None | None | None | None | Each tender in its name should have Executed and completed successfully in Urban Conditions Project Management Consultancy for at least one Buildings, Shops, Roads and Park Works for which the total Value of Construction project is not less than Rs. 500.00 Lakhs. During last 5 financial year ie 2019-20 to 2023-24. In support of this, the Tenderer shall furnish a Certificate duly certified by the Competent Authority of Rank not below the Executive Engineer along with the Technical Bid. Further, the Value of the Completed Works shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-24 | None | Past Experience | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Work Done Certificate |
|
None | None | None | None | Achieved at least in two Financial Years a minimum Average Financial Turnover (in all classes of Civil Engineering Consultation Works only) of Rs. 20.00 Lakhs. During last 5 financial year i.e. 2019-20 to 2023-24. Further, the Financial Turnover of the Previous Years shall be given a Weightage of 10% per year to bring them to the Price Level of 2023 24. In support of this, the Consultant shall furnish the Certificate from Chartered Accountant along with the Technical Proposal. | None | Financial Status | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Audited CA Certificate of Annual Turnover |
|
None | None | None | None | The Consultancy Firm / Company must have experience in the field of engineering consultancy for last 5 years providing design, project management and advisory services for State Government and their undertaking agencies. In support of this, the Consultant shall furnish firm registration, Tax Registration Certificate along with the Technical Proposal. | None | Others | Registration Certificate | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- Registration Certificate |
|
None | None | None | None | Laboratory with NABL or NAAC Accreditation (Both Mechanical & Chemical). (The Consultant / Firm participating in the bid should have their own lab with NABL/NACC. The firm that does not have own laboratory can have the MOU with the firm or institution, having NABL or NAAC Accreditation and ISO certified or association with NABL Accredited lab equivalent And association with ISO certification in Karnataka State only | None | Others | NABL Certificate | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- NABL Certificate |
|
None | None | None | None | Consultants must have Key professional required (as detailed in Terms of Reference) having experience in construction of Roads, Park Works and other utilities to be deployed exclusively for this consultancy contract. The employer or competent authority shall furnish the CVs of the personnel and the availability of the personnel for the project till completion of the assignment | None | Others | Staff Key Professional | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- Staff Key Professional |
|
None | None | None | None | A brief description of the consultants organization and an outline of recent experience on assignments (Section 3B) of a similar nature. For each assignment, the outline should indicate, inter alia, the profiles and names of the staff provided, duration of the assignment, contract amount, and firms involvement | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | Any comments or suggestions on the Terms of Reference and on the data, a list of services, and facilities to be provided by the Client (Section 3C). | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | A description of the methodology and work plan for performing the assignment (Section 3D). | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | The list of the proposed staff team by specialty, the tasks that would be assigned to each staff team member, and their timing (Section 3E) | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | CVs recently signed by the proposed key professional staff and the authorized representative submitting the proposal (Section 3F). Key information should include number of years working for the firm/entity, and degree of responsibility held in various assignments during the last ten (10) years | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | Estimates of the total staff effort (professional and support staff staff time) to be provided to carry out the Assignment, supported by bar chart diagrams showing the time proposed for each key professional staff team member. (Sections 3E and 3G | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|
None | None | None | None | A detailed description of the proposed methodology, staffing, and monitoring of training, if the Data Sheet specifies training as a major component of the assignment. | None | Others | As per Bid Document | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- As per Bid Document |
|