createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1716878100315
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee3040.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-06-2024 16:30:00
tenderQueryClose05-06-2024 11:00:00
technicalBidOpen07-06-2024 16:45:00
publishedDate28-05-2024 18:07:08
publishedByPostPWD_EE_DIV_BGV
publishedByUserKPE12007 - S S SOBARAD
bidValidityPeriod90
noOfCalls2
preBidMeetingDate05-06-2024 11:59:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonS S Sobarad
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08312647103
mobileNumber8312647103
tenderSupplierListNone
tenderSchedule
createdTs1716878100318
version24
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9593/CALL-2
titleProviding Basic facilities, Construction of Toilet Block, Repairs to High School and P.U College class rooms and Drinking water facility to G.G. Chopra Govt High School and Pre University college Savadatti Town Belagavi Dist under H/A 4059 Dept Building for the year 2023-24
descriptionProviding Basic facilities, Construction of Toilet Block, Repairs to High School and P.U College class rooms and Drinking water facility to G.G. Chopra Govt High School and Pre University college Savadatti Town Belagavi Dist under H/A 4059 Dept Building for the year 2023-24
categoryWORKS
categoryTextWorks
ecv12121744.10
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1685
locationNamePWD Division Office Belagavi
provisionalAmount15000000.0
groupOverheadTotal0.0
fileNumberNO/AEE/PWD/SDT/4059/GGCHS/PUC/SO-4/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17168781010001NoneNoneBuildingsConstruction of Toilet Block for Boys & Girls2924618.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181742109543NoneVol-1, Pg No. 8, It No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depthCum97.8597.8559.966FalseNoneNoneFalseNoneFalse5867.67310
3181743109543NoneVol-1, Pg No.8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum105.06105.0696.04FalseNoneNoneFalseNoneFalse10089.96240
3181744109543NoneVol-1, Pg No. 11, It No. 1.23Providing and Filling in foundation with granite/ trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.Cum2762.462762.4623.33FalseNoneNoneFalseNoneFalse64448.19180
3181745109543NoneVol-2, Pg No. 5, It No. 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, ground excavation top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 ltr/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications.Sqm121.54121.54134.37FalseNoneNoneFalseNoneFalse16331.32980
3181746109543NoneVol-1, Pg No. 7, It No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 mCum273.98273.9896.04FalseNoneNoneFalseNoneFalse26313.03920
3181747109543NoneVol-1, Pg No. 7, It No. 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum488.22488.222.01FalseNoneNoneFalseNoneFalse981.32220
3181748109543NoneVol-1, Pg No. 15, It No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregatesCum6168.676168.679.55FalseNoneNoneFalseNoneFalse58910.79850
3181749109543NoneVol-1, Pg No. 15, It No.2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. FootingCum6526.086526.0812.15FalseNoneNoneFalseNoneFalse79291.8720
3181750109543NoneVol-1, Pg No. 111, Sl No. 1aFormwork, Centering & Scaffloding 8% For Isolated footingCum522.08522.0812.15FalseNoneNoneFalseNoneFalse6343.2720
3181751109543NoneVol-1, Pg No. 16, It No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Columns upto Plinth levelCum6526.086526.081.36FalseNoneNoneFalseNoneFalse8875.46880
3181752109543NoneVol-1, Pg No. 111, Sl No. 9Formwork, Centering & Scaffloding 70% For Columns upto plinthCum4568.254568.251.36FalseNoneNoneFalseNoneFalse6212.820
3181753109543NoneVol-1, Pg No. 16, It No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Plinth BeamsCum6526.086526.0826.87FalseNoneNoneFalseNoneFalse175355.76960
3181754109543NoneVol-1, Pg No. 111, Sl No. 2Formwork, Centering & Scaffloding 50% For Plinth BeamsCum3263.043263.0426.87FalseNoneNoneFalseNoneFalse87677.88480
3181755109543NoneVol-1, Pg No. 16, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & LintelCum7048.297048.297.17FalseNoneNoneFalseNoneFalse50536.23930
3181756109543NoneVol-1, Pg No. 112, Sl No. 14Formwork, Centering & Scaffloding 60% For Beams & LintelCum4228.974228.977.17FalseNoneNoneFalseNoneFalse30321.71490
3181757109543NoneVol-1, Pg No. 112, Sl. No. 14Formwork, Centering & Scaffloding 60% For SillCum4228.974228.971.21FalseNoneNoneFalseNoneFalse5117.05370
3181758109543NoneVol-1, Pg No. 16, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. SillCum7048.297048.291.21FalseNoneNoneFalseNoneFalse8528.43090
3181759109543NoneVol-1, Pg No. 18, It No. 2.11.aSteel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildingst92140.7192140.714.7FalseNoneNoneFalseNoneFalse433061.3370
3181760109543NoneVol-2, Pg No. 9, It No. 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6580.676580.6715.52FalseNoneNoneFalseNoneFalse102131.99840
3181761109543NoneVol-2, Pg No. 14, It No. 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8208.078208.0735.72FalseNoneNoneFalseNoneFalse293192.26040
3181762109543NoneVol-2, Pg No. 14, It No. 6.15Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Sqm1063.991063.9969.5FalseNoneNoneFalseNoneFalse73947.3050
3181763109543NoneVol-2, Pg No. 104, It No. 12.54Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge.Sqm327.54327.5485.3FalseNoneNoneFalseNoneFalse27939.1620
3181764109543NoneVol-2, Pg No. 104, It No. 12.55.1Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges with both side prelamSqm2436.982436.9829.19FalseNoneNoneFalseNoneFalse71135.44620
3181765109543NoneVol-2, Pg No. 110, It No. 12.88Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm.Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made)Sqm5551.75551.71.89FalseNoneNoneFalseNoneFalse10492.7130
3181766109543NoneVol-2, Pg No. 109, It No. 12.85Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made)Sqm5890.575890.577.2FalseNoneNoneFalseNoneFalse42412.1040
3181767109543NoneVol-2, Pg No. 86, It No. 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc.Kg188.49188.49151.2FalseNoneNoneFalseNoneFalse28499.6880
3181768109543NoneVol-2, Pg No. 41, It No. 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm248.23248.23437.25FalseNoneNoneFalseNoneFalse108538.56750
3181769109543NoneVol-2, Pg No. 50, It No. 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge.Sqm103.0103.0437.25FalseNoneNoneFalseNoneFalse45036.750
3181770109543NoneVol-2, Pg No. 41, It No. 8.2.2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side)Sqm287.37287.37168.12FalseNoneNoneFalseNoneFalse48312.64440
3181771109543NoneVol-2, Pg No. 59, It No. 9.2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge.Sqm824.0824.047.17FalseNoneNoneFalseNoneFalse38868.080
3181772109543NoneVol-2, Pg No. 64, It No. 9.31Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-ChargeSqm2147.552147.5538.993FalseNoneNoneFalseNoneFalse83739.417150
3181773109543NoneVol-2, Pg No. 69, It No. 10.1.2Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Sqm4055.114055.1116.254FalseNoneNoneFalseNoneFalse65911.757940
3181774109543NoneVol-2, Pg No. 60, It No. 9.11Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.Sqm915.67915.6796.204FalseNoneNoneFalseNoneFalse88091.116680
3181775109543NoneVol-2, Pg No. 71, It No. 10.14Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados,over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete.Sqm1139.181139.18120.24FalseNoneNoneFalseNoneFalse136975.00320
3181776109543NoneVol-2, Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 Sqm with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge.Sqm162.74162.74437.25FalseNoneNoneFalseNoneFalse71158.0650
3181777109543NoneVol-2, Pg No. 46, It No. 8.33.1Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm179.22179.22168.12FalseNoneNoneFalseNoneFalse30130.46640
3181778109543NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm143.17143.1728.92FalseNoneNoneFalseNoneFalse4140.47640
3181779109543NoneVol-2, Pg No. 21, It No. 7.1.1Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m²Sqm905.37905.37147.18FalseNoneNoneFalseNoneFalse133252.35660
3181780109543NoneVol-2, Pg No. 21, It No. 7.4.1Providing & fixing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete as per design drawings. 0.63 mm thick with zinc coating not less than 275 g/m²m658.17658.1713.38FalseNoneNoneFalseNoneFalse8806.31460
3181781109543NoneVol-2, Pg No. 21, It No. 7.6Providing and fixing 15 cm wide, 45 cm overall semi-circular plain G.S. sheet gutter with iron brackets 40x3mm size, bolts, nuts and washers etc., including making necessary connections with rain water pipes complete. (0.63 mm thick with zinc coating not less than 275 g/m²)m664.35664.3526.76FalseNoneNoneFalseNoneFalse17778.0060
3181782109543NoneVol-2, Pg No. 82, It No. 11.16.1Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg140.08140.081830.0FalseNoneNoneFalseNoneFalse256346.40
3181783109543NoneVol-1, Pg No. 16, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Columns above Plinth level Cum7048.297048.293.3FalseNoneNoneFalseNoneFalse23259.3570
3181784109543NoneVol-1, Pg No. 111, Sl. No. 9Formwork, Centering & Scaffloding 70% For Columns above Plinth level Cum4933.84933.83.3FalseNoneNoneFalseNoneFalse16281.540
3181785109543NoneVol-1, Pg No. 16 It No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Curtain WallCum6526.086526.083.34FalseNoneNoneFalseNoneFalse21797.10720
3181786109543NoneVol-1, Pg No. 111, Sl No. 11Formwork, Centering & Scaffloding 10% For Curtain wallCum652.61652.613.34FalseNoneNoneFalseNoneFalse2179.71740
17168781010000NoneNoneBuildingsProviding Water supply and Sanitary work506270.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181787109544NoneVol-2, Pg No. 117, It No. 13.3.1Providing and fixing brass stop cock of approved quality :15 mm nominal boreNos307.97307.9725.0FalseNoneNoneFalseNoneFalse7699.250
3181788109544NoneVol-2 Pg No.131, It No. 14.1.1Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot restsNos5030.525030.5210.0FalseNoneNoneFalseNoneFalse50305.20
3181789109544NoneVol-2, Pg No. 131, It No. 14.2.1Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlleddevice (handle lever), conforming to IS : 7231, with all fittings andfixtures complete, including cutting and making good the walls and floors wherever required :W.C. pan with ISI marked white solid plastic seat and lidNos4983.144983.147.0FalseNoneNoneFalseNoneFalse34881.980
3181790109544NoneVol-2, Pg No. 131, It No.14.4.4Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required :Range of four urinal basins with 10 litre white P.V.C. automatic flushing cisternNos13462.113462.14.0FalseNoneNoneFalseNoneFalse53848.40
3181791109544NoneVol-2, Pg No. 143, It No. 14.78bProviding and fixing Single flow hand showers with Anti lime jets with 1.5m PVC tube and holder made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class PremiumNos1307.071307.077.0FalseNoneNoneFalseNoneFalse9149.490
3181792109544NoneVol-2, Pg No.133, It No. 14.7.8White Vitreous China Surgeon type wash basin of size 660x460 mm with a pair of 15 mm C.P. brass pillar taps with elbow including operated leversNos4236.394236.398.0FalseNoneNoneFalseNoneFalse33891.120
3181793109544NoneVol-2, Pg No. 133, It No. 14.8Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings.Nos1465.691465.698.0FalseNoneNoneFalseNoneFalse11725.520
3181794109544NoneVol-2, Pg No.137, It No. 14.40.2600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 gEach510.88510.887.0FalseNoneNoneFalseNoneFalse3576.160
3181795109544NoneVol-2, Pg No. 136, It No. 14.32.2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 453x357 mmNos1048.541048.5412.0FalseNoneNoneFalseNoneFalse12582.480
3181796109544NoneVol-2, Pg No. 122, It No. 13.31.2Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 20mm nominal dia pipesm249.26249.2630.0FalseNoneNoneFalseNoneFalse7477.80
3181797109544NoneVol-2, Pg No. 122, It No. 13.31.3Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 25mm nominal dia pipesm327.54327.5430.0FalseNoneNoneFalseNoneFalse9826.20
3181798109544NoneVol-2, Pg No. 122, It No. 13.31.4Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 32mm nominal dia pipesm412.0412.030.0FalseNoneNoneFalseNoneFalse12360.00
3181799109544NoneVol-2, Pg No. 122, lt No. 13.31.6Providing & fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction Engineer in Charge.Exposed on wall - 50mm nominal dia pipesm804.43804.4360.0FalseNoneNoneFalseNoneFalse48265.80
3181800109544NoneVol-2, Pg No. 117, It No. 13.4.4Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :50 mm nominal boreNos880.65880.6515.0FalseNoneNoneFalseNoneFalse13209.750
3181801109544NoneVol-2, Pg No. 118, It No. 13.8.2.2Providing and fixing unplasticised PVC connection pipe with brass unions :45 cm length 20 mm nominal boreNos113.3113.315.0FalseNoneNoneFalseNoneFalse1699.50
3181802109544NoneVol-2, Pg No. 123, It No. 13.34Providing and placing on terrace, polyethylene water storage tanks as per IS 12701 : 1996 with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes but without fittings and the base support for tankl9.279.276000.0FalseNoneNoneFalseNoneFalse55620.00
3181803109544NoneVol-5, Pg No. A-44, Sl. No. 660PVC pipes of 8 Kg/cm2 for 140mm(3.097)m469.68469.6888.4FalseNoneNoneFalseNoneFalse41519.7120
3181804109544NoneVol-5, Pg No. A-44, Sl. No. 664PVC pipes of 10 Kg/cm2 for 200mmm1189.651189.6530.0FalseNoneNoneFalseNoneFalse35689.50
3181805109544NoneVol-2, Pg No. 125, It No. 13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipesm585.04585.048.4FalseNoneNoneFalseNoneFalse4914.3360
3181806109544NoneVol-5, Pg No. 208, It No. 16.60.1Providing PVC-U INDIVIDUAL U.G.D House service connection (which shall be laid from inside the customer property ) which includes: a) Supply of PVC-U pipe (b) providing and fixing of 315 mm dia the PE Inspection chambres with lid consisting of inlet & outlet arrangements with base, riser of min. 0.42 m depth which includes earth work, fixing in CC-1:2:4 with appurtenances., complete. (c) civil works like Earthwork excavation for the pipeline trenches for laying of PVC-U pipes for the house connections in all types of soils , disintegrated rock,soft rock, hard rock, including cutting of any road using , crossing drains, compound, Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, c.c. wood work, steel work, including T & P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable and stacking the serviceable material with all lifts and lead , restoring the damaged portions inside or outside the property premises, refilling the portions of trenches that are dug open including linking to existing sewer network with appurtenances. complete.Nos8378.028378.022.0FalseNoneNoneFalseNoneFalse16756.040
3181807109544NoneVol-1, Pg No. 5, It No. 1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 mCum249.26249.264.5FalseNoneNoneFalseNoneFalse1121.670
3181808109544NoneVol-1, Pg No. 7, It No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 mCum273.98273.9810.0FalseNoneNoneFalseNoneFalse2739.80
3181809109544NoneVol-5, Pg No. 191, It No. 16.9Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and coverNos5617.625617.621.0FalseNoneNoneFalseNoneFalse5617.620
3181810109544NoneVol-5, Pg No. 192, It No. 16.15.1Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality, plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.HConstructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.0 M depth & SFRC cover & frameNos29918.4129918.411.0FalseNoneNoneFalseNoneFalse29918.410
3181811109544NoneVol-2, Pg No. 136, It No. 14.29Providing and fixing 100 mm sand cast Iron grating for gully trap.Nos48.4148.4120.0FalseNoneNoneFalseNoneFalse968.20
3181812109544NoneVol-2, Pg No. 120, It No. 13.22.1.2Providing and fixing PTMT grating of approved quality and colour 125 mm nominal diaNos45.3245.3220.0FalseNoneNoneFalseNoneFalse906.40
17168781010001NoneNoneBuildingsConstruction of Septic Tank and Soak pit450039.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181813109545NoneVol-1, Pg No. 8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 mCum105.06105.0654.9413FalseNoneNoneFalseNoneFalse5772.1329780
3181814109545NoneVol-1 Pg No.15, It No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregatesCum6168.676168.673.6321FalseNoneNoneFalseNoneFalse22405.2263070
3181815109545NoneVol-1, Pg No. 17, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Cum7048.297048.293.74FalseNoneNoneFalseNoneFalse26360.60460
3181816109545NoneVol-1, Pg No. 115, Sl No.1Formwork, Centering & Scaffloding 8% For Isolated FootingCum563.86563.863.74FalseNoneNoneFalseNoneFalse2108.83640
3181817109545NoneVol-1, Pg No. 17, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Cum7048.297048.296.277FalseNoneNoneFalseNoneFalse44242.116330
3181818109545NoneVol-1, Pg No.115, SI No. 9Formwork, Centering & Scaffloding 10% For Earth retaining structuresCum704.82704.826.277FalseNoneNoneFalseNoneFalse4424.155140
3181819109545NoneVol-1, Pg No. 17, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Cum7048.297048.294.8845FalseNoneNoneFalseNoneFalse34427.3725050
3181820109545NoneVol-1, Pg No.116, SI No. 13Formwork, Centering & Scaffloding 50% For Roof SlabCum3524.143524.144.8845FalseNoneNoneFalseNoneFalse17213.661830
3181821109545NoneVol-1, Pg No. 18, It No. 2.11ASupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.t92140.7192140.711.8626FalseNoneNoneFalseNoneFalse171621.2864460
3181822109545NoneVol-2, Pg No. 14, It No. 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum8208.078208.072.2958FalseNoneNoneFalseNoneFalse18844.0871060
3181823109545NoneVol-2, Pg No. 42, It No. 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side)Sqm382.13382.1323.2FalseNoneNoneFalseNoneFalse8865.4160
3181824109545NoneVol-2, Pg No. 43, It No. 8.12Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineerin-Charge.Kg65.9265.9231.7FalseNoneNoneFalseNoneFalse2089.6640
3181825109545NoneVol-2, Pg No. 41, lt No. 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm248.23248.237.5438FalseNoneNoneFalseNoneFalse1872.5974740
3181826109545NoneVol-5, Pg No. 221, It No. 18.3Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary lockingarrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge.Each2020.862020.863.0FalseNoneNoneFalseNoneFalse6062.580
3181827109545NoneVol-2, Pg No. 123, It No. 13.33.9Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings, this includes jointing of pipes and fittings with one step solvent cement, trenching refilling & testing of joints complete, as per direction of engineer in charge (External work) 100mm nominal dia pipesm2599.722599.7230.0FalseNoneNoneFalseNoneFalse77991.60
3181828109545NoneVol-2, Pg No. 175, It No. 17.1Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.Cum1032.061032.065.5601FalseNoneNoneFalseNoneFalse5738.3568060
17168781010000NoneNoneBuildingsConstruction of Compound Wall3244436.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181829109546NoneVol-1, Pg No. 8, It No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depthCum97.8597.8576.8FalseNoneNoneFalseNoneFalse7514.880
3181830109546NoneVol-1, Pg No.8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum105.06105.06298.8139FalseNoneNoneFalseNoneFalse31393.3883340
3181831109546NoneVol-1, Pg No. 11, It No. 1.23Providing and Filling in foundation with granite/ trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.Cum2762.462762.4699.9464FalseNoneNoneFalseNoneFalse276097.9321440
3181832109546NoneVol-1, Pg No. 7, It No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum273.98273.98298.8139FalseNoneNoneFalseNoneFalse81869.0323220
3181833109546NoneVol-1, Pg No. 15, It No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregatesCum6168.676168.6746.031FalseNoneNoneFalseNoneFalse283950.048770
3181834109546NoneVol-2, Pg No. 9, It No. 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6580.676580.6731.6723FalseNoneNoneFalseNoneFalse208424.9544410
3181835109546NoneVol-1, Pg No. 18, It No. 2.11.hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.All other type of structurest81381.3381381.337.5058FalseNoneNoneFalseNoneFalse610831.9867140
3181836109546NoneVol-1, Pg No. 15, It No.2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. FootingCum6526.086526.0833.3314FalseNoneNoneFalseNoneFalse217523.3829120
3181837109546NoneVol-1, Pg No. 115, Sl No. 1Formwork, Centering & Scaffloding 8% For Isolated footingCum522.08522.0833.3314FalseNoneNoneFalseNoneFalse17401.6573120
3181838109546NoneVol-1, Pg No. 16, It No. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Columns upto Plinth levelCum6526.086526.086.1496FalseNoneNoneFalseNoneFalse40132.7815680
3181839109546NoneVol-1, Pg No. 111, Sl No. 9Formwork, Centering & Scaffloding 70% For Columns upto plinthCum4568.254568.256.1496FalseNoneNoneFalseNoneFalse28092.91020
3181840109546NoneVol-1, Pg No. 16, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.Columns above plinthCum7048.297048.2910.3313FalseNoneNoneFalseNoneFalse72817.9984770
3181841109546NoneVol-1, Pg No. 115, Sl No. 8Formwork, Centering & Scaffloding 70% For ColumnsCum4933.84933.810.3313FalseNoneNoneFalseNoneFalse50972.567940
3181842109546NoneVol-1, Pg No. 16, It No. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. BeamsCum7048.297048.2916.188FalseNoneNoneFalseNoneFalse114097.718520
3181843109546NoneVol-1, Pg No. 115, Sl No. 12Formwork, Centering & Scaffloding 60% For Plinth BeamsCum4228.974228.9716.188FalseNoneNoneFalseNoneFalse68458.566360
3181844109546NoneVol-2, Pg No. 17, It No. 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.Sqm1349.31349.3445.759FalseNoneNoneFalseNoneFalse601462.61870
3181845109546NoneVol-2, Pg No. 41, It. No. 8.2.1Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm303.85303.851039.3223FalseNoneNoneFalseNoneFalse315798.0808550
3181846109546NoneVol-2, Pg No. 84, It No. 11.25.2Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.Kg140.08140.08223.65FalseNoneNoneFalseNoneFalse31328.8920
3181847109546NoneVol-2, Pg No. 46, It No. 8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm179.22179.221039.3223FalseNoneNoneFalseNoneFalse186267.3426060
17168781010000NoneNoneBuildingsConstruction of Approach Road2379667.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181848109547NoneVol-1, Pg No.8, It No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Vol-1, P.No. 8 / I.No. 1.12)Cum97.8597.85165.03FalseNoneNoneFalseNoneFalse16148.18550
3181849109547NoneVol-3, Pg No. 17, It No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Vol-3 P No:17 I No:3.6 )Cum507.79507.79581.18FalseNoneNoneFalseNoneFalse295117.39220
3181850109547NoneVol-3, Pg No. 23, It No. 4.1 A vPlant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 For Grading -V Material (Vol-3, P.No. 23 / I.No. 4.1 A (v))Cum2561.612561.61165.03FalseNoneNoneFalseNoneFalse422742.49830
3181851109547NoneVol-3, Pg No. 26, It No. 4.14 B ii aWater Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Mechanical means Grading-II (53 mm to 22.4 mm) Using Screening Crushable type such as Moorum or Gravel (Vol-3, P.No. 26 / I.No. 4.14, B (ii) (a))Cum2156.822156.8280.72FalseNoneNoneFalseNoneFalse174098.51040
3181852109547NoneVol-3, Pg No. 51, It No. 6.8.2Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (Vol-3, P.No. 51 / I.No. 6.8.2)Sqm1195.831195.831076.25FalseNoneNoneFalseNoneFalse1287012.03750
3181853109547NoneVol-1 Pg No. 15, It No. 2.1.6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates (Vol-1, P.No. 15 / I.No. 2.1.6)Cum6430.296430.2928.7FalseNoneNoneFalseNoneFalse184549.3230
17168781010000NoneNoneBuildingsDrilling Borewell163143.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181854109548NoneVOL 5, 12.4 page - 140Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 13%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield testEach5446.645446.641.0FalseNoneNoneFalseNoneFalse5446.640
3181855109548NoneVOL 5, 12.1 page - 139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 0-50 Mtrs.Rmtr381.1381.150.0FalseNoneNoneFalseNoneFalse19055.00
3181856109548NoneVOL 5, 12.1 page - 139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 50-100MtrsRmtr477.92477.9250.0FalseNoneNoneFalseNoneFalse23896.00
3181857109548NoneVOL 5, 12.1 page - 139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 100-150MtrsRmtr507.79507.7950.0FalseNoneNoneFalseNoneFalse25389.50
3181858109548NoneVOL 5, 12.1 page - 139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) 150-200 MtrsRmtr589.16589.1650.0FalseNoneNoneFalseNoneFalse29458.00
3181859109548NoneVOL 5, 12.32 page - 139Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty.Rmtr1990.991990.9930.0FalseNoneNoneFalseNoneFalse59729.70
3181860109548NoneVOL 5, 12.34 page - 143Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in chargeEach168.92168.921.0FalseNoneNoneFalseNoneFalse168.920
17168781010001NoneNoneBuildingsBOREWELL PUMP, PUMPHOUSE AND ELECTRIFICATION196351.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181861109549NoneVOL-5, Pg No. 151 It. No. 13.11.5 Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 3 HP 5.00 HP - 90 LPM @ 110 m = 10 STG Outlet Dia - 2.00” Each28956.3928956.391.0FalseNoneNoneFalseNoneFalse28956.390
3181862109549NoneVOL-5, Pg No. 128, It No. 11.3.6Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: Mtr783.29783.2985.0FalseNoneNoneFalseNoneFalse66579.650
3181863109549NoneVOL-5, Pg No. 154, It No. 13.22.3 Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. Mtr139.05139.0595.0FalseNoneNoneFalseNoneFalse13209.750
3181864109549NoneVOL-5, Pg No. 155, It No. 13.23.3Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter 6 to 15 HP pumps Each16377.016377.01.0FalseNoneNoneFalseNoneFalse16377.00
3181865109549NoneVOL-5, Pg No. 156, It No. 13.32Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges, tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. Job6695.06695.01.0FalseNoneNoneFalseNoneFalse6695.00
3181866109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Fabricating supplying and mounting MS box made out SWG suitable for floor wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 16SWG Sq CM0.50.519500.0FalseNoneNoneFalseNoneFalse9750.00
3181867109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 75x75x6mm Mtr555.0555.02.0FalseNoneNoneFalseNoneFalse1110.00
3181868109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 6Amps 3/5 Way Each147.0147.01.0FalseNoneNoneFalseNoneFalse147.00
3181869109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 2.5 sqmm Mtr42.042.010.0FalseNoneNoneFalseNoneFalse420.00
3181870109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.The following additional tests are compulsory either to be conducted at works or independent lab with witness by inspecting authority.Additional Tests for FRLS-Applicable Standard Oxygen Index -IS 694-1990, Clause 16.8 Temperature Index -IS 694-1990, Clause 16.13 Smoke Density -IS 694-1990, Clause 16.14 Test for Halogen Acid Gas evaluation -IS 694-1990, Clause 16.12 4 sqmm Mtr63.063.015.0FalseNoneNoneFalseNoneFalse945.00
3181871109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32Amps Each241.0241.01.0FalseNoneNoneFalseNoneFalse241.00
3181872109549NoneSchedule Of Rates PWD, Electrical SR 2023-24. ItemSupplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 Amps TPN Each3088.03088.01.0FalseNoneNoneFalseNoneFalse3088.00
3181873109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying, fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V up to 300mA sensitivity on existing wood/panel board. 32-40 Amps 4 pole Each5147.05147.01.0FalseNoneNoneFalseNoneFalse5147.00
3181874109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Fixing a shunt capacitor of . KVAR capacity with necessary clamps, bolts, and nuts on existing wooden or metal board including banking of more than one capacitor. Each270.0270.03.0FalseNoneNoneFalseNoneFalse810.00
3181875109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. Each515.0515.01.0FalseNoneNoneFalseNoneFalse515.00
3181876109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Digging of Pit for providing GI Pipe type Earthing Per Pit759.0759.01.0FalseNoneNoneFalseNoneFalse759.00
3181877109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg No743.0743.01.0FalseNoneNoneFalseNoneFalse743.00
3181878109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each No676.0676.01.0FalseNoneNoneFalseNoneFalse676.00
3181879109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Good Quality Salt for grounding purposes packed in 50 Kg gunny bag Bag310.0310.01.0FalseNoneNoneFalseNoneFalse310.00
3181880109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +3% and resistivity 14 Ohms/Kms (Max) as per IS-3975 10 Sqmm, 4 Core, (10 GI Strips - 4 x 0.8 mm) Km118004.0118004.00.015FalseNoneNoneFalseNoneFalse1770.060
3181881109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable Km20886.020886.00.01FalseNoneNoneFalseNoneFalse208.860
3181882109549NoneVol-1, Pg No. 8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m In soil (hard) Cum102.0102.03.75FalseNoneNoneFalseNoneFalse382.50
3181883109549NoneVol-1, Pg No. 7, It No. 1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Cum160.0160.03.75FalseNoneNoneFalseNoneFalse600.00
3181884109549NoneVOL-5, Pg No. 127, It No. 11.1.5Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe - Light Duty GI pipe of 40mm dia GI Pipe - 40 mm Dia Mtr461.44461.444.0FalseNoneNoneFalseNoneFalse1845.760
3181885109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Laying the GI Pipe 80 mm to 150 mm dia at Drainage Water Supply Crossing including fixing collars elbows, bends, Tees and other fitting with Cuts and Threads wherever necessary complete. Mtr93.093.04.0FalseNoneNoneFalseNoneFalse372.00
3181886109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Epoxy Terminating Kit (Pothead) suitable for 1.1 kV, LTUG Cable Up to 4C x 50 Sqmm Each382.0382.01.0FalseNoneNoneFalseNoneFalse382.00
3181887109549NoneSchedule Of Rates PWD, Electrical SR 2019-20 Item Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. Mtr19.019.06.0FalseNoneNoneFalseNoneFalse114.00
3181888109549NoneSchedule Of Rates PWD, Electrical SR 2023-24 Item Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter. Each5705.05705.01.0FalseNoneNoneFalseNoneFalse5705.00
3181889109549NoneVol-1, Pg No. 5, It No. 1.4.1Earth work excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m Cum249.26249.260.768FalseNoneNoneFalseNoneFalse191.431680
3181890109549NoneVOL-1, Pg No. 15, It No. 2.1.5Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, plywood / steel formwork, cost of all materials of quality, labour, Usage charges of machineries, curing and all the other appurtenances required to complete the work as per technical specifications. ( The cost of steel reinforcement shall be paid separately).PCC 1:2:4 using 40 mm aggregate Cum6340.686340.680.256FalseNoneNoneFalseNoneFalse1623.214080
3181891109549NoneVol-2, Pg No. 9, It No. 5.4Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Cum6580.676580.670.9FalseNoneNoneFalseNoneFalse5922.6030
3181892109549NoneVol-5, Pg No. 116, It No. 10.6RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm Each16893.0316893.031.0FalseNoneNoneFalseNoneFalse16893.030
3181893109549NoneVol-5, Pg No. 116, It No. 10.7Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work. Each1938.461938.461.0FalseNoneNoneFalseNoneFalse1938.460
3181894109549NoneVol-2, Pg No. 48, It No. 8.40Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge Sqm118.45118.4510.3686FalseNoneNoneFalseNoneFalse1228.160670
3181895109549NoneVol-3, Pg No. 53, It No. 8.4Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman ( Rs. 0.90/ cm height for 15 cm height x 0.90 = Rs. 13.50 / letter) cm13.9113.9150.0FalseNoneNoneFalseNoneFalse695.50
17168781010001NoneNoneBuildingsRepairs to School Building i.e (Painting, Providig GS Sheet to corridor, Door Repair) Ground Floor673372.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181896109550NoneVol-1, Pg No.8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum105.06105.0622.55FalseNoneNoneFalseNoneFalse2369.1030
3181897109550NoneVol-1, Pg No. 15, It No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (Vol-1 S.R.P NO.: 15 I NO: 2.1.3)Cum6168.676168.677.0243FalseNoneNoneFalseNoneFalse43330.5886810
3181898109550NoneVol-1, Pg No. 15, It No. 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Vol-1 S.R.P NO.: 15 I NO: 2.2.3)Cum6526.086526.081.944FalseNoneNoneFalseNoneFalse12686.699520
3181899109550NoneVol-1, Pg No. 111, Sl No. 1aFormwork, Centering & Scaffloding 8% For Isolated FootingCum522.08522.081.35FalseNoneNoneFalseNoneFalse704.8080
3181900109550NoneVol-1, Pg No. 111, Sl No. 9Formwork, Centering & Scaffloding 70% For Columns upto plinthCum4568.254568.250.594FalseNoneNoneFalseNoneFalse2713.54050
3181901109550NoneVol-1 Pg No. 18, It No. 2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (Vol-1 S.R.P NO.: 18 I NO: 2.11 a)t92140.7192140.710.2241FalseNoneNoneFalseNoneFalse20648.7331110
3181902109550NoneVol-2, Pg No. 9, It No. 5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Vol-2 S.R.P NO.: 9 I NO: 5.3)Cum6391.156391.1516.7137FalseNoneNoneFalseNoneFalse106819.7637550
3181903109550NoneVol-1, Pg No. 7, It No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceed ing 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (Vol-1 S.R.P NO.: 7 I NO: 1.9)Cum273.98273.9822.55FalseNoneNoneFalseNoneFalse6178.2490
3181904109550NoneVol-1, Pg No. 7, It No. 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirementcomplete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (Vol.1,P.No.7, I.No.1.8).Cum488.22488.222.9878FalseNoneNoneFalseNoneFalse1458.7037160
3181905109550NoneVol-2, Pg No. 5, It No. 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (Vol-2 S.R.P NO: 5 NO:4.1)Sqm121.54121.5437.5457FalseNoneNoneFalseNoneFalse4563.3043780
3181906109550NoneVol-2, Pg No. 42, It No. 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol-2 S.R.P NO.: 42 I NO: 8.8) (Out side)Sqm382.13382.1313.53FalseNoneNoneFalseNoneFalse5170.21890
3181907109550NoneVol-2, Pg No. 82, It No. 11.16.1Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Vol-2, P.No. 82 / I.No. 11.16.1)Kg140.08140.08603.525FalseNoneNoneFalseNoneFalse84541.7820
3181908109550NoneVol-2, Pg No. 21, It No. 7.1.1Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approvedsteel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ verticalor curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. 0.63 mm thick with zinc coating not less than 275 g/ m² (Vol-2, P.No. 21 / I.No. 7.1.1)Sqm905.37905.3771.375FalseNoneNoneFalseNoneFalse64620.783750
3181909109550NoneVol-2, Pg No. 21, It No. 7.6Providing and fixing 15 cm wide, 45 cm overallsemi-circular plain G.S. sheet gutter with iron brackets 40x3mm size, bolts, nuts and washers etc., including making necessary connections with rain water pipes complete. (0.63 mm thick with zinc coating not less than 275 g/m²)m664.35664.3528.55FalseNoneNoneFalseNoneFalse18967.19250
3181910109550NoneVol-2, Pg No. 85, It No. 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg188.49188.4990.72FalseNoneNoneFalseNoneFalse17099.81280
3181911109550NoneVol-2, Pg No. 51, It No. 8.60Removing dry or oil bound distemper,waterproofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. as per specifications and as per directions of Engineer in charge.Sqm17.5117.511279.2755FalseNoneNoneFalseNoneFalse22400.1140050
3181912109550NoneVol-2, Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm162.74162.74882.313FalseNoneNoneFalseNoneFalse143587.617620
3181913109550NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm179.22179.22416.77FalseNoneNoneFalseNoneFalse74693.51940
3181914109550NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm51.551.550.76FalseNoneNoneFalseNoneFalse2614.140
3181915109550NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm143.17143.1770.8FalseNoneNoneFalseNoneFalse10136.4360
3181916109550NoneVol-2, Pg No. 100, It No. 12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specificationsCum101779.45101779.450.072FalseNoneNoneFalseNoneFalse7328.12040
3181917109550NoneVol-2, Pg No. 104, It No. 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Nos1046.481046.481.0FalseNoneNoneFalseNoneFalse1046.480
3181918109550NoneVol-2, Pg No. 69, It No. 10.6.3Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc completeNos61.861.86.0FalseNoneNoneFalseNoneFalse370.80
3181919109550NoneVol-2, Pg No. 100, It No. 12.15Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures)Sqm7667.327667.322.52FalseNoneNoneFalseNoneFalse19321.64640
17168781010000NoneNoneBuildingsRepairs to School Building i.e (Painting, Providig GS Sheet to corridor, Door Repair) First Floor283091.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181920109551NoneVol-2, Pg No.85, It No. 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc.Kg190.37190.37151.2FalseNoneNoneFalseNoneFalse28783.9440
3181921109551NoneVol-2, Pg No. 51, It No. 8.60Removing dry or oil bound distemper,waterproofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. as per specifications and as per directions of Engineer in charge.Sqm17.6817.681314.7657FalseNoneNoneFalseNoneFalse23245.0575760
3181922109551NoneVol-2 Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm164.36164.36832.3979FalseNoneNoneFalseNoneFalse136812.9188440
3181923109551NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm181.01181.01482.3677FalseNoneNoneFalseNoneFalse87313.3773770
3181924109551NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm52.0152.0135.28FalseNoneNoneFalseNoneFalse1834.91280
3181925109551NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm144.6144.635.28FalseNoneNoneFalseNoneFalse5101.4880
17168781010001NoneNoneBuildingsRepairs to School Building i.e (Painting, Providig GS Sheet to corridor, Door Repair) Second Floor236360.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181926109552NoneVol-2, Pg No. 51, It No. 8.60Removing dry or oil bound distemper,waterproofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. as per specifications and as per directions of Engineer in charge.Kg17.8617.861208.107FalseNoneNoneFalseNoneFalse21576.791020
3181927109552NoneVol-2 Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.99165.99564.52FalseNoneNoneFalseNoneFalse93704.67480
3181928109552NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm182.8182.8643.587FalseNoneNoneFalseNoneFalse117647.70360
3181929109552NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm52.5352.5317.28FalseNoneNoneFalseNoneFalse907.71840
3181930109552NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm146.03146.0317.28FalseNoneNoneFalseNoneFalse2523.39840
17168781010001NoneNoneBuildingsRepairs to PU College Building (Painting, Window repair) Ground Floor377631.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181931109553NoneVol-2, Pg No.46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm162.74162.741177.2836FalseNoneNoneFalseNoneFalse191591.1330640
3181932109553NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm179.22179.22626.4208FalseNoneNoneFalseNoneFalse112267.1357760
3181933109553NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm51.551.597.9319FalseNoneNoneFalseNoneFalse5043.492850
3181934109553NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm143.17143.1797.9319FalseNoneNoneFalseNoneFalse14020.9101230
3181935109553NoneVol-2, Pg No. 85, It No. 11.30.2Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 5.5 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.Sqm1295.741295.7442.222FalseNoneNoneFalseNoneFalse54708.734280
17168781010001NoneNoneBuildingsRepairs to PU College Building (Painting, Window repair) First Floor287123.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181936109554NoneVol-2 Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm164.36164.361075.0517FalseNoneNoneFalseNoneFalse176695.4974120
3181937109554NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm181.01181.01407.4183FalseNoneNoneFalseNoneFalse73746.7864830
3181938109554NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm52.0152.0157.291FalseNoneNoneFalseNoneFalse2979.704910
3181939109554NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm144.6144.657.291FalseNoneNoneFalseNoneFalse8284.27860
3181940109554NoneVol-2, Pg No. 85, It No. 11.30.2Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 5.5 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.Sqm1308.691308.6919.4219FalseNoneNoneFalseNoneFalse25417.2463110
17168781010000NoneNoneBuildingsRepairs to PU College Building (Painting, Window repair) Second Floor284743.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181941109555NoneVol-2 Pg No. 46, It No. 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats ap plied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm165.99165.99905.5506FalseNoneNoneFalseNoneFalse150312.3440940
3181942109555NoneVol-2, Pg No. 46, It No. 8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm182.8182.8569.5199FalseNoneNoneFalseNoneFalse104108.237720
3181943109555NoneVol-2, Pg No. 47, It No. 8.34.3Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm52.5352.5352.869FalseNoneNoneFalseNoneFalse2777.208570
3181944109555NoneVol-2, Pg No. 47, It No. 8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm146.03146.0352.869FalseNoneNoneFalseNoneFalse7720.460070
3181945109555NoneVol-2, Pg No. 85, It No. 11.30.2Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 5.5 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in Charge.Sqm1321.651321.6515.0FalseNoneNoneFalseNoneFalse19824.750
17168781010001NoneNoneBuildingsConstruction of Jalkumbh (2 Nos)114894.18
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3181946109556NoneVol-1, Pg No.8, It No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (Vol-1, P.No. 8 / I.No. 1.12)Cum97.8597.851.2FalseNoneNoneFalseNoneFalse117.420
3181947109556NoneVol-1, Pg No.8, It No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Vol-1 S.R.P NO: 8 NO: 1.14.1)Cum105.06105.064.335FalseNoneNoneFalseNoneFalse455.43510
3181948109556NoneVol-1, Pg No. 15, It No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates (Vol-1 S.R.P NO.: 15 I NO: 2.1.3)Cum6168.676168.670.578FalseNoneNoneFalseNoneFalse3565.491260
3181949109556NoneVol-1, Pg No. 15, It No. 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (Vol-1 S.R.P NO.: 15 I NO: 2.2.3)Cum6526.086526.081.3499FalseNoneNoneFalseNoneFalse8809.5553920
3181950109556NoneVol-1, Pg No. 111, Sl No. 1aFormwork, Centering & Scaffloding 8% For Isolated FootingCum522.08522.081.3499FalseNoneNoneFalseNoneFalse704.7557920
3181951109556NoneVol-2 Pg No. 9, It No. 5.3Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Vol-2 S.R.P NO.: 9 I NO: 5.3)Cum6391.156391.154.5FalseNoneNoneFalseNoneFalse28760.1750
3181952109556NoneVol-1, Pg No. 16, It No.2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Vol-1 S.R.P NO.: 16 I NO: 2.5.2)Cum7048.297048.290.6749FalseNoneNoneFalseNoneFalse4756.8909210
3181953109556NoneVol-1, Pg No. 112, Sl No. 15Formwork, Centering & Scaffloding 50% For SlabCum3524.143524.140.6749FalseNoneNoneFalseNoneFalse2378.4420860
3181954109556NoneVol-1, Pg No. 18, It No. 2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (Vol-1 S.R.P NO.: 18 I NO: 2.11 a)t92140.7192140.710.0539FalseNoneNoneFalseNoneFalse4966.3842690
3181955109556NoneVol-2, Pg No. 42, Sl No. 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol-2 S.R.P NO.: 42 I NO: 8.8) (Out side)Sqm382.13382.137.8FalseNoneNoneFalseNoneFalse2980.6140
3181956109556NoneVol-2, Pg No. 46, It No. 8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (Vol-2 S.R.P NO.: 46 I NO: 8.30)Sqm179.22179.227.8FalseNoneNoneFalseNoneFalse1397.9160
3181957109556NoneVol-3, Pg No. 146, It No. 16.15bProviding and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 1000mm dia (Vol.3, P.No.146, I.No.16.15 b)m8196.748196.745.0FalseNoneNoneFalseNoneFalse40983.70
3181958109556NoneVol-5, Pg No. A44, Sl No. 655PVC pipe - OD 50mm and 6 Kg/sqcm (Vol 5 Sl No. 655 Pg No: A44)m53.5653.56120.0FalseNoneNoneFalseNoneFalse6427.20
3181959109556NoneVol-5, Pg No. A44, Sl No. 654PVC pipe - OD 32mm and 10 Kg/sqcm (Vol 5 Sl No. 654 Pg No: A44)m33.9933.9940.0FalseNoneNoneFalseNoneFalse1359.60
3181960109556NoneVol-5, Pg No. A44, Sl No. 652PVC pipe - OD 25mm and 10 Kg/sqcm (Vol 5 Sl No. 652 Pg No: A44)m23.6923.6940.0FalseNoneNoneFalseNoneFalse947.60
3181961109556NoneVol-2, Pg No. 305, Sl. No. 13.3.2Providing and fixing brass stop cock of approved quality : 20 mm nominal bore (Vol 2 I No. 13.3.2 Pg No: 305)Nos314.15314.1520.0FalseNoneNoneFalseNoneFalse6283.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17168781000000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17168781000000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17168781000000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17168781000000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17168781000000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17168781000000NoneNoneELIGIBILITYTender invited only for eligible contractors registered under Karnataka Public Works DeptNone
17168781000000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17168781000000NoneNoneELIGIBILITYThe Tenderer shall obtain the workdone certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the Bid.None
17168781000000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thiry first day of March of succeeding year(both days inclusive)None
17168781000000NoneNoneELIGIBILITYAll the documents to be uploaded shall be neatly scanned and the documents scanned shall be in original.None
17168781000000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents can also be uploaded in the tasks created under Document/Evidence Required from the Bidder.None
17168781000000NoneNoneELIGIBILITYThe Employer reserves the right to Reject any or all Tenders without assigning any reasonNone
17168781000000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing e-procurement portalNone
17168781000000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17168781000000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.None
17168781000000NoneNoneELIGIBILITYAll materials required for the work shall be procured by the tenderer himself and should be got tested by the quality control authorities at his own cost before use on work.None
17168781000000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17168781000000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17168781000000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner. ( section 3 & 4 of the bid document ) and shall be uploaded properly, signed by Tenderer . Necessary Certificates shall be uploaded along with the formats wherever required. General documents Section can be used for this purpose.None
17168781000000NoneNoneELIGIBILITYPhysical quantities requirement to qualify the Tenderer is 80% of the estimated quantity as per Govt Order No. .PW/630/CRM/2014 Bangalore Dated: 17-11-2014None
17168781000000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17168781000000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17168781000000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWP & IWT Dept Division Belagavi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17168781000000NoneNoneELIGIBILITYThe Tenderer must be present during opening of tender and submit uploaded documents duly attested by Gazzeted Officer not below the rank of Executive Engineer and also produce original documents for confirmation at the time of opening.None
17168781000000NoneNoneELIGIBILITYThe contractor should employ only registered labours as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009. As per EPF & MP act 1952 in respect of the employees engaged by or through contractors, agencies and contractors shall have provident fund code no. & all the contract employees deployed by them are enrolled as members of provident fund.None
17168781000000NoneNoneELIGIBILITYAs per Karnataka State Govt Order No:LD/300/LET/2006/Bangalore Dt: 1-1-2007 and Govt Ltr No:PW/134/BMS/2007, Dt: 27-7-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17168781000000NoneNoneELIGIBILITYTHE CONTRACTORS ARE INSTRUCTED TO SUBMIT ONLY RELEVENT INFORMATION WITH RECORDS AS REQUIRED AND SPECIFIED IN QUALIFICATION CRITERIA. ANY JUNK, SUPERFLUOS AND UNNECESARY DOCUMENTS IF UPLOADED WILL TREATED AS MISLEADING AND SUCH TENDERS ARE LIABLE TO BE REJECTED.None
17168781000000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes (excluding GST) as per prevailing Government Orders.None
17168781000000NoneNoneELIGIBILITYThe item rates are excluding GST but inclusive of all other charges.None
17168781000000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately.None
17168781000000NoneNoneELIGIBILITYThe Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delays as determined by the authority while granting the extension of time.None
17168781000000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2023-24 in the Technical Qualification CriteriaNone
17168781000000NoneNoneELIGIBILITYThe Project Completion period is 6(Six) months and the Tenderer should maintain work during the defect liability period, which is (1)One year after successful completion of the work. (including Monsoon).None
17168781000000NoneNoneELIGIBILITYAppeal - As per the Govt. ltr no 572/CRM/2020/PWD-COMM-1-PWD-SEC, dated 09.10.2020 the Appeals received in e-procurement as per KTPP Act / Rules within the stipulated time will only be considered. Any written Appeal Received shall not be consideredNone
17168781000000NoneNoneELIGIBILITYThe tenderer should be a KPWD registered Class-II and Above Contractor.None
17168781000000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) for Practicing Chartered Account is PrefferedNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 242.43 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 Satisfactorily completed, as prime contractor, at least one similar work such as Building work of value not less than Rs. 60.61 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2018-19, 2019-20, 2020-21, 2021-22 and 2022-23 executed the following minimum quantities of work 1) Earth work Excavation in foundation/Subgrade & Earthen shoulder 1445.00 Cum, 2) Concrete Works(PCC/RCC)-189.00 Cum, 3)Steel reinforcement Works 11.00 Tonne, 4) Plastering Works 1357.00 Sqm 5) Laying of Tiles Works 255.08 Sqm 6)BBM/SSM/CC Solid Block/Similar Masory Works 163.56 Cum 7)Pavers 861.00 SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe EMD of Rs. 2,00000.00 shall be paid in full through e payment or in two parts i.e. part (1) Rs, 100,000.00 by e -payment Part (2) Rs. 100,000.00 EMD shall be in the form of Bank Guarantee and shall be scanned and uploaded along with the technical Bid. The original Bank Guarantee should be handed over to the Executive Engineer before the prescribed date and time of opening of the Bids.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bank Guarantee shall be scanned and uploaded along with the technical Bid
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity equal to (AxNx1.5 - B) A equal to Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. 0.50 Year where B equal to Value at 2023-24 price level, of existing commitments and on-going works to be completed during the next 0.50 Year form the probable date of Award of this contract.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Calculation Sheet on letter head
NoneNoneNoneNoneAs per this note each tenderer should further demonstrate Availability of key equipment/ machinery for execution of the work. However as per Govt Circular no GOFDAE 263EXP122022 dt 11 052022 this clause for owning key equipment for works costing upto Rs 3.00 Crores is exempted. However it is obligatory for the contractor to use the fallowing machineries for various activities involved in construction as per MORTH specifications. Tippers-1 Own, 1-Hire, Concrete Mixer Batching Plant-1 Own, Vibrator(Pin/Plate)-2 Own 2-Hire and Water Tanker-2 Hire, Floater Vibrator-1 OwnCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Should scan and attach the requisite ownership documents hirelease agreement with the Bid and prod
NoneNoneNoneNoneQualification and experience of the key technical and Management personnel in permanent employment with the Tenderer and those that are proposed to be deployed on this work, if work is awardedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Biodata of the personnel
NoneNoneNoneNoneAssessed Tender Capacity shall be more than the Tendered AmountCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Assessment on the Letter Head of the Tenderer
NoneNoneNoneNoneEach Tenderer should further demonstrate- liquid assets and/or availability of credit facilities of not less than Rs.60.61 lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc. (Enclosed with this NIT under Forms of Bid qualification information as per Govt. Circular No. FD-CAM/16/2022(P-2), dated. 22.08.2022) (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReport on the financial standing of the Tenderer, such as profit and loss statements and auditors report for the last five years.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Auditors Report
NoneNoneNoneNoneConstitutional and Legal Status of the TendererOthersPWD Registration Certificate (Class I/II/III/IV)
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNonePrincipal Place of Business (Full address)OthersOthers -- Address proof, with declaration on Bidders letter head
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Address proof, with declaration on Bidders letter head
NoneNoneNoneNoneName and Address Telephone Nos. Fax Nos. and email ID of the Tenderers BankersOthersOthers -- Information on the Letter Head of the tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneThe proposed methodology and program of construction, backed with equipment planning and deployment duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completionOthersOthers -- CPM/PERT chart
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- CPM/PERT chart
NoneNoneNoneNoneUnique Document Identification Number (UDIN) for Practicing Chartered Account is PrefferedOthersOthers -- UDIN
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- UDIN
NoneNoneNoneNoneInformation on works which are yet to be completed.OthersOthers -- Information in Format 5 and cerificate in format-3
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Information in Format 5 and cerificate in format-3
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersOthers -- New works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- New works
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersOthers -- Information in Format 7
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Information in Format 7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involved:OthersOthers -- Information in Format 10
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Others -- Information in Format 10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Registration CertificateTrueTechnical Bid
Annual Turnover Certificate from CA from 2018-19 to 2022-23TrueTechnical Bid
Work done certificate for similar nature of Work from Competant authority Rank of Executive Engineer & aboveTrueTechnical Bid
Name and Address of Contractor for CommunicationTrueTechnical Bid
Liquid assets or availability of credit facilities Credit lines or letter of credit or certificates from the banksTrueTechnical Bid
UDIN is PrefferedTrueTechnical Bid
List of ongoing works/ Works in HandTrueTechnical Bid
Filled froms enclosed with NITTrueTechnical Bid
Bid capacity on Letter headTrueTechnical Bid
Qty wise work done certificate from competent authourity Rank of Executive Engineer & aboveTrueTechnical Bid
Profit and Loss A/C StatementTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1716878216000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD Dn Killa Belagavi
streetNone
cityBelagavi
stateKarnataka
pin590016
tenderRecallDTONone