noticeInvitingTenderDTO
createdTs1716381446726
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd5287000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-06-2024 17:30:00
tenderQueryClose03-06-2024 17:30:00
technicalBidOpen06-06-2024 11:00:00
publishedDate28-05-2024 11:18:12
publishedByPostMI_EE_DIV_BLR
publishedByUserKPE12538 - NAVEENKUMAR K V
bidValidityPeriod90
noOfCalls1
preBidMeetingDate29-05-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonAyesha Nazeen
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392200293
mobileNumber9036476132
tenderSupplierListNone
tenderSchedule
createdTs1716381446757
version4
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/DA/WORK_INDENT1797
titleCONSTRUCTION OF NEW CHECK DAM TO STREAMS/HALLA OF KUDLIGI TALUK, VIJAYANAGARA DISTRICT, REJUVENATION OF TANKS TO GUDEKOTE, APPAYANAHALLI GANDABOMMANAHALLI TANKS IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT
descriptionCONSTRUCTION OF NEW CHECK DAM TO STREAMS/HALLA OF KUDLIGI TALUK, VIJAYANAGARA DISTRICT, REJUVENATION OF TANKS TO GUDEKOTE, APPAYANAHALLI GANDABOMMANAHALLI TANKS IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT
categoryWORKS
categoryTextWorks
ecv528621494.32
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location136
locationNameMinor Irrigation Division Bellary
provisionalAmount560000000.0
groupOverheadTotal80637180.0
fileNumberAEE/MID/KDL/CEPMIZ/KUDLIGI/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR JANGAMANA GUDDA VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.11055143.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144841108245NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6530.0FalseNoneNoneFalseNoneFalse12379.50
3144842108245NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7715.0FalseNoneNoneFalseNoneFalse401.550
3144843108245NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0210.0FalseNoneNoneFalseNoneFalse530.20
3144844108245NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.12749.69FalseNoneNoneFalseNoneFalse294491.7990
3144845108245NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.255517.01FalseNoneNoneFalseNoneFalse2461965.71250
3144846108245NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3590.62FalseNoneNoneFalseNoneFalse577281.1170
3144847108245NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39436.51FalseNoneNoneFalseNoneFalse2968001.72890
3144848108245NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75419.36FalseNoneNoneFalseNoneFalse3062481.240
3144849108245NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.18.7186FalseNoneNoneFalseNoneFalse813306.754260
3144850108245NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.7886.5FalseNoneNoneFalseNoneFalse441211.050
3144851108245NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.4420.0FalseNoneNoneFalseNoneFalse171108.00
3144852108245NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9136.85FalseNoneNoneFalseNoneFalse183639.0150
3144853108245NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7515.0FalseNoneNoneFalseNoneFalse52526.250
3144854108245NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144855108245NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR BADALADAKU SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.12865588.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144856108246NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6560.8FalseNoneNoneFalseNoneFalse25089.120
3144857108246NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7730.4FalseNoneNoneFalseNoneFalse813.8080
3144858108246NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0220.2666FalseNoneNoneFalseNoneFalse1074.5351320
3144859108246NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.110988.61FalseNoneNoneFalseNoneFalse1176880.1310
3144860108246NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25599.66FalseNoneNoneFalseNoneFalse267598.2750
3144861108246NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35111.86FalseNoneNoneFalseNoneFalse712587.3510
3144862108246NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39557.52FalseNoneNoneFalseNoneFalse3790795.91280
3144863108246NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75504.42FalseNoneNoneFalseNoneFalse3683653.1550
3144864108246NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.19.8655FalseNoneNoneFalseNoneFalse920294.288550
3144865108246NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.72531.25FalseNoneNoneFalseNoneFalse1259803.1250
3144866108246NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41430.0FalseNoneNoneFalseNoneFalse582582.00
3144867108246NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9224.925FalseNoneNoneFalseNoneFalse301826.85750
3144868108246NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7536.0FalseNoneNoneFalseNoneFalse126063.00
3144869108246NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144870108246NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8520.0FalseNoneNoneFalseNoneFalse7077.00
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUNASAGARA VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.12366255.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144871108247NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6540.0FalseNoneNoneFalseNoneFalse16506.00
3144872108247NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7720.0FalseNoneNoneFalseNoneFalse535.40
3144873108247NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0213.3333FalseNoneNoneFalseNoneFalse706.9315660
3144874108247NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.17206.17FalseNoneNoneFalseNoneFalse771780.8070
3144875108247NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25493.42FalseNoneNoneFalseNoneFalse220188.6750
3144876108247NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35115.64FalseNoneNoneFalseNoneFalse736667.2740
3144877108247NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39625.46FalseNoneNoneFalseNoneFalse4252746.46940
3144878108247NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75404.51FalseNoneNoneFalseNoneFalse2954035.40250
3144879108247NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.110.6354FalseNoneNoneFalseNoneFalse992113.717140
3144880108247NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.72493.75FalseNoneNoneFalseNoneFalse1241139.3750
3144881108247NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41800.0FalseNoneNoneFalseNoneFalse733320.00
3144882108247NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9174.825FalseNoneNoneFalseNoneFalse234597.66750
3144883108247NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7556.0FalseNoneNoneFalseNoneFalse196098.00
3144884108247NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144885108247NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HULIKERE VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.15192511.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144886108248NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6580.0FalseNoneNoneFalseNoneFalse33012.00
3144887108248NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7740.0FalseNoneNoneFalseNoneFalse1070.80
3144888108248NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0226.6666FalseNoneNoneFalseNoneFalse1413.8631320
3144889108248NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depthetc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.18642.55FalseNoneNoneFalseNoneFalse925617.1050
3144890108248NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25379.46FalseNoneNoneFalseNoneFalse169334.0250
3144891108248NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35127.87FalseNoneNoneFalseNoneFalse814576.65450
3144892108248NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39717.9FalseNoneNoneFalseNoneFalse4881282.0810
3144893108248NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75504.36FalseNoneNoneFalseNoneFalse3683214.990
3144894108248NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.111.8009FalseNoneNoneFalseNoneFalse1100836.335690
3144895108248NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.73657.5FalseNoneNoneFalseNoneFalse1820337.750
3144896108248NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.42640.0FalseNoneNoneFalseNoneFalse1075536.00
3144897108248NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9243.9FalseNoneNoneFalseNoneFalse327289.410
3144898108248NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7598.0FalseNoneNoneFalseNoneFalse343171.50
3144899108248NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144900108248NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR KAKUPPI (SITE-4) VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.17578003.77
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144901108249NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6597.5FalseNoneNoneFalseNoneFalse40233.3750
3144902108249NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7748.75FalseNoneNoneFalseNoneFalse1305.03750
3144903108249NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0232.5FalseNoneNoneFalseNoneFalse1723.150
3144904108249NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.122344.36FalseNoneNoneFalseNoneFalse2393080.9560
3144905108249NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25519.64FalseNoneNoneFalseNoneFalse231889.350
3144906108249NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35181.61FalseNoneNoneFalseNoneFalse1156919.26350
3144907108249NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39969.41FalseNoneNoneFalseNoneFalse6591396.65990
3144908108249NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75363.74FalseNoneNoneFalseNoneFalse2656302.2850
3144909108249NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.115.5781FalseNoneNoneFalseNoneFalse1453189.038210
3144910108249NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.73375.0FalseNoneNoneFalseNoneFalse1679737.50
3144911108249NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41800.0FalseNoneNoneFalseNoneFalse733320.00
3144912108249NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9277.5FalseNoneNoneFalseNoneFalse372377.250
3144913108249NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7572.0FalseNoneNoneFalseNoneFalse252126.00
3144914108249NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144915108249NoneMI005Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8514.0FalseNoneNoneFalseNoneFalse4953.90
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR ADAVISOORANAHALLI VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.17826645.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144916108250NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6533.0FalseNoneNoneFalseNoneFalse13617.450
3144917108250NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7716.5FalseNoneNoneFalseNoneFalse441.7050
3144918108250NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0211.0FalseNoneNoneFalseNoneFalse583.220
3144919108250NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.129234.72FalseNoneNoneFalseNoneFalse3131038.5120
3144920108250NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25413.28FalseNoneNoneFalseNoneFalse184426.20
3144921108250NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35131.17FalseNoneNoneFalseNoneFalse835598.80950
3144922108250NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39594.14FalseNoneNoneFalseNoneFalse4039789.57460
3144923108250NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75714.16FalseNoneNoneFalseNoneFalse5215331.940
3144924108250NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.110.8364FalseNoneNoneFalseNoneFalse1010863.821240
3144925108250NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.72341.75FalseNoneNoneFalseNoneFalse1165488.9750
3144926108250NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.42555.0FalseNoneNoneFalseNoneFalse1040907.00
3144927108250NoneMI012Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm99.7599.75412.5FalseNoneNoneFalseNoneFalse41146.8750
3144928108250NoneMI013Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9260.125FalseNoneNoneFalseNoneFalse349061.73750
3144929108250NoneMI014Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7570.0FalseNoneNoneFalseNoneFalse245122.50
3144930108250NoneMI015Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144931108250NoneMI016Providing hearting embankment using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum531.3531.3440.0FalseNoneNoneFalseNoneFalse233772.00
3144932108250NoneMI017Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.7632.5FalseNoneNoneFalseNoneFalse301512.750
3144933108250NoneMI018Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8524.0FalseNoneNoneFalseNoneFalse8492.40
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR JERMALI SITE-2 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.14384159.13
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144934108251NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6556.79FalseNoneNoneFalseNoneFalse23434.39350
3144935108251NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7728.395FalseNoneNoneFalseNoneFalse760.134150
3144936108251NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0218.93FalseNoneNoneFalseNoneFalse1003.66860
3144937108251NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.18707.82FalseNoneNoneFalseNoneFalse932607.5220
3144938108251NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to completeIn ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.255434.33FalseNoneNoneFalseNoneFalse2425069.76250
3144939108251NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35121.13FalseNoneNoneFalseNoneFalse771640.49550
3144940108251NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39531.79FalseNoneNoneFalseNoneFalse3615847.60810
3144941108251NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75403.66FalseNoneNoneFalseNoneFalse2947828.0650
3144942108251NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.111.8664FalseNoneNoneFalseNoneFalse1106946.444240
3144943108251NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.71578.75FalseNoneNoneFalseNoneFalse785743.8750
3144944108251NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.4895.0FalseNoneNoneFalseNoneFalse364623.00
3144945108251NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9180.3FalseNoneNoneFalseNoneFalse241944.570
3144946108251NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7556.0FalseNoneNoneFalseNoneFalse196098.00
3144947108251NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144948108251NoneMI015Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3822.03822.0250.0FalseNoneNoneFalseNoneFalse955500.00
3144949108251NoneMI016Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8516.0FalseNoneNoneFalseNoneFalse5661.60
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HARAVADI VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.12295303.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144950108252NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6558.5FalseNoneNoneFalseNoneFalse24140.0250
3144951108252NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7729.25FalseNoneNoneFalseNoneFalse783.02250
3144952108252NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0219.5FalseNoneNoneFalseNoneFalse1033.890
3144953108252NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.114376.68FalseNoneNoneFalseNoneFalse1539742.4280
3144954108252NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25443.12FalseNoneNoneFalseNoneFalse197742.30
3144955108252NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35116.03FalseNoneNoneFalseNoneFalse739151.71050
3144956108252NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39535.93FalseNoneNoneFalseNoneFalse3643997.08270
3144957108252NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75269.93FalseNoneNoneFalseNoneFalse1971231.30750
3144958108252NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.111.7097FalseNoneNoneFalseNoneFalse1092328.825770
3144959108252NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.73500.0FalseNoneNoneFalseNoneFalse1741950.00
3144960108252NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41800.0FalseNoneNoneFalseNoneFalse733320.00
3144961108252NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9161.4FalseNoneNoneFalseNoneFalse216582.660
3144962108252NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.75108.0FalseNoneNoneFalseNoneFalse378189.00
3144963108252NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144964108252NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8516.0FalseNoneNoneFalseNoneFalse5661.60
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUDEKOTE-04 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.11163151.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144965108253NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6538.0FalseNoneNoneFalseNoneFalse15680.70
3144966108253NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7719.0FalseNoneNoneFalseNoneFalse508.630
3144967108253NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0212.6666FalseNoneNoneFalseNoneFalse671.5831320
3144968108253NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.18191.05FalseNoneNoneFalseNoneFalse877261.4550
3144969108253NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25444.34FalseNoneNoneFalseNoneFalse198286.7250
3144970108253NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35115.78FalseNoneNoneFalseNoneFalse737559.1230
3144971108253NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39526.01FalseNoneNoneFalseNoneFalse3576547.13390
3144972108253NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75424.17FalseNoneNoneFalseNoneFalse3097607.46750
3144973108253NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.110.0563FalseNoneNoneFalseNoneFalse938092.894830
3144974108253NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.71898.4375FalseNoneNoneFalseNoneFalse944852.343750
3144975108253NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.4900.0FalseNoneNoneFalseNoneFalse366660.00
3144976108253NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9199.375FalseNoneNoneFalseNoneFalse267541.31250
3144977108253NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7536.0FalseNoneNoneFalseNoneFalse126063.00
3144978108253NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144979108253NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUDEKOTE-05 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.7842455.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144980108254NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6540.5FalseNoneNoneFalseNoneFalse16712.3250
3144981108254NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7720.25FalseNoneNoneFalseNoneFalse542.09250
3144982108254NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0213.5FalseNoneNoneFalseNoneFalse715.770
3144983108254NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.14846.5FalseNoneNoneFalseNoneFalse519060.150
3144984108254NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25280.26FalseNoneNoneFalseNoneFalse125066.0250
3144985108254NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3555.65FalseNoneNoneFalseNoneFalse354509.97750
3144986108254NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39334.98FalseNoneNoneFalseNoneFalse2277659.66220
3144987108254NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75209.14FalseNoneNoneFalseNoneFalse1527297.1350
3144988108254NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.16.5035FalseNoneNoneFalseNoneFalse606673.144350
3144989108254NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.72836.8FalseNoneNoneFalseNoneFalse1411875.360
3144990108254NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41600.0FalseNoneNoneFalseNoneFalse651840.00
3144991108254NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.954.75FalseNoneNoneFalseNoneFalse73469.0250
3144992108254NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7575.0FalseNoneNoneFalseNoneFalse262631.250
3144993108254NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3144994108254NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8514.0FalseNoneNoneFalseNoneFalse4953.90
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR LINGADAHALLI SITE-4 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.13379558.48
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144995108255NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6549.5FalseNoneNoneFalseNoneFalse20426.1750
3144996108255NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7724.75FalseNoneNoneFalseNoneFalse662.55750
3144997108255NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0216.5FalseNoneNoneFalseNoneFalse874.830
3144998108255NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.19208.43FalseNoneNoneFalseNoneFalse986222.8530
3144999108255NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25550.41FalseNoneNoneFalseNoneFalse245620.46250
3145000108255NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35136.98FalseNoneNoneFalseNoneFalse872610.5430
3145001108255NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39666.55FalseNoneNoneFalseNoneFalse4532133.40450
3145002108255NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75485.21FalseNoneNoneFalseNoneFalse3543367.32750
3145003108255NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.111.9036FalseNoneNoneFalseNoneFalse1110416.612760
3145004108255NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.71781.25FalseNoneNoneFalseNoneFalse886528.1250
3145005108255NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41800.0FalseNoneNoneFalseNoneFalse733320.00
3145006108255NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9212.0FalseNoneNoneFalseNoneFalse284482.80
3145007108255NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7542.0FalseNoneNoneFalseNoneFalse147073.50
3145008108255NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3145009108255NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR ARJUNACHINNENAHALLI SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.SITE-313203773.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145010108256NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6535.0FalseNoneNoneFalseNoneFalse14442.750
3145011108256NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7717.5FalseNoneNoneFalseNoneFalse468.4750
3145012108256NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0211.6666FalseNoneNoneFalseNoneFalse618.5631320
3145013108256NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.119769.94FalseNoneNoneFalseNoneFalse2117360.5740
3145014108256NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25473.21FalseNoneNoneFalseNoneFalse211169.96250
3145015108256NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35102.96FalseNoneNoneFalseNoneFalse655891.2360
3145016108256NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39476.92FalseNoneNoneFalseNoneFalse3242765.07880
3145017108256NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75361.96FalseNoneNoneFalseNoneFalse2643303.390
3145018108256NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.19.1125FalseNoneNoneFalseNoneFalse850051.361250
3145019108256NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.74303.125FalseNoneNoneFalseNoneFalse2141665.31250
3145020108256NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41870.0FalseNoneNoneFalseNoneFalse761838.00
3145021108256NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9173.8FalseNoneNoneFalseNoneFalse233222.220
3145022108256NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7590.0FalseNoneNoneFalseNoneFalse315157.50
3145023108256NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3145024108256NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8518.0FalseNoneNoneFalseNoneFalse6369.30
17163814470000NoneNoneDam and Allied worksCONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HURILIHALU SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.16735062.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145025108257NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.6572.0FalseNoneNoneFalseNoneFalse29710.80
3145026108257NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7736.0FalseNoneNoneFalseNoneFalse963.720
3145027108257NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0224.0FalseNoneNoneFalseNoneFalse1272.480
3145028108257NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.120021.15FalseNoneNoneFalseNoneFalse2144265.1650
3145029108257NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum446.25446.25596.82FalseNoneNoneFalseNoneFalse266330.9250
3145030108257NoneMI006Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35170.57FalseNoneNoneFalseNoneFalse1086590.59950
3145031108257NoneMI007Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39915.19FalseNoneNoneFalseNoneFalse6222733.73410
3145032108257NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75485.68FalseNoneNoneFalseNoneFalse3546799.620
3145033108257NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.114.3372FalseNoneNoneFalseNoneFalse1337432.798520
3145034108257NoneMI010Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum497.7497.71828.75FalseNoneNoneFalseNoneFalse910168.8750
3145035108257NoneMI011Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.41595.0FalseNoneNoneFalseNoneFalse649803.00
3145036108257NoneMI012Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9280.8FalseNoneNoneFalseNoneFalse376805.520
3145037108257NoneMI013Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3501.753501.7542.0FalseNoneNoneFalseNoneFalse147073.50
3145038108257NoneMI014Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.01.0FalseNoneNoneFalseNoneFalse9450.00
3145039108257NoneMI015Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.8516.0FalseNoneNoneFalseNoneFalse5661.60
17163814470000NoneNoneDam and Allied worksIMPROVEMENTS OF HIREHEGADAL VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT41105153.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145040108258NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65702.5FalseNoneNoneFalseNoneFalse289886.6250
3145041108258NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7740720.0FalseNoneNoneFalseNoneFalse1090074.40
3145042108258NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.023000.0FalseNoneNoneFalseNoneFalse159060.00
3145043108258NoneMI004De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum98.798.710625.0FalseNoneNoneFalseNoneFalse1048687.50
3145044108258NoneMI005Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.61575.0FalseNoneNoneFalseNoneFalse615195.00
3145045108258NoneMI006Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.755250.0FalseNoneNoneFalseNoneFalse4051687.50
3145046108258NoneMI007Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.15296.56FalseNoneNoneFalseNoneFalse567261.5760
3145047108258NoneMI008Providing cut-off trench filling using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering,compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum542.85542.853240.0FalseNoneNoneFalseNoneFalse1758834.00
3145048108258NoneMI009Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6369.36369.3140.0FalseNoneNoneFalseNoneFalse891702.00
3145049108258NoneMI010Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum8688.758688.75280.0FalseNoneNoneFalseNoneFalse2432850.00
3145050108258NoneMI011Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.118.7615FalseNoneNoneFalseNoneFalse1750149.642150
3145051108258NoneMI012Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2686.952686.95350.0FalseNoneNoneFalseNoneFalse940432.50
3145052108258NoneMI013Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3822.03822.03000.0FalseNoneNoneFalseNoneFalse11466000.00
3145053108258NoneMI014Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges /sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum660.45660.459885.0FalseNoneNoneFalseNoneFalse6528548.250
3145054108258NoneMI015Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75498.88FalseNoneNoneFalseNoneFalse3643195.920
3145055108258NoneMI016Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.53577.5FalseNoneNoneFalseNoneFalse939093.750
3145056108258NoneMI017Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3558.86FalseNoneNoneFalseNoneFalse374958.8010
3145057108258NoneMI018Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39225.82FalseNoneNoneFalseNoneFalse1535438.24980
3145058108258NoneMI019Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne198450.0198450.01.32FalseNoneNoneFalseNoneFalse261954.00
3145059108258NoneMI020Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne185325.0185325.01.74FalseNoneNoneFalseNoneFalse322465.50
3145060108258NoneMI021Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne50085.050085.04.38FalseNoneNoneFalseNoneFalse219372.30
3145061108258NoneMI022Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m2073.752073.7530.0FalseNoneNoneFalseNoneFalse62212.50
3145062108258NoneMI023Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.95206.76FalseNoneNoneFalseNoneFalse156093.4620
17163814470000NoneNoneDam and Allied worksIMPROVEMENTS OF SASALVADA VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT22579494.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145063108259NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.651058.0FalseNoneNoneFalseNoneFalse436583.70
3145064108259NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7730131.0FalseNoneNoneFalseNoneFalse806606.870
3145065108259NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.028977.0FalseNoneNoneFalseNoneFalse475960.540
3145066108259NoneMI004De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum98.798.756160.0FalseNoneNoneFalseNoneFalse5542992.00
3145067108259NoneMI005Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.74106.75FalseNoneNoneFalseNoneFalse1957687.7250
3145068108259NoneMI006Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.6540.0FalseNoneNoneFalseNoneFalse210924.00
3145069108259NoneMI007Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.752550.0FalseNoneNoneFalseNoneFalse1967962.50
3145070108259NoneMI008Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.11032.97FalseNoneNoneFalseNoneFalse110631.0870
3145071108259NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.111.561FalseNoneNoneFalseNoneFalse1078457.48010
3145072108259NoneMI010Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75593.2FalseNoneNoneFalseNoneFalse4331991.30
3145073108259NoneMI011Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.5612.0FalseNoneNoneFalseNoneFalse160650.00
3145074108259NoneMI012Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35160.86FalseNoneNoneFalseNoneFalse1024734.5010
3145075108259NoneMI013Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39539.69FalseNoneNoneFalseNoneFalse3669562.78910
3145076108259NoneMI014Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne198450.0198450.00.88FalseNoneNoneFalseNoneFalse174636.00
3145077108259NoneMI015Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne185325.0185325.01.16FalseNoneNoneFalseNoneFalse214977.00
3145078108259NoneMI016Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)t50085.050085.02.92FalseNoneNoneFalseNoneFalse146248.20
3145079108259NoneMI017Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m2073.752073.7520.0FalseNoneNoneFalseNoneFalse41475.00
3145080108259NoneMI018Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.95301.23FalseNoneNoneFalseNoneFalse227413.58850
17163814470000NoneNoneDam and Allied worksIMPROVEMENTS OF GUDEKOTE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT16631487.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145081108260NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65466.0FalseNoneNoneFalseNoneFalse192294.90
3145082108260NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7734828.0FalseNoneNoneFalseNoneFalse932345.560
3145083108260NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.021860.0FalseNoneNoneFalseNoneFalse98617.20
3145084108260NoneMI004Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.79524.249FalseNoneNoneFalseNoneFalse4540209.49830
3145085108260NoneMI005Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.6450.0FalseNoneNoneFalseNoneFalse175770.00
3145086108260NoneMI006Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.752790.0FalseNoneNoneFalseNoneFalse2153182.50
3145087108260NoneMI007Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.1452.87FalseNoneNoneFalseNoneFalse48502.3770
3145088108260NoneMI008Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.114.974FalseNoneNoneFalseNoneFalse1396836.11340
3145089108260NoneMI009Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75534.53FalseNoneNoneFalseNoneFalse3903538.95750
3145090108260NoneMI010Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.5874.8FalseNoneNoneFalseNoneFalse229635.00
3145091108260NoneMI011Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3575.58FalseNoneNoneFalseNoneFalse481471.0530
3145092108260NoneMI012Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39346.8FalseNoneNoneFalseNoneFalse2358028.4520
3145093108260NoneMI013Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.95160.35FalseNoneNoneFalseNoneFalse121056.23250
17163814470000NoneNoneDam and Allied worksIMPROVEMENTS OF RAYPURA VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT16030029.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145094108261NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65180.0FalseNoneNoneFalseNoneFalse74277.00
3145095108261NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7723345.0FalseNoneNoneFalseNoneFalse624945.650
3145096108261NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.021200.0FalseNoneNoneFalseNoneFalse63624.00
3145097108261NoneMI004Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.71875.9FalseNoneNoneFalseNoneFalse894241.530
3145098108261NoneMI005Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.6337.5FalseNoneNoneFalseNoneFalse131827.50
3145099108261NoneMI006Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.7512000.0FalseNoneNoneFalseNoneFalse9261000.00
3145100108261NoneMI007Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.1223.36FalseNoneNoneFalseNoneFalse23921.8560
3145101108261NoneMI008Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.15.2FalseNoneNoneFalseNoneFalse485077.320
3145102108261NoneMI009Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75224.69FalseNoneNoneFalseNoneFalse1640854.89750
3145103108261NoneMI010Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.5216.0FalseNoneNoneFalseNoneFalse56700.00
3145104108261NoneMI011Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3547.12FalseNoneNoneFalseNoneFalse300170.8920
3145105108261NoneMI012Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39187.65FalseNoneNoneFalseNoneFalse1275905.53350
3145106108261NoneMI013Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.9567.4FalseNoneNoneFalseNoneFalse50883.630
3145107108261NoneMI014Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm477.75477.752400.0FalseNoneNoneFalseNoneFalse1146600.00
17163814470000NoneNoneDam and Allied worksIMPROVEMENTS OF HOSAHALLI KERE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT17048089.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145108108262NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65114.0FalseNoneNoneFalseNoneFalse47042.10
3145109108262NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7728716.0FalseNoneNoneFalseNoneFalse768727.320
3145110108262NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.029572.0FalseNoneNoneFalseNoneFalse507507.440
3145111108262NoneMI004Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.714387.68FalseNoneNoneFalseNoneFalse6858607.0560
3145112108262NoneMI005Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.61350.0FalseNoneNoneFalseNoneFalse527310.00
3145113108262NoneMI006Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.753292.5FalseNoneNoneFalseNoneFalse2540986.8750
3145114108262NoneMI007Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.1487.09FalseNoneNoneFalseNoneFalse52167.3390
3145115108262NoneMI008Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.15.3077FalseNoneNoneFalseNoneFalse495124.017570
3145116108262NoneMI009Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75385.03FalseNoneNoneFalseNoneFalse2811777.83250
3145117108262NoneMI010Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.51154.25FalseNoneNoneFalseNoneFalse302990.6250
3145118108262NoneMI011Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3532.53FalseNoneNoneFalseNoneFalse207227.48550
3145119108262NoneMI012Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39235.09FalseNoneNoneFalseNoneFalse1598468.59510
3145120108262NoneMI013Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne198450.0198450.00.44FalseNoneNoneFalseNoneFalse87318.00
3145121108262NoneMI014Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne185325.0185325.00.58FalseNoneNoneFalseNoneFalse107488.50
3145122108262NoneMI015Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne50085.050085.01.46FalseNoneNoneFalseNoneFalse73124.10
3145123108262NoneMI016Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m2073.752073.7510.0FalseNoneNoneFalseNoneFalse20737.50
3145124108262NoneMI017Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.9554.95FalseNoneNoneFalseNoneFalse41484.50250
17163814500000NoneNoneDam and Allied worksIMPROVEMENTS OF LOKIKERE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT19719626.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145125108263NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65440.0FalseNoneNoneFalseNoneFalse181566.00
3145126108263NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7738988.0FalseNoneNoneFalseNoneFalse1043708.760
3145127108263NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.0212446.0FalseNoneNoneFalseNoneFalse659886.920
3145128108263NoneMI004De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum98.798.76500.0FalseNoneNoneFalseNoneFalse641550.00
3145129108263NoneMI005Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.714427.61FalseNoneNoneFalseNoneFalse6877641.6870
3145130108263NoneMI006Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.61950.0FalseNoneNoneFalseNoneFalse761670.00
3145131108263NoneMI007Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.752385.0FalseNoneNoneFalseNoneFalse1840623.750
3145132108263NoneMI008Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.1682.43FalseNoneNoneFalseNoneFalse73088.2530
3145133108263NoneMI009Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.18.818FalseNoneNoneFalseNoneFalse822579.19380
3145134108263NoneMI010Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75371.13FalseNoneNoneFalseNoneFalse2710269.60750
3145135108263NoneMI011Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.51856.25FalseNoneNoneFalseNoneFalse487265.6250
3145136108263NoneMI012Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3556.79FalseNoneNoneFalseNoneFalse361772.17650
3145137108263NoneMI013Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39420.51FalseNoneNoneFalseNoneFalse2859211.48890
3145138108263NoneMI014Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne198450.0198450.00.44FalseNoneNoneFalseNoneFalse87318.00
3145139108263NoneMI015Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne185325.0185325.00.58FalseNoneNoneFalseNoneFalse107488.50
3145140108263NoneMI016Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne50085.050085.01.46FalseNoneNoneFalseNoneFalse73124.10
3145141108263NoneMI017Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m2073.752073.7510.0FalseNoneNoneFalseNoneFalse20737.50
3145142108263NoneMI018Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum754.95754.95145.87FalseNoneNoneFalseNoneFalse110124.55650
17163814500000NoneNoneDam and Allied worksIMPROVEMENTS OF APPAYANAHALLI VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT24317447.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145143108264NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65411.759FalseNoneNoneFalseNoneFalse169912.351350
3145144108264NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.771535.0FalseNoneNoneFalseNoneFalse41091.950
3145145108264NoneMI003Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.72510.91FalseNoneNoneFalseNoneFalse1196950.7970
3145146108264NoneMI004Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.752754.0FalseNoneNoneFalseNoneFalse2125399.50
3145147108264NoneMI005Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.132.35FalseNoneNoneFalseNoneFalse3464.6850
3145148108264NoneMI006Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6369.36369.3267.15FalseNoneNoneFalseNoneFalse1701558.4950
3145149108264NoneMI007Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum8688.758688.751195.9616FalseNoneNoneFalseNoneFalse10391411.3520
3145150108264NoneMI008Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.5546.75FalseNoneNoneFalseNoneFalse143521.8750
3145151108264NoneMI009Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3532.35FalseNoneNoneFalseNoneFalse206080.82250
3145152108264NoneMI010Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm477.75477.7511200.0FalseNoneNoneFalseNoneFalse5350800.00
3145153108264NoneMI011Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum581.7581.73305.0FalseNoneNoneFalseNoneFalse1922518.50
3145154108264NoneMI012Providing and constructing coursed rubble ( size stone ) face stone masonry in CM 1 : 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour, ramps,cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing and all other ancillary operations complete with all leads and lifts upto 1.5 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum4741.84741.840.5FalseNoneNoneFalseNoneFalse192042.90
3145155108264NoneMI013Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/ stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm450.45450.45112.5FalseNoneNoneFalseNoneFalse50675.6250
3145156108264NoneMI014Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each283.5283.568.0FalseNoneNoneFalseNoneFalse19278.00
3145157108264NoneMI015Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum254.1254.12661.23FalseNoneNoneFalseNoneFalse676218.5430
3145158108264NoneMI016Providing and fixing tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m90.390.3982.53FalseNoneNoneFalseNoneFalse88722.4590
3145159108264NoneMI017Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / essages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each9450.09450.04.0FalseNoneNoneFalseNoneFalse37800.00
17163814500000NoneNoneDam and Allied worksMPROVEMENTS OF GADDABOMMANAHALLI VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT56677452.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145160108265NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.651898.5FalseNoneNoneFalseNoneFalse783416.0250
3145161108265NoneMI002De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum98.798.713200.0FalseNoneNoneFalseNoneFalse1302840.00
3145162108265NoneMI003Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.758050.0FalseNoneNoneFalseNoneFalse6212587.50
3145163108265NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.191.5FalseNoneNoneFalseNoneFalse9799.650
3145164108265NoneMI005Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6369.36369.3649.0FalseNoneNoneFalseNoneFalse4133675.70
3145165108265NoneMI006Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum8688.758688.752874.472FalseNoneNoneFalseNoneFalse24975568.590
3145166108265NoneMI007Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.16.5789FalseNoneNoneFalseNoneFalse613706.765490
3145167108265NoneMI008Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75107.799FalseNoneNoneFalseNoneFalse787229.147250
3145168108265NoneMI009Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.3981.0FalseNoneNoneFalseNoneFalse550750.590
3145169108265NoneMI010Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne198450.0198450.00.5705FalseNoneNoneFalseNoneFalse113215.7250
3145170108265NoneMI011Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne185325.0185325.00.3804FalseNoneNoneFalseNoneFalse70497.630
3145171108265NoneMI012Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm477.75477.7510360.0FalseNoneNoneFalseNoneFalse4949490.00
3145172108265NoneMI013Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each283.5283.5201.0FalseNoneNoneFalseNoneFalse56983.50
3145173108265NoneMI014Providing and fixing tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m90.390.32360.994FalseNoneNoneFalseNoneFalse213197.75820
3145174108265NoneMI015Providing compacted embankment for field irrigation channels with gravelly soil from approved borrow area in layers of 100 to 150 mm thickness (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading in layer of specified thickness, sorting-out, breaking clods, levelling, watering, compacting as directed, dressing sides to required slope and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum513.45513.457875.951FalseNoneNoneFalseNoneFalse4043907.040950
3145175108265NoneMI016Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum254.1254.19772.286FalseNoneNoneFalseNoneFalse2483137.87260
3145176108265NoneMI017Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m353.85353.856000.0FalseNoneNoneFalseNoneFalse2123100.00
3145177108265NoneMI018Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35204.774FalseNoneNoneFalseNoneFalse1304482.05090
3145178108265NoneMI019Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7129.467129.46215.657FalseNoneNoneFalseNoneFalse1537517.955220
3145179108265NoneMI020Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 1000 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m5746.655746.6510.0FalseNoneNoneFalseNoneFalse57466.50
3145180108265NoneMI021Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 800 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m4532.854532.8510.0FalseNoneNoneFalseNoneFalse45328.50
3145181108265NoneMI022Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 700 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3804.153804.1520.0FalseNoneNoneFalseNoneFalse76083.00
3145182108265NoneMI023Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 600 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m3297.03297.010.0FalseNoneNoneFalseNoneFalse32970.00
3145183108265NoneMI024Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 500 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m2722.652722.6510.0FalseNoneNoneFalseNoneFalse27226.50
3145184108265NoneMI025Providing hearting / casing embankment using homogeneous approved soil from borrow areas in layers of 250 to 300 mm ( before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum642.6642.653.568FalseNoneNoneFalseNoneFalse34422.79680
3145185108265NoneMI026Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey RCC NP3 Class piple 250 mm dia,.etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)m1157.11157.1120.0FalseNoneNoneFalseNoneFalse138852.00
17163814500000NoneNoneDam and Allied worksIMPROVEMENTS OF KUDLIGI BIG VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT13902665.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145186108266NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65837.5FalseNoneNoneFalseNoneFalse345594.3750
3145187108266NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.7734253.0FalseNoneNoneFalseNoneFalse916952.810
3145188108266NoneMI003Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each53.0253.022325.0FalseNoneNoneFalseNoneFalse123271.50
3145189108266NoneMI004De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum98.798.711100.0FalseNoneNoneFalseNoneFalse1095570.00
3145190108266NoneMI005Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum476.7476.711792.89FalseNoneNoneFalseNoneFalse5621670.6630
3145191108266NoneMI006Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm390.6390.6216.0FalseNoneNoneFalseNoneFalse84369.60
3145192108266NoneMI007Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.751860.0FalseNoneNoneFalseNoneFalse1435455.00
3145193108266NoneMI008Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.13159.94FalseNoneNoneFalseNoneFalse338429.5740
3145194108266NoneMI009Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2686.952686.951000.0FalseNoneNoneFalseNoneFalse2686950.00
3145195108266NoneMI010Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.7524.75FalseNoneNoneFalseNoneFalse180743.06250
3145196108266NoneMI011Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum262.5262.53138.75FalseNoneNoneFalseNoneFalse823921.8750
3145197108266NoneMI012Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.3537.69FalseNoneNoneFalseNoneFalse240098.49150
3145198108266NoneMI013Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each283.5283.534.0FalseNoneNoneFalseNoneFalse9639.00
17163814500000NoneNoneDam and Allied worksCONSTRUCTION OF SIDDAPURA VILLAGE NEW TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT44085254.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3145199108267NoneMI001Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)100 Sqm412.65412.65540.0FalseNoneNoneFalseNoneFalse222831.00
3145200108267NoneMI002Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Each26.7726.779560.0FalseNoneNoneFalseNoneFalse255921.20
3145201108267NoneMI003Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm771.75771.759000.0FalseNoneNoneFalseNoneFalse6945750.00
3145202108267NoneMI004Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum107.1107.16937.85FalseNoneNoneFalseNoneFalse743043.7350
3145203108267NoneMI005Providing cut-off trench filling using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering,compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum542.85542.851943.5FalseNoneNoneFalseNoneFalse1055028.9750
3145204108267NoneMI006Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Tonne93284.193284.18.1592FalseNoneNoneFalseNoneFalse761123.628720
3145205108267NoneMI007Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges /sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum660.45660.4513871.34FalseNoneNoneFalseNoneFalse9161326.5030
3145206108267NoneMI008Providing hearting / casing embankment using homogeneous approved soil from borrow areas in layers of 250 to 300 mm ( before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum642.6642.67552.5FalseNoneNoneFalseNoneFalse4853236.50
3145207108267NoneMI009Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down approved clean, hard, graded aggregates satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compaction and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2171.42171.431.44FalseNoneNoneFalseNoneFalse68268.8160
3145208108267NoneMI010Providing and constructing graded filter media below and behind rock-toe consisting of 200 mm thick sand, 150 mm thick 20 mm down and 150 mm thick 40 mm down clean, hard, graded coarse aggregate layers satisfying specified filter criteria behind rock-toe and 150 mm thick sand, 200 mm thick 20 mm down and 650 mm thick 40 mm down clean, hard, graded coarse aggregate layers satisfying specified filter criteria below rock-toe including cost of all materials, machinery, labour, laying to specified thickness and slope, compaction and all other ancillary operations complete as perspecifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2017.052017.05486.0FalseNoneNoneFalseNoneFalse980286.30
3145209108267NoneMI011Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery,labour, hand packing rubble and stone chips, finishing top and sides to be required slopes and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1456.351456.352025.0FalseNoneNoneFalseNoneFalse2949108.750
3145210108267NoneMI012Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings Sand layer .etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2196.62196.6282.63FalseNoneNoneFalseNoneFalse620825.0580
3145211108267NoneMI013Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings 20 mm down graded coarse aggregate layer .etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2064.32064.3211.98FalseNoneNoneFalseNoneFalse437590.3140
3145212108267NoneMI014Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum2686.952686.95337.5FalseNoneNoneFalseNoneFalse906845.6250
3145213108267NoneMI015Providing and laying 60mm thick factory made precast M-30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification).etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm1121.41121.42250.0FalseNoneNoneFalseNoneFalse2523150.00
3145214108267NoneMI016Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra).etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) 600x300x150m486.15486.151800.0FalseNoneNoneFalseNoneFalse875070.00
3145215108267NoneMI017Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum1341.91341.9145.26FalseNoneNoneFalseNoneFalse194924.3940
3145216108267NoneMI018Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Sqm407.4407.48400.0FalseNoneNoneFalseNoneFalse3422160.00
3145217108267NoneMI019Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum7302.757302.75322.23FalseNoneNoneFalseNoneFalse2353165.13250
3145218108267NoneMI020Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum99.7599.7510800.0FalseNoneNoneFalseNoneFalse1077300.00
3145219108267NoneMI021Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6370.356370.35175.52FalseNoneNoneFalseNoneFalse1118123.8320
3145220108267NoneMI022Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS)Cum6799.396799.39376.53FalseNoneNoneFalseNoneFalse2560174.31670
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17163814520000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17163814520001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17163814520001NoneNoneELIGIBILITYContractor Registration certificate (Class 1 and Above)None
17163814520000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17163814520000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17163820060000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17163820120000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17163820210000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17163820280000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17163820370000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17163820430000NoneNoneELIGIBILITYThe tenderer should maintain the scheme during the defective liability period.None
17163820520000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17163820580001NoneNoneELIGIBILITYThe tenderer shall scan & upload all the original documents required for this bid to the KPPP portal. The Original Documents shall be produced at the time of opening of Bid for physical verification.None
17163820640000NoneNoneELIGIBILITYEPF & ESI Registration Certificate of Contractor with latest challan should be uploaded.None
17163820740000NoneNoneELIGIBILITYDuring the execution of work, if any minor minerals are required contractors have to abide by the Karnataka Minor Mineral Concession Rules 1994 (as amended up to date). As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the Mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If Mineral Dispatch Permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty and DMF contribution as per Karnataka Minor Mineral concession rules 1994 (as amended from time to time) will be deducted from contractors bills at the time of payment.None
17163820830000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17163821690000NoneNoneELIGIBILITYDrawings uploaded are for TENDER PURPOSE only.None
17163821910000NoneNoneELIGIBILITYThe contractor has to furnish Additional performance security deposit of an amount equal to the difference in the amount put to tender and the tendered amount in addition to security deposit of 5% of contract price.None
17163821980000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only at his own cost. And these materials will have to be got tested by the competent authority before put to use and certificate shall be submitted.None
17163822060000NoneNoneELIGIBILITYThe necessary certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached duly attested to e-tender document. The original certificates/document shall be produced on or before stipulated date and time for verification. Scanned signature of bidder/authorized representative of the bidder shall be attached while up loading bid document.None
17163822150000NoneNoneELIGIBILITYEach item of BOQ to be read as with all lead and lifts and as per the directions of Engineer in charge.None
17163822370000NoneNoneELIGIBILITYA copy of GST registration certificate to be uploaded.None
17163822460000NoneNoneELIGIBILITYLatest copy of the GST Clearance Certificate to be uploaded.None
17163822530000NoneNoneELIGIBILITYIT Returns for past 5 years with Profit & loss statement and Balance sheet.None
17163822610000NoneNoneELIGIBILITYLatest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos to be uploaded.None
17163824140000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds good.None
17163824210000NoneNoneELIGIBILITYIncomplete tender documents will be rejected.None
17163824270000NoneNoneELIGIBILITYCorrigendum will be published in web site for all modifications/corrections if any.None
17163824350000NoneNoneELIGIBILITYThe contractor /firm shall send the authorization letter for the representatives duly attesting their signature.None
17163824430000NoneNoneELIGIBILITYThe intending bidder are advised to visit the site of work before submission of the tenders.None
17163824500000NoneNoneELIGIBILITYIf any of the Contractor who have been black listed as per Government order are not eligible to participate in this tender.None
17163824590000NoneNoneELIGIBILITYAs per the Karnataka building and other construction workers welfare cess act 1996 1 % of the bill amount will be deducted from the bill.None
17163824730000NoneNoneELIGIBILITYThe tender Processing charges paid by the bidder are not refundable even if the tender is cancelled.None
17163824810000NoneNoneELIGIBILITYThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.None
17163824880000NoneNoneELIGIBILITYFurther information can be had from the office of the Executive Engineer, Minor Irrigation & Ground Water Development Division, Ballari during the office Hours.None
17163824950000NoneNoneELIGIBILITYThe work done certificate shall be issued not below the rank of Executive Engineer.None
17163825020000NoneNoneELIGIBILITYAll relevant documents as per KW-4 need to be uploaded while submitting bid in general documents provision in KPPP portal.None
17163825180000NoneNoneELIGIBILITYThe Bidder Shall quote Rates by adding GST 18% (for materials and Labour). All other duties (Including recovered from the contractor bill) taxes and other levies payable by the contractor under the contract or for any other cause shall be included in the total tender price submitted by the tenderer.None
17163825260000NoneNoneELIGIBILITYAnnual turnover certificate along with Balance sheet certified / attested by Chartered Accountants should be uploaded with 18-Digitis system generated unique number (UDIN Number)None
17163826380000NoneNoneELIGIBILITYSecurity deposit should be in the form of e-bank guaranteeNone
17163826650000NoneNoneELIGIBILITYA field lab shall be established by the agency to perform necessary quality control test.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSatisfactorily completed (at least 90% of the contract value), in the last five years (i.e. 2019-20 to 2023-24), as a prime contractor, at least one Similar work such as Construction of check dam/pick up/ Barrage cum Bridge/ Anecut/ check dam cum cause way/Cluster of Check dams / Bandaras / Tank improvements / construction of new tank of value not less than Rs. 2643.50 lakhs (Inclusive of GST) The weightage of 10% will be given per year to bring them to the price level of the FY 2024-25.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneExecuted in any one year, during the last five years 2019-20 to 2023-24 the following minimum quantities of work 1 Earthwork Excavation and Embankment 306382.00 cum 2 Cement concrete in Cum than M20 grade 15302.00 cum 3 Supply and Reinforcement steel 178.00 Tonne 4 Pitching and Revetment 87852.00 SqmCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years i.e. 2019-20 to 2023-24 (updated to 2024-25 price level) taking into account the completed as well as works in progress. N, Number of years (12 months)prescribed for completion of the works for which tenders are invited. B, Value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next 12 months (12/12-1) year i.e. period of completion of the works for which Tenders are invited.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Documents as per Section 3 of Bid Document.
NoneNoneNoneNoneSection 3, Qualification InformationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section 3, Qualification Information
NoneNoneNoneNoneAchieved in at least two financial years during the last five years (i.e. 2019-20 to 2023-24) a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.10573.50 Lakhs. (Inclusive of GST) Financial turn over of previous years will be given a weightage of 10% per year to bring to them to the price level of the FY 2024-25.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Profit & Loss Accounts Satement issued by the Chartered Accountant
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of not less than Rs.1681.62 Lakhs (Inclusive of GST) Lakhs Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etcFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneContractor Registration certificate, Class I and Above,OthersContractor Registration certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Attested copy of Registration certificate
NoneNoneNoneNoneEach Tenderer should further demonstrate (a)Availability by owning at least 50% of the required specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease or hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished. 1.Excavator 4 Nos, 2.Lorry / Tipper 6 Nos, 3. Self-loading Concrete Mixer/Concrete mixer 4 Nos 4. Compactor/vibratory Roller/Power roller 02 NosOthersDetails of machinery and Equipments available
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Owners availability of equipments in format as Sl. No 1.6 in qualification information.
NoneNoneNoneNoneThe Bidder Shall quote Rates by adding GST 18% (for materials and Labour). All other duties (Including recovered from the contractor bill) taxes and other levies payable by the contractor under the contract or for any other cause shall be included in the total tender price submitted by the tenderer.OthersGST
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- GST
NoneNoneNoneNoneSecurity deposit should be in the form of e-bank guaranteeOthersSecurity deposit should be in the form of e-bank guarantee
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Security deposit should be in the form of e-bank guarantee
NoneNoneNoneNoneA Separate Tender will be invited for third party inspection and same shall evaluate the project.OthersA Separate Tender will be invited for third party inspection and same shall evaluate the project.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- A Separate Tender will be invited for third party inspection and same shall evaluate the project.
NoneNoneNoneNoneA field lab shall be established by the agency to perform necessary quality control test.OthersA field lab shall be established by the agency to perform necessary quality control test.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- A field lab shall be established by the agency to perform necessary quality control test.
NoneNoneNoneNoneEPF & ESI Registration Certificate of Contractor with latest challan should be uploaded.OthersEPF & ESI Registration Certificate of Contractor with latest challan should be uploaded.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- EPF & ESI Registration Certificate of Contractor with latest challan should be uploaded.
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Achieved in at least two financial years during the last five years ie 2019 20 to 2023 24 a minimum financial turnover in all classes of civil engineering construction works only of Rs.10573.50 Lakhs Inclusive of GST Financial turn over of previous years will be given a weightage of 10percent per year to bring to them to the price level of the FY2024 25TrueTechnical Bid
Contractor Registration certificate, Class I and Above,TrueTechnical Bid
Satisfactorily completed at least 90percent of contract value in the last five years i.e. 2019-20 to 2023 24 as a prime contractor, at least one Similar work such as Construction of check dam or pick up or Barrage cum Bridge or Anecut or check dam cum cause way orCluster of Check dams orBandaras orTank improvements orconstruction of new tank of value not less than Rs.2643.50 lakhs Inclusive of GST The weightage of 10percent will be given per year to bring them to the price level of the FY2024 25TrueTechnical Bid
Executed in any one year during the last five years 2019 20 to 2023 24 the following minimum quantities of work 1 Earthwork Excavation and Embankment 306382.00 cum 2 Cement concrete in Cum than M20 grade 15302.00 cum 3 Supply and Reinforcement steel 178.00 Tonne 4 Pitching and Revetment 87852.00 SqmTrueTechnical Bid
Liquid assets and or availability of credit facilities of not less than Rs.1681.62 Lakhs Inclusive of GST Credit lines or letter of credit or certificates from banks for meeting the fund requirement etcTrueTechnical Bid
Each Tenderer should further demonstrate a.Availability by owning at least 50percent of the required specified key and critical equipment for this work and b.the remaining 50percent can be deployed on lease orhire basis for all works provided the relevant documents commitment agreements etc. for availability for this work are furnished 1 Excavator 4 Nos 2 Lorry or Tipper 6 Nos 3 Self loading Concrete Mixer or Concrete mixer 4 Nos 4 Compactor or vibratory Roller or Power roller 02 NosTrueTechnical Bid
Security deposit should be in the form of e-bank guaranteeTrueTechnical Bid
A Separate Tender will be invited for third party inspection and same shall evaluate the project.TrueTechnical Bid
A field lab shall be established by the agency to perform necessary quality control test.TrueTechnical Bid
EPF & ESI Registration Certificate of Contractor with latest challan should be uploaded.TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1716458014000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, M.I. and G W D Division
streetNone
cityBALLARI
stateKarnataka
pin583104
tenderRecallDTONone