createdTsNone
noticeInvitingTenderDTO
createdTs1718356307944
id14157
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
tenderFee500.00
emd11953.00
bidValueTypeTextItemwise
tenderReceiptClose21-06-2024 17:00:00
tenderQueryClose17-06-2024 16:00:00
technicalBidOpenNone
publishedDate14-06-2024 14:48:39
publishedByPostRDPR_PDO_GP_219752
publishedByUserKPE20192 - DEVAPPA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeTextRupees
retenderedYnNone
contactPersonDEVAPPA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
isMultipleSupplierSelectionAllowedNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionTrue
qcbsTenderYnNone
itemwiseEmdRequiredYnFalse
itemwiseTechEvalYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9945508831
provisionalAmountNone
tenderSupplierListNone
tenderSchedule
createdTs1718356307978
tenderNumberRDPR/2024-25/IND2721
titleCONSTRUCTION OF KITCHEN HALL IN GOVT BOYS SCHOOL KALLUR
descriptionCONSTRUCTION OF KITCHEN HALL IN GOVT BOYS SCHOOL KALLUR
categoryGOODS
categoryTextGoods
ecv478121.19
indentId13559
deptNameRural Development and Panchayat Raj Department
fileNameNone
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location10131
locationNameRDPR Gram Panchayat Office Kallur TP Sirwar
procEntityTypeGOVT_DEPT
procEntityTypeTextGovernment Department
tenderGroups
createdTsgroupNamebidItemsMandatoryYngroupMandatoryYnitemListnitIditemIdListitemSize
1718356307979DefaultTrueTrue
createdTsitemCodeitemNamenetAmtpricequantityspecificationsuomNamesampleRequiredYnitemEmdtechnicalParameters
1718356308001KBK-67KBK-67Add watering charges at 2 Percentage on Material353.781.0353.78KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308001KBK-66KBK-66Mason Class II with tools 2953.67421.27.0125KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356308001KBK-65KBK-65WATER PROOFING MATERIALS1134.4642.3726.7751KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356308001KBK-64KBK-64Brick bats 25 to 100 mm1361.44593.222.295KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356308000KBK-63KBK-63Labour charges for handing errection of RCC rings etc. At 5 Percentage322.81.0322.8KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308000KBK-62KBK-62Transportation charges of materials beyond 5 KM At 10 Percentage645.61.0645.6KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308000KBK-61KBK-61Fabrication charges.616.011.056.0KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356308000KBK-60KBK-60Cost of 6.5mm M.S. Coil1897.8433.8956.0KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356307999KBK-59KBK-59RCC Cap 1000 mm dia, 100 mm thick750.0750.01.0KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307999KBK-58KBK-58Compensation for earth taken from private land3606.3150.024.042KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307999KBK-57KBK-57Water115.440.02.885KAL14061:AS PER TENDER DOCUMENTS , K.LtrNoneNone
1718356307999KBK-56KBK-56Three wheel 80-100 kN Static Roller110.28367.00.3005KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-55KBK-55Water tanker 6 kl capacity288.99601.060.4808KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-54KBK-54Motor Grader At 50 cum per hour211.911763.00.1202KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-53KBK-53Dozer D-50 for spreading At 200 cum per hour178.261483.00.1202KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-52KBK-52Unloading of earth as per item 1.1 iv 442.3718.424.0418KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307997KBK-51KBK-51Loading of earth as per item 1.1 ii 1586.7766.024.042KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307997KBK-50KBK-50Tipper 5.5 cum with 10 Tonne capacity230.96213.51.0818KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307997KBK-49KBK-49Hydraulic Excavator 0.9 cum bucket capacity At 60 cum per hour384.64958.00.4015KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307996KBK-48KBK-48Pigment611.2750.8512.021KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356307996KBK-47KBK-47Cudddapah slab 2.5 cms thick8923.52290.4830.7199KAL14061:AS PER TENDER DOCUMENTS , SqmNoneNone
1718356307996KBK-46KBK-46Solid Concrete Block 40X15X20 cms 5.00 N sqmm35507.6642.0845.4205KAL14061:AS PER TENDER DOCUMENT , EachNoneNone
1718356307996KBK-45KBK-45Boulders651.23665.00.9793KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307995KBK-44KBK-44Bond stone 20 x 20 x 45 cm3733.8126.67140.0004KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307995KBK-43KBK-43Size stone 20 x 20 x 25 cms29605.0911.862496.2134KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307995KBK-42KBK-42PVC pipe of 4kg cum 75 mm2633.68188.1214.0KAL14061:AS PER TENDER DOCUMENT , MillimeterNoneNone
1718356307994KBK-41KBK-41Handling loading and unloading 3 Percentage on Material189.01.0189.0KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307994KBK-40KBK-40Labour charges for lifting and placing in position and making connection at 7 Percentage on Material441.01.0441.0KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307994KBK-39KBK-39Polyenthylene water storage tank of5080.05.081000.0K.LtrNoneNone
1718356307994KBK-38KBK-38Add 5 Percentage wastage charges131.741.0131.74KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307993KBK-37KBK-37Mathi or nandi wood planks for panels 20 mm thick2310.7651694.920.0447KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307993KBK-36KBK-36Mathi/nandi wood scantling for styles and rails 30 mm thick3230.9351694.920.0625KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-35KBK-35Honnewood planks for panels 20 mm thick1913.664000.00.0299KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-34KBK-34Honne wood2259.264000.00.0353KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-33KBK-33HOM of Machinaries for planing13.7834.00.4053KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-32KBK-32Add cutting and other wastage 5 Percentage960.941.0960.94KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307991KBK-31KBK-31Sal wood White 9774.1541949.150.233KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307991KBK-30KBK-30Add Brush, putty, sand paper at 2 Percentage on cost of paint54.261.054.26KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307991KBK-29KBK-29WATER PROOFING CEMENT PAINT2442.6872.0333.912KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307991KBK-28KBK-28Add Handling , loading and unloading at 1 Percentage on Material61.371.061.3697KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307990KBK-27KBK-27Painter Class I3980.85436.29.1262KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307990KBK-26KBK-26Add Brush, putty, sand paper, roller at 5 Percentage on cost of paint118.71.0118.7KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307989KBK-25KBK-25Plastic emulsion paint2063.54200.010.3177KAL14061:AS PER TENDER DOCUMENT , K.LtrNoneNone
1718356307989KBK-24KBK-24Add providing and removing scaffolding at 3 Percentage on Labour372.991.0372.99KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307989KBK-23KBK-23Add sundries charges at 2 Percentage on Material736.791.0736.7921KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307988KBK-22KBK-22Casurina poles 100 - 150 mm2201.4247.4646.3847KAL14061:AS PER TENDER DOCUMENTS , MillimeterNoneNone
1718356307988KBK-21KBK-21Add Handling , loading and unloading at 2 Percentage on Material1364.081.01364.08KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307988KBK-20KBK-20Casurina Poles 75 - 100 mm dia98.1337.292.6315KAL14061:AS PER TENDER DOCUMENTS , MillimeterNoneNone
1718356307987KBK-19KBK-19Jungle wood runners and planks1050.5129100.00.0361KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307987KBK-18KBK-18Silver oak or equivalent planks 38 mm thick8099.5821186.440.3823KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307987KBK-17KBK-17Mason Class I with tools 19703.94436.245.1718KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307986KBK-16KBK-16White cement19.531562.50.0125KAL14061:AS PER TENDER DOCUMENTS , QuintalNoneNone
1718356307986KBK-15KBK-15Mixer concrete small used in culvert 505.7142.012.0407KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307986KBK-14KBK-14Ceramic tiles 30 x 30 cms3393.32246.013.794KAL14061:AS PER TENDER DOCUMENTS , SqmNoneNone
1718356307986KBK-13KBK-13Binding wire830.6155.0815.0801KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307985KBK-12KBK-12TMT bars Fe 50097541.5960170.01.6211KAL14061:AS PER TENDER DOCUMENTS , TonneNoneNone
1718356307985KBK-11KBK-11HOM of Vibrator 0.71 days199.39169.01.1798KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307985KBK-10KBK-10Plasticizer OR super plasticizer2957.3559.3249.8541KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307985KBK-9KBK-9Over Head & other Miscellaneous Charges51332.881.051332.8844KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-8KBK-8Add sundries charges at 1 Percentage on Material3554.081.03554.0785KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-7KBK-7Add watering charges at 1 Percentage on Material2328.011.02328.0073KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-6KBK-6Mixer concrete - 1 cum Capacity2623.591356.01.9348KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307983KBK-5KBK-5Portland Cement70002.395860.011.9458KAL14061:AS PER TENDER DOCUMENTS , TonneNoneNone
1718356307982KBK-4KBK-4Coarse sand zone III 49135.131675.7629.3211KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307982KBK-3KBK-3Broken stone aggregate 12 mm to 10 mm size8052.41285.716.263KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307982KBK-2KBK-2Broken stone aggregate 20 mm size12885.91285.7110.0224KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307981KBK-1KBK-1Broken stone aggregate 40 mm size5247.641190.484.408KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
14157None67
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
INCOME TAX RETURNSTrueTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
TRADE LICENCETrueTechnical Bid
tenderGoodsItemsList
createdTsitemCodeitemNamenetAmtpricequantityspecificationsuomNamesampleRequiredYnitemEmdtechnicalParameters
1718356308001KBK-67KBK-67Add watering charges at 2 Percentage on Material353.781.0353.78KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308001KBK-66KBK-66Mason Class II with tools 2953.67421.27.0125KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356308001KBK-65KBK-65WATER PROOFING MATERIALS1134.4642.3726.7751KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356308001KBK-64KBK-64Brick bats 25 to 100 mm1361.44593.222.295KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356308000KBK-63KBK-63Labour charges for handing errection of RCC rings etc. At 5 Percentage322.81.0322.8KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308000KBK-62KBK-62Transportation charges of materials beyond 5 KM At 10 Percentage645.61.0645.6KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356308000KBK-61KBK-61Fabrication charges.616.011.056.0KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356308000KBK-60KBK-60Cost of 6.5mm M.S. Coil1897.8433.8956.0KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356307999KBK-59KBK-59RCC Cap 1000 mm dia, 100 mm thick750.0750.01.0KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307999KBK-58KBK-58Compensation for earth taken from private land3606.3150.024.042KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307999KBK-57KBK-57Water115.440.02.885KAL14061:AS PER TENDER DOCUMENTS , K.LtrNoneNone
1718356307999KBK-56KBK-56Three wheel 80-100 kN Static Roller110.28367.00.3005KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-55KBK-55Water tanker 6 kl capacity288.99601.060.4808KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-54KBK-54Motor Grader At 50 cum per hour211.911763.00.1202KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-53KBK-53Dozer D-50 for spreading At 200 cum per hour178.261483.00.1202KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307998KBK-52KBK-52Unloading of earth as per item 1.1 iv 442.3718.424.0418KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307997KBK-51KBK-51Loading of earth as per item 1.1 ii 1586.7766.024.042KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307997KBK-50KBK-50Tipper 5.5 cum with 10 Tonne capacity230.96213.51.0818KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307997KBK-49KBK-49Hydraulic Excavator 0.9 cum bucket capacity At 60 cum per hour384.64958.00.4015KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307996KBK-48KBK-48Pigment611.2750.8512.021KAL14061:AS PER TENDER DOCUMENTS , KgNoneNone
1718356307996KBK-47KBK-47Cudddapah slab 2.5 cms thick8923.52290.4830.7199KAL14061:AS PER TENDER DOCUMENTS , SqmNoneNone
1718356307996KBK-46KBK-46Solid Concrete Block 40X15X20 cms 5.00 N sqmm35507.6642.0845.4205KAL14061:AS PER TENDER DOCUMENT , EachNoneNone
1718356307996KBK-45KBK-45Boulders651.23665.00.9793KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307995KBK-44KBK-44Bond stone 20 x 20 x 45 cm3733.8126.67140.0004KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307995KBK-43KBK-43Size stone 20 x 20 x 25 cms29605.0911.862496.2134KAL14061:AS PER TENDER DOCUMENTS , EachNoneNone
1718356307995KBK-42KBK-42PVC pipe of 4kg cum 75 mm2633.68188.1214.0KAL14061:AS PER TENDER DOCUMENT , MillimeterNoneNone
1718356307994KBK-41KBK-41Handling loading and unloading 3 Percentage on Material189.01.0189.0KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307994KBK-40KBK-40Labour charges for lifting and placing in position and making connection at 7 Percentage on Material441.01.0441.0KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307994KBK-39KBK-39Polyenthylene water storage tank of5080.05.081000.0K.LtrNoneNone
1718356307994KBK-38KBK-38Add 5 Percentage wastage charges131.741.0131.74KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307993KBK-37KBK-37Mathi or nandi wood planks for panels 20 mm thick2310.7651694.920.0447KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307993KBK-36KBK-36Mathi/nandi wood scantling for styles and rails 30 mm thick3230.9351694.920.0625KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-35KBK-35Honnewood planks for panels 20 mm thick1913.664000.00.0299KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-34KBK-34Honne wood2259.264000.00.0353KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-33KBK-33HOM of Machinaries for planing13.7834.00.4053KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307992KBK-32KBK-32Add cutting and other wastage 5 Percentage960.941.0960.94KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307991KBK-31KBK-31Sal wood White 9774.1541949.150.233KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307991KBK-30KBK-30Add Brush, putty, sand paper at 2 Percentage on cost of paint54.261.054.26KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307991KBK-29KBK-29WATER PROOFING CEMENT PAINT2442.6872.0333.912KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307991KBK-28KBK-28Add Handling , loading and unloading at 1 Percentage on Material61.371.061.3697KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307990KBK-27KBK-27Painter Class I3980.85436.29.1262KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307990KBK-26KBK-26Add Brush, putty, sand paper, roller at 5 Percentage on cost of paint118.71.0118.7KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307989KBK-25KBK-25Plastic emulsion paint2063.54200.010.3177KAL14061:AS PER TENDER DOCUMENT , K.LtrNoneNone
1718356307989KBK-24KBK-24Add providing and removing scaffolding at 3 Percentage on Labour372.991.0372.99KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307989KBK-23KBK-23Add sundries charges at 2 Percentage on Material736.791.0736.7921KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307988KBK-22KBK-22Casurina poles 100 - 150 mm2201.4247.4646.3847KAL14061:AS PER TENDER DOCUMENTS , MillimeterNoneNone
1718356307988KBK-21KBK-21Add Handling , loading and unloading at 2 Percentage on Material1364.081.01364.08KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307988KBK-20KBK-20Casurina Poles 75 - 100 mm dia98.1337.292.6315KAL14061:AS PER TENDER DOCUMENTS , MillimeterNoneNone
1718356307987KBK-19KBK-19Jungle wood runners and planks1050.5129100.00.0361KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307987KBK-18KBK-18Silver oak or equivalent planks 38 mm thick8099.5821186.440.3823KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307987KBK-17KBK-17Mason Class I with tools 19703.94436.245.1718KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307986KBK-16KBK-16White cement19.531562.50.0125KAL14061:AS PER TENDER DOCUMENTS , QuintalNoneNone
1718356307986KBK-15KBK-15Mixer concrete small used in culvert 505.7142.012.0407KAL14061:AS PER TENDER DOCUMENTS , HourNoneNone
1718356307986KBK-14KBK-14Ceramic tiles 30 x 30 cms3393.32246.013.794KAL14061:AS PER TENDER DOCUMENTS , SqmNoneNone
1718356307986KBK-13KBK-13Binding wire830.6155.0815.0801KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307985KBK-12KBK-12TMT bars Fe 50097541.5960170.01.6211KAL14061:AS PER TENDER DOCUMENTS , TonneNoneNone
1718356307985KBK-11KBK-11HOM of Vibrator 0.71 days199.39169.01.1798KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307985KBK-10KBK-10Plasticizer OR super plasticizer2957.3559.3249.8541KAL14061:AS PER TENDER DOCUMENT , KgNoneNone
1718356307985KBK-9KBK-9Over Head & other Miscellaneous Charges51332.881.051332.8844KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-8KBK-8Add sundries charges at 1 Percentage on Material3554.081.03554.0785KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-7KBK-7Add watering charges at 1 Percentage on Material2328.011.02328.0073KAL14061:AS PER TENDER DOCUMENTS , Lump Sum for EachNoneNone
1718356307984KBK-6KBK-6Mixer concrete - 1 cum Capacity2623.591356.01.9348KAL14061:AS PER TENDER DOCUMENTS , DayNoneNone
1718356307983KBK-5KBK-5Portland Cement70002.395860.011.9458KAL14061:AS PER TENDER DOCUMENTS , TonneNoneNone
1718356307982KBK-4KBK-4Coarse sand zone III 49135.131675.7629.3211KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307982KBK-3KBK-3Broken stone aggregate 12 mm to 10 mm size8052.41285.716.263KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307982KBK-2KBK-2Broken stone aggregate 20 mm size12885.91285.7110.0224KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
1718356307981KBK-1KBK-1Broken stone aggregate 40 mm size5247.641190.484.408KAL14061:AS PER TENDER DOCUMENTS , CumNoneNone
deliveryScheduleListNone
tenderTechnicalParameterList
tenderSampleDTONone
tenderEligibilityCriterionList
createdTsdescriptionisUserAddedtenderEligibilityCriterionDocumentList
1718356309584Tenderers should not be associated, or have been associated in the past, directly or indirectly, with a firm or any of its affiliates which have been engaged by the Purchaser to provide consulting services for the preparation of the design, specifications, and other documents to be used for the procurement of the goods to be purchased under this Invitation of Tenders. FalseNone
1718356309584Bidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka FalseNone
1718356309585It shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.FalseNone
1718356309585EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.FalseNone
1718356309585The tenderer should be a manufacturer who must have manufactured, tested and supplied the equipment (s) similar to the type specified in the ‘Schedule of Requirements’ up to at least xxxx % of the quantity required in any one of the last 3 years. The equipments offered for supply must be of the most recent series models incorporating the latest improvements in design. The models should have been released on or after xxxxx and be in satisfactory operation for xxxxx months as on date of tender opening. Certificates to be provided as per Section XII of Tender Document.FalseNone
1718356309586In case of authorized representative/dealer of a manufacturer - The manufacturer furnishes authorization in the prescribed format assuring full guarantee and warranty obligations as per General Conditions of Contract and Special Conditions of Contract. Manufacturers Authorization Form to be provided as per Section XIII of Tender Document.FalseNone
1718356309586In case of authorized representative/dealer of a manufacturer - The tenderer, as authorized representative/dealer , has supplied, installed and commissioned satisfactorily at least xxxxx % of the quantity similar to the type specified in the Schedule of Requirements in any one of the last three years which must be in satisfactory operation for at least xxxxx months on the date of tender opening. Certificates to be provided as per Section XII of Tender Document.FalseNone
1718356309586The legal status, place of registration and principal place of business of the company or firm or partnership.FalseNone
1718356309586Details of experience and past performance of the tenderer on equipment offered and on those of similar nature within the past three/five years2 and details of current contracts in hand and other commitments.FalseNone
1718356309586A detailed description of the essential technical and performance characteristics of the goods.FalseNone
1718356309587A list giving full particulars, including available sources and current prices, of spare parts, special tools, etc., necessary for the proper and continuing functioning of the goods for a period of two years, following commencement of the use of the goods by the Purchaser.FalseNone
tenderTechnicalCriterionListNone
tenderPreQualCriterionListNone
tenderAddressNone
tenderRecallDTONone