createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1717222534627
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd47800.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-06-2024 17:00:00
tenderQueryClose20-06-2024 17:00:00
technicalBidOpenNone
publishedDate14-06-2024 16:10:07
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1717222534630
version15
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9535/CALL-2
titleCONSTRUCTION OF ONECLASS ROOM AND STAGE AT T S SUBBANA SARVAJANIKA GIRLS HIGH SCHOOL, TALAKADU.
descriptionCONSTRUCTION OF ONECLASS ROOM AND STAGE AT T S SUBBANA SARVAJANIKA GIRLS HIGH SCHOOL, TALAKADU.
categoryWORKS
categoryTextWorks
ecv1912015.41
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount2260000.0
groupOverheadTotal0.0
fileNumberPWD/AEE/TNP/GirlsHighSchool
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17172225350001NoneNoneBuildingsConstuction of Class Room (Ground Floor).1541866.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215856110856NonePWD SR 2023-24, Vol 1, INO 1.12, Pg No. 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.032.4FalseNoneNoneFalseNoneFalse3078.00
3215857110856NonePWD SR 2023-24, Vol 1, INO 1.14.1, Pg No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.062.34FalseNoneNoneFalseNoneFalse6358.680
3215858110856NonePWD SR 2023-24 Vol 1, INO 2.1.2, Pg No. 15Providing and laying in position plain cement concrete for levelling, course for all works in foundation. The granite/trap/basalt crushed, graded coarse aggregates and fine aggregates as per relevant IS, Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.018.06FalseNoneNoneFalseNoneFalse102291.840
3215859110856NonePWD SR 2023-24 Vol 1, INO 2.2.3, Pg No. 15Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.08.69FalseNoneNoneFalseNoneFalse55059.840
3215860110856NoneP.NO 111 SL.No 1 (a), Add-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 8% on finished rate of concrete per m3) Footings,pedastal,Grade beam & columns For Foundation (The cost of steel reinforcement & formwork to be paid separately) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.888.69FalseNoneNoneFalseNoneFalse4404.78720
3215861110856NonePWD SR 2023-24 Vol 2, INO 2.5.1, Pg No. 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6630.06630.03.32FalseNoneNoneFalseNoneFalse22011.60
3215862110856NonePWD SR 2023-24 Vol 2, INO 2.5.2, Pg No. 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.024.01FalseNoneNoneFalseNoneFalse164300.430
3215863110856NoneP.NO. 111 SL.No 9, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 70% on finished rate of concrete per m3) For columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4790.14790.14.44FalseNoneNoneFalseNoneFalse21268.0440
3215864110856NoneP.NO. 111 SL.No 2, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 50% on finished rate of concrete per m3) For Plinth Beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.52.83FalseNoneNoneFalseNoneFalse9682.8450
3215865110856NoneP.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 60% on finished rate of concrete per m3) For Lintel & Roof beams ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.86.46FalseNoneNoneFalseNoneFalse26523.4680
3215866110856NoneP.NO. 111 SL.No 15, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 50% on finished rate of concrete per m3) For Roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.510.13FalseNoneNoneFalseNoneFalse34659.7950
3215867110856NoneP.NO. 111 SL.No 19, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 45% on finished rate of concrete per m3) For Chejja ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3079.353079.350.16FalseNoneNoneFalseNoneFalse492.6960
3215868110856NonePWD SR 2023-24 Vol 2, INO 5.4 Pg no. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.012.85FalseNoneNoneFalseNoneFalse82098.650
3215869110856NonePWD SR 2023-24 Vol 1, INO 1.9, Pg No. 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum266.0266.088.86FalseNoneNoneFalseNoneFalse23636.760
3215870110856NonePWD SR 2023-24 Vol 1, INO 2.11a, Pg No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs89457.089457.04.14FalseNoneNoneFalseNoneFalse370351.980
3215871110856NonePWD SR 2023-24Vol 2, INO 6.5, Pg No. 13Providing Brick work with common burnt clay machine moulded perforated bricks of class designation 5.0 conforming to IS: 2222 in superstructure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand) With Non modular bricks including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum10977.010977.021.72FalseNoneNoneFalseNoneFalse238420.440
3215872110856NonePWD SR 2023-24 Vol 2, INO 11.5.1, Pg No. 77Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4478.04478.01.89FalseNoneNoneFalseNoneFalse8463.420
3215873110856NonePWD SR 2023-24 Vol 2, INO 11.11.1, Pg No. 79Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs148.0148.0225.0FalseNoneNoneFalseNoneFalse33300.00
3215874110856NonePWD SR 2023-24 Vol 2, INO 8.10, Pg No. 43Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.065.54FalseNoneNoneFalseNoneFalse13828.940
3215875110856NonePWD SR 2023-24 Vol 2, INO 8.1.2, Pg No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm241.0241.0142.04FalseNoneNoneFalseNoneFalse34231.640
3215876110856NonePWD SR 2023-24 Vol 2, INO 8.2.2, Pg No. 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.0109.56FalseNoneNoneFalseNoneFalse30567.240
3215877110856NonePWD SR 2023-24 Vol 2, INO 8.51, Pg No. 50Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm100.0100.0206.63FalseNoneNoneFalseNoneFalse20663.00
3215878110856NonePWD SR 2023-24 Vol 2, INO 9.17.2, Pg No. 61Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1175.01175.069.58FalseNoneNoneFalseNoneFalse81756.50
3215879110856NonePWD SR 2023-24 Vol 2, INO 8.22, Pg No. 44Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm127.0127.0207.57FalseNoneNoneFalseNoneFalse26361.390
3215880110856NonePWD SR 2023-24 Vol 2, INO 8.28, Pg No. 45Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm89.089.0109.56FalseNoneNoneFalseNoneFalse9750.840
3215881110856NonePWD SR 2023-24 Vol 2, INO 8.19.1, Pg No. 44Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.013.2FalseNoneNoneFalseNoneFalse3366.00
3215882110856NonePWD SR 2023-24 Vol-2, I.No 11.34A, Pg no. 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs139.0139.0189.0FalseNoneNoneFalseNoneFalse26271.00
3215883110856NonePWD SR 2023-24 Vol 2, INO 8.33.3, Pg No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.021.29FalseNoneNoneFalseNoneFalse2959.310
3215884110856NonePWD SR 2023-24 Vol 5, I.No. 10.1.6, Pg No.113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. comcplte for 90mm dia., 6 kg/Sqcm & Class 3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr294.0294.024.0FalseNoneNoneFalseNoneFalse7056.00
3215885110856NonePWD SR 2023-24 Vol 2, INO 11.28, Pg No. 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs565.0565.041.6FalseNoneNoneFalseNoneFalse23504.00
3215886110856NonePWD SR 2023-24 Vol 2, INO 15.1, Pg No. 149Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.067.5FalseNoneNoneFalseNoneFalse55147.50
17172225350001NoneNoneBuildingsConstuction of Stage.328437.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215887110857NonePWD SR 2023-24 Vol 1, INO 1.14.1, Pg no. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.014.88FalseNoneNoneFalseNoneFalse1517.760
3215888110857NonePWD SR 2023-24 Vol 1, INO 2.1.2, Pg no. 15Providing and laying in position plain cement concrete for levelling, course for all works in foundation. The granite/trap/basalt crushed, graded coarse aggregates and fine aggregates as per relevant IS, Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.07.76FalseNoneNoneFalseNoneFalse43952.640
3215889110857NonePWD SR 2023-24 Vol 1, INO 2.5.2, Pg no. 16Providing and laying in position Reinforced cement concrete for all Super structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.04.28FalseNoneNoneFalseNoneFalse29288.040
3215890110857NonePWD SR 2023-24 Vol 2, INO 5.4, Pg no. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.012.29FalseNoneNoneFalseNoneFalse78520.810
3215891110857NonePWD SR 2023-24 Vol 1, INO 1.9, Pg no. 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum266.0266.017.08FalseNoneNoneFalseNoneFalse4543.280
3215892110857NonePWD SR 2023-24 Vol 2, INO 11.16.2, Pg no. 82Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs147.0147.0867.0FalseNoneNoneFalseNoneFalse127449.00
3215893110857NonePWD SR 2023-24 Vol 2, INO 7.1.1, Pg no. 21Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm879.0879.047.4FalseNoneNoneFalseNoneFalse41664.60
3215894110857NonePWD SR 2023-24 Vol 2, INO 8.33.3, Pg No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.010.8FalseNoneNoneFalseNoneFalse1501.20
17172225350001NoneNoneBuildingsProviding Electrification Works.41711.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215895110858NoneI-1Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary.(2/1.2.2) 25mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m78.078.015.0FalseNoneNoneFalseNoneFalse1170.00
3215896110858NoneI-2Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary. 32mm dia 2mm thick(2/1.2.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m103.0103.015.0FalseNoneNoneFalseNoneFalse1545.00
3215897110858NoneI-3Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. (2/1.3.2) 25mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m79.079.010.0FalseNoneNoneFalseNoneFalse790.00
3215898110858NoneI-4Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. 32mm dia 2mm thick(2/1.3.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m99.099.05.0FalseNoneNoneFalseNoneFalse495.00
3215899110858NoneI-5Supplying and fixing PVC/metal conduit accessories.(3/1.5.2)deep junction box 25mm junction box ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each56.056.02.0FalseNoneNoneFalseNoneFalse112.00
3215900110858NoneI-6Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (8/3.4.4) 6 Way ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each220.0220.01.0FalseNoneNoneFalseNoneFalse220.00
3215901110858NoneI-7Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(8/3.5.4) 6 Module ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each234.0234.05.0FalseNoneNoneFalseNoneFalse1170.00
3215902110858NoneI-8Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(5/3.5.6)10-12Moudule ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each344.0344.01.0FalseNoneNoneFalseNoneFalse344.00
3215903110858NoneI-9Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. (9/3.6.1) 6Amps one way. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each102.0102.020.0FalseNoneNoneFalseNoneFalse2040.00
3215904110858NoneI-10Supplyin and Fixing Metal Fan Box with Round Hook.(4/1.13) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No117.0117.05.0FalseNoneNoneFalseNoneFalse585.00
3215905110858NoneI-11Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(5/2.2.1) Short point up to 3Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point269.0269.010.0FalseNoneNoneFalseNoneFalse2690.00
3215906110858NoneI-12Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(5/2.2.2) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point379.0379.03.0FalseNoneNoneFalseNoneFalse1137.00
3215907110858NoneI-13Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (5/2.3.2) 1.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m26.026.030.0FalseNoneNoneFalseNoneFalse780.00
3215908110858NoneI-14Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (5/2.3.3) 2.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m42.042.010.0FalseNoneNoneFalseNoneFalse420.00
3215909110858NoneI-15Supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws.(10/3.10.2) 80/90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No15.015.010.0FalseNoneNoneFalseNoneFalse150.00
3215910110858NoneI-16Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. (17/5.18.4)6-32 Amps DP ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each739.0739.01.0FalseNoneNoneFalseNoneFalse739.00
3215911110858NoneI-17Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.( 18/5.19.9 )II- Double Door 12Way SP &N ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2329.02329.01.0FalseNoneNoneFalseNoneFalse2329.00
3215912110858NoneI-18Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia (54/12.56) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No3510.03510.01.0FalseNoneNoneFalseNoneFalse3510.00
3215913110858NoneI-19GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 6 mm GI strip(54/12.58.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m128.0128.010.0FalseNoneNoneFalseNoneFalse1280.00
3215914110858NoneI-20Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 50x50x6mm(20/5.41.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m395.0395.02.0FalseNoneNoneFalseNoneFalse790.00
3215915110858NoneI-21Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.100Amps 4x30x6mm Aluminium Strips (20/5.40.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m2465.02465.02.0FalseNoneNoneFalseNoneFalse4930.00
3215916110858NoneI-22Supplying of ....... feet - LED PVC Square Batten ..W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V @ 50Hz & Power factor greater than 0.9 along with CE approved. 5 years Warranty against any manufacturing defect working under standard electrical condition ( 43/11.3.2)LED light fitting 1 x 4' - 20/22 W ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each690.0690.02.0FalseNoneNoneFalseNoneFalse1380.00
3215917110858NoneI-23Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies for operation on 230 Volts, 50 Cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. (30/6.2.1)48" Sweep (1200mm)Regular model ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2984.02984.02.0FalseNoneNoneFalseNoneFalse5968.00
3215918110858NoneI-24Fixing all types and all capacities of fluorescent /False ceiling/spot light /CFL/LED fittings indoor on the wall/ ceiling/rafters/girders using 23/0.0076' twin twisted PVC insulated wires, required Nos of round blocks and clamps. (56/13.7.1)On wall / ceiling /Rafter / Girders ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each122.0122.01.0FalseNoneNoneFalseNoneFalse122.00
3215919110858NoneI-25Fixing a Ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook wisth fan regulator to the existing board together wisth wupplying and fixing 5amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (57/13.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each171.0171.01.0FalseNoneNoneFalseNoneFalse171.00
3215920110858NoneI-26Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm(52/21.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km20886.020886.00.04FalseNoneNoneFalseNoneFalse835.440
3215921110858NoneI-27Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work (Vol I P.No 79/1.5.1) In ordinary/soft rock without blasting upto 1.5 m depth (0.5*0.75*90) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum299.0299.015.0FalseNoneNoneFalseNoneFalse4485.00
3215922110858NoneI-28Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete.(Water Supply 178/11.2.4) Medium Duty GI pipe of 32mm dia ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m381.0381.04.0FalseNoneNoneFalseNoneFalse1524.00
17172232600000NoneNoneBuildingsCONSTRUCTION OF ONECLASS ROOM AND STAGE AT T S SUBBANA SARVAJANIKA GIRLS HIGH SCHOOL, TALAKADU1912015.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3216076110864NoneI-1Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary.(2/1.2.2) 25mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m78.078.015.0FalseNoneNoneFalseNoneFalse1170.00
3216037110864NonePWD SR 2023-24, Vol 1, INO 1.12, Pg No. 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.032.4FalseNoneNoneFalseNoneFalse3078.00
3216068110864NonePWD SR 2023-24 Vol 1, INO 1.14.1, Pg no. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.014.88FalseNoneNoneFalseNoneFalse1517.760
3216038110864NonePWD SR 2023-24, Vol 1, INO 1.14.1, Pg No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.062.34FalseNoneNoneFalseNoneFalse6358.680
3216069110864NonePWD SR 2023-24 Vol 1, INO 2.1.2, Pg no. 15Providing and laying in position plain cement concrete for levelling, course for all works in foundation. The granite/trap/basalt crushed, graded coarse aggregates and fine aggregates as per relevant IS, Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.07.76FalseNoneNoneFalseNoneFalse43952.640
3216077110864NoneI-2Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia ......mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary. 32mm dia 2mm thick(2/1.2.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m103.0103.015.0FalseNoneNoneFalseNoneFalse1545.00
3216039110864NonePWD SR 2023-24 Vol 1, INO 2.1.2, Pg No. 15Providing and laying in position plain cement concrete for levelling, course for all works in foundation. The granite/trap/basalt crushed, graded coarse aggregates and fine aggregates as per relevant IS, Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.018.06FalseNoneNoneFalseNoneFalse102291.840
3216078110864NoneI-3Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. (2/1.3.2) 25mm dia 2mm thick ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m79.079.010.0FalseNoneNoneFalseNoneFalse790.00
3216070110864NonePWD SR 2023-24 Vol 1, INO 2.5.2, Pg no. 16Providing and laying in position Reinforced cement concrete for all Super structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.04.28FalseNoneNoneFalseNoneFalse29288.040
3216040110864NonePWD SR 2023-24 Vol 1, INO 2.2.3, Pg No. 15Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.08.69FalseNoneNoneFalseNoneFalse55059.840
3216071110864NonePWD SR 2023-24 Vol 2, INO 5.4, Pg no. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.012.29FalseNoneNoneFalseNoneFalse78520.810
3216079110864NoneI-4Supplying heavy gauge PVC Conduit Pipe ….dia …..mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. 32mm dia 2mm thick(2/1.3.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m99.099.05.0FalseNoneNoneFalseNoneFalse495.00
3216072110864NonePWD SR 2023-24 Vol 1, INO 1.9, Pg no. 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum266.0266.017.08FalseNoneNoneFalseNoneFalse4543.280
3216041110864NoneP.NO 111 SL.No 1 (a), Add-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 8% on finished rate of concrete per m3) Footings,pedastal,Grade beam & columns For Foundation (The cost of steel reinforcement & formwork to be paid separately) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.888.69FalseNoneNoneFalseNoneFalse4404.78720
3216080110864NoneI-5Supplying and fixing PVC/metal conduit accessories.(3/1.5.2)deep junction box 25mm junction box ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each56.056.02.0FalseNoneNoneFalseNoneFalse112.00
3216042110864NonePWD SR 2023-24 Vol 2, INO 2.5.1, Pg No. 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6630.06630.03.32FalseNoneNoneFalseNoneFalse22011.60
3216073110864NonePWD SR 2023-24 Vol 2, INO 11.16.2, Pg no. 82Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs147.0147.0867.0FalseNoneNoneFalseNoneFalse127449.00
3216081110864NoneI-6Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (8/3.4.4) 6 Way ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each220.0220.01.0FalseNoneNoneFalseNoneFalse220.00
3216043110864NonePWD SR 2023-24 Vol 2, INO 2.5.2, Pg No. 16Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications - Design Mix M 25 using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.024.01FalseNoneNoneFalseNoneFalse164300.430
3216074110864NonePWD SR 2023-24 Vol 2, INO 7.1.1, Pg no. 21Providing & fixing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete as per design drawings (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required as per the direction of Engineer in charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm879.0879.047.4FalseNoneNoneFalseNoneFalse41664.60
3216082110864NoneI-7Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(8/3.5.4) 6 Module ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each234.0234.05.0FalseNoneNoneFalseNoneFalse1170.00
3216044110864NoneP.NO. 111 SL.No 9, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 70% on finished rate of concrete per m3) For columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4790.14790.14.44FalseNoneNoneFalseNoneFalse21268.0440
3216083110864NoneI-8Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.(5/3.5.6)10-12Moudule ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each344.0344.01.0FalseNoneNoneFalseNoneFalse344.00
3216075110864NonePWD SR 2023-24 Vol 2, INO 8.33.3, Pg No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.010.8FalseNoneNoneFalseNoneFalse1501.20
3216084110864NoneI-9Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. (9/3.6.1) 6Amps one way. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each102.0102.020.0FalseNoneNoneFalseNoneFalse2040.00
3216045110864NoneP.NO. 111 SL.No 2, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 50% on finished rate of concrete per m3) For Plinth Beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.52.83FalseNoneNoneFalseNoneFalse9682.8450
3216046110864NoneP.NO. 111 SL.No 14, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 60% on finished rate of concrete per m3) For Lintel & Roof beams ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.86.46FalseNoneNoneFalseNoneFalse26523.4680
3216085110864NoneI-10Supplyin and Fixing Metal Fan Box with Round Hook.(4/1.13) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No117.0117.05.0FalseNoneNoneFalseNoneFalse585.00
3216047110864NoneP.NO. 111 SL.No 15, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 50% on finished rate of concrete per m3) For Roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.510.13FalseNoneNoneFalseNoneFalse34659.7950
3216086110864NoneI-11Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(5/2.2.1) Short point up to 3Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point269.0269.010.0FalseNoneNoneFalseNoneFalse2690.00
3216048110864NoneP.NO. 111 SL.No 19, Addendum-1, PWD SR 2023-24 V-1Additionalities for formwork, Centring & Scaffolding,( Add 45% on finished rate of concrete per m3) For Chejja ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3079.353079.350.16FalseNoneNoneFalseNoneFalse492.6960
3216087110864NoneI-12Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.(5/2.2.2) Medium point above 3mtr up to 6Mtr from tapping point to out let via switch ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point379.0379.03.0FalseNoneNoneFalseNoneFalse1137.00
3216088110864NoneI-13Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (5/2.3.2) 1.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m26.026.030.0FalseNoneNoneFalseNoneFalse780.00
3216049110864NonePWD SR 2023-24 Vol 2, INO 5.4 Pg no. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.012.85FalseNoneNoneFalseNoneFalse82098.650
3216089110864NoneI-14Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments (5/2.3.3) 2.5 mm2 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m42.042.010.0FalseNoneNoneFalseNoneFalse420.00
3216050110864NonePWD SR 2023-24 Vol 1, INO 1.9, Pg No. 7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum266.0266.088.86FalseNoneNoneFalseNoneFalse23636.760
3216090110864NoneI-15Supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws.(10/3.10.2) 80/90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No15.015.010.0FalseNoneNoneFalseNoneFalse150.00
3216051110864NonePWD SR 2023-24 Vol 1, INO 2.11a, Pg No. 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs89457.089457.04.14FalseNoneNoneFalseNoneFalse370351.980
3216052110864NonePWD SR 2023-24Vol 2, INO 6.5, Pg No. 13Providing Brick work with common burnt clay machine moulded perforated bricks of class designation 5.0 conforming to IS: 2222 in superstructure above plinth level in cement mortar 1:6 (1 cement : 6 coarse sand) With Non modular bricks including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum10977.010977.021.72FalseNoneNoneFalseNoneFalse238420.440
3216091110864NoneI-16Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. (17/5.18.4)6-32 Amps DP ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each739.0739.01.0FalseNoneNoneFalseNoneFalse739.00
3216053110864NonePWD SR 2023-24 Vol 2, INO 11.5.1, Pg No. 77Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4478.04478.01.89FalseNoneNoneFalseNoneFalse8463.420
3216092110864NoneI-17Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.( 18/5.19.9 )II- Double Door 12Way SP &N ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2329.02329.01.0FalseNoneNoneFalseNoneFalse2329.00
3216054110864NonePWD SR 2023-24 Vol 2, INO 11.11.1, Pg No. 79Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs148.0148.0225.0FalseNoneNoneFalseNoneFalse33300.00
3216093110864NoneI-18Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia (54/12.56) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No3510.03510.01.0FalseNoneNoneFalseNoneFalse3510.00
3216094110864NoneI-19GI/Copper strips for grounding connections, using necessary fixing materials as required.25 x 6 mm GI strip(54/12.58.3) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m128.0128.010.0FalseNoneNoneFalseNoneFalse1280.00
3216055110864NonePWD SR 2023-24 Vol 2, INO 8.10, Pg No. 43Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.065.54FalseNoneNoneFalseNoneFalse13828.940
3216095110864NoneI-20Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 50x50x6mm(20/5.41.2) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m395.0395.02.0FalseNoneNoneFalseNoneFalse790.00
3216056110864NonePWD SR 2023-24 Vol 2, INO 8.1.2, Pg No. 41Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm241.0241.0142.04FalseNoneNoneFalseNoneFalse34231.640
3216096110864NoneI-21Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete.100Amps 4x30x6mm Aluminium Strips (20/5.40.1) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m2465.02465.02.0FalseNoneNoneFalseNoneFalse4930.00
3216057110864NonePWD SR 2023-24 Vol 2, INO 8.2.2, Pg No. 41Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.0109.56FalseNoneNoneFalseNoneFalse30567.240
3216097110864NoneI-22Supplying of ....... feet - LED PVC Square Batten ..W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V @ 50Hz & Power factor greater than 0.9 along with CE approved. 5 years Warranty against any manufacturing defect working under standard electrical condition ( 43/11.3.2)LED light fitting 1 x 4' - 20/22 W ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each690.0690.02.0FalseNoneNoneFalseNoneFalse1380.00
3216058110864NonePWD SR 2023-24 Vol 2, INO 8.51, Pg No. 50Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm100.0100.0206.63FalseNoneNoneFalseNoneFalse20663.00
3216059110864NonePWD SR 2023-24 Vol 2, INO 9.17.2, Pg No. 61Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1175.01175.069.58FalseNoneNoneFalseNoneFalse81756.50
3216098110864NoneI-23Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies for operation on 230 Volts, 50 Cycles. Single phase AC supply conforming to ISS-374-1979 and with double ball bearing system. (30/6.2.1)48" Sweep (1200mm)Regular model ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2984.02984.02.0FalseNoneNoneFalseNoneFalse5968.00
3216099110864NoneI-24Fixing all types and all capacities of fluorescent /False ceiling/spot light /CFL/LED fittings indoor on the wall/ ceiling/rafters/girders using 23/0.0076' twin twisted PVC insulated wires, required Nos of round blocks and clamps. (56/13.7.1)On wall / ceiling /Rafter / Girders ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each122.0122.01.0FalseNoneNoneFalseNoneFalse122.00
3216060110864NonePWD SR 2023-24 Vol 2, INO 8.22, Pg No. 44Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm127.0127.0207.57FalseNoneNoneFalseNoneFalse26361.390
3216100110864NoneI-25Fixing a Ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook wisth fan regulator to the existing board together wisth wupplying and fixing 5amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (57/13.10) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each171.0171.01.0FalseNoneNoneFalseNoneFalse171.00
3216061110864NonePWD SR 2023-24 Vol 2, INO 8.28, Pg No. 45Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm89.089.0109.56FalseNoneNoneFalseNoneFalse9750.840
3216101110864NoneI-26Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff LT Cable 2.5 to 25 Sqmm(52/21.05) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Km20886.020886.00.04FalseNoneNoneFalseNoneFalse835.440
3216062110864NonePWD SR 2023-24 Vol 2, INO 8.19.1, Pg No. 44Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.013.2FalseNoneNoneFalseNoneFalse3366.00
3216063110864NonePWD SR 2023-24 Vol-2, I.No 11.34A, Pg no. 86Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs139.0139.0189.0FalseNoneNoneFalseNoneFalse26271.00
3216102110864NoneI-27Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work (Vol I P.No 79/1.5.1) In ordinary/soft rock without blasting upto 1.5 m depth (0.5*0.75*90) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum299.0299.015.0FalseNoneNoneFalseNoneFalse4485.00
3216064110864NonePWD SR 2023-24 Vol 2, INO 8.33.3, Pg No. 47Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.021.29FalseNoneNoneFalseNoneFalse2959.310
3216103110864NoneI-28Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete.(Water Supply 178/11.2.4) Medium Duty GI pipe of 32mm dia ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m381.0381.04.0FalseNoneNoneFalseNoneFalse1524.00
3216065110864NonePWD SR 2023-24 Vol 5, I.No. 10.1.6, Pg No.113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. comcplte for 90mm dia., 6 kg/Sqcm & Class 3 ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr294.0294.024.0FalseNoneNoneFalseNoneFalse7056.00
3216066110864NonePWD SR 2023-24 Vol 2, INO 11.28, Pg No. 85Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kgs565.0565.041.6FalseNoneNoneFalseNoneFalse23504.00
3216067110864NonePWD SR 2023-24 Vol 2, INO 15.1, Pg No. 149Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.067.5FalseNoneNoneFalseNoneFalse55147.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17172225350000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17172225350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17172225350000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17172225350000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17172225350000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17172225350000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17172225350000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17172225350000NoneNoneELIGIBILITYBanker DetailsNone
17172225350000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17172225350000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17172225350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17172225350000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17172225350000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17172225350000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17172225350000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17172225350000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17172225350000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17172225350000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, PWD Division, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17172225350000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17172225350000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should get tested by the quality control authority before use on the work at their own cost.None
17172225350000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer - in charge of this work.None
17172225350000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17172225350000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17172225350000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17172225350000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PW Department, Mysore Division, Mysore during office hours on all working days.None
17172225350000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17172225350000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17172225350000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-1None
17172225350000NoneNoneELIGIBILITYGST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17172225350000NoneNoneELIGIBILITYThe employer reserves the rights to Cancel or withdraw any or all the tenders without Giving any reasons & Any Time.None
17172225350000NoneNoneELIGIBILITYThe contractor shall maintain the work in defective liability period at his cost & as per the directions of Engineer in charge of work.None
17172225350000NoneNoneELIGIBILITYEstimate rates are excluding GST as per common SR 2023-24 and prevailing GST (18% of amount put to tender) amount is kept in form of Lumpsum in sanctioned estimate according to guidelines in common SR. therefore amount put to tender and ECV amount are excluding GST. KPP Portal format has no options to add GST separately at the stage of Draft Tender Schedule process for overall amount put to tender, . Hence GST will be paid separately for the quoted amount accordingly.None
17172225350000NoneNoneELIGIBILITYContractors should be registered as KPWD Class IV & Above Civil Contractor.None
17172225350001NoneNoneELIGIBILITY3.1a Achieved in at least Two financial years 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 an average financial turnover (in all classes of civil engineering construction works only)of Rs.19.12 LakhsNone
17172225350000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as Assessed available tender capacity-(AxNx2.5-B ) Where, A -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress taking into account the completed as well as ongoing works. N-Number of years prescribed for completion of the works for which tenders are invited.B-value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 3 months.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CA and Profit & loss statementsTrueTechnical Bid
KPWD Registration Certificate-CLASS-IV & ABOVETrueTechnical Bid
Ongoing Work detailsTrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone