1717222819000 | 2 | None | None | Buildings | Construction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk | 1020504.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3215949 | 110861 | None | P.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 2023-24 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 95.0 | 95.0 | 24.0 | False | None | None | False | None | False | 2280.0 | 0 | 3215950 | 110861 | None | P.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 34.06 | False | None | None | False | None | False | 3474.12 | 0 | 3215951 | 110861 | None | P.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5664.0 | 5664.0 | 8.67 | False | None | None | False | None | False | 49106.88 | 0 | 3215952 | 110861 | None | P.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 5.4 | False | None | None | False | None | False | 34214.4 | 0 | 3215953 | 110861 | None | P.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 506.88 | 506.88 | 5.4 | False | None | None | False | None | False | 2737.152 | 0 | 3215954 | 110861 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 9.16 | False | None | None | False | None | False | 62681.88 | 0 | 3215955 | 110861 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 2.8 | False | None | None | False | None | False | 11496.24 | 0 | 3215956 | 110861 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3421.5 | 3421.5 | 4.86 | False | None | None | False | None | False | 16628.49 | 0 | 3215957 | 110861 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for lintel beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 0.77 | False | None | None | False | None | False | 3161.466 | 0 | 3215958 | 110861 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for chejja slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3079.35 | 3079.35 | 0.73 | False | None | None | False | None | False | 2247.9255 | 0 | 3215959 | 110861 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 5.28 | False | None | None | False | None | False | 33454.08 | 0 | 3215960 | 110861 | None | P.No: 16 , Iteam No. 2.4.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work forcolumns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4435.2 | 4435.2 | 3.74 | False | None | None | False | None | False | 16587.648 | 0 | 3215961 | 110861 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for plinth beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3168.0 | 3168.0 | 1.03 | False | None | None | False | None | False | 3263.04 | 0 | 3215962 | 110861 | None | P.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 89457.0 | 89457.0 | 2.17 | False | None | None | False | None | False | 194121.69 | 0 | 3215963 | 110861 | None | P.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6389.0 | 6389.0 | 8.87 | False | None | None | False | None | False | 56670.43 | 0 | 3215964 | 110861 | None | P.No: 7 , Iteam No.1.11 VOL 1 PWD SR 2023-24 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations
and other similar works etc. in layers not exceeding 20cm in depth, consolidating
each deposited layer by ramming and watering, lead up to 50 m and lift upto
1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 433.0 | 433.0 | 35.87 | False | None | None | False | None | False | 15531.71 | 0 | 3215965 | 110861 | None | P.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 255.0 | 255.0 | 9.3 | False | None | None | False | None | False | 2371.5 | 0 | 3215966 | 110861 | None | P.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.0 | 8211.0 | 14.61 | False | None | None | False | None | False | 119962.71 | 0 | 3215967 | 110861 | None | P.No: 14 , Iteam No.6.14 VOL 2 PWD SR 2023-24 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1060.0 | 1060.0 | 3.15 | False | None | None | False | None | False | 3339.0 | 0 | 3215968 | 110861 | None | P.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3
fine sand) on concrete surface / ceilings including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 211.0 | 211.0 | 31.08 | False | None | None | False | None | False | 6557.88 | 0 | 3215969 | 110861 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick
wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 29.58 | False | None | None | False | None | False | 8252.82 | 0 | 3215970 | 110861 | None | P.No: 42 , Iteam No.8.1.2 VOL 2 PWD SR 2023-24 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:
6 fine sand) including rounding off corners wherever required smooth
rendering, providing and removing scaffolding, including cost of materials,
labour, curing complete as per specifications and as per directions of
Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 241.0 | 241.0 | 49.8 | False | None | None | False | None | False | 12001.8 | 0 | 3215971 | 110861 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 142.19 | False | None | None | False | None | False | 39671.01 | 0 | 3215972 | 110861 | None | P.No: 45 , Iteam No.8.25 VOL 2 PWD SR 2023-24 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions
of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 137.0 | 137.0 | 60.66 | False | None | None | False | None | False | 8310.42 | 0 | 3215973 | 110861 | None | P.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 283.0 | 283.0 | 126.81 | False | None | None | False | None | False | 35887.23 | 0 | 3215974 | 110861 | None | P.No: 47 , Iteam No.8.33.3 VOL 2 PWD SR 2023-24 | Painting Steel work with Deluxe Multi Surface Paint to give an even
shade. Two coat applied @ 0.90L/10 m² over an under coat of primer
applied @ 0.80 L/10 m² of approved brand and manufacture including
preparing the surface after thorougly cleaning oil, grease, dirt and foreign
matter, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 139.0 | 139.0 | 18.72 | False | None | None | False | None | False | 2602.08 | 0 | 3215975 | 110861 | None | P.No: 47 , Iteam No.8.33.2 VOL 2 PWD SR 2023-24 | Painting wood work with Deluxe Multi Surface Paint of required shade.
Two coat applied @ 0.90L/10 m² over an under coat of primer applied
@0.75 L/10 m² of approved brand and manufacture to give an even shade
including preparing the surface after thorougly cleaning oil, grease, dirt
and foreign matter, sand papering and knotting , cost of materials, labour
complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 138.0 | 138.0 | 6.55 | False | None | None | False | None | False | 903.9 | 0 | 3215976 | 110861 | None | P.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1145.0 | 1145.0 | 26.0 | False | None | None | False | None | False | 29770.0 | 0 | 3215977 | 110861 | None | P.No: 63 , Iteam No.9.27 VOL 2 PWD SR 2023-24 | Providing and laying flooring with burnt stone slabs 10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3, , including cost of materials, mortar, labour, curing complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 2388.0 | 2388.0 | 5.4 | False | None | None | False | None | False | 12895.2 | 0 | 3215978 | 110861 | None | P.No:71 , Iteam No.10.14 VOL 2 PWD SR 2023-24 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1106.0 | 1106.0 | 49.8 | False | None | None | False | None | False | 55078.8 | 0 | 3215979 | 110861 | None | P.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol-2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 291.0 | 291.0 | 16.0 | False | None | None | False | None | False | 4656.0 | 0 | 3215980 | 110861 | None | P.No:104 , Iteam No.12.51 VOL 2 PWD SR 2023-24 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 1016.0 | 1016.0 | 1.0 | False | None | None | False | None | False | 1016.0 | 0 | 3215981 | 110861 | None | P.No:100 , Iteam No.12.13.2 VOL 2 PWD SR 2023-24 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 99600.0 | 99600.0 | 0.07 | False | None | None | False | None | False | 6972.0 | 0 | 3215982 | 110861 | None | P.No:105 , Iteam No.12.57.3 VOL 2 PWD SR 2023-24 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification -do- 30 mm thick both side commercial ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 3005.0 | 3005.0 | 1.95 | False | None | None | False | None | False | 5859.75 | 0 | 3215983 | 110861 | None | P.No:109 , Iteam No.12.87 VOL 2 PWD SR 2023-24 | Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 81mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch ock. Wall thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 6551.0 | 6551.0 | 7.2 | False | None | None | False | None | False | 47167.2 | 0 | 3215984 | 110861 | None | P.No:86 , Iteam No.11.34a VOL 2 PWD SR 2023-24 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Kg | 168.0 | 168.0 | 151.2 | False | None | None | False | None | False | 25401.6 | 0 | 3215985 | 110861 | None | P.No:105 , Iteam No.12.63 VOL 2 PWD SR 2023-24 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 130.0 | 130.0 | 3.0 | False | None | None | False | None | False | 390.0 | 0 | 3215986 | 110861 | None | P.No:107 , Iteam No.12.74.1 VOL 2 PWD SR 2023-24 | Providing and fixing IS : 12817 marked stainless steel butt hinges with
stainless steel screws etc. complete 125x64x1.90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 102.0 | 102.0 | 3.0 | False | None | None | False | None | False | 306.0 | 0 | 3215987 | 110861 | None | P.No:105 , Iteam No.12.62 VOL 2 PWD SR 2023-24 | Providing and fixing chromium plated brass handles of 100/125 mm with
necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 237.0 | 237.0 | 2.0 | False | None | None | False | None | False | 474.0 | 0 | 3215988 | 110861 | None | P.No:105 , Iteam No.12.58 VOL 2 PWD SR 2023-24 | Providing and fixing bright finished brass hanging type floor door stopper
with necessary screws, etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 120.0 | 120.0 | 1.0 | False | None | None | False | None | False | 120.0 | 0 | 3215989 | 110861 | None | P.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 817.0 | 817.0 | 38.85 | False | None | None | False | None | False | 31740.45 | 0 | 3215990 | 110861 | None | P.No:63 , Iteam No.9.23 VOL 2 PWD SR 2023-24 | Providing and laying flamed finish Granite stone flooring in required design
and patterns, in linear as well as curvilinear portions of the building all
complete as per the architectural drawings with 18 mm thick stone
slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4
coarse sand) laid and jointed with cement slurry and pointing with white
cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed
by the Engineer-in-Charge :
** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 2466.0 | 2466.0 | 4.95 | False | None | None | False | None | False | 12206.7 | 0 | 3215991 | 110861 | None | P.No:133 , Iteam No.14.10.1.1 VOL 2 PWD SR 2023-24 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per
IS:13983 with C.I. brackets and stainless steel plug 40 mm, including
painting of fittings and brackets, cutting and making good the walls
wherever required :510x1040 mm bowl depth 250 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 5618.0 | 5618.0 | 1.0 | False | None | None | False | None | False | 5618.0 | 0 | 3215992 | 110861 | None | P.No: 117, Iteam No.13.2.1 VOL 2 PWD SR 2023-24 | Providing and fixing brass bib cock of approved quality ;15 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 286.0 | 286.0 | 4.0 | False | None | None | False | None | False | 1144.0 | 0 | 3215993 | 110861 | None | P.No: 122, Iteam No.13.33.2 VOL 2 PWD SR 2023-24 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC
plain & brass threaded fittings This includes jointing of pipes & fittings
with one step CPVC solvent cement, trenching, refilling & testing of joints
complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 217.0 | 217.0 | 75.0 | False | None | None | False | None | False | 16275.0 | 0 | 3215994 | 110861 | None | P.No: 122, Iteam No.13.33.1 VOL 2 PWD SR 2023-24 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC
plain & brass threaded fittings This includes jointing of pipes & fittings
with one step CPVC solvent cement, trenching, refilling & testing of joints
complete as per direction of Engineer in Charge. External work 15 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 166.0 | 166.0 | 20.0 | False | None | None | False | None | False | 3320.0 | 0 | 3215995 | 110861 | None | P.No: 117, Iteam No.13.4.1 VOL 2 PWD SR 2023-24 | Providing and fixing Brass full way valve gate with C.I. wheel of
approved quality (screwed end) :25 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 549.0 | 549.0 | 1.0 | False | None | None | False | None | False | 549.0 | 0 | 3215996 | 110861 | None | P.No: 128, Iteam No.13.63 VOL 2 PWD SR 2023-24 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0
cm X 4.0 cm with all fitting arrangements & all necessary accessories
complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 244.0 | 244.0 | 3.0 | False | None | None | False | None | False | 732.0 | 0 | 3215997 | 110861 | None | P.No: 132, Iteam No.14.7.2 VOL 2 PWD SR 2023-24 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar
taps, 32 mm C.P. brass waste of standard pattern, including painting of
fittings and brackets, cutting and making good the walls wherever require White Vitreous China Wash basin size 630x450 mm with a single 15 mm
C.P. brass pillar tap ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 2561.0 | 2561.0 | 1.0 | False | None | None | False | None | False | 2561.0 | 0 | 3215998 | 110861 | None | P.No: 120, Iteam No.13.18.1 VOL 2 PWD SR 2023-24 | Providing and fixing PTMT stop cock of approved quality and colour 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 131.0 | 131.0 | 2.0 | False | None | None | False | None | False | 262.0 | 0 | 3215999 | 110861 | None | P.No: 191, Iteam No.16.10 VOL 5 PWD SR 2023-24 | Constructing brick masonry chamber of internal dimension 450x450mm
and depth of 600mm (inner dimensions) with modular bricks of CD 75
in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering
12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing
CI cover & frame etc. excluding the cost of CI frame and cover ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 4236.0 | 4236.0 | 2.0 | False | None | None | False | None | False | 8472.0 | 0 |
| 1717222820000 | 2 | None | None | Buildings | B) Construction of Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk | 674263.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3216000 | 110862 | None | P.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 202 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 95.0 | 95.0 | 30.0 | False | None | None | False | None | False | 2850.0 | 0 | 3216001 | 110862 | None | P.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 23.72 | False | None | None | False | None | False | 2419.44 | 0 | 3216002 | 110862 | None | P.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5664.0 | 5664.0 | 11.23 | False | None | None | False | None | False | 63606.72 | 0 | 3216003 | 110862 | None | P.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 4.5 | False | None | None | False | None | False | 28512.0 | 0 | 3216004 | 110862 | None | P.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 506.88 | 506.88 | 4.5 | False | None | None | False | None | False | 2280.96 | 0 | 3216005 | 110862 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 9.56 | False | None | None | False | None | False | 65419.08 | 0 | 3216006 | 110862 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 2.75 | False | None | None | False | None | False | 11290.95 | 0 | 3216007 | 110862 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3421.5 | 3421.5 | 6.81 | False | None | None | False | None | False | 23300.415 | 0 | 3216008 | 110862 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 3.75 | False | None | None | False | None | False | 23760.0 | 0 | 3216009 | 110862 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3168.0 | 3168.0 | 2.21 | False | None | None | False | None | False | 7001.28 | 0 | 3216010 | 110862 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4435.2 | 4435.2 | 1.54 | False | None | None | False | None | False | 6830.208 | 0 | 3216011 | 110862 | None | P.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 89457.0 | 89457.0 | 1.77 | False | None | None | False | None | False | 158338.89 | 0 | 3216012 | 110862 | None | P.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6389.0 | 6389.0 | 7.48 | False | None | None | False | None | False | 47789.72 | 0 | 3216013 | 110862 | None | P.No: 7 , Iteam No.1.9 VOL 1 PWD SR 2023-24 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations
and other similar works etc. in layers not exceeding 20cm in depth, consolidating
each deposited layer by ramming and watering, lead up to 50 m and lift upto
1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 433.0 | 433.0 | 28.5 | False | None | None | False | None | False | 12340.5 | 0 | 3216014 | 110862 | None | P.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 255.0 | 255.0 | 7.34 | False | None | None | False | None | False | 1871.7 | 0 | 3216015 | 110862 | None | P.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.0 | 8211.0 | 6.46 | False | None | None | False | None | False | 53043.06 | 0 | 3216016 | 110862 | None | P.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3
fine sand) on concrete surface / ceilings including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 211.0 | 211.0 | 66.59 | False | None | None | False | None | False | 14050.49 | 0 | 3216017 | 110862 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 62.14 | False | None | None | False | None | False | 17337.06 | 0 | 3216018 | 110862 | None | P.No: 45 , Iteam No.8.28 VOL 2 PWD SR 2023-24 | Finishing walls with water proofing cement paint of required shade :New
work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 89.0 | 89.0 | 66.59 | False | None | None | False | None | False | 5926.51 | 0 | 3216019 | 110862 | None | P.No: 45 , Iteam No.8.27 VOL 2 PWD SR 2023-24 | Applying one coat of water thinnable cement primer of approved brand
and manufacture on wall surface :Water thinnable cement primer to give
an even shade after thoroughly brooming the surface to remove all dirt,
dust, mortar drops and foreign matter including preparing the surface
even and sand paper smooth, cost of materials, labour complete as per
specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 53.0 | 53.0 | 66.59 | False | None | None | False | None | False | 3529.27 | 0 | 3216020 | 110862 | None | P.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 283.0 | 283.0 | 57.74 | False | None | None | False | None | False | 16340.42 | 0 | 3216021 | 110862 | None | P.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1145.0 | 1145.0 | 50.52 | False | None | None | False | None | False | 57845.4 | 0 | 3216022 | 110862 | None | P.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 291.0 | 291.0 | 18.0 | False | None | None | False | None | False | 5238.0 | 0 | 3216023 | 110862 | None | P.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 817.0 | 817.0 | 53.05 | False | None | None | False | None | False | 43341.85 | 0 |
| 1717223664000 | 1 | None | None | Buildings | Construction of Kitchen Block and Stage in Government Adarsh Vidyalaya in Deburu, Nanjangud Taluk | 1694768.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3216185 | 110867 | None | P.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 2023-24 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 95.0 | 95.0 | 24.0 | False | None | None | False | None | False | 2280.0 | 0 | 3216161 | 110867 | None | P.No: 8 , Iteam No. 1.12.1 VOL 1 PWD SR 202 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools,usage of machinery & other appurtenances required to complete the work. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 95.0 | 95.0 | 30.0 | False | None | None | False | None | False | 2850.0 | 0 | 3216186 | 110867 | None | P.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 34.06 | False | None | None | False | None | False | 3474.12 | 0 | 3216162 | 110867 | None | P.No: 8 , Iteam No. 1.14.1 VOL 1 PWD SR 2023-24 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 102.0 | 102.0 | 23.72 | False | None | None | False | None | False | 2419.44 | 0 | 3216163 | 110867 | None | P.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5664.0 | 5664.0 | 11.23 | False | None | None | False | None | False | 63606.72 | 0 | 3216187 | 110867 | None | P.No: 15 , Iteam No. 2.1.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 5664.0 | 5664.0 | 8.67 | False | None | None | False | None | False | 49106.88 | 0 | 3216188 | 110867 | None | P.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 5.4 | False | None | None | False | None | False | 34214.4 | 0 | 3216164 | 110867 | None | P.No: 15 , Iteam No. 2.2.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Foundation works.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes,labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as pe technical specifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 4.5 | False | None | None | False | None | False | 28512.0 | 0 | 3216189 | 110867 | None | P.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 506.88 | 506.88 | 5.4 | False | None | None | False | None | False | 2737.152 | 0 | 3216165 | 110867 | None | P.No: 15 , Iteam No. 2.2.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for footing ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 506.88 | 506.88 | 4.5 | False | None | None | False | None | False | 2280.96 | 0 | 3216166 | 110867 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 9.56 | False | None | None | False | None | False | 65419.08 | 0 | 3216190 | 110867 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingand all other appurtenances required to complete the work as per technicalspecifications.
M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6843.0 | 6843.0 | 9.16 | False | None | None | False | None | False | 62681.88 | 0 | 3216191 | 110867 | None | P.No: 16 , Iteam No. 2.5.2 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 2.8 | False | None | None | False | None | False | 11496.24 | 0 | 3216167 | 110867 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 2.75 | False | None | None | False | None | False | 11290.95 | 0 | 3216168 | 110867 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for columns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3421.5 | 3421.5 | 6.81 | False | None | None | False | None | False | 23300.415 | 0 | 3216192 | 110867 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3421.5 | 3421.5 | 4.86 | False | None | None | False | None | False | 16628.49 | 0 | 3216169 | 110867 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 3.75 | False | None | None | False | None | False | 23760.0 | 0 | 3216193 | 110867 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for lintel beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4105.8 | 4105.8 | 0.77 | False | None | None | False | None | False | 3161.466 | 0 | 3216194 | 110867 | None | P.No: 16 , Iteam No. 2.5.2VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for chejja slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3079.35 | 3079.35 | 0.73 | False | None | None | False | None | False | 2247.9255 | 0 | 3216170 | 110867 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for roof slab ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3168.0 | 3168.0 | 2.21 | False | None | None | False | None | False | 7001.28 | 0 | 3216171 | 110867 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4435.2 | 4435.2 | 1.54 | False | None | None | False | None | False | 6830.208 | 0 | 3216195 | 110867 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6336.0 | 6336.0 | 5.28 | False | None | None | False | None | False | 33454.08 | 0 | 3216196 | 110867 | None | P.No: 16 , Iteam No. 2.4.1 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work forcolumns ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 4435.2 | 4435.2 | 3.74 | False | None | None | False | None | False | 16587.648 | 0 | 3216172 | 110867 | None | P.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 89457.0 | 89457.0 | 1.77 | False | None | None | False | None | False | 158338.89 | 0 | 3216197 | 110867 | None | P.No: 16 , Iteam No. 2.4.3 VOL 1 PWD SR 2023-24 | Additionalities for Formwork, Centering & Scaffolding for Sub structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work for plinth beam ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 3168.0 | 3168.0 | 1.03 | False | None | None | False | None | False | 3263.04 | 0 | 3216173 | 110867 | None | P.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6389.0 | 6389.0 | 7.48 | False | None | None | False | None | False | 47789.72 | 0 | 3216198 | 110867 | None | P.No: 18 , Iteam No. 2.11.a VOL 1 PWD SR 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Tonne | 89457.0 | 89457.0 | 2.17 | False | None | None | False | None | False | 194121.69 | 0 | 3216174 | 110867 | None | P.No: 7 , Iteam No.1.9 VOL 1 PWD SR 2023-24 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations
and other similar works etc. in layers not exceeding 20cm in depth, consolidating
each deposited layer by ramming and watering, lead up to 50 m and lift upto
1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 433.0 | 433.0 | 28.5 | False | None | None | False | None | False | 12340.5 | 0 | 3216175 | 110867 | None | P.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 255.0 | 255.0 | 7.34 | False | None | None | False | None | False | 1871.7 | 0 | 3216199 | 110867 | None | P.No: 9 , Iteam No. 5.4 VOL 2 PWD SR 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 6389.0 | 6389.0 | 8.87 | False | None | None | False | None | False | 56670.43 | 0 | 3216176 | 110867 | None | P.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.0 | 8211.0 | 6.46 | False | None | None | False | None | False | 53043.06 | 0 | 3216200 | 110867 | None | P.No: 7 , Iteam No.1.11 VOL 1 PWD SR 2023-24 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations
and other similar works etc. in layers not exceeding 20cm in depth, consolidating
each deposited layer by ramming and watering, lead up to 50 m and lift upto
1.5 m. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 433.0 | 433.0 | 35.87 | False | None | None | False | None | False | 15531.71 | 0 | 3216177 | 110867 | None | P.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3
fine sand) on concrete surface / ceilings including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 211.0 | 211.0 | 66.59 | False | None | None | False | None | False | 14050.49 | 0 | 3216201 | 110867 | None | P.No: 44 , Iteam No.8.19.1 VOL 2 PWD SR 2023-24 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 255.0 | 255.0 | 9.3 | False | None | None | False | None | False | 2371.5 | 0 | 3216202 | 110867 | None | P.No: 13 , Iteam No.6.7 VOL 2 PWD SR 2023-24 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 8211.0 | 8211.0 | 14.61 | False | None | None | False | None | False | 119962.71 | 0 | 3216178 | 110867 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 62.14 | False | None | None | False | None | False | 17337.06 | 0 | 3216203 | 110867 | None | P.No: 14 , Iteam No.6.14 VOL 2 PWD SR 2023-24 | Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:3 (1 cement :3 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1060.0 | 1060.0 | 3.15 | False | None | None | False | None | False | 3339.0 | 0 | 3216179 | 110867 | None | P.No: 45 , Iteam No.8.28 VOL 2 PWD SR 2023-24 | Finishing walls with water proofing cement paint of required shade :New
work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after
thoroughly brooming the surface to remove all dirt, dust, mortar drops
and foreign matter including preparing the surface even and sand paper
smooth, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 89.0 | 89.0 | 66.59 | False | None | None | False | None | False | 5926.51 | 0 | 3216204 | 110867 | None | P.No: 43 , Iteam No.8.10 VOL 2 PWD SR 2023-24 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3
fine sand) on concrete surface / ceilings including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 211.0 | 211.0 | 31.08 | False | None | None | False | None | False | 6557.88 | 0 | 3216180 | 110867 | None | P.No: 45 , Iteam No.8.27 VOL 2 PWD SR 2023-24 | Applying one coat of water thinnable cement primer of approved brand
and manufacture on wall surface :Water thinnable cement primer to give
an even shade after thoroughly brooming the surface to remove all dirt,
dust, mortar drops and foreign matter including preparing the surface
even and sand paper smooth, cost of materials, labour complete as per
specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 53.0 | 53.0 | 66.59 | False | None | None | False | None | False | 3529.27 | 0 | 3216205 | 110867 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick
wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners
wherever required smooth rendering, providing and removing scaffolding,
including cost of materials, labour, curing complete as per specifications
and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 29.58 | False | None | None | False | None | False | 8252.82 | 0 | 3216181 | 110867 | None | P.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 283.0 | 283.0 | 57.74 | False | None | None | False | None | False | 16340.42 | 0 | 3216206 | 110867 | None | P.No: 42 , Iteam No.8.1.2 VOL 2 PWD SR 2023-24 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:
6 fine sand) including rounding off corners wherever required smooth
rendering, providing and removing scaffolding, including cost of materials,
labour, curing complete as per specifications and as per directions of
Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 241.0 | 241.0 | 49.8 | False | None | None | False | None | False | 12001.8 | 0 | 3216182 | 110867 | None | P.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1145.0 | 1145.0 | 50.52 | False | None | None | False | None | False | 57845.4 | 0 | 3216183 | 110867 | None | P.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 291.0 | 291.0 | 18.0 | False | None | None | False | None | False | 5238.0 | 0 | 3216207 | 110867 | None | P.No: 41 , Iteam No.8.2.2 VOL 2 PWD SR 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge Out Side wall Plastering ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 279.0 | 279.0 | 142.19 | False | None | None | False | None | False | 39671.01 | 0 | 3216208 | 110867 | None | P.No: 45 , Iteam No.8.25 VOL 2 PWD SR 2023-24 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in cluding water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions
of Engineer-in-charge ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 137.0 | 137.0 | 60.66 | False | None | None | False | None | False | 8310.42 | 0 | 3216184 | 110867 | None | P.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 817.0 | 817.0 | 53.05 | False | None | None | False | None | False | 43341.85 | 0 | 3216209 | 110867 | None | P.No: 45 , Iteam No.8.29 VOL 2 PWD SR 2023-24 | Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 283.0 | 283.0 | 126.81 | False | None | None | False | None | False | 35887.23 | 0 | 3216210 | 110867 | None | P.No: 47 , Iteam No.8.33.3 VOL 2 PWD SR 2023-24 | Painting Steel work with Deluxe Multi Surface Paint to give an even
shade. Two coat applied @ 0.90L/10 m² over an under coat of primer
applied @ 0.80 L/10 m² of approved brand and manufacture including
preparing the surface after thorougly cleaning oil, grease, dirt and foreign
matter, cost of materials, labour complete as per specifications and as per
directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 139.0 | 139.0 | 18.72 | False | None | None | False | None | False | 2602.08 | 0 | 3216211 | 110867 | None | P.No: 47 , Iteam No.8.33.2 VOL 2 PWD SR 2023-24 | Painting wood work with Deluxe Multi Surface Paint of required shade.
Two coat applied @ 0.90L/10 m² over an under coat of primer applied
@0.75 L/10 m² of approved brand and manufacture to give an even shade
including preparing the surface after thorougly cleaning oil, grease, dirt
and foreign matter, sand papering and knotting , cost of materials, labour
complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 138.0 | 138.0 | 6.55 | False | None | None | False | None | False | 903.9 | 0 | 3216212 | 110867 | None | P.No: 60 , Iteam No.9.12.2 VOL 2 PWD SR 2023-24 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 600x600 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1145.0 | 1145.0 | 26.0 | False | None | None | False | None | False | 29770.0 | 0 | 3216213 | 110867 | None | P.No: 63 , Iteam No.9.27 VOL 2 PWD SR 2023-24 | Providing and laying flooring with burnt stone slabs 10 cms thick rough chistle dressed on cement mortar bed 1:6, 25 mm thick, and pointed with cement mortar 1:3, , including cost of materials, mortar, labour, curing complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 2388.0 | 2388.0 | 5.4 | False | None | None | False | None | False | 12895.2 | 0 | 3216214 | 110867 | None | P.No:71 , Iteam No.10.14 VOL 2 PWD SR 2023-24 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 1106.0 | 1106.0 | 49.8 | False | None | None | False | None | False | 55078.8 | 0 | 3216215 | 110867 | None | P.NO. 125, I.No.13.48 of PWD SR 2023-24 Vol-2 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 291.0 | 291.0 | 16.0 | False | None | None | False | None | False | 4656.0 | 0 | 3216216 | 110867 | None | P.No:104 , Iteam No.12.51 VOL 2 PWD SR 2023-24 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 1016.0 | 1016.0 | 1.0 | False | None | None | False | None | False | 1016.0 | 0 | 3216217 | 110867 | None | P.No:100 , Iteam No.12.13.2 VOL 2 PWD SR 2023-24 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Cum | 99600.0 | 99600.0 | 0.07 | False | None | None | False | None | False | 6972.0 | 0 | 3216218 | 110867 | None | P.No:105 , Iteam No.12.57.3 VOL 2 PWD SR 2023-24 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification -do- 30 mm thick both side commercial ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 3005.0 | 3005.0 | 1.95 | False | None | None | False | None | False | 5859.75 | 0 | 3216219 | 110867 | None | P.No:109 , Iteam No.12.87 VOL 2 PWD SR 2023-24 | Providing & fixing of 2.5 track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 81mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm x 57mm and mesh sash of size with GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch ock. Wall thickness of frame & sash shall be of 1.8-2.0mm. Maximum possible size 1519mm x 1519mm (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 6551.0 | 6551.0 | 7.2 | False | None | None | False | None | False | 47167.2 | 0 | 3216220 | 110867 | None | P.No:86 , Iteam No.11.34a VOL 2 PWD SR 2023-24 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Kg | 168.0 | 168.0 | 151.2 | False | None | None | False | None | False | 25401.6 | 0 | 3216221 | 110867 | None | P.No:105 , Iteam No.12.63 VOL 2 PWD SR 2023-24 | Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 130.0 | 130.0 | 3.0 | False | None | None | False | None | False | 390.0 | 0 | 3216222 | 110867 | None | P.No:107 , Iteam No.12.74.1 VOL 2 PWD SR 2023-24 | Providing and fixing IS : 12817 marked stainless steel butt hinges with
stainless steel screws etc. complete 125x64x1.90mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 102.0 | 102.0 | 3.0 | False | None | None | False | None | False | 306.0 | 0 | 3216223 | 110867 | None | P.No:105 , Iteam No.12.62 VOL 2 PWD SR 2023-24 | Providing and fixing chromium plated brass handles of 100/125 mm with
necessary screws etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 237.0 | 237.0 | 2.0 | False | None | None | False | None | False | 474.0 | 0 | 3216224 | 110867 | None | P.No:105 , Iteam No.12.58 VOL 2 PWD SR 2023-24 | Providing and fixing bright finished brass hanging type floor door stopper
with necessary screws, etc. complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Unit | 120.0 | 120.0 | 1.0 | False | None | None | False | None | False | 120.0 | 0 | 3216225 | 110867 | None | P.No:149 , Iteam No.15.1 VOL 2 PWD SR 2023-24 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 817.0 | 817.0 | 38.85 | False | None | None | False | None | False | 31740.45 | 0 | 3216226 | 110867 | None | P.No:63 , Iteam No.9.23 VOL 2 PWD SR 2023-24 | Providing and laying flamed finish Granite stone flooring in required design
and patterns, in linear as well as curvilinear portions of the building all
complete as per the architectural drawings with 18 mm thick stone
slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4
coarse sand) laid and jointed with cement slurry and pointing with white
cement slurry admixed with pigment of matching shade including rub bing, curing and polishing etc. all complete as specified and as directed
by the Engineer-in-Charge :
** Flamed finish granite stone slab Black, Cat Eye, River Pink or equivalent ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Sqm | 2466.0 | 2466.0 | 4.95 | False | None | None | False | None | False | 12206.7 | 0 | 3216227 | 110867 | None | P.No:133 , Iteam No.14.10.1.1 VOL 2 PWD SR 2023-24 | Providing and fixing Stainless Steel A ISI 304 (18/8) kitchen sink as per
IS:13983 with C.I. brackets and stainless steel plug 40 mm, including
painting of fittings and brackets, cutting and making good the walls
wherever required :510x1040 mm bowl depth 250 mm ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 5618.0 | 5618.0 | 1.0 | False | None | None | False | None | False | 5618.0 | 0 | 3216228 | 110867 | None | P.No: 117, Iteam No.13.2.1 VOL 2 PWD SR 2023-24 | Providing and fixing brass bib cock of approved quality ;15 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 286.0 | 286.0 | 4.0 | False | None | None | False | None | False | 1144.0 | 0 | 3216229 | 110867 | None | P.No: 122, Iteam No.13.33.2 VOL 2 PWD SR 2023-24 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC
plain & brass threaded fittings This includes jointing of pipes & fittings
with one step CPVC solvent cement, trenching, refilling & testing of joints
complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 217.0 | 217.0 | 75.0 | False | None | None | False | None | False | 16275.0 | 0 | 3216230 | 110867 | None | P.No: 122, Iteam No.13.33.1 VOL 2 PWD SR 2023-24 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC
plain & brass threaded fittings This includes jointing of pipes & fittings
with one step CPVC solvent cement, trenching, refilling & testing of joints
complete as per direction of Engineer in Charge. External work 15 mm nominal dia Pipes ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | m | 166.0 | 166.0 | 20.0 | False | None | None | False | None | False | 3320.0 | 0 | 3216231 | 110867 | None | P.No: 117, Iteam No.13.4.1 VOL 2 PWD SR 2023-24 | Providing and fixing Brass full way valve gate with C.I. wheel of
approved quality (screwed end) :25 mm nominal bore ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 549.0 | 549.0 | 1.0 | False | None | None | False | None | False | 549.0 | 0 | 3216232 | 110867 | None | P.No: 128, Iteam No.13.63 VOL 2 PWD SR 2023-24 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0
cm X 4.0 cm with all fitting arrangements & all necessary accessories
complete ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 244.0 | 244.0 | 3.0 | False | None | None | False | None | False | 732.0 | 0 | 3216233 | 110867 | None | P.No: 132, Iteam No.14.7.2 VOL 2 PWD SR 2023-24 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar
taps, 32 mm C.P. brass waste of standard pattern, including painting of
fittings and brackets, cutting and making good the walls wherever require White Vitreous China Wash basin size 630x450 mm with a single 15 mm
C.P. brass pillar tap ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 2561.0 | 2561.0 | 1.0 | False | None | None | False | None | False | 2561.0 | 0 | 3216234 | 110867 | None | P.No: 120, Iteam No.13.18.1 VOL 2 PWD SR 2023-24 | Providing and fixing PTMT stop cock of approved quality and colour 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 131.0 | 131.0 | 2.0 | False | None | None | False | None | False | 262.0 | 0 | 3216235 | 110867 | None | P.No: 191, Iteam No.16.10 VOL 5 PWD SR 2023-24 | Constructing brick masonry chamber of internal dimension 450x450mm
and depth of 600mm (inner dimensions) with modular bricks of CD 75
in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering
12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing
CI cover & frame etc. excluding the cost of CI frame and cover ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work. | Each | 4236.0 | 4236.0 | 2.0 | False | None | None | False | None | False | 8472.0 | 0 |
|
|
---|