tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1717396937000 | 0 | None | None | Electrical | Part A Internal wiring to BEO office | 467935.7 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3222783 | 111088 | None | 1.1.4 | Supplying heavy gauge PVC conduit pipe . dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.( 40 mm dia 2.5 mm thick)( B.R- 149.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No. 419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 153.47 | 153.47 | 80.0 | False | None | None | False | None | False | 12277.6 | 0 | 3222784 | 111088 | None | 1.2.1 | Supplying heavy gauge PVC conduit pipe mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary ( 19/20 mm dia 2 mm thick) (( B.R- 66.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No. 419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 67.98 | 67.98 | 280.0 | False | None | None | False | None | False | 19034.4 | 0 | 3222785 | 111088 | None | 1.2.2 | Supplying heavy gauge PVC conduit pipe mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary(25 mm dia 2 mm thick)(( B.R- 78.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 80.34 | 80.34 | 170.0 | False | None | None | False | None | False | 13657.8 | 0 | 3222786 | 111088 | None | 1.3.1 | Supplying heavy gauge PVC Conduit Pipe . dia mmthick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.(19/20 mm dia 2 mm thick)(( B.R- 68.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 70.04 | 70.04 | 200.0 | False | None | None | False | None | False | 14008.0 | 0 | 3222787 | 111088 | None | 1.3.2 | Supplying heavy gauge PVC Conduit Pipe . dia mmthick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.(25 mm dia 2 mm thick)( B.R- 79.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 81.37 | 81.37 | 180.0 | False | None | None | False | None | False | 14646.6 | 0 | 3222788 | 111088 | None | 1.5.1 | Supplying and fixing PVC/metal conduit Deep junction box(19/20 mm deep Junction box)(( B.R- 49.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 50.47 | 50.47 | 20.0 | False | None | None | False | None | False | 1009.4 | 0 | 3222789 | 111088 | None | 1.5.2 | Supplying and fixing PVC/metal conduit Deep junction box(25 mm deep Junction box)( B.R- 56.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.420) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 57.68 | 57.68 | 15.0 | False | None | None | False | None | False | 865.2 | 0 | 3222790 | 111088 | None | 1.9.1 | Supplying PVC/GI flexible conduit pipe mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely(20 mm)( B.R- 19.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.420) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 19.57 | 19.57 | 4.0 | False | None | None | False | None | False | 78.28 | 0 | 3222791 | 111088 | None | 1.9.2 | Supplying PVC/GI flexible conduit pipe mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely(25 mm)( B.R- 22.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.420) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 22.66 | 22.66 | 15.0 | False | None | None | False | None | False | 339.9 | 0 | 3222792 | 111088 | None | 1.9.4 | Supplying PVC/GI flexible conduit pipe mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely(40 mm)( B.R- 36.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.420) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 37.08 | 37.08 | 8.0 | False | None | None | False | None | False | 296.64 | 0 | 3222793 | 111088 | None | 1.13 | Supplying And Fixing Metal Fan Box with Round Hook.( B.R- 117.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.421) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 120.51 | 120.51 | 8.0 | False | None | None | False | None | False | 964.08 | 0 | 3222794 | 111088 | None | 2.2.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet(Short point upto 3m from tapping point to out let via switch box)( B.R- 269+ASL 3% ) (Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Point | 277.07 | 277.07 | 28.0 | False | None | None | False | None | False | 7757.96 | 0 | 3222795 | 111088 | None | 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet(Medium point above 3m upto 6m from tapping point to out letvia switch box)( B.R- 379.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Point | 390.37 | 390.37 | 17.0 | False | None | None | False | None | False | 6636.29 | 0 | 3222796 | 111088 | None | 2.2.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet(Long point above 6m upto 10m from tapping point to out let viaswitch box)( B.R- 555.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Point | 571.65 | 571.65 | 30.0 | False | None | None | False | None | False | 17149.5 | 0 | 3222797 | 111088 | None | 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(1.5 mm2)( B.R- 26.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 26.78 | 26.78 | 450.0 | False | None | None | False | None | False | 12051.0 | 0 | 3222798 | 111088 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments(2.5 mm2)( B.R- 42.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 43.26 | 43.26 | 1500.0 | False | None | None | False | None | False | 64890.0 | 0 | 3222799 | 111088 | None | 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(4 mm2)( B.R- 63.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.423) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 64.89 | 64.89 | 850.0 | False | None | None | False | None | False | 55156.5 | 0 | 3222800 | 111088 | None | 2.3.5 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(6 mm2)( B.R- 92.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.423) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 94.76 | 94.76 | 500.0 | False | None | None | False | None | False | 47380.0 | 0 | 3222801 | 111088 | None | 3.4.1 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall(1-2 Way)( B.R- 138.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 142.14 | 142.14 | 10.0 | False | None | None | False | None | False | 1421.4 | 0 | 3222802 | 111088 | None | 3.4.2 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall(3 Way)( B.R- 159.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 163.77 | 163.77 | 8.0 | False | None | None | False | None | False | 1310.16 | 0 | 3222803 | 111088 | None | 3.4.3 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall(4-5 Way)( B.R- 177.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 182.31 | 182.31 | 8.0 | False | None | None | False | None | False | 1458.48 | 0 | 3222804 | 111088 | None | 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall(6 Way)( B.R- 220.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 226.6 | 226.6 | 10.0 | False | None | None | False | None | False | 2266.0 | 0 | 3222805 | 111088 | None | 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting inBrick/Stone/C.C wall(8 Way)( B.R- 261.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 268.83 | 268.83 | 10.0 | False | None | None | False | None | False | 2688.3 | 0 | 3222806 | 111088 | None | 3.5.1 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.(1 to 2 Module)( B.R- 137.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 141.11 | 141.11 | 10.0 | False | None | None | False | None | False | 1411.1 | 0 | 3222807 | 111088 | None | 3.5.2 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.(3 Module)( B.R- 161.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 165.83 | 165.83 | 8.0 | False | None | None | False | None | False | 1326.64 | 0 | 3222808 | 111088 | None | 3.5.3 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.(4 Module)( B.R- 175.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 180.25 | 180.25 | 8.0 | False | None | None | False | None | False | 1442.0 | 0 | 3222809 | 111088 | None | 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.(6 Module)( B.R- 234.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 241.02 | 241.02 | 10.0 | False | None | None | False | None | False | 2410.2 | 0 | 3222810 | 111088 | None | 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete onthe existing metal/PVC box.(8 Module)( B.R- 284.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 292.52 | 292.52 | 10.0 | False | None | None | False | None | False | 2925.2 | 0 | 3222811 | 111088 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A One Way Switch)( B.R- 102.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 105.06 | 105.06 | 45.0 | False | None | None | False | None | False | 4727.7 | 0 | 3222812 | 111088 | None | 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A Two Way Switch)( B.R- 166.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 170.98 | 170.98 | 2.0 | False | None | None | False | None | False | 341.96 | 0 | 3222813 | 111088 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A Three Way socket)( B.R- 171.00+ASL 3%+ )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 176.13 | 176.13 | 20.0 | False | None | None | False | None | False | 3522.6 | 0 | 3222814 | 111088 | None | 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(Stepped Fan Regulator Two Module)( B.R- 357.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 367.71 | 367.71 | 15.0 | False | None | None | False | None | False | 5515.65 | 0 | 3222815 | 111088 | None | 3.6.7 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(16A One Way Switch)( B.R- 180.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 185.4 | 185.4 | 4.0 | False | None | None | False | None | False | 741.6 | 0 | 3222816 | 111088 | None | 3.6.8 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A Bell Push)( B.R- 177.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 182.31 | 182.31 | 1.0 | False | None | None | False | None | False | 182.31 | 0 | 3222817 | 111088 | None | 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(32A DP Switch)( B.R- 236.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 335.78 | 335.78 | 12.0 | False | None | None | False | None | False | 4029.36 | 0 | 3222818 | 111088 | None | 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6/16A Universal Socket)( B.R- 236.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 243.08 | 243.08 | 12.0 | False | None | None | False | None | False | 2916.96 | 0 | 3222819 | 111088 | None | 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(TV/Telephone Socket)( B.R- 156.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 160.68 | 160.68 | 2.0 | False | None | None | False | None | False | 321.36 | 0 | 3222820 | 111088 | None | 3.14.4 | Supplying And fixing/replacing of 6/16/32A electricalaccessories on existing switch board.(16A Three Pin Top)( B.R- 87.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.427) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 89.61 | 89.61 | 2.0 | False | None | None | False | None | False | 179.22 | 0 | 3222821 | 111088 | None | 5.1 | Supplying push button operated direct online starter with an antiweld silver cadmium oxide contactor with replaceable fixed and moving contacts and bimetallic thermal overload relay help in anticorrosion treated sheet steel or iron clad enclosure and fixing the same to suitable capacity wires for 230/440 V 1/3 phase motor upto 5 HP( B.R- 1927.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.431) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 1984.81 | 1984.81 | 1.0 | False | None | None | False | None | False | 1984.81 | 0 | 3222822 | 111088 | None | 5.6.4 | Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered invertedwooden plugs screws(12" x 12" x 2")( B.R- 181.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.531) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 186.43 | 186.43 | 1.0 | False | None | None | False | None | False | 186.43 | 0 | 3222823 | 111088 | None | 5.7.4 | Supplying & fixing of Porcelain fuse channel with cut out onexisting wooden/panel using necessary nuts, bolts and washers.(100 A)( B.R- 691.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.431) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 711.73 | 711.73 | 2.0 | False | None | None | False | None | False | 1423.46 | 0 | 3222824 | 111088 | None | 5.11.2 | Supplying of on load change over switches 4 poles, AC- 23A Duty, 415V, 50Hz, AC Supply. (Open Execution)(100 A)( B.R- 7090.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.432) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 7302.7 | 7302.7 | 1.0 | False | None | None | False | None | False | 7302.7 | 0 | 3222825 | 111088 | None | 5.15.9 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism.FOUR Pole(100 A 25 kA)( B.R- 8487.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.434) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 8741.61 | 8741.61 | 1.0 | False | None | None | False | None | False | 8741.61 | 0 | 3222826 | 111088 | None | 5.18.2 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(40 A SP)( B.R- 739.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.434) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 761.17 | 761.17 | 8.0 | False | None | None | False | None | False | 6089.36 | 0 | 3222827 | 111088 | None | 5.18.5 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(40 A DP)( B.R- 1060.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.434) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 1091.8 | 1091.8 | 8.0 | False | None | None | False | None | False | 8734.4 | 0 | 3222828 | 111088 | None | 5.18.7 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(6-32 A TPN)( B.R- 1717.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.434) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 1768.51 | 1768.51 | 3.0 | False | None | None | False | None | False | 5305.53 | 0 | 3222829 | 111088 | None | 5.18.9 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(50-63 A TPN)( B.R- 3088.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 3180.51 | 3180.51 | 1.0 | False | None | None | False | None | False | 3180.51 | 0 | 3222830 | 111088 | None | 5.19.4 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure(12 Way SP & N)( B.R- 1863.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 1918.89 | 1918.89 | 2.0 | False | None | None | False | None | False | 3837.78 | 0 | 3222831 | 111088 | None | 5.20.6 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/panel board.(16-25A 4 pole)( B.R- 5066.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 5217.98 | 5217.98 | 1.0 | False | None | None | False | None | False | 5217.98 | 0 | 3222832 | 111088 | None | 5.21 | Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush
mounting on panel board.( B.R- 9255.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 9532.65 | 9532.65 | 1.0 | False | None | None | False | None | False | 9532.65 | 0 | 3222833 | 111088 | None | 5.23 | Supplying, fixing and wiring 0 to 30V Direct Reading DCVoltmeter/Ammeter( B.R- 690.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 710.7 | 710.7 | 1.0 | False | None | None | False | None | False | 710.7 | 0 | 3222834 | 111088 | None | 5.29 | Supplying, fixing and wiring 3 Phase Digital Ammeter /Voltmeter( B.R- 1425.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 1467.75 | 1467.75 | 1.0 | False | None | None | False | None | False | 1467.75 | 0 | 3222835 | 111088 | None | 5.27 | Supplying, fixing and wiring rotary selector switch suitablefor Ammeter( B.R- 200.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 206.0 | 206.0 | 1.0 | False | None | None | False | None | False | 206.0 | 0 | 3222836 | 111088 | None | 5.28 | Supplying, fixing and wiring rotary selector switch suitablefor Voltmeter( B.R- 160+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 164.8 | 164.8 | 1.0 | False | None | None | False | None | False | 164.8 | 0 | 3222837 | 111088 | None | 5.34 | Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound.( B.R- 562.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 578.86 | 578.86 | 3.0 | False | None | None | False | None | False | 1736.58 | 0 | 3222838 | 111088 | None | 5.35 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 AccuracyEnergy Meter.( B.R- 5705.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 5876.15 | 5876.15 | 1.0 | False | None | None | False | None | False | 5876.15 | 0 | 3222839 | 111088 | None | 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz12/24V D.C.( B.R- 515.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 530.45 | 530.45 | 3.0 | False | None | None | False | None | False | 1591.35 | 0 | 3222840 | 111088 | None | 5.40.1 | Supplying . A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete(100 A 4 x 30 x 6 mm Aluminium Strips)( B.R- 2465.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.437) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 2538.95 | 2538.95 | 2.0 | False | None | None | False | None | False | 5077.9 | 0 | 3222841 | 111088 | None | 5.41.1 | Supplying and fixing angle iron frame work fabricated out ofM.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint(.40 x 40 x 6 mm)( B.R- 305.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.437) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 314.15 | 314.15 | 2.0 | False | None | None | False | None | False | 628.3 | 0 | 3222842 | 111088 | None | 5.42.1 | Fabricating supplying and mounting MS box made outSWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete.(14 SWG)( B.R- 0.50+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.437) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Sq CM | 0.52 | 0.52 | 30000.0 | False | None | None | False | None | False | 15600.0 | 0 | 3222843 | 111088 | None | 6.4.1 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 4.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty.(48" Sweep 5 Star (1200 mm)( B.R- 2677.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.447) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 2757.31 | 2757.31 | 15.0 | False | None | None | False | None | False | 41359.65 | 0 | 3222844 | 111088 | None | 13.10 | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring.( B.R- 171.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.474) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 176.13 | 176.13 | 15.0 | False | None | None | False | None | False | 2641.95 | 0 |
| 1717396937000 | 0 | None | None | Electrical | Part B Lift Work | 1477682.83 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3222845 | 111089 | None | 14.4.1 | Design, supplying, erecting testing and commissioning of - passenger/Bed -cum-passenger hospital lift with speed of 1 mtr per second, variable voltage variable frequency drive, with or without machine room for the available well size, operating at 415 V 3 phase 52 cycles AC supply,powder coated/stainless steel car entrance doors enclosures with suitable colour vinyl flooring, LED car illumination, emergency light, intercom and fan as desired by the user, central opening/side opening door with or without atendant operation, 7 segment display buttons, call register indicator, fireman drive, SS handrails inside cr, full length infrared curtain in car door, automatic rescue divice with batteries, voice announcing in reginol/international langues, Braille buttons with one year warranty and maintenance with necessary scaffolding and minor civil works like fixing of guide rail, counter weight etc.,(Chapter-14 Elevators)(6 Passengers (D With out machine room-SS Finish) Capacity 3 Stops)( B.R- 1375286.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.476) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Job | 1416544.58 | 1416544.58 | 1.0 | False | None | None | False | None | False | 1416544.58 | 0 | 3222846 | 111089 | None | 32.08 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975(25 Sqmm, 4 Core, (13 GI Strips - 4 x 0.8 mm)( B.R- 179844.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.349) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Km | 185239.32 | 185239.32 | 0.08 | False | None | None | False | None | False | 14819.1456 | 0 | 3222847 | 111089 | None | 1.1.2 | Supplying heavy gauge PVC conduit pipe . dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws.(25 mm dia 2 mm thick)( B.R- 81.00+ASL 3%)
(Common SR 2023-24 Volume-6 Pg.No.419) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 83.43 | 83.43 | 100.0 | False | None | None | False | None | False | 8343.0 | 0 | 3222848 | 111089 | None | 1.9.1 | Supplying PVC/GI flexible conduit pipe mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely(20 mm)( B.R- 19.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.420) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 19.57 | 19.57 | 10.0 | False | None | None | False | None | False | 195.7 | 0 | 3222849 | 111089 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(2.5 mm2)( B.R- 42.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 43.26 | 43.26 | 50.0 | False | None | None | False | None | False | 2163.0 | 0 | 3222850 | 111089 | None | 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments(4 mm2)( B.R- 63.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 64.89 | 64.89 | 50.0 | False | None | None | False | None | False | 3244.5 | 0 | 3222851 | 111089 | None | 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.(Medium point above 3m upto 6m from tapping point to out let via switch box)( B.R- 379.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.422) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Point | 390.37 | 390.37 | 6.0 | False | None | None | False | None | False | 2342.22 | 0 | 3222852 | 111089 | None | 3.3.3 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., complete.(4-5 Way)( B.R- 137.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 141.11 | 141.11 | 3.0 | False | None | None | False | None | False | 423.33 | 0 | 3222853 | 111089 | None | 3.5.3 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(4 Module)( B.R- 175.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.425) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 180.25 | 180.25 | 4.0 | False | None | None | False | None | False | 721.0 | 0 | 3222854 | 111089 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A One Way Switch)( B.R- 102.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 105.06 | 105.06 | 4.0 | False | None | None | False | None | False | 420.24 | 0 | 3222855 | 111089 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6A Three Way socket)( B.R- 171.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.426) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 176.13 | 176.13 | 4.0 | False | None | None | False | None | False | 704.52 | 0 | 3222856 | 111089 | None | 5.15.9 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism.(100 A 25 kA FOUR Pole)( B.R- 8487.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.434) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 8741.61 | 8741.61 | 1.0 | False | None | None | False | None | False | 8741.61 | 0 | 3222857 | 111089 | None | 5.20.6 | Supplying, fixing and wiring Residual current circuit breaker (RCCB)240/450V upto 300mA sensitivity on existing wood/ panel board.(16-25A 4 pole)( B.R- 5066.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.435) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 5217.98 | 5217.98 | 1.0 | False | None | None | False | None | False | 5217.98 | 0 | 3222858 | 111089 | None | 11.3.2 | Supplying of .feet -PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.(LED light fitting 1 x 4' - 20/22 W)( B.R- 690.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.460) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 710.7 | 710.7 | 4.0 | False | None | None | False | None | False | 2842.8 | 0 | 3222859 | 111089 | None | 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps.(On wall/ ceiling / Rafter / Girders)( B.R- 122.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.462) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 125.66 | 125.66 | 4.0 | False | None | None | False | None | False | 502.64 | 0 | 3222860 | 111089 | None | 12.57 | Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.( B.R- 4256.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.471) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 4383.68 | 4383.68 | 2.0 | False | None | None | False | None | False | 8767.36 | 0 | 3222861 | 111089 | None | 12.58.1 | GI/Copperstripsforgroundingconnections,usingnecessaryfixingmaterials as required.(25 x 3 mm GI strip)( B.R- 82.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.471) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | m | 84.46 | 84.46 | 20.0 | False | None | None | False | None | False | 1689.2 | 0 |
| 1717396937000 | 0 | None | None | Electrical | Part C Transformer Commissioning | 231360.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3222862 | 111090 | None | 1.10 ,1.1.1 & 2.02 | Supply & Erection of PSCC Pole - 9 Mtr Long, 300 Kg WL
(Dwg No. BESCOM/GM/QS&S/55 Dtd 24.11.2018) as per REC Standards including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing for Ordinary Soil and Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Item no 1.10 page 3 of 81 and Item no 1.1.1 and 2.02 page 43 & 44 of 81 Volume-6) (Material + Labour ) ( B.R- 6794.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.339,379&380 ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 6997.82 | 6997.82 | 1.0 | False | None | None | False | None | False | 6997.82 | 0 | 3222863 | 111090 | None | 1.06 ,1.1.1 & 2.02 | Supply & Erection of PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards including Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr Long Steel/RCC/PSCC supports as per approved Drawing for Ordinary Soil and Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth (Item no 1.06 page 3 of 81 and Item no 1.1.1 and 2.02 page 43 & 44 of 81 Volume-6) (Material + Labour )( B.R- 5941.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.339, 379 & 380) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 6119.23 | 6119.23 | 1.0 | False | None | None | False | None | False | 6119.23 | 0 | 3222864 | 111090 | None | 9.(a) | Supply & providing of 11 kV, Horizontal Cross Arm with HT Single Top supports, clamps, bolts, nuts & washers - MS For RCC Pole (C,D.S Pg No 341/635 I .No 9.(a)) (Material + Labour )( B.R- 918.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 945.54 | 945.54 | 3.0 | False | None | None | False | None | False | 2836.62 | 0 | 3222865 | 111090 | None | 2.04, | supplying of Cross Arms (MS & GI) as per IS-1977 of 11 kV, Special 3 Pin Cross Arm - GI ( (Item no 2.04 page no 3 of 81 ) (Material ) B.R- 1151.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.339) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 1185.53 | 1185.53 | 2.0 | False | None | None | False | None | False | 2371.06 | 0 | 3222866 | 111090 | None | 6.06 | Supply & Providing of 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) (Item no 6.06 page no 5 of 81) (Material )( B.R- 205.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.341) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 211.15 | 211.15 | 9.0 | False | None | None | False | None | False | 1900.35 | 0 | 3222867 | 111090 | None | 6.02 | Supply & Providing of 11 kV GI Pin for 11 kV Ceramic Shell Insulator (Item no 6.02 page no 5 of 81) (Material )( B.R- 66.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.341) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 67.98 | 67.98 | 5.0 | False | None | None | False | None | False | 339.9 | 0 | 3222868 | 111090 | None | 6.10 | Supply & Providing of 11 kV, 45 kN Polymeric Insulator(Item no 6.10 page no 5 of 81) (Material )( B.R- 186.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.341) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 191.58 | 191.58 | 6.0 | False | None | None | False | None | False | 1149.48 | 0 | 3222869 | 111090 | None | 7.02, & 6.02 | Supply & stringing of Rabbit ACSR
(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM and Stringing of Conductor for Rabbit ACSR (Item no 7.02 page no 5 of 81 and 6.02 page no 46 of 81) (Material + Labour )( B.R-62898.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.382) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Km | 64784.94 | 64784.94 | 0.103 | False | None | None | False | None | False | 6672.84882 | 0 | 3222870 | 111090 | None | 9.02 | Supplying of PG Clamp Rabbit to Rabbit (Item no 9.02 page no 6 of 81) (Material )( B.R- 102.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.342) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 105.06 | 105.06 | 6.0 | False | None | None | False | None | False | 630.36 | 0 | 3222871 | 111090 | None | 2.16 & 2.08 | Supply of Spiral Earth Electrode and Providing Spiral Earth Electrode type earthing (without charcoal, salt etc.,) (Item no 2.16 page no 4 of 81 and 2.08 page no 44 of 81) (Material + Labour )( B.R- 332.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.380) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 341.96 | 341.96 | 1.0 | False | None | None | False | None | False | 341.96 | 0 | 3222872 | 111090 | None | 68.17 & 5.15 | Supply & Fixing of Caution/Danger Board (Item no 68.17 page no 32 of 81 and 5.15 page no 45 of 81) (Material + Labour )( B.R- 230.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No368 & 381) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 236.9 | 236.9 | 1.0 | False | None | None | False | None | False | 236.9 | 0 | 3222873 | 111090 | None | 4.02 & 5.09 | Supply & Fixing of GI Barbed wire (12 Mtr/Kg) (Item no 4.02 page no 4 of 81 and 5.09 page no 45 of 81) (Material + Labour )( B.R- 131.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.340 & 381) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 134.93 | 134.93 | 3.0 | False | None | None | False | None | False | 404.79 | 0 | 3222874 | 111090 | None | S.L No.1 | Supply & Erection of DP Transformer Structure using PSCC Pole - 9 Mtr Long, 300 Kg WL (Including Cost of Poles) (C,D.S Pg No 416/635 Sl.No 1) (Material + Labour )( B.R- 34651.00+ASL 3%) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 35690.53 | 35690.53 | 1.0 | False | None | None | False | None | False | 35690.53 | 0 | 3222875 | 111090 | None | 24 (a) | Supply & Providing Guy set with No. 15 Strain Insulator & Concreting materials as per Dwg No. BESCOM/GM/CP/7 Dt: 24.10.07 (C,D.S Pg No 344/635 I .No 24.(a)) (Material + Labour )( B.R- 1763.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 1815.89 | 1815.89 | 2.0 | False | None | None | False | None | False | 3631.78 | 0 | 3222876 | 111090 | None | 26(g) | Labour for Guy concreting with Boulders, Mud & Sand (300x300x450 mm)As per Drawing No. BESCOM/GM/CP/7 Dt: 24.10.07 (C,D.S Pg No 345/635 I .No 26.(g)(Labour )( B.R- 250.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 257.5 | 257.5 | 2.0 | False | None | None | False | None | False | 515.0 | 0 | 3222877 | 111090 | None | SI.No 6 | Supply & Fixing of 11kV/433V, 25 kVA, 3 Phase, 50 Cys Distribution Transformer BEE - 5 Star Rated with Oil (C,D.S-24 Pg No 370/635 SI.No.6) (Material + Labour )( B.R- 107187+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 110402.61 | 110402.61 | 1.0 | False | None | None | False | None | False | 110402.61 | 0 | 3222878 | 111090 | None | SI.No .6 | Supply & Fixing of Earthing materials pipe type for grounding (Single Electrode with accessories) (C,D.S-24 Pg No 370/635 SI.No.7) (Material + Labour )( B.R- 2678.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 2758.34 | 2758.34 | 3.0 | False | None | None | False | None | False | 8275.02 | 0 | 3222879 | 111090 | None | 68.17 & 5.15 | Supply & Fixing of Caution/Danger Board (Item no 68.17 page no 32 of 81 and 5.15 page no 45 of 81) (Material + Labour )( B.R- 230.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.368 &381 ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 236.9 | 236.9 | 2.0 | False | None | None | False | None | False | 473.8 | 0 | 3222880 | 111090 | None | 8.02 | Supply & providing of 8 SWG GI Wire
(4.064 mm Dia), Std Wt: 131 Kg/KM (Item no 8.02 page no 5 of 81) (Material )( B.R- 75040.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.341) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | MT | 77291.2 | 77291.2 | 0.01 | False | None | None | False | None | False | 772.912 | 0 | 3222881 | 111090 | None | 8.01 | Supply & providing of 7/10 SWG Guy Wire (7/3.251 mm Dia), Std Wt: 680 Kg/KM (Item no 8.01 page no 5 of 81) (Material)( B.R- 77226.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.341) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | MT | 79542.78 | 79542.78 | 0.01 | False | None | None | False | None | False | 795.4278 | 0 | 3222882 | 111090 | None | 19.02 & 13.06 | Supply & providing of 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR and Fixing of 3 Nos Lightning Arrestor including wiring (Item no 19.02 page 9 of 81 and Item no 13.06 48 of 81 Volume-6) (Material + Labour )( B.R- 1703.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.345 & 384) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 1754.09 | 1754.09 | 1.0 | False | None | None | False | None | False | 1754.09 | 0 | 3222883 | 111090 | None | 17.01 & 15.03 | Supply & providingLT Protection Kit
(Dwg No. BESCOM/GM/QS&S/10 Dtd 24.11.2018) and Fixing of LT Protection Kit (Item no 17.01 page 9 of 81 and Item no 15.03 49of 81 Volume-6) (Material + Labour )( B.R-2379.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.345 & 385) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 2450.37 | 2450.37 | 1.0 | False | None | None | False | None | False | 2450.37 | 0 | 3222884 | 111090 | None | 15.04 | Wiring of 1 Circuit of LT Wiring for for 25/63/100 kVA DTC to the existing LT protection Kit/Distribution Box via metering box. (includes fixing of necessary supports like 2 Pin cross arm, Spacer etc)(I.No 15.04 Pg No 49 of 81 ) (Labour)( B.R- 949.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.385) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 977.47 | 977.47 | 1.0 | False | None | None | False | None | False | 977.47 | 0 | 3222885 | 111090 | None | 14b(i) | Supply & providing LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT i) Al Lead Wire - 50 Sqmm ( C.D.S-24 I No 14 b (i) Pg No 370 of 635 ) (Material )( B.R- 64.19+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Mtr | 66.12 | 66.12 | 22.0 | False | None | None | False | None | False | 1454.64 | 0 | 3222886 | 111090 | None | 14b(ii) | Supply & providing LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT ii) Heavy Duty Long Barrel Copper Lug - 50 Sqmm ( C.D.S-24 I No 14 b (ii) Pg No 370 of 635 ) (Material )( B.R- 58.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 59.74 | 59.74 | 3.0 | False | None | None | False | None | False | 179.22 | 0 | 3222887 | 111090 | None | 14b(iii) | Supply & providing LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT iii) PG Clamp - Rabbit to 50 Sqmm ( C.D.S-24 I No 14 b (iii) Pg No 370 of 635 ) (Material )( B.R- 102.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 105.06 | 105.06 | 3.0 | False | None | None | False | None | False | 315.18 | 0 | 3222888 | 111090 | None | 14b(iv) | Supply & providing LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT iv) Spacer for DTC Wiring ( C.D.S-24 I No 14 b (iv) Pg No 370 of 635 ) (Material )( B.R- 42.00+ASL 3%) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 43.26 | 43.26 | 2.0 | False | None | None | False | None | False | 86.52 | 0 | 3222889 | 111090 | None | 14b(v) | Supply & providing LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) SINGLE CIRCUIT v) Fish Plate with necessary Clamps, bolts & nuts etc complete (Galvanised ( C.D.S-24 I No 14 b (v) Pg No 370 of 635 ) (Material )( B.R-264.00+ASL 3% ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 271.92 | 271.92 | 4.0 | False | None | None | False | None | False | 1087.68 | 0 | 3222890 | 111090 | None | 20.01 & 13.01 | Supply of 11 kV, HG Fuse Unit with Solid Core Insulator (Dwg No. BESCOM/GM/QS&S/21 Dtd 24.11.2018) & Fixing DOLO Cutout/Horn Gap Fuse including fixing of
cross arm and wiring(Item no 20.01 page 9 of 81 and Item no 13.01 48 of 81 Volume-6) (Material + Labour )( B.R- 1306.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.345 & 384) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 1345.18 | 1345.18 | 1.0 | False | None | None | False | None | False | 1345.18 | 0 | 3222891 | 111090 | None | 24.01 & 13.02 | Supply & Fixing of 11 kV, 200 Amps Single Break GOS (DwgNo.BESCOM/GM/QS&S/23 Dtd 24.11.2018) (Item no 24.01 page 11 of 81 and Item no 13.02 48 of 81 Volume-6) (Material + Labour )( B.R- 10554.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No. 347 & 384 ) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 10870.62 | 10870.62 | 1.0 | False | None | None | False | None | False | 10870.62 | 0 | 3222892 | 111090 | None | 24.06 & 2.09 | Supply of H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS (Item no 24.06 page 11 of 81 and Item no 2.09 44 of 81 Volume-6) (Material + Labour )( B.R- 4655.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.374 & 380) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 4794.65 | 4794.65 | 1.0 | False | None | None | False | None | False | 4794.65 | 0 | 3222893 | 111090 | None | 52.01 | Supplying of Transparent Alkathine tube 19 mm dia, 2 mm thick in coils of 30 Mtr (Item no 52.01 page 23 of 81)(Labour)( B.R- 517.00+ASL 3%)(Common SR 2023-24 Volume-6 Pg.No.359) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Coil | 532.51 | 532.51 | 3.0 | False | None | None | False | None | False | 1597.53 | 0 | 3222894 | 111090 | None | 59.05 | Supplying of Heavy Duty Copper Terminal Long Barrel (Item no 59.05 page 23 of 81)(Labour)( B.R- 129.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.362) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | No | 132.87 | 132.87 | 7.0 | False | None | None | False | None | False | 930.09 | 0 | 3222895 | 111090 | None | 64.06 & 15.02 | Supply of Distribution Transformer Centre (DTC) MS Box for housing the ETV Meter 3 Phase 4 Wire 5 Amps, with associated LT CT 0.5 Accuracy Class, ring type, with wiring Clamps, B&N and all other accessories required. (EXCLUDING ETV METER) SMC metering box as above for With CT Ratio 50/5 for 15/25 kVA DTC & Fixing of LT Metering Box with clamping arrangement for mounting on the Transformer structure with necessary terminal strip and CT mounting arrangement for housing the ETV Meters and connecting to the existing ground. (Item no 64.06 page 29 of 81 and Item no 15.02 49 of 81 Volume-6) (Material + Labour )( B.R- 7393.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.365 & 385) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Set | 7614.79 | 7614.79 | 1.0 | False | None | None | False | None | False | 7614.79 | 0 | 3222896 | 111090 | None | 5.31 | Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in
polycarbonate body in class 0.5 accuracy as per IS 14697 andcompletely wired.(Item no 5.31 Volume-6) (Material )( B.R- 4390.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.436) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 4521.7 | 4521.7 | 1.0 | False | None | None | False | None | False | 4521.7 | 0 | 3222897 | 111090 | None | 12.4.4 | Rewinding a . mm ceiling fan/after using necessary gauge annealed and insulated copper wire with necessary insulating, separators vibration arresting shellac, etc including replacement of bearings if any transportation to and from the spot to workshop inclusive of releasing the refixing. for 1400mm(I.No 12.4.4 Pg No 48 of 105 ) (Labour)( B.R- 798.00+ASL 3% )(Common SR 2023-24 Volume-6 Pg.No.465) ---- including cost and conveyance of all materials, labour and other incidental charges necessary for the successful completion of work etc., complete as per standard specification of work and as directed by the Engineer in charge of the work. | Each | 821.94 | 821.94 | 1.0 | False | None | None | False | None | False | 821.94 | 0 |
|
|
---|