noticeInvitingTenderDTO
createdTs1716707038112
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3150.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-06-2024 16:00:20
tenderQueryClose03-06-2024 16:00:06
technicalBidOpen05-06-2024 16:15:23
publishedDate28-05-2024 11:08:59
publishedByPostPWD_EE_DIV_BID
publishedByUserKPE14569 - SHIVSHANKER V KAMSHETTY
bidValidityPeriod90
noOfCalls1
preBidMeetingDate01-06-2024 12:40:44
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShivshanker kamshetty
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08482226440
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1716707038149
version4
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT10709
titleDevelopment of Shivaji Park and Construction of Town Hall at Basavakalayan Town District Bidar Under KKRDB (CDQ &Gen) for the year 2023-24
descriptionDevelopment of Shivaji Park and Construction of Town Hall at Basavakalayan Town District Bidar Under KKRDB (CDQ &Gen) for the year 2023-24
categoryWORKS
categoryTextWorks
ecv12579380.51
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1692
locationNamePWD Division Office Bidar
provisionalAmount15000000.0
groupOverheadTotal0.0
fileNumberBDR235343577
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17167070380000NoneNoneBuildingsDevelopment of Park Area1034454.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3163863109040NoneP:63, I.No 9.25 PWD SR 2023-24 Volume 2Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as the direction of Engineer-in-chargeSqm3787.353787.35254.06FalseNoneNoneFalseNoneFalse962214.1410
3163864109040NoneP: A-39, I.No 40 PWD SR 2023-24 Volume 1Material Component ; Hedge plantNo34.6534.651600.0FalseNoneNoneFalseNoneFalse55440.00
3163865109040NoneP: A-40, I.No 67 PWD SR 2023-24 Volume 1Material Component ; ShrubsEach2.12.18000.0FalseNoneNoneFalseNoneFalse16800.00
17167070380000NoneNoneBuildingsTown Hall11544926.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3163866109041NoneP:8, I.No 1.12. PWD SR 2023-24 Volume 1Earth work in surface excavation for stripping, seating of bund, Road way, by mechanical means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.Cum99.7599.75262.5FalseNoneNoneFalseNoneFalse26184.3750
3163867109041NoneP:8, I.No 1.14 PWD SR 2023-24 Volume 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.11056.0FalseNoneNoneFalseNoneFalse113097.60
3163868109041NoneP:8, I.No 1.14.2 PWD SR 2023-24 Volume 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth 3 m to 6 mCum122.85122.85268.27FalseNoneNoneFalseNoneFalse32956.96950
3163869109041NoneP:15, I.No 2.1.4 PWD SR 2023-24 Volume 1Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.85142.56FalseNoneNoneFalseNoneFalse930610.2960
3163870109041NoneP:15, I.No 2.2.1 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6601.356601.35152.06FalseNoneNoneFalseNoneFalse1003801.2810
3163871109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1553.27FalseNoneNoneFalseNoneFalse382752.94050
3163872109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1529.62FalseNoneNoneFalseNoneFalse212824.1430
3163873109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1540.45FalseNoneNoneFalseNoneFalse290639.31750
3163874109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.15112.33FalseNoneNoneFalseNoneFalse807107.89950
3163875109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.151.51FalseNoneNoneFalseNoneFalse10849.57650
3163876109041NoneP:18, I.No 2.11a .PWD Common SR 2023-24 Volume 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Addendum III Criteria Requirement for approval of ReinforcementTonne93929.8593929.8542.55FalseNoneNoneFalseNoneFalse3996715.11750
3163877109041NoneP:14, I.No 6.8 PWD SR 2023-24 Volume 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8367.458367.4534.29FalseNoneNoneFalseNoneFalse286919.86050
3163878109041NoneP:100, I.No 12.13.1 PWD SR 2023-24 Volume 2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum103755.8103755.80.36FalseNoneNoneFalseNoneFalse37352.0880
3163879109041NoneP:100, I.No 12.16 PWD SR 2023-24 Volume 2Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures )Sqm7241.857241.859.45FalseNoneNoneFalseNoneFalse68435.48250
3163880109041NoneP:104, I.No 12.51 PWD SR 2023-24 Volume 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.No1066.81066.83.0FalseNoneNoneFalseNoneFalse3200.40
3163881109041NoneP:102, I.No 12.52 PWD SR 2021-22 Volume 2Fixing of window frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per specificationsNo811.65811.653.0FalseNoneNoneFalseNoneFalse2434.950
3163882109041NoneP:86, I.No 11.34B PWD SR 2023-24 Volume 2Providing and fixing M.S. grills of required pattern in frames of win- dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kgs192.15192.15725.76FalseNoneNoneFalseNoneFalse139454.7840
3163883109041NoneP:41, I.No 8.2.1 PWD SR 2023-24 Volume 2Providing 15 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm309.75309.75201.09FalseNoneNoneFalseNoneFalse62287.62750
3163884109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.154.47FalseNoneNoneFalseNoneFalse32117.62050
3163885109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.156.06FalseNoneNoneFalseNoneFalse43542.0090
3163886109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.155.94FalseNoneNoneFalseNoneFalse42679.7910
3163887109041NoneP:18, I.No 2.11a .PWD Common SR 2023-24 Volume 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Addendum III Criteria/Requirement for approval of Reinforcement Bars)Tonne93929.8593929.852.37FalseNoneNoneFalseNoneFalse222613.74450
3163888109041NoneP:14, I.No 6.8 PWD SR 2023-24 Volume 2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8367.458367.4543.84FalseNoneNoneFalseNoneFalse366829.0080
3163889109041NoneP:100, I.No 12.13.1 PWD SR 2023-24 Volume 2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Sqm103755.8103755.80.19FalseNoneNoneFalseNoneFalse19713.6020
3163890109041NoneP:104, I.No 12.51 PWD SR 2023-24 Volume 2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Nos1066.81066.82.0FalseNoneNoneFalseNoneFalse2133.60
3163891109041NoneP:86, I.No 11.34B PWD SR 2023-24 Volume 2Providing and fixing M.S. grills of required pattern in frames of win- dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kgs192.15192.1560.48FalseNoneNoneFalseNoneFalse11621.2320
3163892109041NoneP:41, I.No 8.2.1 PWD SR 2023-24 Volume 2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in-chargeSqm309.75309.75263.3FalseNoneNoneFalseNoneFalse81557.1750
3163893109041NoneP:72, I.No 10.19 PWD SR 2023-24 Volume 2Providing and fixing 20mm thick gang saw water cut Lakared granite for cladding in CM 1:3 (1 cement : 3 coarse sand) proportion with a coat of rough plastering using CM 1:4 (1 cement : 4 fine sand), cut to required shape, pattern with paper joints, finished with cement mortar using white cement and colour pigments to match the colour of slab making through jointing with sealant, grooves in joints including cost of curing etc., complete including cost and conveyance of all materials, mortar, labour for all items of work, usage charges of machinery etc., complete as per specificationSqm3787.353787.35299.37FalseNoneNoneFalseNoneFalse1133818.96950
3163894109041NonePWD Electrical CSR 2022-23 It. No. 1.2.2 Pg. No. 1Concealed Conduit System: Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thickMtr70.070.0450.0FalseNoneNoneFalseNoneFalse31500.00
3163895109041NonePWD Electrical CSR 2022-23 It. No. 1.2.3 Pg. No. 1Concealed Conduit System: Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 32 mm dia 2.5 mm thickMtr70.070.0250.0FalseNoneNoneFalseNoneFalse17500.00
3163896109041NoneP:15, I.No 2.2.1 PWD SR 2023-24 Volume 1Providing Centring & Shuttering For Footing Cum528.11528.11152.06FalseNoneNoneFalseNoneFalse80304.40660
3163897109041NoneP:15, I.No 2.5.2 PWD SR 2023-24 Volume 1Providing Centring & Shuttering For Column Cum5029.615029.6153.27FalseNoneNoneFalseNoneFalse267927.32470
3163898109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for plinth beam Cum4311.094311.0929.62FalseNoneNoneFalseNoneFalse127694.48580
3163899109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for LINTEL AND Roof BEAM beam Cum4311.094311.0940.44FalseNoneNoneFalseNoneFalse174340.47960
3163900109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for Roof Slab Cum3592.583592.58112.33FalseNoneNoneFalseNoneFalse403554.51140
3163901109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for Chajja Cum3233.323233.321.51FalseNoneNoneFalseNoneFalse4882.31320
3163902109041NoneP:15, I.No 2.5.2 PWD SR 2023-24 Volume 1Ground Floor providing centering and shuttering for Column Cum5029.615029.614.47FalseNoneNoneFalseNoneFalse22482.35670
3163903109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for Roof Beam Cum4105.84105.86.06FalseNoneNoneFalseNoneFalse24881.1480
3163904109041NoneP:16, I.No 2.5.2 PWD SR 2023-24 Volume 1providing centering and shuttering for Roof Slab Cum4311.094311.095.94FalseNoneNoneFalseNoneFalse25607.87460
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17167070390000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17167070390000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17167070390000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17167070390000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17167070390000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17167070520000NoneNoneELIGIBILITYThe Tenderer shall furnish, as part of his tender, earnest money deposit in the amount as shown in column 4 of the Table of IFT for this particular work. Tenderer can pay the full EMD amount of Rs. 2,00,000/- through e-payment or the Earnest Money Deposit shall be in two parts. Part(1): Rs. 1,00,000/- by e-payment, Part-(2): Rs. 1,00,000/- EMD shall be in favour of Executive Engineer, PWD, Bidar Division, Bidar, and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD, Bidar Division, Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD, Bidar DivisionNone
17167070620000NoneNoneELIGIBILITYPeriod for completion of this work is 11(Eleven) months including Monsoon.None
17167070790000NoneNoneELIGIBILITYPart (2) Rs. 1,00,000/- EMD shall be in favour of Executive Engineer, PWD , Bidar Division, Bidar and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD Divn. Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD.Division, Bidar or Bank Guarantee in the prescribed format obtained form any Nationaled / Scheduled Banks.None
17167070910000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 251.58 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.None
17167071030000NoneNoneELIGIBILITYLiquid Assets and/or availability of credit facilities of not less than Rs. 34.31 Lakhs Lakhs (Credit Lines/Letter of Credit/Certificates from the Banks for meeting the fund requirement etc.None
17167071310000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (b) satisfactorily completed as prime contractor, at least one similar work such as Construction such as of value not less than Rs 62.90 Lakhs/-of BuildingNone
17167071470000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (c) executed in any one year, the following minimum quantities of work(1) EWE: 1269.00 cum (2) RCC/PCC: 439.00 cum (3) RRM/BBM: 62.51 cum (4) Plastering: 371.672 Sqm (5) Flooring: 239.5 sqm (6) TMT Steel: 35.94 TonneNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (b) satisfactorily completed as prime contractor, at least one similar work such as Construction of Building such as of value not less than Rs 62.90 Lakhs/-Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (c) executed in any one year, the following minimum quantities of work(1) EWE: 1269.00 cum (2) RCC/PCC: 439.00 cum (3) RRM/BBM: 62.51 cum (4) Plastering: 371.672 Sqm (5) Flooring: 239.5 sqm (6) TMT Steel: 35.94 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLiquid Assets and/or availability of credit facilities of not less than Rs. 34.31 Lakhs Lakhs (Credit Lines/Letter of Credit/Certificates from the Banks for meeting the fund requirement etc.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneList of existing commitments and ongoing worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 251.58 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluationFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Work done CertificateTrueTechnical Bid
Line of CreditTrueTechnical Bid
Other DocumentsFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1716707482000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD Division Bidar
streetNone
cityBidar
stateKarnataka
pin585401
tenderRecallDTONone