createdTs1716378131059
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd740000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose15-07-2024 16:00:00
tenderQueryClose08-07-2024 12:00:00
technicalBidOpen16-07-2024 16:30:00
publishedDate13-06-2024 20:02:06
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod180
noOfCalls1
preBidMeetingDate15-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee640000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1716378131095
version11
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT10649
titleConstruction of Bye-Pass Road to Mincheri Village in Ballari Taluk Ballari District (Ch 0.00 to 1.30 km) under 8443 - CEPMIZ - KMERC Projects for the year 2023 - 24.
descriptionConstruction of Bye-Pass Road to Mincheri Village in Ballari Taluk Ballari District (Ch 0.00 to 1.30 km) under 8443 - CEPMIZ - KMERC Projects for the year 2023 - 24.
categoryWORKS
categoryTextWorks
ecv49273577.67
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount82500000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SDN/BAL/KMERC/MINCHERI/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17163781310000NoneNoneRoadsPavement Construction31230506.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144243108223NonePWD SR 2023-24 ,V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing. i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 KPWD VOL-3 M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1 No 15,352.00 Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.2 Class B Type-3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each16729.716729.74.0FalseNoneNoneFalseNoneFalse66918.80
3144244108223NonePWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm412.65412.6531.2FalseNoneNoneFalseNoneFalse12874.680
3144245108223NonePWD SR 2023-24 ,V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.751480.37FalseNoneNoneFalseNoneFalse147666.90750
3144246108223NonePWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.7.Compacting Original GroundCompacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum110.25110.252046.44FalseNoneNoneFalseNoneFalse225620.010
3144247108223NonePWD SR 2023-24 ,V-1,Pg. No. 7 I. No.1.8.Construction of Embankment by excavating the available approved Gravel Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling,water, all materials, usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5 per m for every 1.50 m height or part there of Deduct 5 percent per if rollers are not used and tamping is done manually Add 8 per for works under foul & sullage situation ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.77661.85FalseNoneNoneFalseNoneFalse3813302.7450
3144248108223NonePWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.657984.62FalseNoneNoneFalseNoneFalse4133238.5430
3144249108223NonePWD SR 2023-24 ,V-3,Pg. No. 23 I. No.4.2.(B) (5)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2476.952476.951840.06FalseNoneNoneFalseNoneFalse4557736.6170
3144250108223NonePWD SR 2023-24 ,V-3,Pg. No. 49 I. No.6.1.Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5166.05166.0731.41FalseNoneNoneFalseNoneFalse3778464.060
3144251108223NonePWD SR 2023-24 ,V-3,Pg. No. 49 I. No.6.2.2Pavement Quality Concrete using paver - M40 Grade Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 315 kg/m3 & GGBS @ 105 kg/m3 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8616.38616.31682.24FalseNoneNoneFalseNoneFalse14494684.5120
17163781310000NoneNoneRoadsEstimate of Junction1423013.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144252108224NonePWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) aClearing and Grubbing Road Land. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm412.65412.650.02FalseNoneNoneFalseNoneFalse8.2530
3144253108224NonePWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.5.Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm6.36.3550.0FalseNoneNoneFalseNoneFalse3465.00
3144254108224NonePWD SR 2023-24 ,V-1,Pg. No. 8 I. No.1.12.Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum99.7599.7581.0FalseNoneNoneFalseNoneFalse8079.750
3144255108224NonePWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.7.Compacting Original Ground Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum110.25110.2560.0FalseNoneNoneFalseNoneFalse6615.00
3144256108224NonePWD SR 2023-24 ,V-3,Pg. No. 17 I. No.3.6.Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.65109.76FalseNoneNoneFalseNoneFalse56817.2640
3144257108224NonePWD SR 2023-24 ,V-3,Pg. No. 23 I. No.4.2.(B) (5)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2476.952476.95140.24FalseNoneNoneFalseNoneFalse347367.4680
3144258108224NonePWD SR 2023-24 ,V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2686.952686.95145.0FalseNoneNoneFalseNoneFalse389607.750
3144259108224NonePWD SR 2023-24 ,V-3,Pg. No. 31 I. No.5.1.A(i)Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm43.0543.05550.0FalseNoneNoneFalseNoneFalse23677.50
3144260108224NonePWD SR 2023-24 ,V-3,Pg. No. 31 I. No.5.3.(i)Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm12.612.6550.0FalseNoneNoneFalseNoneFalse6930.00
3144261108224NonePWD SR 2023-24 ,V-3,Pg. No. 35 I. No.5.12.(C)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum9921.459921.4533.0FalseNoneNoneFalseNoneFalse327407.850
3144262108224NonePWD SR 2023-24 ,V-3,Pg. No. 38 I. No.5.16Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum11501.711501.722.0FalseNoneNoneFalseNoneFalse253037.40
17163781310000NoneNoneRoadsCross Drainage Works13616445.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144263108225NonePWD PWD SR 2023-24 ,V-1 Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1476.48FalseNoneNoneFalseNoneFalse51031.0080
3144264108225NonePWD PWD SR 2023-24 ,V-1 Page No 11 Item No1.23Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.142.5FalseNoneNoneFalseNoneFalse119684.250
3144265108225NonePWD PWD SR 2023-24 ,V-1 Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7598.97FalseNoneNoneFalseNoneFalse298107.3690
3144266108225NonePWD PWD SR 2023-24 ,V-1 Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4542.06FalseNoneNoneFalseNoneFalse264492.2070
3144267108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7060.417060.417.78FalseNoneNoneFalseNoneFalse54929.98980
3144268108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7983.367983.36245.47FalseNoneNoneFalseNoneFalse1959675.37920
3144269108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8622.188622.1835.25FalseNoneNoneFalseNoneFalse303931.8450
3144270108225NonePWD PWD SR 2023-24 ,V-3 Page No 118 Item No12.1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.6519.3FalseNoneNoneFalseNoneFalse1751564.7450
3144271108225NonePWD PWD SR 2023-24 ,V-3 Page No 125 Item No13.2Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.92.81FalseNoneNoneFalseNoneFalse255684.4290
3144272108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.5536.0FalseNoneNoneFalseNoneFalse257455.80
3144273108225NonePWD PWD SR 2023-24 ,V-3 Page No 122 Item No13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.7560.0FalseNoneNoneFalseNoneFalse745605.00
3144274108225NonePWD PWD SR 2023-24 ,V-3 Page No 124 Item No13.1Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m1884.751884.7560.0FalseNoneNoneFalseNoneFalse113085.00
3144275108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.2M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.5524.08FalseNoneNoneFalseNoneFalse353242.7640
3144276108225NonePWD PWD SR 2023-24 ,V-3 Page No 129 Item No14.1Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.613.44FalseNoneNoneFalseNoneFalse26982.1440
3144277108225NonePWD PWD SR 2023-24 ,V-3 Page No 117 Item No12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.85162.05FalseNoneNoneFalseNoneFalse455498.24250
3144278108225NonePWD PWD SR 2023-24 ,V-3 Page No 117 Item No12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No250.95250.9596.0FalseNoneNoneFalseNoneFalse24091.20
3144279108225NonePWD PWD SR 2023-24 ,V-3 Page No 67 Item No8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.432.0FalseNoneNoneFalseNoneFalse25132.80
3144280108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No3434.553434.554.0FalseNoneNoneFalseNoneFalse13738.20
3144281108225NonePWD PWD SR 2023-24 ,V-3 Page No 66 Item No8.10.Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.45175.4FalseNoneNoneFalseNoneFalse20074.530
3144282108225NonePWD PWD SR 2023-24 ,V-3 Page No 146 Item No16.1Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m3501.753501.7530.0FalseNoneNoneFalseNoneFalse105052.50
3144283108225NonePWD SR 2023-24 Page No 64 Item No8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No4435.24435.24.0FalseNoneNoneFalseNoneFalse17740.80
3144284108225NonePWD PWD SR 2023-24 ,V-1 Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1449.35FalseNoneNoneFalseNoneFalse48125.3850
3144285108225NonePWD PWD SR 2023-24 ,V-1 Page No 11 Item No1.23Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2816.12816.138.58FalseNoneNoneFalseNoneFalse108645.1380
3144286108225NonePWD PWD SR 2023-24 ,V-1 Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.7514.4FalseNoneNoneFalseNoneFalse256016.880
3144287108225NonePWD PWD SR 2023-24 ,V-1 Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6288.456288.4538.1FalseNoneNoneFalseNoneFalse239589.9450
3144288108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7060.417060.417.78FalseNoneNoneFalseNoneFalse54929.98980
3144289108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7983.367983.36209.28FalseNoneNoneFalseNoneFalse1670757.58080
3144290108225NonePWD PWD SR 2023-24 ,V-1 Page No 16 Item No2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum8622.188622.1831.25FalseNoneNoneFalseNoneFalse269443.1250
3144291108225NonePWD PWD SR 2023-24 ,V-3 Page No 118 Item No12.1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90754.6590754.6517.93FalseNoneNoneFalseNoneFalse1627230.87450
3144292108225NonePWD PWD SR 2023-24 ,V-3 Page No 125 Item No13.2Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Super structure of Bridges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90990.990990.92.49FalseNoneNoneFalseNoneFalse226567.3410
3144293108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7151.557151.5531.2FalseNoneNoneFalseNoneFalse223128.360
3144294108225NonePWD PWD SR 2023-24 ,V-3 Page No 122 Item No13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum12426.7512426.7552.0FalseNoneNoneFalseNoneFalse646191.00
3144295108225NonePWD PWD SR 2023-24 ,V-3 Page No 124 Item No13.1Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m1884.751884.7552.0FalseNoneNoneFalseNoneFalse98007.00
3144296108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.2M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum14669.5514669.5520.86FalseNoneNoneFalseNoneFalse306006.8130
3144297108225NonePWD PWD SR 2023-24 ,V-3 Page No 129 Item No14.1Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.613.2FalseNoneNoneFalseNoneFalse26500.320
3144298108225NonePWD PWD SR 2023-24 ,V-3 Page No 117 Item No12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2810.852810.85148.03FalseNoneNoneFalseNoneFalse416090.12550
3144299108225NonePWD PWD SR 2023-24 ,V-3 Page No 117 Item No12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.95196.0FalseNoneNoneFalseNoneFalse49186.20
3144300108225NonePWD PWD SR 2023-24 ,V-3 Page No 67 Item No8.18Boundary pillar / Guard stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.432.0FalseNoneNoneFalseNoneFalse25132.80
3144301108225NonePWD PWD SR 2023-24 ,V-3 Page No 121 Item No13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No3434.553434.554.0FalseNoneNoneFalseNoneFalse13738.20
3144302108225NonePWD PWD SR 2023-24 ,V-3 Page No 66 Item No8.10.Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm114.45114.45175.4FalseNoneNoneFalseNoneFalse20074.530
3144303108225NonePWD PWD SR 2023-24 ,V-3 Page No 146 Item No16.1Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m1884.751884.7530.0FalseNoneNoneFalseNoneFalse56542.50
3144304108225NonePWD SR 2023-24 Page No 64 Item No8.5 (A) (xii)Retro -Reflectorised Traffic Signs Providing and fixing of retro - reflectorised cautionary,mandatory and informatory sign as per IRC:67 made of high intensity grade sheeting vide Clause 801.3,fixed over aluminium sheeting,1.5 mm thick supportde on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm,60 cm below ground level as per approved drawing. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No4435.24435.24.0FalseNoneNoneFalseNoneFalse17740.80
17163781310000NoneNoneRoadsConstruction of Field Culverts1797558.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144305108226NonePWD SR 2023-24 ,V-1,Page No 38 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.181.41FalseNoneNoneFalseNoneFalse8719.0110
3144306108226NonePWD SR 2023-24 ,V-3,Page No 146 Item No16.15.cProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row. Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 750 mm dia ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m3501.753501.7597.5FalseNoneNoneFalseNoneFalse341420.6250
3144307108226NonePWD SR 2023-24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum497.7497.71902.3FalseNoneNoneFalseNoneFalse946774.710
3144308108226NonePWD SR 2023-24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6602.876602.875.72FalseNoneNoneFalseNoneFalse37768.41640
3144309108226NonePWD SR 2023-24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7170.287170.2848.86FalseNoneNoneFalseNoneFalse350339.88080
3144310108226NoneV-1,Page No 18 Item No2.11.CSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of Bridges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.t90754.790754.71.24FalseNoneNoneFalseNoneFalse112535.8280
17163781310000NoneNoneRoadsRoad Furniture892902.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144311108227NonePWD SR 2023-24 ,V-3,Pg. No. 65 I. No.8.7.Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm9460.59460.53.6FalseNoneNoneFalseNoneFalse34057.80
3144312108227NonePWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm equilateral triangle ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4918.24918.216.0FalseNoneNoneFalseNoneFalse78691.20
3144313108227NonePWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 cm circular ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4511.854511.857.0FalseNoneNoneFalseNoneFalse31582.950
3144314108227NonePWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.90 cm high octagon ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each6827.16827.13.0FalseNoneNoneFalseNoneFalse20481.30
3144315108227NonePWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm556.5556.5369.8FalseNoneNoneFalseNoneFalse205793.70
3144316108227NonePWD SR 2023-24 ,V-3,Pg. No. 74 I. No.8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos383.25383.25197.0FalseNoneNoneFalseNoneFalse75500.250
3144317108227NonePWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc. MORTH Specification No.805 (ii) Ordinary kilometer stone (precast ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3073.353073.352.0FalseNoneNoneFalseNoneFalse6146.70
3144318108227NonePWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc. MORTH Specification No.805 (iii) 200 m stone (precast) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each884.1884.16.0FalseNoneNoneFalseNoneFalse5304.60
3144319108227NonePWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2122.052122.056.48FalseNoneNoneFalseNoneFalse13750.8840
3144320108227NonePWD SR 2023-24 ,V-3,Pg. No. 67 I. No.8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2122.052122.0520.0FalseNoneNoneFalseNoneFalse42441.00
3144321108227NonePWD SR 2023-24 ,V-1,Pg. No. 8 I. No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1172.8FalseNoneNoneFalseNoneFalse18506.880
3144322108227NonePWD SR 2023-24 ,V-3,Pg. No. 71 I. No.8.29(i)Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.m2322.62322.6140.0FalseNoneNoneFalseNoneFalse325164.00
3144323108227NonePWD SR 2023-24 ,V-3,Pg. No. 64 I. No.8.5 (A) (iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012.60 cm x 45 cm rectangular ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each4435.24435.28.0FalseNoneNoneFalseNoneFalse35481.60
17163781310000NoneNoneRoadsUtility Shifting - Electrical Pole Shifting313151.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3144324108228None1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pit660.45660.459.0FalseNoneNoneFalseNoneFalse5944.050
3144325108228None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos7429.87429.89.0FalseNoneNoneFalseNoneFalse66868.20
3144326108228None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1168.651168.659.0FalseNoneNoneFalseNoneFalse10517.850
3144327108228None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018) as per REC Standards ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos4408.954408.953.0FalseNoneNoneFalseNoneFalse13226.850
3144328108228None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos1168.651168.653.0FalseNoneNoneFalseNoneFalse3505.950
3144329108228None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No922.95922.959.0FalseNoneNoneFalseNoneFalse8306.550
3144330108228None3.0111 kV, Cross Arm with HT Top Support (glass reinforced hot pressed SMC compound)" ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set754.95754.959.0FalseNoneNoneFalseNoneFalse6794.550
3144331108228None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No215.25215.2527.0FalseNoneNoneFalseNoneFalse5811.750
3144332108228None6.08DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos535.5535.53.0FalseNoneNoneFalseNoneFalse1606.50
3144333108228None1.7Digging of Pit for GUY SET Ordinary Soil ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pit343.35343.354.0FalseNoneNoneFalseNoneFalse1373.40
3144334108228None6.05Releasing of Rabbit Conductor ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km4212.64212.61.215FalseNoneNoneFalseNoneFalse5118.3090
3144335108228None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Kms48545.748545.71.125FalseNoneNoneFalseNoneFalse54613.91250
3144336108228None6.02Stringing of Rabbit Conductor (including pin binding, providing jumps, dead ending, etc.,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km5494.655494.651.125FalseNoneNoneFalseNoneFalse6181.481250
3144337108228None9.03PG Clamp Rabbit to Rabbit ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No107.1107.127.0FalseNoneNoneFalseNoneFalse2891.70
3144338108228None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set331.8331.827.0FalseNoneNoneFalseNoneFalse8958.60
3144339108228None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No303.45303.451.0FalseNoneNoneFalseNoneFalse303.450
3144340108228None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No138.6138.61.0FalseNoneNoneFalseNoneFalse138.60
3144341108228None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set128.1128.11.0FalseNoneNoneFalseNoneFalse128.10
3144342108228None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set128.1128.11.0FalseNoneNoneFalseNoneFalse128.10
3144343108228None6.031.1 kV Ceramic Pin Insulator (Shell only) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos32.5532.555.0FalseNoneNoneFalseNoneFalse162.750
3144344108228None6.06No. 8 Strain Insulator ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos28.3528.355.0FalseNoneNoneFalseNoneFalse141.750
3144345108228None2.16Spiral Earth Electrode ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Nos250.95250.9512.0FalseNoneNoneFalseNoneFalse3011.40
3144346108228None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr97.6597.6512.6FalseNoneNoneFalseNoneFalse1230.390
3144347108228None24.0111 kV, GOS a) 200 Amps, Single Break " ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set9922.59922.51.0FalseNoneNoneFalseNoneFalse9922.50
3144348108228None13.02Labour for 11 kV, GOS a) 200 Amps, Single Break" ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set1159.21159.21.0FalseNoneNoneFalseNoneFalse1159.20
3144349108228None1.8.1.aa) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each286.65286.6512.0FalseNoneNoneFalseNoneFalse3439.80
3144350108228None1.8.1.bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each371.7371.712.0FalseNoneNoneFalseNoneFalse4460.40
3144351108228None1.8.2B) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3315.93315.912.0FalseNoneNoneFalseNoneFalse39790.80
3144352108228None1.8.2.gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each210.0210.01.0FalseNoneNoneFalseNoneFalse210.00
3144353108228None21.02Transporation by Head Load where ever there is no accessability for transporation by vechicle" for Poles 25 to 105 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Pole299.25299.259.0FalseNoneNoneFalseNoneFalse2693.250
3144354108228None22.02For ACSR Conductors 25 to 105 Mtr ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Per Km129.15129.151.215FalseNoneNoneFalseNoneFalse156.917250
3144355108228None26.029 Mtr RCC/PSCC Pole ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No149.1149.19.0FalseNoneNoneFalseNoneFalse1341.90
3144356108228None5.06Fixing of HT/LT Single Top Support ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each117.6117.69.0FalseNoneNoneFalseNoneFalse1058.40
3144357108228None6.08DISC Insulator 45 kN Porcelain ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No535.5535.53.0FalseNoneNoneFalseNoneFalse1606.50
3144358108228None24.01GOS as per IS-9921, IS-1977 174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018)" ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set9922.59922.51.0FalseNoneNoneFalseNoneFalse9922.50
3144359108228None27.0263 kVA ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No299.25299.251.0FalseNoneNoneFalseNoneFalse299.250
3144360108228None27.0763 kVA ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.No299.25299.251.0FalseNoneNoneFalseNoneFalse299.250
3144361108228None26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set6721.056721.052.0FalseNoneNoneFalseNoneFalse13442.10
3144362108228None54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set780.15780.154.0FalseNoneNoneFalseNoneFalse3120.60
3144363108228None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set709.8709.84.0FalseNoneNoneFalseNoneFalse2839.20
3144364108228None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set325.5325.54.0FalseNoneNoneFalseNoneFalse1302.00
3144365108228None54.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Set2280.62280.64.0FalseNoneNoneFalseNoneFalse9122.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17163781320000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17163781320000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17163781320000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17163781320000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17163781320000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17164592860000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17164592940000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement Portal on or before the last date and time of bid submission.None
17164593020000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17164593100000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17164593170000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17164593250000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17164593340000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17164593410000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17164593770000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17164593860000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17164593940000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17164594040000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17164594120000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17164594200000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building/Bridge during the defect liability period.None
17164594290000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17164594370000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17164594460000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17164594590000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17164594670000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the kp-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17164594750000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17164594880000NoneNoneELIGIBILITYThe time stipulated for completion of work is 11 (Eleven) calendar months including rainy season.None
17164594990000NoneNoneELIGIBILITYThe Agency shall comply with ISO 14001 (Environmental Management System) requirement during execution of work.None
17164595050000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17164595130000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17164595220000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17164595380000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17164595460000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP-Procurement portalon or before the last date of bid submission.None
17164595540000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches.None
17164595620000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17164595700000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17164595860000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082009 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17164595980000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17164596070000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17164596140000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17164596230000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17164596330000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17164596420000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17164596490000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17164596610000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clausesNone
17164596690000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17164596780000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial implementation calendar format before last date of tender receipt in the kpp portal.None
17164596870000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17164596960000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply, Water supply, UGD from local bodies etc., before commencement of the workNone
17172208750000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should furnish qualification information as per clause-3 and section- 3 of Standard Tender Document attached to this tender and all the Formats prescribed in the bid documents shall be filled by the tenderer in full and complete manner. Otherwise the tender will be rejected.None
17172208830000NoneNoneELIGIBILITYAll scanned documents uploaded Should be in original and legible.None
17172208900000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents of K.P.W.D. and further orders thereon. The employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17172208970000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders ( Difference between amount put to tender and quoted amount).None
17172209060000NoneNoneELIGIBILITYThe tender of any tenderer who does not accept the conditions contained in the tender document is liable to be rejected. Conditional tenders will not be accepted.None
17172209140000NoneNoneELIGIBILITYThe cost of tender form shall not be refundable. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. No interest will be paid by the Government on the Earnest money deposit.None
17172209220000NoneNoneELIGIBILITYThe rates quoted shall be through rates for finished items of work inclusive of all lead and lifts, loading and unloading charges, all incidental charges and all Royalty etc., complete payable to the Government or Local bodies in the Region.None
17172209300000NoneNoneELIGIBILITYThe rates quoted shall be inclusive of providing barricading fittings of danger lights, Jungle clearance near work spot / watchman etc., complete and maintained till completion of work and removing on completion as directed by the Engineer-in-charge of work. Rates quoted should includes clearance of site prior to commencement of work and its closure in all respects and holds good for all works under all conditions of site, moisture and weather.None
17172209380000NoneNoneELIGIBILITYA Cess of 1% of the total approved amount of contract will be deducted from the work bill towards the Building and other construction workers welfare in accordance with the Govt. Order No. LD 300 LET 2006 Bangalore dated 18-1-2007. Royalty on construction materials and other taxes will be deducted as per prevailing Government orders. Contractor should follow strictly the prevailing rules of labour act.None
17172209470000NoneNoneELIGIBILITYAll the materials required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost. All quantity and gradation of metal collected for the works should be got approved by the competent authority before use.None
17172209550000NoneNoneELIGIBILITYContractor should execute the project with least impact to the environment. The Contractor should maintain the work during defective liability period as per contract conditions.None
17172209620000NoneNoneELIGIBILITYOmission and Typographical errors which is in the opinion of the Executive Engineer, will not be a ground for claims of extra payment. If any of the dates mentioned happens to be a general holiday, the next working day will holds good.None
17172209690000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Division, Chitradurga during office hours on all working days.None
17172209770000NoneNoneELIGIBILITYThe tenderer should have registration under section 7 of Building and other construction works act 1966. (As per G.O. No. LD 95 LET 2013, Bangalore dated 01-4-2013.None
17172209840001NoneNoneELIGIBILITYThe Defects Liability Period is 24 Months after successful completion of the ProjectNone
17172209930000NoneNoneELIGIBILITYThe tenderer should be a registered KPWD/CPWD Class-I ContractorNone
17172210010000NoneNoneELIGIBILITYTenderer should produce certificate of work insurance policies before executing the work.None
17172210080000NoneNoneELIGIBILITYTenderer Should submit work program before executing the workNone
17172210150000NoneNoneELIGIBILITYGST shall be paid to the tendered amount separately as per Government order no FD 20 CSL 2022, Bangalore Dated: 15.07.2022 and also as per circular issued by the government vide letter No. FD 447 Expenditure-12/2022, Bangalore Dated: 30.07.2022None
17172210230000NoneNoneELIGIBILITYPayment based on the grant released from KMERCNone
17172210300000NoneNoneELIGIBILITYAll the milestones should be achieved as per the approved DPR (Annexure attached)None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - satisfactorily completed as prime contractor, at least one similar work such as - IMPROVEMENT / CONSTRUCTION OF CEMENT CONCRETE PAVEMENT WORKS of value not less than Rs.246.50 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.986.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate along with UDIN)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment/Subgrade : 17,211.00 Cum, (b) Granular Sub base : 1585.00 Cum (d) WBM/WMM : 116.00 Cum, (c) PCC/RCC/DLCC : 2687.00 Cum, (d) Steel : 36.00 MTPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneAvailability by owning equipments for this work , provided relevant document List of machinery to be owned Concrete Batching Plant -01No, Transit Mixer -01No, Vibratory Roller -1 No, Tipper-2 Nos, Excavator- 1 No, Vehicle mounted Water tanker -2 Nos & Slip form paver finisher-1 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant certified documents such as sale deed registration certificates delivery invoice etc
NoneNoneNoneNoneStatements/details as per 1.3, 1.4, 1.6, 1.7, 1.8, 1.9, and 1.12 of Section 3 of Qualification information should be furnished.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statements should be countersigned by the Executive Engineer or Equivalent officer
NoneNoneNoneNoneList of machinery on Own/Hire/Lease basis equipments for this work, provided relevant document List of machinery to be Own/Hire/Lease Transit Mixer -1No, Vibratory Roller -1 No, Tipper - 2 Nos. Excavator - 1 No. Vehicle mounted Water tanker - 2 NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant certified documents such as sale deed registration certificates delivery invoice etc
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.135.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers Certificate - Information in Format-9
NoneNoneNoneNoneThe E.M.D. as prescribed should be submitted by the Tenderer and In case of Bank Guarante valid for 135 days as prescribed in Karnataka public Procurement portal.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned copy of E.M.D and Scanned copy of Bank Guarantee
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Similar Nature i.e CONSTRUCTION OF CEMENT CONCRETE ROAD WORKS Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Physicaland Financial Implimentation calendar formatTrueTechnical Bid
Key qty statement i.e yearwise breakup detailsTrueTechnical Bid
The tenderer should be a registered KPWD/CPWD Class-I ContractorTrueTechnical Bid
Availability by owning equipments for this work , provided relevant document List of machinery to be owned Concrete Batching Plant -01No, Transit Mixer -01No, Vibratory Roller -1 No, Tipper-2 Nos, Excavator- 1 No, Vehicle mounted Water tanker -2 Nos & Slip form paver finisher-1 NoTrueTechnical Bid
List of machinery on Own/Hire/Lease basis equipments for this work, provided relevant document List of machinery to be Own/Hire/Lease Transit Mixer -1No, Vibratory Roller -1 No, Tipper - 2 Nos. Excavator - 1 No. Vehicle mounted Water tanker - 2 NosTrueTechnical Bid
The E.M.D. as prescribed should be submitted by the Tenderer and In case of Bank Guarante valid for 135 days as prescribed in Karnataka public Procurement portal.TrueTechnical Bid
GST Declaration CertificateTrueTechnical Bid
Statements/details as per 1.3, 1.4, 1.6, 1.7, 1.8, 1.9, and 1.12 of Section 3 of Qualification information should be furnished.TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718182471000
version0
createdDateNone
modifiedDateNone
blockNumberoffice of the Executive Engineer, PWD, Division, Fort, Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone