tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1715260059000 | 0 | None | None | Buildings | Civil Work | 2082135.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3137259 | 107813 | None | code01 | Hire charges for providing, erecting and removing the pipe barricading with weld mesh covering to barricading with 3'' thick vertical poles supported by using suitable Jack at an suitable interval as per site condition and with suitable number of horizontal pipe 2 1/2''dia, fixed using nuts & bolts.The weld mesh of size 1'' x 1'' fixed to the horizontal pipe using binding wire mesh upto full height from floor to roof at inside the Counting rooms, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 3400.0 | 3400.0 | 121.05 | False | None | None | False | None | False | 411570.0 | 0 | 3137260 | 107813 | None | code02 | Hire charges for supplying semi VIP cushion chairs with arms inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work .
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 270.0 | 270.0 | 18.0 | False | None | None | False | None | False | 4860.0 | 0 | 3137261 | 107813 | None | code03 | Hire charges for supplying high quality plastic chairs without arm inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 16.0 | 16.0 | 620.0 | False | None | None | False | None | False | 9920.0 | 0 | 3137262 | 107813 | None | code04 | Supplying and Arranging on Hire basis good quality plastic chairs without arm with cloth cover, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 20.0 | 20.0 | 658.0 | False | None | None | False | None | False | 13160.0 | 0 | 3137263 | 107813 | None | code05 | Hire charges for supplying of teapoy sets with cloths cover & frill etc., complete, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 275.0 | 275.0 | 12.0 | False | None | None | False | None | False | 3300.0 | 0 | 3137264 | 107813 | None | code06 | Providing &Arranging on Hire basis good quality Two Seater Sofa, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 1500.0 | 1500.0 | 10.0 | False | None | None | False | None | False | 15000.0 | 0 | 3137265 | 107813 | None | code07 | Hire charges for supplying of 0.45 M x 0.90 M table with cloths cover & frill etc., complete, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 200.0 | 200.0 | 42.0 | False | None | None | False | None | False | 8400.0 | 0 | 3137266 | 107813 | None | code08 | Hire charges for supplying of 0.60 M x 1.20 M table with cloths cover & frill etc., complete, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 245.0 | 245.0 | 9.0 | False | None | None | False | None | False | 2205.0 | 0 | 3137267 | 107813 | None | code09 | Hire charges for supplying neatly cleaned Lattis Pendel, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 130.0 | 130.0 | 180.0 | False | None | None | False | None | False | 23400.0 | 0 | 3137268 | 107813 | None | code10 | Marking booths placing arrengements inside the floor of strong room including booth number per assembly constituency, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Job | 20000.0 | 20000.0 | 3.0 | False | None | None | False | None | False | 60000.0 | 0 | 3137269 | 107813 | None | code11 | Hire charges for supplying charms carpet inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 120.0 | 120.0 | 883.13 | False | None | None | False | None | False | 105975.6 | 0 | 3137270 | 107813 | None | code12 | Hire charges for supplying neatly cleaned good quality frilled/ fancy cloth side wall, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 50.0 | 50.0 | 1080.0 | False | None | None | False | None | False | 54000.0 | 0 | 3137271 | 107813 | None | code13 | Hire charges for Providing,erecting and removing the 4' height Mojo barricading, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 250.0 | 250.0 | 554.2 | False | None | None | False | None | False | 138550.0 | 0 | 3137272 | 107813 | None | code14 | Hire charges for Supplying Persian carpet (Big), inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 200.0 | 200.0 | 67.5 | False | None | None | False | None | False | 13500.0 | 0 | 3137273 | 107813 | None | code15 | Providing & Erecting on Hire basis good quality German Pendal, inclusive of cost of all transportation, labour, ., clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 900.0 | 900.0 | 432.0 | False | None | None | False | None | False | 388800.0 | 0 | 3137274 | 107813 | None | code16 | Providing & Erecting on Hire basis good quality Dust bins, inclusive of cost or all transportation, labour, ., clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 100.0 | 100.0 | 10.0 | False | None | None | False | None | False | 1000.0 | 0 | 3137275 | 107813 | None | code17 | Supplying and Arranging Octonam Stall sheet partition on Hire basis good quality inclusive of cost of all transportation, labour, . clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 250.0 | 250.0 | 17.28 | False | None | None | False | None | False | 4320.0 | 0 | 3137276 | 107813 | None | code18 | Supplying and arranging on Hire basis good quality SS table of size 0.45 X 1.80 M with Cloth with all components like Cloth cover, complete, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 350.0 | 350.0 | 70.0 | False | None | None | False | None | False | 24500.0 | 0 | 3137277 | 107813 | None | code19 | Providing and Supplying on Hire basis good quality Designing DTP works, erection of different type of fabric material boards digital printing on fabric material of cloth of different sizes including cost printing on fabric material of cloth of different sizes including cost of wooden frame, fixing on wooden frame & erection at different locations with reqired poles etc. , inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 720.0 | 720.0 | 54.31 | False | None | None | False | None | False | 39103.2 | 0 | 3137278 | 107813 | None | code20 | Providing on Hire basis good quality Mesh Barricading inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Rmtr | 2500.0 | 2500.0 | 126.4 | False | None | None | False | None | False | 316000.0 | 0 | 3137279 | 107813 | None | code21 | Hire charges for providing erecting and removing 12mm thick plywood boards in one layer covering with suitable beeding arrengements to opening without damaging to wall and tied with suitable bolt and nut arrengements for a period of 4 days and removing the same after counting work completed including cost of all materiala , labour with all lead and lift etc., complete clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 1320.0 | 1320.0 | 131.04 | False | None | None | False | None | False | 172972.8 | 0 | 3137280 | 107813 | None | code22 | Hire charges for providing erecting and removing 12mm thick plywood boards in two layer covering with suitable beeding arrengements to opening without damaging to wall and tied with suitable bolt and nut arrengements for a period of 4 days and removing the same after counting work complete, inclusive of cost of all transportation, labour, clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 2600.0 | 2600.0 | 35.1 | False | None | None | False | None | False | 91260.0 | 0 | 3137281 | 107813 | None | code23 | Providing two legged scaffolding using 10-15 cms. dia best quality Casurina poles of 4m over all length (3m +0.5m projection + 0.5m In to the ground) the distance between two rows being 1.25m and spacing of post being 2m in both rows with 2 horizontal posts with 0.5 mm overlap on either side and braces at 2 m c to c including longitudinal and transveres middle braces to step up and providing platform with casurina poles, forms tied up using coir rope complete as per specifications.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Sqm | 105.0 | 105.0 | 168.0 | False | None | None | False | None | False | 17640.0 | 0 | 3137282 | 107813 | None | code24 | Providing & Erecting on Hire basis good quality Pagoda of size 6 X 6M , inclusive of cost of all transportation, labour, ., clearing the site for the next event etc. complete as per specification & as directed by the officer in charge of the work.
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 16000.0 | 16000.0 | 6.0 | False | None | None | False | None | False | 96000.0 | 0 | 3137283 | 107813 | None | code25 | Engaging Heavy Mazdoor
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | No | 694.78 | 694.78 | 96.0 | False | None | None | False | None | False | 66698.88 | 0 |
| 1715260059000 | 0 | None | None | Buildings | Electrical work | 778927.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3137284 | 107814 | None | code01 | Hire charges for Supply, Fixing, Wiring, Servicing& Maintaining of 4’ 40Watts strip type fluorescent fitting with all accessories (SL No 15) (inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 68.44 | 68.44 | 40.0 | False | None | None | False | None | False | 2737.6 | 0 | 3137285 | 107814 | None | code02 | Hire charges for Supply, Fixing, Wiring, Servicing& Maintaining 250/400W Metal halide flood light fitting with all accessories (SL No 16)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Set | 1542.26 | 1542.26 | 35.0 | False | None | None | False | None | False | 53979.1 | 0 | 3137286 | 107814 | None | code03 | Hire charges for supplying and running circuit service main with necessary messenger wire and reel insulators and maintaining the same using. 2 of 6sqmm/ 10sqmm PVC insulated sheathed alluminium wire (SL No 17)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 8.26 | 8.26 | 1000.0 | False | None | None | False | None | False | 8260.0 | 0 | 3137287 | 107814 | None | code04 | Hire charges for supplying and running circuit service main with necessary messenger wire and reel insulators and maintaining the same using 4 of 16 sqmm PVC insulated and sheathed alluminium wire (SL No 18)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 16.52 | 16.52 | 250.0 | False | None | None | False | None | False | 4130.0 | 0 | 3137288 | 107814 | None | code05 | Hire charges up to one month for providing earth electrodes as per the Earthing specification (SL No 19)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 1622.5 | 1622.5 | 4.0 | False | None | None | False | None | False | 6490.0 | 0 | 3137289 | 107814 | None | code06 | Hire charges for supplying wiring and maintaining suitable size L.T panel board with pilot lamp arrangements and the following switches b) 100A TPST switch with neutral link (SL No 20)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 410.64 | 410.64 | 1.0 | False | None | None | False | None | False | 410.64 | 0 | 3137290 | 107814 | None | code07 | Hire charges for supplying, fixing servicing and and maintaining of following change over switch for providing alternative power supply as required 125 to 250Amps (SL No 21)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 271.4 | 271.4 | 1.0 | False | None | None | False | None | False | 271.4 | 0 | 3137291 | 107814 | None | code08 | Hire charges for supplying and fixing MCB on existing board using necessary fixing materials and wiring complete (a) 5 to 30Amps MCB SPN (SL No 22)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 82.6 | 82.6 | 10.0 | False | None | None | False | None | False | 826.0 | 0 | 3137292 | 107814 | None | code09 | Hire charges for supplying and fixing MCB on existing board using necessary fixing materials and wiring complete.a. 32 to 63Amps TPN (SL No 23)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 172.28 | 172.28 | 4.0 | False | None | None | False | None | False | 689.12 | 0 | 3137293 | 107814 | None | code10 | Hire charges for supplying and fixing MCB on existing board using necessary fixing materials and wiring complete e) 0 to 32Amps ELCB 4 pole (SL No 23)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 1439.6 | 1439.6 | 4.0 | False | None | None | False | None | False | 5758.4 | 0 | 3137294 | 107814 | None | code11 | Hire charges for supplying laying connecting PVC insulated armored / enamored UG cable with necessary cable glands sockets etc as required 3.5 x 70 sqmm (SL No 25)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 79.06 | 79.06 | 100.0 | False | None | None | False | None | False | 7906.0 | 0 | 3137295 | 107814 | None | code12 | Hire charges for supplying fixing and wiring 16 amps Universal Socket (SL No 32)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 34.22 | 34.22 | 30.0 | False | None | None | False | None | False | 1026.6 | 0 | 3137296 | 107814 | None | code13 | Hire charges for supply fixing wiring servicing and maintaining of speaker 4Nos with amplifier control 4 channel audio mixers and CD player, cordless mic 2No, Stage Mike 4Nos Complete Set including operators and services(SL No 27)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 51379.56 | 51379.56 | 1.0 | False | None | None | False | None | False | 51379.56 | 0 | 3137297 | 107814 | None | code14 | Hire charges for providing installing and removing of Horn (SL No 29)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 361.08 | 361.08 | 8.0 | False | None | None | False | None | False | 2888.64 | 0 | 3137298 | 107814 | None | code15 | Hire charges for supply fixing wiring servicing and maintaining Pedestal fan (SL No 30)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 1896.26 | 1896.26 | 10.0 | False | None | None | False | None | False | 18962.6 | 0 | 3137299 | 107814 | None | code16 | Hire charges for supply fixing wiring servicing and maintaining Air cooler Heavy Duty (SL No 31)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 4525.3 | 4525.3 | 4.0 | False | None | None | False | None | False | 18101.2 | 0 | 3137300 | 107814 | None | code17 | Hire charges for DVR System:- False alarm filtering for up to 8-ch behavior detection 256/200 Mbps bit rate input / output (up to 32 ch I camera input) Up to 12 MP resolution recoding / live view H.265 +/H.265/H.264+/H.264 video fromats self -adapt 12-ch 1080P decoding capability HDMI output at up to 4K resolution Up to 4K resolution Up to 4 SATA interfaces, up to 6 TB fro each HDD(SL No 35)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 37642.0 | 37642.0 | 1.0 | False | None | None | False | None | False | 37642.0 | 0 | 3137301 | 107814 | None | code18 | Surveillance Grade HDD 4 TB (Video + Power + Poles) (SL No 36)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 17154.84 | 17154.84 | 1.0 | False | None | None | False | None | False | 17154.84 | 0 | 3137302 | 107814 | None | code19 | Hire charges for CAT 6 E /LAN Cabling:- Cabling (Video + Power + Poles) (SL No 2)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Mtr | 25.95 | 25.95 | 800.0 | False | None | None | False | None | False | 20760.0 | 0 | 3137303 | 107814 | None | code20 | Hire Charges for Monitor 55 inch (SL No 1)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 7632.24 | 7632.24 | 3.0 | False | None | None | False | None | False | 22896.72 | 0 | 3137304 | 107814 | None | code21 | Hire charges for CC Camera Up to 2 megapixel high resolution Max 1920 x 1080 @ 60 fps 2.8 mm / 4 mm / 6 mm/ 8 mm /12 mm fixed lens, optional Powered by Darkfighter H.265 H. 265 +, H. 264 120 bB wide Dynamic range 3D Digital Noise Reduction DC 12V & PoE (802.3af) IR range: up to 30 m Support on - board Storage up to 128 GB IP67 (SL No 34)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 2725.79 | 2725.79 | 12.0 | False | None | None | False | None | False | 32709.48 | 0 | 3137305 | 107814 | None | code22 | Hire charges for supply fixing wiring servicing and maintaining of 6U with 450mm depth mounting rack with power manager & Cable manager .(SL No 3)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 3672.16 | 3672.16 | 3.0 | False | None | None | False | None | False | 11016.48 | 0 | 3137306 | 107814 | None | code23 | Hire charges for supply fixing wiring servicing and maintaining of Network Switches 24 Port Gigabyte (managble) (SL No 4)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 9790.46 | 9790.46 | 2.0 | False | None | None | False | None | False | 19580.92 | 0 | 3137307 | 107814 | None | code24 | Hire Charges for Providing LAN Connection using UTP Lan cable, Port Interconnection of systems with service in the premises (SL No 5)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 1223.65 | 1223.65 | 2.0 | False | None | None | False | None | False | 2447.3 | 0 | 3137308 | 107814 | None | code25 | Hire charges for supply fixing wiring servicing and maintaining of Setup box with Dish connection (SL No 6)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 1180.0 | 1180.0 | 2.0 | False | None | None | False | None | False | 2360.0 | 0 | 3137309 | 107814 | None | code26 | Hire Charges for Providing Computer, Monitor, CPU, Keyboard, Mouse for 4days Monitor: TFT 15-17, minimum CPU, Intel I3, 4GB Ram, 300GB HDO with windows 07 05 & antivirus minimum (SL No 7)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 8566.8 | 8566.8 | 6.0 | False | None | None | False | None | False | 51400.8 | 0 | 3137310 | 107814 | None | code27 | Hire charges for supply fixing wiring servicing and maintaining of 3KVA UPS with Batteries (SL No 8)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 12236.59 | 12236.59 | 6.0 | False | None | None | False | None | False | 73419.54 | 0 | 3137311 | 107814 | None | code28 | Hire Charges for Providing Printer LASER for (SL No 9)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 7341.96 | 7341.96 | 3.0 | False | None | None | False | None | False | 22025.88 | 0 | 3137312 | 107814 | None | code29 | Hire charges for providing, installing and removing of LED wall with Graphics system including scheffolding, cabling complete system. (Per Square Feet Construction) (SL No 14)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 986.47 | 986.47 | 96.0 | False | None | None | False | None | False | 94701.12 | 0 | 3137313 | 107814 | None | code30 | Hire Charges for Providing Photo Copier (SL No 10)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Nos | 24475.55 | 24475.55 | 1.0 | False | None | None | False | None | False | 24475.55 | 0 | 3137314 | 107814 | None | code31 | Hire charges for Supplying Fire Extinguisher (SL No 11)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 9545.01 | 9545.01 | 6.0 | False | None | None | False | None | False | 57270.06 | 0 | 3137315 | 107814 | None | code32 | Hire Charges for Generator 62.5 KVA (Vol -I P.No A-43/ I No 41)The rates include crew charges, operational & maintenance charges such as cost of fuel,lubricants, stores, establishments, and depreciation & interest charges on hypothecation. (inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | hr | 982.52 | 982.52 | 104.0 | False | None | None | False | None | False | 102182.08 | 0 | 3137316 | 107814 | None | code33 | Electrician, for Sound & Light Maintenance (Civil SR Vo-1 P No:52/A-51 SL No:27)(inclusive of GST) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work | Each | 767.0 | 767.0 | 4.0 | False | None | None | False | None | False | 3068.0 | 0 |
|
|
---|