1718369432000 | 0 | None | None | Bridges/Culverts | Construction of C C Drain and culverts of road from Hura-Hanchipura Road to cunnecting Eregowdanahundi Via Maduvinahalli In Nanjangud Taluk. | 4999369.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3291071 | 114415 | None | P.No.10 , Item No. 2.8-ii b VOL 3 PWD SR 2023-24 | Dismantling of existing structures like culverts, bridges, retainingwalls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means Prestressed / RCC grade M-20 & above, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 1307.44 | 1307.44 | 7.02 | False | None | None | False | None | False | 9178.2288 | 0 | 3291072 | 114415 | None | P.No.8 Item No. 1.14.1 VOL 1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 120.36 | 120.36 | 841.82 | False | None | None | False | None | False | 101321.4552 | 0 | 3291073 | 114415 | None | P.No 11 Iteam No. 1.23 VOL 1 PWD SR 2023-24 | Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications., as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3164.76 | 3164.76 | 66.27 | False | None | None | False | None | False | 209728.6452 | 0 | 3291074 | 114415 | None | P.No: 15 Iteam No. 2.1.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates , as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7067.02 | 7067.02 | 53.64 | False | None | None | False | None | False | 379074.9528 | 0 | 3291075 | 114415 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7476.48 | 7476.48 | 164.75 | False | None | None | False | None | False | 1231750.08 | 0 | 3291076 | 114415 | None | P.No: 111 ,addendum 1:sl no. 8 VOL 1 PWD SR 2023-2 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications andas per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 598.11 | 598.11 | 164.75 | False | None | None | False | None | False | 98538.6225 | 0 | 3291077 | 114415 | None | P.No: 18 , Iteam No. 2.11.h VOL 1 PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 93232.98 | 93232.98 | 11.28 | False | None | None | False | None | False | 1051668.0144 | 0 | 3291078 | 114415 | None | P.No: 121 , Iteam No. 13.2 VOL 3 PWD SR 2023-24 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant),
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 16485.78 | 16485.78 | 11.19 | False | None | None | False | None | False | 184475.8782 | 0 | 3291079 | 114415 | None | P.No: 66 , Item No.8.10 VOL 3 PWD SR 2023-24 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 128.62 | 128.62 | 13.9 | False | None | None | False | None | False | 1787.818 | 0 | 3291080 | 114415 | None | P.No: 146, Item No.16.15(C) VOL 3 PWD SR 2023-24 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6.,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Rmtr | 3935.3 | 3935.3 | 7.5 | False | None | None | False | None | False | 29514.75 | 0 | 3291081 | 114415 | None | P.No: 7 Item No.1.10 VOL1 PWD SR 2023-24 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 188.8 | 188.8 | 8.31 | False | None | None | False | None | False | 1568.928 | 0 | 3291082 | 114415 | None | P.No: 7, Item No.1.7 VOL 1 PWD SR 2023-24 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3),
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 140.42 | 140.42 | 288.0 | False | None | None | False | None | False | 40440.96 | 0 | 3291083 | 114415 | None | P.No: 55, Item No.3.45.1 VOL4 PWD SR 2023-24 | Providing and constructing size stone pitching using 200 to 250 mmsize stones with pin headers at 2 per m2 set in CM 1 : 5 proportionby volume with pointing joints in CM 1 : 3 proportion by volumeincluding cost of all materials from approved source, labour,packing stone chips and mortar into joints,finishing,curing and all other ancillaryoperations complete. 300 mm thick,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1003.0 | 1003.0 | 40.0 | False | None | None | False | None | False | 40120.0 | 0 | 3291084 | 114415 | None | P.No: 121, Item No.13.7 VOL3 PWD SR 2023-24 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 3859.78 | 3859.78 | 6.0 | False | None | None | False | None | False | 23158.68 | 0 | 3291085 | 114415 | None | P.No: 67, Item No.8.17 VOL3 PWD SR 2023-24 | Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 2384.78 | 2384.78 | 16.0 | False | None | None | False | None | False | 38156.48 | 0 | 3291086 | 114415 | None | P.No:117, Item No.12.2 VOL3 PWD SR 2023-24 | Providing weep holes in Brick masonry/Plain/ Reinforcedconcrete abutment, wing wall/ return wall with PVC Pipe110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 282.02 | 282.02 | 20.4 | False | None | None | False | None | False | 5753.208 | 0 | 3291087 | 114415 | None | P.No:16, Item No.2.4.2 VOL1 PWD SR 2023-24 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 7461.14 | 7461.14 | 32.0 | False | None | None | False | None | False | 238756.48 | 0 | 3291088 | 114415 | None | P.No:117, Item No.12.4 VOL3 PWD SR 2023-24 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing
and Technical Specification,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3158.86 | 3158.86 | 30.0 | False | None | None | False | None | False | 94765.8 | 0 | 3291089 | 114415 | None | P.No: 111,addendum 1:sl no. 8 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge,
Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2611.39 | 2611.39 | 19.2 | False | None | None | False | None | False | 50138.688 | 0 | 3291090 | 114415 | None | P.No: 9 Iteam No.2.5 A VOL 3 PWD SR 2023-24 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness a.In area of light jungle,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 463.74 | 463.74 | 2.44 | False | None | None | False | None | False | 1131.5256 | 0 | 3291091 | 114415 | None | P.No: 17 Item No.3.4 (ii) VOL 3 PWD SR 2023-24 | Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 5.9 | 5.9 | 1098.0 | False | None | None | False | None | False | 6478.2 | 0 | 3291092 | 114415 | None | P.No:23 Iteam No.4.2(v) VOL 3 PWD SR 2023-24 | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve
the desired density, complete as per clause 401 (v) For Grading -V Material,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 2783.62 | 2783.62 | 134.2 | False | None | None | False | None | False | 373561.804 | 0 | 3291093 | 114415 | None | P.No:26 Item No.4.17 VOL 3 PWD SR 2023-24 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired densit,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3019.62 | 3019.62 | 97.6 | False | None | None | False | None | False | 294714.912 | 0 | 3291094 | 114415 | None | P.No:31 Item No.5.1 A VOL 3 PWD SR 2023-24 | Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 48.38 | 48.38 | 457.5 | False | None | None | False | None | False | 22133.85 | 0 | 3291095 | 114415 | None | P.No:31 Item No.5.3 (i)VOL 3 PWD SR 2023-24 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 14.16 | 14.16 | 457.5 | False | None | None | False | None | False | 6478.2 | 0 | 3291096 | 114415 | None | P.No:43 Item No.5.31 VOL 3 PWD SR 2023-24 | Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision.,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 11979.36 | 11979.36 | 11.44 | False | None | None | False | None | False | 137043.8784 | 0 | 3291097 | 114415 | None | P.No:33 Iteam No.5.8(ii) C VOL 3 PWD SR 2023-24 | Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 9039.98 | 9039.98 | 22.88 | False | None | None | False | None | False | 206834.7424 | 0 | 3291098 | 114415 | None | P.No:17 Iteam No.3.6 VOL 3 PWD SR 2023-24 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2,
as per direction of Engineer in Charge, Rate inclusive GST18%
---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 581.74 | 581.74 | 208.16 | False | None | None | False | None | False | 121094.9984 | 0 |
|