noticeInvitingTenderDTO
createdTs1716447324769
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1630.00
emd65000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose03-06-2024 17:00:00
tenderQueryClose30-05-2024 14:04:03
technicalBidOpen04-06-2024 17:01:00
publishedDate24-05-2024 18:35:47
publishedByPostRDPR_EE_DIV_VJN
publishedByUserKPE12111 - J R PAMPAPATHI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEE office
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392242173
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1716447324824
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2023-24/RD/WORK_INDENT5405
titleConstruction of Road and drain in Doddagollarahatti(Rs.20.00lakhs),Construction of CC road in Nadumavinahalli (Rs.10.00lakhs)Constructionof cc road in Toolahalli (Rs.15lakhs)Construction of cc road in Hanumanahalli (Rs,10.00lakhs) and Construction of cc road in Benakanahalli village in Kudligi Constrituency CATEGORY SC
descriptionConstruction of Road and drain in Doddagollarahatti(Rs.20.00lakhs),Construction of CC road in Nadumavinahalli (Rs.10.00lakhs)Constructionof cc road in Toolahalli (Rs.15lakhs)Construction of cc road in Hanumanahalli (Rs,10.00lakhs) and Construction of cc road in Benakanahalli village in Kudligi Constrituency CATEGORY SC Total Rs.65.00 lakhs
categoryWORKS
categoryTextWorks
ecv6485462.73
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location943
locationNameRDPR Division Office Vijayanagara
provisionalAmount6500000.0
groupOverheadTotal989307.87
fileNumberNO/AEE/PRESD/KDL/KKRDBSAVINGS/2023-24/NO1
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17164473250000NoneNoneRoadsConstruction of Road and drain in Doddagollarahatti(Rs.20.00lakhs),Construction of CC road in Nadumavinahalli (Rs.10.00lakhs)Constructionof cc road in Toolahalli (Rs.15lakhs)Construction of cc road in Hanumanahalli (Rs,10.00lakhs) and Construction of cc road in Benakanahalli village in Kudligi Constrituency5496154.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3148541108408Nonecode01CONTREMRNT OF CC ROAD AND DRAIN IN D.GOLLARAHATTI :Earth work excavation by manual means for drains, canals, waste weir, draft,appr oach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.1175.44FalseNoneNoneFalseNoneFalse44579.3040
3148542108408Nonecode02Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density asgiven in Table 300-2 for embankment construction. (PWD CSR 2023-24 VOL-3, SLNo. 3.7, P.No.17 )Cum110.25110.25131.58FalseNoneNoneFalseNoneFalse14506.6950
3148543108408Nonecode03Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.7131.58FalseNoneNoneFalseNoneFalse65487.3660
3148544108408Nonecode04Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers withpaver/grader in sub-base / base course on well prepared surfaceand compacting with vibratory roller to achieve the desired density.. PWD CSR 2023-24 VOL-3, SL.No.4.17 (A) P.No. 26)Cum2686.952686.9587.72FalseNoneNoneFalseNoneFalse235699.2540
3148545108408Nonecode05Providing and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any othertype as per Clause 1501.2.2 M20 (Grade), coarse andfine aggregates conforming to IS:383, maximum sizeof coarse aggregate not exceeding 25 mm, mixed ina concrete mixer of not less than 0.2 m3 capacity andappropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawingand technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of allmaterials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. PWD CSR 2023-24 VOL-3, SL.No.16.27 P.No. 148)Cum6692.76692.7131.58FalseNoneNoneFalseNoneFalse880625.4660
3148546108408Nonecode06Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges andsuch simillar works in all kinds of soils , as per drawing and technicalspecifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter,excavated surface leveled and sides neatly dressed disposing off theexcavated stuff or sorting & stacking the selected stuff for reuse in aradius of 50 m and lift upto 1.5 m including cost of labour, tools & otherappurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.152.65FalseNoneNoneFalseNoneFalse13378.3650
3148547108408Nonecode07Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as pertechnical specifications. (The cost of steel reinforcement & formwork Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates PWD DSR.2023-24/ Pg-15 Item No.2.1.3 Rs.6201.00/cumCum6511.056511.055.85FalseNoneNoneFalseNoneFalse38089.64250
3148548108408Nonecode08Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) PWD DSR.2023-24/ Pg-15 Item No.2.2.1.1 Rs. 6595.00/cumCum11772.0811772.0821.45FalseNoneNoneFalseNoneFalse252511.1160
3148549108408Nonecode09Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately PWD DSR.2023-24/V-1, Pg-84 I No. 2.11A Rs.89457/MTCum93.9393.931501.5FalseNoneNoneFalseNoneFalse141035.8950
3148550108408Nonecode10Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.73.9FalseNoneNoneFalseNoneFalse1941.030
3148551108408Nonecode11Providing and fixing kkrdb name boardNo6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
3148552108408Nonecode12CONTREMRNT OF CC ROAD A IN NADUMAVINAHALLI :Earth work excavation by manual means for drains, canals, waste weir, draft,appr oach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.196.08FalseNoneNoneFalseNoneFalse24413.9280
3148553108408Nonecode13Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density asgiven in Table 300-2 for embankment construction. (PWD CSR 2023-24 VOL-3, SLNo. 3.7, P.No.17 )Cum110.25110.2596.08FalseNoneNoneFalseNoneFalse10592.820
3148554108408Nonecode14Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.764.05FalseNoneNoneFalseNoneFalse31877.6850
3148555108408Nonecode15Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers withpaver/grader in sub-base / base course on well prepared surfaceand compacting with vibratory roller to achieve the desired density.. PWD CSR 2023-24 VOL-3, SL.No.4.17 (A) P.No. 26)Cum2686.952686.9548.04FalseNoneNoneFalseNoneFalse129081.0780
3148556108408Nonecode16Providing and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any othertype as per Clause 1501.2.2 M20 (Grade), coarse andfine aggregates conforming to IS:383, maximum sizeof coarse aggregate not exceeding 25 mm, mixed ina concrete mixer of not less than 0.2 m3 capacity andappropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawingand technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of allmaterials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. PWD CSR 2023-24 VOL-3, SL.No.16.27 P.No. 148)Cum6692.76692.796.08FalseNoneNoneFalseNoneFalse643034.6160
3148557108408Nonecode17Providing and fixing kkrdb name boardNo6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
3148558108408Nonecode18CONTREMRNT OF CC ROAD A IN TOOLAHALLI:Earth work excavation by manual means for drains, canals, waste weir, draft,appr oach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.1144.6FalseNoneNoneFalseNoneFalse36742.860
3148559108408Nonecode19Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density asgiven in Table 300-2 for embankment construction. (PWD CSR 2023-24 VOL-3, SLNo. 3.7, P.No.17 )Cum110.25110.25144.6FalseNoneNoneFalseNoneFalse15942.150
3148560108408Nonecode20Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.796.4FalseNoneNoneFalseNoneFalse47978.280
3148561108408Nonecode21Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers withpaver/grader in sub-base / base course on well prepared surfaceand compacting with vibratory roller to achieve the desired density.. PWD CSR 2023-24 VOL-3, SL.No.4.17 (A) P.No. 26)Cum2686.952686.9572.3FalseNoneNoneFalseNoneFalse194266.4850
3148562108408Nonecode22Providing and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any othertype as per Clause 1501.2.2 M20 (Grade), coarse andfine aggregates conforming to IS:383, maximum sizeof coarse aggregate not exceeding 25 mm, mixed ina concrete mixer of not less than 0.2 m3 capacity andappropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawingand technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of allmaterials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. PWD CSR 2023-24 VOL-3, SL.No.16.27 P.No. 148)Cum6692.76692.7144.6FalseNoneNoneFalseNoneFalse967764.420
3148563108408Nonecode23Providing and fixing kkrdb name boardNo6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
3148564108408Nonecode24CONTREMRNT OF CC ROAD A IN HANUMSNSHSLLI:Earth work excavation by manual means for drains, canals, waste weir, draft,appr oach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.196.0FalseNoneNoneFalseNoneFalse24393.60
3148565108408Nonecode25Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density asgiven in Table 300-2 for embankment construction. (PWD CSR 2023-24 VOL-3, SLNo. 3.7, P.No.17 )Cum110.25110.2596.0FalseNoneNoneFalseNoneFalse10584.00
3148566108408Nonecode26Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.764.0FalseNoneNoneFalseNoneFalse31852.80
3148567108408Nonecode27Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers withpaver/grader in sub-base / base course on well prepared surfaceand compacting with vibratory roller to achieve the desired density.. PWD CSR 2023-24 VOL-3, SL.No.4.17 (A) P.No. 26)Cum2686.952686.9548.0FalseNoneNoneFalseNoneFalse128973.60
3148568108408Nonecode28Providing and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any othertype as per Clause 1501.2.2 M20 (Grade), coarse andfine aggregates conforming to IS:383, maximum sizeof coarse aggregate not exceeding 25 mm, mixed ina concrete mixer of not less than 0.2 m3 capacity andappropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawingand technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of allmaterials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. PWD CSR 2023-24 VOL-3, SL.No.16.27 P.No. 148)Cum6692.76692.796.0FalseNoneNoneFalseNoneFalse642499.20
3148569108408Nonecode29Providing and fixing kkrdb name boardNo6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
3148570108408Nonecode30CONTREMRNT OF CC ROAD A IN BENAKANAHALLI :Earth work excavation by manual means for drains, canals, waste weir, draft,appr oach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. (PWD CSR 2023-24 VOL-I S.No. 1.4.1 P.No.5 )Cum254.1254.196.0FalseNoneNoneFalseNoneFalse24393.60
3148571108408Nonecode31Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supportingembankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and thencompacted by rolling so as to achieve minimum dry density asgiven in Table 300-2 for embankment construction. (PWD CSR 2023-24 VOL-3, SLNo. 3.7, P.No.17 )Cum110.25110.2596.0FalseNoneNoneFalseNoneFalse10584.00
3148572108408Nonecode32Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with alllifts and lead, transportation to site, spreading, grading to required slope andcompacting to meet the requirement complete as per specifications, includingcost of bour,rolling,water,all materials,usage& all other appurtenaces requiredto complete the work.(PWD CSR 2023-24 VOL-I, SL.No.1.8 P.No.7 )Cum497.7497.764.0FalseNoneNoneFalseNoneFalse31852.80
3148573108408Nonecode33Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers withpaver/grader in sub-base / base course on well prepared surfaceand compacting with vibratory roller to achieve the desired density.. PWD CSR 2023-24 VOL-3, SL.No.4.17 (A) P.No. 26)Cum2686.952686.9548.0FalseNoneNoneFalseNoneFalse128973.60
3148574108408Nonecode34Providing and constructing un-reinforced plain cementconcrete pavement, thickness as per design, over aprepared sub base, with 43 grade cement or any othertype as per Clause 1501.2.2 M20 (Grade), coarse andfine aggregates conforming to IS:383, maximum sizeof coarse aggregate not exceeding 25 mm, mixed ina concrete mixer of not less than 0.2 m3 capacity andappropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork asper drawing), spreading the concrete with shovels, rakes,compacted using needle, screed and plate vibrators andfinished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawingand technical specification clause 1501 with all lead, lifts,loading & unloading charges, cost and conveyance of allmaterials, labour, equipments etc., complete. as per thedirections of the Engineer-in-charge of the work. PWD CSR 2023-24 VOL-3, SL.No.16.27 P.No. 148)Cum6692.76692.796.0FalseNoneNoneFalseNoneFalse642499.20
3148575108408Nonecode35Providing and fixing kkrdb name boardNo6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17164473260000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17164473260000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17164473260000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17164473260000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17164473260000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17164510490000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17164510580000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement 2.0 on or before the last date and time of bid submission.None
17164510790000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement2.0 portal due to internet connectivity issues and technical glitches at bidders endNone
17164510900000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17164511210000NoneNoneELIGIBILITYTotal value of civil engineering works executed and payments received in the last five years 2019-20, 2020-21,2021-22, 2022-23 and 2023-24) should not be less than Estimated cost of the work. Turnover certificate must be submitted with UDIN No on it, Failing will be considered as invalid.None
17164511350000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17164511420000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17164511510000NoneNoneELIGIBILITYBanker Details with bank contact detailsNone
17164511610000NoneNoneELIGIBILITYThe bid is to be submitted through GOK e-Procurement2.0 platform www.eproc.karnataka.gov.in only.None
17164511700000NoneNoneELIGIBILITYTenderers who have not registered in the GOK e-Procurement2.0 portal should be registered through web site https://kppp.karnataka.gov.in.None
17164511790000NoneNoneELIGIBILITYThe Tenderer shall view tender documents through e-procurement2.0 website https://kppp.karnataka.gov.in at free of cost. Additional conditions and information also can be obtained through the above mentioned website.None
17164511860000NoneNoneELIGIBILITYBidders / Contractors should submit the bid on the website itself (for help on e-procurement2.0 / e-payment, please contact helpdesk No. 91-8046010000 and 91-8068948777 from Monday to Saturday during 9.00 AM to 5.00 PM.)None
17164511940000NoneNoneELIGIBILITYEMD shall be paid in the form of e-payment through e-procurement2.0 portal on or before as per the last date and time mentioned in the e-procurement portal.None
17164512080000NoneNoneELIGIBILITYTender documents may be downloaded from Government of Karnataka e-procurement2.0 website https://kppp.karnataka.gov.in. under contractor login.None
17164512160000NoneNoneELIGIBILITYBidder can access tender documents from the website, fill them and submit the completed tender document into electronic tender on the website. https://eproc.karnataka.gov.in/ after submitting the EMD and tender processing fee in the form of e-payment. EMD will be refunded only after acceptance of successful bidder.None
17164512260000NoneNoneELIGIBILITYTender application cost will not be refundable or exchangeable in case of cancellation of tender.None
17164512330000NoneNoneELIGIBILITYAll materials shall be of good quality as per specification, quality certificate for the same should be obtained from the concerned authority at their own cost.None
17164512440000NoneNoneELIGIBILITYContractor should made an agreement within 20 days from the date of LOA. work should be commence within 2 weeks time from the date of work order. If not tender will be cancelled at the contractors own risk and cost.None
17164512630000NoneNoneELIGIBILITYSecurity deposit at the rate of 5% of tender cost should be made in favor of Executive Engineer in the form of DD / FDR / NSC / BG (NSC should be pledge in favor of Executive Engineer P R E Div, Vijayanagara) Before executing the agreement.None
17164512740000NoneNoneELIGIBILITYCorrigendum / modifications / correction, if any, will be published in the website only.None
17164512860000NoneNoneELIGIBILITYAs per karnataka state government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Govt letter No.PW/134/BMS /2007/dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17164512950000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17164513030000NoneNoneELIGIBILITYSelf attested copies of the document of all details uploaded to the e-portal in original should be submitted to the executive engineer on the date & time specified above i.e., at the time of technical bid opening as per notification.None
17164513130000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17164513210000NoneNoneELIGIBILITYIt is to be noted that any false documentation is found to be uploaded, the action may attract punitive measures such as blacklisting, cancellation of registration etc.None
17164513300000NoneNoneELIGIBILITYThe work will be inspected by the third party & the bill will be admitted only after the satisfactory quality report from third party.None
17164513390000NoneNoneELIGIBILITYContractors should submitted tax clearance copy.None
17164513570000NoneNoneELIGIBILITYContractor should submit the workdone certificate of Similar nature of work.None
17164513740000NoneNoneELIGIBILITYAll other conditions and requirements has to be fulfilled as per the standard bid document kw-3.None
17164513840000NoneNoneELIGIBILITYThe tenderer should quote his rates With all leads and lifts loading and un loading, including cost of Labour, hire charges of Machinery and other incidental charges etc complete as per the directions of the engineer incharge of the work specifications.None
17164513920000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17164514010000NoneNoneELIGIBILITYThe tenderer should maintain the road during the defective liability period - 1YEAR ( maintenance period from the completion of the work.)None
17164514080000NoneNoneELIGIBILITYGST will be paid to the contract value of the work. If GST value increases in case of delay in completion of the work then dept is not responsible for variations.None
17164514260000NoneNoneELIGIBILITYSC contractors should submit the Caste certificate and it should have RD number and it should be issued by compentent authorityNone
17164514380000NoneNoneELIGIBILITYThe Information on litigation in which the tender is involved are to be furnishedNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneExecuted in any one year for a continuous period of 12 months the minimum quantities of work. 2019-20 to 2023-24 (80% of the estimated quantity required).Earthwork Excavation & Construction of embankment : 844.00 Cum,WMM : 243.00 Cum,PCC/RCC : 473.00 Cum,Steel : 1.2.00 MT. IMP.Note.: Separate year wise 80% quantity with works list sheet to be enclosed. other wise bid may not be consider.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSatisfactorily completed as prime contractor, for at least any construction work of value not less than Rs. 16.21.00 lakhs (usually 25% of the cost work in last five years) (2019-20 to 2023-24).Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneConstitution/ legal status of Tenderer, Place of Registration , Principal place of business.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAchieved in at least One financial year a minimum financial turnover(in all classes of civil engineering construction works only) of Rs. 65.00 lakhs (2019-20 to 2023-24).(Usually not less than the estimated annual payments under this contract for works costing upto Rs. 100.00 lakhs)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAchieved in at least One financial year a minimum financial turnover(in all classes of civil engineering construction works only) of Rs. 65.00 lakhs (2019-20 to 2023-24).(Usually not less than the estimated annual payments under this contract for works costing upto Rs. 100.00 lakhs)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.OthersPERT/CHART
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- CPM/PERT chart with relevant Documents
NoneNoneNoneNoneInformation on works which are yet to be completed.OthersExisting committement
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 5 and Certificates in Format 3
NoneNoneNoneNoneQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awarded.OthersBiodata of the personnel.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Biodata of the personnel.
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involved:Otherslitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format 10
NoneNoneNoneNoneAll the tenderer shall provide the requested Qualification Information accurately and in sufficient details as per formats given in Section 3 of SBD KW-3OthersThe details of information should submit in KW-3 prescribed format with relevant documents
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- The details of information should submit in KW-3 prescribed format with relevant documents
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Registration Certificate PWDTrueTechnical Bid
Last 5 years Turnover Certificate from CA with UDIN noTrueTechnical Bid
Single similar nature of work done certificate issued by competent authority, not below the rank of Executive Engineer.TrueTechnical Bid
Line of credit from nationalized bank with bankers contact detailsTrueTechnical Bid
Ongoing commitment detailsTrueTechnical Bid
Recent tax clearance certificateTrueTechnical Bid
Category reservation certificate with RD number.TrueTechnical Bid
Other Kw-3 documentsTrueTechnical Bid