1718193109000 | 0 | None | None | Buildings | Construction of Toilet Building at Govt Higher Primary School at DFA Dandeli(ST) | 440496.37 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3279237 | 113788 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ( Vol-1/ P. No.8/ I.No 1.14.1) ---- work complete within 2 months | Cum | 114.24 | 114.24 | 20.3 | False | None | None | False | None | False | 2319.072 | 0 | 3279238 | 113788 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.No.2.1.3) ---- work complete within 2 months | Cum | 6908.91 | 6908.91 | 2.33 | False | None | None | False | None | False | 16097.7603 | 0 | 3279239 | 113788 | None | code03 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) ( Vol-02/ P. No. 9/ I. No. 5.1.1) ---- work complete within 2 months | Cum | 6284.32 | 6284.32 | 10.78 | False | None | None | False | None | False | 67744.9696 | 0 | 3279240 | 113788 | None | code04 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ( Vol-1/ P. No.7/ I.No 1.8) ---- work complete within 2 months | Cum | 530.88 | 530.88 | 4.54 | False | None | None | False | None | False | 2410.1952 | 0 | 3279241 | 113788 | None | code05 | Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete. ( Vol-1/ P. No.7/ I.No 1.11) ---- work complete within 2 months | Cum | 2438.24 | 2438.24 | 1.13 | False | None | None | False | None | False | 2755.2112 | 0 | 3279242 | 113788 | None | code06 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.Nl. 2.2.1) ---- work complete within 2 months | Cum | 7014.44 | 7014.44 | 1.34 | False | None | None | False | None | False | 9399.3496 | 0 | 3279243 | 113788 | None | code07 | Providing and laying in position Reinforced cement concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.17/ I.Nl. 2.5.1) ---- work complete within 2 months | Cum | 11880.96 | 11880.96 | 1.9 | False | None | None | False | None | False | 22573.824 | 0 | 3279244 | 113788 | None | code08 | Slab ---- work complete within 2 months | Cum | 11138.4 | 11138.4 | 2.58 | False | None | None | False | None | False | 28737.072 | 0 | 3279245 | 113788 | None | code09 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Vol-01/ P. No.18/ I. no.2.11) ---- work complete within 2 months | Kgs | 100.2 | 100.2 | 467.26 | False | None | None | False | None | False | 46819.452 | 0 | 3279246 | 113788 | None | code10 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ( Vol-02/ P. No. 17/ I. No. 6.32) ---- work complete within 2 months | Cum | 1467.2 | 1467.2 | 37.22 | False | None | None | False | None | False | 54609.184 | 0 | 3279247 | 113788 | None | code11 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ( Vol-02/ P. No. 14/ I. No. 6.8) ---- work complete within 2 months | Cum | 8925.28 | 8925.28 | 3.16 | False | None | None | False | None | False | 28203.8848 | 0 | 3279248 | 113788 | None | code12 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Vol-02/ P. No.75/ I. no.11.5.2) ---- work complete within 2 months | Kgs | 4751.04 | 4751.04 | 7.56 | False | None | None | False | None | False | 35917.8624 | 0 | 3279249 | 113788 | None | code13 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. G.I. pipes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ( Vol-02/ P. No.82/ I. No. 11.26.3) ---- work complete within 2 months | Sqm | 164.64 | 164.64 | 66.15 | False | None | None | False | None | False | 10890.936 | 0 | 3279250 | 113788 | None | code14 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-02/ P. No.41/ I. No. 8.3.2) ---- work complete within 2 months | Kgs | 372.96 | 372.96 | 8.58 | False | None | None | False | None | False | 3199.9968 | 0 | 3279251 | 113788 | None | code15 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-02/ P. No.41/ I. No. 8.4.2) ---- work complete within 2 months | Kgs | 349.44 | 349.44 | 82.62 | False | None | None | False | None | False | 28870.7328 | 0 | 3279252 | 113788 | None | code16 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ( Vol-02/ P. No.42/ I. No. 8.9) ---- work complete within 2 months | Cum | 431.2 | 431.2 | 22.5 | False | None | None | False | None | False | 9702.0 | 0 | 3279253 | 113788 | None | code17 | Providing and fixing white vitreous china water closet squatting pan (Indian type) Long pattern W.C. pan of size 580 mm (Vol-02/ P. No.134/ I. No.:14.13.1) ---- work complete within 2 months | Sqm | 1599.36 | 1599.36 | 4.0 | False | None | None | False | None | False | 6397.44 | 0 | 3279254 | 113788 | None | code18 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching shade complete (Vol-02/ P. No.60/ I. No. 9.10) ---- work complete within 2 months | Sqm | 1238.72 | 1238.72 | 19.8 | False | None | None | False | None | False | 24526.656 | 0 | 3279255 | 113788 | None | code19 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (p-46,I.no-8.3,V2) ---- work complete within 2 months | Sqm | 156.4 | 156.4 | 28.18 | False | None | None | False | None | False | 4407.352 | 0 | 3279256 | 113788 | None | code20 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (P-46, V2, INO-8.33.1 ---- work complete within 2 months | Sqm | 176.96 | 176.96 | 51.7 | False | None | None | False | None | False | 9148.832 | 0 | 3279257 | 113788 | None | code21 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.(P.No. 123 I. No.13.34) ---- work complete within 2 months | Sqm | 10.35 | 10.35 | 1000.0 | False | None | None | False | None | False | 10350.0 | 0 | 3279258 | 113788 | None | code22 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge.Internal work - Exposed on wall mm nominal dia Pipes (P.no,-120, I.NO-13.31.3 25, V2) ---- work complete within 2 months | Sqm | 365.7 | 365.7 | 28.0 | False | None | None | False | None | False | 10239.6 | 0 | 3279259 | 113788 | None | code23 | KSRB13-8.5 : Providing and fixing to wall, ceiling and floor, low density polyethylene pipes 6.00 kgf/sq.cm working pressure 110mm outside diameter with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No.KBS 13.2.15.1 / 13.9(P.No. 96 I. No.13.70.5) ---- work complete within 2 months | m | 517.5 | 517.5 | 10.0 | False | None | None | False | None | False | 5175.0 | 0 |
|