tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1716644289000 | 0 | None | None | Roads | CONSTRUCTION OF CC ROAD FROM MAIN GATE TO COLLEGE AND CONTRUCTION OF COMPOUND WALL TO GOVERNMENT PU COLLEGE AT SARSAMBA VILLAGE IN ALAND TALUKA(ROAD WORK) | 556361.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3163728 | 109002 | None | PWD SR 2023-24 VOLUME-1 IT.NO 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
| Cum | 99.75 | 99.75 | 60.0 | False | None | None | False | None | False | 5985.0 | 0 | 3163729 | 109002 | None | PWD SR 2023-24 VOLUME-1 IT.NO 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
| Cum | 497.7 | 497.7 | 92.0 | False | None | None | False | None | False | 45788.4 | 0 | 3163730 | 109002 | None | PWD SR 2023-24 VOLUME-3 IT.NO 4.14 A (ii) (a) | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. By Manual Means Grading-II (53 mm to 22.4 mm) Using Screening Crushable type such as Moorum or Gravel
| Cum | 2575.65 | 2575.65 | 40.0 | False | None | None | False | None | False | 103026.0 | 0 | 3163731 | 109002 | None | PWD SR 2023-24 VOLUME-3 IT.NO 20.28 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.
| Cum | 6692.7 | 6692.7 | 60.0 | False | None | None | False | None | False | 401562.0 | 0 |
| 1716644289000 | 0 | None | None | Roads | CONSTRUCTION OF CC ROAD FROM MAIN GATE TO COLLEGE AND CONTRUCTION OF COMPOUND WALL TO GOVERNMENT PU COLLEGE AT SARSAMBA VILLAGE IN ALAND TALUKA(COMPOUND WALL) | 2912265.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3163732 | 109003 | None | PWD DSR 2023-24 IT.NO 1.4.1 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.
| Cum | 254.1 | 254.1 | 142.14 | False | None | None | False | None | False | 36117.774 | 0 | 3163733 | 109003 | None | PWD DSR 2023-24 IT.NO 2.1.4 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates
| Cum | 6527.85 | 6527.85 | 45.61 | False | None | None | False | None | False | 297735.2385 | 0 | 3163734 | 109003 | None | PWD DSR 2023-24 IT.NO 5.1.1 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
| Cum | 5891.55 | 5891.55 | 90.97 | False | None | None | False | None | False | 535954.3035 | 0 | 3163735 | 109003 | None | PWD DSR 2023-24 IT.NO 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
| Cum | 6708.45 | 6708.45 | 68.23 | False | None | None | False | None | False | 457717.5435 | 0 | 3163736 | 109003 | None | PWD DSR 2023-24 IT.NO 6.7 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.
| Cum | 8621.55 | 8621.55 | 112.27 | False | None | None | False | None | False | 967941.4185 | 0 | 3163737 | 109003 | None | PWD DSR 2023-24 IT.NO 8.9 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
| Sqm | 404.25 | 404.25 | 1010.8 | False | None | None | False | None | False | 408615.9 | 0 | 3163738 | 109003 | None | PWD DSR 2023-24 IT.NO 8.3.1 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.
| Sqm | 371.7 | 371.7 | 303.24 | False | None | None | False | None | False | 112714.308 | 0 | 3163739 | 109003 | None | PWD DSR 2023-24 IT.NO 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.
| Sqm | 93.45 | 93.45 | 1021.6 | False | None | None | False | None | False | 95468.52 | 0 |
|
|
---|