noticeInvitingTenderDTO
createdTs1717222819393
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd42350.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose21-06-2024 17:00:00
tenderQueryClose20-06-2024 17:00:00
technicalBidOpenNone
publishedDate14-06-2024 16:08:18
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1717222819396
version19
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT7449/CALL-2
titleConstruction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk
descriptionConstruction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk
categoryWORKS
categoryTextWorks
ecv1694768.12
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount2000000.0
groupOverheadTotal0.0
fileNumberPWD/Nanjangud/Debur/School
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17172228190002NoneNoneBuildingsConstruction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk1020504.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215949110861NoneP.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 2023-24Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.024.0FalseNoneNoneFalseNoneFalse2280.00
3215950110861NoneP.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.034.06FalseNoneNoneFalseNoneFalse3474.120
3215951110861NoneP.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.08.67FalseNoneNoneFalseNoneFalse49106.880
3215952110861NoneP.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.05.4FalseNoneNoneFalseNoneFalse34214.40
3215953110861NoneP.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.885.4FalseNoneNoneFalseNoneFalse2737.1520
3215954110861NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.09.16FalseNoneNoneFalseNoneFalse62681.880
3215955110861NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.82.8FalseNoneNoneFalseNoneFalse11496.240
3215956110861NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.54.86FalseNoneNoneFalseNoneFalse16628.490
3215957110861NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for lintel beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.80.77FalseNoneNoneFalseNoneFalse3161.4660
3215958110861NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for chejja slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3079.353079.350.73FalseNoneNoneFalseNoneFalse2247.92550
3215959110861NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.05.28FalseNoneNoneFalseNoneFalse33454.080
3215960110861NoneP.No: 16 , Iteam No. 2.4.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work forcolumns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4435.24435.23.74FalseNoneNoneFalseNoneFalse16587.6480
3215961110861NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for plinth beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3168.03168.01.03FalseNoneNoneFalseNoneFalse3263.040
3215962110861NoneP.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne89457.089457.02.17FalseNoneNoneFalseNoneFalse194121.690
3215963110861NoneP.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.08.87FalseNoneNoneFalseNoneFalse56670.430
3215964110861NoneP.No: 7 , Iteam No.1.11 VOL 1 PWD SR 2023-24Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum433.0433.035.87FalseNoneNoneFalseNoneFalse15531.710
3215965110861NoneP.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.09.3FalseNoneNoneFalseNoneFalse2371.50
3215966110861NoneP.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8211.08211.014.61FalseNoneNoneFalseNoneFalse119962.710
3215967110861NoneP.No: 14 , Iteam No.6.14 VOL 2 PWD SR 2023-24Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1060.01060.03.15FalseNoneNoneFalseNoneFalse3339.00
3215968110861NoneP.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.031.08FalseNoneNoneFalseNoneFalse6557.880
3215969110861NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.029.58FalseNoneNoneFalseNoneFalse8252.820
3215970110861NoneP.No: 42 , Iteam No.8.1.2 VOL 2 PWD SR 2023-24Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm241.0241.049.8FalseNoneNoneFalseNoneFalse12001.80
3215971110861NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.0142.19FalseNoneNoneFalseNoneFalse39671.010
3215972110861NoneP.No: 45 , Iteam No.8.25 VOL 2 PWD SR 2023-24Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm137.0137.060.66FalseNoneNoneFalseNoneFalse8310.420
3215973110861NoneP.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm283.0283.0126.81FalseNoneNoneFalseNoneFalse35887.230
3215974110861NoneP.No: 47 , Iteam No.8.33.3 VOL 2 PWD SR 2023-24Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.018.72FalseNoneNoneFalseNoneFalse2602.080
3215975110861NoneP.No: 47 , Iteam No.8.33.2 VOL 2 PWD SR 2023-24Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm138.0138.06.55FalseNoneNoneFalseNoneFalse903.90
3215976110861NoneP.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1145.01145.026.0FalseNoneNoneFalseNoneFalse29770.00
3215977110861NoneP.No: 63 , Iteam No.9.27 VOL 2 PWD SR 2023-24Providing and laying flooring with burnt stone slabs 10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3, , including cost of materials, mortar, labour, curing complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm2388.02388.05.4FalseNoneNoneFalseNoneFalse12895.20
3215978110861NoneP.No:71 , Iteam No.10.14 VOL 2 PWD SR 2023-24Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1106.01106.049.8FalseNoneNoneFalseNoneFalse55078.80
3215979110861NoneP.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol-2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m291.0291.016.0FalseNoneNoneFalseNoneFalse4656.00
3215980110861NoneP.No:104 , Iteam No.12.51 VOL 2 PWD SR 2023-24Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit1016.01016.01.0FalseNoneNoneFalseNoneFalse1016.00
3215981110861NoneP.No:100 , Iteam No.12.13.2 VOL 2 PWD SR 2023-24Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum99600.099600.00.07FalseNoneNoneFalseNoneFalse6972.00
3215982110861NoneP.No:105 , Iteam No.12.57.3 VOL 2 PWD SR 2023-24Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification -do- 30 mm thick both side commercial ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm3005.03005.01.95FalseNoneNoneFalseNoneFalse5859.750
3215983110861NoneP.No:109 , Iteam No.12.87 VOL 2 PWD SR 2023-24Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 81mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch ock. Wall thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6551.06551.07.2FalseNoneNoneFalseNoneFalse47167.20
3215984110861NoneP.No:86 , Iteam No.11.34a VOL 2 PWD SR 2023-24Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg168.0168.0151.2FalseNoneNoneFalseNoneFalse25401.60
3215985110861NoneP.No:105 , Iteam No.12.63 VOL 2 PWD SR 2023-24Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit130.0130.03.0FalseNoneNoneFalseNoneFalse390.00
3215986110861NoneP.No:107 , Iteam No.12.74.1 VOL 2 PWD SR 2023-24Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete 125x64x1.90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit102.0102.03.0FalseNoneNoneFalseNoneFalse306.00
3215987110861NoneP.No:105 , Iteam No.12.62 VOL 2 PWD SR 2023-24Providing and fixing chromium plated brass handles of 100/125 mm with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit237.0237.02.0FalseNoneNoneFalseNoneFalse474.00
3215988110861NoneP.No:105 , Iteam No.12.58 VOL 2 PWD SR 2023-24Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit120.0120.01.0FalseNoneNoneFalseNoneFalse120.00
3215989110861NoneP.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.038.85FalseNoneNoneFalseNoneFalse31740.450
3215990110861NoneP.No:63 , Iteam No.9.23 VOL 2 PWD SR 2023-24Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : ** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm2466.02466.04.95FalseNoneNoneFalseNoneFalse12206.70
3215991110861NoneP.No:133 , Iteam No.14.10.1.1 VOL 2 PWD SR 2023-24Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required :510x1040 mm bowl depth 250 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5618.05618.01.0FalseNoneNoneFalseNoneFalse5618.00
3215992110861NoneP.No: 117, Iteam No.13.2.1 VOL 2 PWD SR 2023-24Providing and fixing brass bib cock of approved quality ;15 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each286.0286.04.0FalseNoneNoneFalseNoneFalse1144.00
3215993110861NoneP.No: 122, Iteam No.13.33.2 VOL 2 PWD SR 2023-24Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m217.0217.075.0FalseNoneNoneFalseNoneFalse16275.00
3215994110861NoneP.No: 122, Iteam No.13.33.1 VOL 2 PWD SR 2023-24Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 15 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m166.0166.020.0FalseNoneNoneFalseNoneFalse3320.00
3215995110861NoneP.No: 117, Iteam No.13.4.1 VOL 2 PWD SR 2023-24Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :25 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each549.0549.01.0FalseNoneNoneFalseNoneFalse549.00
3215996110861NoneP.No: 128, Iteam No.13.63 VOL 2 PWD SR 2023-24Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0 cm X 4.0 cm with all fitting arrangements & all necessary accessories complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each244.0244.03.0FalseNoneNoneFalseNoneFalse732.00
3215997110861NoneP.No: 132, Iteam No.14.7.2 VOL 2 PWD SR 2023-24Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2561.02561.01.0FalseNoneNoneFalseNoneFalse2561.00
3215998110861NoneP.No: 120, Iteam No.13.18.1 VOL 2 PWD SR 2023-24Providing and fixing PTMT stop cock of approved quality and colour 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each131.0131.02.0FalseNoneNoneFalseNoneFalse262.00
3215999110861NoneP.No: 191, Iteam No.16.10 VOL 5 PWD SR 2023-24Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4236.04236.02.0FalseNoneNoneFalseNoneFalse8472.00
17172228200002NoneNoneBuildingsB) Construction of Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk674263.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3216000110862NoneP.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 202Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.030.0FalseNoneNoneFalseNoneFalse2850.00
3216001110862NoneP.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.023.72FalseNoneNoneFalseNoneFalse2419.440
3216002110862NoneP.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.011.23FalseNoneNoneFalseNoneFalse63606.720
3216003110862NoneP.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.04.5FalseNoneNoneFalseNoneFalse28512.00
3216004110862NoneP.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.884.5FalseNoneNoneFalseNoneFalse2280.960
3216005110862NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.09.56FalseNoneNoneFalseNoneFalse65419.080
3216006110862NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.82.75FalseNoneNoneFalseNoneFalse11290.950
3216007110862NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.56.81FalseNoneNoneFalseNoneFalse23300.4150
3216008110862NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.03.75FalseNoneNoneFalseNoneFalse23760.00
3216009110862NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3168.03168.02.21FalseNoneNoneFalseNoneFalse7001.280
3216010110862NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4435.24435.21.54FalseNoneNoneFalseNoneFalse6830.2080
3216011110862NoneP.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne89457.089457.01.77FalseNoneNoneFalseNoneFalse158338.890
3216012110862NoneP.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.07.48FalseNoneNoneFalseNoneFalse47789.720
3216013110862NoneP.No: 7 , Iteam No.1.9 VOL 1 PWD SR 2023-24Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum433.0433.028.5FalseNoneNoneFalseNoneFalse12340.50
3216014110862NoneP.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.07.34FalseNoneNoneFalseNoneFalse1871.70
3216015110862NoneP.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8211.08211.06.46FalseNoneNoneFalseNoneFalse53043.060
3216016110862NoneP.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.066.59FalseNoneNoneFalseNoneFalse14050.490
3216017110862NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.062.14FalseNoneNoneFalseNoneFalse17337.060
3216018110862NoneP.No: 45 , Iteam No.8.28 VOL 2 PWD SR 2023-24Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm89.089.066.59FalseNoneNoneFalseNoneFalse5926.510
3216019110862NoneP.No: 45 , Iteam No.8.27 VOL 2 PWD SR 2023-24Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm53.053.066.59FalseNoneNoneFalseNoneFalse3529.270
3216020110862NoneP.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm283.0283.057.74FalseNoneNoneFalseNoneFalse16340.420
3216021110862NoneP.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1145.01145.050.52FalseNoneNoneFalseNoneFalse57845.40
3216022110862NoneP.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m291.0291.018.0FalseNoneNoneFalseNoneFalse5238.00
3216023110862NoneP.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.053.05FalseNoneNoneFalseNoneFalse43341.850
17172236640001NoneNoneBuildingsConstruction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk1694768.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3216185110867NoneP.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 2023-24Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.024.0FalseNoneNoneFalseNoneFalse2280.00
3216161110867NoneP.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 202Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum95.095.030.0FalseNoneNoneFalseNoneFalse2850.00
3216186110867NoneP.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.034.06FalseNoneNoneFalseNoneFalse3474.120
3216162110867NoneP.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum102.0102.023.72FalseNoneNoneFalseNoneFalse2419.440
3216163110867NoneP.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.011.23FalseNoneNoneFalseNoneFalse63606.720
3216187110867NoneP.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5664.05664.08.67FalseNoneNoneFalseNoneFalse49106.880
3216188110867NoneP.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.05.4FalseNoneNoneFalseNoneFalse34214.40
3216164110867NoneP.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.04.5FalseNoneNoneFalseNoneFalse28512.00
3216189110867NoneP.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.885.4FalseNoneNoneFalseNoneFalse2737.1520
3216165110867NoneP.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum506.88506.884.5FalseNoneNoneFalseNoneFalse2280.960
3216166110867NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.09.56FalseNoneNoneFalseNoneFalse65419.080
3216190110867NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6843.06843.09.16FalseNoneNoneFalseNoneFalse62681.880
3216191110867NoneP.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.82.8FalseNoneNoneFalseNoneFalse11496.240
3216167110867NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.82.75FalseNoneNoneFalseNoneFalse11290.950
3216168110867NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.56.81FalseNoneNoneFalseNoneFalse23300.4150
3216192110867NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3421.53421.54.86FalseNoneNoneFalseNoneFalse16628.490
3216169110867NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.03.75FalseNoneNoneFalseNoneFalse23760.00
3216193110867NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for lintel beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4105.84105.80.77FalseNoneNoneFalseNoneFalse3161.4660
3216194110867NoneP.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for chejja slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3079.353079.350.73FalseNoneNoneFalseNoneFalse2247.92550
3216170110867NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3168.03168.02.21FalseNoneNoneFalseNoneFalse7001.280
3216171110867NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4435.24435.21.54FalseNoneNoneFalseNoneFalse6830.2080
3216195110867NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6336.06336.05.28FalseNoneNoneFalseNoneFalse33454.080
3216196110867NoneP.No: 16 , Iteam No. 2.4.1 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work forcolumns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4435.24435.23.74FalseNoneNoneFalseNoneFalse16587.6480
3216172110867NoneP.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne89457.089457.01.77FalseNoneNoneFalseNoneFalse158338.890
3216197110867NoneP.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for plinth beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3168.03168.01.03FalseNoneNoneFalseNoneFalse3263.040
3216173110867NoneP.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.07.48FalseNoneNoneFalseNoneFalse47789.720
3216198110867NoneP.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne89457.089457.02.17FalseNoneNoneFalseNoneFalse194121.690
3216174110867NoneP.No: 7 , Iteam No.1.9 VOL 1 PWD SR 2023-24Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum433.0433.028.5FalseNoneNoneFalseNoneFalse12340.50
3216175110867NoneP.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.07.34FalseNoneNoneFalseNoneFalse1871.70
3216199110867NoneP.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6389.06389.08.87FalseNoneNoneFalseNoneFalse56670.430
3216176110867NoneP.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8211.08211.06.46FalseNoneNoneFalseNoneFalse53043.060
3216200110867NoneP.No: 7 , Iteam No.1.11 VOL 1 PWD SR 2023-24Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum433.0433.035.87FalseNoneNoneFalseNoneFalse15531.710
3216177110867NoneP.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.066.59FalseNoneNoneFalseNoneFalse14050.490
3216201110867NoneP.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm255.0255.09.3FalseNoneNoneFalseNoneFalse2371.50
3216202110867NoneP.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8211.08211.014.61FalseNoneNoneFalseNoneFalse119962.710
3216178110867NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.062.14FalseNoneNoneFalseNoneFalse17337.060
3216203110867NoneP.No: 14 , Iteam No.6.14 VOL 2 PWD SR 2023-24Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1060.01060.03.15FalseNoneNoneFalseNoneFalse3339.00
3216179110867NoneP.No: 45 , Iteam No.8.28 VOL 2 PWD SR 2023-24Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm89.089.066.59FalseNoneNoneFalseNoneFalse5926.510
3216204110867NoneP.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.0211.031.08FalseNoneNoneFalseNoneFalse6557.880
3216180110867NoneP.No: 45 , Iteam No.8.27 VOL 2 PWD SR 2023-24Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm53.053.066.59FalseNoneNoneFalseNoneFalse3529.270
3216205110867NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.029.58FalseNoneNoneFalseNoneFalse8252.820
3216181110867NoneP.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm283.0283.057.74FalseNoneNoneFalseNoneFalse16340.420
3216206110867NoneP.No: 42 , Iteam No.8.1.2 VOL 2 PWD SR 2023-24Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm241.0241.049.8FalseNoneNoneFalseNoneFalse12001.80
3216182110867NoneP.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1145.01145.050.52FalseNoneNoneFalseNoneFalse57845.40
3216183110867NoneP.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m291.0291.018.0FalseNoneNoneFalseNoneFalse5238.00
3216207110867NoneP.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm279.0279.0142.19FalseNoneNoneFalseNoneFalse39671.010
3216208110867NoneP.No: 45 , Iteam No.8.25 VOL 2 PWD SR 2023-24Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm137.0137.060.66FalseNoneNoneFalseNoneFalse8310.420
3216184110867NoneP.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.053.05FalseNoneNoneFalseNoneFalse43341.850
3216209110867NoneP.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm283.0283.0126.81FalseNoneNoneFalseNoneFalse35887.230
3216210110867NoneP.No: 47 , Iteam No.8.33.3 VOL 2 PWD SR 2023-24Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm139.0139.018.72FalseNoneNoneFalseNoneFalse2602.080
3216211110867NoneP.No: 47 , Iteam No.8.33.2 VOL 2 PWD SR 2023-24Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @0.75 L/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm138.0138.06.55FalseNoneNoneFalseNoneFalse903.90
3216212110867NoneP.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1145.01145.026.0FalseNoneNoneFalseNoneFalse29770.00
3216213110867NoneP.No: 63 , Iteam No.9.27 VOL 2 PWD SR 2023-24Providing and laying flooring with burnt stone slabs 10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3, , including cost of materials, mortar, labour, curing complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm2388.02388.05.4FalseNoneNoneFalseNoneFalse12895.20
3216214110867NoneP.No:71 , Iteam No.10.14 VOL 2 PWD SR 2023-24Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1106.01106.049.8FalseNoneNoneFalseNoneFalse55078.80
3216215110867NoneP.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol-2Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m291.0291.016.0FalseNoneNoneFalseNoneFalse4656.00
3216216110867NoneP.No:104 , Iteam No.12.51 VOL 2 PWD SR 2023-24Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit1016.01016.01.0FalseNoneNoneFalseNoneFalse1016.00
3216217110867NoneP.No:100 , Iteam No.12.13.2 VOL 2 PWD SR 2023-24Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum99600.099600.00.07FalseNoneNoneFalseNoneFalse6972.00
3216218110867NoneP.No:105 , Iteam No.12.57.3 VOL 2 PWD SR 2023-24Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification -do- 30 mm thick both side commercial ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm3005.03005.01.95FalseNoneNoneFalseNoneFalse5859.750
3216219110867NoneP.No:109 , Iteam No.12.87 VOL 2 PWD SR 2023-24Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 81mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch ock. Wall thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6551.06551.07.2FalseNoneNoneFalseNoneFalse47167.20
3216220110867NoneP.No:86 , Iteam No.11.34a VOL 2 PWD SR 2023-24Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg168.0168.0151.2FalseNoneNoneFalseNoneFalse25401.60
3216221110867NoneP.No:105 , Iteam No.12.63 VOL 2 PWD SR 2023-24Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit130.0130.03.0FalseNoneNoneFalseNoneFalse390.00
3216222110867NoneP.No:107 , Iteam No.12.74.1 VOL 2 PWD SR 2023-24Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete 125x64x1.90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit102.0102.03.0FalseNoneNoneFalseNoneFalse306.00
3216223110867NoneP.No:105 , Iteam No.12.62 VOL 2 PWD SR 2023-24Providing and fixing chromium plated brass handles of 100/125 mm with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit237.0237.02.0FalseNoneNoneFalseNoneFalse474.00
3216224110867NoneP.No:105 , Iteam No.12.58 VOL 2 PWD SR 2023-24Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit120.0120.01.0FalseNoneNoneFalseNoneFalse120.00
3216225110867NoneP.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm817.0817.038.85FalseNoneNoneFalseNoneFalse31740.450
3216226110867NoneP.No:63 , Iteam No.9.23 VOL 2 PWD SR 2023-24Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : ** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm2466.02466.04.95FalseNoneNoneFalseNoneFalse12206.70
3216227110867NoneP.No:133 , Iteam No.14.10.1.1 VOL 2 PWD SR 2023-24Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per IS:13983 with C.I. brackets and stainless steel plug 40 mm, including painting of fittings and brackets, cutting and making good the walls wherever required :510x1040 mm bowl depth 250 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5618.05618.01.0FalseNoneNoneFalseNoneFalse5618.00
3216228110867NoneP.No: 117, Iteam No.13.2.1 VOL 2 PWD SR 2023-24Providing and fixing brass bib cock of approved quality ;15 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each286.0286.04.0FalseNoneNoneFalseNoneFalse1144.00
3216229110867NoneP.No: 122, Iteam No.13.33.2 VOL 2 PWD SR 2023-24Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m217.0217.075.0FalseNoneNoneFalseNoneFalse16275.00
3216230110867NoneP.No: 122, Iteam No.13.33.1 VOL 2 PWD SR 2023-24Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 15 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m166.0166.020.0FalseNoneNoneFalseNoneFalse3320.00
3216231110867NoneP.No: 117, Iteam No.13.4.1 VOL 2 PWD SR 2023-24Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) :25 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each549.0549.01.0FalseNoneNoneFalseNoneFalse549.00
3216232110867NoneP.No: 128, Iteam No.13.63 VOL 2 PWD SR 2023-24Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0 cm X 4.0 cm with all fitting arrangements & all necessary accessories complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each244.0244.03.0FalseNoneNoneFalseNoneFalse732.00
3216233110867NoneP.No: 132, Iteam No.14.7.2 VOL 2 PWD SR 2023-24Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require White Vitreous China Wash basin size 630x450 mm with a single 15 mm C.P. brass pillar tap ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2561.02561.01.0FalseNoneNoneFalseNoneFalse2561.00
3216234110867NoneP.No: 120, Iteam No.13.18.1 VOL 2 PWD SR 2023-24Providing and fixing PTMT stop cock of approved quality and colour 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each131.0131.02.0FalseNoneNoneFalseNoneFalse262.00
3216235110867NoneP.No: 191, Iteam No.16.10 VOL 5 PWD SR 2023-24Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4236.04236.02.0FalseNoneNoneFalseNoneFalse8472.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17172228190000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17172228190000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17172228190000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17172228190000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17172228190000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17172228190000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17172228190000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17172228190000NoneNoneELIGIBILITYBanker DetailsNone
17172228190000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17172228190000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP Portal due to internet connectivity issues and technical glitches at bidders end.None
17172228190000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17172228190000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17172228190000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17172228190000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17172228190000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17172228190000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17172228190000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17172228190000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, PWD Division, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17172228190000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17172228190000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should get tested by the quality control authority before use on the work at their own cost.None
17172228190000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer - in charge of this work.None
17172228190000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17172228190000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17172228190000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17172228190000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PW Department, Mysore Division, Mysore during office hours on all working days.None
17172228190000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17172228190000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17172228190000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-1None
17172228190000NoneNoneELIGIBILITYGST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17172228190000NoneNoneELIGIBILITYThe employer reserves the rights to Cancel or withdraw any or all the tenders without Giving any reasons & Any Time.None
17172228190000NoneNoneELIGIBILITYThe contractor shall maintain the work in defective liability period at his cost & as per the directions of Engineer in charge of work.None
17172228190000NoneNoneELIGIBILITYEstimate rates are excluding GST as per common SR 2023-24 and prevailing GST (18% of amount put to tender) amount is kept in form of Lumpsum in sanctioned estimate according to guidelines in common SR. therefore amount put to tender and ECV amount are excluding GST. KPP Portal format has no options to add GST separately at the stage of Draft Tender Schedule process for overall amount put to tender, . Hence GST will be paid separately for the quoted amount accordingly.None
17172228190000NoneNoneELIGIBILITYContractors should be registered as KPWD Class IV & Above Civil Contractor.None
17172228190001NoneNoneELIGIBILITY3.1a Achieved in at least Two financial years 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 an average financial turnover (in all classes of civil engineering construction works only)of Rs.16.95 LakhsNone
17172228190000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as Assessed available tender capacity-(AxNx2.5-B ) Where, A -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress taking into account the completed as well as ongoing works. N-Number of years prescribed for completion of the works for which tenders are invited.B-value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 3 months.None
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CA and Profit & loss statementsTrueTechnical Bid
KPWD Registration Certificate-CLASS-IV & ABOVETrueTechnical Bid
Ongoing Work detailsTrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid