tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1717080538000 | 0 | None | None | Water /sewage treatment tanks | Design and Construction of Faecal Sludge Treatment Plant (FSTP) at Savanur (12 KLD) and Sirsi (15 KLD) including Operation and Maintenance of constructed facilities for 5 years. Package-10 (Turnkey basis) | 32413215.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3206723 | 110274 | None | 001 | PART- A: (Lumpsum): (FSTP Components) Design, Construction and successful commissioning of Faecal Sludge Treatment Plant (FSTP) including Screening Chamber, Planted Drying Bed, Integrated Settler, Anaerobic Filter & Collecting tank,Vertical Planted Gravel Filter, Polishing pond, Operator room at Savanur (12 KLD), which includes Works as per specification(indicative) and drawings(indicative) as per RFP document and as per CPHEEO manual and relevant IS codes, Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 15620228.0 | 15620228.0 | 1.0 | False | None | None | False | None | False | 15620228.0 | 0 | 3206724 | 110274 | None | 002 | PART-B: (Lumpsum): (Supporting facilities) Design, Construction of site Development works,Septic tank, sludge storage yard,internal roads(3.75m wide) length as per site condition requirements, footpath(2m wide) length as per site condition requirements and storm water drainage length as per site condition requirements, CC TV system & solar street lighting, Boundary wall & Pillars, Gate, Borewell and landscaping work in the premises at Savanur (12 KLD), which includes Works as per specification(indicative) and drawings(indicative) as per RFP document etc. in complete as per the direction of the Engineer-in-charge of work and trial run of the plant for 3 months & Defects Liability Period of 2 year from the date of completion of trial run, Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 11253027.0 | 11253027.0 | 1.0 | False | None | None | False | None | False | 11253027.0 | 0 | 3206725 | 110274 | None | 003 | PART-C: (O&M) Operation & Maintenance of Faecal Sludge Treatment Plant (FSTP) at Savanur (12 KLD) after commissioning of components built up under this contract for 5 years (including 2 year defect liability period) 1st year Operation and maintenance of the components (including defect liability period) taken up under this contract excluding power charges including manpower, repair, establishment cost, consumables and disposing of sludge etc., as per RFP document and as directed by the engineer -in-charge. Including all lift and lead charges etc., | Job | 760169.76 | 760169.76 | 1.0 | False | None | None | False | None | False | 760169.76 | 0 | 3206726 | 110274 | None | 004 | 2nd year Operation and maintenance of the components (including defect liability period) taken up under this contract excluding power charges including establishment cost, repairs, consumables and disposing of sludge etc., as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 836186.74 | 836186.74 | 1.0 | False | None | None | False | None | False | 836186.74 | 0 | 3206727 | 110274 | None | 005 | 3rd year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1191421.18 | 1191421.18 | 1.0 | False | None | None | False | None | False | 1191421.18 | 0 | 3206728 | 110274 | None | 006 | 4th year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1310563.29 | 1310563.29 | 1.0 | False | None | None | False | None | False | 1310563.29 | 0 | 3206729 | 110274 | None | 007 | 5th year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1441619.62 | 1441619.62 | 1.0 | False | None | None | False | None | False | 1441619.62 | 0 |
| 1717080538000 | 0 | None | None | Water /sewage treatment tanks | Design and Construction of Faecal Sludge Treatment Plant (FSTP) at Sirsi (15 KLD) including Operation and Maintenance of constructed facilities for 5 years. Package-10 (Turnkey basis) | 41474529.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3206730 | 110275 | None | 001 | PART- A: (Lumpsum): (FSTP Components) Design, Construction and successful commissioning of Faecal Sludge Treatment Plant (FSTP) including Screening Chamber, Planted Drying Bed, Integrated Settler, Anaerobic Filter & Collecting tank,Vertical Planted Gravel Filter, Polishing pond, Operator room at Sirsi (15 KLD), which includes Works as per specification(indicative) and drawings(indicative) as per RFP document and as per CPHEEO manual and relevant IS codes, Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 23284771.0 | 23284771.0 | 1.0 | False | None | None | False | None | False | 23284771.0 | 0 | 3206731 | 110275 | None | 002 | PART-B: (Lumpsum): (Supporting facilities) Design, Construction of site Development works,Septic tank, sludge storage yard,internal roads(3.75m wide) length as per site condition requirements, footpath(2m wide) length as per site condition requirements and storm water drainage length as per site condition requirements, CC TV system & solar street lighting, Boundary wall & Pillars, Gate, Borewell and landscaping work in the premises at Sirsi (15 KLD), which includes Works as per specification(indicative) and drawings(indicative) as per RFP document etc. in complete as per the direction of the Engineer-in-charge of work and trial run of the plant for 3 months & Defects Liability Period of 2 year from the date of completion of trial run, Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 12258958.0 | 12258958.0 | 1.0 | False | None | None | False | None | False | 12258958.0 | 0 | 3206732 | 110275 | None | 003 | PART-C: (O&M) Operation & Maintenance of Faecal Sludge Treatment Plant (FSTP) at Sirsi (15 KLD) after commissioning of components built up under this contract for 5 years (including 2 year defect liability period) 1st year Operation and maintenance of the components (including defect liability period) taken up under this contract excluding power charges including manpower, repair, establishment cost, consumables and disposing of sludge etc., as per RFP document and as directed by the engineer -in-charge. Including all lift and lead charges etc., | Job | 783692.16 | 783692.16 | 1.0 | False | None | None | False | None | False | 783692.16 | 0 | 3206733 | 110275 | None | 004 | 2nd year Operation and maintenance of the components (including defect liability period) taken up under this contract excluding power charges including establishment cost, repairs, consumables and disposing of sludge etc., as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 862061.38 | 862061.38 | 1.0 | False | None | None | False | None | False | 862061.38 | 0 | 3206734 | 110275 | None | 005 | 3rd year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1294575.99 | 1294575.99 | 1.0 | False | None | None | False | None | False | 1294575.99 | 0 | 3206735 | 110275 | None | 006 | 4th year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1424033.59 | 1424033.59 | 1.0 | False | None | None | False | None | False | 1424033.59 | 0 | 3206736 | 110275 | None | 007 | 5th year Operation and maintenance of the components taken up under this contract including establishment cost, repairs, consumables etc as per RFP document and as directed by the engineer -in-charge ---- Including all lift and lead charges etc., As per the Instructions of Engineering-in-charge. | Job | 1566436.95 | 1566436.95 | 1.0 | False | None | None | False | None | False | 1566436.95 | 0 |
|
|
---|
technicalCriterionList | createdTs | version | createdDate | modifiedDate | description | criterionCategoryText | criterionTypeOthersValue | tenderTechnicalCriterionDocumentList |
---|
None | None | None | None | Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs) | None | None | | None | None | None | None | Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender) | None | None | | None | None | None | None | Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction) | None | None | | None | None | None | None | Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year | None | None | | None | None | None | None | Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year | None | None | | None | None | None | None | Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx) | None | None | | None | None | None | None | Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period) | None | None | | None | None | None | None | Total value of civl engineering works executed and payments received in the last five years (year-wise) | None | None | | None | None | None | None | List of existing commitments and ongoing works | None | None | | None | None | None | None | List of works for which tenders already submitted | None | None | | None | None | None | None | Banker Details for reference | None | None | | None | None | None | None | Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded | None | None | | None | None | None | None | Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years | None | None | | None | None | None | None | Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded | None | None | | None | None | None | None | List of Financial Resources with Certificates | None | None | | None | None | None | None | The intending bidder satisfactorily completed (at least 90% of the contract value), at least one similar works such as Faecal Sludge Treatment Plant (FSTP) /Sewage treatment plant(STP) costing not less than Rs. 369.44 Lakhs in the last five years 2019-20 to 2023-24 / preceding 5 years | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Work Done Certificate |
| None | None | None | None | The intending bidder should have executed in any one financial year of the last five years (2019-20) the following minimum quantities of work1.Earthwork excavation in all kinds of soil5546.00Cum2.Cement concrete (Including RCC and PCC)1370.00Cum3.Steel 73.50 Tonne | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Work Done Certificate |
| None | None | None | None | The Bidder should have designed, supplied, built, installed, tested and commissioned a Sewage Treatment Plant (STP) minimum capacity work (single or multiple STPs works totaling to capacity) not less than 1 MLD OR Faecal Sludge Treatment Plant (FSTP) minimum capacity (single or multiple FSTPs works totaling to capacity) not less than 10 KLD-01 | Past Experience | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Work Done Certificate |
| None | None | None | None | availability by owning at least 50% of the required key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents ( commitment agreements etc.)for availability for this work are furnished.1. Excavators1 No2.Tippers 2 No3. Ajax Self-loading Concrete mixer/batching plant : 2 No /1 No 4. Soil compactor/ Vibratory roller1 No | Capabilities of Vendor | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Others -- Attach the RC Copy of owner for own/Hired particular vehicles ,Attach the Updated Insurance and Fitness Certificates for the vehicles |
| None | None | None | None | The intending bidder should have (in the last five years i.e. from 2019-20 to 2023-24 preceding 5 years) achieved in at least two financial years a minimum financial turnover of Rs.1477.76 Lakhs. (Audited profit and loss account balance sheet certified by the chartered accountant along with the turnover certificate with UDIN for the above-indicated years along with IT returns filed for the said years all to be uploaded with the technical bid ). | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Audited CA Certificate of Annual Turnover |
| None | None | None | None | The intending bidder/ firm/ company shall furnish details of liquid assets/ availability of credit facilities of not less than the equivalent of the estimated cash flow for 3 months in the peak construction period amounting to Rs.246.29 Lakhs for meeting the required funds in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks | Financial Status | None | createdTs | version | createdDate | modifiedDate | documentName |
---|
None | None | None | None | Line of Credit |
|
|
---|