createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1717221518217
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1271000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose15-07-2024 16:00:00
tenderQueryClose08-07-2024 12:00:00
technicalBidOpen16-07-2024 16:30:00
publishedDate13-06-2024 20:03:59
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate13-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1171000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1717221518253
version7
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT10624
titleImprovements to Road from Yelubenchi to Kudathini Railway Station on to Siddammanahalli (MDR) from Km 0.00 to 10.50 (selected reaches) in Sandur Constituency, Ballari Taluk Ballari District under 8443 -CEPMIZ - KMERC Projects for the year 2023-24
descriptionImprovements to Road from Yelubenchi to Kudathini Railway Station on to Siddammanahalli (MDR) from Km 0.00 to 10.50 (selected reaches) in Sandur Constituency, Ballari Taluk Ballari District under 8443 -CEPMIZ - KMERC Projects for the year 2023-24
categoryWORKS
categoryTextWorks
ecv84710691.34
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount106600000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SDN/BAL/KMERC/YELUBENCHI/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17172215180000NoneNoneRoadsPavement Construction60793977.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215116110827NoneIC: 16.29Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 (PWD SR 2023-24 ,V-3,Pg. No. 149 I. No.16.29) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9000.09000.02.0FalseNoneNoneFalseNoneFalse18000.00
3215117110827NoneIC: 2.5(ii) aClearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle (PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm412.65412.6573.2FalseNoneNoneFalseNoneFalse30205.980
3215118110827NoneIC: 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (PWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6.36.310675.0FalseNoneNoneFalseNoneFalse67252.50
3215119110827NoneIC: 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (PWD SR 2023-24 ,V-1,Pg. No. 8 I. No.1.12) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.754173.23FalseNoneNoneFalseNoneFalse416279.69250
3215120110827NoneIC: 3.7Compacting Original Ground Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (PWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum110.25110.254602.45FalseNoneNoneFalseNoneFalse507420.11250
3215121110827NoneIC: 1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (PWD SR 2023-24 ,V-1,Pg. No. 7 I. No.1.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum124.95124.952162.73FalseNoneNoneFalseNoneFalse270233.11350
3215122110827NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per Cum for every 1.50 m height or part there of Deduct 5% per Cum if rollers are not used and tamping is done manually Add 8% per Cum for works under foul & sullage situation (PWD SR 2023-24 ,V-1,Pg. No. 7 I. No.1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.74092.49FalseNoneNoneFalseNoneFalse2036832.2730
3215123110827NoneIC: 3.6Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (PWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.6) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.659108.09FalseNoneNoneFalseNoneFalse4714802.78850
3215124110827NoneIC: 4.2.(B) (5)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material (PWD SR 2023-24 ,V-3,Pg. No. 23 I. No.4.2.(B) (5)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2476.952476.954273.6FalseNoneNoneFalseNoneFalse10585493.520
3215125110827NoneIC: 6.1Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing (PWD SR 2023-24 ,V-3,Pg. No. 49 I. No.6.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5166.05166.01687.01FalseNoneNoneFalseNoneFalse8715093.660
3215126110827NoneIC: 6.2.2Pavement Quality Concrete using paver - M40 Grade Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 315 kg/m3 & GGBS @ 105 kg/m3 (PWD SR 2023-24 ,V-3,Pg. No. 49 I. No.6.2.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8616.38616.33880.13FalseNoneNoneFalseNoneFalse33432364.1190
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 4.76, 4.93, 0, , ,1293096.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215127110828NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95216.0FalseNoneNoneFalseNoneFalse163069.20
3215128110828NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.8520.0FalseNoneNoneFalseNoneFalse20097.00
3215129110828NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1122.1FalseNoneNoneFalseNoneFalse13076.910
3215130110828NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7122.83FalseNoneNoneFalseNoneFalse61132.4910
3215131110828NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.417.87FalseNoneNoneFalseNoneFalse21915.7680
3215132110828NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6602.876602.874.52FalseNoneNoneFalseNoneFalse29844.97240
3215133110828NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1574.65FalseNoneNoneFalseNoneFalse495612.54750
3215134110828NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9520.0FalseNoneNoneFalseNoneFalse199059.00
3215135110828NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.66.69FalseNoneNoneFalseNoneFalse13430.8440
3215136110828NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.618.0FalseNoneNoneFalseNoneFalse36136.80
3215137110828NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.651.74FalseNoneNoneFalseNoneFalse157913.0910
3215138110828NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.440.0FalseNoneNoneFalseNoneFalse31416.00
3215139110828NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4593.87FalseNoneNoneFalseNoneFalse10743.42150
3215140110828NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1374.65FalseNoneNoneFalseNoneFalse39648.85450
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 5.08, 5.36, 5.43, 5.76, 5.96,6,6.32,6.47,5113053.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215141110829NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95864.0FalseNoneNoneFalseNoneFalse652276.80
3215142110829NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.8580.0FalseNoneNoneFalseNoneFalse80388.00
3215143110829NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1511.8FalseNoneNoneFalseNoneFalse54813.780
3215144110829NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7491.35FalseNoneNoneFalseNoneFalse244544.8950
3215145110829NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.471.46FalseNoneNoneFalseNoneFalse87638.5440
3215146110829NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6602.876602.8718.08FalseNoneNoneFalseNoneFalse119379.88960
3215147110829NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.15292.15FalseNoneNoneFalseNoneFalse1939627.67250
3215148110829NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9580.0FalseNoneNoneFalseNoneFalse796236.00
3215149110829NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.626.79FalseNoneNoneFalseNoneFalse53783.6040
3215150110829NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.672.0FalseNoneNoneFalseNoneFalse144547.20
3215151110829NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.656.8FalseNoneNoneFalseNoneFalse617131.620
3215152110829NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.4160.0FalseNoneNoneFalseNoneFalse125664.00
3215153110829NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.45365.68FalseNoneNoneFalseNoneFalse41852.0760
3215154110829NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.13292.15FalseNoneNoneFalseNoneFalse155169.62950
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 5.18, 5.65, 6.08, 6.23, ,2536036.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215155110830NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95384.0FalseNoneNoneFalseNoneFalse289900.80
3215156110830NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.8540.0FalseNoneNoneFalseNoneFalse40194.00
3215157110830NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1258.31FalseNoneNoneFalseNoneFalse27665.0010
3215158110830NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7245.69FalseNoneNoneFalseNoneFalse122279.9130
3215159110830NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.435.73FalseNoneNoneFalseNoneFalse43819.2720
3215160110830NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6602.876602.879.04FalseNoneNoneFalseNoneFalse59689.94480
3215161110830NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.15147.69FalseNoneNoneFalseNoneFalse980536.06350
3215162110830NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9540.0FalseNoneNoneFalseNoneFalse398118.00
3215163110830NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.613.39FalseNoneNoneFalseNoneFalse26881.7640
3215164110830NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.636.0FalseNoneNoneFalseNoneFalse72273.60
3215165110830NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.653.44FalseNoneNoneFalseNoneFalse312195.9960
3215166110830NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.480.0FalseNoneNoneFalseNoneFalse62832.00
3215167110830NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.45185.3FalseNoneNoneFalseNoneFalse21207.5850
3215168110830NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.13147.69FalseNoneNoneFalseNoneFalse78442.58970
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 5.8, 5.85, , , ,1194023.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215169110831NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95135.0FalseNoneNoneFalseNoneFalse101918.250
3215170110831NoneIC: 2.17(ix) (A)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1150.81150.815.0FalseNoneNoneFalseNoneFalse17262.00
3215171110831NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1154.44FalseNoneNoneFalseNoneFalse16540.5240
3215172110831NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7122.83FalseNoneNoneFalseNoneFalse61132.4910
3215173110831NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.417.87FalseNoneNoneFalseNoneFalse21915.7680
3215174110831NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6299.456299.454.52FalseNoneNoneFalseNoneFalse28473.5140
3215175110831NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1570.63FalseNoneNoneFalseNoneFalse468923.16450
3215176110831NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9520.0FalseNoneNoneFalseNoneFalse199059.00
3215177110831NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.66.69FalseNoneNoneFalseNoneFalse13430.8440
3215178110831NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.618.0FalseNoneNoneFalseNoneFalse36136.80
3215179110831NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.651.64FalseNoneNoneFalseNoneFalse148837.6260
3215180110831NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.440.0FalseNoneNoneFalseNoneFalse31416.00
3215181110831NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4587.75FalseNoneNoneFalseNoneFalse10042.98750
3215182110831NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.424.52FalseNoneNoneFalseNoneFalse1421.17840
3215183110831NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1370.63FalseNoneNoneFalseNoneFalse37513.71190
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 5.56, , , , ,639176.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215184110832NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95104.0FalseNoneNoneFalseNoneFalse78514.80
3215185110832NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.857.5FalseNoneNoneFalseNoneFalse7536.3750
3215186110832NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.180.1FalseNoneNoneFalseNoneFalse8578.710
3215187110832NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.761.41FalseNoneNoneFalseNoneFalse30563.7570
3215188110832NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.48.93FalseNoneNoneFalseNoneFalse10951.7520
3215189110832NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.452.26FalseNoneNoneFalseNoneFalse14211.8970
3215190110832NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1536.92FalseNoneNoneFalseNoneFalse245117.4180
3215191110832NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9510.0FalseNoneNoneFalseNoneFalse99529.50
3215192110832NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.63.35FalseNoneNoneFalseNoneFalse6725.460
3215193110832NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.69.0FalseNoneNoneFalseNoneFalse18068.40
3215194110832NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.650.86FalseNoneNoneFalseNoneFalse78048.9990
3215195110832NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.420.0FalseNoneNoneFalseNoneFalse15708.00
3215196110832NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4546.32FalseNoneNoneFalseNoneFalse5301.3240
3215197110832NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.422.26FalseNoneNoneFalseNoneFalse710.58920
3215198110832NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1336.92FalseNoneNoneFalseNoneFalse19609.31960
17172215180000NoneNoneRoadsConstruction of Two Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 6.18, , , , ,879022.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215199110833NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.95100.0FalseNoneNoneFalseNoneFalse75495.00
3215200110833NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.8510.0FalseNoneNoneFalseNoneFalse10048.50
3215201110833NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1111.19FalseNoneNoneFalseNoneFalse11908.4490
3215202110833NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.772.41FalseNoneNoneFalseNoneFalse36038.4570
3215203110833NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.418.87FalseNoneNoneFalseNoneFalse23142.1680
3215204110833NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.453.14FalseNoneNoneFalseNoneFalse19745.7330
3215205110833NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1548.87FalseNoneNoneFalseNoneFalse324455.26050
3215206110833NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9520.0FalseNoneNoneFalseNoneFalse199059.00
3215207110833NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.65.68FalseNoneNoneFalseNoneFalse11403.1680
3215208110833NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.69.0FalseNoneNoneFalseNoneFalse18068.40
3215209110833NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.651.11FalseNoneNoneFalseNoneFalse100737.66150
3215210110833NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.420.0FalseNoneNoneFalseNoneFalse15708.00
3215211110833NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4554.78FalseNoneNoneFalseNoneFalse6269.5710
3215212110833NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.423.14FalseNoneNoneFalseNoneFalse987.27880
3215213110833NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1348.87FalseNoneNoneFalseNoneFalse25956.32310
17172215180000NoneNoneRoadsConstruction of One Rows NP4 1000 mm Dia Pipe Culvert Reconst CD At CH 6.68, , , , ,633989.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215214110834NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.9554.0FalseNoneNoneFalseNoneFalse40767.30
3215215110834NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. (PWD SR 2023-24 ,V-3,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1004.851004.857.5FalseNoneNoneFalseNoneFalse7536.3750
3215216110834NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.165.2FalseNoneNoneFalseNoneFalse6982.920
3215217110834NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.779.29FalseNoneNoneFalseNoneFalse39462.6330
3215218110834NoneIC: 12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material (PWD SR 2023-24 ,V-3,Page No 117 Item No12.3 (a)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1226.41226.411.67FalseNoneNoneFalseNoneFalse14312.0880
3215219110834NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.452.26FalseNoneNoneFalseNoneFalse14211.8970
3215220110834NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1536.64FalseNoneNoneFalseNoneFalse243258.4560
3215221110834NoneIC: 9.2(i)Providing and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . i. 1000mm dia (PWD SR 2023-24 ,V-3,Page No 87 Item No9.2(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr9952.959952.9512.5FalseNoneNoneFalseNoneFalse124411.8750
3215222110834NoneIC: 4.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.63.35FalseNoneNoneFalseNoneFalse6725.460
3215223110834NoneIC: 14.4(A)Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. A)Stone /Boulder (PWD SR 2023-24 ,V-3,Page No 129 Item No14.4(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.69.0FalseNoneNoneFalseNoneFalse18068.40
3215224110834NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.650.85FalseNoneNoneFalseNoneFalse77141.45250
3215225110834NoneIC: 8.18Boundary pillar Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.420.0FalseNoneNoneFalseNoneFalse15708.00
3215226110834NoneIC: 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (PWD SR 2023-24 ,V-3,Page No 66 Item No8.10) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4545.71FalseNoneNoneFalseNoneFalse5231.50950
3215227110834NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.422.26FalseNoneNoneFalseNoneFalse710.58920
3215228110834NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1336.64FalseNoneNoneFalseNoneFalse19460.60320
17172215180000NoneNoneRoadsConstruction of Box Culvert,1 vent 3.0 X 3.5 Size At CH 4.02, , , , ,3014263.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215229110835NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.9517.5FalseNoneNoneFalseNoneFalse13211.6250
3215230110835NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1416.42FalseNoneNoneFalseNoneFalse44598.5820
3215231110835NoneIC: 2.13Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification. (PWD SR 2023-24 ,V-1 ,Page No 11 Item No2.13) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.117.21FalseNoneNoneFalseNoneFalse48465.0810
3215232110835NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7121.22FalseNoneNoneFalseNoneFalse60331.1940
3215233110835NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4520.53FalseNoneNoneFalseNoneFalse129101.87850
3215234110835NoneIC: 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.26724.24.86FalseNoneNoneFalseNoneFalse32679.6120
3215235110835NoneIC: 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.8109.71FalseNoneNoneFalseNoneFalse729878.6880
3215236110835NoneIC: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1519.8FalseNoneNoneFalseNoneFalse142265.970
3215237110835NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.659.22FalseNoneNoneFalseNoneFalse836757.8730
3215238110835NoneIC: 2.11.dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.d) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.91.58FalseNoneNoneFalseNoneFalse143765.6220
3215239110835NoneIC: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.557.5FalseNoneNoneFalseNoneFalse53636.6250
3215240110835NoneIC: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 122 Item No13.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.7512.5FalseNoneNoneFalseNoneFalse155334.3750
3215241110835NoneIC: 13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD SR 2023-24 ,V-3 ,Page No 124 Item No13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7530.0FalseNoneNoneFalseNoneFalse56542.50
3215242110835NoneIC: 13.2.AProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.2.A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.556.69FalseNoneNoneFalseNoneFalse98139.28950
3215243110835NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.69.02FalseNoneNoneFalseNoneFalse18108.5520
3215244110835NoneIC: 12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8569.51FalseNoneNoneFalseNoneFalse195382.18350
3215245110835NoneIC: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9540.0FalseNoneNoneFalseNoneFalse10038.00
3215246110835NoneIC: 8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3 ,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
3215247110835NoneIC: 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3434.553434.552.0FalseNoneNoneFalseNoneFalse6869.10
3215248110835NoneIC: 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (PWD SR 2023-24 ,V-3 ,Page No 66 Item No8.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4578.1FalseNoneNoneFalseNoneFalse8938.5450
3215249110835NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.757.5FalseNoneNoneFalseNoneFalse26263.1250
3215250110835NoneIC: 8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.22.0FalseNoneNoneFalseNoneFalse8870.40
3215251110835NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.4220.53FalseNoneNoneFalseNoneFalse6455.04260
3215252110835NoneIC: 2.4.1Form work at 5% for I.No. 2.4.1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum336.21336.214.86FalseNoneNoneFalseNoneFalse1633.98060
3215253110835NoneIC: 2.4.3Form work at 20% for I.No. 2.4.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.56109.71FalseNoneNoneFalseNoneFalse145975.73760
3215254110835NoneIC: 2.5.2Form work at 20% for I.No. 2.5.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.0319.8FalseNoneNoneFalseNoneFalse28453.1940
17172215180000NoneNoneRoadsConstruction of Box Culvert,1 Vent 2.00 x 2.00 m At CH 4.37, , , , ,1707233.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215255110836NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.956.38FalseNoneNoneFalseNoneFalse4816.5810
3215256110836NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (PWD SR 2023-24 ,V-3 ,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1150.81150.87.5FalseNoneNoneFalseNoneFalse8631.00
3215257110836NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1148.07FalseNoneNoneFalseNoneFalse15858.2970
3215258110836NoneIC: 2.13Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification. (PWD SR 2023-24 ,V-1 ,Page No 11 Item No2.13) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.19.41FalseNoneNoneFalseNoneFalse26499.5010
3215259110836NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7237.4FalseNoneNoneFalseNoneFalse118153.980
3215260110836NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4511.33FalseNoneNoneFalseNoneFalse71248.13850
3215261110836NoneIC: 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.26724.23.08FalseNoneNoneFalseNoneFalse20710.5360
3215262110836NoneIC: 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.851.51FalseNoneNoneFalseNoneFalse342685.7280
3215263110836NoneIC: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1510.68FalseNoneNoneFalseNoneFalse76737.4020
3215264110836NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.654.38FalseNoneNoneFalseNoneFalse397505.3670
3215265110836NoneIC: 2.11.dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.d) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.90.85FalseNoneNoneFalseNoneFalse77342.2650
3215266110836NoneIC: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.556.0FalseNoneNoneFalseNoneFalse42909.30
3215267110836NoneIC: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 122 Item No13.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.7510.0FalseNoneNoneFalseNoneFalse124267.50
3215268110836NoneIC: 13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD SR 2023-24 ,V-3 ,Page No 124 Item No13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7520.0FalseNoneNoneFalseNoneFalse37695.00
3215269110836NoneIC: 13.2.AProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.2.A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.554.95FalseNoneNoneFalseNoneFalse72614.27250
3215270110836NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.64.56FalseNoneNoneFalseNoneFalse9154.6560
3215271110836NoneIC: 12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8538.28FalseNoneNoneFalseNoneFalse107599.3380
3215272110836NoneIC: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9520.0FalseNoneNoneFalseNoneFalse5019.00
3215273110836NoneIC: 8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3 ,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
3215274110836NoneIC: 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3434.553434.552.0FalseNoneNoneFalseNoneFalse6869.10
3215275110836NoneIC: 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (PWD SR 2023-24 ,V-3 ,Page No 66 Item No8.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4541.36FalseNoneNoneFalseNoneFalse4733.6520
3215276110836NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.757.5FalseNoneNoneFalseNoneFalse26263.1250
3215277110836NoneIC: 8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.22.0FalseNoneNoneFalseNoneFalse8870.40
3215278110836NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.4211.33FalseNoneNoneFalseNoneFalse3562.37860
3215279110836NoneIC: 2.4.1Form work at 5% for I.No. 2.4.1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum336.21336.213.08FalseNoneNoneFalseNoneFalse1035.52680
3215280110836NoneIC: 2.4.3Form work at 20% for I.No. 2.4.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.5651.51FalseNoneNoneFalseNoneFalse68537.14560
3215281110836NoneIC: 2.5.2Form work at 20% for I.No. 2.5.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.0310.68FalseNoneNoneFalseNoneFalse15347.48040
17172215180000NoneNoneRoadsConstruction of Box Culvert,1 Vent 1.50 x 2.00 m At CH 4.64, , , , ,1371946.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215282110837NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.958.5FalseNoneNoneFalseNoneFalse6417.0750
3215283110837NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (PWD SR 2023-24 ,V-3 ,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1150.81150.810.0FalseNoneNoneFalseNoneFalse11508.00
3215284110837NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1103.2FalseNoneNoneFalseNoneFalse11052.720
3215285110837NoneIC: 2.13Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification. (PWD SR 2023-24 ,V-1 ,Page No 11 Item No2.13) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.17.75FalseNoneNoneFalseNoneFalse21824.7750
3215286110837NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.732.08FalseNoneNoneFalseNoneFalse15966.2160
3215287110837NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.459.47FalseNoneNoneFalseNoneFalse59551.62150
3215288110837NoneIC: 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.26724.22.84FalseNoneNoneFalseNoneFalse19096.7280
3215289110837NoneIC: 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.844.41FalseNoneNoneFalseNoneFalse295450.8480
3215290110837NoneIC: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.158.55FalseNoneNoneFalseNoneFalse61433.03250
3215291110837NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.653.76FalseNoneNoneFalseNoneFalse341237.4840
3215292110837NoneIC: 2.11.dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.d) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.90.69FalseNoneNoneFalseNoneFalse62783.7210
3215293110837NoneIC: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.554.5FalseNoneNoneFalseNoneFalse32181.9750
3215294110837NoneIC: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 122 Item No13.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.757.5FalseNoneNoneFalseNoneFalse93200.6250
3215295110837NoneIC: 13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD SR 2023-24 ,V-3 ,Page No 124 Item No13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7520.0FalseNoneNoneFalseNoneFalse37695.00
3215296110837NoneIC: 13.2.AProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.2.A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.553.83FalseNoneNoneFalseNoneFalse56184.37650
3215297110837NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.63.96FalseNoneNoneFalseNoneFalse7950.0960
3215298110837NoneIC: 12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8535.85FalseNoneNoneFalseNoneFalse100768.97250
3215299110837NoneIC: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9516.0FalseNoneNoneFalseNoneFalse4015.20
3215300110837NoneIC: 8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3 ,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
3215301110837NoneIC: 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3434.553434.552.0FalseNoneNoneFalseNoneFalse6869.10
3215302110837NoneIC: 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (PWD SR 2023-24 ,V-3 ,Page No 66 Item No8.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4532.76FalseNoneNoneFalseNoneFalse3749.3820
3215303110837NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.757.5FalseNoneNoneFalseNoneFalse26263.1250
3215304110837NoneIC: 8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.22.0FalseNoneNoneFalseNoneFalse8870.40
3215305110837NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.429.47FalseNoneNoneFalseNoneFalse2977.55740
3215306110837NoneIC: 2.4.1Form work at 5% for I.No. 2.4.1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum336.21336.212.84FalseNoneNoneFalseNoneFalse954.83640
3215307110837NoneIC: 2.4.3Form work at 20% fro I.No. 2.4.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.5644.41FalseNoneNoneFalseNoneFalse59090.16960
3215308110837NoneIC: 2.5.2Form work at 20% for I.No. 2.5.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.038.55FalseNoneNoneFalseNoneFalse12286.60650
17172215180000NoneNoneRoadsConstruction of Box Culvert,1 Vent 1.50 x 2.00 m At CH 6.65, , , , ,1371608.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215309110838NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.957.65FalseNoneNoneFalseNoneFalse5775.36750
3215310110838NoneIC: 2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to 900 mm dia (PWD SR 2023-24 ,V-3 ,Page No 11 Item No2.17(ix) (B)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1150.81150.87.5FalseNoneNoneFalseNoneFalse8631.00
3215311110838NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1132.9FalseNoneNoneFalseNoneFalse14233.590
3215312110838NoneIC: 2.13Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification. (PWD SR 2023-24 ,V-1 ,Page No 11 Item No2.13) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.17.75FalseNoneNoneFalseNoneFalse21824.7750
3215313110838NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.732.08FalseNoneNoneFalseNoneFalse15966.2160
3215314110838NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.459.47FalseNoneNoneFalseNoneFalse59551.62150
3215315110838NoneIC: 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.26724.22.84FalseNoneNoneFalseNoneFalse19096.7280
3215316110838NoneIC: 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.844.41FalseNoneNoneFalseNoneFalse295450.8480
3215317110838NoneIC: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.158.55FalseNoneNoneFalseNoneFalse61433.03250
3215318110838NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.653.76FalseNoneNoneFalseNoneFalse341237.4840
3215319110838NoneIC: 2.11.dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.d) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.90.69FalseNoneNoneFalseNoneFalse62783.7210
3215320110838NoneIC: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.554.5FalseNoneNoneFalseNoneFalse32181.9750
3215321110838NoneIC: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 122 Item No13.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.757.5FalseNoneNoneFalseNoneFalse93200.6250
3215322110838NoneIC: 13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD SR 2023-24 ,V-3 ,Page No 124 Item No13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7520.0FalseNoneNoneFalseNoneFalse37695.00
3215323110838NoneIC: 13.2.AProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.2.A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.553.83FalseNoneNoneFalseNoneFalse56184.37650
3215324110838NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.63.96FalseNoneNoneFalseNoneFalse7950.0960
3215325110838NoneIC: 12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8535.85FalseNoneNoneFalseNoneFalse100768.97250
3215326110838NoneIC: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9516.0FalseNoneNoneFalseNoneFalse4015.20
3215327110838NoneIC: 8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3 ,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
3215328110838NoneIC: 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3434.553434.552.0FalseNoneNoneFalseNoneFalse6869.10
3215329110838NoneIC: 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (PWD SR 2023-24 ,V-3 ,Page No 66 Item No8.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4532.76FalseNoneNoneFalseNoneFalse3749.3820
3215330110838NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.757.5FalseNoneNoneFalseNoneFalse26263.1250
3215331110838NoneIC: 8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.22.0FalseNoneNoneFalseNoneFalse8870.40
3215332110838NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.429.47FalseNoneNoneFalseNoneFalse2977.55740
3215333110838NoneIC: 2.4.1Form work at 5% for I.No. 2.4.1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum336.21336.212.84FalseNoneNoneFalseNoneFalse954.83640
3215334110838NoneIC: 2.4.3Form work at 20% for I.No. 2.4.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.5644.41FalseNoneNoneFalseNoneFalse59090.16960
3215335110838NoneIC: 2.5.2Form work at 20% for I.No. 2.5.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.038.55FalseNoneNoneFalseNoneFalse12286.60650
17172215180000NoneNoneRoadsConstruction of Box Culvert,1 Vent 2.0 x 1.50 m At CH 6.86, , , , ,1332371.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215336110839NoneIC: 2.8 (ii) (A)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 (PWD SR 2023-24 ,V-3,Page No 10 Item No2.8 (ii) (A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum754.95754.956.3FalseNoneNoneFalseNoneFalse4756.1850
3215337110839NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1106.55FalseNoneNoneFalseNoneFalse11411.5050
3215338110839NoneIC: 2.13Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification. (PWD SR 2023-24 ,V-1 ,Page No 11 Item No2.13) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.18.06FalseNoneNoneFalseNoneFalse22697.7660
3215339110839NoneIC: 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (PWD SR 2023-24 ,V-1,Page No 7 Item No1.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.724.16FalseNoneNoneFalseNoneFalse12024.4320
3215340110839NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.459.98FalseNoneNoneFalseNoneFalse62758.7310
3215341110839NoneIC: 2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6724.26724.23.08FalseNoneNoneFalseNoneFalse20710.5360
3215342110839NoneIC: 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.4.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6652.86652.841.64FalseNoneNoneFalseNoneFalse277022.5920
3215343110839NoneIC: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Including cost of form works. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 16 Item No2.5.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7185.157185.1510.54FalseNoneNoneFalseNoneFalse75731.4810
3215344110839NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.653.53FalseNoneNoneFalseNoneFalse320363.91450
3215345110839NoneIC: 2.11.dSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.d) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.90.84FalseNoneNoneFalseNoneFalse76432.3560
3215346110839NoneIC: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.8) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.554.5FalseNoneNoneFalseNoneFalse32181.9750
3215347110839NoneIC: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 122 Item No13.9 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.757.5FalseNoneNoneFalseNoneFalse93200.6250
3215348110839NoneIC: 13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. (PWD SR 2023-24 ,V-3 ,Page No 124 Item No13.16) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr1884.751884.7520.0FalseNoneNoneFalseNoneFalse37695.00
3215349110839NoneIC: 13.2.AProviding and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.2.A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.554.2FalseNoneNoneFalseNoneFalse61612.110
3215350110839NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.64.56FalseNoneNoneFalseNoneFalse9154.6560
3215351110839NoneIC: 12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.8528.05FalseNoneNoneFalseNoneFalse78844.34250
3215352110839NoneIC: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (PWD SR 2023-24 ,V-3 ,Page No 117 Item No12.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9512.0FalseNoneNoneFalseNoneFalse3011.40
3215353110839NoneIC: 8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24 ,V-3 ,Page No 67 Item No8.18) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.416.0FalseNoneNoneFalseNoneFalse12566.40
3215354110839NoneIC: 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification. (PWD SR 2023-24 ,V-3 ,Page No 121 Item No13.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos3434.553434.552.0FalseNoneNoneFalseNoneFalse6869.10
3215355110839NoneIC: 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. (PWD SR 2023-24 ,V-3 ,Page No 66 Item No8.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.4530.31FalseNoneNoneFalseNoneFalse3468.97950
3215356110839NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.757.5FalseNoneNoneFalseNoneFalse26263.1250
3215357110839NoneIC: 8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.22.0FalseNoneNoneFalseNoneFalse8870.40
3215358110839NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.429.98FalseNoneNoneFalseNoneFalse3137.91160
3215359110839NoneIC: 2.4.1Form work at 5% for I.No. 2.4.1 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum336.21336.213.08FalseNoneNoneFalseNoneFalse1035.52680
3215360110839NoneIC: 2.4.3Form work at 20% for I.No. 2.4.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1330.561330.5641.64FalseNoneNoneFalseNoneFalse55404.51840
3215361110839NoneIC: 2.5.2Form work at 20% for I.No. 2.5.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum1437.031437.0310.54FalseNoneNoneFalseNoneFalse15146.29620
17172215180000NoneNoneRoadsImprovements of Existing CD22585.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215362110840NoneIC: 14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. (PWD SR 2023-24 ,V-3 ,Page No 129 Item No14.1(A)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.611.25FalseNoneNoneFalseNoneFalse22585.50
17172215180000NoneNoneRoadsConstruction of Field Culverts409634.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215363110841NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.156.36FalseNoneNoneFalseNoneFalse6036.1560
3215364110841NoneIC: 16.15.CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia (PWD SR 2023-24 ,V-3 ,Page No 146 Item No16.15.C) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr3501.753501.7516.25FalseNoneNoneFalseNoneFalse56903.43750
3215365110841NoneIC: 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1 ,Page No 15 Item No2.1.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.453.96FalseNoneNoneFalseNoneFalse24902.2620
3215366110841NoneIC: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Including cost of form works. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1533.82FalseNoneNoneFalseNoneFalse224536.0530
3215367110841NoneIC: 2.11.cupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges (PWD PWD SR 2023-24 ,V-1 Page No. 18 Item No. 2.11.c) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.650.86FalseNoneNoneFalseNoneFalse78048.9990
3215368110841NoneIC: 2.1.3Form work at 5% for I.No. 2.1.3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum314.42314.423.96FalseNoneNoneFalseNoneFalse1245.10320
3215369110841NoneIC: 2.4.2Form work at 8% for I.No. 2.4.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum531.13531.1333.82FalseNoneNoneFalseNoneFalse17962.81660
17172215180000NoneNoneRoadsRoad Furniture1573749.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215370110842NoneIC: 8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (PWD SR 2023-24 ,V-3,Pg. No. 65 I. No.8.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm9460.59460.51.8FalseNoneNoneFalseNoneFalse17028.90
3215371110842NoneIC: 8.5 (A) (ii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (ii)) 90 cm equilateral triangle ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4918.24918.24.0FalseNoneNoneFalseNoneFalse19672.80
3215372110842NoneIC: 8.5 (A) (viii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (viii)) 60 cm circular ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4511.854511.852.0FalseNoneNoneFalseNoneFalse9023.70
3215373110842NoneIC: 8.5 (A) (xii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. (PWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (xii)) 60 cm x 45 cm rectangular ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.24.0FalseNoneNoneFalseNoneFalse17740.80
3215374110842NoneIC: 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) (PWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.15) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.5556.5643.66FalseNoneNoneFalseNoneFalse358196.790
3215375110842NoneIC: 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (PWD SR 2023-24 ,V-3,Pg. No. 74 I. No.8.43) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos383.25383.25376.0FalseNoneNoneFalseNoneFalse144102.00
3215376110842NoneIC: 8.16(ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc Ordinary kilometer stone (precast) (PWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.16(ii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3073.353073.353.0FalseNoneNoneFalseNoneFalse9220.050
3215377110842NoneIC: 8.16(iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 200 m stone (precast) (PWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.16(iii)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each884.1884.113.0FalseNoneNoneFalseNoneFalse11493.30
3215378110842NoneIC: 8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. (PWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2122.052122.0512.96FalseNoneNoneFalseNoneFalse27501.7680
3215379110842NoneIC: 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (PWD SR 2023-24 ,V-1,Pg. No. 8 I. No.1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1558.0FalseNoneNoneFalseNoneFalse59761.80
3215380110842NoneIC: 8.29(i)Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (PWD SR 2023-24 ,V-3,Pg. No. 71 I. No.8.29(i)) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr2322.62322.6387.5FalseNoneNoneFalseNoneFalse900007.50
17172215180000NoneNoneRoadsUtility Shifting - Electrical Pole Shifting824921.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3215381110843NoneIC: 1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pit660.45660.4527.0FalseNoneNoneFalseNoneFalse17832.150
3215382110843NoneIC: 1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. BESCOM/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos7429.87429.827.0FalseNoneNoneFalseNoneFalse200604.60
3215383110843NoneIC: 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1168.651168.6527.0FalseNoneNoneFalseNoneFalse31553.550
3215384110843NoneIC: 1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos4408.954408.957.0FalseNoneNoneFalseNoneFalse30862.650
3215385110843NoneIC: 2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1168.651168.657.0FalseNoneNoneFalseNoneFalse8180.550
3215386110843NoneIC: 2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/03 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos922.95922.9527.0FalseNoneNoneFalseNoneFalse24919.650
3215387110843NoneIC: 3.0111 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set754.95754.9527.0FalseNoneNoneFalseNoneFalse20383.650
3215388110843NoneIC: 6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos215.25215.2581.0FalseNoneNoneFalseNoneFalse17435.250
3215389110843NoneIC: 6.08DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos535.5535.59.0FalseNoneNoneFalseNoneFalse4819.50
3215390110843NoneIC: 1.7.1Digging of Pit for GUY SET Ordinary Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pit343.35343.354.0FalseNoneNoneFalseNoneFalse1373.40
3215391110843NoneIC: 6.05Releasing of Rabbit Conductor ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km4212.64212.63.645FalseNoneNoneFalseNoneFalse15354.9270
3215392110843NoneIC: 7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km48545.748545.73.645FalseNoneNoneFalseNoneFalse176949.07650
3215393110843NoneIC: 6.02Stringing of Rabbit Conductor (including pin binding, providing jumps, dead ending, etc.,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km5494.655494.653.645FalseNoneNoneFalseNoneFalse20027.999250
3215394110843NoneIC: 9.03PG Clamp Rabbit to Rabbit ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No107.1107.181.0FalseNoneNoneFalseNoneFalse8675.10
3215395110843NoneIC: 10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set331.8331.881.0FalseNoneNoneFalseNoneFalse26875.80
3215396110843NoneIC: 2.05LT 4 Pin Cross Arm - MS (Dwg No. BESCOM/ GM/QS&S/32 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No303.45303.452.0FalseNoneNoneFalseNoneFalse606.90
3215397110843NoneIC: 2.07LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No138.6138.62.0FalseNoneNoneFalseNoneFalse277.20
3215398110843NoneIC: 5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set128.1128.12.0FalseNoneNoneFalseNoneFalse256.20
3215399110843NoneIC: 5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set128.1128.12.0FalseNoneNoneFalseNoneFalse256.20
3215400110843NoneIC: 6.031.1 kV Ceramic Pin Insulator (Shell only) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos32.5532.5510.0FalseNoneNoneFalseNoneFalse325.50
3215401110843NoneIC: 6.06No. 8 Strain Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos28.3528.3510.0FalseNoneNoneFalseNoneFalse283.50
3215402110843NoneIC: 2.16Spiral Earth Electrode ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9534.0FalseNoneNoneFalseNoneFalse8532.30
3215403110843NoneIC: 4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr97.6597.6537.8FalseNoneNoneFalseNoneFalse3691.170
3215404110843NoneIC: 24.0111 kV, GOS a) 200 Amps, Single Break ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set9922.59922.52.0FalseNoneNoneFalseNoneFalse19845.00
3215405110843NoneIC: 13.02Labour for 11 kV, GOS a) 200 Amps, Single Break ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set1159.21159.22.0FalseNoneNoneFalseNoneFalse2318.40
3215406110843NoneIC: 1.8.1.aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each286.65286.6534.0FalseNoneNoneFalseNoneFalse9746.10
3215407110843NoneIC: 1.8.1.bA) Base Concreting with CC 1:4: 8 b Pole base for 9 Mtr Square Pole (650x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each371.7371.734.0FalseNoneNoneFalseNoneFalse12637.80
3215408110843NoneIC: 1.8.2.aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3315.93315.934.0FalseNoneNoneFalseNoneFalse112740.60
3215409110843NoneIC: 1.8.2.gGuy concreting with Boulders, Mud & SandAs per Drawing No. BESCOM/GM/CP/7/dt: 24.10.07.(with out cement) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each210.0210.02.0FalseNoneNoneFalseNoneFalse420.00
3215410110843NoneIC: 21.02Transporation by Head Load where ever there is no accessability for transporation by vechicle for Poles 25 to 105 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pole299.25299.2527.0FalseNoneNoneFalseNoneFalse8079.750
3215411110843NoneIC: 22.02Transporation by Head Load where ever there is no accessability for transporation by vechicle For ACSR Conductors 25 to 105 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km129.15129.153.645FalseNoneNoneFalseNoneFalse470.751750
3215412110843NoneIC: 26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot) NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No149.1149.127.0FalseNoneNoneFalseNoneFalse4025.70
3215413110843NoneIC: 5.06Fixing of HT/LT Single Top Support ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each117.6117.627.0FalseNoneNoneFalseNoneFalse3175.20
3215414110843NoneIC: 6.08DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No535.5535.59.0FalseNoneNoneFalseNoneFalse4819.50
3215415110843NoneIC: 24.01GOS as per IS-9921, IS-1977 174 11 kV, 200 Amps Single Break GOS (Dwg No. BESCOM/GM/QS&S/23 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set9922.59922.52.0FalseNoneNoneFalseNoneFalse19845.00
3215416110843NoneIC: 26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. BESCOM/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set6721.056721.051.0FalseNoneNoneFalseNoneFalse6721.050
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17172215190000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17172215190000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17172215190000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17172215190000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17172215190000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17172215420000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17172215480000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement Portal on or before the last date and time of bid submission.None
17172215550000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17172215670000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17172215740000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17172215800000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17172215880000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17172215950000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17172216010000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17172216070000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17172216130000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17172216190000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17172216270000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17172216340000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building/Bridge during the defect liability period.None
17172216410000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17172216480000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17172216550000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17172216640000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17172216700000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the kp-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17172216760000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17172216840001NoneNoneELIGIBILITYThe time stipulated for completion of work is 6 (Six) calendar months including rainy season.None
17172216940000NoneNoneELIGIBILITYThe Agency shall comply with ISO 14001 (Environmental Management System) requirement during execution of work.None
17172217110000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17172217170000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17172217240000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17172217330000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17172217390000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP-Procurement portalon or before the last date of bid submission.None
17172217460000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches.None
17172217540000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17172217630000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17172217700000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082009 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17172217800000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17172217870000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17172217950000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17172218030000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17172218100000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17172218170000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17172218260000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17172218330000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17172218430000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17172218490000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial implementation calendar format before last date of tender receipt in the kpp portal.None
17172218550000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17172218610000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply, Water supply, UGD from local bodies etc., before commencement of the workNone
17172218680000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should furnish qualification information as per clause-3 and section- 3 of Standard Tender Document attached to this tender and all the Formats prescribed in the bid documents shall be filled by the tenderer in full and complete manner. Otherwise the tender will be rejected.None
17172218750000NoneNoneELIGIBILITYAll scanned documents uploaded Should be in original and legible.None
17172218810000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents of K.P.W.D. and further orders thereon. The employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17172218880000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders ( Difference between amount put to tender and quoted amount).None
17172218960000NoneNoneELIGIBILITYThe tender of any tenderer who does not accept the conditions contained in the tender document is liable to be rejected. Conditional tenders will not be accepted.None
17172219030000NoneNoneELIGIBILITYThe cost of tender form shall not be refundable. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. No interest will be paid by the Government on the Earnest money deposit.None
17172219090000NoneNoneELIGIBILITYThe rates quoted shall be through rates for finished items of work inclusive of all lead and lifts, loading and unloading charges, all incidental charges and all Royalty etc., complete payable to the Government or Local bodies in the Region.None
17172219160000NoneNoneELIGIBILITYThe rates quoted shall be inclusive of providing barricading fittings of danger lights, Jungle clearance near work spot / watchman etc., complete and maintained till completion of work and removing on completion as directed by the Engineer-in-charge of work. Rates quoted should includes clearance of site prior to commencement of work and its closure in all respects and holds good for all works under all conditions of site, moisture and weather.None
17172219250000NoneNoneELIGIBILITYA Cess of 1% of the total approved amount of contract will be deducted from the work bill towards the Building and other construction workers welfare in accordance with the Govt. Order No. LD 300 LET 2006 Bangalore dated 18-1-2007. Royalty on construction materials and other taxes will be deducted as per prevailing Government orders. Contractor should follow strictly the prevailing rules of labour act.None
17172219320000NoneNoneELIGIBILITYAll the materials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost. All quantity and gradation of metal collected for the works should be got approved by the competent authority before use.None
17172219390000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment. The Contractor should maintain the work during defective liability period as per contract conditions.None
17172219480000NoneNoneELIGIBILITYOmission and Typographical errors which is in the opinion of the Executive Engineer, will not be a ground for claims of extra payment. If any of the dates mentioned happens to be a general holiday, the next working day will holds good.None
17172219550000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Division, Chitradurga during office hours on all working days.None
17172219630000NoneNoneELIGIBILITYThe tenderer should have registration under section 7 of Building and other construction works act 1966. (As per G.O. No. LD 95 LET 2013, Bangalore dated 01-4-2013.None
17172219700001NoneNoneELIGIBILITYThe Defects Liability Period is 24 Months after successful completion of the ProjectNone
17172219800000NoneNoneELIGIBILITYThe tenderer should be a registered KPWD/CPWD Class-I ContractorNone
17172219880000NoneNoneELIGIBILITYTenderer should produce certificate of work insurance policies before executing the work.None
17172219960000NoneNoneELIGIBILITYTenderer Should submit work program before executing the workNone
17172220030000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately as per Government order no FD 20 CSL 2022, Bangalore Dated: 15.07.2022 and also as per circular issued by the government vide letter No. FD 447 Expenditure-12/2022, Bangalore Dated: 30.07.2022None
17172220110000NoneNoneELIGIBILITYPayment based on the grant released from KMERCNone
17172220190000NoneNoneELIGIBILITYAll the milestones should be achieved as per the approved DPR (Annexure attached)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - satisfactorily completed as prime contractor, at least one similar work such as - CONSTRUCTION OF CEMENT CONCRETE ROAD WORKS of value not less than Rs.424.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.1695.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate along with UDIN)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment/Subgrade : 19,204.00 Cum, (b) Granular Sub base : 3,419.00 Cum,(c) PCC/RCC/DLCC : 5,503.00 Cum & (d) Steel : 38.00 tPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneAvailability by owning equipments for this work , provided relevant document List of machinery to be owned Concrete Batching Plant -01No, Transit Mixer -01No, Vibratory Roller -1 No, Tipper-2 Nos, Excavator- 1 No, Vehicle mounted Water tanker -2 Nos & Slip form paver finisher-1 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant certified documents such as sale deed registration certificates delivery invoice etc
NoneNoneNoneNoneStatements/details as per 1.3, 1.4, 1.6, 1.7, 1.8, 1.9, and 1.12 of Section 3 of Qualification information should be furnished.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statements should be countersigned by the Executive Engineer or Equivalent officer
NoneNoneNoneNoneList of machinery on Own/Hire/Lease basis equipments for this work, provided relevant document List of machinery to be Own/Hire/Lease Transit Mixer -1No, Vibratory Roller -1 No, Tipper - 2 Nos. Excavator - 1 No. Vehicle mounted Water tanker - 2 NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant certified documents such as sale deed registration certificates delivery invoice etc
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.424.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers Certificate - Information in Format-9
NoneNoneNoneNoneThe E.M.D. as prescribed should be submitted by the Tenderer and In case of Bank Guarante valid for 135 days as prescribed in Karnataka public Procurement portal.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned copy of E.M.D and Scanned copy of Bank Guarantee
NoneNoneNoneNoneLegal Status of the TendererOthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The tenderer should be a registered KPWD/CPWD Class-I ContractorTrueTechnical Bid
Annual Turnover Certificate with UDIN for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Similar Nature i.e CONSTRUCTION OF CEMENT CONCRETE ROAD WORKS Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Physicaland Financial Implimentation calendar formatTrueTechnical Bid
Key qty statement i.e yearwise breakup detailsTrueTechnical Bid
Availability by owning equipments for this work , provided relevant document List of machinery to be owned Concrete Batching Plant -01No, Transit Mixer -01No, Vibratory Roller -1 No, Tipper-2 Nos, Excavator- 1 No, Vehicle mounted Water tanker -2 Nos & Slip form paver finisher-1 NoTrueTechnical Bid
List of machinery on Own/Hire/Lease basis equipments for this work, provided relevant document List of machinery to be Own/Hire/Lease Transit Mixer -1No, Vibratory Roller -1 No, Tipper - 2 Nos. Excavator - 1 No. Vehicle mounted Water tanker - 2 NosTrueTechnical Bid
The E.M.D. as prescribed should be submitted by the Tenderer and In case of Bank Guarante valid for 135 days as prescribed in Karnataka public Procurement portal.TrueTechnical Bid
GST Declaration CertificateTrueTechnical Bid
Statements/details as per 1.3, 1.4, 1.6, 1.7, 1.8, 1.9, and 1.12 of Section 3 of Qualification information should be furnished.TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718178171000
version0
createdDateNone
modifiedDateNone
blockNumberoffice of the Executive Engineer, PWD, Division, Fort, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone