3264363 | 113082 | None | code01 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ( Vol-1/ P. No.8/ I.No 1.14.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 114.24 | 114.24 | 46.49 | False | None | None | False | None | False | 5311.0176 | 0 |
3264364 | 113082 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.No.2.1.3) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 6908.91 | 6908.91 | 4.77 | False | None | None | False | None | False | 32955.5007 | 0 |
3264365 | 113082 | None | code03 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) ( Vol-02/ P. No. 9/ I. No. 5.1.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 6284.32 | 6284.32 | 15.89 | False | None | None | False | None | False | 99857.8448 | 0 |
3264366 | 113082 | None | code04 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work ( Vol-1/ P. No.7/ I.No 1.8) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 530.88 | 530.88 | 30.34 | False | None | None | False | None | False | 16106.8992 | 0 |
3264367 | 113082 | None | code05 | Supplying and filling in plinth with sand under floors, foundation of Bridges including watering, ramming, consolidating and dressing complete. ( Vol-1/ P. No.7/ I.No 1.11) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 2438.24 | 2438.24 | 6.32 | False | None | None | False | None | False | 15409.6768 | 0 |
3264368 | 113082 | None | code06 | Providing and laying in position Reinforced cement concrete for all Super structures of building, Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.17/ I.Nl. 2.5.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 8019.65 | 8019.65 | 6.43 | False | None | None | False | None | False | 51566.3495 | 0 |
3264369 | 113082 | None | code07 | COLUMN ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 12623.52 | 12623.52 | 3.82 | False | None | None | False | None | False | 48221.8464 | 0 |
3264370 | 113082 | None | code08 | PLINTH BEAM ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 11880.96 | 11880.96 | 7.79 | False | None | None | False | None | False | 92552.6784 | 0 |
3264371 | 113082 | None | code09 | SLAB ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 11138.4 | 11138.4 | 7.75 | False | None | None | False | None | False | 86322.6 | 0 |
3264372 | 113082 | None | code10 | CHEJJA ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 11138.4 | 11138.4 | 0.19 | False | None | None | False | None | False | 2116.296 | 0 |
3264373 | 113082 | None | code11 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. (Vol-01/ P. No.18/ I. no.2.11) ---- WORK COMPLETE WITHIN 3 MONTHS | Kgs | 100.2 | 100.2 | 2267.21 | False | None | None | False | None | False | 227174.442 | 0 |
3264374 | 113082 | None | code12 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ( Vol-02/ P. No. 14/ I. No. 6.8) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 8925.28 | 8925.28 | 14.34 | False | None | None | False | None | False | 127988.5152 | 0 |
3264375 | 113082 | None | code13 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (Vol-02/ P. No.75/ I. no.11.5.2) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 4751.04 | 4751.04 | 10.08 | False | None | None | False | None | False | 47890.4832 | 0 |
3264376 | 113082 | None | code14 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (Vol-02/ P. No.85/ I. no.11.34 A) ---- WORK COMPLETE WITHIN 3 MONTHS | Kgs | 188.16 | 188.16 | 113.4 | False | None | None | False | None | False | 21337.344 | 0 |
3264377 | 113082 | None | code15 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. G.I. pipes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ( Vol-02/ P. No.82/ I. No. 11.26.3) ---- WORK COMPLETE WITHIN 3 MONTHS | Kgs | 204.96 | 204.96 | 74.25 | False | None | None | False | None | False | 15218.28 | 0 |
3264378 | 113082 | None | code16 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol-1/ P. No.15/ I.Nl. 2.2.1) ---- WORK COMPLETE WITHIN 3 MONTHS | Cum | 7041.44 | 7041.44 | 4.13 | False | None | None | False | None | False | 29081.1472 | 0 |
3264379 | 113082 | None | code17 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour, curing, polishing complete as per specifications (Vol-02/ P. No.64/ I. No. 9.34 ) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 1730.4 | 1730.4 | 54.59 | False | None | None | False | None | False | 94462.536 | 0 |
3264380 | 113082 | None | code18 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-02/ P. No.41/ I. No. 8.3.2) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 372.96 | 372.96 | 18.6 | False | None | None | False | None | False | 6937.056 | 0 |
3264381 | 113082 | None | code19 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ( Vol-02/ P. No.41/ I. No. 8.4.2) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 349.44 | 349.44 | 221.9 | False | None | None | False | None | False | 77540.736 | 0 |
3264382 | 113082 | None | code20 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (p-46,I.no-8.3,V2) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 156.4 | 156.4 | 118.47 | False | None | None | False | None | False | 18528.708 | 0 |
3264383 | 113082 | None | code21 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge (P-50, V2, INO-8.51) ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 112.0 | 112.0 | 108.7 | False | None | None | False | None | False | 12174.4 | 0 |
3264384 | 113082 | None | code22 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (P-46, V2, INO-8.33.1 ---- WORK COMPLETE WITHIN 3 MONTHS | Sqm | 176.96 | 176.96 | 108.7 | False | None | None | False | None | False | 19235.552 | 0 |
3264385 | 113082 | None | code23 | SupplyingheavygaugePVCconduitpipe.......dia.......mmthickconfirmingtoIS2509withsuitablesizebends,junctionboxes,adhesivepasteetc,andfixingusinginvertedwoodplugsincaseofRCCceilingandRCCwall/stonestructureorrawlplugsincaseofbrickwallsandcementplasteringthedamagedportionusingheavygauge saddles at an interval of 700mm using NF screws 25mm dia 2mm thick( It. No 1.1.2 Electrical Sr 2023-24 Page. No 1) ---- WORK COMPLETE WITHIN 3 MONTHS | m | 81.0 | 81.0 | 20.0 | False | None | None | False | None | False | 1620.0 | 0 |
3264386 | 113082 | None | code24 | Supplying and fixing PVC/metal conduit Deep junction box 25mm deep junction box( It. No 1.5.2 Electrical Sr 2023-24 Page. No 2) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 56.0 | 56.0 | 10.0 | False | None | None | False | None | False | 560.0 | 0 |
3264387 | 113082 | None | code25 | Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts, 50Hz AC supply & completely wired on existing box.( It. No 3.7 Electrical Sr 2023-24 Page. No 9) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 646.0 | 646.0 | 1.0 | False | None | None | False | None | False | 646.0 | 0 |
3264388 | 113082 | None | code26 | Supplying and drawing PVC insulated flexible copper wire of approved make..23/0.0040” ( It. No 2.4.2 Electrical Sr 2023-24 Page. No 3) ---- WORK COMPLETE WITHIN 3 MONTHS | m | 21.0 | 21.0 | 50.0 | False | None | None | False | None | False | 1050.0 | 0 |
3264389 | 113082 | None | code27 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.1.5 sqmm ( It. No 2.3.2 Electrical Sr 2023-24 Page. No 3) ---- WORK COMPLETE WITHIN 3 MONTHS | m | 26.0 | 26.0 | 50.0 | False | None | None | False | None | False | 1300.0 | 0 |
3264390 | 113082 | None | code28 | Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 ( It. No 3.1 Electrical Sr 2023-24 Page. No 5) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 128.0 | 128.0 | 15.0 | False | None | None | False | None | False | 1920.0 | 0 |
3264391 | 113082 | None | code29 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.6A One Way Switch ( It. No 3.6.1 Electrical Sr 2023-24 Page. No 5) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 102.0 | 102.0 | 15.0 | False | None | None | False | None | False | 1530.0 | 0 |
3264392 | 113082 | None | code30 | Supplying and fixing surface/flush mounting unbreakable PVC modular box suitable for mounting modular switch plates with due groove cutting in Brick/C.C wall, including necessary rawl plugs, Machine/NF screws etc., 10-12 Way ( It. No 3.3.6 Electrical Sr 2023-24 Page. No 5) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 261.0 | 261.0 | 4.0 | False | None | None | False | None | False | 1044.0 | 0 |
3264393 | 113082 | None | code31 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module ( It. No 3.5.6 Electrical Sr 2023-24 Page. No 5) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 344.0 | 344.0 | 4.0 | False | None | None | False | None | False | 1376.0 | 0 |
3264394 | 113082 | None | code32 | Fixing all types and all capacities of 1'x4' / 2'x2' LED Light fittings indoor on the wall / ceiling / rafters / girders with necessary supporting frame, using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps..( It. No 13.19 Electrical Sr 2023-24 Page. No 47) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 490.0 | 490.0 | 2.0 | False | None | None | False | None | False | 980.0 | 0 |
3264395 | 113082 | None | code33 | Supplying of recess mounting non integrated type LED down light ... ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 1671.0 | 1671.0 | 2.0 | False | None | None | False | None | False | 3342.0 | 0 |
3264396 | 113082 | None | code34 | Wiring for lighting/power circuit using oneofFRLSPVCinsulated1100Vgrade, multistrand copper wire with lowconductor resistance single coreinopenorconcealed systemofwiring with specified IS-694:confirming to latest amendments.10 mm2 ( It. No 2.3 6 Electrical Sr 2023-24 Page. No 3) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 167.0 | 167.0 | 25.0 | False | None | None | False | None | False | 4175.0 | 0 |
3264397 | 113082 | None | code35 | Supplying of recess mounting non integrated type LED down light ... ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 1671.0 | 1671.0 | 1.0 | False | None | None | False | None | False | 1671.0 | 0 |
3264398 | 113082 | None | code36 | Wiring for lighting/power circuit using oneofFRLSPVCinsulated1100Vgrade, multistrand copper wire with lowconductor resistance single coreinopenorconcealed systemofwiring with specified IS-694:confirming to latest amendments.10 mm2 ( It. No 2.3 6 Electrical Sr 2023-24 Page. No 3) ---- WORK COMPLETE WITHIN 3 MONTHS | Each | 167.0 | 167.0 | 1.0 | False | None | None | False | None | False | 167.0 | 0 |