tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR JANGAMANA GUDDA VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 11055143.22 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144841 | 108245 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 30.0 | False | None | None | False | None | False | 12379.5 | 0 | 3144842 | 108245 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 15.0 | False | None | None | False | None | False | 401.55 | 0 | 3144843 | 108245 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 10.0 | False | None | None | False | None | False | 530.2 | 0 | 3144844 | 108245 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 2749.69 | False | None | None | False | None | False | 294491.799 | 0 | 3144845 | 108245 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 5517.01 | False | None | None | False | None | False | 2461965.7125 | 0 | 3144846 | 108245 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 90.62 | False | None | None | False | None | False | 577281.117 | 0 | 3144847 | 108245 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 436.51 | False | None | None | False | None | False | 2968001.7289 | 0 | 3144848 | 108245 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 419.36 | False | None | None | False | None | False | 3062481.24 | 0 | 3144849 | 108245 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works. etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 8.7186 | False | None | None | False | None | False | 813306.75426 | 0 | 3144850 | 108245 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 886.5 | False | None | None | False | None | False | 441211.05 | 0 | 3144851 | 108245 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 420.0 | False | None | None | False | None | False | 171108.0 | 0 | 3144852 | 108245 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 136.85 | False | None | None | False | None | False | 183639.015 | 0 | 3144853 | 108245 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 15.0 | False | None | None | False | None | False | 52526.25 | 0 | 3144854 | 108245 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144855 | 108245 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR BADALADAKU SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 12865588.57 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144856 | 108246 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 60.8 | False | None | None | False | None | False | 25089.12 | 0 | 3144857 | 108246 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 30.4 | False | None | None | False | None | False | 813.808 | 0 | 3144858 | 108246 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 20.2666 | False | None | None | False | None | False | 1074.535132 | 0 | 3144859 | 108246 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 10988.61 | False | None | None | False | None | False | 1176880.131 | 0 | 3144860 | 108246 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 599.66 | False | None | None | False | None | False | 267598.275 | 0 | 3144861 | 108246 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 111.86 | False | None | None | False | None | False | 712587.351 | 0 | 3144862 | 108246 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 557.52 | False | None | None | False | None | False | 3790795.9128 | 0 | 3144863 | 108246 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 504.42 | False | None | None | False | None | False | 3683653.155 | 0 | 3144864 | 108246 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 9.8655 | False | None | None | False | None | False | 920294.28855 | 0 | 3144865 | 108246 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 2531.25 | False | None | None | False | None | False | 1259803.125 | 0 | 3144866 | 108246 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1430.0 | False | None | None | False | None | False | 582582.0 | 0 | 3144867 | 108246 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 224.925 | False | None | None | False | None | False | 301826.8575 | 0 | 3144868 | 108246 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 36.0 | False | None | None | False | None | False | 126063.0 | 0 | 3144869 | 108246 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144870 | 108246 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 20.0 | False | None | None | False | None | False | 7077.0 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUNASAGARA VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 12366255.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144871 | 108247 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 40.0 | False | None | None | False | None | False | 16506.0 | 0 | 3144872 | 108247 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 20.0 | False | None | None | False | None | False | 535.4 | 0 | 3144873 | 108247 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 13.3333 | False | None | None | False | None | False | 706.931566 | 0 | 3144874 | 108247 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 7206.17 | False | None | None | False | None | False | 771780.807 | 0 | 3144875 | 108247 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 493.42 | False | None | None | False | None | False | 220188.675 | 0 | 3144876 | 108247 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 115.64 | False | None | None | False | None | False | 736667.274 | 0 | 3144877 | 108247 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 625.46 | False | None | None | False | None | False | 4252746.4694 | 0 | 3144878 | 108247 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 404.51 | False | None | None | False | None | False | 2954035.4025 | 0 | 3144879 | 108247 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 10.6354 | False | None | None | False | None | False | 992113.71714 | 0 | 3144880 | 108247 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 2493.75 | False | None | None | False | None | False | 1241139.375 | 0 | 3144881 | 108247 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1800.0 | False | None | None | False | None | False | 733320.0 | 0 | 3144882 | 108247 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 174.825 | False | None | None | False | None | False | 234597.6675 | 0 | 3144883 | 108247 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 56.0 | False | None | None | False | None | False | 196098.0 | 0 | 3144884 | 108247 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 80.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144885 | 108247 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HULIKERE VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 15192511.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144886 | 108248 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 80.0 | False | None | None | False | None | False | 33012.0 | 0 | 3144887 | 108248 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 40.0 | False | None | None | False | None | False | 1070.8 | 0 | 3144888 | 108248 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 26.6666 | False | None | None | False | None | False | 1413.863132 | 0 | 3144889 | 108248 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depthetc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 8642.55 | False | None | None | False | None | False | 925617.105 | 0 | 3144890 | 108248 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 379.46 | False | None | None | False | None | False | 169334.025 | 0 | 3144891 | 108248 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 127.87 | False | None | None | False | None | False | 814576.6545 | 0 | 3144892 | 108248 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 717.9 | False | None | None | False | None | False | 4881282.081 | 0 | 3144893 | 108248 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 504.36 | False | None | None | False | None | False | 3683214.99 | 0 | 3144894 | 108248 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.8009 | False | None | None | False | None | False | 1100836.33569 | 0 | 3144895 | 108248 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 3657.5 | False | None | None | False | None | False | 1820337.75 | 0 | 3144896 | 108248 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2640.0 | False | None | None | False | None | False | 1075536.0 | 0 | 3144897 | 108248 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 243.9 | False | None | None | False | None | False | 327289.41 | 0 | 3144898 | 108248 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 98.0 | False | None | None | False | None | False | 343171.5 | 0 | 3144899 | 108248 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144900 | 108248 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR KAKUPPI (SITE-4) VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 17578003.77 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144901 | 108249 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 97.5 | False | None | None | False | None | False | 40233.375 | 0 | 3144902 | 108249 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 48.75 | False | None | None | False | None | False | 1305.0375 | 0 | 3144903 | 108249 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 32.5 | False | None | None | False | None | False | 1723.15 | 0 | 3144904 | 108249 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 22344.36 | False | None | None | False | None | False | 2393080.956 | 0 | 3144905 | 108249 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 519.64 | False | None | None | False | None | False | 231889.35 | 0 | 3144906 | 108249 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 181.61 | False | None | None | False | None | False | 1156919.2635 | 0 | 3144907 | 108249 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 969.41 | False | None | None | False | None | False | 6591396.6599 | 0 | 3144908 | 108249 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 363.74 | False | None | None | False | None | False | 2656302.285 | 0 | 3144909 | 108249 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 15.5781 | False | None | None | False | None | False | 1453189.03821 | 0 | 3144910 | 108249 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 3375.0 | False | None | None | False | None | False | 1679737.5 | 0 | 3144911 | 108249 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1800.0 | False | None | None | False | None | False | 733320.0 | 0 | 3144912 | 108249 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 277.5 | False | None | None | False | None | False | 372377.25 | 0 | 3144913 | 108249 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 72.0 | False | None | None | False | None | False | 252126.0 | 0 | 3144914 | 108249 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144915 | 108249 | None | MI005 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 14.0 | False | None | None | False | None | False | 4953.9 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR ADAVISOORANAHALLI VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 17826645.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144916 | 108250 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 33.0 | False | None | None | False | None | False | 13617.45 | 0 | 3144917 | 108250 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 16.5 | False | None | None | False | None | False | 441.705 | 0 | 3144918 | 108250 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 11.0 | False | None | None | False | None | False | 583.22 | 0 | 3144919 | 108250 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 29234.72 | False | None | None | False | None | False | 3131038.512 | 0 | 3144920 | 108250 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 413.28 | False | None | None | False | None | False | 184426.2 | 0 | 3144921 | 108250 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 131.17 | False | None | None | False | None | False | 835598.8095 | 0 | 3144922 | 108250 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 594.14 | False | None | None | False | None | False | 4039789.5746 | 0 | 3144923 | 108250 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 714.16 | False | None | None | False | None | False | 5215331.94 | 0 | 3144924 | 108250 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 10.8364 | False | None | None | False | None | False | 1010863.82124 | 0 | 3144925 | 108250 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 2341.75 | False | None | None | False | None | False | 1165488.975 | 0 | 3144926 | 108250 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 2555.0 | False | None | None | False | None | False | 1040907.0 | 0 | 3144927 | 108250 | None | MI012 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 99.75 | 99.75 | 412.5 | False | None | None | False | None | False | 41146.875 | 0 | 3144928 | 108250 | None | MI013 | Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 260.125 | False | None | None | False | None | False | 349061.7375 | 0 | 3144929 | 108250 | None | MI014 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 70.0 | False | None | None | False | None | False | 245122.5 | 0 | 3144930 | 108250 | None | MI015 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144931 | 108250 | None | MI016 | Providing hearting embankment using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 531.3 | 531.3 | 440.0 | False | None | None | False | None | False | 233772.0 | 0 | 3144932 | 108250 | None | MI017 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 632.5 | False | None | None | False | None | False | 301512.75 | 0 | 3144933 | 108250 | None | MI018 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 24.0 | False | None | None | False | None | False | 8492.4 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR JERMALI SITE-2 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 14384159.13 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144934 | 108251 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 56.79 | False | None | None | False | None | False | 23434.3935 | 0 | 3144935 | 108251 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 28.395 | False | None | None | False | None | False | 760.13415 | 0 | 3144936 | 108251 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 18.93 | False | None | None | False | None | False | 1003.6686 | 0 | 3144937 | 108251 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 8707.82 | False | None | None | False | None | False | 932607.522 | 0 | 3144938 | 108251 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to completeIn ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 5434.33 | False | None | None | False | None | False | 2425069.7625 | 0 | 3144939 | 108251 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 121.13 | False | None | None | False | None | False | 771640.4955 | 0 | 3144940 | 108251 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 531.79 | False | None | None | False | None | False | 3615847.6081 | 0 | 3144941 | 108251 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 403.66 | False | None | None | False | None | False | 2947828.065 | 0 | 3144942 | 108251 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.8664 | False | None | None | False | None | False | 1106946.44424 | 0 | 3144943 | 108251 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 1578.75 | False | None | None | False | None | False | 785743.875 | 0 | 3144944 | 108251 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 895.0 | False | None | None | False | None | False | 364623.0 | 0 | 3144945 | 108251 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 180.3 | False | None | None | False | None | False | 241944.57 | 0 | 3144946 | 108251 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 56.0 | False | None | None | False | None | False | 196098.0 | 0 | 3144947 | 108251 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144948 | 108251 | None | MI015 | Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and
fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3822.0 | 3822.0 | 250.0 | False | None | None | False | None | False | 955500.0 | 0 | 3144949 | 108251 | None | MI016 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HARAVADI VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 12295303.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144950 | 108252 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 58.5 | False | None | None | False | None | False | 24140.025 | 0 | 3144951 | 108252 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 29.25 | False | None | None | False | None | False | 783.0225 | 0 | 3144952 | 108252 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 19.5 | False | None | None | False | None | False | 1033.89 | 0 | 3144953 | 108252 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 14376.68 | False | None | None | False | None | False | 1539742.428 | 0 | 3144954 | 108252 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 443.12 | False | None | None | False | None | False | 197742.3 | 0 | 3144955 | 108252 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 116.03 | False | None | None | False | None | False | 739151.7105 | 0 | 3144956 | 108252 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 535.93 | False | None | None | False | None | False | 3643997.0827 | 0 | 3144957 | 108252 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 269.93 | False | None | None | False | None | False | 1971231.3075 | 0 | 3144958 | 108252 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.7097 | False | None | None | False | None | False | 1092328.82577 | 0 | 3144959 | 108252 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 3500.0 | False | None | None | False | None | False | 1741950.0 | 0 | 3144960 | 108252 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1800.0 | False | None | None | False | None | False | 733320.0 | 0 | 3144961 | 108252 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 161.4 | False | None | None | False | None | False | 216582.66 | 0 | 3144962 | 108252 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6 - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 108.0 | False | None | None | False | None | False | 378189.0 | 0 | 3144963 | 108252 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144964 | 108252 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUDEKOTE-04 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 11163151.65 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144965 | 108253 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 38.0 | False | None | None | False | None | False | 15680.7 | 0 | 3144966 | 108253 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 19.0 | False | None | None | False | None | False | 508.63 | 0 | 3144967 | 108253 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 12.6666 | False | None | None | False | None | False | 671.583132 | 0 | 3144968 | 108253 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 8191.05 | False | None | None | False | None | False | 877261.455 | 0 | 3144969 | 108253 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 444.34 | False | None | None | False | None | False | 198286.725 | 0 | 3144970 | 108253 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 115.78 | False | None | None | False | None | False | 737559.123 | 0 | 3144971 | 108253 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 526.01 | False | None | None | False | None | False | 3576547.1339 | 0 | 3144972 | 108253 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 424.17 | False | None | None | False | None | False | 3097607.4675 | 0 | 3144973 | 108253 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 10.0563 | False | None | None | False | None | False | 938092.89483 | 0 | 3144974 | 108253 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 1898.4375 | False | None | None | False | None | False | 944852.34375 | 0 | 3144975 | 108253 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 900.0 | False | None | None | False | None | False | 366660.0 | 0 | 3144976 | 108253 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 199.375 | False | None | None | False | None | False | 267541.3125 | 0 | 3144977 | 108253 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 36.0 | False | None | None | False | None | False | 126063.0 | 0 | 3144978 | 108253 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144979 | 108253 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR GUDEKOTE-05 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 7842455.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144980 | 108254 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 40.5 | False | None | None | False | None | False | 16712.325 | 0 | 3144981 | 108254 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 20.25 | False | None | None | False | None | False | 542.0925 | 0 | 3144982 | 108254 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 13.5 | False | None | None | False | None | False | 715.77 | 0 | 3144983 | 108254 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 4846.5 | False | None | None | False | None | False | 519060.15 | 0 | 3144984 | 108254 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 280.26 | False | None | None | False | None | False | 125066.025 | 0 | 3144985 | 108254 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 55.65 | False | None | None | False | None | False | 354509.9775 | 0 | 3144986 | 108254 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 334.98 | False | None | None | False | None | False | 2277659.6622 | 0 | 3144987 | 108254 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 209.14 | False | None | None | False | None | False | 1527297.135 | 0 | 3144988 | 108254 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 6.5035 | False | None | None | False | None | False | 606673.14435 | 0 | 3144989 | 108254 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 2836.8 | False | None | None | False | None | False | 1411875.36 | 0 | 3144990 | 108254 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1600.0 | False | None | None | False | None | False | 651840.0 | 0 | 3144991 | 108254 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 54.75 | False | None | None | False | None | False | 73469.025 | 0 | 3144992 | 108254 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 75.0 | False | None | None | False | None | False | 262631.25 | 0 | 3144993 | 108254 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3144994 | 108254 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 14.0 | False | None | None | False | None | False | 4953.9 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR LINGADAHALLI SITE-4 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 13379558.48 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3144995 | 108255 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 49.5 | False | None | None | False | None | False | 20426.175 | 0 | 3144996 | 108255 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 24.75 | False | None | None | False | None | False | 662.5575 | 0 | 3144997 | 108255 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 16.5 | False | None | None | False | None | False | 874.83 | 0 | 3144998 | 108255 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 9208.43 | False | None | None | False | None | False | 986222.853 | 0 | 3144999 | 108255 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 550.41 | False | None | None | False | None | False | 245620.4625 | 0 | 3145000 | 108255 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 136.98 | False | None | None | False | None | False | 872610.543 | 0 | 3145001 | 108255 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 666.55 | False | None | None | False | None | False | 4532133.4045 | 0 | 3145002 | 108255 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 485.21 | False | None | None | False | None | False | 3543367.3275 | 0 | 3145003 | 108255 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.9036 | False | None | None | False | None | False | 1110416.61276 | 0 | 3145004 | 108255 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 1781.25 | False | None | None | False | None | False | 886528.125 | 0 | 3145005 | 108255 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1800.0 | False | None | None | False | None | False | 733320.0 | 0 | 3145006 | 108255 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 212.0 | False | None | None | False | None | False | 284482.8 | 0 | 3145007 | 108255 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 42.0 | False | None | None | False | None | False | 147073.5 | 0 | 3145008 | 108255 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3145009 | 108255 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR ARJUNACHINNENAHALLI SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT.SITE-3 | 13203773.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145010 | 108256 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 35.0 | False | None | None | False | None | False | 14442.75 | 0 | 3145011 | 108256 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 17.5 | False | None | None | False | None | False | 468.475 | 0 | 3145012 | 108256 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 11.6666 | False | None | None | False | None | False | 618.563132 | 0 | 3145013 | 108256 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 19769.94 | False | None | None | False | None | False | 2117360.574 | 0 | 3145014 | 108256 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 473.21 | False | None | None | False | None | False | 211169.9625 | 0 | 3145015 | 108256 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 102.96 | False | None | None | False | None | False | 655891.236 | 0 | 3145016 | 108256 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 476.92 | False | None | None | False | None | False | 3242765.0788 | 0 | 3145017 | 108256 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 361.96 | False | None | None | False | None | False | 2643303.39 | 0 | 3145018 | 108256 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 9.1125 | False | None | None | False | None | False | 850051.36125 | 0 | 3145019 | 108256 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 4303.125 | False | None | None | False | None | False | 2141665.3125 | 0 | 3145020 | 108256 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1870.0 | False | None | None | False | None | False | 761838.0 | 0 | 3145021 | 108256 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 173.8 | False | None | None | False | None | False | 233222.22 | 0 | 3145022 | 108256 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6.- 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 90.0 | False | None | None | False | None | False | 315157.5 | 0 | 3145023 | 108256 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3145024 | 108256 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 18.0 | False | None | None | False | None | False | 6369.3 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF CHECK DAM ACROSS HALLA NEAR HURILIHALU SITE-3 VILLAGE IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT. | 16735062.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145025 | 108257 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer-In area of light jungle.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 72.0 | False | None | None | False | None | False | 29710.8 | 0 | 3145026 | 108257 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 36.0 | False | None | None | False | None | False | 963.72 | 0 | 3145027 | 108257 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 24.0 | False | None | None | False | None | False | 1272.48 | 0 | 3145028 | 108257 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In AKS depth upto 3 m depth.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 20021.15 | False | None | None | False | None | False | 2144265.165 | 0 | 3145029 | 108257 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete In ordinary/soft rock without blasting depth exceeding 1.5m , but not exceeding 3m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 446.25 | 446.25 | 596.82 | False | None | None | False | None | False | 266330.925 | 0 | 3145030 | 108257 | None | MI006 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 170.57 | False | None | None | False | None | False | 1086590.5995 | 0 | 3145031 | 108257 | None | MI007 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 915.19 | False | None | None | False | None | False | 6222733.7341 | 0 | 3145032 | 108257 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 485.68 | False | None | None | False | None | False | 3546799.62 | 0 | 3145033 | 108257 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 14.3372 | False | None | None | False | None | False | 1337432.79852 | 0 | 3145034 | 108257 | None | MI010 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, includingcost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 497.7 | 497.7 | 1828.75 | False | None | None | False | None | False | 910168.875 | 0 | 3145035 | 108257 | None | MI011 | Providing and constructing dry size stone pitching using200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete. 300mm thick.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 1595.0 | False | None | None | False | None | False | 649803.0 | 0 | 3145036 | 108257 | None | MI012 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 280.8 | False | None | None | False | None | False | 376805.52 | 0 | 3145037 | 108257 | None | MI013 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granula material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets per Clause 1101.6. - 750 mm Diameter.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3501.75 | 3501.75 | 42.0 | False | None | None | False | None | False | 147073.5 | 0 | 3145038 | 108257 | None | MI014 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 1.0 | False | None | None | False | None | False | 9450.0 | 0 | 3145039 | 108257 | None | MI015 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 16.0 | False | None | None | False | None | False | 5661.6 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF HIREHEGADAL VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 41105153.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145040 | 108258 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 702.5 | False | None | None | False | None | False | 289886.625 | 0 | 3145041 | 108258 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 40720.0 | False | None | None | False | None | False | 1090074.4 | 0 | 3145042 | 108258 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing
off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 3000.0 | False | None | None | False | None | False | 159060.0 | 0 | 3145043 | 108258 | None | MI004 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 10625.0 | False | None | None | False | None | False | 1048687.5 | 0 | 3145044 | 108258 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 1575.0 | False | None | None | False | None | False | 615195.0 | 0 | 3145045 | 108258 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 5250.0 | False | None | None | False | None | False | 4051687.5 | 0 | 3145046 | 108258 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 5296.56 | False | None | None | False | None | False | 567261.576 | 0 | 3145047 | 108258 | None | MI008 | Providing cut-off trench filling using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering,compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 542.85 | 542.85 | 3240.0 | False | None | None | False | None | False | 1758834.0 | 0 | 3145048 | 108258 | None | MI009 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 140.0 | False | None | None | False | None | False | 891702.0 | 0 | 3145049 | 108258 | None | MI010 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 280.0 | False | None | None | False | None | False | 2432850.0 | 0 | 3145050 | 108258 | None | MI011 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 18.7615 | False | None | None | False | None | False | 1750149.64215 | 0 | 3145051 | 108258 | None | MI012 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2686.95 | 2686.95 | 350.0 | False | None | None | False | None | False | 940432.5 | 0 | 3145052 | 108258 | None | MI013 | Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3822.0 | 3822.0 | 3000.0 | False | None | None | False | None | False | 11466000.0 | 0 | 3145053 | 108258 | None | MI014 | Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges /sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 660.45 | 660.45 | 9885.0 | False | None | None | False | None | False | 6528548.25 | 0 | 3145054 | 108258 | None | MI015 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 498.88 | False | None | None | False | None | False | 3643195.92 | 0 | 3145055 | 108258 | None | MI016 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 3577.5 | False | None | None | False | None | False | 939093.75 | 0 | 3145056 | 108258 | None | MI017 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 58.86 | False | None | None | False | None | False | 374958.801 | 0 | 3145057 | 108258 | None | MI018 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 225.82 | False | None | None | False | None | False | 1535438.2498 | 0 | 3145058 | 108258 | None | MI019 | Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 198450.0 | 198450.0 | 1.32 | False | None | None | False | None | False | 261954.0 | 0 | 3145059 | 108258 | None | MI020 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 185325.0 | 185325.0 | 1.74 | False | None | None | False | None | False | 322465.5 | 0 | 3145060 | 108258 | None | MI021 | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 50085.0 | 50085.0 | 4.38 | False | None | None | False | None | False | 219372.3 | 0 | 3145061 | 108258 | None | MI022 | Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 2073.75 | 2073.75 | 30.0 | False | None | None | False | None | False | 62212.5 | 0 | 3145062 | 108258 | None | MI023 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 206.76 | False | None | None | False | None | False | 156093.462 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF SASALVADA VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 22579494.28 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145063 | 108259 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 1058.0 | False | None | None | False | None | False | 436583.7 | 0 | 3145064 | 108259 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 30131.0 | False | None | None | False | None | False | 806606.87 | 0 | 3145065 | 108259 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 8977.0 | False | None | None | False | None | False | 475960.54 | 0 | 3145066 | 108259 | None | MI004 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 56160.0 | False | None | None | False | None | False | 5542992.0 | 0 | 3145067 | 108259 | None | MI005 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 4106.75 | False | None | None | False | None | False | 1957687.725 | 0 | 3145068 | 108259 | None | MI006 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 540.0 | False | None | None | False | None | False | 210924.0 | 0 | 3145069 | 108259 | None | MI007 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 2550.0 | False | None | None | False | None | False | 1967962.5 | 0 | 3145070 | 108259 | None | MI008 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 1032.97 | False | None | None | False | None | False | 110631.087 | 0 | 3145071 | 108259 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 11.561 | False | None | None | False | None | False | 1078457.4801 | 0 | 3145072 | 108259 | None | MI010 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 593.2 | False | None | None | False | None | False | 4331991.3 | 0 | 3145073 | 108259 | None | MI011 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 612.0 | False | None | None | False | None | False | 160650.0 | 0 | 3145074 | 108259 | None | MI012 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 160.86 | False | None | None | False | None | False | 1024734.501 | 0 | 3145075 | 108259 | None | MI013 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 539.69 | False | None | None | False | None | False | 3669562.7891 | 0 | 3145076 | 108259 | None | MI014 | Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 198450.0 | 198450.0 | 0.88 | False | None | None | False | None | False | 174636.0 | 0 | 3145077 | 108259 | None | MI015 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 185325.0 | 185325.0 | 1.16 | False | None | None | False | None | False | 214977.0 | 0 | 3145078 | 108259 | None | MI016 | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | t | 50085.0 | 50085.0 | 2.92 | False | None | None | False | None | False | 146248.2 | 0 | 3145079 | 108259 | None | MI017 | Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 2073.75 | 2073.75 | 20.0 | False | None | None | False | None | False | 41475.0 | 0 | 3145080 | 108259 | None | MI018 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 301.23 | False | None | None | False | None | False | 227413.5885 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF GUDEKOTE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 16631487.84 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145081 | 108260 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 466.0 | False | None | None | False | None | False | 192294.9 | 0 | 3145082 | 108260 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 34828.0 | False | None | None | False | None | False | 932345.56 | 0 | 3145083 | 108260 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 1860.0 | False | None | None | False | None | False | 98617.2 | 0 | 3145084 | 108260 | None | MI004 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 9524.249 | False | None | None | False | None | False | 4540209.4983 | 0 | 3145085 | 108260 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 450.0 | False | None | None | False | None | False | 175770.0 | 0 | 3145086 | 108260 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 2790.0 | False | None | None | False | None | False | 2153182.5 | 0 | 3145087 | 108260 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 452.87 | False | None | None | False | None | False | 48502.377 | 0 | 3145088 | 108260 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 14.974 | False | None | None | False | None | False | 1396836.1134 | 0 | 3145089 | 108260 | None | MI009 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 534.53 | False | None | None | False | None | False | 3903538.9575 | 0 | 3145090 | 108260 | None | MI010 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 874.8 | False | None | None | False | None | False | 229635.0 | 0 | 3145091 | 108260 | None | MI011 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 75.58 | False | None | None | False | None | False | 481471.053 | 0 | 3145092 | 108260 | None | MI012 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 346.8 | False | None | None | False | None | False | 2358028.452 | 0 | 3145093 | 108260 | None | MI013 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 160.35 | False | None | None | False | None | False | 121056.2325 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF RAYPURA VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 16030029.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145094 | 108261 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 180.0 | False | None | None | False | None | False | 74277.0 | 0 | 3145095 | 108261 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 23345.0 | False | None | None | False | None | False | 624945.65 | 0 | 3145096 | 108261 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 1200.0 | False | None | None | False | None | False | 63624.0 | 0 | 3145097 | 108261 | None | MI004 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 1875.9 | False | None | None | False | None | False | 894241.53 | 0 | 3145098 | 108261 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 337.5 | False | None | None | False | None | False | 131827.5 | 0 | 3145099 | 108261 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 12000.0 | False | None | None | False | None | False | 9261000.0 | 0 | 3145100 | 108261 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 223.36 | False | None | None | False | None | False | 23921.856 | 0 | 3145101 | 108261 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 5.2 | False | None | None | False | None | False | 485077.32 | 0 | 3145102 | 108261 | None | MI009 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 224.69 | False | None | None | False | None | False | 1640854.8975 | 0 | 3145103 | 108261 | None | MI010 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 216.0 | False | None | None | False | None | False | 56700.0 | 0 | 3145104 | 108261 | None | MI011 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 47.12 | False | None | None | False | None | False | 300170.892 | 0 | 3145105 | 108261 | None | MI012 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 187.65 | False | None | None | False | None | False | 1275905.5335 | 0 | 3145106 | 108261 | None | MI013 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 67.4 | False | None | None | False | None | False | 50883.63 | 0 | 3145107 | 108261 | None | MI014 | Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 477.75 | 477.75 | 2400.0 | False | None | None | False | None | False | 1146600.0 | 0 |
| 1716381447000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF HOSAHALLI KERE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 17048089.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145108 | 108262 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 114.0 | False | None | None | False | None | False | 47042.1 | 0 | 3145109 | 108262 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 28716.0 | False | None | None | False | None | False | 768727.32 | 0 | 3145110 | 108262 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 9572.0 | False | None | None | False | None | False | 507507.44 | 0 | 3145111 | 108262 | None | MI004 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 14387.68 | False | None | None | False | None | False | 6858607.056 | 0 | 3145112 | 108262 | None | MI005 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 1350.0 | False | None | None | False | None | False | 527310.0 | 0 | 3145113 | 108262 | None | MI006 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 3292.5 | False | None | None | False | None | False | 2540986.875 | 0 | 3145114 | 108262 | None | MI007 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 487.09 | False | None | None | False | None | False | 52167.339 | 0 | 3145115 | 108262 | None | MI008 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 5.3077 | False | None | None | False | None | False | 495124.01757 | 0 | 3145116 | 108262 | None | MI009 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 385.03 | False | None | None | False | None | False | 2811777.8325 | 0 | 3145117 | 108262 | None | MI010 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 1154.25 | False | None | None | False | None | False | 302990.625 | 0 | 3145118 | 108262 | None | MI011 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 32.53 | False | None | None | False | None | False | 207227.4855 | 0 | 3145119 | 108262 | None | MI012 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 235.09 | False | None | None | False | None | False | 1598468.5951 | 0 | 3145120 | 108262 | None | MI013 | Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 198450.0 | 198450.0 | 0.44 | False | None | None | False | None | False | 87318.0 | 0 | 3145121 | 108262 | None | MI014 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 185325.0 | 185325.0 | 0.58 | False | None | None | False | None | False | 107488.5 | 0 | 3145122 | 108262 | None | MI015 | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 50085.0 | 50085.0 | 1.46 | False | None | None | False | None | False | 73124.1 | 0 | 3145123 | 108262 | None | MI016 | Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 2073.75 | 2073.75 | 10.0 | False | None | None | False | None | False | 20737.5 | 0 | 3145124 | 108262 | None | MI017 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 54.95 | False | None | None | False | None | False | 41484.5025 | 0 |
| 1716381450000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF LOKIKERE VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 19719626.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145125 | 108263 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 440.0 | False | None | None | False | None | False | 181566.0 | 0 | 3145126 | 108263 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 38988.0 | False | None | None | False | None | False | 1043708.76 | 0 | 3145127 | 108263 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 12446.0 | False | None | None | False | None | False | 659886.92 | 0 | 3145128 | 108263 | None | MI004 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 6500.0 | False | None | None | False | None | False | 641550.0 | 0 | 3145129 | 108263 | None | MI005 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 14427.61 | False | None | None | False | None | False | 6877641.687 | 0 | 3145130 | 108263 | None | MI006 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 1950.0 | False | None | None | False | None | False | 761670.0 | 0 | 3145131 | 108263 | None | MI007 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 2385.0 | False | None | None | False | None | False | 1840623.75 | 0 | 3145132 | 108263 | None | MI008 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 682.43 | False | None | None | False | None | False | 73088.253 | 0 | 3145133 | 108263 | None | MI009 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 8.818 | False | None | None | False | None | False | 822579.1938 | 0 | 3145134 | 108263 | None | MI010 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 371.13 | False | None | None | False | None | False | 2710269.6075 | 0 | 3145135 | 108263 | None | MI011 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 1856.25 | False | None | None | False | None | False | 487265.625 | 0 | 3145136 | 108263 | None | MI012 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 56.79 | False | None | None | False | None | False | 361772.1765 | 0 | 3145137 | 108263 | None | MI013 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 420.51 | False | None | None | False | None | False | 2859211.4889 | 0 | 3145138 | 108263 | None | MI014 | Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 198450.0 | 198450.0 | 0.44 | False | None | None | False | None | False | 87318.0 | 0 | 3145139 | 108263 | None | MI015 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 185325.0 | 185325.0 | 0.58 | False | None | None | False | None | False | 107488.5 | 0 | 3145140 | 108263 | None | MI016 | Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platform, railing, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 50085.0 | 50085.0 | 1.46 | False | None | None | False | None | False | 73124.1 | 0 | 3145141 | 108263 | None | MI017 | Providing, fixing and erecting 50 mm dia steel pipe railing in 3 rows duly painted on medium weight steel channels (ISMC series) 100 mm x 50 mm, 1.2 metres high above ground, 2 m centre to centre, complete as per approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 2073.75 | 2073.75 | 10.0 | False | None | None | False | None | False | 20737.5 | 0 | 3145142 | 108263 | None | MI018 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 754.95 | 754.95 | 145.87 | False | None | None | False | None | False | 110124.5565 | 0 |
| 1716381450000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF APPAYANAHALLI VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 24317447.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145143 | 108264 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 411.759 | False | None | None | False | None | False | 169912.35135 | 0 | 3145144 | 108264 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 1535.0 | False | None | None | False | None | False | 41091.95 | 0 | 3145145 | 108264 | None | MI003 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 2510.91 | False | None | None | False | None | False | 1196950.797 | 0 | 3145146 | 108264 | None | MI004 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 2754.0 | False | None | None | False | None | False | 2125399.5 | 0 | 3145147 | 108264 | None | MI005 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 32.35 | False | None | None | False | None | False | 3464.685 | 0 | 3145148 | 108264 | None | MI006 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 267.15 | False | None | None | False | None | False | 1701558.495 | 0 | 3145149 | 108264 | None | MI007 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 1195.9616 | False | None | None | False | None | False | 10391411.352 | 0 | 3145150 | 108264 | None | MI008 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 546.75 | False | None | None | False | None | False | 143521.875 | 0 | 3145151 | 108264 | None | MI009 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 32.35 | False | None | None | False | None | False | 206080.8225 | 0 | 3145152 | 108264 | None | MI010 | Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 477.75 | 477.75 | 11200.0 | False | None | None | False | None | False | 5350800.0 | 0 | 3145153 | 108264 | None | MI011 | Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 581.7 | 581.7 | 3305.0 | False | None | None | False | None | False | 1922518.5 | 0 | 3145154 | 108264 | None | MI012 | Providing and constructing coursed rubble ( size stone ) face stone masonry in CM 1 : 4 proportion by volume with stones from approved source including cost of all materials, machinery, labour, ramps,cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing and all other ancillary operations complete with all leads and lifts upto 1.5 m.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 4741.8 | 4741.8 | 40.5 | False | None | None | False | None | False | 192042.9 | 0 | 3145155 | 108264 | None | MI013 | Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/ stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 450.45 | 450.45 | 112.5 | False | None | None | False | None | False | 50675.625 | 0 | 3145156 | 108264 | None | MI014 | Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 283.5 | 283.5 | 68.0 | False | None | None | False | None | False | 19278.0 | 0 | 3145157 | 108264 | None | MI015 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 254.1 | 254.1 | 2661.23 | False | None | None | False | None | False | 676218.543 | 0 | 3145158 | 108264 | None | MI016 | Providing and fixing tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 90.3 | 90.3 | 982.53 | False | None | None | False | None | False | 88722.459 | 0 | 3145159 | 108264 | None | MI017 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / essages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 9450.0 | 9450.0 | 4.0 | False | None | None | False | None | False | 37800.0 | 0 |
| 1716381450000 | 0 | None | None | Dam and Allied works | MPROVEMENTS OF GADDABOMMANAHALLI VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 56677452.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145160 | 108265 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 1898.5 | False | None | None | False | None | False | 783416.025 | 0 | 3145161 | 108265 | None | MI002 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 13200.0 | False | None | None | False | None | False | 1302840.0 | 0 | 3145162 | 108265 | None | MI003 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 8050.0 | False | None | None | False | None | False | 6212587.5 | 0 | 3145163 | 108265 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 91.5 | False | None | None | False | None | False | 9799.65 | 0 | 3145164 | 108265 | None | MI005 | Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6369.3 | 6369.3 | 649.0 | False | None | None | False | None | False | 4133675.7 | 0 | 3145165 | 108265 | None | MI006 | Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 8688.75 | 8688.75 | 2874.472 | False | None | None | False | None | False | 24975568.59 | 0 | 3145166 | 108265 | None | MI007 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 6.5789 | False | None | None | False | None | False | 613706.76549 | 0 | 3145167 | 108265 | None | MI008 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 107.799 | False | None | None | False | None | False | 787229.14725 | 0 | 3145168 | 108265 | None | MI009 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 81.0 | False | None | None | False | None | False | 550750.59 | 0 | 3145169 | 108265 | None | MI010 | Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc., with all accessories for vertical lift roller gate for canal escape / regulator including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complets as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 198450.0 | 198450.0 | 0.5705 | False | None | None | False | None | False | 113215.725 | 0 | 3145170 | 108265 | None | MI011 | Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift gate ( with top seal ) consisting of skin plate, siffeners, horizontal and vertical girders, wheels, guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent including cost of all materials,machinery,labour,cutting, aligning, welding finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 185325.0 | 185325.0 | 0.3804 | False | None | None | False | None | False | 70497.63 | 0 | 3145171 | 108265 | None | MI012 | Providing and constructing dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 477.75 | 477.75 | 10360.0 | False | None | None | False | None | False | 4949490.0 | 0 | 3145172 | 108265 | None | MI013 | Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 283.5 | 283.5 | 201.0 | False | None | None | False | None | False | 56983.5 | 0 | 3145173 | 108265 | None | MI014 | Providing and fixing tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 90.3 | 90.3 | 2360.994 | False | None | None | False | None | False | 213197.7582 | 0 | 3145174 | 108265 | None | MI015 | Providing compacted embankment for field irrigation channels with gravelly soil from approved borrow area in layers of 100 to 150 mm thickness (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading in layer of specified thickness, sorting-out, breaking clods, levelling, watering, compacting as directed, dressing sides to required slope and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 513.45 | 513.45 | 7875.951 | False | None | None | False | None | False | 4043907.04095 | 0 | 3145175 | 108265 | None | MI016 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 254.1 | 254.1 | 9772.286 | False | None | None | False | None | False | 2483137.8726 | 0 | 3145176 | 108265 | None | MI017 | Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 353.85 | 353.85 | 6000.0 | False | None | None | False | None | False | 2123100.0 | 0 | 3145177 | 108265 | None | MI018 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 204.774 | False | None | None | False | None | False | 1304482.0509 | 0 | 3145178 | 108265 | None | MI019 | Providing and laying in position Cement Concrete for all Foundation works.
The granite/trap/basalt crushed graded coarse aggregates and fine aggregates
as per relevant IS Codes machine mixed with super plasticizers laid in finished
layers, well compacted using needle vibrators, including all lead & lifts, cost
of all materials, quality confirming to the requirements of relevant IS codes,
labour, Usage charges of machinery, curing and all the other appurtenances
required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7129.46 | 7129.46 | 215.657 | False | None | None | False | None | False | 1537517.95522 | 0 | 3145179 | 108265 | None | MI020 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.
1000 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 5746.65 | 5746.65 | 10.0 | False | None | None | False | None | False | 57466.5 | 0 | 3145180 | 108265 | None | MI021 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.
800 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 4532.85 | 4532.85 | 10.0 | False | None | None | False | None | False | 45328.5 | 0 | 3145181 | 108265 | None | MI022 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.
700 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3804.15 | 3804.15 | 20.0 | False | None | None | False | None | False | 76083.0 | 0 | 3145182 | 108265 | None | MI023 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.
600 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 3297.0 | 3297.0 | 10.0 | False | None | None | False | None | False | 32970.0 | 0 | 3145183 | 108265 | None | MI024 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.
500 dia.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 2722.65 | 2722.65 | 10.0 | False | None | None | False | None | False | 27226.5 | 0 | 3145184 | 108265 | None | MI025 | Providing hearting / casing embankment using homogeneous approved soil from borrow areas in layers of 250 to 300 mm ( before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 642.6 | 642.6 | 53.568 | False | None | None | False | None | False | 34422.7968 | 0 | 3145185 | 108265 | None | MI026 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey RCC NP3 Class piple 250 mm dia,.etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | m | 1157.1 | 1157.1 | 120.0 | False | None | None | False | None | False | 138852.0 | 0 |
| 1716381450000 | 0 | None | None | Dam and Allied works | IMPROVEMENTS OF KUDLIGI BIG VILLAGE TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 13902665.95 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145186 | 108266 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 837.5 | False | None | None | False | None | False | 345594.375 | 0 | 3145187 | 108266 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 34253.0 | False | None | None | False | None | False | 916952.81 | 0 | 3145188 | 108266 | None | MI003 | Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 53.02 | 53.02 | 2325.0 | False | None | None | False | None | False | 123271.5 | 0 | 3145189 | 108266 | None | MI004 | De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery,labour & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 98.7 | 98.7 | 11100.0 | False | None | None | False | None | False | 1095570.0 | 0 | 3145190 | 108266 | None | MI005 | Providing new embankment abutting to existing bund to strength the existing bund using soil from approved borrow area in layers of 200 to 250 mm and compacting each layer to density control of not less than 95 percent by vibrating plate compactor or pnuematic tamper including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 476.7 | 476.7 | 11792.89 | False | None | None | False | None | False | 5621670.663 | 0 | 3145191 | 108266 | None | MI006 | Removing disturbed rough / size stone revetment 300 mm thick with 150 mm thick 40 mm down aggregate backing and resetting the same using the available stones and fresh aggregate from quarry including handpacking, wedging, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 390.6 | 390.6 | 216.0 | False | None | None | False | None | False | 84369.6 | 0 | 3145192 | 108266 | None | MI007 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 1860.0 | False | None | None | False | None | False | 1435455.0 | 0 | 3145193 | 108266 | None | MI008 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 3159.94 | False | None | None | False | None | False | 338429.574 | 0 | 3145194 | 108266 | None | MI009 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2686.95 | 2686.95 | 1000.0 | False | None | None | False | None | False | 2686950.0 | 0 | 3145195 | 108266 | None | MI010 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 24.75 | False | None | None | False | None | False | 180743.0625 | 0 | 3145196 | 108266 | None | MI011 | Excavating grip trenches of specified size in all kinds of soil in existing bund for abutting fresh embankment to strengthen the existing bund including disposing off the excavated soil in in specified dump area & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 262.5 | 262.5 | 3138.75 | False | None | None | False | None | False | 823921.875 | 0 | 3145197 | 108266 | None | MI012 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 37.69 | False | None | None | False | None | False | 240098.4915 | 0 | 3145198 | 108266 | None | MI013 | Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage/ arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 283.5 | 283.5 | 34.0 | False | None | None | False | None | False | 9639.0 | 0 |
| 1716381450000 | 0 | None | None | Dam and Allied works | CONSTRUCTION OF SIDDAPURA VILLAGE NEW TANK IN KUDLIGI TALUK, VIJAYANAGARA DISTRICT | 44085254.08 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3145199 | 108267 | None | MI001 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | 100 Sqm | 412.65 | 412.65 | 540.0 | False | None | None | False | None | False | 222831.0 | 0 | 3145200 | 108267 | None | MI002 | Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Each | 26.77 | 26.77 | 9560.0 | False | None | None | False | None | False | 255921.2 | 0 | 3145201 | 108267 | None | MI003 | Providing and constructing 450 mm thick hand packed rough stone revetment consisting of 300 mm thick rough stones with 400 to 450 mm long through stones at 1.5 m c / c over a backing of 150 mm thick 40 mm down graded coarse aggregate layer including cost of all materials, machinery, labour, laying to specified slope, wedging with chips, finishing & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 771.75 | 771.75 | 9000.0 | False | None | None | False | None | False | 6945750.0 | 0 | 3145202 | 108267 | None | MI004 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 107.1 | 107.1 | 6937.85 | False | None | None | False | None | False | 743043.735 | 0 | 3145203 | 108267 | None | MI005 | Providing cut-off trench filling using selected approved impervious soil from borrow areas in layers of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering,compacting to density control of not less than 95 percent using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 542.85 | 542.85 | 1943.5 | False | None | None | False | None | False | 1055028.975 | 0 | 3145204 | 108267 | None | MI006 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Tonne | 93284.1 | 93284.1 | 8.1592 | False | None | None | False | None | False | 761123.62872 | 0 | 3145205 | 108267 | None | MI007 | Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges /sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 660.45 | 660.45 | 13871.34 | False | None | None | False | None | False | 9161326.503 | 0 | 3145206 | 108267 | None | MI008 | Providing hearting / casing embankment using homogeneous approved soil from borrow areas in layers of 250 to 300 mm ( before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 642.6 | 642.6 | 7552.5 | False | None | None | False | None | False | 4853236.5 | 0 | 3145207 | 108267 | None | MI009 | Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down approved clean, hard, graded aggregates satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compaction and all other ancillary operations complete as per specifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2171.4 | 2171.4 | 31.44 | False | None | None | False | None | False | 68268.816 | 0 | 3145208 | 108267 | None | MI010 | Providing and constructing graded filter media below and behind rock-toe consisting of 200 mm thick sand, 150 mm thick 20 mm down and 150 mm thick 40 mm down clean, hard, graded coarse aggregate layers satisfying specified filter criteria behind rock-toe and 150 mm thick sand, 200 mm thick 20 mm down and 650 mm thick 40 mm down clean, hard, graded coarse aggregate layers satisfying specified filter criteria below rock-toe including cost of all materials, machinery, labour, laying to specified thickness and slope, compaction and all other ancillary operations complete as perspecifications and approved drawings.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2017.05 | 2017.05 | 486.0 | False | None | None | False | None | False | 980286.3 | 0 | 3145209 | 108267 | None | MI011 | Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery,labour, hand packing rubble and stone chips, finishing top and sides to be required slopes and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1456.35 | 1456.35 | 2025.0 | False | None | None | False | None | False | 2949108.75 | 0 | 3145210 | 108267 | None | MI012 | Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings Sand layer .etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2196.6 | 2196.6 | 282.63 | False | None | None | False | None | False | 620825.058 | 0 | 3145211 | 108267 | None | MI013 | Providing and constructing vertical /inclined graded filter media using clean, hard graded sand and coarse aggregates from approved source satisfying specified filter creteria in layers of specified thickness including cost of all materials, machinery, labour, laying to required slopes, compacting and all other ancillary operations complete as per specifications and approved drawings 20 mm down graded coarse aggregate layer .etc., complete with all lead and lifts including loading and unloading and as per specification with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2064.3 | 2064.3 | 211.98 | False | None | None | False | None | False | 437590.314 | 0 | 3145212 | 108267 | None | MI014 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 2686.95 | 2686.95 | 337.5 | False | None | None | False | None | False | 906845.625 | 0 | 3145213 | 108267 | None | MI015 | Providing and laying 60mm thick factory made precast M-30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification).etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 1121.4 | 1121.4 | 2250.0 | False | None | None | False | None | False | 2523150.0 | 0 | 3145214 | 108267 | None | MI016 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra).etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) 600x300x150 | m | 486.15 | 486.15 | 1800.0 | False | None | None | False | None | False | 875070.0 | 0 | 3145215 | 108267 | None | MI017 | Providing rubble stone/boulder filling between or behind abutment/below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 1341.9 | 1341.9 | 145.26 | False | None | None | False | None | False | 194924.394 | 0 | 3145216 | 108267 | None | MI018 | Providing and constructing dry size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips into joints, finishing and all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Sqm | 407.4 | 407.4 | 8400.0 | False | None | None | False | None | False | 3422160.0 | 0 | 3145217 | 108267 | None | MI019 | Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, including cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing, centering, formwork and scafolding and all other appurtenances required to complete the work as per technical specifications for check dam /pickups /irrigation tanks/waste weir/sluice, sluice canal and other allied works like abutments/wing walls/returns/cutoff walls works & all necessary works as directed and complete as per specification.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 7302.75 | 7302.75 | 322.23 | False | None | None | False | None | False | 2353165.1325 | 0 | 3145218 | 108267 | None | MI020 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 99.75 | 99.75 | 10800.0 | False | None | None | False | None | False | 1077300.0 | 0 | 3145219 | 108267 | None | MI021 | Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6370.35 | 6370.35 | 175.52 | False | None | None | False | None | False | 1118123.832 | 0 | 3145220 | 108267 | None | MI022 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.etc., complete with all lead and lifts including loading and unloading and as per specifiction with the directions of Engineer-in-charge of work. ( Ref :- As per relevant IS) | Cum | 6799.39 | 6799.39 | 376.53 | False | None | None | False | None | False | 2560174.3167 | 0 |
|
|
---|