100790None1.05Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.827.0FalseNoneNoneFalseNoneFalse30553.740
3015948100790None2.01Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.967.0FalseNoneNoneFalseNoneFalse7615.720
3015949100790None1.07Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.364.0FalseNoneNoneFalseNoneFalse83553.440
3015950100790None2.05Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.924.0FalseNoneNoneFalseNoneFalse12007.680
3015951100790None2.011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.9636.0FalseNoneNoneFalseNoneFalse15802.560
3015952100790None2.11HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.38107.0FalseNoneNoneFalseNoneFalse11489.660
3015953100790None5.06Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.16107.0FalseNoneNoneFalseNoneFalse14141.120
3015954100790None2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.7621.0FalseNoneNoneFalseNoneFalse3270.960
3015955100790None2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.0221.0FalseNoneNoneFalseNoneFalse7161.420
3015956100790None5.01Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.842.0FalseNoneNoneFalseNoneFalse7929.60
3015957100790None6.111 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.4818.0FalseNoneNoneFalseNoneFalse3950.640
3015958100790None6.0611 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.943.0FalseNoneNoneFalseNoneFalse10401.70
3015959100790None7.02Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.063.0FalseNoneNoneFalseNoneFalse182193.180
3015960100790Nonecost dataErection of 3 Phase, 11kV/433V, 63 kVA BEE - 4/5 Star Rated Distribution Transformer Centre Using 9 Mtr RCC Pole DPTC ( WithOut Transformer) - Cost Data Sheet - 25 ( Common SR - 2023-24, ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet115431.14115431.145.0FalseNoneNoneFalseNoneFalse577155.70
3015961100790None51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( Common SR - 2023-24, Item No 51.01 Page No 22/81 Material No -281674)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos880.28880.2810.0FalseNoneNoneFalseNoneFalse8802.80
3015962100790None51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ( Common SR - 2023-24, Item No 51.02 Page No 22/81 Material No -600095)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos797.68797.6810.0FalseNoneNoneFalseNoneFalse7976.80
3015963100790None51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ( Common SR - 2023-24, Item No 51.03 Page No 22/81 Material No -607054) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesBag365.8365.810.0FalseNoneNoneFalseNoneFalse3658.00
3015964100790None51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ( Common SR - 2023-24, Item No 51.04 Page No 23/81 Material No -281685) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2562.962562.9610.0FalseNoneNoneFalseNoneFalse25629.60
3015965100790None1.2.2Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit1187.081187.0871.0FalseNoneNoneFalseNoneFalse84282.680
3015966100790None9 mtR&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.3550.0FalseNoneNoneFalseNoneFalse124767.50
3015967100790NonearmR&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.7236.0FalseNoneNoneFalseNoneFalse12913.920
3015968100790NonehtstR&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos.251.1251.1142.0FalseNoneNoneFalseNoneFalse35656.20
3015969100790None7.02R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.146.0FalseNoneNoneFalseNoneFalse59280.840
17102516400000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015970100791None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015971100791None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015972100791None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015973100791None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015974100791None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015975100791None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17102516400000NoneNoneRoads2nd Year Maintainance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015976100792None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015977100792None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015978100792None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015979100792None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015980100792None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3015981100792None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17102516400000NoneNoneRoads3rd Year Maintenance641894.88
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015982100793NoneItem No.VOL-III-2.6 Page No. 9Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm519.39519.3973.32FalseNoneNoneFalseNoneFalse38081.67480
3015983100793Nonetem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.934888.0FalseNoneNoneFalseNoneFalse38761.840
3015984100793Nonetem No.VOL-III-10.3 Page . 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54641.55FalseNoneNoneFalseNoneFalse33065.4870
3015985100793NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.22138.5FalseNoneNoneFalseNoneFalse274155.70
3015986100793NoneItem No.VOL-III-10.4 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.0168.02FalseNoneNoneFalseNoneFalse94595.260
3015987100793NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.056.11FalseNoneNoneFalseNoneFalse16020.72550
3015988100793NoneItem No.OL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.256.11FalseNoneNoneFalseNoneFalse1663.44750
3015989100793NoneV 1 Page No.8. Item No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.551080.0FalseNoneNoneFalseNoneFalse135594.00
3015990100793Nonetem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.0569.12FalseNoneNoneFalseNoneFalse9956.7360
17102516400000NoneNoneRoads4th Year Maintanance636164.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015991100794NoneItem No.VOL-III-2.6 Page No. 9)Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm537.94537.9473.32FalseNoneNoneFalseNoneFalse39441.76080
3015992100794NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.214888.0FalseNoneNoneFalseNoneFalse40130.480
3015993100794Nonetem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38641.55FalseNoneNoneFalseNoneFalse34245.9390
3015994100794NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.772138.5FalseNoneNoneFalseNoneFalse283928.6450
3015995100794NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.11168.02FalseNoneNoneFalseNoneFalse97974.14220
3015996100794NoneV 1 Page No.8. Item No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.041080.0FalseNoneNoneFalseNoneFalse140443.20
17102516410000NoneNoneRoads5th year Maintenance759492.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3015997100795NoneItem No.VOL-III-2.6 Page No. 9Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm556.49556.4973.32FalseNoneNoneFalseNoneFalse40801.84680
3015998100795NoneVOL-III-16.19 Page No. 14Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.54888.0FalseNoneNoneFalseNoneFalse41548.00
3015999100795NoneVOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22641.55FalseNoneNoneFalseNoneFalse35426.3910
3016000100795NoneVOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.352138.5FalseNoneNoneFalseNoneFalse293722.9750
3016001100795NoneVOL-III-10.4 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22336.05FalseNoneNoneFalseNoneFalse202712.0810
3016002100795NoneV 1 Page No.8. Item No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.521080.0FalseNoneNoneFalseNoneFalse145281.60
17102516410000NoneNoneRoads6th Year Renewal after Maintanance19686151.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016003100796NoneItem No 16.22, Page no 147, Vol 3, PWD Common SR Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 2341.12+561.87 = 2902.99 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.995.01FalseNoneNoneFalseNoneFalse14543.97990
3016004100796NoneItem No 16.24 i, Page no 148, Vol 3, PWD Common SMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones- Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats withsynthetic enamel paint Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 243.08+58.34 = 301.42 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos301.42301.425.01FalseNoneNoneFalseNoneFalse1510.11420
3016005100796NoneItem No 8.1, Page no 66, Vol 3, PWD Common SR 202Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 128.62+30.87 = 159.49 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4986.4FalseNoneNoneFalseNoneFalse13779.9360
3016006100796NoneItem No 5.3i, Page no 31, Vol 3, PWD Common SR 20Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 14.16+3.40 = 17.56 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5636754.11FalseNoneNoneFalseNoneFalse645402.17160
3016007100796NoneItem No 5.16 C (ii), Page no 40, Vol 3, PWD CommBituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site,laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MORTHspecification clause No. 507 complete in all respects 12925.72 + 3102.17 = 16027.89 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.891102.62FalseNoneNoneFalseNoneFalse17672672.07180
3016008100796NoneItem No 8.15, Page no 67, Vol 3, PWD Common SR 20Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 625.40 + 150.10 = 775.50 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.51220.0FalseNoneNoneFalseNoneFalse946110.00
3016009100796NoneItem No 8.43, Page no 74, Vol 3, PWD Common SR 20Supplying and Fixing of Molded Shank Raised PavementMarkers / Cat's Eye made of polycarbonate and ABS mouldedbody and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications ofCategory A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall notexceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to thebase shall be 35 +/- 5 degree. The strength of detachment ofthe integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) fromthe body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulatedretro-reflectance of the reflecting panel, to the Engineer. 430.70 + 103.347 = 534.07 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07720.0FalseNoneNoneFalseNoneFalse384530.40
3016010100796NoneItem No. 8.4 Page No. 64 Vol.03Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.321.325760.0FalseNoneNoneFalseNoneFalse7603.20
17102516410000NoneNoneRoadsPKG-783 (B)Improvements to Road from Mandya Hadagalli to join Bevinakuppe-Shambuvinahalli via Shettihalli Anuvunahalli, Narahalli road PDP -56 at Ch0.00 KM to 9.60 KM In Selected reaches In Pandavapura Taluk of Mandya District. - Road Works34731061.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016011100797NoneItem No 2.5, Page no 9, Vol 3, PWD Common SR 2023Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (ii) By Mechanical Means using Dozer (a) In area of light jungle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm463.74463.7454.72FalseNoneNoneFalseNoneFalse25375.85280
3016012100797NoneItem No 3.5, Page no 17, Vol 3, PWD Common SR 202Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.087.084275.0FalseNoneNoneFalseNoneFalse30267.00
3016013100797NoneItem No 1.12, Page no 8, Vol 1, PWD Common SR 202Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum112.1112.11026.0FalseNoneNoneFalseNoneFalse115014.60
3016014100797NoneItem No 1.7, Page no 7, Vol 1, PWD Common SR 2023Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum140.42140.42820.8FalseNoneNoneFalseNoneFalse115256.7360
3016015100797NoneItem No 1.8, Page no 7, Vol 1, PWD Common SR 2023Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum559.32559.322938.31FalseNoneNoneFalseNoneFalse1643455.54920
3016016100797NoneItem No 3.6, Page no 17, Vol 3, PWD Common SR 202Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum581.74581.743032.4FalseNoneNoneFalseNoneFalse1764068.3760
3016017100797NoneItem No 4.2 (v), Page no 23, Vol 3, PWD Common SRBy Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2783.622783.622739.45FalseNoneNoneFalseNoneFalse7625587.8090
3016018100797NoneItem No. 4.17 Page No. 26 Vol.03Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Item No. 4.17/ Page No. 26/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3019.623019.623381.29FalseNoneNoneFalseNoneFalse10210210.90980
3016019100797NoneItem No 5.1 A (I), Page no 31, Vol 3, PWD Common Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm48.3848.3813069.15FalseNoneNoneFalseNoneFalse632285.4770
3016020100797NoneItem No 5.4, Page no 31, Vol 3, PWD Common SR 202Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2on Granular surface ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm16.5216.5213069.15FalseNoneNoneFalseNoneFalse215902.3580
3016021100797NoneItem No 5.12 (B ), Page no 35, Vol 3, PWD Common Dense Graded Bituminous Macadam Grading - II for traffic20 MSA Providing and laying Dense Graded Bituminous Macadam with40/60 TPH capacity HMP using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 4.5 per centby weight of total mix and filler, transporting the hot mix to worksite, laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MoRTHspecification clause No. 505 complete in all respects." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11149.8211149.82653.45FalseNoneNoneFalseNoneFalse7285849.8790
3016022100797NoneItem No 5.24 B (ii), Page no 40, Vol 3, PWD CommoBituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site,laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MORTHspecification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum12925.7212925.72392.07FalseNoneNoneFalseNoneFalse5067787.04040
17102516410000NoneNoneRoadsRoad Furnitures837267.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016023100798NoneItem No 8.15, Page no 67, Vol 3, PWD Common SR 20Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous SurfaceProviding and laying of hot applied thermoplastic compound2.5 mm thick including reflectorising glass beads @ 250 g/m2area, thickness of 2.5 mm is exclusive of surface applied glassbeads as per IRC:35:2015.The finished surface to be level,uniform and free from streaks and holes. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm625.4625.4474.0FalseNoneNoneFalseNoneFalse296439.60
3016024100798NoneItem No 16.29, Page no 150, Vol 3, PWD Common SR Project Display Board i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (Item No. 16.29/ Page No. 149/Vol.03/Common SR-2023-24) - as per the direction of Engineer-in-charge. - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3016025100798NoneItem No 8.7, Page no 65, Vol 3, PWD Common SR 202Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorisedsign as per IRC:67:2022 made of high intensitygrade sheeting vide clause 801.3, fixed over aluminiumsheeting, 2 mm thick or Aluminium composite material sheetwith overall thickness of 4mm with area not exceeding 0.9m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to theground by means of properly designed foundation with M25grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm10631.810631.81.8FalseNoneNoneFalseNoneFalse19137.240
3016026100798NoneItem No 8.5 ii, Page no 64, Vol 3, PWD Common SR Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 madeof Class B Type XI retro reflective sheeting fixed over 2 mmthick aluminium sheeting vide clause 801.3, 3mm/4mm thickAluminium composite material sheet depending on the size ofthe sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properlydesigned foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as per approveddrawing.The sign shall be maintained as per section 12 ofIRC:67:2022. (ii) 90 cm equilateral triangle ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5527.125527.1218.0FalseNoneNoneFalseNoneFalse99488.160
3016027100798NoneItem No 8.5 viii, Page no 64, Vol 3, PWD Common SRetro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mmthick aluminium sheeting vide clause 801.3, 3mm/4mm thickAluminium composite material sheet depending on the size ofthe sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properlydesigned foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as perapproveddrawing.The sign shall be maintained as per section 12 ofIRC:67:2022. (viii) 60 cm circular" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5070.465070.462.0FalseNoneNoneFalseNoneFalse10140.920
3016028100798NoneItem No 8.43, Page no 74, Vol 3, PWD Common SR 20Supplying and Fixing of Molded Shank Raised PavementMarkers / Cat's Eye made of polycarbonate and ABS mouldedbody and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications ofCategory A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall notexceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to thebase shall be 35 +/- 5 degree. The strength of detachment ofthe integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) fromthe body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulatedretro-reflectance of the reflecting panel, to the Engineer. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos430.7430.7380.0FalseNoneNoneFalseNoneFalse163666.00
3016029100798NoneItem No 8.16 (ii), Page no 67, Vol 3, PWD Common Kilometre Stone Reinforced cement concrete M15grade kilometre stone oftandard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3453.863453.862.0FalseNoneNoneFalseNoneFalse6907.720
3016030100798NoneItem No 8.16 (iii), Page no 67, Vol 3, PWD CommoKilometre Stone Reinforced cement concrete M15grade kilometre stone ofstandard design as per IRC:8-1980, fixing in position includingpainting and printing etc- (iii) 200 m stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach993.56993.569.0FalseNoneNoneFalseNoneFalse8942.040
3016031100798NoneItem No. 8.60.2 (ii) Page No. 80 Vol.03Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Intermediate lane with formation width of 7.50 m (Item No. 8.60.2 (ii) / Page No. 80/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos53635.7253635.722.0FalseNoneNoneFalseNoneFalse107271.440
3016032100798NoneItem No. 8.5 A xv) Page No. 65 Vol.03Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (xv) 90 cm high octagon (Item No. 8.5 A (xv)/ Page No. 65/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7672.367672.362.0FalseNoneNoneFalseNoneFalse15344.720
3016033100798NoneItem No. 8.48 Page No. 76Vol.03Chevron Boards Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (Item No. 8.48/ Page No. 76/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4231.484231.4816.0FalseNoneNoneFalseNoneFalse67703.680
3016034100798NoneItem No. 8.16 (i) Page No. 67 Vol.03Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 5th kilometre stone (precast) (Item No. 8.16 (i)/ Page No. 67/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
17102516410000NoneNoneRoadsRCC Drain1969800.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016035100799NoneItem No 1.14.1, Page no 8, Vol 1, PWD Common SR 2Earth work excavation for Foundationdepth upto 3 m, as per drawing and technicalout, shoring, strutting, barricading,excavated surfaces, disposing off or & stacking the selected earth for reusem including cost of labour, tools, usagerequired to complete the workIn all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36462.2FalseNoneNoneFalseNoneFalse55630.3920
3016036100799NoneItem No 2.1.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the otherappurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0236.8FalseNoneNoneFalseNoneFalse260066.3360
3016037100799NoneItem No. 2.4.2 Page No. 16 Vol.01Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.4.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7461.147461.1429.6FalseNoneNoneFalseNoneFalse220849.7440
3016038100799NoneItem No 2.4.2, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The granite/trap/basaltcrushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compactedusing needle vibrators, providing weep holes wherever necessary, includingall lead & lifts, cost of all materials of quality, confirming to the requirementsof relevant IS codes, labour, Usage charges of machinery, curing and all otherappurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum10072.5410072.5448.0FalseNoneNoneFalseNoneFalse483481.920
3016039100799NoneItem No 2.5.1, Page no 16, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9388.089388.0825.6FalseNoneNoneFalseNoneFalse240334.8480
3016040100799NoneItem No 2.11 h, Page no 18, Vol 1, PWD Common SR Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMT93232.9893232.986.57FalseNoneNoneFalseNoneFalse612540.67860
3016041100799NoneItem No. 2.5.2 Page No. 16 Vol.01Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6910.0FalseNoneNoneFalseNoneFalse96896.90
17102516410000NoneNoneRoadsWater Supply147889.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016042100800NoneItem No 1.17.1, Page no 10, Vol 1, PWD Common SR Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the followingstrata ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum309.16309.1690.0FalseNoneNoneFalseNoneFalse27824.40
3016043100800NoneItem No 9.2.1, Page no 96, Vol 5, PWD Common SR 2Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolli g and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e HDPE Grade PE80-PN8.0, 63mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr258.42258.4250.0FalseNoneNoneFalseNoneFalse12921.00
3016044100800NoneItem No 1.1, Page no 7, Vol 1, PWD Common SR 2023Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of alllabour complete as per specifications ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum188.8188.890.0FalseNoneNoneFalseNoneFalse16992.00
3016045100800NoneItem No. 19.2.3 Page No. 96 Vol.05Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and nloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For: HDPE Grade PE80-PN8.0,90mm dia (Item No. 19.2.3/ Page No. 96/Vol.05/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm450.76450.76200.0FalseNoneNoneFalseNoneFalse90152.00
17102516410000NoneNoneRoadsBox Culvert (1.5 x 1.5) 1Vent2726355.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016046100801NoneItem No 1.14.1, Page no 8, Vol 1, PWD Common SR 2Earth work excavation for Foundationdepth upto 3 m, as per drawing and technicalout, shoring, strutting, barricading,excavated surfaces, disposing off or& stacking the selected earth for reusem including cost of labour, tools, usagerequired to complete the workIn all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum120.36120.36210.0FalseNoneNoneFalseNoneFalse25275.60
3016047100801NoneItem No 2.1.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid inlayers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges ofmachinery, curing, and all the otheappurtenances required to complete thework as per technical specifications.-Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7067.027067.0227.0FalseNoneNoneFalseNoneFalse190809.540
3016048100801NoneItem No 2.4.3, Page no 15, Vol 1, PWD Common SR 2Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works &other parallel works from 0.50m to 3.50 m height. The granite /trap/ basaltcrushed graded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, includingall lead & lifts, cost of all materials of quality, confirming to the requirementsof relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. .M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8971.788971.78107.1FalseNoneNoneFalseNoneFalse960877.6380
3016049100801NoneItem No 2.11 h, Page no 18, Vol 1, PWD Common SR Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMT93232.9893232.9811.47FalseNoneNoneFalseNoneFalse1069382.28060
3016050100801NoneItem No 8.1, Page no 66, Vol 3, PWD Common SR 202Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.62128.6222.5FalseNoneNoneFalseNoneFalse2893.950
3016051100801NoneItem No 8.4, Page no 15, Vol 1, PWD Common SR 202Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeper cm height" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer cm Height Per Letter1.061.061200.0FalseNoneNoneFalseNoneFalse1272.00
3016052100801NoneItem No. 2.11 (ii) A Page No. 10 Vol.03Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means (A)Dismantling Brick / Tile work / rubble masonry / pitching / etc bymechanical means (Item No. 2.11 (ii) A/ Page No. 10/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum212.4212.439.0FalseNoneNoneFalseNoneFalse8283.60
3016053100801NoneItem No. 2.17 (ix) B Page No. 11 Vol.03Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (Item No. 2.17 (ix) B/ Page No. 11/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1293.281293.2850.0FalseNoneNoneFalseNoneFalse64664.00
3016054100801NoneItem No. 2.5.2Page No. 16 Vol.01Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Item No. 2.5.2/ Page No. 16/Vol.01/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum9689.699689.6941.58FalseNoneNoneFalseNoneFalse402897.31020
17102516410000NoneNoneRoadsShifting of Electrical Poles382874.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016055100802None1.02Line Supports (Pole) RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ( Common SR - 2023-24, Item No 1.02 Page No 03/81 Material No -200106)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos9812.889812.887.0FalseNoneNoneFalseNoneFalse68690.160
3016056100802None2.02Erection of Poles Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ( Common SR - 2023-24, Item No 2.02 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1313.341313.347.0FalseNoneNoneFalseNoneFalse9193.380
3016057100802None1.05Line Supports (Pole) PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ( Common SR - 2023-24, Item No 1.05 Page No 03/81 Material No -200004)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos4364.824364.822.0FalseNoneNoneFalseNoneFalse8729.640
3016058100802None2.01Erection of Poles Erection of RCC/PSCC Pole of 7.5 to 8 Mtr long in a pit of 1.5 Mtr depth ( Common SR - 2023-24, Item No 2.01 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1087.961087.962.0FalseNoneNoneFalseNoneFalse2175.920
3016059100802None1.07Line Supports (Pole) Pre-Stressed Tubular Spun Pole - 11 Mtr Long, 500 Kg WL (Dwg No. BESCOM/GM/QS&S/45 Dtd 24.11.2018) as per IS-13158: 1991 ( Common SR - 2023-24, Item No 1.07 Page No 03/81 Material No -200120)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos20888.3620888.361.0FalseNoneNoneFalseNoneFalse20888.360
3016060100802None2.05Erection of Poles Erection of 11 Mtr long Concrete Spun Pole in a pit of 2.5 Mtr depth (Mechnised Labour) ( Common SR - 2023-24, Item No 2.05 Page No 44/81 Material No -)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos3001.923001.921.0FalseNoneNoneFalseNoneFalse3001.920
3016061100802None2.011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.01 Page No 03/81 Material No -279020) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos438.96438.968.0FalseNoneNoneFalseNoneFalse3511.680
3016062100802None2.11HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.11 Page No 04/81 Material No -279092) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos107.38107.3823.0FalseNoneNoneFalseNoneFalse2469.740
3016063100802None5.06Fixing of HT/LT Single Top Support ( Common SR - 2023-24, Item No 5.06 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach132.16132.1623.0FalseNoneNoneFalseNoneFalse3039.680
3016064100802None2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018). ( Common SR - 2023-24, Item No 2.07 Page No 04/81 Material No -279012) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos155.76155.765.0FalseNoneNoneFalseNoneFalse778.80
3016065100802None2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ( Common SR - 2023-24, Item No 2.05 Page No 04/81 Material No -279014)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos341.02341.025.0FalseNoneNoneFalseNoneFalse1705.10
3016066100802None5.01Fixing of 2 Pin cross arm with Insulator and Braces fixing / Fixing of 4 Pin cross arm with Insulator and Braces fixing ( Common SR - 2023-24, Item No 5.01 & 5.02 Page No 45/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos188.8188.810.0FalseNoneNoneFalseNoneFalse1888.00
3016067100802None6.111 kV, 45 kN Polymeric Insulator . ( Common SR - 2023-24, Item No 6.1 Page No 05/81 Material No -283320) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos219.48219.486.0FalseNoneNoneFalseNoneFalse1316.880
3016068100802None6.0611 kV, 5 kN Composite/Polymeric Pin Insulator. ( Common SR - 2023-24, Item No 6.06 Page No 05/81 Material No -283008) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos241.9241.99.0FalseNoneNoneFalseNoneFalse2177.10
3016069100802None7.02Rabbit ACSR conductor ( Common SR - 2023-24, Item No 7.02 Page No 05/81 Material No -284108) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm60731.0660731.061.0FalseNoneNoneFalseNoneFalse60731.060
3016070100802Nonecost dataErection of 3 Phase, 11kV/433V, 63 kVA BEE - 4/5 Star Rated Distribution Transformer Centre Using 9 Mtr RCC Pole DPTC ( WithOut Transformer) - Cost Data Sheet - 25 ( Common SR - 2023-24, ) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet115431.14115431.141.0FalseNoneNoneFalseNoneFalse115431.140
3016071100802None51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ( Common SR - 2023-24, Item No 51.01 Page No 22/81 Material No -281674)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos880.28880.282.0FalseNoneNoneFalseNoneFalse1760.560
3016072100802None51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ( Common SR - 2023-24, Item No 51.02 Page No 22/81 Material No -600095)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos797.68797.682.0FalseNoneNoneFalseNoneFalse1595.360
3016073100802None51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ( Common SR - 2023-24, Item No 51.03 Page No 22/81 Material No -607054) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesBag365.8365.82.0FalseNoneNoneFalseNoneFalse731.60
3016074100802None51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ( Common SR - 2023-24, Item No 51.04 Page No 23/81 Material No -281685) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2562.962562.962.0FalseNoneNoneFalseNoneFalse5125.920
3016075100802None1.2.2Digging of Pit - Digging of Pit 1.6 Mtr depth for erection of 7.5/8 Mtr Long Steel/RCC/PSCC supports as per approved Drawing. - Hard Soil ( Common SR - 2023-24, Item No 1.2.2 Page No 43/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit1187.081187.0815.0FalseNoneNoneFalseNoneFalse17806.20
3016076100802None9 mtR&R of 9mt pole ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos2495.352495.358.0FalseNoneNoneFalseNoneFalse19962.80
3016077100802NonearmR&R of X-Arm ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos358.72358.728.0FalseNoneNoneFalseNoneFalse2869.760
3016078100802NonehtstR&R of HTST ( Common SR - 2023-24, Item No Page No Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos.251.1251.130.0FalseNoneNoneFalseNoneFalse7533.00
3016079100802None7.02R&R of Rabbit ( Common SR - 2023-24, Item No 7.02 & 7.04 Page No 46/81 Material No -) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm9880.149880.142.0FalseNoneNoneFalseNoneFalse19760.280
17102516410000NoneNoneRoads1st year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016080100803None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 43.36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016081100803None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3252) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016082100803None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016083100803None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016084100803None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =298.10) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016085100803None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17102516410000NoneNoneRoads2nd Year Maintanance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016086100804None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =65.04) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016087100804None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =4336) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016088100804None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016089100804None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016090100804None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =379.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3016091100804None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17102516410000NoneNoneRoads3rd Year Maintenance216187.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016092100805NoneItem No.VOL-III-2.6 Page No. 9Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm519.39519.3927.36FalseNoneNoneFalseNoneFalse14210.51040
3016093100805Nonetem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr7.937.931824.0FalseNoneNoneFalseNoneFalse14464.320
3016094100805Nonetem No.VOL-III-10.3 Page . 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm51.5451.54239.4FalseNoneNoneFalseNoneFalse12338.6760
3016095100805NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm128.2128.2798.0FalseNoneNoneFalseNoneFalse102303.60
3016096100805NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm563.0563.062.7FalseNoneNoneFalseNoneFalse35300.10
3016097100805NoneItem No.VOL-III-16.22 Page No. 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.22 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2622.052622.052.28FalseNoneNoneFalseNoneFalse5978.2740
3016098100805NoneItem No.OL-III-16.24 i Page No. 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.24 i / Page No. 148)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm272.25272.252.28FalseNoneNoneFalseNoneFalse620.730
3016099100805NoneV 1 Page No.8. Item No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum125.55125.55225.0FalseNoneNoneFalseNoneFalse28248.750
3016100100805Nonetem No.VOL-III-8.10 Page No. 66Painting of Parapet walls of CD work. KSRRB M800-6. Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-8.10/ Page No. 66)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.05144.0518.9FalseNoneNoneFalseNoneFalse2722.5450
17102516410000NoneNoneRoads4th Year Maintenance214242.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016101100806NoneItem No.VOL-III-2.6 Page No. 9)Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm537.94537.9427.36FalseNoneNoneFalseNoneFalse14718.03840
3016102100806NoneItem No.VOL-III-16.19 Page No. 147Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.218.211824.0FalseNoneNoneFalseNoneFalse14975.040
3016103100806Nonetem No.VOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm53.3853.38239.4FalseNoneNoneFalseNoneFalse12779.1720
3016104100806NoneItem No.VOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm132.77132.77798.0FalseNoneNoneFalseNoneFalse105950.460
3016105100806NoneItem No.VOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm583.11583.1162.7FalseNoneNoneFalseNoneFalse36560.9970
3016106100806NoneV 1 Page No.8. Item No.1.12)Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum130.04130.04225.0FalseNoneNoneFalseNoneFalse29259.00
17102516410000NoneNoneRoads5th Year Maintenance259465.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016107100807NoneItem No.VOL-III-2.6 Page No. 9Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.6 / Page No. 9)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm556.49556.4927.36FalseNoneNoneFalseNoneFalse15225.56640
3016108100807NoneVOL-III-16.19 Page No. 14Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-16.19 / Page No. 147)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.58.51824.0FalseNoneNoneFalseNoneFalse15504.00
3016109100807NoneVOL-III-10.3 Page No. 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.3 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm55.2255.22239.4FalseNoneNoneFalseNoneFalse13219.6680
3016110100807NoneVOL-III-10.2 Page No. 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-10.2 / Page No. 91)" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm137.35137.35798.0FalseNoneNoneFalseNoneFalse109605.30
3016111100807NoneVOL-III-10.5 Page No. 91Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using VG-30 Grade Bitumen) - Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 510 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - as per the direction of Engineer-in-charge. (Item No. 10.5/ Page No.91/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm603.22603.22125.4FalseNoneNoneFalseNoneFalse75643.7880
3016112100807NoneV 1 Page No.8. Item No.1.12Nala Training: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. PWD, Bangalore, SR:2023-24 V 1 Page No.8. Item No.1.12) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum134.52134.52225.0FalseNoneNoneFalseNoneFalse30267.00
17102516410000NoneNoneRoads6th Year Renewal after Maintenance7273375.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3016113100808NoneItem No 16.22, Page no 147, Vol 3, PWD Common SR Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 2341.12+561.87 = 2902.99 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2902.992902.992.28FalseNoneNoneFalseNoneFalse6618.81720
3016114100808NoneItem No 16.24 i, Page no 148, Vol 3, PWD Common SMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones- Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats withsynthetic enamel paint Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 243.08+58.34 = 301.42 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos301.42301.422.28FalseNoneNoneFalseNoneFalse687.23760
3016115100808NoneItem No 8.1, Page no 66, Vol 3, PWD Common SR 202Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 128.62+30.87 = 159.49 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm159.49159.4922.5FalseNoneNoneFalseNoneFalse3588.5250
3016116100808NoneItem No 5.3i, Page no 31, Vol 3, PWD Common SR 20Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 14.16+3.40 = 17.56 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.5617.5613069.15FalseNoneNoneFalseNoneFalse229494.2740
3016117100808NoneItem No 5.16 C (ii), Page no 40, Vol 3, PWD CommBituminous Concrete Grading II for traffic 20 MSAProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specifiedgrading, premixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site,laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory andtandem rollers to achieve the desired compaction as per MORTHspecification clause No. 507 complete in all respects 12925.72 + 3102.17 = 16027.89 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16027.8916027.89392.07FalseNoneNoneFalseNoneFalse6284054.83230
3016118100808NoneItem No 8.15, Page no 67, Vol 3, PWD Common SR 20Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. Add Adhoc increase in SR @ the rate of 24% however even if the executed maintainence quantity exceeds the quantity considered in estimate no additional payment shall be made 625.40 + 150.10 = 775.50 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm775.5775.5702.0FalseNoneNoneFalseNoneFalse544401.00
3016119100808NoneItem No 8.43, Page no 74, Vol 3, PWD Common SR 20Supplying and Fixing of Molded Shank Raised PavementMarkers / Cat's Eye made of polycarbonate and ABS mouldedbody and reflective panels with micro prismatic lens capable ofproviding total internal reflection of the light entering the lensface and shall support a load of 16000 kg tested in accordanceto ASTM D 4280 Type H and complying to Specifications ofCategory A of MORTH Circular No RW/NH/33023/10-97DO III Dt 11.06. 1997. The height, width and length shall notexceed 50 mm, 100 mm and 102 +/- 2 mm and with minimumreflective area of 13 cm2 on each side and the slope to thebase shall be 35 +/- 5 degree. The strength of detachment ofthe integrated cylindrical shanks, (of diameter not less than19 +/- 2 mm and height not less than 30+/- 2 mm) fromthe body is to be a minimum value of 500 Kg. Fixing will beby drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as permanufacturer's recommendation and complete as directed bythe engineer.The contractor shall submit a two year warrantyfor satisfactory field performance including stipulatedretro-reflectance of the reflecting panel, to the Engineer. 430.70 + 103.347 = 534.07 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos534.07534.07380.0FalseNoneNoneFalseNoneFalse202946.60
3016120100808NoneItem No. 8.4 Page No. 64 Vol.03Printing New Letter Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (Item No. 8.4/ Page No. 64/Vol.03/Common SR-2023-24) - Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work." ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.321.321200.0FalseNoneNoneFalseNoneFalse1584.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17102552520000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17102552520000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17102552520001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17102552920000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17102553040000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17102553110000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17102553180000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17102553250000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17102553340000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17102553400000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17102553460000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17102553520000NoneNoneELIGIBILITYContractors should be registered with KPWD Class I Registration.None
17102553570000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17102553650000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17102553730000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17102553790000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17102553840000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17102553890000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17102553950000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17102554000000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17102554090000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17102554170000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including 18 percent GST.None
17102554280000NoneNoneELIGIBILITYGST shall not be paid separately.None
17102554340000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP and maintenance period.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3898.62 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDetails of committed worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of committed works
NoneNoneNoneNoneKPWD registration certificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(b) Machineries to be owned and on lease as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- a) Availability by owning(b) Machineries to be owned and on lease as per KW4
NoneNoneNoneNoneBid capacity as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 31660 Cum 2. GSB/WMM : 1864.00Cum 3. BM/SDBC/DBM/BC : 3190.00Cum 4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : 320.00cum 5. Reinforced Cement Concrete (RCC) M20 & higher grades : 920cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneCopies of Tax registrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 & 2022-23. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3898.62 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.584.80 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAudited turnover certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Reserved Category CertificateTrueTechnical Bid
Small Scale Industries CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1710256917000
version0
createdDateNone
modifiedDateNone
blockNumberO/O CHIEF PROJECT OFFICER, PIU SHDP, PWD ANNEX BUILDING KR CIRCLE BANGALORE
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone